HomeMy WebLinkAbout20181694 Ver 1_Dudley Mill Pond Site as-built_20220503From: Davis, Erin B To: Baker, Caroline D Subject: FW: [External] RE: Wildlands Cape Fear 05 UMB - Dudley Mill Pond Site as -built Date: Wednesday, May 18, 2022 1:21:18 PM Laserfiche Upload: Email DW R#: 20181694 v.1 Doc Type: Mitigation Information From: Jessop, Jordan E CIV USARMY CESAW (USA)<Jordan.E.Jessop@usace.army.mil> Sent: Tuesday, May 3, 2022 11:54 AM To: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Kim Browning <Kimberly.D.Browning@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov>; kathryn_matthews@fws.gov; Twyla Cheatwood - NOAA Federal <twyla.cheatwood@noaa.gov>; Turlington, Chad <chad.turlington@ncdenr.gov>; Mickey Sugg <Mickey.t.sugg@usace.army.mil>; Gledhill-earley, Renee <renee.gledhill-earley@ncdcr.gov>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Haywood, Casey M CIV USARMY CESAW (USA) <Casey.M.Haywood@usace.army.mil> Subject: [External] RE: Wildlands Cape Fear 05 UMB - Dudley Mill Pond Site as -built CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hi everyone, Last week I walked the Dudley Mill Pond Site with the folks from Wildlands. For anyone interested, I sent out a link to the photo log of the visit. As shown in red in the drawings there are a couple of spots were "floodplain outlets" were added and large areas of brush toe on bends, and some additional rock material was added in -stream in a couple riffle areas to help deal with the increased velocity due to the relatively quick drop in slope across the former main pond bed. Everything appeared stable. The report notes a bare area where the groundcover has been sparse due to a low pH (the value is not in report but they said on -site it was 3.8). They've limed that area and other bare spots (there are several within the old pond bed adjacent to the stream channel, which will be noted in the letter and are worth watching in the coming years. They are visible in my photo log. I will be getting the credit release letter out soon, let me know if you have any questions or comments. Best regards, Jordan From: Jessop, Jordan E CIV USARMY CESAW (USA) Sent: Friday, April 15, 2022 2:09 PM To: Tugwell, Todd J CIV USARMY CESAW (USA)<Todd.J.TugwelIPusace.army.mil>; Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.BrowningPusace.army.mil>; Davis, Erin B <erin.davisPncdenr.Rov>; Matthews, Kathryn H <kathryn matthewsPfws.Rov>; Wilson, Travis W. <travis.wilsonPncwildlife.org>; Twyla Cheatwood - NOAA Federal <twyla.cheatwoodPnoaa.gov>; chad.turlingtonPncdenr.gov; Renee Gledhill -Earley (renee..Rledhill-earleypncdcr.Rov) <renee.gledhill-earleyzPncdcr.gov>; Sugg, MickeyT CIV USARMY CESAW (USA) <Mickey.T.SuRRPusace.army.mil> Subject: Wildlands Cape Fear 05 UMB - Dudley Mill Pond Site as -built Hi everyone, The as -built plans for Dudley Mill Pond ( 34.9572,-78.7517) are available on RIBITS (https://ribits.ops.usace.army.mil/ords/f? p=107:278:16611493701610:::RP.278:P278_BANK _ID:5196#). The site visit is scheduled for April 28, Thursday at 9:30am. Please let me know if you plan on attending. A video of the site is available here- https://www.youtube.com/watch?v=IEU6PU-kbz8 Let me know if you have any questions. Best regards, Jordan