Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW1191201_Plansheet - Misc. Detail_20220314
1 2" WEEP PLAN HOLES W/GRATE & FRAME REMOVED I 4'-0" 33 � � � 3" 6" o A 6" 0 = o i0 i0 rn o 0 0 DOWEL SEE NOTE #2 SECTION-XX FRAME SHALL BE SEALED WITH RUBBER "0" RING AND BOLTED TO MANHOLE GRADE RINGS AS REQUIRED (2 COURSES MAX.) HGT.= 3-1/2" MAX. HGT.= 12" CONE SECTION HGT.=3' OR 4' INTERMEDIATE SECTION AS REQUIRED HGT.=16", 32", OR 48" MONOLITHIC LOWER BARREL & BASE SLAB SECTION VARIABLE HGT. 311 11.9" "-9" 3" (10)-3/8" DIA. WELDED STUD ANCHORS 8" LG. (4"+4" ANCHORS PIGGYBACK =8") PLAN SHOWING POSITION OF BOLTS 3" 6" #4 BAR 6" DOWEL 3/8"DIA.x 8"LG. WELDED PIGGYBACK STUD ANCHORS 6" I 27a11 29Y2" = I 27i/z�l 25Y4" 30" 39%s" 41%" 39%" 37Y4" 42" GRATE SECTIONS FRAME & GRATE SHALL BE ADA COMPLIANT (V-5660-80 BY EJIW OR APPROVED EQUAL) STANDARD CONCRETE DROP INLET CAST IRON RING & COVER TONGUE & GROOVE JOINT WITH RUBBER'O'- RING OR RAM -NECK 4000 PSI CONCRETE (REINF.NOT SHOWN) MIN. AS=0.12IN2/FT MANHOLE OPENING AS PER PLANS (BY MANUFACTURER) SLOPE 1/4" PER FOOT SHAPEDINVERT CONCRETE OR MASONRY 8" NO. 57 STONE NOTES: 1. FOR DEAD-END MANHOLES, THE INVERT SHALL BE EXTENDED THROUGH THE MANHOLE. 2. ON THE INTERIOR OF THE MANHOLE, ALL JOINTS BETWEEN SECTIONS SHALL BE PARGED WITH NON -SHRINK GROUT. 3. ON THE INTERIOR OF ALL OUTFALL MANHOLES, ALL JOINTS BETWEEN SECTIONS SHALL BE PARGED WITH PRECO-PLUG QUICK SETTING GROUT, 4. ON THE EXTERIOR OF ALL MANHOLES, ALL JOINTS BETWEEN SECTIONS SHALL BE CONTINUOUSLY WRAPPED WITH 12" WIDE WATERPROOF BITUMINOUS TAPE. 5. SEWER MANHOLES WITHIN 1200 FEET OF FORCE MAIN CONNECTION SHALL HAVE INTERIOR EPDXY COATED. DIMENSIONS FOR DROP INLET DIMENSIONS OF BOX & PIPE PIPE SPAN WIDTH HEIGHT D A B H 1211 31-011 21-011 21-811 15" 3'-011 1811 3'-511 2411 4'-0" 3011 3'-011 2'-0" 4'-3" DIMENSIONS FOR CHANNELS NO. SIZE LENGTH TOTAL LIN. FT. 2 3"x4.1" 4'-0" 8'-011 2 3"x4.1" 2'-6" GRATE PLAN L I�C) A ° A o p0o 0 00° 00 w0 0 gJ 00 e6 Do _ wl o o0 ° o°o cp 000 8, 0 `4 0 0 O�°0po00wV_ �Oo 0 o o g O pgjo� o O 00 go D(=OUTLET PIPE DIAMETER oat O p 1 IL I LI\ ULfll Vf\L 1 Oc PLAN SECTION A -A (OUTLET TO FLAT AREA WITH NO WELL DEFINED CHANNEL) NOTES: 1. 3,000-PSI CONCRETE TO BE USED THROUGHOUT. 2. OPTIONAL CONSTRUCTION - MONOLITHIC POUR, 2" KEYWAY, OR #4 BAR DOWELS AT 12" CENTER, AS DIRECTED BY THE DESIGNER. 3. TWO 2" PIPE WEEP HOLES TO BE PLACED AS DIRECTED BY DESIGNER. 4. FORMS ARE TO BE USED FOR THE CONSTRUCTION OF THE BOTTOM SLAB. 5, IF REINFORCED CONCRETE PIPE IS SET IN BASE SLAB OF BOX, ADD TO BASE AS SHOWN ON NCDOT STANDARD 840.00. 6. A STONE DRAIN CONSISTING OF 1 CUBIC FOOT OF NO. 78M STONE CONTAINED IN A BAG OF POROUS FABRIC SHALL BE PLACED AT EACH WEEP HOLE. 7. ALL DROP INLETS OVER 3'-6" IN DEPTH TO BE PROVIDED WITH STEPS 15" ON CENTERS. STEPS SHALL BE IN ACCORDANCE WITH NCDOT STANDARD 840.66. THE FIRST STEP SHALL BE 24" BELOW RIM OF GRATE. 8. ALL GRATES IN SIDEWALK AREAS SHALL BE ADA COMPLIANT. V-5660-80 BY EAST JORDAN IRON WORKS OR APPROVED EQUAL. 9. INLETS MAY BE CONSTRUCTED OF BLOCK AND MORTAR IN LIEU OF PRE -CAST CONCRETE. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. L B B O __-- °°0po00 0000000 00o 00 0 O°O p000%J 0 0 o� 0 c) c co DO _ o°��°°�o°° 00 00 800 o 0 w _ 0000000o Oo��a�0o0 0 000 00 °0o0p d 0000 0 ° O 0 o O00 DO=OUTLET PIPE DIAMETER PLAN (OUTLET TO WELL DEFINED CHANNEL) NOTES: TYPE STONE FILTER BLANKET SECTION B-B 1. TOP OF RIP RAP AT DOWNSTREAM END OF APRON MAINTENANCE: SHALL BE FLUSH WITH NATURAL GRADE OF THE 1. RIP RAP OUTLET STRUCTURES TO BE INSPECTED RECEIVING CHANNEL. WEEKLY AND AFTER EVERY RAINFALL EVENT. 2. VEGETATE ALL DISTURBED AREAS WITH VEGETATION REPAIRS ARE TO BE MADE IMMEDIATELY. IMMEDIATELY AFTER INSTALLATION. 3. SEE EROSION CONTROL PLAN FOR DIMENSIONS. STONE HEEL PROOF IRON SLOTTED TRENCH GRATE SLOPE 12" CONIC SAWCUT FOR CLEAN EDGE. ADD APRON APRON JOINT FILLER. DOWN PAVEMENT 2010 PAVEMENT LJ 10" THICK 4,000-PSI CONCRETE OVER 4" ABC STONE CROSS SECTION SLOPE 12" CONIC APRON APRON DOWN 2% A �- LEVEL TOP ELEV= B I 0.5% BOTTOM SLOPE ADD ADAPTERS AS NECESSARY TO ACCOMMODATE PIPE SIZE SEE PLAN FOR PIPE SIZE © PROFILE INV OUT= N.T.S. 1 (2 SLOPE 12" CONIC APRON APRON DOWN 2% %1 0.5% BOTTOM SLOPE t� ADD ADAPTERS AS NECESSARY TO ACCOMMODATE PIPE SIZE SEE PLAN FOR PIPE SIZE INV OUT= TRENCH DRAIN NO. A B � TRENCH GRATE WIDTH TD - 1 117-LF ELEV 1226.0' ELEV 1222.5' 6" TD - 2 49-LF ELEV 1226.0' ELEV 1221.4' 6" TD - 3 38-LF ELEV 1226.0' ELEV 1221.7' 6" TD - 4 92-LF ELEV 1226.0' ELEV 1220.2' 6" TD - 5 125-LF ELEV 1226.0' ELEV 1222.01 6" TD - 6 123-LF ELEV 1225.5' ELEV 1218.5' 8" TD - 7 138-LF ELEV 1225.5' ELEV 1219.3' 8" TD - 8 27-LF ELEV 1226.23' ELEV 1220.0' 6" TD - 9 21-LF ELEV 1225.4' ELEV 1223.1' 6" 8- TD - 11 114-LF ELEV 1223.8' ELEV 1219.0' 6" TD - 12 24-LF ELEV 1223.8' ELEV 1220.8' 6" TRENCH DRAIN METALLIC LOCATOR TAPE SHALL BE INSTALLED FOR ALL DIP PIPE 18" BELOW FINISHED GRADE /� FINISHED / GRADE Ck FINAL BACKFILL (SEE SPECIFICATIONS) INITIAL BACKFILL COMPACTED IN 6" MAX. LIFTS AS SPECIFIED SPRING LINE No 57 STONE WORK WELL UNDER BOTTOM OF PIPE. 10" THICK 4,000-PSI CONCRETE OVER 4" ABC STONE 10" THICK 4,000-PSI CONCRETE OVER 4" ABC STONE N.T.S. FINISHED GRADE DOWNSPOUT VERIFY SIZE PRIOR TO ORDERING BOOT FINISHED GRADE CLEANOUT TO BE ON FRONT OR SIDE OF BOOT FINISH/PAINT BOOT TO MATCH COLOR OF EXISTING DOWNSPOUT FINISHED GRADE CAST IRON DOWNSPOUT BOOT WITH CLEANOUT. BOOT SIZED FOR DOWNSPOUT. BASIS OF DESIGN: ZURN Z191-CA OR APPROVED EQUAL PROVIDE ADAPTER AND WATERTIGHT CONNECTION FROM PIPE TO DOWNSPOUT BOOT. SCHED 40 PVC OR CLASS 52 DIP PIPE (SEE PLANS & NOTES BELOW) NOTES: 1. INSTALL CAST IRON DOWNSPOUT BOOT ON EXISTING DOWNSPOUT AND MOUNT SECURELY TO WALL. 2. FINISH / PAINT BOOT TO MATCH COLOR OF DOWNSPOUT. 3. ALL BELOW GRADE ROOF DRAINAGE PIPING SHALL BE 6" PVC @ 1.0% MIN. SLOPE UNLESS NOTED OTHERWISE. 4. PIPE SHALL BE DIP WHEN LESS THAN 24" OF COVER IS PROVIDED. 5. VERIFY DOWNSPOUT DIMENSIONS MATCH BOOT DIMENSIONS PRIOR TO ORDERING BOOT OR ADAPTOR. CAST IRON DOWNSPOUT BOOT AND PIPE CONNECTION INCREASEYE R MUST BE 2" BELOW GRADE CLEANOUT \�/\\�/\Iff I -III. III -I BRANCH LINE WYE iLiiiIII III- CLEANOUT IN PVMT ❑ STD VALVE BOX SHALL BE INSTALLED INSIDE A VALVE BOX CLEANOUT SHALL BE WITH SEWER OR STORM LOCATED ON BRANCH LINE, COVER AS APPLICABLE. UPSTREAM OF FITTING. PAVEMENT INSTALLATION LINE SIZE CHANGES SHALL OCCUR UPSTREAM OF FITTING (SEE UTILITY PLAN FOR PIPE 4" ROUND SLOTTED CAST IRON, SIZES) � BRASS OR CHROME GRATE FLUSH WITH FINISHED GRADE MAIN LINE FINISHED GRADE PLAN VIEW AT FITTINGSjjj��j;�j\, CONIC COLLAR 12"x12"x6" THK N.T.S. 6" O.D. OF PIPE 6" MINIMUM SIDE CLEARANCE 6" O.D. OF PIPE 6" 12" O.D. OF PIPE 12" MAXIMUM SIDE CLEARANCE 12" O.D. OF PIPE 12" 4" CAST IRON PIPE (ONE CONTINUOUS PIECE) CLASS B CLASS D NOTE: RISER STACK SHALL BE 4 CAST REQUIRED FOR: REQUIRED FOR; IRON. PROVIDE REDUCING WYE AS HDPE & PVC PIPE DIP, CIP AND RCP NEEDED TO TRANSITION TO DIFFERING LATERAL PIPE SIZE. NOTES MIN. GRADE 1 % SEE UTILITY PLAN FOR SIZE AND MATERIAL 1. FOR TRENCHES REQUIRING SHORING AND BRACING, DIMENSIONS SHALL BE TAKEN FROM THE INSIDE FACE OF THE SHORING AND BRACING. _ 2. NO ROCKS OR BOULDERS 4" OR LARGER TO BE USED IN INITIAL BACKFILL. BARREL OF PIPE TO REST ON 3. ALL BACKFILL MATERIAL SHALL BE SUITABLE NATIVE MATERIAL. UNDISTURBED SOIL COMBINATION LONG TURN PATTERN Y AND 1/8" BEND 4. BACKFILL SHALL BE TAMPED IN 6" LAYERS. NOTES: 5. IF ROCK IS ENCOUNTERED AT BOTTOM OF TRENCH OVER EXCAVATE ROCK A MIN. THE FULL LENGTH OF THE SERVICE DITCH BE COMPACTED OF 6"CHS AND BACK FILL WITH NO. 67 STONE TO THE BOTTOM OF PIPE. IN 6" LAYERS WITH MECHANICAL TAMP. 6O STORM SEWER TRENCHES N.T.S. O STANDARD CLEANOUT N.T.S. DUCTILE IRON DUCTILE IRON DOMED GRATE FLAT TOP GRATE IN MULCH AREAS ONLY IN PAVEMENT & GRASS AREAS d° d GRADE ADJACENT GROUND ° d° TO PROVIDE POSITIVE ° DRAINAGE TO GRATE PVC BODY RUBBER GASKET - PVC RISER (12" MIN.) - UTILIZE REDUCERS AS NEEDED TO CONNECT TO TEE OR ELBOW PVC TEE (RUN DIA. TO MATCH DOWNSTREAM PIPE SIZE) SEE PLAN FOR PIPE MATERIAL INLINE DRAIN N0. TOP ELEV INVERT OUT ELEV GRATE SIZE PIPE SIZE Y1 1214.0 1207.1 12" 10" Y2 1220.0 1216.5 12" 101, Y3 1219.5 1216.4 12" 101, Y4 1225.5 1218.0 12" 8" Y5 1225.5 1218.8 12" 8" Y6 1225.5 1218.8 12" 8" Y7 1225.5 1218.8 12" 8" Y8 1225.5 1219.8 12" 8" Y9 1225.5 1217.3 12" 8" Y10 1226.5 1223.5 8" 8" Y11 1224.3 1218.8 18" 101, Y12 1221.3 1218.0 181, 12" Y13 1226.6 1218.8 12" 8" Y14 1226.6 1218.8 12" 8" 0 Y16 1221.5 1218.5 12" 6" Y17 1223.8 1220.8 12" 6" Y18 1225.1 1221.1 12" 8" Y19 1225.1 1222.0 12" 6" 12" ON ALL SIDES. SURROUND SIDES AND BOTTOM WITH ABC STONE (TYP) NOTES: 1. GRATES SHALL BE 18" DIAMETER, SLOTTED, CAST IRON, HINGED AT BASE. 2. PIPE AND FITTINGS SHALL BE PVC, SMOOTH INTERIOR AND EXTERIOR. 3. REFER TO DRAWING 7.2 FOR INLINE DRAIN SCHEDULE. 1' BRIC O DRAINAGE MANHOLE N.T.S. O FLARED END SECTION N.T.S. O INLINE DRAIN N.T.S. 9O PERFORATED UNDERDRAIN N.T.S. 3 Q .., #U o 'Cr2 rn .Y #7 S� , L V 03 d f8 f Cr o .� 0 C c R G #.r c UMFJU IrL 0 LO (0 N IFw O U il� uj •2 W 1p � m - U) o n Co CD■ W 0(lJ�N�O �(7Y�UrnLO i Ty i � Z C Z r c0 W N c6•cy)rn _U ou_H 0)(DM J E O '7D � UE �MtX z�QLdlrali NOT FOR CONSTRUCTION �k 1CARo�i��'', , 2 s ��FESS/p� Q < - SEAL = 033612 FNGINEE� 1111111 SD/DD REVIEW 1 U W z z O U U z W C) 1 [)L Z W �U V U) CO Q w C: Z O z 0 Li7 O LO 00 Q w N z 0� U z Q z Q z O z J - O W O r^ r Q LLJ 2 U m2i� CN I ` �O 'ztQ I..L C L O Z z ra(/n a� I = z U) [)� *0>Ln O O J LO 0 G vJ G Lb Revisions No. Date SWR #1 2021 AUG 13 SWR #2 2022 FEB 24 Project Number: 1711-13 Date: 2020 JAN 20 Drawn by: FS SITE DETAILS Sheet Number: C8010 AQUATTIC BENCH ELEV: 1202.00 OUTSIDE EDGE OF AQUATIC BENCH IS 6-IN ABOVE PERMANENT POOL ELEV r ��������� FOREBAY SECTION 6' WIDE AQUATIC BENCH TOP OF WEIR - AROUND ENTIRE POND ELEV: 1201.50 (SEE SHEETS C4.1 & C6.1) AQUATIC BENCH ELEV: 1201.00 6 -11 INSIDE EDGE OF AQUATIC BENCH IS 6-FT LENGTH T SUBMERGED 6-IN BELOW PERMANENT POOL ELEV FOREBAY WEIR ELEV: 1200.00 PERMANENT POOL ELEV: 1201.50 3 FOREBAY �1 ENTRANCE ELEV: 1197 1 r EXIT ELEV: 1198 42 _ _ NL_ FOREBAY - - " RCP IET PIPE RIPRAP PAD EMBANKMENT TOP OF PERM. SED. STOR. FOREBAY ENTRANCE ELEV: 1197.00 BOT. OF PERM. SED. STOR. FOREBAY ENTRANCE ELEV: 1196.00 BOT. OF PERM. SED. STOR. FOREBAY EXIT ELEV: 1196.50 SEQUENCE OF CONVERSION FROM SEDIMENT BASIN TO STORMWATER CONTROL MEASURE 1. INSTALL POND BARREL, OUTLET STRUCTURE, EMBANKMENT AND ALL OTHER POND COMPONENTS. 2. CALL FOR SITE INSPECTION PRIOR TO BACKFILLING POND BARREL. 3, INSTALL TEMPORARY SKIMMER TO OUTLET STRUCTURE. 4. EXCAVATE POND TO TEMPORARY SKIMMER BASIN DIMENSIONS, SEE EROSION CONTROL PLAN. 5. INSTALL BAFFLES AND OTHER TEMPORARY SKIMMER BASIN COMPONENTS, SEE TEMPORARY SKIMMER BASIN DETAIL. 