Loading...
HomeMy WebLinkAboutNC0031038_NOV-2020-LV-0303 Response_20200625Jeff Titus Operations Manager June 25, 2020 1 li Phone: (678) 314-2006 USPS Certified Mail # 7016 2710 0000 0681 9754 W. Corey Basinger Regional Supervisor Water Quality Regional Operations Section NCDEQ — Division of Water Resources Mooresville Regional Office 610 East Center Avenue Suite 301 Mooresville, NC 28115 Re: Notice of Violation & Intent to Assess Civil Penalty Tracking Number NOV-2020-LV-0303 Permit No. NC0031038 Colonial Pipeline Company - Charlotte Delivery Facility Mecklenburg County Dear Mr. Basinger: MENRI WQ OS `u REGIONAL This letter is in response to the above referenced Notice of Violation (NOV) received April 27, 2020. Upon reviewing the lab report(s) for the February 2020 sampling events, John Culbreath, the Operator -in -Responsible Charge for the NPDES permit made a telephonic notification to Wes Bell with NCDEQ - Mooresville Regional Office on March 10, 2020 regarding the exceedances that are listed in the NOV. The exceedances were attributed to ongoing excavation and construction activities that began in September 2019 for the removal of petroleum impacted soil and replacement of several hundred feet of a defective 30-inch petroleum storage tank line. Additionally, there was an above -average rainfall amount between February 6 and February 25, 2020 that totaled approximately 9.2 inches. The two outfall locations at the Charlotte facility where the exceedances occurred are part of two separate petroleum storage tank containment areas (dikes). The dike areas are constructed with earthen banks and ballast ground cover (stone/gravel). Valves located at each dike are kept closed at all times and only manually opened to drain accumulated stormwater through those outfalls. In order to preserve the integrity of the tanks, accumulated stormwater must be released or removed whenever the volume of water in the dike reaches a level that causes it to come into contact with the base of the storage tanks. The contractor performing the construction activities had implemented sediment and erosion control measures (silt fence, hay bales, filter bags, etc.) throughout the facility. However much of the excavation and construction activity took place in or adjacent to these dike areas. Soil disturbance activities and excessive stormwater events resulted in abnormal amounts of silt being deposited into the ballast ground cover of these dike areas and subsequently in the discharged water, resulting in the exceedances. Remedial Actions: The above referenced exceedances at Outfalls 007 and 009 occurred during the discharge / sampling event that took place on February 19, 2020. Stormwater that collected in these two diked areas after February 19 (approximately 1.5 inches of rainfall), was pumped into frac tanks that were staged in each dike area. A vendor was contacted about treating the stored stormwater with a product called "Haloklear", which consists of natural flocculants used to reduce turbidity and TSS. (A copy of the brochure for this product is attached). After treating the P.O. Box 87 Paw Creek, NC 28130 2 I Notice of Violation NOV-2020-LV-0303 Colonial Pipeline Company Charlotte Delivery Facility stored stormwater from the Outfall 009 dike the turbidity result was 23 ntu and the TSS result was <25 mg/I. In March 2020 the stormwater from the Outfall 007 and Outfall 009 areas continued to be stored in the frac tanks and was held for the entire month of March 2020 pending treatment. Soil disturbing activities in and around the Outfall 007 and 009 dike areas ended in March 2020. The silty ballast (gravel) was removed from these two diked areas. A layer of geotextile fabric was installed in both dikes and covered with clean, new ballast. A vegetative cover has been re- established along the dike walls and adjacent areas where the disturbed soil run-off had been contributing to the exceedances. There were no new exceedances for the months of March, April, or May 2020. Based on information provided and belief formed after a reasonable inquiry, I certify that the information contained above for this facility is accurate and true to the best of my knowledge. If you should have any questions or require additional information, I can be contacted at (678) 314-2006. Sin erely, J/ff Titus Manager, Operations Enclosure Cc: John W. Culbreath - Environmental Specialist; Operator -in -Responsible Charge Colonial Pipeline Company HaloKlear® NATURAL FLOCCULANTS The best water treatment system for your business and the environment DUAL PRODUCT SYSTEM (DPS) HaloKlear products are used to treat storm, industrial and municipal water, including pollutants in construction site runoff, by reversing the process of water contamination through a combination of advanced, environmentally friendly, natural flocculant technologies. When it comes to handling dirty water, HaloKlear has built its reputation on creating reliable, effective and safe solutions that can solve all kinds of sediment control problems. HaloKlear's Dual Product System (DPS) uses natural flocculants that completely biodegrade through simple enzymatic activity, resulting in no bioaccumulation. The primary active ingredients are commonly used in the dietary supplement and food industries. The HaloKlear Residual Test Kit is used to ensure excess flocculants are not leaving the site. This knowledge is comforting for regulators, f=f contractors and the general public, who can rest assured that the products are not going to cause harm to the environment. Most importantly, HaloKlear's DPS has a best -in -class performance and has proven itself under vastly varied conditions around the world. It is used in systems ranging from active treatment for mobile water treatment, semi -passive pumped water incorporating coarse filtration and geotextile bags, and completely passive models, such as bio-filtration and check dams, HaloKlear DPS is designed to give contractors and industries in need of water treatment solutions the essential tool they need to meet state and national discharge regulations, as well as EPA Effluent Limitation Guidelines (ELGs). EA R ADVANT AGE FOR YOUR OPERATION We'll help you choose from a portfolio of HaloKlear biobased flocculants-from 100cvo biodegradable natural flocculants to hybrid flocculants—all of which