WILMINGTON DISTRICT
Action Id. SAW-2021-02712 County: Franklin U.S.G.S. Quad: NC-Franklinton
GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION
NZNA, Inc.
Attn: Steve Stadelman
PO Box 576
Franklinton, North Carolina 27525
919-518-3390
sast@novozymes.com
—576.96
Cedar Creek
03020101
Permittee:
Address:
Telephone Number:
E-mail:
Size (acres)
Nearest Waterway
USGS HUC
Nearest Town Franklinton
River Basin Pamlico
Coordinates Latitude: 36.0746
Longitude: -78.3916
Location description: The project area is located at 258 Perry's Chapel Road in Franklinton, Franklin County, North Carolina.
Description of projects area and activity: This verification authorizes the permanent discharge of fill material into 0.020 acre of
riparian, non-riverine wetlands. Theses impacts are necessary for riprap protection to dissipate energy from discharge flows.
Applicable Law(s): N Section 404 (Clean Water Act, 33 USC 1344)
❑ Section 10 (Rivers and Harbors Act, 33 USC 403)
Authorization: Nationwide Permit 58. Utility Activities for Water and Other
SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS
Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached
Conditions, your application signed and dated 12/22/2021, and the enclosed plans entitled, "PWW Direct Discharge Pipeline"
dated 7/28/2020. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to
a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action.
This verification will remain valid until the expiration date identified below unless the nationwide and/or regional general permit
authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide and/or regional general
permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided
it complies with all requirements of the modified nationwide permit. If the nationwide and/or regional general permit authorization
expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the
nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon
the nationwide and/or regional general permit, will remain authorized provided the activity is completed within twelve months of the
date of the nationwide and/or regional general permit's expiration, modification or revocation, unless discretionary authority has been
exercised on a case -by -case basis to modify, suspend or revoke the authorization.
Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You
should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements.
For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior
to beginning work you must contact the N.C. Division of Coastal Management Morehead City, NC, at (252) 808-2808.
This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State
or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of
Engineers regulatory program, please contact April Norton at (919) 441-3637or April.R.Nortonnn,usace.army.mil.
Digitally signed by April R.
Norton
Corps Regulatory Official: Date:2°zz.°,.,3,5:56:32
-osoo'
April R. Norton
Expiration Date of Verification: 3/14/2026
Date: 01/13/2022
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete the Customer Satisfaction Survey located at
http://corpsmapu.usace.army.mil/cm_apex/Vp=136:4:0
Copy furnished:
Agent: SWE Group, PLLC.
Attn: Scott Frederick
Address: 3216 Byers Drive
Raleigh, North Carolina 27607
Telephone Number: 919-831-1234
E-mail: sifrederickna swegrp.com
Property Owner: NZNA, Inc.
Attn: Steve Stadelman
Address: P.O. Box 576
Franklinton, North Carolina 27525
Telephone Number: 919-518-3390
E-mail: sast(anovozymes.com
Action ID Number: SAW-2021-02712
Permittee: NZNA, Inc., Attn: Steve Stadelman
Project Name: NZNA, N.A. PWW Direct Discharge Outfall
Date Verification Issued: 01/13/2022
Project Manager: April Norton
County: Franklin
Upon completion of the activity authorized by this permit and any mitigation required by the permit,
sign this certification and return it to the following address:
US ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Attn: April Norton
Raleigh Regulatory Office
U.S Army Corps of Engineers
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
or
April.R.Norton@usace.army.mil
Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of
Engineers representative. Failure to comply with any terms or conditions of this authorization may
result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I
administrative penalty, or initiating other appropriate legal action.
I hereby certify that the work authorized by the above referenced permit has been completed in
accordance with the terms and condition of the said permit, and required mitigation was completed in
accordance with the permit conditions.
Signature of Permittee Date
SAW-2021-02712
A. Determination of Jurisdiction:
1. There are wetlands, on the above described project area that may be subject to Section 404 of the Clean Water Act (CWA) (33
USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). This preliminary determination is not an
appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you
may request an approved JD, which is an appealable action, by contacting the Corps district for further instruction. Please note, if
work is authorized by either a general or nationwide permit, and you wish to request an appeal of an approved JD, the appeal must
be received by the Corps and the appeal process concluded prior to the commencement of any work in waters of the United States
and prior to any work that could alter the hydrology of waters of the United States.
2. ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of
Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA) (33 USC §
1344). This determination may be relied upon for a period not to exceed five years from the date of this notification, provided
there is no change in law or our published regulations or new information that warrants revision of this determination.
3. ❑ There are wetlands, within the above described project area that are subject to the permit requirements of Section 404 of the
Clean Water Act (CWA) (33 USC § 1344). This determination may be relied upon for a period not to exceed five years from the
date of this notification, provided there is no change in law or our published regulations or new information that warrants revision
of this determination.
4. A jurisdiction determination was not completed with this request. Therefore, this is not an appealable action. However, you may
request an approved JD, which is an appealable action, by contacting the Corps for further instruction.
5. ❑ The jurisdictional areas within the above described project area have been identified under a previous action. Please reference
jurisdictional determination issued 1/13/2022. Action ID: SAW-2021-02712.
B. Basis For Determination: See the preliminary jurisdictional determination form dated 01/13/2022.
C. Remarks: None.
D. Attention USDA Program Participants
This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site
identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security
Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request
a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work.
E. Appeals Information for Approved Jurisdiction Determinations (as indicated in A2 and A3 above).
If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed
you will find a Notification of Appeal Process (NAP) fact sheet and Request for Appeal (RFA) form. If you request to appeal this
determination you must submit a completed RFA form to the following address:
US Army Corps of Engineers
South Atlantic Division
Attn: Philip Shannin, Appeal Review Officer
60 Forsyth Street SW, Room 10M15
Atlanta, Georgia 30303-8801
Phone: (404) 562-5137
AND
PHILIP.A. SHANNIN@USACE.ARMY.MIL
In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal
under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you
decide to submit an RFA form, it must be received at the above address by Not applicable.
SAW-2021-02712
It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this
correspondence. April R. Digitally signed by
April R. Norton
Norton Date: 2022.01.13
Corps Regulatory Official: 15:57:21 -05'00'
April Norton
Date of JD: 01/13/2022 Expiration Date of JD: Not applicable
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so,
please complete our Customer Satisfaction Survey, located online at https://regulatory.ops.usace.army.mil/customer-service-survey/.
NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND
REQUEST FOR APPEAL
Applicant: NZNA, Inc., Attn: Steve Stadelman File Number: SAW-2021-02712 Date: 01/13/2022
Attached is:
See Section below
INITIAL PROFFERED PERMIT (Standard Permit or Letter of permission)
A
PROFFERED PERMIT (Standard Permit or Letter of permission)
B
PERMIT DENIAL
C
APPROVED JURISDICTIONAL DETERMINATION
D
PRELIMINARY JURISDICTIONAL DETERMINATION
E
x
SECTION
Additional
or the
I - The following identifies your rights and options regarding an administrative appeal of the above decision.
information may be found at or http://www.usace.army.mil/Missions/CivilWorks/RegulatoryProgramandPermits.aspx
Corps regulations at 33 CFR Part 331.
A: INITIAL PROFFERED PERMIT: You may accept or object to the permit.
• ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final
authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your
signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all
rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the
permit.
• OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request
that the permit be modified accordingly. You must complete Section II of this form and return the form to the district
engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will
forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your
objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your
objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After
evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in
Section B below.
B: PROFFERED PERMIT: You may accept or appeal the permit
• ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final
authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your
signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all
rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the
permit.
• APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein,
you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of
this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days
of the date of this notice.
C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by
completing Section II of this form and sending the form to the division engineer. This form must be received by the division
engineer within 60 days of the date of this notice.
D: APPROVED
information.
•
•
JURISDICTIONAL DETERMINATION: You may accept or appeal the
ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify
date of this notice, means that you accept the approved JD in its entirety, and waive all
APPEAL: If you disagree with the approved JD, you may appeal the approved JD under
Administrative Appeal Process by completing Section II of this form and sending the form
approved JD or provide new
the Corps within 60 days of the
rights to appeal the approved JD.
the Corps of Engineers
to the district engineer. This form
must be received by the division engineer within 60 days of the date of this notice.
E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the
preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed),
by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the
Corps to reevaluate the JD.
SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT 11.
REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial
proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or
objections are addressed in the administrative record.)
ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the
record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to
clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record.
However, you may provide additional information to clarify the location of information that is already in the administrative
record.
