Loading...
HomeMy WebLinkAboutWQ0003380_Renewal Application_20220516 Non-Discharge Branch Upload/Submittal Form �. NORTH CAROLINA EnWrvnmenfol Quoity Version 2-Revised June 23,2020 Initial Review Reviewer Thornburg,Nathaniel D Is this submittal an application?(Excluding additional information.)* Yes No Permit Number(IR)* WQ0003380 Applicant/Permittee Georgia-Pacific Wood Products LLC Applicant/Permittee Address 139 Brewington Rd Dudley,NC 28333 Is the owner in BIMS? Yes No Is the facility in BIMS? Yes No Owner Type Organization Facility Name Georgia-Pacific-Dudley Plywood Facility CLRS County Wayne Fee Category Closed-Loop Recycle Fee Amount $0 Is this a complete application?* Yes No Complete App Date 05/16/2022 Signature Authority Signature Authority Title Signature Authority Email Document Type(if non-application) Email Notifications Does this need review by the hydrogeologist?* Yes No Regional Office CO Reviewer Admin Reviewer Below list any additional email address that need notification about a new project. Email Address Comments to be added to email notfication Comments for Admin Comments for RO Comments for Reviewer Comments for Applicant Submittal Form Project Contact Information Please provide information on the person to be contacted by NDB Staff regarding electronic submittal,confirmation of receipt,and other correspondence. ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ Name* Brandy Turley Email Address* Phone Number* brandy.turley@gapac.com 919-705-0526 Project Information Application/Document Type* New(Fee Required) Modification-Minor Modification-Major(Fee Required) Renewal Renewal with Major Modification(Fee GW-59, NDMR,NDMLR, NDAR-1, Required) NDAR-2 Annual Report Residual Annual Report Additional Information Change of Ownership Other We no longer accept these monitoring reports through this portal. Please click on the link below and it will take you to the correct form. https://edocs.deg.nc.gov/Forms/NonDischarge_Monitoring_Report Permit Type:* Wastewater Irrigation High-Rate Infiltration Other Wastewater Reclaimed Water Closed-Loop Recycle Residuals Single-Family Residence Wastewater Other Irrigation Permit Number:* WQ0003380 Has Current Existing permit number Applicant/Permittee* Georgia-Pacific Wood Products LLC Applicant/Permittee Address* 139 Brewington Rd Dudley,NC 28333 Facility Name* Georgia-Pacific-Dudley Plywood Facility CLRS Please provide comments/notes on your current submittal below. At this time,paper copies are no longer required.If you have any questions about what is required,please contact Nathaniel Thornburg at nathaniel.thornburg@ncdenr.gov. Please attach all information required or requested for this submittal to be reviewed here.* (Application Form,Engineering Plans,Specifications,Calculations,Etc.) GP Dudley Ply Closed Loop Renew App Final Scan.pdf 9.94MB Upload only 1 PDF document(less than 250 MB).Multiple documents must be combined into one PDF file unless file is larger than upload limit. * By checking this box, I acknowledge that I understand the application will not be accepted for pre-review until the fee(if required)has been received by the Non- Discharge Branch.Application fees must be submitted by check or money order and made payable to the North Carolina Department of Environmental Quality(NCDEQ). I also confirm that the uploaded document is a single PDF with all parts of the application in correct order(as specified by the application). Mail payment to: NCDEQ—Division of Water Resources Attn:Non-Discharge Branch 1617 Mail Service Center Raleigh,NC 27699-1617 Signature re7..M.V Submission Date 5/16/2022 1 GP Georgia'Pacific Georgia-Pacific Wood Products LLC Dudley Plywood Facility 139 Brewington Road Dudley,NC 28333 May 16, 2022 Mr. Nathaniel Thornburg—Unit Program Manager North Carolina Department of Environmental Quality Division of Water Resources Water Quality Permitting Section Non-Discharge Permitting Unit RE: Georgia-Pacific Wood Products LLC, Dudley Plywood Plant Closed-Loop Recycle Permit Renewal Permit Number: WQ0003380 V4.1; Wayne County Mr.Thornburg: Enclosed is the permit renewal application package for the Georgia-Pacific Wood Products LLC, Dudley Plywood Plant's Closed Loop Recycle Permit No. WQ0003380 as required in Section 1.3. If you have any questions or need additional information, please contact Brandy Turley at (919) 705- 0526 or via e-mail at brandv.turlev@gapac.com. Sincerely, ICqtZl__._______ Mason Curry Plywood Plant Manager Attachments: Renewal Application CLRS-R 02-21 Site Map Affiliation Corrections Compliance Schedules (Clarifier Post Construction) Manufacturing Process Overview State of North Carolina DWRDepartment of Environmental Quality Division of Water Resources Division of Water Resources 15A NCAC 02U —CLOSED-LOOP RECYCLE SYSTEM—RENEWAL FORM: CLRS-R 02-21 Pursuant to 15A NCAC 02T.0107(b),if the application does not include all required information and the necessary supporting documentation,the application shall be returned. The application and attachments shall be prepared in accordance with 15A NCAC 02T.0100, 15A NCAC 02U,and Division Policies. For more information,visit the Water Quality Permitting Section's Non-Discharge Branch website. The Applicant shall submit an electronic copy of the application and attachments uploaded as a single Portable Document Format(PDF)file to https://edocs.deq.nc.gov/Forms/NonDischarge-Branch-Submittal-Form-Vert, or emailed to Non-Discharge.Reports(a,ncdenr.gov if less than 20 megabytes(MB). SECTION I—APPLICANT INFORMATION 1. Applicant: Georgia-Pacific Wood Products LLC 2. Permit No.:WQ0003380 3. Signature authority:Mason Curry Title:Plant Manager Phone number: (919)705-3523 Office Email:mccurry@gapac.com 4. Mailing address: 139 Brewington Road City:Dudley State:NC Zip:28333- 5. Contact person:Brandy Turley Email:brandy.turley@gapac.com Primary phone number:(919)705-0530 Office Secondary phone number:(919)750-9738 Cell SECTION II—FACILITY INFORMATION 1. Physical address: 139 Brewington Road County: Wayne Parcel No.:2585811115 City: Dudley State:NC Zip: 28333- 2. Treatment facility coordinates