Loading...
HomeMy WebLinkAboutWQ0043389_Application (FTSE)_20220517State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Application Number: Entity Requesting Allocation: Project Name for which flow is being requested: I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility name: b.WWTP Facility Permit #: c. WWTP facility permitted flow: d.Estimated obligated flow not yet tributary to the WWTP: e. WWTP facility's actual average flow: f. Total flow for this specific request: g.Total actual and obligated flows to the facility: h.Percent of permitted flow used: II. List pump stations located between the project connection point and the WWTP. (A)(B)(C)(D) = (B+C) (E)=(A-D) Pump Station (Name or Number) Pump Station Permit Number Firm Capacity1 Design Average Daily Flow2 (Firm/pf), Approx. Current Avg. Daily Flow, Obligated, Not Yet Tributary Daily Flow, Total Current Flow Plus Obligated Flow Available Capacity3 MGD MGD MGD MGD MGD MGD Shaddox_Creek #WQ0039653 2.7000 1.0800 0.1570 0.0000 0.1570 0.9230 Hughes_Creek 0.2350 0.9403 0.1382 0.0000 0.1382 0.8021 Gum_Fork 0.9994 0.4003 0.1109 0.1147 0.2256 0.1747 Little_Buffalo 6.3648 2.5459 1.3046 0.6602 1.9648 0.5811 zBig_Buffalo #N/A #N/A #N/A #N/A #N/A #N/A x #N/A #N/A #N/A #N/A #N/A #N/A Downstream Facility Name (Sewer): Downstream Permit Number: 5.9402 50% ECO TIP West, LLC More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. Big Buffalo Wastewater Treatment Plant NC0024147 1. The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. 2. Design Average Flow is the firm capacity of the pump station divided by the peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. 3. A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is  0. Complete this section for each pump station you are responsible for along the route of this proposed AKPAR 58145 & 91175 Initial Infrastructure City of Sanford Collection System WQCS00047 All flows are in MGD 12.0000 1.8012 4.1390 0.00000 FT-341FT-341 Page 1 of 6 FTSE 10-18 DocuSign Envelope ID: E1FE8B31-BBE4-4626-8FE0-01ABF6C1C29A III. Certification Statement Signing Official Signature Date City Engineer Title of Signing Official 05/17/22 wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. I, Paul Weeks, Jr. PE, certify to the best of my knowledge that the addition of the volume of Page 2 of 6 FTSE 10-18 DocuSign Envelope ID: E1FE8B31-BBE4-4626-8FE0-01ABF6C1C29A