Loading...
HomeMy WebLinkAboutNCC211580_NOT Closeout Documents_20220518North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 FB-Fort Bragg NG County: Cumberland Project: Distribution -Project A-9 River basin: Cape Fear Person financially responsible: Duke Energy -Piedmont Natural Gas - Joseph M Project #: CUNME-2021-029 Heckman, Project Manager Address: 4740 Corporation Drive, Fayetteville, NC 28306 1. Project Location: Gruber Road, Fort Bragg Pictures: No 2. Weather and soil conditions: sunny/workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Drew Scott Inspection report: Sent Report 9. Corrective action needed: Title: Superintendent Date given/sent: May 13, 2022 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Penny Markle Others present: Latanya Reed Date of inspection: May 11, 2022 Time arriving on site: 12:54 PM Time leaving site: 1:55 PM cc: