Loading...
HomeMy WebLinkAbout20150416 Ver 1_Mitigation Information_20220513From: Davis, Erin B To: Baker, Caroline D Subject: FW: [External] RE: Russell Gap video link as follow-up to IRT credit release meeting Date: Wednesday, May 18, 2022 1:13:12 PM Laserfiche Upload: Email DWR#: 20150416 v.I Doc Type: Mitigation Information -----Original Message ----- From: Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil> Sent: Friday, May 13, 2022 2:54 PM To: King, Scott <Scott.King( mbakerintl.com> Cc: Reid, Matthew <matthew.reid@ncdenr.gov>; Wiesner, Paul <paul.wiesner@ncdenr.gov>; Davis, Erin B <erin.davis(a��ncdenr.gov>; Tugwell, Todd J CIV USARMY CESAW (US) Todd.J.Tugwell@usace.army.mil>; Haywood, Casey M CIV USARMY CESAW (USA) <Casey.M.Haywood(ousace.army.mil>; Wilson, Travis W. <travis.wilson&cwildlife.org> Subject: [External] RE: Russell Gap video link as follow-up to IRT credit release meeting CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. <mailto:report.spam(cr)nc. go Thanks again for the follow-up, Scott. I appreciate that you documented where the flow camera was installed on RI 1. It's our expectation that the camera will document flow during this monitoring season, and not just a dry channel. We look forward to reviewing this data next year. Have a good weekend, Kim Kim (Browning) Isenhour Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers 1 919.946.5107 -----Original Message ----- From: King, Scott <Scott.King( mbakerintl.com> Sent: Friday, May 06, 2022 1:03 PM To: Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning(ousace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov> Cc: Reid, Matthew <matthew.reid@ncdenr.gov>; McKeithan, Katie <Katie.McKeithan(ombakerintl.com> Subject: [URL Verdict: Neutral][Non-DoD Source] Russell Gap video link as follow-up to IRT credit release meeting Good afternoon, During the IRT credit release meeting on 4/19/22 we discussed our installation of a flow camera at the bottom section of Reach RI 1 on 10/27/21 (see attached photo and location map). As we noted, the IRT had some concerns during their field visit (in June 2021) about this lowermost section where RI 1 flows through the floodplain of the larger main reach RL They were worried that the channel would lack sufficient seasonal flow due to it drying up, soaking in, dispersing out, or cutting over into the adjacent larger reach RI. We captured flow photos with the camara over this past winter and spring which will be included in the MY3 report. I had also mentioned we collected a video showing the installation of the camera and the condition of the channel, though we did not include it with the MY2 monitoring report, and the IRT expressed interest in viewing the video. Kim, you had said I could email the group or upload it to RIBITS site. I'm afraid I couldn't figure out how to do that with RIBITS today (just not tech savvy enough!) but we'll use that method for this sort of thing in the future. As such, please see the YouTube link below showing the channel and installation of the camera: https://urldefense.com/v3/_https://youtu.be/oG4X0IrSDaA_711HYmSToo IYdf-iPNN4faYaJ6q-V2JNQ63- tLH 1 PPPb_Oz 192y 2cx4Sr7xyL 5Gb89jl67upSdDy P3UON82imX 1 zI7J5Na5KTdCfcaHn_PPYKS S <Blockedhttps: //y outu.be/oG4XOIrSDaA> Please let me know if you have any questions or comments. I hope you find it useful. Thank you, Scott Scott King, LSS, PWS I Soil Scientist - Ecosystem Restoration Group I Michael Baker International 797 Haywood Road, Suite 2011 Asheville, NC 28806 1 [O] 828-412-6102 1 [M] 919-219-6339 scoff.king@mbakerintl.com<mailto:scott.king�q_)mbakerintl.com> https://urldefense.com/v3/ http://www.mbakerintl.com__1IHYmSToo!Ydf-iPNN4faYaJ6q-V2JvNQ63- tLH1PPPb_Oz 192y 2cx4Sr7xyL 5Gb89j 167upSdDvP3UON82imX 1 zI7J5Na5KTdCfcaHvBO SoF gs <Blockedhttp://www.mbakerintl.com/>