to the sixth decimal degree: Latitude:35.258764° Longitude:-78.032250° Method:Navigation quality GPS SECTION III—BILLING INFORMATION 1. Billing address: 139 Brewington Road City:Dudley State:NC Zip:28333- 2. Verify the Applicant does not have any overdue annual fees: https://deq.nc.gov/about/divisions/water-resources/water-resources-permits/wq-epayments Pursuant to 15A NCAC 02T.0120(c),permits for renewing facilities shall not be granted if the Applicant or any affiliation has an unpaid annual fee. SECTION IV—OPEN-ATMOSPHERE STRUCTURES 1. List all open-atmosphere treatment and storage structures associated with the renewing permit. Attach additional sheets if necessary. Type Parcel No. Volume(gal) Liner Type Freeboard(ft) Latitude Longitude Treatment/Storage 2585811115 142,606 Full,concrete 1 35.259971° -78.034873° Treatment/Storage 2585811115 142,606 Full,concrete 1 35.259985° -78034769° Storage 2585811115 121,984 Full,synthetic 1 35.259868° -78034377° Treatment/Storage 2585811115 538,560 Full,concrete 1 35.262010° -78034838° FORM: CLRS-R 02-21 Page 1 of 3 SECTION V—RELATED PERMITS 1. List all wastewater permits (i.e., sewer, collection system,NPDES,residuals)that have interactions with the renewing permit. Attach additional sheets if necessary. Permit Type Permit No. Relationship Type Select Select Select Select Select Select SECTION VI—MONITORING WELLS 1. List all groundwater monitoring wells associated with the renewing permit. Attach additional sheets if necessary. Well Name Parcel No. Status Gradient Location Latitude Longitude Select Select Select ° - . Select Select Select - ° Select Select Select ° - Select Select Select ° - Select Select Select 0 - ° Select Select Select ° - . ATTACHMENT A—SITE MAP Was the facility originally permitted or had a major modification issued after September 1,2006? ® Yes—Pursuant to 15A NCAC 02T.0105(d),submit a site map pursuant to the requirements in 15A NCAC 02U.0201(d). These requirements are: ❑ A scaled map of the site with topographic contour intervals not exceeding 10 feet or 25 percent of total site relief and showing all facility-related structures and fences within 500 feet of the treatment,storage,and recycle areas. ❑ Delineation of the compliance and review boundaries per 15A NCAC 02L.0107 and.0108. ❑ Setbacks as required by 15A NCAC 02U.0701. ❑ Site property boundaries within 500 feet of all treatment,storage,and recycle sites. ❑No—Skip Attachment A. ATTACHMENT B SIGNATURE AUTHORITY DELEGATION Does the signature authority in Section I,Item 3 meet the requirements pursuant to 15A NCAC 02T.0106(b)? ®Yes—Skip Attachment B. ❑No—Submit a delegation letter pursuant to 15A NCAC 02T.0106(c)authorizing the signature authority to sign. ATTACHMENT C—EASEMENT,ENCROACHMENT,AND LEASE AGREEMENTS Does the Permittee own all of the land associated with the treatment,storage,and recycle system? ® Yes—Skip Attachment C. ❑ No—Pursuant to 15A NCAC 02T.0116(c),provide a copy of all easements, lease agreements, and encroachment agreements allowing the Permittee to operate and maintain the treatment,storage,and recycle system on property not owned by the Permittee. ATTACHMENT D—AFFILIATIONS Are the Permittee's affiliations of record correct? Check affiliations. El Yes—Skip Attachment D. ® No—Provide the corrected affiliations and their contact information. FORM: CLRS-R 02-21 Page 2 of 3 ATTACHMENT E—COMPLIANCE SCHEDULES Does the existing permit include any Compliance Schedules?(See Section I of the most recently issued permit) ❑ Yes—Submit documentation that the compliance schedules have been met. ❑ No—Skip Attachment E. ATTACHMENT F—CIVIL PENALTIES AND OUTSTANDING VIOLATIONS Does the Permittee have any existing civil penalties or outstanding violations? ❑ Yes(civil penalties)—Submit payment for the civil penalty,or proof of remission request. ❑ Yes(violations)—Submit a copy of your response to the Notice of Violation. ® No—Skip Attachment F. ATTACHMENT G—INDUSTRIAL WASTEWATER Does the closed-loop recycle system treat and/or store industrial wastewater? ® Yes—Proceed to the next question. ❑ No—Skip Attachment G. Has the nature of the industrial wastewater changed since the last permit issuance(i.e.,changes in industrial process,introduction of new materials or chemicals,etc.)? ❑ Yes— Provide a chemical analysis of the wastewater pursuant to the requirements in 15A NCAC 02U .0201(g). Provide an overview of the manufacturing process;an inventory of all chemical and biological materials used in the manufacturing process; and an overview of the cleaning and treatment methodology. ® No— Provide an overview of the manufacturing process; an inventory of all chemical and biological materials used in the manufacturing process;and an overview of the cleaning and treatment methodology. ATTACHMENT H—SETBACK WAIVERS Does the existing permit include setback waivers? ❑ Yes—Pursuant to 15A NCAC 02U.0701(g),provide setbacks waivers that have been written,notarized, signed by all parties involved, and recorded with the county Register of Deeds. Waivers involving the compliance boundary shall be in accordance with 15A NCAC 02L.0107. ® No—Skip Attachment H. APPLICANT'S CERTIFICATION I, t\a.so' Lcuu..1 attest that this application (Signature authority's name as noted in Section I,Item 3) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application package are not completed, and that if all required supporting information and attachments are not included, this application package will be returned as incomplete. I further certify pursuant to 15A NCAC 02T.0120(b),that the applicant,or any parent,subsidiary,or other affiliate of the applicant has:not been convicted of environmental crimes under;not previously abandoned a wastewater treatment facility without properly closing the facility;not paid a civil penalty;not been compliant with any compliance schedule in a permit,settlement agreement,or order;not paid an annual fee. Note: The Applicant's Certification shall be signed pursuant to 15A NCAC 02T.0106(b). An alternate person may be delegated as the signing official if a letter is provided pursuant to 15A NCAC 02T .0106(c). Pursuant to § 143-215.6A and § 143-215.6B, any person who knowingly makes any fal - tatement,representation,or certification in any application package shall be guilty of a Class 2 misdemeanor,which ii: • lu.