6. REFER TO TEMPORARY SEDIMENT SKIMMER BASIN DETAIL FOR ELEVATION OF SKIMMER CONNECTION. 7. SEE CONSTRUCTION SEQUENCE ON EROSION CONTROL PLAN FOR INFORMATION, 8. ONCE SITE IS APPROVED, REMOVE TEMPORARY SKIMMER, BAFFLES AND OTHER TEMPORARY COMPONENTS 9, FILL HOLE IN OUTLET STRUCTURE FROM SKIMMER WITH NON -SHRINK GROUT. PROVIDE PERMANENT WATERTIGHT SEAL. 10. EXCAVATE SEDIMENT AND GRADE TO FINAL CONTOURS, SEE GRADING PLAN. 11. CONSTRUCT WET POND STORMWATER CONTROL MEASURE AS SHOWN ON THE DRAWINGS. AS -BUILT SURVEY REQUIREMENTS NOTE: CONTRACTOR SHALL PROVIDE AS -BUILT TOPOGRAPHIC SURVEY PERFORMED BY A PROFESSIONAL LAND SURVEYOR CERTIFYING WET DETENTION POND AREA DIMENSIONS AND ELEVATIONS OF THE FOLLOWING: 1. TOPOGRAPHIC SURVEY OF THE WET POND AND EMBANKMENT 2. OUTLET STRUCTURE TOPS AND INVERTS 3. OUTLET STRUCTURE DIMENSIONS 4. ORIFICE DIAMETERS 5. BARREL PIPE SIZES AND INVERTS 6. EMERGENCY SPILLWAY ELEVATION AND DIMENSIONS. OUTLET STRUCTURE NOTES 1. CAST -IN -PLACE CONCRETE RISER IS REQUIRED WITHOUT EXCEPTION. 2. CLASS "A" (3,000 PSI) CONCRETE TO BE USED. 6. ALL MORTOR JOINTS ARE 1/2" f 1/8". 7. GROUT SHALL BE NON -SHRINK (ASTM-C1107) S. ALL STRUCTURES OVER 3'-6" IN DEPTH TO BE PROVIDED WITH STEPS V-2" ON CENTERS. STEPS SHALL BE IN ACCORDANCE WITH STANDARD 840.66. 9. LOCATE MANHOLE OVER STEPS. 6-IN DUCTILE IRON DRAIN PIPE WITH GATE VALVE AND HAND WHEEL d° ° X r ° d° d °� ° ° a° d ° ° ° W d° ° ° d d , ° 4. ° L CONCRETE CAST IN PLACE RISER IS PIPE ANCHOR Y REQUIRED WITHOUT EXCEPTION ° PVC PRIMARY SPILLWAY ° ORIFICE DIAMETER: 3.5-IN I 8IN 4-FT C LL ° ° ° o ° 00 TEMPORARY SKIMMER TO BE \ / REMOVED (SEQUENCE OF �/ FILL SKIMMER CONVERSION FROM SEDIMENT HOLE WITH BASIN TO STORMWATER NON -SHRINK CONTROL MEASURE) GROUT FOR WATERTIGHT SEAL X 12" PVC INV.: 1197.0 (REFER TO ,SHEET C4.1) OUTLET BARREL 100-LF 24-IN RCP 8-IN CONTRACTOR SHALL PROVIDE STEP IN ACCORDANCE WITH NCDOT STD. 840.66. STEPS SHALL BE PLACED AT 16" O.C. OUTLET STRUCTURE PLAN VIEW 2 �1 TOP OF PERM. SED. STOR. FOREBA. EXIT ELEV: 1197.00 6" IMPERVIOUS FILL LAYER UNDER ALL WATER SURFACES 3 1� 24-IN THICK CLASS B RIPRAP OVER FILTER FABRIC TOP OF EMBANKMENT ELEV: 1208.00 100-YR STORM ELEV 1206.60 10-YR STORM ELEV 1205.10 2-YR STORM ELEV 1204.02 1-YR STORM ELEV 1203.68 PROVIDE 6' X 6' DEPRESSED AREA 2-FT BELOW PRINCIPAL SPILLWAY WITHIN AQUATIC BENCH FOR ADEQUATE DRAINAGE PERMANENT POOL ELEV: 1201.50 MAIN POOL INV=1197.20 TOP OF PERM. SED. STOR. ELEV: 1197.00 - BOT. OF PERM. SED. STOR. ELEV: 1196.00 SEASONAL HIGH WATER TABLE BELOW ELEV: 1192.00 TOP ELEV: 1205.50 6-FT WIDE ACCESS PAD TO OUTLET STRUCTURE 6-IN BELOW WEIR 10-FT WEIR WIDTH 3 �1 SPILLWAY CREST ELEV: 1206.50 ' ' � � I-III-III-III-III-III-III-III-III-III-III-� EMERGENCY SPILLWAY SECTION 3 1� 24-IN THICK CLASS B RIPRAP OVER FILTER FABRIC 1 � �I~ EMERGENCY SPILLWAY CREST ELEV: 1206.50 3 1 PRINCIPAL SPILLWAY=- INV=1203.30 L L 6-IN COMPACTED COMPACTED \ OUTLET STRUCTURE SELECT FILL 7 U_ SELECT FILL / N / N \ INV=1201.50 I N SEED & MULCH EMBANKMENT SEE SEEDING SCHEDULE (INSTALL SLOPE PROTECTION MATTING ON ALL SLOPES STEEPER THAN 6: 1) - - - � EXISTING DROP INLET CORE DRILL AND PROVIDE WATERTIGHT CONNECTION TO SCHEDULE A PRE -INSTALLATION CONFERENCE PRIOR TO CONSTRUCTION OF THE STORMWATER CONTROL MEASURE -------- - - - - - - EXISTING DROP INLET BARREL OUTLET BARREL: 142-LF 24" RCP @17.2% SLOPE (ASTM C-76, CLASS III) GASKETED JOINT PIPE MANUFACTURED WITHOUT LIFT HOLES. GASKETED I INV=1171.00 INV=1197.00 JOINT PIPE SHALL BE WRAPPED WITH A DOUBLE LAYER OF NON -WOVEN FILTER FABRIC ON THE OUTSIDE OF THE PIPE AT EACH JOINT. `----------------------------------------------4------- - - - - - INV=1197.10 6 IN�THICK • • N CONCRETE PIPE N N / I / 4 • ° 4 • ° 6" DUCTILE IRON COLLAR TO CONC. ANTI -SEEP COLLAR (6" WIDE) s , DRAIN PIPE SPRINGLINE 3 TOTAL UNDER EMBANKMENT WITH \ \ i� , . POND AND EMBANKMENT SECTION IV ONE COLLAR UNDER CENTER OF \ \ - I / N • ° DAM / \,4 CONCRETE \ 24" PIPE ° \ • ° RCP°• COLLAR I _ I i \ • ° ---�� z I a e• • N ,° • • •• •• A ° ° \ 24„ 24„ / \ MIN MIN / \ ANTI -SEEP COLLAR \ \ ENLARGEMENT / WET DETENTION BASIN MAINTENANCE SCHEDULE DAM EMBANKMENT CONSTRUCTION STANDARDS 1. CONTROLLED FILL, AS SPECIFIED BY THE GEOTECHNICAL ENGINEER, IN THE DAM EMBANKMENT SHALL BE PLACED IN 6-INCH LOOSE LAYERS (3-INCH LOOSE LAYERS WITHIN 3-FEET OF DESCRIPTION METHOD FREQUENCY SEASON EITHER SIDE OF THE PRINCIPAL SPILLWAY PIPE TO A DEPTH OF 2-FEET OVER THE PIPE) AND SHALL BE COMPACTED TO A DENSITY OF NO LESS THAN 95% OF THE STANDARD PROCTOR MAXIMUM DENSITY AT A MOISTURE CONTENT OF + OR - TWO PERCENTAGE POINTS OF THE OPTIMUM MOISTURE CONTENT IN ACCORDANCE WITH ASTM D698. EMBANKMENT 2. ALL VISIBLE ORGANIC DEBRIS SUCH AS ROOTS AND LIMBS SHALL BE REMOVED FROM THE FILL MATERIAL PRIOR TO COMPACTION TO THE REQUIRED DENSITY. SOILS WITH ORGANIC MATTER INSPECT AND REPAIR VISUAL ONCE PER YEAR ALL CONTENT EXCEEDING 5% BY WEIGHT SHALL NOT BE USED. STONES GREATER THAN 3-INCH (IN ANY DIRECTION) SHALL BE REMOVED FROM THE FILL PRIOR TO COMPACTION. EROSION / ANIMAL NESTINGS 3. FILL MATERIAL PLACED AT DENSITIES LOWER THAN SPECIFIED MINIMUM DENSITIES OR AT MOISTURE CONTENTS OUTSIDE THE SPECIFIED RANGES OR OTHERWISE NOT CONFORMING TO INSPECT AND RESEED VISUAL WHENEVER NEEDED ALL SPECIFIED REQUIREMENTS SHALL BE REMOVED AND REPLACED WITH ACCEPTABLE MATERIALS. - - - - - - GRASS COVERAGE 