Loading...
HomeMy WebLinkAboutNC0020354_Wasteload Allocation_19910621NPDES DOCU ENT SCANNING COVER !SHEET NPDES Permit: NC0020354 Pittsboro WWTP Document Type: Permit Issuance Wasteload Allocation Authorization to Construct (AtC) Permit Modification Complete File - Historical Engineering Alternatives (EAA) Correspondence Owner Name Change Approval Instream Assessment (67b) Speculative Limits Environmental Assessment (EA) Document Date: June 21, 1991 This document is printed on reuse paper - igiu i e any content on the resrerse side NPDES WAS Ili LOAD ALLOCATION PERMIT NO.: NC0020354 PERMITTEE NAME: Town of Pittsboro / Pittsboro WastewaterTp Facility Status: Existing Permit Status: Renewal Major Pipe No.: 001 Minor Design Capacity: Domestic (% of Flow): Industrial (% of Flow): Comments: 0.75* MGD �"'�c,, /i/y 1"-A 5 or `'f i- O .-7SMG-717on /y arc 100% ycu STREAM INDEX: 16-38-(31 RECEIVING STREAM: Class: C-NSW Roberson (Robeson) Creek Sub -Basin: 03-06-04 Reference USGS Quad: E22NW, Pittsboro County: Chatham Regional Office: Raleigh Regional Office (please attach) Previous Exp. Date: 9/30/91 Treatment Plant Class: Classification changes within three miles: ca. 5 mi.-> WS-III & B NSW Requested by: Jule Shanklin Prepared by: Reviewed by: L":41-1-�- u3isAEt✓ - wQ III A if Date: 5/14/91 Date: 6//9/7/ Date: C44/.26/1 / e19a Modeler Date Rec. #Z4 DAG S 15141 Co Drainage Area (mil ) /Q • Avg. Streamflow (cfs): // 7Q10 (cfs) 0. 0 Winter 7Q10 (cfs) Q. L 30Q2 (cfs) O• 67 Toxicity Limits: IWC % Acute/Chronic Instream Monitoring: Parameters etrnee2 timt., W.4 1 Ac-4/ Gd�� Upstream V Location /od ya cy'-- 4 // Downstream '/ Location /o0yd.c cis eLr rr7( Effluent Characteristics Summer Winter BOD5 (mom) S' c /d . O NH3-N (mg/1) / 0 Z. D.O. (mg/1) 6 , D 6.0 TSS (mg/1) 3a.O 30. O F. Col. (/100 ml) 2400 .0 ftO. 0 pH (SU) C. 0 — % O a. D - J'. O TP(myll) 2.o 2o4 TAJ (m y//) rh •' 'Y 04�/ £M�2� (A-y/0) M l / ,�' pip, FIB sLi L,,, Comments: le tot'/y �e fe— el wet icy. m�%S . 0 gam- -_ tit .ED • �.� �\ r 1 • • ., 450 - 1 . 2157 • • 1 720 000 FEET 3955 /7, —c� •. 360 4 •x 9954 42'30" i.3953 3952 '951 3950 C5B0�o P, \ o WE: A. (3). EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS Summer (April 1 - October 31) During the period beginning January 1, 1990 and authorized to discharge from outfall(s) serial monitored by the Permittee as specified below: Effluent Characteristics lasting until expansion above 0.25 numbers) 001. Such discharges Discharge Limitations Monitoring Kg/day (lbs/day) Monthly Avg. Weekly Avg. Flow BOD, 5Day, 20 Degrees C** Total Suspended Residue** NH3 as N Dissolved Oxygen (minimum) Fecal Coliform (geometric mean) Total Residual Chlorine Temperature Total Nitrogen (NO2 + NO3 + TKN) Total Phosphorus Other Units (Specify) Monthly Avg. Weekly Avg. 0.25 MGD 8.0 mg/1 12.0 mg/1 30.0 mg/1 45.0 mg/1 4.0 mg/1 6.0 mg/1 6.0 mg/1 6.0 mg/1 1000.0/100 ml 2000.0/100 ml 2.0 mg/1*** Measurement Frequency * Sample locations: E - Effluent, I Influent, U - Upstream, D - Downstream ** *arts Continuous 2/month 2/month 2/month Weekly 2/month Daily Weekly Quarterly Weekly The monthly average effluent BOD5 and Total Suspended Residue concentrations shall not respective influent values (85% removal). Quarterly Average Limitation. MGD, the Permittee i. shall be limited and Requirements Sample Type Recording Composite Composite Composite Grab Grab Grab Grab Composite Composite *Sample Location I or E E, I E, I E E, U, D E, U, D E E, U, D E E exceed 15% of the The pH shall not be less than 6.0 standard units nor greater than 9.0 standard units and shall be monitored 2/month at the effluent by grab sample. There shal '�Eo .at of floating solids or visible foam in other than trace ILC • amounts. NC0020354 A. (4). EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS Winter (November 1 - March 31) During the period beginning January 1, 1990 and lasting until expansion authorized to discharge from outfall(s) serial number(s) 001. Such monitored by the Permittee as specified below: Effluent Characteristics Discharge Limitations Kg/day (lbs/day) Monthly Avg. Weekly Avg. Flow BOD, 5Day, 20 Degrees C** Total Suspended Residue** NH3 as N Dissolved Oxygen (minimum) Fecal Coliform (geometric mean) Total Residual Chlorine Temperature Total Nitrogen (NO2 + NO3 + TKN) Total Phosphorus M3 * Sample locations: Other Units (Specify) Monthly Avg. Weekly Avg. 0.25 MGD 16.0 mg/1 24.0 mg/1 30.0 mg/1 45.0 mg/1 8.0 mg/1 12.0 mg/1 6.0 mg/1 6.0 mg/1 1000.0/100 ml 2000.0/100 ml 2.0 mg/1*** above 0.25 MGD, the discharges shall be Permittee is limited and Monitoring Requirements Measurement Frequency E - Effluent, I - Influent, U - Upstream, D - Downstream The monthly average effluent BOD5 and Total Suspended Residue respective influent values (85% removal). *** Quarterly Average Limitation. The pH shall not be less than 6.0 monitored 2/month at the effluent by grab There shall be no discharge of floating standard units sample. solids or visible Continuous 2/month 2/month 2/month Weekly 2/month Daily Weekly Quarterly Weekly concentrations nor greater than foam in other than Sample Recording Composite Composite Composite Grab Grab Grab Grab Composite Composite *Sample Location I or E E, I E, I E E, U, D E, U, D E E, U, D E E shall not exceed 15% of the 9.0 standard, units and shall be trace amounts. NC0020354 A. (5). EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS Summer (April 1 - October 31) During the period beginning after expansion above 0.25 MGD and lasting until expiration, the Permittee is authorized to discharge from outfall(s) serial number(s) 001. Such limited and monitored by the Permittee as specified below: Effluent Characteristics Discharge Limitations Monitoring Kg/dap (lbs/day) Monthly Avg. Weekly Avg. Flow BOD, 5Day, 20 Degrees C** Total Suspended Residue** NH3 as N Dissolved Oxygen (minimum) Fecal Coliform (geometric mean) Total Residual Chlorine Temperature Total Nitrogen (NO2 + NO3 + TKN) Total Phosphorus Conductivity Other Units (Specify) Monthly Avg. Weekly Avg. 0.75 MGD 5.0 mg/1 7.5 mg/1 30.0 mg/1 45.0 mg/1 2.0 mg/1 3.0 mg/1 6.0 mg/1 6.0 mg/1 1000.0/100 ml 2000.0/100 ml 2.0 mg/1*** Measurement Frequency Continuous 2/month 2/month 2/month Weekly 2/month Daily Weekly Quarterly Quarterly Weekly