- . j e not to exceed$10,000 as well as civil penalties up to$25,000 per violation. 11— Signature: 1 I I v ( 1 Date: 5- \ I,\ THE COMPLETED A, - A I N AND ATTACHMENTS SHALL BE SUBMITTED AS A SINGLE PDF FILE VIA: Email: Laserfiche Upload: Non-Discharge.Reports(a ncdenr.gov https://edocs.deq.nc.gov/Forms/NonDischarge-Branch- Submittal-Form-Vert FORM: CLRS-R 02-21 Page 3 of 3 Attachment A Site Plan fr El ` l _i N ! i _ ■ Ji e!gi o o`•3 I i Oo 11 O CI- 7 ad ggi. ,T1 : Z leg 5 O tl �iI.1$!fry " N .� w coO 3 d II s� $ �3� I O W C O a€fr z1 d U U 0 fc fr z �.. _ 3 1 w MO 4114 f i I H • ■ (i ) f -=-'ft= 1.--._--, i i 111 S - __ 3 :t1 I • • 'L L tll CO 4 Ir if;e .E L.-).1', f. 3 f , , J,‘a dolk, ''It‘I e IFrr er ,i;'A iP 6A tios .,. ,p. ....., , ,,i - -- ,..,,..;.---- ---....a..,. , ., ,,,,, y .: ` '� _� Y 3 � � `k 1 p I: fit_ j`ss e+ - j,! , .,, I i 1 i k ; inn)!r r r k -- ' ' r _ - f r J 1 i... 4a� f - { L I '; ' bit *, ii. �+ i tit f. I mo-+ ' ^i� c•: -� • tl III /y-'rY' t .? b.� , _, y . " ram r �' "ems. ,.4 k 441 i _ Attachment D - Red Line Corrections North Carolina Department of Environmental Quality Division of Water Resources Permit Number: WQ0003380 Permit Type: Closed-Loop Recycle Facility Name: Dudley Plywood Facility CLRS Facility Addressl: 139 Brewington Rd Facility Address2: City,State&Zip: Dudley, NC 28333 Owner Information Details: MUST submit a Change of Name/Ownership form to DWR to make any changes to this Owner information. (Click here for "Change of Name/Ownership"form) Owner Name: Georgia-Pacific Wood Products LLC Owner Type: Non-Government Owner Type Group: Organization *** Legally Responsible for Permit*** (Responsible corporate officer/principle executive officer or ranking elected official/general partner or proprietor; or any other person with delegated signatory authority from the legally responsible person.) Owner Affiliation: Satrick S Anthony Mason Curry Title: G Addressl: 139 Brewington Rd Address2: Dudley NC 28333 Plant Manager City,State&Zip: Atlanta,CA 30393 5G05 919-705-0530 Work Phone: 401 652 5397 mccurry@gapac.com Fax: Email Address: satr4630thravtigarrermom *** Permit Annual Fee Billing *** Billing Month: July Invoice Number Invoice Date Invoice Due Date Invoice Amount Invoice Status Owner Contact Person(s) Contact Name Title Address Phone Fax Email Ai4gia-rErpter 139 Browington Rd, Dudley, NC 28333 919 705 0526 a Michael dV 11Q Rralelingtnn Rd, midi y, Mr PR333 9t Q.S=9rr23 Michael goldenOgapac,c Geldee oat Mike O'Brien 1664 S-Min St Fv, Mr rQrmirl, SC 8 4 29835 Hara ,L Barfie d 1 adllcerii, 91 n-r;a)-srigi cal n-(a)-nV.l NC 28+31 Norman P I-'s Plent-P9aneger 1988-f or+11a Parifir Pd 1A/hitwilla„.14C 9 1 284Z2 Charles 0 2157 B Old Mount Olivc Hwy, Dudlcy, 919 736 1385 9±9 73G 4305 Mtea; NC 28333 Timothy F , Andersen 283�3 ctapb n Packar , 2 DaMiel, 149-Bex;9, Dets',iu 8.S7z3 28&-384-6302 Hi+nsen n'r Michael P4-6evell PO Box 907,Ahockic, NC 279+0 2),-,2 332 3107 252 332 2G74 Facility Contact Person(s) Contact Name Title Address Phone Fax Email Brandy Turley; Environmental Manager; 139 Brewington Rd Dudley, NC 28333; 919-705-0526; brandy.turley@gapac.com Mason Curry; Plant manager; 139 Brewington Rd Dudley, NC 28333; 919-705-0530; mccurry@gapac.com 5/16/2022 Page 1 Permit Number: WQ0003380 Permit Type: Closed-Loop Recycle Facility Name: Dudley Plywood Facility CLRS Facility Addressl: 139 Brewington Rd Facility Address2: City,State&Zip: Dudley, NC 28333 Permit Contact Person(s) Contact Name Title Address Phone Fax Email Brandy Long Environmental 139 Brewington Rd, Dudley, NC 28333 919-705-0526 919-735-7140 brandy.turley@gapac.co Turley Manager m Permit Billing Contact Person(s) Contact Name Title Address Phone Fax Email Georgia-Pacific 139 Brewington Rd, Dudley, NC 28333 877-858-3855 brandy.turley@gapac.com Wood Products LLC Persons with Signatory Authority Type Contact Name Title Address Phone Fax Email Permit Plant Manager 139 Brewington Rd, Dudley, NC 9-11Y-8..S23 miclaaalirrldmrtergarram Mason Curry 28333 919-705-0530 041 mccurry@gapac.com Designated Operators If the designated operators listed below are incorrect or no longer associated with the collection system,the information can be updated by st, a completed"Operator Designation Form"(Click Here for ORC Designation Form). Please provide specific details as to the changes requested, the addition/removal of designated operators. For all other operator questions or issues,please call 919-807-6353. Facility Classification: Operator Name Role Cert Type Cert Status Cert# Effective Date 5/16/2022 Page 2 Attachment E Compliance Schedules r • i € • j 1 U:s:postal Service CITIFIED M,AIV REC�1 T - poroestic ma Only ----- DUDLEY i 43---—j intar►Hattah,vis3to, ,i.rtePt t�iv usp antn Foyi r �� j_ 4219 US 117 ALT RAI. GH,ld ably y II , V DUNCEY rl > � � I_n ti _ j`a=��tv�`d 28333-72Q3 •ru EMraServices&Fees peck box,add MO•s ,.•• ae) € 28333-7243 8:32 AM (]Rewm RecetptmardconYl $-- - .. ..a'`I 12/14/2018 (800)275-8777 _____ Postmark i ___ _ 'Here . O °Adult Si MaNRe idulodequine Delivery S $C qr �.�, _ p °mugsignatureRe*kie t`i VSale~-- ^ Final ❑Adult signature Reslrkted DotWery$ ., 8 i Product SaY Price O PoslayFt � Description Er' $1.84 $184 12/14/2i8 First-Class 1 �• Total Postage and Fees j '' $8.►:►4 ��, Mail I r s r 1 a • P-. .-Vi C, _...._.. Large Envelope 1 � r 1.� $oxAro. 27699) o s a� No.,•r (Domestic, NC N / �l ... '(�11�C'p.