Loading...
HomeMy WebLinkAbout20220050 Ver 1_More Information Received_20220315Strickland, Bev From: Ian McMillan <imcmillan@SAGEECOLOGICAL.COM> Sent: Tuesday, March 15, 2022 8:12 AM To: Cohn, Colleen M Cc: Lastinger, James C CIV USARMY CESAW (USA); Sean Clark Subject: [External] Caterpillar Site DWR#20220050 Attachments: 2022.01.31.C3.1 - Grading and Drainage Plan.pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hi Colleen, please see the responses below from the engineer to your requests. 1. Please provide an overall site including an overlay for jurisdictional features. I only see a Wetland Impact Map that does not show the proposed impacts in relation to the rest of the jurisdictional features on the property. [15A NCAC 02H .0502(a)(9)]. I have attached a grading and drainage plan (3.1) for reference to show the proposed impacts in relation to the expansion of the existing facility. 2. Please provide more details regarding avoidance and minimization of wetland impacts for this project. This should include alternative designs and layouts of the proposed expansion. [15A NCAC 02H .0506(b)(1)] The operation of the existing facility requires an expansion to the facility for logistic, flexibility and safety reasons. In order to improve in these areas, a new logistics warehouse and truck entry is required. Based on this need the designer tried to minimize the impacts as follows: o No access through the property to the east (Keen facility) was allowed therefore another driveway connection to Keen road is required. o The first analysis was to provide this connection at the northwest corner of the site. Having this connection required not only a wetland impact but also a impact to the existing stream including the headwall. Moving the drive further west alleviated the stream impact altogether but still required wetland impacts. o The equipment manufactured on site requires a minimum time of endurance for each piece of machinery. Based on the quantity of and the required spacing needed (for each piece of equipment), the existing endurance area was not sufficient. Therefore there is a need to relocate and expand the endurance area. The endurance area expansion is based on time of endurance for each machine and the space required for each movement between each piece of equipment. o The facility is operated in two ten-hour shifts which is why phasing the construction was essential to allow for continued operation. o The placement of the new building was also required to be within certain proximity to the existing building for logistical reasons. These reasons include, safety, flexibility and overall operation of the facilities. 