Loading...
HomeMy WebLinkAbout20201004 Ver 1_3-2020-09-22-REVISED-PCN-NCDWR-COMMENT_20200923C. Proposed Impacts Inventory 1. Impacts Summary la. Which sections were completed below for your project (check ❑ Buffers all that apply): Waters ❑ Pond Construction X Wetlands X Streams — tributaries X Open 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary (T) 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 W5 W6 W7 Flooding Unknown No BOTH 0.328 W2 W9 W10 W11 Fill Mountain Bog No BOTH 0.019 W3 W1 Fill Unknown No BOTH 0.005 W4 W8 Fill Unknown Yes/No BOTH 0.05 W5 Choose one Choose one Yes/No - W6 - Choose one Choose one Yes/No - 2g. Total Wetland Impacts: 0.402 2h. Comments: W5, W6, W7 - Temp, 0.328 Ac; W1, W8, W9, W10, W11 - Permanent, 0.074 Ac 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 S5 Flooding S5 PER BOTH 3 61 S2 S6 Dam construction S6 PER BOTH 2 40 S3 S6 Flooding S6 PER BOTH 2 48 — S4 Thompson Ri' Rock Vane Crossing Thompson River PER BOTH 18 15 S5 Thompson Ri' Stabilization Thompson River PER BOTH 18 75 S6 S3,56 Daylighting - Culvert Remo) S3,S6 PER BOTH 3 40 3h. Total stream and tributary impacts 279 3i. Comments: Permanent Impacts - S6 dam construction, S6 Flooding, S5 Flooding - 149 L.F. Temporary Impacts - Thompson River rock vane and bank stabilization, S3 daylighting, S6 daylighting - 130 L.F. Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary (T) 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 P Lake Pickens Fill Lake 0.0005 02 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water impacts 4g. Comments: hit tor Dock failings