�l..... �r (Weight:0 Lb 4.20 Oz) t Se9 T3 verseSnr lt-strtfcil"i): (Estimated Delivery Date) Pmanaa, rrtot;rsN�sao2u�aa (Monday 12/17/2018) $3.45 Cert(1®LISPS Certified Mail #) (70170190000025218955) $2.75 Return Receipt Return Receipt #) (9590940307065196183418)1 ($7.83) Affixed postage • (Affixed Amount:$7.83) Total $0.21 Cash $0.21 Text your tracking number to 28777 • (2USPS) to get the latest status. Standard Message and Data rates may apply. You may also visit www.usps.com USPS Tracking or call 1-800-222-1811. } • 1 1 i GP Georgia-Pacific Georgia-Pacific Wood Products LLC Dudley Plywood Facility 139 Brewington Road Dudley,NC 28333 Certified Mail#7017 0190 0000 2521 8955 December 14,2018 North Carolina Department of Environmental Quality Attn:Mr. Nathaniel Thornburg—Unit Supervisor Division of Water Resources-Water Quality Permitting Section/Non-Discharge Permitting Unit 1617 Mail Service Center Raleigh, NC 27699-1617 RE: Georgia-Pacific Wood Products LLC Dudley Plywood Plant • Closed Loop Recycle Permit—Completion of construction certification-Clarifier Permit Number:WQ0003380;Wayne County • Mr.Thornburg: • Enclosed is the engineering certification required in Section 1.1 of the facilities Closed Loop Recycle Permit.Construction on the new clarifier was completed on December 11,2018.The facility called the Washington Regional Office on December 11,2018 and left a message for Steven May,at least 48 hours in advance (excluding weekends and holidays,as required in Section 1.2 for inspection of the new facilities. If you have any questions or need additional information, please contact Brandy Turley at(919)705- 0526 or brandv.turlev@gapac.com Sincerely, Z4V Michael Golden Plywood Plant manager Attachments: Engineering certification Approved Engineering Plans • • Permit No.WQ0003380 Closed-Loop ReCycle System Georgia-Pacific Wood Products LLC October 29,2018 Dudley Plywood Facility CLRS Wayne County ENGINEERING CERTIFICATION . ❑Partial riti Final In accordance with 15A NCAC 02T.0116,I,_ EA R 455 i 1 , p At Uf r' P6,as El duly registered Professional n-ineer in the State of North Carolina,having the Permittee's authorization to❑periodically 0 weeldy P1 fully observe the construction of the permitted facility,hereby state to the best of my abilities that due care and diligence was used in the observation of the construction, such that the facility was built within substantial compliance and intent of this permit,the Division-approved plans and specifications,and other supporting documentation. (� Any variation to this permit,the Division-approved plans and specifications, and other supporting documentation has been documented in the attached as-built drawings, and shall serve as the • Permittee's minor modification request to amend the permit accordingly. Provide a brief narrative description of any variations: Professional Engineer's Name • Engineering Firm S,v�P R40 car FA/C,-1�../ �72/A//1 LLC o. Mailing Address 1° vI I g� • `City _VAj C_E y __ _ State i Zip „•.,..,.EP1/4,,`��� v').-21/,5-Z66 8 f F4OCL1 2 GCpf-re, 57 4-'&7 �aurmu�a� • Telephone E-mail I NC PE Seal,Signature&Date THE COMPLETED ENGINEERING CERTIFICATION,INCLXJDING ALL SUPPORTING INFORMATION AND MATERIALS,SHALL BE SENT TO THE FOLLOWING ADDRESS: NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALIFY • DIVISION OF WATER RESOURCES WATER QUALITY PERMITTING SECTION NON DISCHARGE PERMITTING UNIT By U.S.Postal Service: By Courier/Special Delivery: 1617 MAIL SERVICE CENTER. 512 N.SALISBURY ST. RALEIGH,NORTH CAROLINA 27699-1617 RALEIGH,NORTH CAROLINA 27604 I WQ0003380 Version 4.1 Shell Version 180711 Page 7 of 7 I', : • SCS • STEAM& CONTROL SYSTEMS, INC. • • • Scrubber and Clarifier Upgrade • • • Georgia-Pacific Dudley NC • October 12, 2018 N 6 .c��/} ite2.3 thr 4_ • Georgia-Pacific Dudley Scrubber and Clarifier Upgrades Page No.1 .. fFAML CONTROL SMTEMS INC. is • [ j Table of Contents Equipment Summary 3 System Design Criteria 3 Venturi Scrubber 3 Clarifier 3 Recycle Pumps from Clarifier 3-5 Recycle Pumps from Pond 6-8 Instrumentation 9-11 Appendix 12 tC Georgia-Pacific Dudley Scrubber and Clarifier Upgrades Page No.2 41 S: s JrfEAM&CONTROL SYSTEMS;INC. Summary: Georgia Pacific in Dudley NC is installing a new wet scrubber to replace the scrubber currently in service. The new installation will utilize the existing concrete pond basin and will add a clarifier unit adjacent to the pond to remove a percentage of the ash before it enters the settling pond. The new system will include a new wet scrubber with variable venturi, clarifier, support structure, redundant recycle pumps from clarifier to the venturi and a recirculation pump from the existing pond. The system will be constructed per the general arrangement drawings included In the Appendix of this package. In the following sections we have provided the design criteria and specifications for the new equipment and instrumentation. Venturi Scrubber and Clarifier Design Criteria The Venturi scrubber and Clarifier can be seen on the included arrangement drawings in the appendix. The process design criteria for the new equipment will be as follows: Scrubber Recycle rate(from Clarifier to Nozzles) 1200 GPM Clarifier Blowdown Rate 70 GPM Scrubber Evaporation Rate 54 GPM Scrubber Makeup Water Rate 54 GPM • Recirculation Rate from Pond to Clarifier 70 GPM Pressure Required at Scrubber Nozzles 20 psig Venturi Scrubber The new Venturi Scrubber will consist of variable venturi section,separator section and stack. Unit will be fabricated of/4"304 Stainless steel with reinforcing angles. Venturi will be controlled using a Beck 11- 309 rotary actuator to maintain the pressure drop across the venturi during boiler load fluctuations. Clarifier The new clarifier will be fabricated per drawing M-651-01 included in the appendix. The clarifier will be constructed of%"carbon steel with AR-400 wear plate in the bottom for increased reliability. Before and after installation unit will be hydrostatically tested for leaks. Unit will be installed on an above ground level concrete footing therefore no floatation calculations have been included. Recycle Pumps from Clarifier Recycle from the Clarifier will be accomplished using a set of pumps fed from the "clean" basin in rear section of Clarifier. Each pump will be capable of providing 100%of required recycle water to keep the system in operation. These new pumps will be a Goulds 3196 6x8 pumps. Summary of system head requirement are shown in the chart below. Friction Lose in Piping 27 ft Elevation to Top Nozzle 24 ft Head Required at Nozzle 46.4 ft Total Head Required 97.4 ft Available