Loading...
HomeMy WebLinkAbout20201004 Ver 1_200921_L6.03_20200923EMBED BASE STONE IN RIVERBANK AT EDGE OF STREAM FLAT STEPPING STONES BASE STONES PINNED TO BEDROCK. BASE STONES TO BE 6'1LONG, TYP VAR/ES 3, RANGE 9"-12" ROCK CROSS VANE - PLAN 1 /2"=1'-0" - d�. 4\ ROCK CROSS VANE - SECTION ELEVATION AT STEPPER / 1 -1 WATE LEVEL 21„ 2 IA* 01110' I00'��00'0�W�W������� 4" MIN TYP ROCK CROSS VANE - SECTION AT WEIR 1"=1' PRELIMINARY: NOT FOR CONSTRUCTION THIS DRAWING IS FOR INFORMATIONAL PURPOSES ONLY AND IS NOT INTENDED FOR CONSTRUCTION. DO NOT START CONSTRUCTION WITHOUT A SEALED SET OF CONSTRUCTION DOCUMENTS. COPYRIGHT, STEPHEN STIMSON ASSOCIATES LANDSCAPE ARCHITECTS, INC. ALL RIGHTS RESERVED. NO REPRODUCTION, IN WHOLE OR IN PART, IS PERMITTED WITHOUT EXPRESS WRITTEN AUTHORIZATION FROM STEPHEN STIMSON ASSOCIATES LANDSCAPE ARCHITECTS, INC. BANK STABILIZATION EMBED BASE STONE IN RIVERBANK AT EDGE OF STREAM STACK BOULDERS DOWNSTREAM TO FORM CASCADING POOLS BANK STABILIZATION BEYOND STEPPING STONES 3' TO 4' LONG #7 DWL x 9" @ 18" O.C. - DRILL AND EPDXY 3" EMBED INTO STEPPINGSTONE W/SIMPSON SET XP - EPDXY ADHESIVE- ALLOW EPDXY TO SET- DRILL INTO BASE STONES 6" AND FILL HOLES WITH EPDXY- SET STEPPING STONES - INSTALL EPDXY IN STRICT ACCORDANCE WITH MANUFACURES INSTRUCTIONS BASE STONES 6' LONG, TYP EPDXY ACCESS HOLE - 2" ABOVE TOP OF DWL FILL VOID SOLID W/ NON -SHRINK GROUT5000 PSI #7DWL x1'-0"@18"O.C.-DRILL AND EPDXY 6" EMBED INTO BEDROCK W/SIMPSON SET XP - EPDXY ADHESIVE- FILL DRILL HOLE SOLID WITH EPDXY AFTER STONE IS SET - USE ACCESS HOLE TO INSERT EPDXY. - FILL ENTIRE HOLE SOLID WITH EPDXY. INSTALL EPDXY IN STRICT ACCORDANCE WITH MANUFACURES INSTRUCTIONS STACK BOULDERS DOWNSTREAM TO FORM CASCADING POOLS NOTCH BEDROCK TO LEVEL AND SECURE BASE STONES. INSTALL BASE STONES TIGHT TO EDGE OF NOTCH EXISTING BEDROCK RIVER BED 4" MAX TYP LANDSCAPE ARCHITECT STIMSON STEPHEN STIMSON ASSOCIATES LANDSCAPE ARCHITECTS, INC. 288 NORFOLK STREET CAMBRIDGE, MA 02139 T 617 876 8960 2 MOUNTAIN ROAD PRINCETON, MA 01541 T 978 464 5200 STIMSONSTUDIO.COM 2'-3' TYP FUSCO LAND PLANNING & DESIGN, PLLC STEPPING STONES BEYOND SLOPE TOP OF BASE STONE AT OPENINGS BASE STONES 6' LONG, TYP EPDXY ACCESS HOLE - 2" ABOVE TOP OF DWL FILL VOID SOLID W/ NON -SHRINK GROUT5000 PSI #7 DWL x 1'-0" @ 18" O.C. - DRILL AND EPDXY 6" EMBED INTO BEDROCK W/SIMPSON SET XP - EPDXY ADHESIVE- FILL DRILL HOLE SOLID WITH EPDXY AFTER STONE IS SET - USE ACCESS HOLE TO INSERT EPDXY. - FILL ENTIRE HOLE SOLID WITH EPDXY. INSTALL EPDXY IN STRICT ACCORDANCE WITH MANUFACURES INSTRUCTIONS STACK BOULDERS DOWNSTREAM TO FORM CASCADING POOLS STACK BOULDERS DOWNSTREAM TO FORM CASCADING POOLS NOTCH BEDROCK TO LEVEL AND SECURE BASE STONES. INSTALL BASE STONES TIGHT TO EDGE OF NOTCH EXISTING BEDROCK RIVER BED ROCK CROSS VANE - AXONOMETRIC SKETCH NTS H E LlA ENVIRONMENTAL SAPPHIRE FARM SAPPHIRE NC 28774 /2\ ROCK CROSS VANE 0 ROCK CROSS VANE - CONTEXT PLAN 3142 — - Wn 7 NTS ISSUE DATE 1 2 3 4 5 6 7 8 DESCRIPTION SCALE AS NOTED DATE 09.21.2020 DRAWN BY SK/MV REVIEWED BY STIMSON STEPPING STONES 3' TO 4' LONG BASE STONES 6' LONG TYP STACK BOULDERS DOWNSTREAM TO CREATE CASCADING POOLS SITE DETAILS PERMITTING