HomeMy WebLinkAbout20201004 Ver 1_Summary of Proposed Impacts and Required Mitigation_20201202Slusher Property
Summary of Proposed Impacts and Required Mitigation
PCN Impacts
No.
NWP Number
Open Water (acre)
Wetland (acre)
Stream (linear feet)
Temporary
Permanent
Temporary
Permanent
Temporary
Permanent
W 1
NWP 29
0.328
W2
NWP 29
0.019*
W4
NWP 29
0.05*
S 1
NWP 29
61*
S2
NWP 29
40*
S3
NWP 29
48*
S4
NWP 27
183
S5
NWP 27
150
S6
NWP 29
40
OW1
NWP 29
0.005*
Impact Totals
0
0.005
0
0.397
40
482
*Total Loss of Waters of the U.S. (acre) 0.056
*Total Loss of Waters of the U.S. (linear feet) 149
Required Wetland Mitigation (acre) 0
Required Stream Mitigation (linear feet) 0
Notes:
1)Wetland 7 has 0.3 ac of permanent impacts without loss of WoUS (part of Impact W 1), but wetlands are converted
to open waters. Applicant is building 0 72 ac of a littoral wetlands within the pond to compensate for conversion of
wetlands to open waters.
2) W2 - of the 0.19 ac of permanent impacts to wetlands, only 0.001 ac result in a loss of WoUS.