Loading...
HomeMy WebLinkAbout20201004 Ver 1_3-2020-11-10-REVISED-PCN-NCDWR-COMMENT_20201110 (2)C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check ❑ Buffers all that apply): Waters ❑ Pond Construction X Wetlands X Streams — tributaries X Open 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary (r) 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 W5 W6 W7 Flooding Unknown No BOTH 0.328 W2 W9 W1C W11 Fill Mountain Bog No BOTH 0.019 W3 W4 W8 Fill Unknown Yes/No BOTH 0.05 W5 Choose one Choose one Yes/No - W6 - Choose one Choose one Yes/No - 2g. Total Wetland Impacts: 0.397 2h. Comments: W5. W6. W7 - Temp. 0.328 Ac: W8, W9. W10. W11 - Permanent, 0.069 Ac 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site. then complete this question for al stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 S5 Flooding S5 PER BOTH 3 61 S2 S6 Dam construction S6 PER BOTH 2 40 S3 S6 Flooding S6 PER BOTH 2 48 S4 Thompson Ri' Rock Vane Crossing Thompson River PER BOTH 18 183 S5 Thompson Ri' Stabilization Thompson River PER BOTH 18 150 S6 S3,S6 Daylighting - Culvert Remo\ S3.S6 PER BOTH 3 40 3h. Total stream and tributary impacts 522 3i. Comments: Permanent Impacts - S6 dam construction. S6 Flooding. S5 Flooding - 149 L.F. Temporary Impacts - Thompson River rock vane and bank stabilization, S3 daylighting. S6 daylighting - 243 L.F. Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary (T) 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 P Lake Pickens Fill Lake 0.0005 O2 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water impacts 4g. Comments: Fill for DOCK Pilings 5. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes. permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer. then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑ Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Randleman ❑ Other: 6b. Buffer Impact number - Permanent (P) or Temporary (T) 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g. Zone 2 impact (square feet) B1 - Yes/No B2 - Yes/No B3 - Yes/No B4 - Yes/No B5 - Yes/No B6 - Yes/No 6h. Total Buffer Impacts: 6i. Comments: Page 5 of 10