Loading...
HomeMy WebLinkAbout490019_Compliance Evaluation Inspection_20220302 ,_ '. '7 a._:' _ =?-i,.,_a' — -- - `- _ _<'". U'llisio n=of WaterReso t re es .. - _ ia . _s t a,, a Y . -. ; - �Facli ;Nirtier'- `Q� 3ivisipnof.Soil and Corservatio ; , e • - �e - . f-�` -.�'' _ OthrAenc `; =� x _ o ."Yf .,.J =„a �_- - " gfiAV• ` •. a: . e • Type of Visit: 0-Ciim Hance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: 3- z -Z74 Arrival Time:I q 50 Departure Time: (000 County: Region: Farm Name: /a U Y/) TLI.S Owner Email: Owner Name: ✓ Phone: • Mailing Address: Physical Address:Facility Contact: pi 0 k fallej Title: Phone: Onsite Representative: Integrator: Certified Operator: Certification Number: ' Back-up Operator: Certification Number: i Location of Farm: Latitude: Longitude: • %-t'l - - _ Desi zCu ent���• �: • �_� - -Desi= ''Gurrerit� - °:Desi n�° C e} t�`sA�_ Swine= z.14" Ca'ac4 'Pq Wet`Poultr` Ca` •ap 7, Cattle -°Ca aci ©° = 9 .,P t3'a�_ ,�'P�� _ °� Y�� p . t3'n - P�= - _ �A.,, �4t ;A:: p _ ti3''�°`��,kp`� ��o•''• _.. ": q r _1 ._.-,. _ �� . �" -a ,_-r � ems= -- -__, ?s�'1 a_ ' - __ -=a w€f.� r'�T=..,,� "` Wean to Finish Layer _ -'-4 t/15airy Cow 33S 37� ;_ Wean to Feeder Non-Layer -__ Dairy Calf - -_ tF Feeder to Finish :; `q E.`,`^ -� - ° _ °7 -` - -. ..:._ '`:,.L - Dairy Heifer Farrow to Wean ::- _`°,','` to 1 Design 'Curr :a-_ent Dry Cow - Farrow to Feeder 'a _-° £D ` Pout& _- Cea`i aci .:Po:' =_;= Non-Dairy v:_! Farrow to Finish �,,;, --§$'_Beef Stocker -2,i Gilts v Non-La ers ��°. Beef Feeder . _,_ Boars `.•Pullets �� ��; Beef Brood Cow • Otheirl: :__-_ -=_ _---�° ,;°. -__IIII Turke Poults - c_ i .- _____ __ : __ Other _ Other Discharges and Stream Impacts 1.Is any discharge observed from any part of the operation? ❑ Yes �To ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State(gallons)? - d. Does the discharge bypass the waste management system?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE 2.Is there evidence of a past discharge from any part of the operation? ❑ Yes I No ❑ NA ❑ NE 3.Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes Il'1Ve ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 2/4/2015 Continued Facility Number: - /9. Date of Inspection: 3—I - ZZ Waste Collection&Treatment 4.Is storage capacity(structural plus storm storage plus heavy rainfall)less than adequate? ❑ Yes EvC ❑ NA ❑ NE a.If yes,is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard(in): 3 Observed Freeboard(in): 5.Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes [ To ❑ NA ❑ NE • (i.e.,large trees,severe erosion,seepage,etc.) 6.Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes to ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental threat,notify DWR 7.Do any of the structures need maintenance or improvement? ❑ Yes [o ❑ NA ❑ NE 8.Do any of the structures lack adequate markers as required by the permit? ❑ Yes [ 3�0 ❑ NA ❑ NE (not applicable to roofed pits,dry stacks,and/or wet stacks) 9.Does any part of the waste management system other than the waste structures require ❑ Yes [y No ❑ NA ❑ NE maintenance or improvement? Waste Application 10.Are there any required buffers,setbacks,or compliance alternatives that need ❑ Yes [L'No ❑ NA ❑ NE maintenance or improvement? 11.Is there evidence of incorrect land application?If yes,check the appropriate box below. ❑ Yes lErNO ❑ NA ❑ NE ,-❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.) ❑ PAN ❑ PAN> 10%or 10 lbs. El Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil El Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14.Do the receiving crops differ from those designated in the CAWMP? ❑ Yes []-No ❑ NA ❑ NE 15.Does the receiving crop and/or land application site need improvement? ❑ Yes Q'No ❑ NA ❑ NE 16.Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes [To ❑ NA ❑ NE acres determination? 17.Does the facility lack adequate acreage for land application? ❑ Yes [To ❑ NA ❑ NE 18.Is there a lack of properly operating waste application equipment? ❑ Yes ago ❑ NA ❑ NE Required Records&Documents 19.Did the facility fail to have the Certificate of Coverage&Permit readily available? ❑ Yes El/No ❑ NA ❑ NE 20.Does the facility fail to have all components of the CAWMP readily available?If yes,check ❑ Yes aKo ❑ NA ❑ NE the appropriate box. ❑WUP El Checklists El Design El Maps ❑Lease Agreements ❑Other: 21.Does record keeping need improvement?If yes,check the appropriate box below. ❑ Yes EKN-o ❑ NA ❑ NE El Waste Application El Weekly Freeboard El Waste Analysis ❑Soil Analysis ❑Waste Transfers ❑Weather Code El Rainfall ❑Stocking El Crop Yield El 120 Minute Inspections El Monthly and 1"Rainfall Inspections ❑Sludge Survey 22.Did the facility fail to install and maintain a rain gauge? ❑ Yes Ergo ❑ NA ❑ 23.If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA Di NE Page 2 of 3 2/4/2015 Continued Facility Number: Date of Inspection: 3 24.Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes 'No ❑ NA ❑ NE 25.Is the facility out of compliance with permit conditions related to sludge? If yes,check ❑ Yes ❑ No al(A ❑ NE the appropriate box(es)below. ❑Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑Non-compliant sludge levels in any lagoon List structure(s)and date of first survey indicating non-compliance: 26.Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes [E/No ❑ NA ❑ NE 27.Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes ❑ No [1, A ❑ NE Other Issues 28.Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ''To ❑ NA ❑ NE and report mortality rates that were higher than normal? 29.At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes [J4o ❑ NA ❑ NE If yes,contact a regional Air Quality representative immediately. 30.Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes El' o ❑ NA ❑ NE permit?(i.e.,discharge,freeboard problems,over-application) 31.Do subsurface tile drains exist at the facility?If yes,check the appropriate box below. ❑ Yes ❑ No ❑ NA [ iE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32.Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes [ATo ❑ NA ❑ NE 33.Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes 04o ❑ NA ❑ NE 34.Does the facility require a follow-up visit by the same agency? ❑ Yeso ❑ NA ❑ NE Comments(refer to question#):Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations(use additional pages as necessary). F r& I k 5 d' 929 ' �-a7$ Reviewer/Inspector Name: �Z. X ni Qn�+c�/ Phone: Reviewer/Inspector Signature: Date: 3 Z — ?�ZZ-•- Page 3of3 2/4/2015