Loading...
HomeMy WebLinkAboutWQ0043443_Application (FTSE)_20220517 (4)State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: City of Brevard, NC Project Name for which flow is being requested: Sunset Drive Sewer Extension More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Brevard Wastewater Treatment Plant b. WWTP Facility Permit #: NC0060534 All flows are in MGD c. WWTP facility's permitted flow 2.5 d. Estimated obligated flow not yet tributary to the WWTP 0.04 e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility 1.68 0.00024 1.72 h. Percent of permitted flow used 68.8 II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: Pump Pump Station Station (Name or Permit Number) No. Neely Rd Firm Capacity, * MGD 2.8224 (A) Design Average Daily Flow** (Firm / pf), MGD (B) (C) (D)=(B+C) (E)=(A-D) Obligated, Approx. Not Yet Total Current Current Tributary Flow Plus Avg. Daily Daily Flow, Obligated Flow, MGD MGD Flow Available Capacity*** 1.13 0.94 0.04 0.98 0.15 * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Brevard Wastewater Treatment Plant Downstream Permit Number: NC0060534 Page 1 of 6 FTSE 10-18 III. Certification Statement: I Emory G. Owen certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Signing jelal Signature ve. Till of Signing Official 01A Ail 07,<7.&(-1-1a/, Date Page 2 of 6 FTSE 10-18