3. Please provide additional details regarding the Stormwater Management Plan. Is this SMP being reviewed by DEMLR? Has the plan been approved? Can you please provide a copy of the SMP including plans? [15A NCAC 02H .0502(c)]. Based on your last email, we are now required to provide a stormwater management plan which can be provided. Ian McMillan, PWS, GISP, CPM Sage Ecological Services, Inc. 919-608-3156 (McMillan@SageEcological.com i 2 120 W W 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1`I\\ I I I 1+1-+ ►-� +-H++-►+ITh IIIIII 11111i111i1111 LI I I I_LJ J-I_LL1 SD SD I / / / 1 1 1 I \\1 1 I 1 1 1 I \f` 11+14 I +\Ii 1-1+1 '/'- 11_1\ 1 1 1 1 1\4\1 I I I �% — �) \\ .1 1 1 J_-I'I I I I I I i 1 ti. I �C 1 RETAINING WALL #4 IMMIIW.111111111111 III El ?Pt •��� 11111111, v' //\)(///`,(///)./4// Tr/ 7 / / / // \\ EXISTING /.b \/\\\\l\\\\I\ I 1 RETAINING WALL #3 11 \\, III 111 111 AXIS TINC _ ;', y ►.zAIOMMENIMMIMIMINE% .•_ - 114 011". .'"- Ida PROPOSED FACILITY 122, 000 SF FFE= 303.60 \ I Illlllll \\ III 1 \ 1 i 1=I1\\\\\\\\ �111111ill{ 1 �� �___ __________(1111 \ \ INFORMATION SHOWN IN THESE PLANS ARE TO BE UTILIZED FOR PRELIMINARY PRICING ONLY AND SHOULD NOT BE CONSIDERED FINAL DESIGN. \ SCM #3 WET DETENTION POND / \ i 4' C REVISION PER US ARMY CORPS OF ENGINEERS, WILMINGTON DISTRICT COMMENTS 2022.01.31 B ADDENDUM #3 - PLAN CLARIFICATIONS 2021.09.23 A ISSUED FOR PRELIMINARY PRICING PURPOSES ONLY 2021.09.03 REV.NO. DESCRIPTIONS DATE REVISIONS J 1,7p I1;,' �illlli(?"i1/^I\ llli \III /IIINo,lllllllllll4 IIIIIII((l'J IIlIIl1I � 111111111 "t` 1\ 1111111111\\IIII\\��\ 111111111 I/ . I % 111 11 \11111 IIIII//. 1 11111i iill III�III� / � \ \ \ `„l; I; I I 111111 I,IIIII ll 1 I \ c- I \ \ 1 1 \ 1 I V I N \ 1 1 I o I I 1 \\ I I\ \ \ I i / EXISTING STREAM "A" (TYP.) (STREAM TO REMAIN AND NOT BE DISTURBED) 295 - EXISTING STREAM B" (TYP.) , _ (STREAM IS TO REMAIN AND ____----------------- /- i IS i i i i i i NOT BE DISTURBED) •• I / PROPOSED LOGISTICS WAREHOUSE FACILITY +150,000 SF FFE= 312.10 EH BARN FFE= 307.45 1(+17,250 SF) FUTURE WAREHOUSE EXPANSION ± 100, 000 SF r ' -y -1-T ���6 I I II/I • � • • • / ♦ d. \ :� �Illl� a \ • —\ ro� �A ■• --�— • ��/ s✓ /i/ /•/ . /: /' .,. //• r/ • / /,F/'/ ! /✓ • / 1/ /• / % / • / • / / • \�' \�•` 1.1\1\\I\1 'I 6\• ---o — e---o 307 '�/ '' ✓/✓�/// //d./( �r • 4 ` '1 1'/•l /IJ \ \ \'• • • , ��\\ _. 3111 • \ \z•--• v . • • _--T . / l /• • /� b / . ✓• /' } 1:1 • / / / } )• ' ! /• / f~• '11 1 1 1 \ \` �\\ \ \� \, ` •:hL • • ��* • . o• --s'� /'y '' . /3! � 'i `' i" /> �✓ /:/ 1/•//•// /i%/ % .y • -�•ar-�1�' �•1 1 \ .1 11 1 1 1 \. \ \ \ ti ..�f _ -. - " Y _ r�� `� _ i/' -/ : • /�'. /'. • /' /. /' j / l d / / // // / 6-; • ■ '�iililsli._' 1.1 \ `'� \\ \ . 306• -• ---- �- _- -- -�'-~�-_--- . - •r ,• -// - d 7 /: ! ,: d �N / l-l•/ / 'r / , .\ s-_.v d ( / . I 1. �� /.l'� { //'./ /. f. MIREIWARIMERIOSISIMILIZMEIMENIKOR / Ill'--_- -_-_ _//— --- / /---------_- _ SEAL' PRELIMINARY PLAN FOR BIDDING PURPOSES ONLY J / / I / / / / / > (// I �11'lll ---- 300-%'j'''---- - I\ \1\1\\\ l\\—l\11�111\\i\1\\\\i\ \\"1\;\\\\\\\\\\\\�\\\\�` /- ' / / /11- / / , / 1111111\1_ i // / / / / 1 l 1 SEAL' J 328.213 S35' 23' 19.40W I U5'IWAY1 (VARIABLE WIDTHPUBLIC R/W) 298.842 S46.46— 40"W 4MCK[M&CREED 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 Phone: (919)233-8091, Fax: (919)233-8031 F-1222 www.mckimcreed.com J \ 290 SCM #4 - WET DETENTION POND - 7 N 482.689 S39' 30' 20.401W 1 CATERPILLAR® / \ \ 1/1/1/111/111/iT91:11--- II III, 