Pump Head 120 ft Difference 22.6 ft Georgia-Pacific Dudley Scrubber and Clarifier Upgrades Page No.3 ii 4 "' csr STEAM&CONTROL SYBTEMe,INC. • The pump curve is shown below: Model:3196 Size:6x8-17 Group:I-17 60Hz RPM:1180 Stages:1 . Customer:TENCARVA MACHINERY/CHATTA Goulds Serial No:N747H532 Customer P.O.No:6286140S Item No:ITEM 002 End User:SCS Issued by: Meghan Morrin Service:Scrubber Pump Quotation No.: 62ML18.07-0301 Date: 08/21/2018 Certified By: Meghan Morrin Rev.: 0 Operating Conditions Pump Performance Liquid: water Published Efficiency: 74.0% Suction Specific Speed: 11,340 gpm(US)ft Temp.: 180.0 deg F Rated Pump Efficiency: 73.5% Min.Hydraulic Flow: 749.0 gpm S.G.Mso.: 0.980/0.800 cp Rated Total Power: 56.4 hp Min.Thermal Flow N/A Flow. 1,400.0 gpm Non-Overloading Power: 76.6 hp TDH: 120.0 ft Imp.Die.First 1 Stg(s): 16.1250In NPSHa: 14.0ft NPSHr: 5.7ft Solid size: Shut off Head: 127.3 ft • %Susp.Solids Vapor Press: 7.51 psi abs Max.Solids Size: 0.6800 In (by wtg): . Notes: 1.Power and efficiency losses are not reflected on the curve below. 2.Curve shown Is at ambient temperature conditions. CENTRIFUGAL PUMP CHARACTERISTICS CDS No.:4362-1 csGOULDS PUMPS PRAOmmnreStand rd:Hilt.elablespower Speed:1180_(pm ,_,_—_, — m Model:3198 -52 ft Size:8X8.17-I-17 160 --- -----`— Imp.DW9:004 6 6APattern 48 150 Eye Area:63.6IrF Sit I -44 140 18.:61n ;, bit { E 7,t 7(t 1 -40 0 1018ir arouf .: irt.:._�_ i 36 V 8 110 15r .. , elliri ( r (. 16 -32 100 � 14ir90 I 4 28 allina rr i 70 �l\ * I \76h >� P — 20 60 _ , 50 ,5\ Very -16 S I 60tip 40lr I `� 0 400 800 1200 1600 2000 2400 2800 3200 gpm o ieo 2o0 300 400 s0o 600 700 m'/hr • ITT tj Georgia-Pacific Dudley Scrubber and Clarifier Upgrades Page No.4 .941 SCS STEAMS,CONTROL SYSTEMS,INC. ( G i` E i Clarifier Recycle Pump Specifications: r�GOUIDS PUMPS Model 3196 I-17 OUTLINE DRAWING Size 6x8-17 ITT 78.13 +--- 39.00 -- - 33.88 12.16 14.62 -- --6.25 0.00 ^- Discharge ( Coupling guard 1 "1 1 _ 36.60 ;y 3uUlonpo,29.131 � 14.6C 118.50 ` t�r ^--- 1,25 0 - LL . 4i1 3,62 I`` I fi�1 1 4•i.001n.deI4 00 1300 I L11.25 11.25.-1 74.00 26.00 Pump Specification Weights and Measurements SUCT.FLANGE SIZE 8" DRILLING AN.S7JS0i FACING FP FINISH SFMMRATEED PUMP 590.0 lb DISCHPLANGE SIZE 6" DRIWNG AMU Mfg FACING F7% FINISH SRRRATI;D MOTORICPLG 1,160.0/60.0lb PUMP ROTATION(LOOKING AT PUMP FROM MOTOR) CIP BASEPLATE 667.0 lb TYPE OF LUBRICATION MOD OIL COOLED NO TOTAL 2,497.0 lb TYPE OF STUFFING BOX RIGSOHN COOLED NO GR.VOLUMEw1BOX 98.6 Et TYPE OF SEALING MECHANICAL SEAL GR,WEIGHTVI/BOX 2,970.0 lb Motor Specification Notes and References • MOTOR BY POJAMPA4IYF MOUNT BY PUMP MFG MFG. Pl/MPMFT75CUOICE .UTR DIMENSIONS ARE APPROXIMATE FRAME a03T POWER 75.OAp RPM I200 •INSTALL FOUNDATION BOLTS IN PIPE SLEEVES • -AVOW FROM OTBb 1.6On.FOR PHASE 9 • FREQUENCY 6011X VOLTS 460 OROURNG.SEE INSTRUOTION BOOK FORDETArL8. INSULATION P S.F. LIE Tobnnee N•0384We ^Foundafbn boa a$Pianos ENCLOSURE 1Ian,7141 SEVEREDUIT PREMIUMEFFICIENI' Auxiliary Specification COUPLING BY P11MPA4FFI---CPLO TYPE RR.WOODSDURiFI,FX,IPRSSO CPL GUARD BY POMP MOO CPLO GUARD MATL UNIGUANDRPON-MEru.UC) BASEPLATE CAST IRON(AMER TOP.0,90054A FOR PUUUPTAPPEOOPEIIMOS REFER TO(Nat MECH.SEAL JUILVLR1Vrr6)e ralOe0114xxravr IKINCLg0me13ePAvvCRMAriersneto. . N�1 STAI eO DIMENSIONS ARE CERTIFIED FOR CONSTRUCTION BY: Iehl__t"." MeghanMorrin DATE August21,2018 �----J Custom;TENCARVAMACHINERY/CHATTA Gourds 3eRa1No:N747H532 • Customer P.O.No:52881409 Item No:1TEM 002 End User.SCE Service:Scrubber Pump Copyright 2018 NI dimensions are In Inches. ITT Carp Drawing Is not to scale —.-' Weights pa)amapproximate DRAWING NO A7475320 Rev.0 DateAugust21,2018 k FORM# ED0008 I SUPERSEDES ANY PREVIOUS DRAWINGS E. Georgia-Pacific Dudley Scrubber and Clarifier Upgrades Page No.5 • • L r 4011 LIAO scs STEAM W CONTROL SYSTEMS,INC. f(h - Recirculation Pumps from Existing Pond Recirculation from the existing pond will be accomplished using a single pump from the existing pond pump basin. The pump will be capable of providing 100%of the required 70 GPM recirculation water to keep the system in operation. This new pump will be a Goulds 3196 1.5x1.5 pump. Back up for this pump will be accomplished with a complete onsite spare. Summary of system head requirement are shown in the chart below. Friction Lose in Piping 15 ft Elevation to Top Nozzle 16 ft Head Required at Nozzle Atm. Total Head Required 21 FT Available Pump Head• 48 FT Difference 17 FT The curve and specifications for this pump are included on the following pages. • • Georgia-Pacific Dudley Scrubber and Clarifier Upgrades Page No.6 40A) sCS STEAM&CONTROL SYSTEMS.INC. Existing Pond Recirculation Pump Curve • Model:3796 Size:1.6x1.6-8 Group:STi 60Hz RPM:1750 Stages:1 Customer:TENCARVA MACHINERYICHATTA • Goulds Serial No:N747H631 Customer P.O.No:528814DS Item No:ITEM 001 End User:scs Issued by: Meghan Morrin Service:F16046 Scrubber Pump I Quotation No.:82ML18.07.03 01 Date: 08/21/2018 Certified fly: Meghan Morrin Rev.: 0 ' Operating Conditions Pump Performance Liquid: water Published Efficiency: 43.0% Suction Specific Speed: 3,543 gpm(US)ft Temp.: 180.0 deg F Rated Pump Efficiency: 39.0% Min.Hydraulic Flow: 4.8 gpm S.G.Niso.:• 0.980/0.800 cp Rated Total Power: 2.1 hp Mtn.Thermal Flow: N/A Flow: 70.0 gpm Non-Overloading Power: 2.4 hp TDH: 48.0 ft' Imp.Dta,First 1 Stg(s): 7.8250 in NPSHa: 20.0 ft NPSHr: 6.1 ft Solid size: Shut off Head: 62.2 ft • %Susp.Solids Vapor Press: 7.61 pal abs Max.Solids Size: 0.3440In (by wig): Notes: 1.Power and efficiency losses are not reflected on the curve below. 2.Curve shown Is at ambient temperature conditions. CENTRIFUGAL PUMP CHARACTERISTICS COSNo,:2529-2__ _ __ ' aGOULDS PUMPS Pedomanre Stundia1 Hlt4.61B lusts power ISpeed.:1760rpm _ ft (Model:3796 m 20 1 1 I Size:1.6X1.6-8-STI 70 8in 3, I I 1 imRDwg:76779/76793 -22 t :Pattern:66090/66208 1 'EyeArea:3.65In' -20 • 65 �` 4243 1 60 . lel I eft 50 fI ( 16 'in i ' ift oIzf8 14 4511110 rigig40 l "1F 7 -12 35 5 i0. . 