Loading...
HomeMy WebLinkAboutNCC221908_Site Plan or Location Map_20220519- - US 421 HWY EX. CONCRETE EX.ASPHALT ISLAND SOUTH EXIT RAMP _7► _ _ I- EP EX GRAVEL 950 955 95 X E�Eij i_ ASPHALT OVE WFEF --- �� �,� - - - - - - - }_ X ENCE I REBAR WITH CAPS - �� DISTURBED LIMIT - - - - x` _ _ _ \ \ \ \ \ \ \ \ \ \ \ \ \ - �aN+ROL ACGES�L" sa _ S84°50'59"E \ 9iiO Co ON 17 �� �70 I I \ /\ r- \ A JAMES M. BLEVINS // \ I j \\� J A DB 448, PG. 255 TAX PARCEL ID: 120993 / I IC 11" ZONED: HB A o I�/ B 1 - /1 I soLu CIO - U CO A ol/\� I //\\I� B J do A M v `I /\ CHADWICK W. ELLER DB 1252, PG. 758 I/ TAX PARCEL ID: 120990 ( k I \ \- ZONED: HB r - IC:: Im 20-ft. R/W and I ^� I_ �I/ \} I 930 L,LJ Utility Easement bk. 438, pg. 313 1 I - J ✓I I I� Ic _ OHU�OH jOHU 5/8" REBAR 1 1 lk9?5 EX.INV= L' 920.58'E-X- EXl/L8 ROP� -+NV�- /' � /I �921.2�/� -iFM T / DISTURBED LIMITS / r � - - - - - - - - - - - - - - - - - - - A PROPERTY INFORMATION: PARCEL NUMBER: 120993 ZONING: HB ACREAGE: 3.052 PROPERTY OWNER: MILL AVENUE RE, LLC 802 NORTHERN SHORES LANE GREENSBORO, NC 27455 PHONE: (845) 226-6541 EMAIL: KJESSUP@GENEVAMERCHANTBANK.COM KEVIN JESSUP DEVELOPER: MAX LAND HOLDING, LLC 323 RIVERBEND DRIVE ADVANCE, NC 27006 PHONE: (336) 408-6438 EMAIL: STILLWATERHOMESNC@GMAIL.COM ROBERT BALDWIN ENGINEER: ALLIED DESIGN, INC. 4720 KESTER MILL ROAD WINSTON-SALEM, N.C. 27103 PHONE: (336) 765-2377 EMAIL: SCAUSEY@ALLIED-ENGSURV.COM STEVECAUSEY GRADING AND EROSION CONTROL GENERAL NOTES 1. CUT SLOPES SHALL BE A MAXIMUM OF 2:1 UNLESS OTHERWISE SHOWN. FILL SLOPES SHALL BE VICINITY MAP A MAXIMUM OF 3:1 UNLESS OTHERWISE SHOWN. NOT TO SCALE 2. REMOVE VEGETATION, TOPSOIL, DEBRIS, UNSATISFACTORY SOIL MATERIALS, OBSTRUCTIONS, AND DELETERIOUS MATERIALS FROM GROUND SURFACE PRIOR TO PLACING FILLS. PLOW, SCARIFY, BENCH, OR BREAK UP SLOPED SURFACES STEEPER THAN 1 VERTICAL TO 4 HORIZONTAL SO FILL MATERIAL WILL BOND WITH EXISTING MATERIAL. PLACE AND COMPACT FILL MATERIAL IN LAYERS TO REQUIRED ELEVATIONS. EROSION CONTROL CONSTRUCTION SEQUENCE 2-12-13 3. PLACE BACKFILL AND FILL MATERIALS IN 8" LIFTS. COMPACT SOIL MATERIALS TO NOT LESS THAN 1. OBTAIN GRADING/EROSION CONTROL PLAN APPROVAL AND PERMIT FROM NCDEQ THE FOLLOWING PERCENTAGES OF MAXIMUM DRY UNIT WEIGHT - STD. PROCTOR, ASTM D 698. INSPECTIONS. 4. UNDER STRUCTURES, BUILDING SLABS & STEPS, SCARIFY AND RECOMPACT TOP 12" OF EXISTING 2. CONTACT EROSION CONTROL INSPECTOR TO ESTABLISH A PRE -CONSTRUCTION SUBGRADE AND COMPACT EACH LAYER OF BACKFILL OR FILL MATERIAL AT 98% DRY DENSITY. CONFERENCE AND INSPECTION SCHEDULE. 