discharges shall be Requirements Sample Type Recording Composite Composite Composite Grab Grab Grab Grab Composite Composite Grab Sample Location I or E E, I E, I E E, U, D E, U, D E E, U, D E E E, U, D * Sample locations: E - Effluent, I - Influent, U - Upstream above discharge point, D - Downstream (1) 1.3 miles below discharge at State road to the North, or (2) 1.6 miles below discharge at unpaved road to the South ** The monthly average effluent BOD5 and Total Suspended Residue concentrations shall not exceed 15% of the respective influent values (85% removal). *** Quarterly average limitation. The pH shall not be less than 6.0 standard units nor greater than 9.0 standard units and shall be monit.oe onth at the effluent by grab sample. a. ; There"s al'1 o discharge of floating solids or visible foam in other than trace amounts. M3 NC0020354 A. (6). EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS Winter (November 1 - March 31) During the period beginning after expansion above 0.25 MGD and lasting until expiration, the Permittee is authorized to discharge from outfall(s) serial number(s) 001. Such discharges shall bL limited and monitored by the Permittee as specified below: Effluent Characteristics Discharge Limitations Monitoring Kg/day (lbs/day) Other Units (Specify) Monthly Avg. Weekly Avg. Monthly Avg. Weekly Avg. Flow BOD, 5Day, 20 Degrees C** Total Suspended Residue** NH3 as N Dissolved Oxygen (minimum) Fecal Coliform (geometric mean) Total Residual Chlorine Temperature Total Nitrogen (NO2 + NO3 + TKN) Total Phosphorus Conductivity 0.75 MGD 10.0 mg/1 15.0 mg/1 30.0 mg/1 45.0 mg/1 4.0 mg/1 6.0 mg/1 6.0 mg/1 6.0 mg/1 1000.0/100 ml 2000.0/100 ml 2.0 mg/1*** Measurement Frequency Continuous 2/month 2/month 2/month Weekly 2/month Daily Weekly Quarterly Quarterly Weekly Requirements Sample Type Recording Composite Composite Composite Grab Grab Grab Grab Composite Composite Grab *Sample Location I or E E, I E, I E E, U, D E, U, D E E, U, D E E E, U, D Sample locations: E - Effluent, I - Influent, U - Upstream above discharge point, D - Downstream (1) 1.3 miles below discharge at State road to the North, or (.2) 1.6 miles below discharge at unpaved road to the South The monthly average effluent BOD5 and Total Suspended Residue concentrations shall not exceed 15% of the respective influent values (85% removal). Quarterly average limitation. The pH l�� -'s�, t be less than 6.0 standard monitoret, m"3it the effluent by grab sample. M3 ThereA all be no harge of floating solids P..1 � _- units nor greater than 9.0 standard units and shall be or visible foam in other than trace amounts. NC0020354 GKEX88/MP COMPLIANCE EVALUATION ANALYSIS REPORT 05/i3/9i PAGE i PERMIT--NCO020354 PIPE--OOi REPORT PERIOD: 9004-9103 LOC---E 'FACILITY--PITT%BORO WWTP, TOWN OF DESIGN FLOW-- .7500 CLASS--3 LOCATION--PITT%BORO REGION/COUNTY--05 CHATHAM 50050 0000 00530 006iO 31616 50060 00300 060i0 MONTH Q/MGD BOD RE%/T%% NH3+NH4- FEC COLT CHLORINE DO TEMP LIMIT % .4650 % 8.00 % 30.0 % 2.00 % 1000.0 NOL % 6.00 NOL 90/04 .3336 3.50 53 .45 12.0 .552 7.32 15.96 90/05 .3531 4.8O 4.4 .62 5.5 .472 6.87 i8.45 90/06 .2274 2.30 2.7 90/07 .1932 1.75 4.1 .O9 .O5 .0 .442 7.55 21.23 7.4 .357 7.67 23.84 90/08 .2072 3.95 3.8 .25 .O .430 7.40 25.04 90/09 .1874 1.70 3.2 .07 186.2 .000 7.92 24.52 LIMIT F .2500 F 8.00 F 30.0 F 4.00 F 1000.0 NOL F 6.00 NOL 90/iO .3440F 2.70 1.6 .i8 24.2 .Oi2 8.20 20.80 LIMIT F .2500 F 16.00 F 30.0 F 8.00 F 1000.0 NOL F 6.00 NOL 98/ii .2685F 1.70 1.7 .33 .O .0OO 9.24 17.00 LIMIT F .2500 F 16.00 F 30.0 F 2.00 F 1000.0 NOL F 6.00 NOL 90/12 .3033F 2.45 2.3 .06 94.9 .000 8.95 14.25 LIMIT F .7500 F 5.00 F 30.0 F 2.00 F iOOO.O NOL F 6.00 NOL 9i/Oi .4102 3.iO 3.9 .21 2.2 .0O0 9.55 12.00 91/02 .2543 4.20 1.8 .07 .O .00O 9.66 12.4O 91/03 .4750 7.00F 2.0 .24 i5.O .000 9.70 i5.37 AVERAGE .2964 3.26 3.0 .21 28.9 .i88 8.33 i8.4O MAXIMUM 1.3806 7.40 5.6 .87 14240.0 1.800 10.40 28.00 MINIMUM .1377 1.20 .7 .01 .O .00O 6.80 iO.00 UNIT MGD MG/L MG/L MG/L 0/100ML MG/L MG/L DEG.0 KEX'1-3/MP COMPLIANCE EVALUATION ANALYSIS REPORT O5/13/9i PA(*.;E 2 ^ PERMIT--NC0020354 1:1IPE-~00i REPORT PERIOD: 9004-9103 LOC~--E FACILITY .... .... PITT%BORO WWTP/ TOWN OF DESIGN FLOW-- .7500 CLA%%--3 LOCATION .... .... PITT%BORO RE�ION/COUNTY--05 CHATHAM 00400 08600 O0665 MONTH PH TOTAL N PHO%-TOT LIMIT 9.0 6.0 90/04 6.7-6.6 90/05 6.9-6.7 LIMIT 9.0 6.0 NOL NOL 90/06 6.9-6.9 18.8O0 1.8700 90/07 7.2-7.1 90/08 7.2-7.2 90/09 7.3--- 7.2 11^700 3.1900 LIMIT 9.0 6.0 NOL F 2.0O00 90/i0 7.i-7.1 LIMIT 9.0 6.0 NOL F 2^8000 90/11 7.1-6^9 LIMIT 9.0 6.0 NOL F 2.O000 90/12 6.9-6.8 21~800 1.7300 LIMIT 9.0 6.0 NOL F 2.0000 9i/01 7^1-7.1 LIMIT 9^0 6^0 NOL NOL 91/02 7^O-6.7 ^5500 91/03 7.2.... 6^3 3^540 i.2800 AVERAGE 13.960 1.7240 MAXIMUM 7.340 21^800 3.1900 MINIMUM 6.350 3.540 .5580 UNIT %U M�/L MG/L. GKEX[T8/MP COMPLIANCE EVALUATION ANALY%I% REPORT O5/i3/9i PAGE i PERMIT--NC002O354 PIPE--OOi REPORT PERIOD- 89O4.... 9003 LOC--------- E ' FACILITY--PITT%BORO WWTP, TOWN OF DE%I�N FLOW-- .75O0 CLA%%--3 LOCAT ION--PITT%BORO REGION/COUNTY.... .... O5 CHATHAM 50050 00310 00530 00610 31616 50060 0030O 000i0 MONTH Q/MGD BOD RE%/T%% NH3+NH4- FEC COLI CHLORINE DO TEMP LIMIT % .4650 % 8.00 s 30.0 % 2.00 % 1000.0 NOL % 6.00 NOL 89/04 .4183 5.35 5.7 ^66 i36.9 .455 7.42 14.64 89/O5 .3906 3.10 7.2 .47 35.i .600 7.50 17^38 89/06 .2864 2.30 4.9 .04 130.3 .309 7.38 21.00 89/07 .2747 2.95 4.3 .17 18.7 .440 7.02 22.85 89/08 .2207 i.75 3.2 ^O7 i32.8 .427 7.12 23.27 89/09 .2218 3.65 5.3 .20 85.0 .345 7.05 22.60 89/10 .3543 3.40 6.8 .08 34.i .490 7.80 19.45 LIMIT % .4650 % 16.00 % 30.O % 4.00 % 1000.0 NOL % 6.00 NOL 89/ii .3065 5.05 i0.9 .36 32.9 .435 7.50 16.64 89/12 .4877 3.20 6.2 .08 10.2 .565 8.02 12.36 90/01 .4iO3 3.0� 7.5 .08 4.8 .509 8.75 i1.79 90/02 .4474 3.60 5.5 .06 3.6 .785 7.20 12^72 90/03 ^4025 3.10 7.8 .05 .0 .55O 7.72 i3.77 AVERACIE .3451 3.37 6.2 .19 52.0 .492 7.54 17.37 MAXIMUM i.O4i3 6.4O 14.2 i.i5 615.0 i.800 9.1O 24.00 MINIMUM .i3i0 1.70 2.2 .03 .O .200 6.50 10.O0 UNIT MG*D MG/L MG/L MG/1- 01-/100ML MG/L. MG/L DEG.0 , �CKEX88/MP COMPLIANCE 1:..VALUAT%ON ANALY%I% REPORT PAGE � . PERMIT-~NCO02O354 PIPE--00i REPORT PERIOD` 8904-9O03 LOC---� FACILITY~~P%TT%BORO WWTP, TOWN OF DE%I�N FLOW-- .7500 CLA%�--3 LOCATION .... .... PITT%BORO RE(1ION/COUNTY.... .... 05 CHATHAM 00400 00600 00665 MONTH PH TOTAL N PHO%-TOT LIMIT 9.0 6.0 89/04 6^S.... 6.6 ' LIMIT 9.0 6.0 NOL NOL 89/05 6.7.... 6^6 9^710 .7400 89/06 7.0.... 6.8 i.7300 89/07 6.8-6^7 17^100 1^8300 89/08 6.9-6.8 89/09 7.0-6^9 89/10 6.8-6.7 .8600 L.IMIT 9^0 6^0 NOL NOL 89/1i 6.8.... 6.7 8.460 89/12 6.8.... 6.8 90/0i 6.7-6.5 90/02 6.5-6.3 90/03 6^7-6^6 12^200 1^4200 AVERAGE ii.867 1.3160 MAXIMUM 7^O00 17^100 1.8300 MINIMUM 6.390 8.460 .7400 UNIT %U MG/L.. MG/L -6KEXS8/MP COMPLIANCE EVALUATION ANALY%I% REPORT 05/i3/91 PAGE i PERMIT- .... NCOO2O354 PIPE- .... OOi REPORT PERIOD: 88O4--- 8903 ' FACILIT Y-.... PITT%BORO WWTP, TOWN OF DE%IGN FLOW-- .7500 CLA%%--3 LOCATION .... .... PITT%BORO REGION/COUNTY--05 CHATHAM 5OO50 00310 00530 00610 31616 50060 00300 00010 MONTH Q/MGD BOD RE%/T%% NH3+NH4- FEC COLI CHLORINE DO TEMP LIMIT F .2500 F 8.00 F 30.0 F 4^O0 F 1000.0 NOL F 6.00 NOL 88/04 .2852F 6.15 5.4 .89 2.8 .630 7.44 i5.65 88/05 .2275 6^65 4.5 .85 2.2 .428 8.00 19.16 88/06 .2013 1.40 2.2 .09 .O ^450 8.05 22.11 88/O7 .i7O4 2^65 i.9 .O5 4.2 .455 7.82 24.05 88/08 .i633 i.25 2.O .0i 14.7 .386 7.70 �� Cz 4 88/09 .2075 2.40 1.9 .54 ^O .475 6.95 23.17 88/iO .25i2F 0 i.95 3.3 .7 i8.0 .438 8.45 18.90 LIMIT % .4650 F i6.00 F 30.O F 8.00 % i000.0 NOL F 6.O0 NOL 88/11 .2765 1.80 1.7 .04 3.6 .635 8.40 16.10 LIMIT % .4650 % 16.0O % 30.0 % 4.00 % 1000.0 NOL % 6.00 NOL 88/12 .2396 3.05 4^0 .07 10.2 .410 9.45 13.20 89/01 .2554 3.95 7.7 .05 25.7 89/02 .4370 4.25 5.5 .36i 8.75 12.90 .04 42.0 .660 8.40 ii.97 89/O3 .53OOF 5.40 6.5 .3O 2.6 .595 8.i8 ii.70 AVERA�E .2704 3.40 3.8 .25 10.5 °493 8.i3 17.87 MAXIMUM i.i802 8.00 8.6 1.70 220.0 2.000 9.60 26.00 MINIMUM .i369 1.00 1.4 .Oi .0 .200 6.30 9.00 UNIT MGD MG/L MG/L MG/L #/100ML MG/L MG/L DEG.0 ~ `�KEX88/MP COMPLIANCE EVALUATION ANALY%I9 REPORT 0':5/13/9i PACE 2 PERMIT--NC002O354 PIPE--00i REPORT PERIOD: 88O4.... 8903 LOC---E ^FACILITY- ---- PITT%BORO WWTP, TOWN OF DE%ICN FLOW-- ^7500 CLA%%--3 LOCATION --- ---- PITTEll ORO REGION/COUNTY--- --- O5 CHATHAM 00400 00600 00665 MONTH PH TOTAL N PHO%-TOT LIMIT 9.O 6.0 NOL 88/04 6^9-6^8 1.4000 LIMIT 9^0 6.0 NOL NOL 88/05 6.9-6.8 1.9500 88/06 7.2.... 7^2 1.880 2.460O 88/07 7^1.... 7^i 2.5000 88/08 7.3.... 7.2 2.600O LIMIT 9.0 6.0 NOL F 2.0000 88/09 7^1-6^9 LIMIT 9.0 6.0 NOL NOL 88/10 7.1-6.9 .9600 LIMIT 9.0 6.0 NOL F 2^0000 88/ii 6.7--- 6.7 LIMIT 9.0 6.0 NOL NOL 88/12 6.8-6.8 2i^�O0 1.6000 89/81 6.8-6^7 1.7208 89/02 6.7-6.6 89/03 6^8.... 6.7 i.0600 AVERAGE _.... .... .... 1i.440 1^8O55 MAXIMUM 7.3O0 21^000 2^6000 MINIMUM 6.600 1.880 ^9600 UNIT %U MG/L MG/L.. Cv . / RECEIVED Facility Name: NPDES No.: Type of Waste: Facility Status: Permit Status: Receiving Stream: Stream Classification: Subbasin: County: Regional Office: Requestor: Date of Request: Topo Quad: FACT SHEET FOR WASTELOAD ALLOCATION Request # WWTP Town of Pittsboro/Pittsboro NC0020354 Domestic - 100% Existing Renewal Roberson Creek C-NSW 030604 Chatham Raleigh Regional Office Shanklin 5/14/91 E22NW MAY 301991 62stilFro4r` Pi_ 0Fr!