1 6 . Sin 1c -10 30 • As 25 \2PP -Stu. 20 I (FOR 1.6 Nd,•PIPE EQUAL Htetsn6 15 1 ,, ( �1.51�p I TO EFFECT1iE SfA UFO I st . the 1 s, 0 20 40 60 80 100 120 140 160 gpm 0 5 10 is io 25 30 35 nP/hr ' ' ITT Georgia-Pacific Dudley Scrubber and Clarifier Upgrades Page No.7 4fiscs STEAM&CONTROL SYSTEMS,INC, 1 4 • 1i { Existing Pond Recirculation Pump Specifications: [GOULDS PUMPS OUTLINE DRAWING Model 3796 STi • Size 1.5x1.5-8 ITT 40.25 ' 18.00. 20.50 . Suction -6.60 6.80 • --3.75 -.) 6.00 Discharge Coupling Guard 7.88 SFi - v -rti \� . • C�I �;s51;� ! tai R • 1 ; 15.50 F`--�:I !1�,�ICI Lib 7.50 or�' 18.83 i 1 3.006 — 11.111111n � I 1 4.0.75 In.dia.Holes d 3.76 r 36.50 —1.25 4.501 4.50 39.00 12.00— Pump Specification Welais and Measurements SUCT.FIANGE SIZE LS" DRILLING ANSI1509 'FACING FR FINII3H SEWL47Ii0 PUMP 170.0 lb DISCH.FLANGESIZE LS" DRILLING ANSIISOL FACING FP FINISH SERRATED MOTOR/CPLO 9S.0/4.0 lb PUMP ROTATION(LOOKING AT PUMP FROM MOTOR) CR' BASEPLATE 80.0 lb TYPE OF LUBRICATION FLOOD OIL COOLED NO TOTAL 3d9.0 lb TYPE OF STUFFING BOX BIG BORE COOLED NO ' GR.VOLUMEw/BOX 1e.5 Bts TYPE OF SEALING ML•V7HANICALSEIL GR.WEIGHTW/BOX 442.0 lb Motor Specification Notes and References • MOTOR BY PUMP MEG MOUNT BY PIMPMFG MFG. PUA1PMFl75(9iONZ •MIR1911ENsa6S AssAPPROX6UTE FRAME 1S2Y POWER 3.Ohp RPM 18U0 ..me it.FOUNDATION BOLTS IN PIPE awns .ROM FROM 0.76to 160.FOR PHASE 3 FREQUENCY 60112 VOLTS 460 GROUI1NO.SEEINSTRIXSTION BOOK FOR RETAILS. INSULATION T S.F. I.IS •TokvantsH ALL M.38 ENCLOSURE IEELTI41 SEPER iDU1T1'R11XaUMS•INCIEY7' Auxiliary Specification COUPLING BY PIMPMRI CPLG TYPE T.R.WOODWST•S CPL GUARD BY PUMP MFG CPLG•GUARDMAIL UNICUARD'NONMTALLIC) BASEPLATE C45TIRON LAMER TOP 8000SOA FOR PUMP TAPPER OPENINGS REFER TO 0.93: MECH.SEAL donvcR,Ixvawoa7datnmua,oavitlswcamctAamatssatCavcdxuoEomtrm, ATitssti . . . DIMENSIONS ARE CERTIFIED FOR CONSTRUCTION BY: 1e>C:3 Meghan Mortin DATE August 21,2018 • Customer:TENCARVA MACHINERY/CHATTA Goulds Serial Na N747H531 Customer P.O.Na 52881405 aemNb:ITEM 00t End Uses SCs SeMce:F18048 Saubbet Pump Copyright2418 . NI dimensions are In Inches. Drawing Is not to scale I" "'���-" Weights Otis)are apprmdmete DRAWING NO A7475310 Rev.0 Date:August 21,2018 ' FORM# E00013 I SUPERSEDES ANY PREVIOUSDRAWINGS Georgia-Pacific Dudley Scrubber and Clarifier Upgrades Page No.8 is ICS STEAM&CONTROL SYSTEMS.INC. ( • fIk F i Instrumentation and controls: The scrubber system will be controlled using the existing Allen Brady Control Logix boiler combustion control PLC. System will monitor scrubber differential pressure, recycle flow rate and recycle pressure. Flow rate and pressure will be controlled using variable speed drives on the clarifier recycle pumps and if required, manually adjusted valves on the recycle header system. The Recycle flow will be measured using Rosemount Flanged Magnetic Flowmeters with a 2051 transmitter. There will be two of these flow meters mounted in parallel with one in use and one backup at all times. The Recycle header pressure will be measured using a Rosemount Model 2051 gauge pressure transmitter. Back up for this will be by onsite spare parts. The Venturi differential pressure will be measured using a Rosemount Model 2051 differential pressure transmitter. Back up for this will be by onsite spare parts. E , Georgia-Pacific Dudley Scrubber and Clarifier Upgrades Page No.9 ISscs STEAM&CONTROL SYSTEMS,INC. Typical Specifications for Rosemount 2051• • rebruary2017 Rosemount 2051 Rosemount 2.051 C Coplanar Pressure Transmitter Configuration $ansmitteroutputcode 4-20mAHART Rosemount2051 A Rosegtount2051 with 5electable HARM • - t Lower.Power tf Rosentount2051 M Rosentount2051 with Selectable s1ART01 Rosensount2051CCoplunr FOIRIDAUONHeldbut i ' Nesiurelransmitkr PROHOUS W • Wireless X • 1. Thc420mAuidt SelectahkHARrdorke can ba Oared ntehtrammrtteroufputopdm �.. code Aplo flyofthe foMYAngoptipmcodes9M,QT.DZ.CRCt.Cr:HRi,HR7. Additional Information Speidflcattons:page 47 Cernf icalloff's:page59 Dimensional Drawtngi:page 69 Specification and selection of product materials,opltons,or components must be made by the purchaser of the equipment. Secpagp56 format In(ormandnoninateriaiselection. Tablet:Rosemount2051C'Coplanar PressurelransmittersOrderinglnformatlon The starred offerings(*)represenethe most common optiojssandshoutdbe selected for best tielivery,Titenon•starredotfedngsarosubJett toaddtlfonai delivery lead time. Model Ttansmittertype 2051C Coplanar Pressure Transmitter Measueementtype 0 Differential G Gage • Pressure range • Rosemoupt2051CD Rosemotnt2051CG 1 -25to251nH20(-62.2to62,2mbar) -25to25tnH20(-62,2to62,2mbar) s1' 2, -250to 25eInH20(-623 to 623 mbar) -250 to2501n1120(-623 to 623 mbar) * 3 -1000to1000tnl12O(-2,5to2,5bar) -393to1000InH2o(-Q,98to2,5bar) 4 : -300 to 300 psi(-20,7 to 20,7 bar) -14.2to300ps1(-0,98to20,7bar) �k 5 ' -2000 to 2000 psi(-137,9 to 137,9 bar) -14.2to2000 psi(-0,98to137.9bar) I* • Emerson.cons/Rosemount 3 Georgia-Pacific Dudley Scrubber and Clarifier Upgrades Page No. 10 E � • +II/- sr cS STEAM&CONTROL SYSTEMS,INC. • The differential pressure across the Venturi will be controlled using a multi blade damper arrangement connected to a Beck11-309 rotary actuator. Typical Beck Actuator Specifications ' �E 1X{ COha,iFii11t5 H SXa .w7.r.ca\n.J—\ 5//J2 a zs/32 I7t r CMMA All 11: why.);M\21.;:10\ �,` [158: (121) ;. ,•. "dui I 0 overt,p'CT70\IC ,` - L. AN:SArctl t _ T • -#Z • :SOW ��C�YIi j4 : .., • f ';r, A-fe Ytl Ta'L f (� --3 ` `1`H.P.-,ca,ourt iii �\ yr I 1 H. f.CtOMMT 1t •:ari}H,I'1:51Y.i\-\ , 1 kb/ —. ELKS 110 U_YC:S ` k 1..• J• \� '1t' r t (�I H4YC�.AT\ a S/9 1 l '}S/ Yam^ ro� :.4-)!b I � Ir IK....,.......1,,,\,,,„ii. u ct ' -'vf i 1 . i .t::• - /.. G. [ U 1 rt s/2 53 •:lsJ tl / pa}( i I L-a 1/2 D Ij_--•y —11/18 0l1 E s —p t (.//y, tI43: pao: [171 :s; [te. rr k-8 3/8 ' - 6 4/6--6- (4-3 HOLES , •/a zi [Ie2. [102, [1:A• • Y/c . 1112 3/4 • 4 3/A 1.3/0W.1( [32, (IT: .0 iAt:- (2•}^. �'. Alio4 E•-....4 lot tt,W40 - H'Xi.P(III)Iryt HE ULYA 1:000,10 Et SitYtt tiJL-1110 Eh N1AhloAMi BCC, T310_C A'"ROX. O.TUT CIW,KW1 CRA\KNIV S1P7U5 5itlC_ $OIYL II 31V1 W2011.11 :TN' ILa}ST VTR- SINT PART O. (M.l'.'i Al 0) it\OT II PfK3 VICH-U\C WO.-\C. ]IA. H�.HY. 