5. UNDER PAVEMENTS, SCARIFY AND RECOMPACT TOP 12" OF EXISTING SUBGRADE AND COMPACT SELFINSPECTION ----- EFFECTIVE OCTOBER 1, 2010, PERSONS CONDUCTING EACH LAYER OF BACKFILL OR FILL MATERIAL AT 95% DRY DENSITY. AASHTO T99 MAY BE USED. LAND -DISTURBING ACTIVITIES, LARGER THAN ONE (1) ACRE, MUST INSPECT THEIR PROJECT AFTER EACH PHASE OF THE PROJECT, AND DOCUMENT THE INSPECTION 6. UNDER SIDEWALKS AND WALKWAYS, SCARIFY AND RECOMPACT TOP 6" BELOW SUBGRADE AND IN WRITING ON APPROVED FORMS AVAILABLE FROM NCDENR INSPECTIONS OFFICE. 03 COMPACT EACH LAYER OF BACKFILL OR FILL MATERIAL AT 92% DRY DENSITY. THE PHASES ARE AS FOLLOWS: 1. INSTALLATION OF PERIMETER EROSION AND SEDIMENT CONTROL MEASURES. 2. CLEARING AND GRUBBING OF EXISTING GROUND COVER. 'S 7. UNDER LAWN OR UNPAVED AREAS, SCARIFY AND RECOMPACT TOP 6" BELOW SUBGRADE AND COMPACT EACH LAYER OF BACKFILL OR FILL MATERIAL AT 85% DRY DENSITY. 3. 4. COMPLETION OF ANY PHASE OFN GRADING OF SLOPES OR FILLS. INSTALLATION OF STORM DRAINAGE FACILITIES. / 5. COMPLETION OF CONSTRUCTION OR DEVELOPMENT. 8. ALL TRENCH BACKFILL SHALL BE COMPACTED TO THE REQUIREMENTS LISTED ABOVE FOR THE 6. ESTABLISHMENT OF PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN OVERLYING CONDITION, WITH A MINIMUM COMPACTION OF 90% DRY DENSITY, UNLESS EROSION. � OTHERWISE DIRECTED BY THE ENGINEER. 3. CLEAR SITE ONLY AS NECESSARY TO INSTALL INITIAL EROSION CONTROL �C l� 9. UNIFORMLY GRADE AREAS TO A SMOOTH SURFACE, FREE FROM IRREGULAR SURFACE CHANGES. MEASURES AS FOLLOWS: W �^ �0`i MEET COMPACTION REQUIREMENTS AND GRADE TO CROSS SECTIONS, LINES, AND ELEVATIONS A. TEMPORARY CONSTRUCTION ENTRANCE/EXIT INDICATED. PROVIDE A SMOOTH TRANSITION BETWEEN ADJACENT EXISTING GRADES AND NEW B. TEMPORARY SEDIMENT BASINS. FOR SITES OVER ONE (1) ACRE, OUTLET STRUCTURES [SKIMMERS] THAT ONLY WITHDRAW WATER FROM THE GRADES. SLOPE GRADES TO DIRECT WATER AWAY FROM BUILDINGS AND TO PREVENT PONDING. SURFACE OF THE BASIN, SHALL BE UTILILIZED. NO SEDIMENT TRAPS OR S� 10. FILL MATERIAL FOR BACKFILL OF TEMPORARY SEDIMENT TRAPS SHALL BE KEPT ON -SITE, IN ROCK DAMS ALLOWED. � VICINITY OF TRAPS. TRAPS TO BE UNDERCUT AND BACKFILLED UPON STABILIZATION OF SITE O -t\7 !LQ AND WHEN APPROVED BY EROSION CONTROL INSPECTOR. PROVIDE STRUCTURAL FILL IN AREAS OF PROPOSED BUILDING PADS AS DIRECTED BY GEOTECHNICAL ENGINEER. D. TEMPORARY SILT FENCING SEED EMBANKMENTS AND DISTURBED AREAS OF DEVICES (INCLUDING "CLEAN" WATER DIVERSION) UPON COMPLETION OF CONSTRUCTION. SEE GROUND (n 11. THE RETAINING WALL, INCLUDING ASSOCIATED DRAINAGE SYSTEMS SHALL BE DESIGNED AND STABILIZATION CRITERIA BELOW FOR MORE INFORMATION. CONSTRUCTED BY THE CONTRACTOR. THE PROPOSED RETAINING WALL SYSTEM SHALL BE OF KEYSTONE/MODULAR TYPE AND APPROVED BY THE OWNER PRIOR TO START OF 4. BEGIN CLEARING, GRUBBING, AND STRIPPING OF SITE AS REQUIRED. > DESIGN/CONSTRUCTION. EARTHEN -MATERIAL STOCKPILES ON -SITE FOR LATER DISTRIBUTION AND/OR > REMOVAL, AREAS DEDICATED FOR MANAGEMENT OF LAND CLEARING AND _ DEMOLITION DEBRIS, CONSTRUCTION AND DOMESTIC WASTE, AND HAZARDOUS OR _ A1> TOXIC WASTE SHALL BE LOCATED AT LEAST 50 FEET AWAY FROM STORM DRAIN INLETS AND SURFACE WATERS (UNLESS IT CAN BE SHOWN THAT NO OTHER ALTERNATIVES ARE REASONABLY AVAILABLE), AND WITHIN AREAS PROTECTED BY GENERAL NOTES EROSION CONTROL MEASURES. 5. BEGIN SITE GRADING. MAINTAIN EROSION CONTROL DEVICES IN ACCORDANCE _ - - - 1. TOTAL SITE AREA = 3.05 ACRES. WITH THE MAINTENANCE PLAN. INSTALL ADDITIONAL EROSION CONTROL MEASURES AS REQUIRED. \ 2. TOTAL DISTURBED AREA = 3.07 AC. (133,820 SF). \ 6. INSTALL STORM DRAINAGE SYSTEM AND UTILITIES. STORM PIPING SHALL BE \ 3. ALL UTILITIES OR STRUCTURES NOT DESIGNATED FOR REMOVAL OR MODIFICATION ARE INSTALLED TO THE POINT WHERE IT ENTERS EACH DEVICE. COMPLETION OF PIPING \ TO REMAIN AND BE PROTECTED. ALL UTILITIES OR STRUCTURES DESIGNATED FOR WILL ONLY BE ALLOWED ONCE THE SITE HAS BEEN DEEMED STABLE BY THE MODIFICATION SHALL BE PROTECTED BY THE CONTRACTOR DURING CONSTRUCTION. EROSION CONTROL INSPECTOR. INSTALL PROTECTION AROUND ALL INLETS AS STORM DRAIN SYSTEM IS INSTALLED. 4. THE LOCATION OF ALL EXISTING UNDERGROUND UTILITIES IS APPROXIMATE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL ILLUSTRATED GROUND STABILIZATION CRITERIA UNDERGROUND UTILITIES AND PROPOSED UTILITY CROSSINGS. THE CONTRACTOR SHALL EXERCISE REASONABLE EFFORTS TO PROTECT ANY UNKNOWN UNDERGROUND UTILITIES. NOTIFY ENGINEER IMMEDIATELY IF ANY ELEMENTS ARE DISCOVERED THAT WOULD NECESSITATE DESIGN REVISIONS. 5. A YADKIN COUNTY INSPECTOR SHALL BE PRESENT WHEN TERMINATING WATER AND SEWER CONNECTIONS. ALL CONSTRUCTION, MATERIALS, AND SANITATION PROCEDURES SHALL MEET OR EXCEED THE REQUIREMENTS OF THE NORTH CAROLINA PLUMBING CODE AND THE YADKIN COUNTY STANDARDS, SPECIFICATIONS AND DETAILS. 6. NO SIGNAGE SHALL BE REMOVED TEMPORARILY OR PERMANENTLY FROM THE NCDOT RIGHT-OF-WAY. SIGNAGE SHALL BE PROTECTED DURING ALL CONSTRUCTION ACTIVITIES. ANY SIGNS DAMAGE DURING CONSTRUCTION SHALL BE REPAIR OR REPLACED AT CONTRACTORS EXPENSE. \ IU - I OHU� STAGE 2 CONTROL CONSTRUCTION SEQUENCE - - - - - _ _ _\ \ ,c2inir1Of� _ _ _ _/ / j / 1 ��I 1. CONTINUE SITE GRADING TO ACHIEVE PROPOSED FINISHED GRADES. -- - - - - - tlE - _ - -- _ _ _ _ _ - - - - - �� �� \�\\ ` - ice_ �_ _ _ _ i/�' I I 2. CONTINUE TO MAINTAIN EXISTING MEASURES AND REMOVE ACCUMULATED SEDIMENT. Co - / NV=_ _ L _ CD_ 3. AS SITE IS GRADED, BEGIN INSTALLATION OF STORMDRAINAGE SYSTEM. INSTALL INLET 935 \ \ \ _ - 9 5EX.1.66i � %I r \ PROTECTION AROUND INLETS. \ ` _--�- ---- 4. INSTALL SITE UTILITIES. 