POINT OF CONTACT FOR QUESTIONS OR INFORMATION:
If you have questions regarding this decision and/or the
appeal process you may contact:
District Engineer, Wilmington Regulatory Division
Attn: April Norton
Raleigh Regulatory Office
U.S Army Corps of Engineers
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
If you only have questions regarding the appeal process you may
also contact:
MR. PHILIP A. SHANNIN
ADMINISTRATIVE APPEAL REVIEW OFFICER
CESAD-PDS-O
60 FORSYTH STREET SOUTHWEST, FLOOR M9
ATLANTA, GEORGIA 30303-8803
PHONE: (404) 562-5136; FAX (404) 562-5138
EMAIL: PHILIP.A.SHANNIN@USACE.ARMY.MIL
RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government
consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15-day
notice of any site investigation, and will have the opportunity to participate in all site investigations.
Date:
Telephone number:
Signature of appellant or agent.
For appeals on Initial Proffered Permits send this form to:
District Engineer, Wilmington Regulatory Division, Attn: April Norton, 69 Darlington Avenue, Wilmington, North Carolina
28403
For Permit denials, Proffered Permits and Approved Jurisdictional Determinations send this form to:
Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Philip Shannin, Administrative
Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 10M15, Atlanta, Georgia 30303-8801
Phone: (404) 562-5137
PRELIMINARY JURISDICTIONAL DETERMINATION (PJD) FORM
BACKGROUND INFORMATION
A. REPORT COMPLETION DATE FOR PJD: 01/13/2022
B. NAME AND ADDRESS OF PERSON REQUESTING PJD: NZNA, Inc., Attn: Steve Stadelman, PO Box
576, Franklinton, North Carolina 27525
C. DISTRICT OFFICE, FILE NAME, AND NUMBER: Wilmington District, NZNA, N.A. PWW Direct
Discharge Outfall, SAW-2021-02712
D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION: The project area is located at 258
Perry's Chapel Road in Franklinton, Franklin County, North Carolina.
(USE THE TABLE BELOW TO DOCUMENT MULTIPLE AQUATIC RESOURCES
AND/OR AQUATIC RESOURCES AT DIFFERENT SITES)
State: NC County: Franklin City: Franklinton
Center coordinates of site (lat/long in degree decimal format): Latitude: 36.0746 Longitude: -78.3916
Universal Transverse Mercator: 17
Name of nearest waterbody: Cedar Creek
E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY):
® Office (Desk) Determination. Date: 1/13/2022
❑ Field Determination. Date(s):
TABLE OF AQUATIC RESOURCES INREVIEW AREA WHICH "MAY BE" SUBJECT TO
REGULATORY JURISDICTION
Site Number
Latitude
Longitude
Estimated
Type of aquatic
Geographic authority to
(decimal
degrees)
(decimal
degrees)
amount of
aquatic
resources in
review area
resources (i.e.,
wetland vs.
non -wetland
waters)
which the aquatic
resource "may be"
subject (i.e., Section 404
or Section 10/404)
(acreage and
linear feet, if
applicable
W1
35.2728
-78.2638
0.02 ac
wetland
404
1. The Corps of Engineers believes that there may be jurisdictional aquatic resources in the
review area, and the requestor of this PJD is hereby advised of his or her option to request
and obtain an approved JD (AJD) for that review area based on an informed decision after
having discussed the various types of JDs and their characteristics and circumstances when
they may be appropriate.
2. In any circumstance where a permit applicant obtains an individual permit, or a Nationwide
General Permit (NWP) or other general permit verification requiring "pre- construction
notification" (PCN), or requests verification for a non -reporting NWP or other general
permit, and the permit applicant has not requested an AJD for the activity, the permit
applicant is hereby made aware that: (1) the permit applicant has elected to seek a permit
authorization based on a PJD, which does not make an official determination of
jurisdictional aquatic resources; (2) the applicant has the option to request an AJD before
accepting the terms and conditions of the permit authorization, and that basing a permit
authorization on an AJD could possibly result in less compensatory mitigation being
required or different special conditions; (3) the applicant has the right to request an
individual permit rather than accepting the terms and conditions of the NWP or other
general permit authorization; (4) the applicant can accept a permit authorization and
thereby agree to comply with all the terms and conditions of that permit, including
whatever mitigation requirements the Corps has determined to be necessary; (5)
undertaking any activity in reliance upon the subject permit authorization without
requesting an AJD constitutes the applicant's acceptance of the use of the PJD; (6)
accepting a permit authorization (e.g., signing a proffered individual permit) or undertaking
any activity in reliance on any form of Corps permit authorization based on a PJD
constitutes agreement that all aquatic resources in the review area affected in any way by
that activity will be treated as jurisdictional, and waives any challenge to such jurisdiction
in any administrative or judicial compliance or enforcement action, or in any administrative
appeal or in any Federal court; and (7) whether the applicant elects to use either an AJD or
a PJD, the JD will be processed as soon as practicable. Further, an AJD, a proffered
individual permit (and all terms and conditions contained therein), or individual permit
denial can be administratively appealed pursuant to 33 C.F.R. Part 331. If, during an
administrative appeal, it becomes appropriate to make an official determination whether
geographic jurisdiction exists over aquatic resources in the review area, or to provide an
official delineation of jurisdictional aquatic resources in the review area, the Corps will
provide an AJD to accomplish that result, as soon as is practicable. This PJD finds that
there "may be" waters of the U.S. and/or that there "may be" navigable waters of the U.S.