4. ANY FILL LAYER THAT IS SMOOTH DRUM ROLLED TO REDUCE MOISTURE PENETRATION DURING A STORM EVENT SHALL BE PROPERLY SCARIFIED PRIOR TO THE PLACEMENT OF THE NEXT SOIL LIFT. OUTLET STRUCTURE 5. SURFACE WATER AND STREAM FLOW SHALL BE CONTINUOUSLY CONTROLLED THROUGHOUT CONSTRUCTION AND THE PLACEMENT OF CONTROLLED FILL. \ \ DEBRIS / OBSTRUCTIONS BY HAND WHENEVER NEEDED ALL 6. FOUNDATION AREAS MAY REQUIRE UNDERCUTTING OF COMPRESSIBLE AND/OR UNSUITABLE SOILS IN ADDITION TO THAT INDICATED ON THE PLANS. ALL SUCH UNDERCUTTING SHALL BE END CAP WITH / DRILL OPENING \ PERFORMED AT THE DISCRETION OF THE GEOTECHNICAL ENGINEER AND SHALL BE MONITORED AND DOCUMENTED. IN NO CASE SHALL THERE BE AN ATTEMPT TO STABILIZE ANY PORTIONS / DIAMETER: 3.5-IN \ OF THE FOUNDATION SOILS WITH CRUSHED STONE. / \ OPERATE POND DRAIN VALVE BY HAND ONCE PER YEAR ALL 7. TREATMENT OF SEEPAGE AREAS, SUBGRADE PREPARATION, FOUNDATION DEWATERING AND ROCK FOUNDATION PREPARATION (I.E., TREATMENT WITH SLUSH GROUTING, DENTAL CONCRETE, / \ ETC.) MAY BE REQUIRED AT THE DISCRETION OF THE GEOTECHNICAL ENGINEER. ALL SUCH ACTIVITIES SHALL BE CLOSELY MONITORED AND DOCUMENTED BY THE GEOTECHNICAL ENGINEER. / ° d \ EROSION AT OUTLET DISCHARGE VISUAL ONCE PER YEAR ALL 8. FILL ADJACENT TO THE RISER AND PRINCIPAL SPILLWAY PIPE SHALL BE PLACED SO THAT LIFTS ARE AT THE SAME LEVEL ON BOTH SIDES OF THE STRUCTURES. / ° \ 9. EARTHWORK COMPACTION WITHIN 3-FEET OF ANY STRUCTURES SHALL BE ACCOMPLISHED BY MEANS OF HAND TAMPERS, MANUALLY DIRECTED POWER TAMPERS OR PLATE COMPACTORS OR ° ANCHOR \ MINIATURE SELF-PROPELLED ROLLERS. ° DRAWDOWN \ FOREBAY / MAIN POOL 10. COMPACTION BY MEANS OF DROP WEIGHTS FROM A CRANE OR HOIST SHALL NOT BE PERMITTED. � d PIPE TO WALL ° ° ° 11. HEAVY EQUIPMENT SHALL NOT BE ALLOWED TO PASS OVER CAST -IN -PLACE STRUCTURES (INCLUDING THE CRADLE) UNTIL ADEQUATE CURING TIME HAS ELAPSED. SEDIMENT / DEBRIS BY HAND ONCE PER YEAR ALL / 10 IN 12. TO RE-ESTABLISH VEGETATION AFTER CONSTRUCTION, A 2- TO 3-INCH LAYER OF TOPSOIL SHALL BE PLACED ON THE DISTURBED EMBANKMENT SURFACE AND THE AREA SEEDED AND MULCHED OR HYDROSEEDED. REMOVE TRASH BY HAND WHENEVER NEEDED ALL 4"PVC ° "° CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE UNTIL PROJECT CLOSE OUT TESTING, OBSERVATION, AND CERTIFICATION I ° 1 AT WHICH TIME OWNER WILL ASSUME MAINTENANCE RESPONSIBILITY. 1. TESTS OF THE DEGREE (%) OF COMPACTION OF THE PLACED FILL IN THE DAM SHALL BE PERFORMED AS A PART OF THE PERMITTEE'S NORMAL QUALITY CONTROL PROGRAM FOR THE d ° d PRIMARY CONSTRUCTION OF THE DAM. TESTS SHALL BE CONDUCTED CONCURRENT WITH THE INSTALLATION OF THE COMPACTED FILL AND THE CONTRACTOR SHALL COORDINATE THE CONSTRUCTION I 4"PVC TEE ° SPILLWAY OF THE DAM SO THAT THE TESTING CAN BE COMPLETED. SHOULD THE RESULTS OF THE TESTS INDICATE THAT THE SPECIFIED DEGREE OF COMPACTION HAS NOT BEEN OBTAINED; THE INV=1212.60 PORTIONS OF THE DAM REPRESENTED BY SUCH TESTS SHALL BE REWORKED OR REBUILT. ALL PORTIONS OF THE DAM SHALL ACHIEVE THE SPECIFIED MINIMUM DEGREE OF COMPACTION. PERM. POOL ELEV: 1201.50 I 2. CONSTRUCTION OF CLASS A, B AND C DAM EMBANKMENTS SHALL BE DONE UNDER THE OBSERVATION OF A QUALIFIED GEOTECHNICAL ENGINEER, WHO IS REGISTERED AS A PROFESSIONAL I ENGINEER IN THE STATE OF NORTH CAROLINA. THE GEOTECHNICAL ENGINEER MUST HAVE EXPERIENCE IN THE DESIGN AND CONSTRUCTION MONITORING OF DAMS OF THE SIZE AND SCOPE ° ° COVERED BY THESE STANDARDS AND GUIDELINES. d 3. ON CLASS A, B, AND C DAMS (WITH THE EXCEPTION OF DETENTION ONLY CLASS C DAMS THAT COLLECT DRAINAGE FROM AN AREA OF 25-ACRES OR LESS), THE GEOTECHNICAL ENGINEER, ° 4"PVC WATERTIGHT NON -SHRINK I AS DEFINED ABOVE, SHALL OBSERVE ALL ASPECTS OF THE CONSTRUCTION OF THE DAM (I.E., PREPARATION OF THE FOUNDATION, INSTALLATION OF THE CUT-OFF TRENCH, INSTALLATION OF GROUT I THE PRINCIPAL SPILLWAY PIPE, INSTALLATION OF THE INTERNAL DRAINAGE, INSTALLATION OF COMPACTED FILL, ETC.). THE FREQUENCY OF OBSERVATION AND TESTING MUST BE 8-IN °d SUFFICIENT FOR THE GEOTECHNICAL ENGINEER (OR THE DESIGN ENGINEER ON CLASS D DAMS AND CLASS C, DETENTION ONLY, DAMS) TO STATE, IN HIS/HER PROFESSIONAL OPINION, THAT THE SPECIFIC ITEMS OBSERVED AND TESTED WERE INSTALLED IN ACCORDANCE WITH THE APPROVED CONSTRUCTION DRAWINGS AND SPECIFICATIONS. ANCHOR / DRAWDOWN / \ °° PIPE TO WALL / \ • / HEAVY DUTY VALVE STEM \ / WHEEL \ END CAP WITH / DRILL OPENING \ / DIAMETER: 3.5-IN CONCRETE SLAB 3" DIA. CONCRETE CORE 5-IN THICK MANHOLE RING AND COVER CONCRETE SLAB \ PRIMARY SPILLWAY / #4 BARS 8" O.C. E.W. \ / 24" 6-FT WIDE ACCESS #4 BARS ENLARGEMENT PAD TO OUTLET 8"O.C. E.W. 3"R �� TOP SLAB ELEV: 1216.00 STRUCTURE 6-IN TOP SLAB ELEV: 1205.30 \ o' BELOW WEIR o• - - - \ #4 REBAR 6" O.C. E.W. \ TRASH RACK TRASH RACK TRASH RACK (ALL \ •0 ' IS ON ALL FOUR SIDES 3" •0 ' IS ON ALL FOUR SIDES FOUR SIDES OF \ WEIR ELEV: 1214.40 e 1 RIM ELEV: 1203.10 e OUTLET STRUCTURE) _ I \ ANCHOR TRASH RACK \ 8-IN 8-IN 6-IN - I�I� 8-IN (ALL CONTACT POINTS) 8-IN \ \ PRIMARY � - - �. VALVE STEM GUIDE. ATTACH ' , \ SPILLWAY / TO RISER WITH THREADED / \ ROD FILLED WITH GROUT AQUATIC BENCH PRIMARY / • ,, , INV=1201.50 . A. SPILLWAY ' INV=1201.50 • ° PERMANENT POOL ELEV: 1201.00 7 1 I HEAVY DUTY VALVE STEM I `' I ���� • � �� � I� I I� I I� ,e II•IIII TEMPORARY SKIMMER TO \ \ '� °• °• BE REMOVED ( SEE CONSTRUCTION \ \ � U SHAPED STEEL 3 � 3 1 F SEQUENCE) \ \ +• BRACKET ATTACHED