HomeMy WebLinkAboutNCG030531_DMR_20220225 Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG030000
Date submitted 11/23/20
3
CERTIFICATE OF COVERAGE NO. NCG030 SAMPLE COLLECTION YEAR 2022
FACILITY NAME Kings Mountain Internaional.Inc. SAMPLE PERIOD ®Jan-June ❑July-Dec
COUNTY Cleveland or ❑ Monthly'
PERSON COLLECTING SAMPLES Bob Jafarkhani DISCHARGING TO CLASS
LABORATORY Pace Labs Lab Cert.It 12&40 Comments on ❑ORW ❑HQW ❑Trout ❑PNA
sample collection or analysis:Don Jones p C C�. i\/F D ❑Zero-flow ❑Water Supply ❑SA
f�G ®Other Stormwater
MAk Q 1 Zg?1
CENTRAL FILES PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
Part A:Stormwater Benchmarks and Monitoring Results DWR SECTION
® No discharge this period?'
Date Sample 24-hour rainfall pH, Non-Polar O&G/
Total Toxic
Outfall No. Collected' amount, Total Suspended Solids Standard units Copper Lead Zinc Total Petroleum Organics'
(mo/dd/yr) Inches' Hydrocarbons
Benchmarks===> - 100 mg/L or 50 mg/L4 6.0—9.0 0.010 mg/L 0.075 mg/L 0.126 mg/L 15 mg/L 1 mg/L
Parameter Code 46529 C0530 00400 01119 01051 01094 00552 78141
SDO#005 1 2/4/22 1.00 1 5.9 6.9 .0042J ND .06 ND
'Monthly sampling(instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall,you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit,Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
'Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals,or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample(for metal finishing use the definition as found in 40 CFR 433.11;for semiconductor
manufacture use the definition as found in 40 CFR 469.12;for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date:11/1/2018-5/31/2021 SWU-245, last revised 11/1/2018
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver,the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO),I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Don Jones
Name(Print name)
VP of Operations
le
2/25/2022
(Signat (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non-detect, ND,or other similar non-numerical
format. When results are below the applicable limits,they must be reported in the format."<XX mg/L".where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?z
Date Sample 24-hour rainfall
Outfall No. Collected' amount, New Motor Oil or Non-polar O&G/Total Total Suspended
(mo/dd/yr) Inches3 Hydraulic Oil Usage Petroleum Hydrocarbons Solids
Benchmarks=__> _ - 15 mg/L 100 mg/L or 50 mg/L*
Parameter Code 46529 NCOIL 00552 CO530
Footnotes from Part A also apply to this Part B
*See General Permit text,Table 5,identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date:11/1/2018-5/31/2021 SWLI-245, last revised 11/1/2018
Page 2 of 3
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART AAND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO
IF YES,HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑NO❑
REGIONAL OFFICE CONTACT NAME: Zahid Khan
Mail an original and one copy of this DMR, including all "No Discharge"reports, within 30 days of receipt of the lab results for at end of monitoring period
in the case of"No Discharge"reports)to:
Division of Water Quality
Attn:DWQ Central Files
1617 Mail Service Center
Raleigh,North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system,or
those persons directly responsible for gathering t information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete. I
am aware that there are significant penal . or submitting false information, including the possibility of fines and imprisonment for knowing violations."
2/25/2022
(Signature of Perm' ) (Date)
Permit Date:11/1/2018-5/31/2021 SWU-245,last revised 11/1/2018
Page 3 of 3