(; A' _�._ E J UN 1 'r 1991 Stream Chziracteristic: USGS # Date: Drainage Area: Summer 7Q10: Winter 7Q10: Average Flow: 30Q2: _,'if. 02.0970.6900 1988 10.3 0.0 0.4 11.0 0.6 Wasteload Allocation Summary (approach taken, correspondence with region, EPA, etc.) Facility now discharging under expanded limits. Choice of an ammonia limit or a chronic toxicity test should be given to the facility. Downstream sampling station is different from that specified in permit. Is this acceptable to the region? Fecal coliform limit changed to 200/100 mi. Letter has been prepared regarding the potential toxicity of residual chlorine. Special Schedule Requirements and additional comments from Reviewers: Recommended by: Reviewed by Instream Assessment: 0a.A..6,1Sa,l,Lotutr,)-6-vs- Date: `)/c9c//9 / 66 Regional Supervisor: Permits & Engineering: Date: Di*a-• Date: 5/24/19/ Date: ‘//x/5/ RETURN TO TECHNICAL SERVICES BY: JUN 2 7 1991 1& - . , A)-- ffrikt,�S-c�..�Dn-r a-m- .auA_ ,l c.•u-�f �5�,.�,�er--1. o s/ — kr2- `fie � �o " dl� l0 91 n1"_ _ i -�Xi ;fir C 1 l 2 Existing Limits: Wasteflow (MGD): BOD5 (mg/1): NH3N (mg/1): DO (mg/1): TSS (mg/1): Fecal Co1. (/100 ml): pH (SU): Conductivity (µmhos/cm2): TP (mg/1): TN (mg/1): Residual Chlorine (µg/1): Temperature (°C): Recommended Limits: Wasteflow (MGD): BOD5 (mg/1): NH3N (mg/1): DO (mg/1): TSS (mg/1): Fecal Co1. (/100 ml): pH (SU): Conductivity (1.1mhos/cm2): TP (mg/1): TN (mg/1): Residual Chlorine (µg/1): Temperature (°C): Chronic Toxicity Test: PARAMETERS Monthly Average Summer Winter 0.75 0.75 5.0 10.0 2.0 6.0 30.0 1000.0 6.0-9.0 monitor 2.0* monitor monitor monitor Monthly NH3 Li Summer 0.75 5.0 1.0 6.0 30.0 200.0 6.0-9.0 monitor 2.0* monitor monitor monitor Limit Changes Due To: Change in 7Q10 Data Change in stream classification Change in wasteflow Failing toxicity test Ammonia Toxicity Other 4.0 6.0 30.0 1000.0 6.0-9.0 monitor 2.0* monitor monitor monitor Average with mit Winter 0.75 10.0 .1g1•3 6.0 30.0 200.0 6.0-9.0 monitor 2.0* monitor monitor monitor Monthly Average with toxicity test mmer Winter 0. 5 0.75/ 5. 10� 2.0 4. 6.0 6.,0 30.0 30.0 200.0 00.0 6.0-9.0 .0-9.0 U monitor onitor 2.0* monitor moni monitor monito itor monitor @99%P/F @99% Parameters Affected Fecal coliforms INSTREAM MONITORING REQUIREMENTS: Upstream: Roberson Ck. x Location: Downstream: Roberson Ck x Location: 100 yds. upstream of discharge 100 yds. downstream of discharge Parameters: Dissolved oxygen, fecal coliform, temperature, conductivity 10/89 Facility Name /)t/ 1 / % ` ° Permit CI:` TOXICITY MONITORING REQUIREN1FN"1 !(,)IZ"1-R l_ 1.) The North Carolina Ceriodaphnia chronic effluent bioassay Bioassay Procedure - Revised `September 1989) or subsequent versions, using full range option outlined in Appendix A. The test concentral..9tris for this test series will be established around the instream waste concentration of . 