TO _ _ FILL SKIMMER HOLE WITH \ \ BASE WITH THREADED NON SHRINK GROUT. \ \ ROD FILLED WITH GROUT PROVIDE PERMANENT • ' ELEV: 1197.00 WATERTIGHT SEAL. 8-IN OUTLET EXTEND PIPE OUTSIDE �'j _ -�, I /I I J I I_ ' '• • , INV=1197.00 BARREL 100-LF 24-IN RCP I ' EMBANKMENT / I I- " INV=1197.10 DEWATERING . INV=1197.20 TOP PERMANENT SEDIMENT STORAGE ELEV: 1197.00 °° 6" DUCTILE IRON DEWATERING PIPE PIPE INV=1196.00 ° A • • •CONCRETE If •° •CONCRETE °, a ° 6-FT X 6-FT X 2.5-FT DEEP \ N / FILL • r` ° •. • ° • ° FILL t ° • ° ' • ° • DEPRESSION UNDER PRINCIPAL BOTTOM PERMANENT SEDIMENT STORAGE ELEV: 1196.00 / \ / , , ' TO EXCEED N TO EXCEED ° • ° • N �. SPILLWAY FOR ADEQUATE / • BUOYANT FORCE .1 ` ° A' • . q BUOYANT FORCE ' ° a •, DRAINAGE. TIE BACK TO AQUATIC / CONCRETE ° ° °• ° .. �, ,• °, • t • 4 ° BENCH AT 3:1 SLOPE. / PIPE ANCHOR ° z A. ° z FLANGED, NRS, RESILIENT WEDGE GATE / \ VALVE WITH EXTENSION STEM, HAND WHEEL / \ AND STEM GUIDES AS MANUFACTURED BY / \ CLOW OR APPROVED EQUAL. / \ / .. 24 IN °, . \ OUTLET STRUCTURE OUTLET STRUCTURE \ SECTION Y-Y SECTION X-X r• I ' , •n ° °. Y 6-IN DIP '°• I ` C �• °, 36IN • . ° °• . • ' ' !° S ° 1 A' °• 12-IN ' °, • '° J / \ CONCRETE PIPE ANCHOR / \ ENLARGEMENT \ lO PERMANENT WET DETENTION POND STORMWATER CONTROL MEASURE (SCM) NTS 3 Q .., #U o Q r9 .v # r%1 Let &'! ` m m 18 a o c G w_ m +• U M ea 0 LO O N W * " (3 O il� W2 W * z 3 m 0_ U) O n U) Co 0 't � Lu 2E75c)-'Ncoa) U)(DY_�:,UrnLO Lu M Mai _U 0 L-L p�.. - J E O '� () g 5 X ZFQLo�D-LL NOT FOR CONSTRUCTION , 2 s ��FESS/p� Q < = SEAL = = 033612 FNGINEE� �N SD/DD REVIEW U W Z Z O U U Z W C) 0. Z W ::)U V V J U) Q W !` Z Z O OFn 0 Li7 Lr) � 00 Q w O N Z O� U z Q J w zQ z O O WHO V r Vw n� U m�=3 CN I ` �O > I..L co L O Z L6 a - rQ ( a) 1 / , z v) 0. �0Ln 0_jLO �O 0 ` V/ C 'o Revisions No. Date SWR #1 2021 AUG 13 SWR #2 2022 FEB 24 Project Number: 1711-13 Date: 2020 JAN 20 Drawn by: FS SITE DETAILS Sheet Number: 0 SEQUENCE OF CONVERSION FROM SEDIMENT BASIN TO STORMWATER CONTROL MEASURE 1. INSTALL POND BARREL, OUTLET STRUCTURE, EMBANKMENT AND ALL OTHER POND COMPONENTS. 2. CALL FOR SITE INSPECTION PRIOR TO BACKFILLING POND BARREL. 3, INSTALL TEMPORARY SKIMMER TO OUTLET STRUCTURE. 4. EXCAVATE POND TO TEMPORARY SKIMMER BASIN DIMENSIONS, SEE EROSION CONTROL PLAN. 5. INSTALL BAFFLES AND OTHER TEMPORARY SKIMMER BASIN COMPONENTS, SEE TEMPORARY SKIMMER BASIN DETAIL. 6. REFER TO TEMPORARY SEDIMENT SKIMMER BASIN DETAIL FOR ELEVATION OF SKIMMER CONNECTION. 7. SEE CONSTRUCTION SEQUENCE ON EROSION CONTROL PLAN FOR INFORMATION, 8. ONCE SITE IS APPROVED, REMOVE TEMPORARY SKIMMER, BAFFLES AND OTHER TEMPORARY COMPONENTS 9, FILL HOLE IN OUTLET STRUCTURE FROM SKIMMER WITH NON -SHRINK GROUT. PROVIDE PERMANENT WATERTIGHT SEAL. 10. EXCAVATE SEDIMENT AND GRADE TO FINAL CONTOURS, SEE GRADING PLAN. 11. CONSTRUCT WET POND STORMWATER CONTROL MEASURE AS SHOWN ON THE DRAWINGS. AS -BUILT SURVEY REQUIREMENTS NOTE: CONTRACTOR SHALL PROVIDE AS -BUILT TOPOGRAPHIC SURVEY PERFORMED BY A PROFESSIONAL LAND SURVEYOR CERTIFYING WET DETENTION POND AREA DIMENSIONS AND ELEVATIONS OF THE FOLLOWING: 1. TOPOGRAPHIC SURVEY OF THE WET POND AND EMBANKMENT 2. OUTLET STRUCTURE TOPS AND INVERTS 3. OUTLET STRUCTURE DIMENSIONS 4. ORIFICE DIAMETERS 5. BARREL PIPE SIZES AND INVERTS 6. EMERGENCY SPILLWAY ELEVATION AND DIMENSIONS. OUTLET STRUCTURE NOTES 1. CAST -IN -PLACE CONCRETE RISER IS REQUIRED WITHOUT EXCEPTION. 2. CLASS "A" (3,000 PSI) CONCRETE TO BE USED. 6. ALL MORTOR JOINTS ARE 1/2" f 1/8". 7. GROUT SHALL BE NON -SHRINK (ASTM-C1107) S. ALL STRUCTURES OVER 3'-6" IN DEPTH TO BE PROVIDED WITH STEPS 1'-2" ON CENTERS. STEPS SHALL BE IN ACCORDANCE WITH STANDARD 840.66. 9. LOCATE MANHOLE OVER STEPS. 6-IN DUCTILE IRON DRAIN PIPE WITH GATE VALVE AND HAND WHEEL CONCRETE PIPE ANCHOR a° d ° d PVC PRIMARY SPILLWAY ORIFICE DIAMETER: 1.5-IN d 8-IN .19=0 FAF1=l.fA Film IF NO AQUATIC BENCH ADJACENT TO FORBAY TOP OF WEIR ELEV: 1210.50 6-FT LENGTH FOREBAY WEIR 3 ELEV: 1209.00 11 PERMANENT POOL ELEV: 1210.50 FOREBAY ENTRANCE ELEV: 1206.50 1 2 2 - - - _ _ _ _ _ EXIT ELEV: 1207.50 1 24" RCP INLET PIPE RIPRAP PAD FOREBAY ----------- EMBANKMENT TOP OF PERM. SED. STOR. TOP OF PERM. SED. STOR. FOREBAY ENTRANCE ELEV: 1206.25 FOREBAY EXIT ELEV: l i86.58 BOT. OF PERM. SED. STOR. 1206.25 FOREBAY ENTRANCE ELEV: 1205.50 6" IMPERVIOUS FILL - BOT. OF PERM. SED. STOR. LAYER UNDER ALL FOREBAY EXIT WATER SURFACES ELEV: l i%.98 1205.75 AQUATTIC BENCH ELEV: 1211.00 OUTSIDE EDGE OF AQUATIC BENCH IS 6-IN ABOVE PERMANENT POOL ELEV WATER QUALITY ORIFICES: TWO (2)-12" X 6" ORIFICES ON BOTH SIDES WITH PEAK TRASH GUARDS INVERT ELEVATION: 1212.25' a z ° a ° co A d° d CAST IN PLACE RISER IS REQUIRED WITHOUT EXCEPTION I 4-FT OUTLET BARREL 96-LF 18-IN RCP 8-IN ° ? ° ° a ° 06 ° CONTRACTOR SHALL PROVIDE STEP IN ACCORDANCE WITH NCDOT STD. 840.66. STEPS SHALL BE PLACED AT 16" O.C. OUTLET STRUCTURE PLAN VIEW 24-IN THICK CLASS B RIPRAP OVER FILTER FABRIC 100-YR STORM ELEV 1214.18' 10-YR STORM ELEV 1213.11' 2-YR STORM ELEV 1212.50' 1-YR STORM ELEV 1212.33' TOP OF EMBANKMENT ELEV: 1216.00 PROVIDE 6' X 6' DEPRESSED AREA 2-FT BELOW PRINCIPAL SPILLWAY WITHIN AQUATIC BENCH FOR ADEQUATE DRAINAGE PERMANENT POOL ELEV: 1210.50 MAIN POOL 1204.00 INV=126F.88 _ TOP OF PERM. SED. STOR. ELEV: 12651.881204.00 BOT. OF PERM. SED. STOR. ELEV: 1206.00 SEASONAL HIGH WATER TABLE BELOW ELEV: 1192.00 6' WIDE