Loading...
HomeMy WebLinkAboutNC0005126_Authorization to Construct_20040406NPDES DOCUMENT 5CANNINO COVER SHEET NPDES Permit: NC0005126 Harmony Rendering Plant Document Type: Permit Issuance Wasteload Allocation iW„,.„.5f y ,,,,.si,,,,;,.. Itlt;�Wil. fstz..+mow '..,a war._,. Authorization to Construct (AtC ,,.; ..1:M4 9N`w:'F1.:lt?ft7f:nK,-k ::::v:::.: Permit Modification Complete File - Historical Engineering Alternatives (EAA) Correspondence Owner Name Change Instream Assessment (67b) Speculative Limits Environmental Assessment (EA) Document Date: April 6, 2004 This document is printed on reuse paper - iggnore any - corn -tent on the re‘rerse side Michael F. Easley, Govemor State of North Carolina William G. Ross, Jr., Secretary Department of Environment and Natural Resources Alan W. Klimek, P.E., Director Division of Water Quality April 6, 2004 Mr. Dan Crowe Tyson Foods, Inc. P.O. Box 158 Harmony, North Carolina 28634 Subject: Authorization to Construct ATC No. 005126A02 NPDES Permit No. NC0005126 Harmony Rendering Plant WWTP Iredell County Dear Mr. Crowe: The Division of Water Quality's NPDES Unit has reviewed the Tyson Foods, Inc.'s request for an Authorization to Construct improvements at the Harmony Rendering Plant WWTP, as well as additional information provided by Reid Engineering. The Division finds the proposed improvements and design to be satisfactory and hereby grants authorization for the following: • installation of one 92 ft. diameter x 17 ft. SWD, bolted steel tank with three 50 HP surface aerators, to serve as an aerated flow equalization basin (FEB), • installation of one 350 gpm rotary drum screen upstream of the new 1~t•;>i, • relocation of the existing DAF influent pump station, to serve as the FEB effluent/ DAF feed pumping station, • removal of the existing FEB tank from service, and • construction or installation of all related structures, equipment, piping, controls, and other appurtenances, as described in the approved plans and specifications. This Authorization to Construct is issued in accordance with Part III, Paragraph A of NPDES Permit No. NC0005126, issued September 13,1999, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in that perrnit. Upon completion of construction and submittal of an acceptable Engineer's Certification (see below), the approved design capacity of the facility shall remain at 0.040 MGD. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. Notification Requirements The Permittee shall notify the Mooresville Regional Office, telephone number (704) 663-1699, at least forty-eight (48) hours in advance of operation of the installed facilities, so that an in -place inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours of 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 733-7015 FAX (919) 733-0719 On the Internet at http://h2o.enr.state.nc.us/ Mr. Dart Crowe Harmony Rendering Plant WWTP ATC No. 005126A02 Page 2 Engineering Certification Upon completion of construction and prior to operation of the modified facility, the Permittee shall provide the Division with a certification from a professional engineer registered in North Carolina certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct, and the approved plans and specifications. The certification should be mailed to the NPDES Unit, 1617 Mail Service Center, Raleigh, North Carolina 27699-1617. ORC Requirements The Permittee must continue to employ a certified wastewater treatment plant operator in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of Title 15A, Chapter 8G, .0200. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III, and IV facility at least daily, excluding weekends and holidays; and must properly manage and document daily operation and maintenance of the facility and comply with all other conditions of Title 15A, Chapter 8G, .0200. Additional Conditions Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to enforcement action by the Division of Water Quality in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not relieve the Permittee from its responsibility to comply with any and all statutes, rules, regulations, or ordinances that may be imposed by other government agencies (local, state, and federal) which have jurisdiction. The Permittee shall maintain a copy of the approved plans and specifications on file for the life of the facility. If you have any questions about this Authorization to Construct, please contact Mike Templeton at (919) 733-5083, extension 541, or by e-mail at mike.templeton@ncmail.net. Sincerely, r.A1an�W. Klimek,1 L. �^ Director Enclosures: Approved plans and specifications Engineer's Certification Form Copies: John H. Reid, P.E. (w/ engr. cert.) - Reid Engineering Company, Inc. 1211 Princess Anne Street Fredericksburg, VA 22401 Mooresville Regional Office, Water Quality Technical Assistance and Certification Unit Central Files NPDES Unit Files Reid Engineering Company, inc. Teahn 24:1 Reid engineering Company, Inc. Consulting Environmental Engineers Specializing in the Design and Operation of Water Pollution Control Systems September 3, 2003 Mr. Charles Weaver North Carolina Department of Environment and Natural Resources 512 N. Salisbury St. P. O. Box 27867 Raleigh, NC 27626 DENR-WATER O'JALJTY POINT SOURCE BRANCH L �tt-') OCT 3 1 2003 121 Subject: Authorization to Construct, Proposed New Flow Equalization Basin at Wastewater Treatment System, Tyson Foods/River Valley Animal Foods, Harmony, NC, NPDES Permit #NC0005126 Dear Mr. Weaver: Tyson Foods/River Valley Animal Foods desires to install a new Drainage Wastewater Screen and new Flow Equalization Basin (FEB) at their wastewater treatment system in Harmony, NC. Reid Engineering Company is submitting the attached Construction Drawings and Specifications, to the NCDENR for approval of an Authorization to Construct this proposed new FEB. The design flow capacity of the wastewater treatment system is 0.50 MGD. No increase in the wastewater discharge flow volume is proposed as part of this project. This project includes the following wastewater treatment system improvements: 1. One new Drainage Wastewater Screen will be installed to remove grit, solids and rocks from the drainage wastewater stream. 2. One new Flow Equalization Basin (FEB) will be installed to provide 7 day hydraulic flow equalization of all raw wastewater upstream of the existing dissolved air flotation (DAF) pretreatment system. 1210 Princess Anne Street • Fredericksburg, Virginia 22401 • 540-371-8500 • FAX 540-371-8576 • Www.reidengineering.com Registered Professional Engineers in Alabama. Arkansas. California, Delaware, Florida. Georgia, Idaho, Illinois. Indiana. Kansas. Kentucky, Louisiana, Maine. Maryland, Michigan. Minnesota, Mississippi, Missouri. Nebraska, New Jersey, New York, North Carolina, Ohio, Oklahoma. Pennsylvania, South Carolina, Tennessee,'Icnas, Virginia. Washington, West Virginia, Wisconsin Mr. Charles Weaver Authorization To Construct September 3, 2003 3. The existing DAF Cell influent pump station will be relocated to function as the new FEB Effluent Pump Station to pump equalized wastewater from the new FEB to the existing DAF Cell. Installation and operation of this proposed new screen and FEB will result in a significant improvement in wastewater pretreatment upstream of the new activated sludge final treatment system, and a significant reduction in slug loadings on the activated sludge system. Tyson Foods desires to commence construction of this project immediately therefore expedited approval from the NCDENR wou d be appreciated. If you have need of additional information please call. Sin John H. Reid, P.E., President cc: Bo Watson Kelly Pogue Dan Crowe s all • , el I