Loading...
HomeMy WebLinkAbout20140394 Ver 1_Corps of Engineer Correspondence_20140512Homewood, Sue From: Sent: To: Cc: Subject: Attachments: Classification: UNCLASSIFIED Caveats: NONE Messrs. Owen and Evenhouse, Bailey, David E SAW <David.E.Bailey2 @usace.army.mil> Monday, May 12, 2014 10:27 AM Harold Owen; Chad Evenhouse Homewood, Sue Request for Additional Information: Haw River Interceptor, Burlington, Alamance Co., NC; SAW- 2014 -00852 (UNCLASSIFIED) 2014 -00852 Incomplete Tearsheet.pdf Thanks for your PCN and attached plans, dated and received 4/16/2014, for the above referenced project. I have reviewed the information and currently the project as described does not fit the terms and conditions of Nationwide Permit 12 http: / /www,saw.usace.army.mil/ Portals /59 /docs/ regulatory /regdocs /NWP2012 /NWP12 3- 23.pdf. Please see the attached document (2014 -00852 Incomplete Tearsheet.pdf) and submit the requested information (via e-mail is fine) within 30 days of receipt of this Notification, otherwise we may deny verification of the use of the Nationwide Permit or consider your application withdrawn and close the file. Also, as requested last week, I would like to schedule a field verification of the Jurisdictional resources in the project corridor. Please let me know if you have any questions. Sincerely, Dave Bailey David E. Bailey Project Manager US Army Corps of Engineers CE- SAW -RG -R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554 -4884, Ext. 30. Fax: (919) 562 -0421 Email: David.E.Bailey2 @ usace.army.mil The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http : / /regulatory.usacesurvey.com /. Classification: UNCLASSIFIED Caveats: NONE U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW- 2014 -00852 County: Alamance U.S.G.S. Quad: Burlington /Mebane INCOMPLETE APPLICATION Property Owner: City of Burlington Agent: Kimley -Horn and Associates attn: Harold Owen attn: Chad Evenhouse Address: 425 South Lexington Avenue Address: 3001 Weston Parkway Burlington, N.C. 27215 Cary, N.C. 27513 Location/Description of Proposed Activity: The project is located on the west side of the Haw River between US 70 Bypass and Riverside Drive in Burlington, Alamance County, North Carolina. Latitude 36.099450 N, Longitude - 79.379159 W. The applicant has submitted a Preconstruction Notification (PCN) application for 5 total crossings in order to replace existing 42" and 15" gravity sewer lines with 42" and 16" gravity sewer lines, respectively, resulting cumulatively in 155 linear feet of temporary stream impacts, 0.3273 acre of temporary riparian, non - riverine wetland impacts, and 0.226 acre of permanent conversion of forested to herbaceous wetlands. Type of Permit Applied For (check one): IP ❑ NWP ® GP ❑ Applicable law: Section 404 of the Clean Water Act®; Section 10, Rivers and Harbor Act ❑ YOUR APPLICATION IS INCOMPLETE AND CANNOT BE PROCESSED UNTIL THE FOLLOWING INFORMATION IS RECEIVED (CHECK ALL THAT APPLY): ❑ Your application form has not been completed and/or signed (see remarks) ❑ Under the conditions of the Nationwide Permit, mitigation is required for your project. The mitigation proposal submitted with your application is insufficient. (see remarks.) ❑ Your application did not include a statement explaining how avoidance and minimization for losses of waters of the U.S. were achieved on the project site. (see remarks) ❑ Your submitted project plans or maps were insufficient, too large, or not legible (see remarks). ❑ Your application did not include a delineation of affected special aquatic sites, including wetlands, vegetated shallows, and riffle and pool complexes as required. ❑ You must submit a copy of your application to the NC Wildlife Resources Commission (WRC) since your proposed work is in a designated trout water county (see remarks section below for the address of your WRC representative) ® Other (see remarks below). "Please reference the PCN submitted by Kimley -Horn and Associates dated and received 4/16/2014. REMARKS: 1. Your PCN included impacts to wetlands, streams, and open waters, however these jurisdictional boundaries have not been verified by the USACE. Please schedule a time for an on -site verification with the USACE. 2. According to the plans, rip rap is proposed for Impacts 1 and 4; however this is not mentioned in the PCN. Please include these impacts as permanent in the PCN (although they would not be considered a loss of Waters). Also, please explain why rip is not proposed for Impacts 2, 3, and 5. 3. According to the plans, the utility lines are buried for Impacts 4 and 5; however they are not buried for Impact 1 -3. Please explain how Impact 1 -3 will avoid impeding flow, so as to comply with Nationwide Permit Condition # 2. Please note that, based on the plans, Impact 3 appears to have the effect of permanent fill. 4. Per Regional Condition # 4.1.8 please provide a plan to restore and re- vegetate wetland areas cleared for construction. Note that Fescue grass shall not be used. 5. Please confirm that, in wetlands, the top 6 to 12 inches of the trench will be backfilled with topsoil from the trench, as required in the Nationwide Permit 12 description. Page 1 of 2