December 9, 2021
NORTH CAROLINA.
Enviranmentat Quaaty
CERTIFIED MAIM. #7014 2120 0000 8055 4133
RETURN RECEIPT REQUESTED
Steve W, Doebler 401K Trust
Attn: Mr. Steven W. Doebler, Trustee
523 Wayne Avenue
Pittman, NJ 08071
RECEIVED
DEC 14 2121
DENR•LANQ QUALITY
STORMWATER PERMITTING
Subject: NOTICE OF CONTINUING VIOLATION AND RECOMMENDATION FOR
ENFORCEMENT
NOV- 2020-PC-0508
Stormwater Management Permit No. SW8 140406
River Oake
Carteret County
Dear Permittee,
On July 7, 2021, Wilmington Regional Office staff of the Division of Energy, Mineral and Land Resources
(DEMLR) performed an inspection to determine the status of compliance with Stormwater Management Permit
No. SW8 140406, which was issued to you on May 3, 2017, for the River Oake, located along Christine Maria
Way in Cedar Point, Carteret County, North Carolina.
This letter is to notify you that you remain under a continuing violation of Title 15A North Carolina
Administrative Code (NCAC) 02H .1003 in accordance with North Carolina General Statute (G.S.) 143-214.7 for
failure to respond to the Notice of Violation dated December 3, 2020, and for failing to resolve the violations. The
violations, as outlined in the prior notices of violation and updated below, are:
1.Failure to construct according to the approved plan. Per Section III (9) of the Permit the permittee shall
construct, operate, and maintain the approved stormwater system in accordance with the permit
requirements and the supporting documents. In addition, per Section II (6), the permittee shall submit
to the Director and shall have received approval for revised plans, specifications, and calculations
prior to construction, for any modification to the approved plans. The following deficiencies were
noted.
a. The 3:1 swales are not in place.
b. A small ditch has been dug along the northern edge of the subdivision which does not drain to
the infiltration basin.
2. Failure to certify the stormwater system. Per Section Il (10) of the Permit, upon completion of
construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted
facility, a certification must be received from an appropriate designer for the system installed
certifying that the permitted facility has been installed in accordance with this permit, the approved
plans and specifications, and other supporting documentation. Any deviations from the approved
plans and specifications must be noted on the Certification. An administrative review of the file
revealed that this Office has not received the Designer's Certification. Please consider the following
during the certification process:
a. The 3:1 swales are not in place.
b. The elevation of the inlets in the cul-de-sac are reportedly set too high.
D_En Q'. North Carolina Department of Environmental Quality I Dtviston of Energy, Mneral and land Resources
Wilmington Regional Office 1127 Cardinal Drive Extension I Wilmington, North Carolina 28405
xonm
os.�.rasn.m.wa / 910.796.7215
State Stormwater Permit No. SW8 140406
Page 2 of 2
3.Failure to Operate and Maintain the Stormwater stem. Per Section II (11) of the permit, the
Permittee shall provide the operation and maintenance necessary to assure the permitted stornwater
system functions at design condition. The project must be maintained per the Operation and
Maintenance (O&M) Agreement. Specifically,
a. The infiltration basin needs to be cleaned out.
b. Vegetation needs to be maintained on the side slopes of the basin.
As also stated in the permit, the approved O&M Agreement must be followed in its entirety and
maintenance must occur at the scheduled intervals, including, but not limited to:
a. Routine monthly inspections
b. Sediment Removal
c. Mowing and re -vegetation of side slopes
d. Immediate repair of eroded areas
e. Maintenance of side slopes in accordance with the approved plans and
specifications
£ Debris removal and unclogging of the outlet structure, orifice device and
catch basins and piping
g. Access to the outlet / bypass structure must always be available.
This Office requires that you respond to this letter in writing within 30 calendar days of receipt of this Notice.
Your response should be sent to this office at the letterhead address. Your response should include a written
"Schedule of Compliance" which outlines the actions you will take to correct the violadon(s) noted above and
in the attached inspection report and a time frame for completion of those actions.
Thank you for your immediate attention to this matter. This Office is considering an enforcement action including
the assessment of civil penalties regarding these violations and any continuing violations that may be
encountered. Your above -mentioned response to this correspondence will be considered in this process. Please
be advised, these violations and any continuing or future violations are subject to a civil penalty assessment
of up to $25,000.00 per day for each violation pursuant to North Carolina General Statute 143-215.6A.
This office requires that the violations, as detailed above, be abated, and properly resolved. Please reference
the State assigned project number on all correspondence. Should you have any questions regarding these matters,
please contact Kelly Johnson, Environmental Engineer III, via email at kelly.pjohnson@ncdenr.gov or Christine
Hall, Wilmington Regional Stormwater Program Supervisor, via email at christine.hall@ncdenr.gov. Both can
be reached at (910) 796-7215.
Sincerely,
;97"- Brian Wrenn, Director
Division of Energy, Mineral and Land Resources
Enclosures: Compliance Inspection Report
Attachment A - Inspection Photos
Attachment B - Vicinity/ Site Map with Photo Locations
DES/ kpj:\\\ Stormwater\Permits & Projects\2014\140406 HD\2021 12 NOVRE 140406
cc: Justin C. Bishop, Malpass Engineering & Surveying, PC
New Hanover County Engineering
Brad Cole, PE / Alaina Morman; DEMLR
Wilmington Regional Office Stormwater File
DNn 1Z. North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405
a iww+m+a� /'� 910.796.7215
Attachment A — Inspection Photos
T
ce';;
-
1
T
i
9..1
Roadside Swales are not Installed (8/12/2020)
AVE at , @
ami ~ w amv
o cu
rronn
a.q
25 JS I ll I ` 9RNI� � rs
TYPICAL PAVEMENT SECTION
SUB✓ECT TO GEOTECHNICAL
ENGINEER RECOMMENOATION
/wr m srww
Roadside Swales on Permitted Plans
State Storalwater Permit No. SW8 140406
Page 2 of 4
Infiltration Basin (7/7/2021)
Infiltration Basin (8/12/2020)
,0111k
Nm QJ/ North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405
xaanrsnaru
ww�..aauw...naw� 910.796.7215
State Stormwater Permit No. SW8 140406
Page 3 of 4
Infiltration Basin (3/6/2019)
StOrmwatei
Plan
:.
I
I
Approximate Location of Broken Pipe (7/7/2021)
IrIft
Mn Aft,� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405
910.796.7215
State Stormwater Permit No. SW8 140406
Page 4 of 4
Potentially Broken Pipe Underground (7/7/3031)
BC Q,� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405
o en .mA.i "e..�s�..uro.ra� 910.796.7215
Attachment B - Vicinity May
Google Earth aerial photograph dated March 11, 2019, with approximate project boundary. The infiltration basin
has a permitted surface area of 1,259sf.