HomeMy WebLinkAbout20140322 Ver 1_On Hold Request_20140509A 71
rA
ANNOMMOM
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Resources
Water Quality Programs
Pat McCrory John E, Skvada, III
Governor Secretary
May 9, 2014
CERTIFIED, MAIL - RETURN RECEIPT REQUESTED
70133020000076320291
Mr. Clay Willis
NCDOT, Division One
113 Airport Drive, Suite 100
Edenton, NC 27932
Subject: The replacement of Bridge No. 23 over Chinkapin Swamp on SR 1328 (Buncomb Rd) in Bertie County; State Project No,
1713P. I.R.66; DWR project number 20140322
Dear Mr. Willis:
The Division of Water Resources has reviewed your submittal for a 401 Water Quality Certification for the aforementioned project.
Review of your application revealed it lacking necessary information required for making an informed permit decision. The permit
application was deficient in the following areas:
• Stream Impacts. The drainage feature shown being piped in the northwest quadrant of the project is ajurisdictional stream.
These impacts have not been accounted for. Please minimize the impacts to this feature to the maximum extent practicable and
resubmit a PCN and plan sheets showing these impacts. Please also be aware that any pipe on this feature will need to meet the
proper pipe burial requirements.
Therefore, pursuant to 15A NCA,C 21-1.0507(a)(5), we will have to place the permit application on hold until we are supplied the
necessary information. You have 21 days to respond in writing with the requested information or notification to this office that the
information is forthcoming. If, at the end of the 21 days, this office has not received this information in writing, we will assume you
are withdrawing your application and it will be returned. Furthermore, until the information is received by the NC Division of Water
Resources, we request (by copy of this letter) that the US Army Corps of Engineers place the permit application on hold.
If you have any questions or require additional information, please contact Garcy Ward at (252) 948-3922 or garcy.ward@ncdenr.gov.
Sincerely,
for T % mas Reeder
Director
cc: Tracey Wheeler, US Army Corps of Engineers, Washington Field Office (electronic copy only)
Garcy Ward, DWR, Washington Regional Office
File Copy
Transportation and Permitting Unit
1650 Mail Service Center, Raleigh, NC 27699-1650
Location: 512 N. Salisbury St. Raleigh, NC 27604
An Equal Oppodunity 1 Affirmatve Action Employer
Phone: 919- 707 -87851 FAX: 919-733-1290
Internet: www,ncwater.org