'i 31Y. D.I?. C.A. 303 70$Y.113. rt:123 LDS. •3/' 1•-�Pr-SS 3 1/2 TO 8 2 1/2 5/e-io R'-'/I 291 •3f1J 11$. 41I it:Y.8' ',11 D7 KO:i. [44. -El TO 2C31 Ems. C 1240,10_4. fiCHL 10 JULS '' 'pxT ir' 'a�Accs NMWeµTrxaiNf olNe o.:.t_)St,SOIS 31/4 leli .. YLiCN V o I \SCI.S Alla...1 PALM Je2.Dd4 EQi d01Hlt ALL O WEHSIONSASE PI EICHES41ND IAIUI UNLESS OIHEAWIE SPECIFIED. TII MO°MOT/WMIMIae Me 01E0114E0 M UNIMSITtYtEAO82E4OHLY. rare PERAMSWOAN INMNAI STANOAAO TAP.PIP4TNeZAOS OLP.Ta _Z✓?f' '18Nc001ea • }ppf. is r K. E. Georgia-Pacific Dudley Scrubber and Clarifier Upgrades Page No. 11 i= , iiiiio IV(,�EI�,. S 1 STEAM&CONTROL SYSTEMS,INC. ti fn • • F ( ' 1 , • • APPENDIX • • • • • Georgia-Pacific Dudley Scrubber and Clarifier Upgrades Page No. 12 firoo STEAM&CONTROL SYSTEMS,INC. elI *r4 r ( �uurrrrrrnu04 ::: ,- ti �r t cA 9 J O _ 11 97‘.1? 42iird ' 4 L.- ' I}' nl { r i J f 3Y l to fi nil friT____,,,-, "�gi� Mu 4144 g r_Jt_ 1.-4. r-1 "<_, 6 M. doJy, !I y 1 11 . (- _ __.._... � i z .._. t t 8 E a Vio0Zo.0 �w Pt Q F—I U mt=�Z, a agNE5008 m gip 5,6 al t—, rO W J-§g5mN m.5" F-� 4 F—I 1 t t. .c F� 4.14u;mm i C) 1 4 us3 1 t t 1 5 T , C../ ccxaaa t-a 1 / Z 00.0.0. 6 0 0 0 O O O O a E t"'�.3 W 2i 17e2j7Mej Mil p W J i7,7MMOp:N m s 0 0 0 0 N 0 rM"'7 6 OaDODOOo1 C.) Cr) I g y ' 9 14144,,,, V g i )I :1 ) f Li IR;1 r:cle 1 ..,.. 1 'O 3 i -I �tl{ 1 ai i lEpe2g .:aridvi rein Og 1 1 1 co -. I 41"/ el 0. s gs 1 R ti j• P ,F f , €I t _ r y- nand ilf12! 6 M. • F a 1l}� �� i dp�Fa p�, =a d Ili 0 1 ' a- o t 3ri.. il ij - ! ..! a � I y3 � �' fit, 4 .. c .'� �45t¢{h 5 tt� { to 4 �.� � .3»3'n_' {' .emu s- ,...,--,-,tzsx.w.;,--,-,.„., ,,,:.i.. .:\ A\ -,,,,,,...4,,,:s4-:.-,1z-T ,-... .. ,,,,,. , ,,, „i,... ... 1.:,....7,. ...;..„,..„c!?..-.:-_,-...,„„..;,„_,_,:,,,,,,., , ,,,,„_----.,., J._ ,s,i\-,--... .„,.. - _,,,, , ,.,„:„--,, 4v.37,,....-\ A('', VA-e,Z4'. ' ''-17',--- ".'' c ( - igig-1\ �_ 1 CFw \�'<zes �z ---,;,<. , 2,,,, 9. % as t a. '' A' \IAIIIMIIPPf__ _ ,__ fi 3. t -,3 4t • ; ; • C`rSS�Ultlinn�� p,^ y 1R t3 g��b 4. 1 3 �p+� �� _` u =_ ggSzn :• O 13 OsV p g y s a Es'itt 3",A .R q "I 6 F M 1lit_ 13;11 II4 w 0 1 g60oi .\ to ski &14 I /I 1 r------ — j / 1 1 1..,' 4r pJ tEtl • I .� �: �5 ` i ' J L.__ ___ 1--.1 D N 1 _::1,..., f4 . L k -E \ \ % i 1 `, t i 1 a i�i _ .. .�; f G i =ol ! [ • ' `, jtwR ?TO1J11 , 1!� qq PP i. c `-'"-- -- i{ F1 4 _� i ' -- i- i:. ,., : --- - tl 6 r1 i I m c 1 I 1to I 1 ! 1 I' • 1 g * 1 t li 11 lig il iii 14 R 1 11 31/ 13 Ril 1 g oa — t n ..,• 0 Ir. 6 8 4 t — El ii 1 ligicA L P Ei 1 pigi h 111 v gi P J, 01814',/i, tZII ,J) . pit; z c, il 11 11 111111 1111 11 141Pg1111 ii 11 851 I iti, 'tfr, ''' c a % ‹ 1 1. 80 I Nisi g id 1 Ay i 11 411 . 4NVI:,.. g Ihn E.-- '8 5 li h 0104110/ ighlkikkgbillhAil ct )..5'-`"461 I IN ig -110 v §. ffigilPiliri N b 4 14 RI IIT 141 " 4 „ ..,....' 0" ul...1%" gli$161 0 1 g pl 1 11 NQ gj gram MI i if . pti. 1 s-z • g 1141P1111111110b11411111 1111/111 11111//114 I 1 filli i I- Ing1 V1 1 11 51151 11 01 011/ 1111 /644 Agi 1 i Ag-111,1 E i 1 AEA gM 0 : ' • Oil 4 501 § i ' -"- I. -- I m j A 44 I,a 1 i 11 i'V 31 q I -- --P -- ,ii•;.2.. .1r) --) d ' gg 1 Ll ,.//,,4d tk , N 0 li I L--- li ,f,',•'.../.j.,1 I 2 1 A4:17-±1,,,,,,_ i ;`:.•'///,'-'15/2•%''''Zi tff1:411:11-121 \ '1/2"7/1":",::•":4tj I— \(:/;;;,'":•';1!,?::7',';1 rtkiEFrEF 0 , I— x<= , . , z. . J . ' g 6 1 I 6 t ---1 — L. - ------ - / i / / I / Pi I 1 M i o • a Si d 5, t, 4 !i, 1 h% 1 it 1 1 1 z kl 2 g \ g I 1 I 14 1 \ \ . \ 1 . .1.L i ___L — 1 \\ HT !!, I __•-e--- -_, • '- ------;-- !!, r . - • to ' — t? \ r5 -------i -- ---r— - ,,, 1 k [ Ig ti t N _ , ' 2 [ , , • ,... MI 1,11 0. 0 . 4 17 i„OODU4,. ,. IraOW ...il MS.% : If j[i F a 0 li 5 1 ah. 'kiwi ' -1 H of + - ,. Is c' g g l 1 {fir ri4 Iiili II 1 . i II f-1. _11 4,- yoiv„,.,,_ i+ 1 .,. .tyr--r':•,iiii 1 liqi . A it -.41 hit It eliv1:::1;116i • • ri.,, I a.1-4. -; as itr /'l1 a C 1 '°11drItt.-k_ 10 , It i 4 I 1 iji 6. P. .flag .43 lig 7, Fr I I ./, fp dUi `GSi II; I till/ ' I3 c . 4#—'— i.Cz. co id 2. 0LJ 1 r a Lit, ■ •O n Q. 3 . _ w p .• L ¢1 i 41 WO y. .1 e7 C3 1.341.4135r[!• L! Q ,.._ ...... ,..,,;:, u� [eu�j-� r�t .�l�l �_a ,,,; • r, 1 ,1ds, n 1 an �". qq it �.«2�ti;. a El N =J_ O �„ gsi 11•LL t} .D .W Y ■ �_ 6L'6f i II . i • —� z' w B e r. L • k 1 0 lo 1 ...4.. .... 9y�y #j o 3s it )14 .. . N33 •}}}s}}'}}t�Jtt L3 1g i rq g., i i 1(3 4!!1 \� li it ii lig ... \:--------,e343- 1 Li 3[ - -,i- ,, „,___. ,, ______-__, ,773,1_,.. -pi 1 ...3j"1" ' -------\--\ — , \� \ 1 111 tiff € 7iol ) 1 / 20261 11 h.,- iroo2 Rif k( Z. ri 71: .. _ 11' 17 . fi 1, , ,...s, • _.iiirl jr—W-1 ...a .. a' if-4 ' ..4 40 .• ! :: , i g ' i. —. Iliti is lit_ �-t P t)� �q�; ll \ •�1 f - 3 3 }� 1} t 4t'b Y i , 1 3. .}is ,t t I 4 _... ,)___::___ /" f L' �__. ` 1 �J } ? :c1L1 / <' o1' 7I ii 1 I 1 /r t €� jo----—4/—11.114)--1:1 [Ilk i tr_i - , i , i di i't t\ 0.--ri 0 11 r—_s=0 ii I GP Georgia-Pacific Closed Loop Wastewater Recycle System Renewal Permit No. WQ0003380 V4.1 Georgia-Pacific Wood Products LLC Dudley Plywood Plant 139 Brewington Road Dudley, NC 28333 Attachment G May 2022 Page I 1 Contents Section 1: Introduction 3 Section 2: Overview of the Manufacturing Process 3 Section 3: Chemical and Biological Materials Used in the Process 4 Section 4: Cleaning and Treatment Methodology 4 If Page 12 Section 1: Introduction The Georgia-Pacific Wood Products LLC Dudley Plywood Facility (GP) currently operates under Permit Number WQ0003380 that was issued by the North Carolina Department of Environment and Natural Resources (NCDENR) on October 29, 2018 for the Closed-Loop Recycle System. This document was prepared as required by the Closed-Loop Recycle System Renewal Form CLRS-R 02-21 Section: Attachment G —Provide an overview of the manufacturing process, an inventory of all chemical and biological materials used in the manufacturing process, and overview of the cleaning and treatment methodology. Section 2: Overview of the Manufacturing Process Logs from the woodyard are sent to the log vats for heating prior to the veneer peeling process. Logs are converted to veneer by the lathes. The lathes peel the logs into thin sheets of green veneer,which are then clipped to desired widths by the