offer a greener alternative to commodity chemicals. Effective alone or paired with other chemistries Appropriate for active, semi -passive and passive applications Use with existing equipment or as part of a customized product ✓` Ensure regulatory compliance with on -site residual testing capabilities T HaloKlear Dry and Liquid Formula Flocculants The Dual Product System (DPS) uses biodegradable, natural flocculants that perform on a wide array of soil types and pH ranges. In contrast to other products on the market, the HaloKlear Dual Product System creates dense flocs with great shear strength and a low water content that settle very quickly. Solids can be efficiently removed from the water column — increasing performance and productivity while keeping costs low. In addition, the HaloKlear DPS is extremely flexible with a successful track record in active, passive, and semi -passive deployment. LIQUID DPS SYSTEM • LBP-2101 • LiquiFloc O Functions in active treatment systems DPS SYSTEM • DBP-2100 socks O GelFloc socks • Functions in active semi -passive and passive treatment environments LS DPS SYSTEM • MB Kits n Functions in passive treatment environments PART ONE LBP-2101 = Liquid DBP-2100 = Dry socks DBP=2100 MB = Loose, dry PART TWO LiquiFloc = Liquid GelFloc = Dry socks GelFloc MB = Loose, dry VARIABLES Soil Types Soil Samples Dose Rate Calculation Organic & Biodegradable Residual Testing Application Range COMPARISONS ---=HALOKLEAR DPS The H Kie e is rio.n works`on" Dose rates can HaloKlear:DP"S; Yes- manufactured-f t degrade through, enzyi s.4n :ellcofi HaloKlear offersan affordatile,resldual-te used in the field for:Immedlate''resuhs HaloKlearDRS Can actiye"treatment-s ems,(Sand Screens; ;etc.), A: et) type of-flockgenerat abilityto-retain fin_ ers (i.e. driersOlids) rtridges;" rtefit due i the er gtlf), i#s et PAMs (POLYACRYLAMIDES) GRANULAR, POWDER & BLOCKS Highly soil -specific (100s of different formulations) The majority of soil samples must be collected and shipped to manufacturer's lab for specific polyacrylamide selection, adding time and cost Dose rate calculation must be made by manufacturer after soil sample is received at factory and analyzed, adding time and cost Yes —derived from petroleum -based products Laboratory analysis is needed, which can take several days, adding time and cost Polyacrylamides can only be used with passive and semi - passive systems and not with active treatment systems, because they will usually produce a gelatinous flock which contains a high percentage of water and will stick/bind to the filtration media (Le. Sand, Screens, etc.) making it difficult to backwash and clean HaloKlear DPS "Passive" Treatment Model: • Acrylamide-free treatment system • Lowest maintenance requirement • No mechanized equipment requirement • Can reduce footprint by up to 50% • Minimizes or eliminates need for water storage • Actual flow range dependent on Best Management Practice (BMP) design and frequency/severity of storm events • Uses natural filtration and settling to reduce costs • A cost-effective model for meeting EPA & ELG requirements • Easily applied to new and existing BMPs • Lowest cost treatment system HaloKlear DPS "Semi -Passive" Treatment Model: • Delivers consistent results • Acrylamide-free treatment system Low maintenance requirement Low mechanized equipment requirement Significantly reduces footprint compared to traditional active treatment systems • Does not require backwashing PICALRE$ • Requires HaloKlear SockMasterTM Manifold kit & pump; rated 100-500 GPM • Low cost compared to traditional active treatment systems • May use coarse filtration, settling, or both to improve cost effectiveness • Plug -in -play a variety of configurations including: BMPs, dewatering bags, and recirculation systems • May be used in conjunction with passive treatment models • May involve contaminant and nutrient removal HaloKlear DPS "Active" Treatment Model: • Delivers consistent results • Acrylamide-free treatment system • Identical footprint to traditional active treatment systems • Reduced frequency of backwashing compared to traditional active treatment systems Actual flow range dependent on mechanized equipment and pumping capabilities Can reduce operational costs compared to traditional active treatment systems The use of HaloKlear natural flocculants enhances the efficiency of most filtration equipment used in active treatment systems, by aiding the capture of finer solids, reducing the frequency of back -wash, allowing faster settling of particles in settling tanks, and providing solids/ contaminants that have a lower percentage of water, which reduces hauling and disposal costs. INDUSTRIES In the field, we all face the same problem — we must return water to the environment that meets discharge guidelines. HaloKlear products are a complete line of cost-effective, innovative products that will meet your needs today. These products are not only safe for the environment, but they have helped our customers solve their discharge problems, while enhancing project economics in industries like: ACCESSORIES Convenient Economical Reliable Dependable Added Safety Layer HaloKlear Residual Test Kit The HaloKlear Residual Test Kit uses proven test methods for detecting the presence of free residual chitosan before it can leave the job site. Compared to other test kits, this kit improves accuracy by up to 25%. You can achieve results without the hassle of using outside labs, while ensuring you are compliant with local and federal discharge regulations. ACCREDITATIONS Water QuGallotdl Seal Association Zr regon epartment of Transportation Cal -EPA ailtrans- CDE a aw,..,, CrriwywC� w�D M.a-J�K RC 59,“ HaLoKL NATURAL FLOCCULANTS e= provide °education and development for your sales team. Our team encourages you -_ io reach out to schedule a joint sales call or request access to our Dober Digital Lab:_ n addition to your: sales team,we provide_ on=site=training and development for your field staff, • e "treat your sample in our lab, and then work with you to apply our findings to your field =site. We will work directly with you _on -site '-and -in our corporate lab to make sure you have the -best O 11230 Katherine's Crossing I Woodridge, IL 60517 • Phone: 630.410.7300 I Toll Free: 800.323.4983 • www.dober.com DIJBER GFT 02008_V1