Loading...
HomeMy WebLinkAboutNCC201815_Notice of Termination_20220509Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 5/9/2022 11:49:45 AM (NOT Submittal) Approve by Morman, Alaina 5/20/2022 9:13:30 AM (NOT Request Review - NCC201815) • The task was assigned to Morman, Alaina. The due date is: May 12, 2022 5:00 PM 5/9/2022 11:49 AM NORTH CAROLINA Rrf OmFkm&tral Qualrly Certificate of NCC201815 Coverage (COC) No.* Enter the Certificate of Coverage Number 2020 Annual Fee Status 2021 Annual Fee Status PAID May be blank (if not yet billed). 2022 Annual Fee OPEN Status May be blank (if not yet billed). Information associated with this permit Project Name PNG Line 171 - Retrofit Launcher Site Address U.S> Hwy 70 / E New Bern Road, Kinston, NC County Lenoir Latitude 35.2348 Longitude -77.5656 Permittee Listed Piedmont Natural Gas, inc Legally Responsible Sanu Odugbesan Individual NC Reference No. NCG01-2020-1815 E&SC Plan ID Lenoi-2020-008 Original NOI Tracking 25006 No. Date COC Issued 5/4/2020 Prior Rescission Date Date populates only if COC was already rescinded at time of submittal. Reason for Rescission/Termination Request: Reason for Project Closed -Out Termination of Sale (Another Owner/Operator obtained new COC) Coverage* . Mistake or Invalid Coverage Other Additional More information about the basis of this request, if needed. Explanation This project obtained a COC in error. The project scope for NCC201815 included adding a natural gas transmission launcher station to the existing natural gas transmission pipeline; therefore this project would qualify for the exemption for transmission facilities as stated in Clean Water Act (CWA) section 402(I)(2): (2) The Director may not require a permit for discharges of storm water runoff from the following: (ii) All field activities or operations associated with oil and gas exploration, production, processing, or treatment operations or transmission facilities, including activities necessary to prepare a site for drilling and for the movement and placement of drilling equipment, whether or not such field activities or operations may be considered to be construction activities, except in accordance with paragraph (c)(1)(iii) of this section. Discharges of sediment from construction activities associated with oil and gas exploration, production, processing, or treatment operations or transmission facilities are not subject to the provisions of paragraph (c)(1)(iii)(C) of this section. Supporting Upload Supporting Documentation if applicable. Documentation Must be PDF format Project Close-out Information: Final Close-out Inspection Approval Project Close-out Must be PDF format Approval Documentation North Carolina General Statute 143-215.613 (1) provides that: Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCGO10000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature le�w &VAZZ6 Type Name* Adam Pollak Title* Project Manager Organization* Piedmont Natural Gas Date * 05/09/2022 Email for adam.pollak@duke-energy.com Confirmation Contact Telephone* 7047314954 NOT Certification NOT Certification _ Line 171-Launcher.pdf 118.09KB Form Must be PDF Format Is this CDC Already Ensure this COC has not been rescinded since submittal! Rescinded? Additional Email CC'd on Notification Emails (Optional) alicia.depalma@duke-energy.com Original Permittee CC'd on Notification Emails Email sanu.odugbesan@duke-energy.com Original Site Contact CC'd on Notificaiton Emails Email jpriest@nses.com