AQUATIC BENCH AROUND MAIN POOL 3 3' SUBMERGED �1 1 PFRMANFNT Pnni FI F\/• 1?ln r 1 TERMINATE 6-IN IMPERVIOUS FILL AT OUTSIDE EDGE OF AQUATIC BENCH AQUATIC BENCH SECTION MAIN POOL (SEE DETAIL ABOVE) END CAP ° d \ a ANCHOR \ ° DRAWDOWN \ a PIPE TO WALL ° d \ 10-IN 4"PVC \ d ° d ,d PRIMARY 4"PVC TEE ° c SPILLWAY INV=1210.50 PERM. POOL ELEV: 1210.50 TOP ELEV: 1215.00 TOP ELEV: 1214.80 1215.50 6-FT WIDE ACCESS PAD TO OUTLET STRUCTURE 6-IN BELOW WEIR 8-FT WEIR WIDTH 3 3 �1 1� SPILLWAY CREST ELEV: 1215.00 ' � � I -III -III -III -III -III -III -III -III -III -III-"'" EMERGENCY SPILLWAY SECTION 10-FT 24-IN THICK CLASS B RIPRAP OVER FILTER FABRIC SEED & MULCH EMBANKMENT SEE SEEDING SCHEDULE (INSTALL SLOPE PROTECTION MATTING ON ALL SLOPES STEEPER THAN 6: 1) SCHEDULE A PRE -INSTALLATION CONFERENCE PRIOR TO CONSTRUCTION OF THE STORMWATER CONTROL MEASURE 1214.50 -EMERGENCY SPILLWAY CREST ELEV: 1215.00 1 INV=1212.59 6-IN = •'Vi EXISTING DROP INLET PRINCIPAL -, % zC / "'IIISPILLWAY _ L COMPACTED OMPACTED 7/ _ICI iil�- TWO (2)-12" X 6" ORIFICES ON BOTH ••. SELECT FILL 7 SELECT FILL I- -I FES W/CURTAIN WALL OUTLET OUTLET STRUCTURE SIDES WITH PEAK TRASH GUARDS N / U_ / N INV. EPER CDOT STD DWG 310.02 INVERT ELEVATION: 1212.25' INV=1210.50 I TIE CURTAIN WALL INTO FES VIA EPDXY COATED - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - REBAR AND EPDXY GLUE C BARREL OUTLET BARREL: 96-LF 18" RCP @2.6% SLOPE (ASTM -76, CLASS III) GASKETED JOINT PIPE MANUFACTURED WITHOUT LIFT HOLES. GASKETED INV=1202.00 JOINT PIPE SHALL BE WRAPPED WITH A DOUBLE LAYER OF NON -WOVEN FILTER FABRIC ON THE OUTSIDE OF THE PIPE AT EACH JOINT. - - - - - - - - - - - - - - - - - - - - - - - - - - - - _ _ _ _ _ _ _ _ _ - - - - - - - - - - - - - - - - - - - 1 OUTLET PROTECTION • - - - - - SEE GRADING PLAN. INV=1206.80 1203.80ur • / I -III III -III -III -III- =- -11 6-IN THICK - - - - - - - • N CONCRETE PIPE N COLLAR TO CONC. ANTI -SEEP COLLAR (6" WIDE) \ N / co co 6" DUCTILE IRON s , , ,' SPRINGLINE 3 TOTAL UNDER EMBANKMENT WITH DRAIN PIPE \ - - ONE COLLAR UNDER CENTER OF \ \ DAM A \ \ \ / / \' ° d CONCRETE \ , • , d 24" PIPE RCP COLLAR I iAZ d• • d• d , N \ •• '• 4.d \ 24„ 24„ / \ MIN MIN / \ ANTI -SEEP COLLAR \ ENLARGEMENT / POND AND EMBANKMENT SECTION WET DETENTION BASIN MAINTENANCE SCHEDULE DESCRIPTION METHOD FREQUENCY SEASON EMBANKMENT INSPECT AND REPAIR EROSION / ANIMAL NESTINGS VISUAL ONCE PER YEAR ALL INSPECT AND RESEED GRASS COVERAGE VISUAL WHENEVER NEEDED ALL OUTLET STRUCTURE DEBRIS / OBSTRUCTIONS BY HAND WHENEVER NEEDED ALL OPERATE POND DRAIN VALVE BY HAND ONCE PER YEAR ALL EROSION AT OUTLET DISCHARGE VISUAL ONCE PER YEAR ALL FOREBAY / MAIN POOL SEDIMENT / DEBRIS BY HAND ONCE PER YEAR ALL REMOVE TRASH BY HAND WHENEVER NEEDED ALL CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE UNTIL PROJECT CLOSE OUT AT WHICH TIME OWNER WILL ASSUME MAINTENANCE RESPONSIBILITY. ° d ° d WATERTIGHT I 4"PVC NON -SHRINK I GROUT I 8-IN ANCHOR / DRAWDOWN / 4° PIPE TO WALL ° d / \ END CAP WITH / DRILL OPENING \ \ DIAMETER: 1.5-IN 3" DIA. CONCRETE CORE \ \ PRIMARY SPILLWAY ENLARGEMENT 1215.50 �\ TOP SLAB ELEV: #i!4.•99 \ \ 1214.50 \ WEIR ELEV: 12i2.58 \ PRIMARY - - \ SPILLWAY / EXTEND PIPE OUTSIDE EMBANKMENT 1204.00 INV-1-207.09 TOP PERMANENT SEDIMENT STORAGE ELEV: "129;Z.G 1204.00 1203.50 BOTTOM PERMANENT SEDIMENT STORAGE ELEV: 1296.89 --- / \ / 24-IN \ •° a I Y 6-IN DIP •°' I •n d 4. ` e °36-IN . • ' d d• ° • !° S 1 ° 12-IN ' ° • • '° / \ / \ CONCRETE PIPE ANCHOR / \ \ ENLARGEMENT EPIPE ANCHOR FLANGED, NRS, RESILIENT WEDGE GATE VALVE WITH EXTENSION STEM, HAND WHEEL AND STEM GUIDES AS MANUFACTURED BY CLOW OR APPROVED EQUAL. HEAVY DUTY VALVE STEM WHEEL OUTLET STRUCTURE SECTION Y-Y DAM EMBANKMENT CONSTRUCTION STANDARDS 1. CONTROLLED FILL, AS SPECIFIED BY THE GEOTECHNICAL ENGINEER, IN THE DAM EMBANKMENT SHALL BE PLACED IN 6-INCH LOOSE LAYERS (3-INCH LOOSE LAYERS WITHIN 3-FEET OF EITHER SIDE OF THE PRINCIPAL SPILLWAY PIPE TO A DEPTH OF 2-FEET OVER THE PIPE) AND SHALL BE COMPACTED TO A DENSITY OF NO LESS THAN 95% OF THE STANDARD PROCTOR MAXIMUM DENSITY AT A MOISTURE CONTENT OF + OR - TWO PERCENTAGE POINTS OF THE OPTIMUM MOISTURE CONTENT IN ACCORDANCE WITH ASTM D698. 2. ALL VISIBLE ORGANIC DEBRIS SUCH AS ROOTS AND LIMBS SHALL BE REMOVED FROM THE FILL MATERIAL PRIOR TO COMPACTION TO THE REQUIRED DENSITY. SOILS WITH ORGANIC MATTER CONTENT EXCEEDING 5% BY WEIGHT SHALL NOT BE USED. STONES GREATER THAN 3-INCH (IN ANY DIRECTION) SHALL BE REMOVED FROM THE FILL PRIOR TO COMPACTION. 3. FILL MATERIAL PLACED AT DENSITIES LOWER THAN SPECIFIED MINIMUM DENSITIES OR AT MOISTURE CONTENTS OUTSIDE THE SPECIFIED RANGES OR OTHERWISE NOT CONFORMING TO SPECIFIED REQUIREMENTS SHALL BE REMOVED AND REPLACED WITH ACCEPTABLE MATERIALS. 4. ANY FILL LAYER THAT IS SMOOTH DRUM ROLLED TO REDUCE MOISTURE PENETRATION DURING A STORM EVENT SHALL BE PROPERLY SCARIFIED PRIOR TO THE PLACEMENT OF THE NEXT SOIL LIFT. 5. SURFACE WATER AND STREAM FLOW SHALL BE CONTINUOUSLY CONTROLLED THROUGHOUT CONSTRUCTION AND THE PLACEMENT OF CONTROLLED FILL. 6. FOUNDATION AREAS MAY REQUIRE UNDERCUTTING OF COMPRESSIBLE AND/OR UNSUITABLE SOILS IN ADDITION TO THAT INDICATED ON THE PLANS. ALL SUCH UNDERCUTTING SHALL BE PERFORMED AT THE DISCRETION OF THE GEOTECHNICAL ENGINEER AND SHALL BE MONITORED AND DOCUMENTED. IN NO CASE SHALL THERE BE AN ATTEMPT TO STABILIZE ANY PORTIONS OF THE FOUNDATION SOILS WITH CRUSHED STONE. 