on the subject review area, and identifies all aquatic features in the review area that could
be affected by the proposed activity, based on the following information:
SUPPORTING DATA. Data reviewed for PJD (check all that apply) Checked items are included in the administrative
record and are appropriately cited:
❑X Maps, plans, plots or plat submitted by or on behalf of the PJD requestor:
Map: Project Review Area Map (Figure A)
❑X Data sheets prepared/submitted by or on behalf of the PJD requestor. Datasheets: Wetland Data Forms
❑X Office concurs with data sheets/delineation report.
❑ Office does not concur with data sheets/delineation report. Rationale:
❑ Data sheets prepared by the Corps:
❑ Corps navigable waters' study:
❑ U.S. Geological Survey Hydrologic Atlas:
❑USGS NHD data:
❑USGS 8 and 12 digit HUC maps:
❑X U.S. Geological Survey map(s). Cite scale & quad name- 1.24,000 Franklin, NC
LINatural Resources Conservation Service Soil Survey. Citation: 2004 Franklin Co. Soil Survey Map Sheet 9/17
❑ National wetlands inventory map(s). Cite name:
❑ State/local wetland inventory map(s):
❑ FEMA/FIRM maps:
❑ 100-year Floodplain Elevation is: (National Geodetic Vertical Datum of 1929)
❑ Photographs: ® Aerial (Name & Date): Google Earth 3/9/2021
or ® Other (Name & Date): Site Photographs
❑ Previous determination(s). File no. and date of response letter:
❑ Other information (please specify):
IMPORTANT NOTE: The information recorded on this form has not necessarily been verified by the Corps
and should not be relied upon for later jurisdictional determinations.
April R. Digitally signed
by April R. Norton
Date: 2022.01.13
Norton 15:58:51 -05'00'
Signature and date of Regulatory Signature and date of person requesting PJD
staff member completing PJD (REQUIRED, unless obtaining the signature is
01 / 13 /2022 impracticable)'
1 Districts may establish timeframes for requester to return signed PJD forms. If the requester does not respond within the established
time frame, the district may presume concurrence and no additional follow up is necessary prior to finalizing an action.
Strickland, Bev
From: Norton, April R CIV USARMY CESAW (USA) <April.R.Norton@usace.army.mil>
Sent: Friday, January 14, 2022 9:11 AM
To: Scott Frederick
Cc: Cohn, Colleen M
Subject: [External] Nationwide Permit 58 Verification (NZNA Outfall) SAW-2021-02712
Attachments: Nationwide Permit 58 (NZNA Discharge) SAW-2021-02712.pdf; NWP58.pdf;
SAW-2021-02712 (NZNA) Site Plan Sheets.pdf
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Dear Scott Frederick,
Attached to this message is your requested Section 404 permit authorization for the following project:
NZNA Direct Discharge Outfall in Franklinton, Franklin County, North Carolina
Also, attached are the corresponding regional and general conditions and a copy of the permit compliance certification.
A Preliminary Jurisdictional Determination is included.
Please note that the attached conditions must be strictly adhered to in order for this permit authorization to remain
valid and that the compliance certification must be returned to this office when the work is completed.
This electronic copy is your official Department of the Army Notification; no paper copy will be mailed, unless specifically
requested.
Please contact me if you have any questions or concerns regarding this permit verification.
Thank you,
April Norton
April R. Norton
Regulatory Division
US Army Corps of Engineers
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Phone: (919) 441-3637
Fax: (919) 562-0421
Email: April.R.Norton@usace.army.mil
1