1111111 III II 11 / EXISTING WETLAND "WA" (TYP.) // 1 (WETLANDS TO REMOVED) olso LP • / LEGEND )0000 0 EXISTING PROPERTY LINE EXISTING CONTOUR EXISTING FENCE EXISTING WOODSLINE APPROXIMATE LOCATION OF EXISTING STREAM CENTERLINE EXISTING STORM PIPE SILT FENCE LIMITS OF DISTURBANCE TREE PROTECTION FENCE BAFFLES STONE SILT FENCE OUTLET SKIMMER TEMPORARY CONSTRUCTION ENTRANCE EMERGENCY SPILLWAY APPROXIMATE LOCATION OF EXISTING WETLANDS CHECK DAM BLOCK AND GRAVEL INLET PROTECTION CATERPILLAR, INC. LOGISTICS WAREHOUSE FACILITY LEE COUNTY, NORTH CAROLINA GRADING AND DRAINAGE PLAN RAUZIGH VICINITY AP NOT TO SCALE KEY NOTES: SILT BAG INLET PROTECTION (TYP.). TEMPORARY SILT FENCE (TYP.). CHECK DAM (TYP.) STRAW WATTLE (TYP.). TEMPORARY DIVERSION DITCH (TYP.). TEMPORARY CONSTRUCTION ENTRANCE. SILT FENCE OUTLET (TYP.). SKIMMER (TYP.). REFER TO DETAIL SHEET D3.3. LIMITS OF DISTURBANCE (TYP.). TEMPORARY SKIMMER SEDIMENT BASIN (TYP.). INSTALLED IN PHASE 1 EROSION CONTROL. REFER TO SHEET C3.0. RIPRAP OUTLET PROTECTION (TYP.). STOCKPILE AREA (TYP.). INSTALL FLARED END SECTION (FES). PER NCDOT STANDARDS AND SPECIFICATIONS. SCM RISER STUCTURE (TYP.). REFER TO SHEETS D5.0 THRU D5.11 FOR DETAILS. ® 18" REINFORCED CONCRETE STORM PIPE (TYP.). PER g 24" RCP REINFORCED CONCRETE STORM PIPE (TYP.). PER NCDOT STANDARDS AND SPECIFICATIONS. NCDOT STANDARDS AND SPECIFICATIONS. ® ARCH BOTTOMLESS CULVERT (10' 8" X 31.0'. (DESIGN BY 0 0 0 NCDOT STANDARD CONCRETE HEADWALL (TYP.). PER NCDOT STANDARDS AND SPECIFICATIONS. REFER TO DETAIL SEGMENTAL BLOCK WALL (TYP.). (CONTRACTOR TO COORDINATE WITH OWNER. (DESIGN BY OTHERS). CONCRETE STORM MANHOLE (TYP.). PER NCDOT STANDARDS AND SPECIFICATIONS. SCM EMERGENCY SPILLWAY (TYP.). REFER TO SHEETS D5.0 THRU D5.11 FOR DETAILS. STANDARD CONCRETE CURB INLET (TYP.). PER NCDOT STANDARDS AND SPECIFICATIONS. STANDARD CONCRETE DRAIN INLET (TYP.). PER NCDOT STANDARDS AND SPECIFICATIONS. REMOVE FLARED END SECTION AND INSTALL CONCRETE STORM MANHOLE. PER NCDOT STANDARDS AND SPECIFICATIONS. REMOVE 4' SECTIONS OF EXISTING DOUBLE 24" RCP HAVE A MINIMM OF 4' OUTSIDE OF EDGE OF PAVEMENT. CONTRACTOR TO INSTALL FLOWABLE FILL CONCRETE INTO DOUBLE 24" RCP TO ABANDON IN PLACE. REMOVE EXISTING HEADWALL AND INSTALL CONCRETE STORM MANHOLE. PER NCDOT STANDARDS AND SPECIFICATIONS. EXISTING RISER STRUCTURES TO BE REMOVED. REFER TO DETAIL SHEETS D5.0 THRU D5.6 FOR DETAILS. EXISTING SCMS TO BE REGRADED BASED ON PROPOSED GRADES. CONTRACTOR TO REFER TO DETAIL SHEETS D5.0 THRU D5.6 FOR DETAILS. A PORTION OF THE EXISTING 24" RCP TO BE REMOVED FOR INSTALLATION OF CONCRETE STORM MANHOLE. REFER TO NCDOT STANDARDS AND SPECIFICATIONS. EXISTING 24" RCP CULVERT TO BE RELOCATED. RETAINING WALL (TYP.). TO BE DESIGNED BY OTHERS. 80' NORTH 0 /ALL N.C. 01.X CALL CENTER BEFORE YOU DIG STOP 1-800-632-4949 \VOID UllUTY/ DAMAGE 80' 160' PRELIMINARY DO NOT USE FOR CONSTRUCTION MCE PROJ. # DRAWN 04193-0039 JEB DESIGNED CHECKED PROJ. MGR. DJB DJB GML HORIZONTAL: VERTICAL: N/A C3.X DRAWING NUMBER C3.1 STATUS: PRELIMINARY DRAWINGS SSUED FOR PRELIMINARY PRICING ONLY REVISION