7. TREATMENT OF SEEPAGE AREAS, SUBGRADE PREPARATION, FOUNDATION DEWATERING AND ROCK FOUNDATION PREPARATION (I.E., TREATMENT WITH SLUSH GROUTING, DENTAL CONCRETE, ETC.) MAY BE REQUIRED AT THE DISCRETION OF THE GEOTECHNICAL ENGINEER. ALL SUCH ACTIVITIES SHALL BE CLOSELY MONITORED AND DOCUMENTED BY THE GEOTECHNICAL ENGINEER. 8. FILL ADJACENT TO THE RISER AND PRINCIPAL SPILLWAY PIPE SHALL BE PLACED SO THAT LIFTS ARE AT THE SAME LEVEL ON BOTH SIDES OF THE STRUCTURES. 9. EARTHWORK COMPACTION WITHIN 3-FEET OF ANY STRUCTURES SHALL BE ACCOMPLISHED BY MEANS OF HAND TAMPERS, MANUALLY DIRECTED POWER TAMPERS OR PLATE COMPACTORS OR MINIATURE SELF-PROPELLED ROLLERS. 10. COMPACTION BY MEANS OF DROP WEIGHTS FROM A CRANE OR HOIST SHALL NOT BE PERMITTED. 11. HEAVY EQUIPMENT SHALL NOT BE ALLOWED TO PASS OVER CAST -IN -PLACE STRUCTURES (INCLUDING THE CRADLE) UNTIL ADEQUATE CURING TIME HAS ELAPSED. 12. TO RE-ESTABLISH VEGETATION AFTER CONSTRUCTION, A 2- TO 3-INCH LAYER OF TOPSOIL SHALL BE PLACED ON THE DISTURBED EMBANKMENT SURFACE AND THE AREA SEEDED AND MULCHED OR HYDROSEEDED. TESTING, OBSERVATION, AND CERTIFICATION 1. TESTS OF THE DEGREE (%) OF COMPACTION OF THE PLACED FILL IN THE DAM SHALL BE PERFORMED AS A PART OF THE PERMITTEE'S NORMAL QUALITY CONTROL PROGRAM FOR THE CONSTRUCTION OF THE DAM. TESTS SHALL BE CONDUCTED CONCURRENT WITH THE INSTALLATION OF THE COMPACTED FILL AND THE CONTRACTOR SHALL COORDINATE THE CONSTRUCTION OF THE DAM SO THAT THE TESTING CAN BE COMPLETED. SHOULD THE RESULTS OF THE TESTS INDICATE THAT THE SPECIFIED DEGREE OF COMPACTION HAS NOT BEEN OBTAINED; THE PORTIONS OF THE DAM REPRESENTED BY SUCH TESTS SHALL BE REWORKED OR REBUILT. ALL PORTIONS OF THE DAM SHALL ACHIEVE THE SPECIFIED MINIMUM DEGREE OF COMPACTION. 2. CONSTRUCTION OF CLASS A, B AND C DAM EMBANKMENTS SHALL BE DONE UNDER THE OBSERVATION OF A QUALIFIED GEOTECHNICAL ENGINEER, WHO IS REGISTERED AS A PROFESSIONAL ENGINEER IN THE STATE OF NORTH CAROLINA. THE GEOTECHNICAL ENGINEER MUST HAVE EXPERIENCE IN THE DESIGN AND CONSTRUCTION MONITORING OF DAMS OF THE SIZE AND SCOPE COVERED BY THESE STANDARDS AND GUIDELINES. 3. ON CLASS A, B, AND C DAMS (WITH THE EXCEPTION OF DETENTION ONLY CLASS C DAMS THAT COLLECT DRAINAGE FROM AN AREA OF 25-ACRES OR LESS), THE GEOTECHNICAL ENGINEER, AS DEFINED ABOVE, SHALL OBSERVE ALL ASPECTS OF THE CONSTRUCTION OF THE DAM (I.E., PREPARATION OF THE FOUNDATION, INSTALLATION OF THE CUT-OFF TRENCH, INSTALLATION OF THE PRINCIPAL SPILLWAY PIPE, INSTALLATION OF THE INTERNAL DRAINAGE, INSTALLATION OF COMPACTED FILL, ETC.). THE FREQUENCY OF OBSERVATION AND TESTING MUST BE SUFFICIENT FOR THE GEOTECHNICAL ENGINEER (OR THE DESIGN ENGINEER ON CLASS D DAMS AND CLASS C, DETENTION ONLY, DAMS) TO STATE, IN HIS/HER PROFESSIONAL OPINION, THAT THE SPECIFIC ITEMS OBSERVED AND TESTED WERE INSTALLED IN ACCORDANCE WITH THE APPROVED CONSTRUCTION DRAWINGS AND SPECIFICATIONS. 6-FT WIDE ACCESS PAD TO OUTLET STRUCTURE 6-IN BELOW WEIR - o-iry WATER QUALITY ORIFICES: TWO (2)-12" X 6" ORIFICES ON BOTH SIDES WITH PEAK TRASH GUARDS INVERT ELEVATION: 1212.25' 1215.50 TOP SLAB ELEV: 1214.99 1214.50 3" RIM ELEV:1213.88 lO PERMANENT WET DETENTION POND STORMWATER CONTROL MEASURE (SCM) 'B' NTS OUTLET STRUCTURE SECTION X-X CONCRETE SLAB MANHOLE RING AND COVER #4 BARS 8" O.C. E.W. 3"R T #4 REBAR 6" O.C. E.W. TRASH RACK (ALL FOUR SIDES OF OUTLET STRUCTURE) WATER QUALITY ORIFICES: TWO (2)-12" X 6" ORIFICES ON BOTH SIDES WITH PEAK TRASH GUARDS INVERT ELEVATION: 1212.25' 6-FT X 6-FT X 2.5-FT DEEP DEPRESSION UNDER PRINCIPAL SPILLWAY FOR ADEQUATE DRAINAGE. TIE BACK TO AQUATIC BENCH AT 3:1 SLOPE. 3 Q .., #zu -7 o ICErTl .v Let _ ra G m m ea a f c M a +L CL .� m f' ` U �3.1. p ea N co O N W opU op L 6 O W Lu * 4 m a U) O Z �� 0C)'� S; O 1 O 5 Lo LU 2 E75 ob 6) �C7Y UrnLo IF 1: Z N E Z T ao ED t6 ' O 6 _U 0L-L p�dj� J E O '� C:U E� �� X zizQ��tlli NOT FOR CONSTRUCTION , 2 s ��FESS/p� Q < = SEAL = = 033612 FNGINEE� \N SD/DD REVIEW U W z z O U U z W C) 0. Z W �U V V J U/ Q W C: Z Z o 0 L0 O� Lo W 00 Q w O N z U z Q (3) z_Q z O z J - O V ��O r Q U m2i=3 I ` (=) zj� a) �O > L O Z Z ran U) z U) O >� �_LO �O V/ C Lo Revisions No. Date SWR #1 2021 AUG 13 SWR #2 2022 FEB 24 Project Number: 1711-13 Date: 2020 JAN 20 Drawn by: FS SITE DETAILS Sheet Number: C8,1 STATION 1 SIGNJ 3 REPETITION MAXIMUM DEADLIFT Ee 1/4-IN GALVAN BOLTED TO POST FO GAUGE STEEL WEATHER, HOT I 2'8.2'8. DETAIL 1 SHEET C8.19 STATION 2 SIGN STANDING POWER THROW DETAIL 2 SHEET C8.19 �4„1 O POST 4" O BASE PLATE PLAN VIEW BASE PLATE CROSS SECTION 237.8 221.4 57.4' 8.2'8.2'8.2'8.2' 8'-10.75" 7'-10.75" AINLESS STEEL BOLTS WITH FLAT STAINLESS STEEL WASHERS AND UPHILL SIDE LOCKING NUTS (TYP.) LESS STEEL 6-IN EAD (OR EQUIVALENT) FLAT STAINLESS HERS (TYP.) T FOOT FASTENED ;ONCRETE STATION 4 SIGN SPRINT -DRAG -CARRY DETAIL 4 SHEET C8.19 CAP TOP CONTINUOUS WELD` ALL WEATHER STEEL BAR HOT DIP GALVANIZED 1.5" DIAMETER BAR STAINLESS STEEL -- LOCKING NUTS (TYP.) STAINLESS STEEL BOLTS WITH FLAT STAINLESS STEEL WASHERS (TYP.) POST: 4-IN X 4-IN 11 GAUGE STEEL TUBE POST. ALL WEATHER, HOT DIP GALVANIZED. 