77 % by factors of three as outlined in Appendix A. The permit holder shall perform quarterly monitoring using this procedure to establish compliance with the permit condition. The t test will be perfoues1 after thirty days from the issuance of this permit during the months of •/NOV.,, / • . Effluent sampling for this testing shall be performed at the NPDES ermitted�final effluent discharge below all treatment processes. � g All toxicity testing results required as part of this permit condition will be entered on the Effluent Discharge Monitoring Form (MR-1) for the month in which it was performed, using the parameter code THP3B. Additionally, all testing results will be sent to the following address: Attention: Environmental Sciences Branch North Carolina Division of Environmental Management P.O. Box 27687 Raleigh, N.C. 27611 Test data shall be complete and accurate and include all supporting chemical/physical measurements performed in association with the toxicity tests, as well as all dose/response data. Total residual chlorine of the effluent toxicity sample must be measured and reported if chlorine is employed for disinfection of the waste stream. Should any test data from this monitoring requirement or tests performed by the North Carolina Division of Environmental Management indicate potential impacts to the receiving stream, this permit may be re -opened and modified to include alternate monitoring requirements or limits. NOTE: Failure to achieve test conditions as specified in the cited document, such as minimum control organism survival and appropriate environmental controls, shall constitute an invalid test and will require immediate retesting(within 30 days of initial monitoring event). Failure to submit suitable test results will constitute noncompliance with monitoring requirements. 7Q10 i• G cfs Permitted Flo MGD IWC% /00 Basin & Sub -basin CPI- O 30604 Receiving Stream kft4t4sem C/«4- County 'Llc fluttn Recommended by: Date 5/ z- q1 /4076-eA- **Chronic Toxicity (Cerio) ChV Monitoring at %,P 4 ee Part , Condition TOWN OF PITTSBORO - Allowable Waste Concentrations SUMMER Residual Chlorine Ammonia as NH3 7Q10 (CFS) 0 7Q10 (CFS) 0 DESIGN FLOW (MGD) 0.75 DESIGN FLOW (MGD) 0.75 DESIGN FLOW (CFS) 1.1625 DESIGN FLOW (CFS) 1.1625 STREAM STD (UG/L) 17.0 STREAM STD (MG/L) 1.0 UPS BACKGROUND LEVEL (UG/L) 0 UPS BACKGROUND LEVEL (MG/L) 0.22 IWC (%) 100 IWC (%) 100 Allowable Concentration (ug/1) 17 Allowable Concentration (mg/l) 1 WINTER Residual Chlorine Ammonia as NH3 7010 (CFS) 0.4 7010 (CFS) 0.4 DESIGN FLOW (MGD) 0.75 DESIGN FLOW (MGD) 0.75 DESIGN FLOW (CFS) 1.1625 DESIGN FLOW (CFS) 1.1625 STREAM STD (UG/L) 17.0 STREAM STD (MG/L) 1.8 UPS BACKGROUND LEVEL (UG/L) 0 UPS BACKGROUND LEVEL (MG/L) 0.22 IWC (%) 74.4 IWC (%) 74.4 Allowable Concentration (ug/I) 22.849462 Allowable Concentration (mg/I) 2.343656 NC0020354 DAG 5/21/91 t1coG 20354 5001R-Pc or lotAlil PT grroc,;0;c &14,06 65E29/%1 Zieel:=1‘ ettA) O.75c 40300 04 02.0-10•(9ao (1�1(Rk wu of i?rr oR0 <&Nu - .75Nc-o) DA,- 10.3 niz 57a10 -- 0.0 h17G,10 = 0. c$s 30Q Z = C. 6 c.f STREAM DATA INSTREAM SELF -MONITORING DATA MONTHLY AVERAGES Discharger: rifi-Stia Receiving Stream: PaPJei2 € c Upstream Location: WO vns-. tAr's rtcAwt DATE Dec-91 Nov-91 Oct-91 Sep-91 Aug-91 Jul-91 Jun-91 May-91 Apr-91 Mar-91 Feb-91 Jan-91 Dec-90 Nov-90 Oct-90 Sep-90 Aug-90 JuI-90 Jun-90 May-90 Apr-90 Mar-90 Feb-90 Jan-90 Dec-89 Nov-89 Oct-89 Sep-89 Aug-89 JuI-89 Jun-89 May-89 Apr-89 Mar-89 Feb-89 Jan-89 TEMP D.O. COLD Permit