5. COMPLETE FINE GRADING AND BEGIN BUILDING CONSTRUCTION. 'O / \ °tip HOOTS ROAD - S.R. 1150 120' PUBLIC RIGHT -OF -WAS' KEY NOTES BRICK OR CONCRETE DROP INLET. NCDOT STANDARD 840.14 OR 840.15 \ WITH U.S. FOUNDRY 4139 FRAME AND 6429 GRATE. \ I OB TEMPORARY WIRE AND STONE DROP INLET FILTER. � 1 O OC PIPE OUTLET STABILIZATION. tiG OD TEMPORARY SILT SACK. \ 30 SITE AREA STABILIZATION STABILIZATION DESCRIPTION TIMEFRAME TIMEFRAME EXCEPTIONS PERIMETER DIKES, SWALES, 7 DAYS NONE DITCHES, & SLOPES SLOPES STEEPER THAN 3:1 7 DAYS IF SLOPES ARE 10' OR LESS IN LENGTH & ARE NOT STEEPER THAN 2:1, 14 DAYS ALLOWED SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES > 50 FEET IN LENGTH ALL OTHER AREAS WITH 14 DAYS NONE SLOPES FLATTER THAN 4:1 7. PRIOR TO THE CONTRACTOR DEMOBILIZING FROM THE SITE (AT APPROXIMATELY 45 DAYS PRIOR TO DEMOBILIZATION), THE FINANCIALLY RESPONSIBLE PARTY (OR THE DESIGNEE) WILL NOTIFY NCDENR AND THE DESIGNATED EROSION CONTROL INSPECTOR OF THEIR ANTICIPATED DATE TO LEAVE THE SITE. AN ON -SITE INSPECTION WILL BE CONDUCTED PRIOR TO THE LEAVE DATE BY NCDENR AND THE DESIGNATED EROSION CONTROL INSPECTOR TO MAKE CERTAIN ALL ACTION ITMES HAVE BEEN ADDRESSED BY THE CONTRACTOR.. 8. CONTINUE TO MAINTAIN EROSION CONTROL MEASURES UNTIL VEGETATIVE COVER HAS BEEN ESTABLISHED OVER ALL DISTURBED AREAS AND SITE HAS BEEN STABILIZED. REMOVE EROSION CONTROL MEASURES ONLY AFTER FINAL INSPECTION AND APPROVAL BY INSPECTOR. EROSION CONTROL MAINTENANCE PLAN 2-12-13 1. INSPECT ALL SEDIMENTATION AND EROSION CONTROL DEVICES FOR STABILITY AND FUNCTION EACH WEEK AND FOLLOWING EACH RAINFALL EVENT. 2. REMOVE SILT/SEDIMENT FROM TEMPORARY DEVICES WHEN ACCUMULATED VOLUME HAS REACHED 50% CAPACITY. 3. REMOVE ACCUMULATED SILT/SEDIMENT FROM BEHIND TEMPORARY SEDIMENT FENCE WHEN DEPTH EXCEEDS APPROXIMATELY 05. REPAIR AND REPLACE SILT FENCE AS NECESSARY. 4. SEED AND STABILIZE TEMPORARY DIVERSION BERMS IMMEDIATELY AFTER CONSTRUCTION INCLUDING "CLEAN" WATER DIVERSION BERMS. RE-GRADE/REPAIR BERMS AS REQUIRED. 5. CONTRACTOR SHALL APPOINT AN ON -SITE INSPECTOR AND MAINTAIN RECORDS OF INSPECTIONS IN ACCORDANCE WITH THE PROVISIONS OF THE GENERAL NPDES STORMWATER DISCHARGE PERMIT FOR CONSTRUCTION ACTIVITIES. GRAPHIC SCALE 0 15 30 60 120 M 0 U Z r- N � Q w i Z_ J U) U 0 E Q oT_ o O O y w �w0°O-6 J O N w 13�Q_(0= Z w w (0 r- 7 O U)zm 3:a) W Y� 6�� _ c Q U q-i> dli-C( FIRM LICENSE C-1891 ��{Y3�i1 t.R#Lji1 4; �8 CAROB jr . Q�cES '•4 r: O z U J W J � � z Q U O �/1 vJ O = W z W Q Z i W Z m J p J_ X Q CU Y Q Q � 00 Z U N U) N N N 0 0 O Z U m w Z m 0 w Y O Q w d 0 0 U z O d Z U z O cn o w 0� of w a 0 0 w U) N w N o o r 0 0 o z Q STAGE 2 EROSION CONTROL AND GRADING PLAN SHEET U 1.2 ( IN FEET ) 1 inch = 30 ft.