5-2" 18" STEP-UP BOLTED TO POST 24" STEP-UP BOLTED TO POST SOLID WALL 8" SCH 40 PVC MANIFOLD, CONNECT 8.2'8.2'8 8.04' 16.4" 16.4' 16.4' 16.4' \ \ \ \ \ \ \ \ I 15' TO SEAM \ \ \ \ \ \ \ \ \ 171 ________ _1_ _1 _l _/ 1 _1_ _l _� _ _ _ _ __ 1 _ - - - \ / \ WHITE TURF v \ \ STRIPE (TYP.) YELLOW TURF / / /8 12.4' TO SEAM STRIPE (TYP.) \ \/ �A 2' 7 j j 87' v v \ YELLOW TURF STRIPE \ \ (TYP.) ----- --- ----------------- ---------------------4" SCH 40 PERFORATED PVC UNDERDRAI N -- 15' TO SEAM 98.43' TURF LENGTH \�\\\\ _f_�_ 7'_ f_f_f _,�_�_f_f_�_ �_ f_ f__ __�_�_ f_ f _,�_ �_ __ f_�_7_,_ f_ __ f__�_ 5 - 7 /� T � T 7 /7 7 T' /� T' f 7' /� T \\\\ -\v,v 7' /� 5 13.66' TO SEAM ARTIFICIAL TURF GRASS, REFER TO 82.02' YELLOW TURF DETAIL 5 THIS SHEET / TURF/ - --- ---STRIPE (TYP_) - - �_ _�---� - - - WIDTH - - - - - -- ------------------------- - - --- -= \ \- �- - ---�- 7 -� T- \Z Z - ---- - - - - -----777 - -�- - - - - - -- ------ - - -��� 7/���� 15' TO SEAM --U --- YELLOW TURF WHITE TURF � � STRIPE (TYP.) A -- - -� - - - -� - - - -�- STRIPE (TYP.) - -- --- -- \ \ \ \ __ _ - -- - - \ Q --�-L) --- ,--- 10.96' TO SEAM / / �z - i -�------------- 4" SCH 40 PERFORATED PVC UNDERDRAIN -=------------------------------=----=--�- NOTES: 1. STRIPING ON CONCRETE TO BE 4-IN WIDE THERMOPLASTIC. 2. STRIPING ON THE TURF TO BE COLORED "GRASS" FIBERS WOVEN INTO THE TURF. 3. SIGNAGE SHALL BE LOCATED WITHIN THE CONCRETE APRON ON BOTH SIDES OF THE 10-LANE AREA AS SHOWN ABOVE. 10-LANE ACFT FIELD .e 1.5" DIAMETER BAR 11 GAUGE STEEL FLANGE WELDED TO END OF BAR AND BOLTED TO POST (TYP.). 18" STEP-UP BOLTED TO POST a � 4 4 24" STEP-UP BOLTED TO POST NOTES: 1. PROVIDE SHOP DRAWING FOR KNEE -TUCK BAR ASSEMBLY. BASIS OF DESIGN IS BEAVERFIT. CONTACT SAM HOVIG AT (408) 315-0474, SAMUEL@BEAVERFITUSA.COM 2. POSTS TO BE 4-IN X 4-IN X 11 GAUGE THICK GALVANIZED STEEL TUBING. 3. BAR TO BE 1.5-IN DIAMETER GALVANIZED AND POWDER COATED SEMI GLOSS, LIGHT GRAY. 4. ALL MATERIALS TO BE HOT DIP GALVANIZED (BURRS REMOVED) POWDER COATED SEMI GLOSS, LIGHT GRAY UNLESS OTHERWISE NOTED. 5. BOLTS IN CONCRETE SHALL BE SET IN CONCRETE ANCHORING EPDXY. 6. TALL POST TO GO ON THE DOWNHILL SIDE TO LEVEL BARS ON SLOPING GROUND. 9'-1.25" 8'-1.25" CONCRETE PAVEMENT (REFER TO DETAIL 4 SHEET C8.0 FOR CONCRETE SECTION) POST FOOT FASTENED DOWNHILL SIDE TO CONCRETE (TYP.) STATION 6 SIG DETAIL 6 SHEET C8.19 STAPLE OR NAIL TURF TO COMPOSITE WOOD BORDER AROUND PERIMETER 2X4 COMPOSITE WOOD PERIMETER BOARD CONCRETE SIDEWALK (REFER TO DETAIL 4 SHEET C8.0) a EDGE OF CONCRETE SLAB (REFER TO DETAIL 4 SHEET C8.0 FOR CONCRETE SECTION) EXERCISE MAT (PLANK) SEE DETAIL 3 THIS SHEET KNEE -TUCK BARS SEE DETAIL 4 THIS SHEET SILICA SAND INFILL FASTEN BOARD TO CONCRETE EDGE OF CONCRETE SLAB (REFER TO DETAIL 4 SHEET C8.0 FOR CONCRETE SECTION) SCALE 1 "=10' NOR 0 10' 20' 5/16" X 3" 5/16" X 3" 1/4" GALVANIZED J-BOLT GALVANIZED J-BOLT 1/4" RECESSED RECESSED 1 ° 2" FA 2" 4„ 5/16" DRILLED CONCRETE BOLT SET IN CONCRETE 3/4" WEEPHOLE I ANCHORING EPDXY 0 O ABC STONE BASE, REFER TO DETAIL 4 SHEET C8.0 NOTES: 1. AFTER CONCRETE IS SET, CORE 3-IN DIAMETER, APPROXIMATELY 2-IN DEEP HOLE. 2. INSTALL 5/16-IN X 3-IN J-BOLT IN CONCRETE ANCHORING EPDXY. 3. TOP OF BOLT SHALL BE RECESSED BELOW TOP OF CONCRETE BY APPROXIMATELY 1/4-IN. 1" HIGH ARTIFICIAL TURF GRASS RECESSED J-BOLT NTS DRAINAGE GROOVES ON BOTTOM SIDE OF MAT NOTES: 1. 3/4-IN THICK RUBBER STALL MAT (USED FOR PLANK MAT AND PUSH-UP MAT) 2. MAT BOLTED TO CONCRETE WITH 2.5-IN STAINLESS STEEL BOLTS APPROX. 2-FT ON CENTER. EXERCISE MAT NTS 3-IN AT CENTER, BOTTOM OF (MIN) #78 o #78 STONE CROWNED AT 1% o WASHED STONE 1 /0 1 /o (90 /o COMPACTION) _ NON -WOVEN GEOTEXTILE FABRIC 12-IN #57 WASHED STONE (4-IN ' 1 1 1 ' I I I ' I ON TOP AND BOTTOM OF PIPE) II II COMPACTED SUBGRADE�� 16.40' SUB -DRAIN 4" SCH 40 PVC PERFORATED PIPE. CONNECT TO SOLID -WALL 8" SCH 40 PVC MANIFOLD AS SHOWN IN THE ACFT FIELD DETAIL ABOVE. CONNECT 8" SMOOTH -WALL PVC TO STORM PIPING AS SHOWN ON SHEET C4.1. NOTES: 1. BASIS OF DESIGN/PERFORMANCE SPEC IS "SYNSPORT" BY SYNLAWN. 2. TURF TO BE INSTALLED BY CERTIFIED INSTALLER. SYNLAWN CONTACT IS TANNER HATLEY AT (702) 223-1666, TANNER@SYNLAWNCAROLINA.COM 3. PROVIDE ARTIFICIAL TURF WITH THE FOLLOWING SPECIFICATIONS: A. PILE HEIGHT 1" B. COLOR: GREEN C. WATER PERMEABILITY 300 IN/HR OR GREATER D. TURF MATERIAL: POLYETHYLENE E. INFILL MATERIAL: SILICA SAND APPLIED AT 2LB/SF F. "STRIPES" TO BE 4" WIDE POLYETHYLENE OF SPECIFIED COLOR WOVEN INTO THE ARTIFICIAL TURF. G. ASTM D2859, F1292, F1551, F1951 CERTIFIED 4. UNDERDRAINS TO BE 4" PERFORATED PVC, "MANIFOLD" LINE TO BE 8" SOLID -WALL PVC. 5. ANY "GRAIN" IN THE ARTIFICIAL TURF SHALL RUN FROM RIGHT TO LEFT ALONG THE LANE. 6. SEAMS IN ARTIFICIAL TURF SHALL BE LOCATED TOWARDS THE EDGE OF A LANE, NOT IN THE CENTER OF A LANE. SEAMS SHOULD BE GLUED WITH SUITABLE SEAMING GLUE AND SEAMING CLOTH, NOT ADHESIVE TAPE. 7. #78 STONE COMPACTED TO 90% COMPACTION. 4O KNEE -TUCK BARS NTS 5O ARTIFICIAL TURF WITH UNDERDRAINS NTS E Q o �U } m m N Q O C R �•+ c U .� 13, U C=L ea. } 0 N LO o im = U r w w . 8 ■ y m - U)O Y"a0:�� Q z * + t .2�No,I�C) w OF U(7Y�C)0)Lo i # h z N �•EZrao w E2 - U � c,ai0, U S N t m z H Q 0 � Lo 0- NOT FOR CONSTRUCTION 2 s ��FESS/p� Q < - SEAL 033612 FNGINE� SLINS��.�`� SD/DD REVIEW U W z z O U U z ry W C) � L.L Z W �U V U) VJ Q W I` z z O O Lo i L0 U 00 Q w O N z U z Q J a)z Q Z O z J - is O W O Q LIJ U m�� I z C:)N �O 1 > I..L C'7 .0 L O z ran a� I z U) p �O oJL0 0 fly Lo Revisions No. Date SWR #1 2021 AUG 13 SWR #2 2022 FEB 24 Project Number: 1711-13 Date: 2020 JAN 20 Drawn by: FS SITE DETAILS Sheet Number: C8.18