No. r20061-1' Sub -basin: Downstream Location: vit) a `9 . G M FECAL COLI. 13. /0 /0.3 38 e' 7,s /I0 9.7 9, 7 izq 3Z 9.0 /7.S U..3 /9. S /s bco /75 /S' lGC. III /off 3 9,S 67 z/-7/ 4S TEMP D.O. COND. FECAL CO PIS ,q.. 4L 9.1 _ •I/ / • 9. LL /o. s /te.;,, G� g 2. /o. q :14 Z 265- // 9; 7 ' /Rr 9E / 3 i S 25a '70 17 G,4 g 473 Z/.3 6.e 5/ / `f `f- 6. • 6 343 v.k 7 , p 35-2, 92 zo.6 7 o /7y /44 / /9. z 7, 3 /49 77-4 /6" & g, ? / c c /`'. / /3 9_6- /74' z2 Page 1 To: Permits and Engineering Unit Water Quality Section RFCEIVED JUN 1 9 1991 TECNIiiL'AL SUPPORT BRANCH DATE: NPDES STAFF REPORT AND RECOMMENDATIONS COUNTY: Chatham PERMIT NUMBER: NC0020354 PART I - GENERAL INFORMATION 1. Facility and Address: 2. 3. 4. Date of Investigation: Town of Pittsboro WWTP P.O. Box 753 Pittsboro, NC 27312 site visit April 11, 1991 June 17`, 1991 Report Prepared by: Carol Stephens, Environmental Technician Person Contacted & Telephone Number: Hammond Snyder (919) 542-2444 5. Directions to Site: Hwy 64 west; left onto Small Street; Plant is at the end of the extension 6. Location of Discharge Point (see attached USGS map extract with discharge point indicated). a. USGS Quad Number: E22NW USGS Quad Name: Pittsboro, NC b. Latitude: 35°42'50" Longitude: 79°10'12" 7. Size (land available for expansion and upgrading): limited area available 8. Topography (including relationship to 100-year flood plain): not located in the flood plain 9. Location of Nearest Dwelling: several within 1000 feet 10. Description of Receiving Stream or Affected Surface Waters. a. Name: Roberson Creek b. Classification: C NSW c. River Basin and Subbasin Number: 03-06-04 d. Receiving Stream Features and Pertinent Downstream Uses: stream flows into Jordan Lake PART II - DESCRIPTION OF DISCHARGE AND TREATMENT WORKS 1. Description of Wastewater. a. Type of Wastewater: 100 % Domestic 0 % Industrial b. Volume of Wastewater (design capacity): 0.750 MGD 2. Pretreatment Program Status: In Development Approved Should Be Required X Not Needed 5. Treatment System Information. a. Status of Treatment System: X Existing Proposed b. Description of Treatment System: mechanical barscreen, grit removal, diffused aeration basins, clarifiers, Phosphorus removal, high rate sand filters, sludge thickening, aerobic sludge digestion, UV disinfection, and cascade post aeration • 6. Residual Solids Treatment and Disposal Method: land application 7. Treatment System Classification (rating sheet attached, if appropriate): IV 8. Codes. a. SIC Code: 4952 b. Wastewater Code: 01 9. Treatment System Compliance Status: compliant PART III - OTHER PERTINENT INFORMATION 1. Is This Facility Being Constructed With Construction Grants Funds? NA 2. Special Monitoring Requests: 3. Additional Effluent Limits Requests: 4. Other: Mr. Snyder opted for the more stringent ammonia effluent limt instead of a toxicity requirement. See wasteload allocation. PART IV - EVALUATION AND RECOMMENDATIONS The Raleigh Regional Office recommends renewal of this permit. Repo Writer Regional Water Quality Survisor 4//10/9/ Date TD:CS:cs r00 ' • 11• Q • �!o • • • • \ 1\: n�• 460/ r/ / • T 1 TT5BeA,1�lC_ •• 550,,