Loading...
HomeMy WebLinkAbout20201004 Ver 1_Summary of Proposed Impacts and Required Mitigation_20201202Slusher Property Summary of Proposed Impacts and Required Mitigation PCN Impacts No. NWP Number Open Water (acre) Wetland (acre) Stream (linear feet) Temporary Permanent Temporary Permanent Temporary Permanent W 1 NWP 29 0.328 W2 NWP 29 0.019* W4 NWP 29 0.05* S 1 NWP 29 61* S2 NWP 29 40* S3 NWP 29 48* S4 NWP 27 183 S5 NWP 27 150 S6 NWP 29 40 OW1 NWP 29 0.005* Impact Totals 0 0.005 0 0.397 40 482 *Total Loss of Waters of the U.S. (acre) 0.056 *Total Loss of Waters of the U.S. (linear feet) 149 Required Wetland Mitigation (acre) 0 Required Stream Mitigation (linear feet) 0 Notes: 1)Wetland 7 has 0.3 ac of permanent impacts without loss of WoUS (part of Impact W 1), but wetlands are converted to open waters. Applicant is building 0 72 ac of a littoral wetlands within the pond to compensate for conversion of wetlands to open waters. 2) W2 - of the 0.19 ac of permanent impacts to wetlands, only 0.001 ac result in a loss of WoUS.