rotary clippers,graded, and stacked. The veneer trimmings from the rotary clippers are sent to the veneer chippers. If the clipped green veneer is of high quality, it proceeds directly to the four veneer dryers. The lower quality veneer is cut into smaller strips by the fishtail saw, stacked, and sent to dryers. The veneer dryers are heated indirectly using steam that is generated by the wood-fired boiler. The dried veneer is graded, sorted, and processed and is further trimmed to size. The dried veneer then proceeds to the glue line,where resin (glue) is applied to the veneer sheets before core strips are applied. The veneer is applied in layers, with glue being applied after each subsequent layer of veneer is added. This process is repeated until the desired thickness is achieved. After the desired thickness is achieved, a flying saw makes a cut in the layered-up veneer. The unpressed plywood panel then proceeds to the cold pre-presses (3) and presses. In the presses,the combination of heat and pressure cures the glue and forms the plywood panel. After the presses,the panels are trimmed by the trim panel saw and the trimmed material is hogged in the dry residuals hog. Sawed panels then proceed to the patch line,the tongue and groove (T&G) sander, the specialty saw, the Big Four Head Sander,or the strapper to be packaged for shipment off-site. From the finishing operations, some of the plywood panels may be sent for edge sealing or for form oil application. Finished bundles of panels are stenciled with the Georgia-Pacific logo and end stripping. The plywood panels are then shipped off-site via trucks and/or railcars. The wood residuals throughout the process are conveyed to be used as boiler fuel or to a truck bin for shipment off-site or as fuel source. Page 13 Section 3: Chemical and Biological Materials Used in the Manufacturing Process A complete listing of chemical and biological materials used in the process is as follows: • Caustic Soda 25% • Hydex 1425 • Hydrex 1108 • Hydrex 1647 • Hydrex 2517 • Sodium Hypochlorite 12% • Caustic Soda 50% • Tiger Liquid (TM 14-006) • Commander • Marking Paints o MIC-1051 Moisture Ink Green o MIC-571 Veneer Marking Brown o MIC-1031 Moisture Ink Red o MIC-1061 Moisture Ink Blue o MIC-1021 Moisture Ink Black • RESI-MIX® 580150 • SCP-901 A Black Ink • Utility Release Concentrate • U-100-A • U-100-B Patch Catalyst • Finishing Paints/Inks o RPR-94-2 End Seal Orange o TBL-P500B-SWM Marking Ink Black o OSP-10-B2 Overcoat Stencil Blue o SCP-931 Blue Ink o GP Striping Paints; Black, Green, Purple Section 4: Cleaning and Treatment Methodology The cleaning and treatment methodology differs for each independent system within the Closed-Loop Recycle System permit since each is self-contained. Scrubber Water Discharge Recycle Loop The scrubber/clarifier system uses physical settling of the boiler ash for its cleaning and treatment, with the water being reused in a closed loop system through the scrubber, clarifier, and ponds. No biological or chemical treatment is used at the clarifier or ash ponds. Ash laden water from the Boilers'scrubber is discharged into the clarifier to undergo physical settling of the ash.The ash is then mechanically conveyed out of the clarifier via chains to a dewatering pad prior to disposal. The two adjacent ash ponds serve as overflow for the clarifier.The ash ponds are used in a rotation Page 14 allowing for physical ash settling and dewatering prior to disposal. Ash solids are removed from the ponds by mobile equipment (front end loader). Log Heating Vat Water Recycle System The log heating vat water recycle system uses physical settling of the wood vat fiber for its cleaning and treatment, with the water being reused in a closed loop system through the individual vats and the vat surge basin. No biological or chemical treatment is used at the vats or vats surge basin; however, caustic soda (50%) is used for pH adjustment as a process control measure. As logs are soaked/heated inside one of the facilities seven vats, wood fibers come from the logs and physically settle in the bottom.At routine intervals, the vats are emptied and the vat water is sent to the surge basin via pumps. At the surge basin,the vat water is pumped through a screen to separate the solids, which are mechanically moved to a dewatering pad prior to disposal or reuse as a fuel in the boiler.The water is held at the surge basin until needed for reuse in the vats. Oil Water Separator The mills oil water separator system uses physical separation for its cleaning and treatment with no biological or chemical treatment. The system gravity drains oily or potentially oily water from various inlets in the mill into a common sump. The oily water is then pumped across a side hill screen to separate out any wood debris.This debris is then discharged into a hopper for disposal, and the water is sent through a series of filters and baffles within the oil water separator. The oil is discharged into an offboard tank for recycling, and the water can then be sent to either the county POTW or the mills boiler system. The adjacent surge basin is a gravity fed failsafe system that is connected to the oil water separators inlet sump. It is designed to hold excess influent waters in the event of an upset condition (i.e. power failure, heavy rainfall, etc).The surge basins normal operating level is zero. Veneer Dryer Wash Down System The veneer dryer washdown system relies on physical separation for its cleaning and treatment methodology, with no chemical or biological treatment used in the system. The veneer dryers are equipped with trench drains that collect washdown water and deliver it to a common sump pit. The pit water is then pumped across a screen and the solids are collected in a hopper for disposal. The cleaned water is stored in an interior holding tank for reuse as washdown water.When the water is deemed too dirty to reuse, it is sent to the facilities log heating vat water recycle system for further reuse or to the oil water separator system, if the vat system does not have adequate holding capacity. Page I5