Loading...
HomeMy WebLinkAboutSW5200602_As-Built Designer Certification - Sand Filters_20220516State Stormwater Management Permit No. SW5200602 AS -BUILT DESIGNER'S CERTIFICATION FOR SAND FILTER PROJECT I hereby state that I am a licensed professional and I certify by my signature and seal below, that I have observed the construction of the project named above to the best of my abilities with all due care and diligence, and that the project meets all of the MDC found in NCAC 02H.1056, in accordance with the permit documents, plans and specifications on file with or provided to the Division, except as noted on the "AS -BUILT" drawings, such that the intent of the stormwater rules and the general statutes has been preserved. Check here if this is a partial certification. Section/phase/SCM #? Check here if this is part of a Fast -Track As -Built Package Submittal per .1044(3). Check here if the Designer did not observe the construction, but is certifying the project. Check here if pictures of the SCM are provided. Printed Name Signature /�-•'• NC Registration Number SEAL: 39082 Date Consultant's Mailing Address: City/State/ZIP Phone Number Consultant's Email address: O Circle N if the as -built value differs from the Plan/permit. If N is circled, provide an explanation on page 2 ON/E = not evaluated (provide explanation on page 2) ON/A = not applicable to this project or SCM. This Certification must be completed in conjunction with the General MDC certification under NCAC 02H.1050 Consultant's Certification (MDC .1056) OAs-built ON/EON/A A. Two -chambers stem 1. Does the Sand Filter include a Sediment chamber and a Y N Sand chamber? or 2. The storage volume in each chamber is equivalent. Y or N 3. The incoming stormwater is evenly distributed across the Y N surface of the sand. or B. Volume / Elevations 1. The volume of water stored in the sediment chamber and on top of the sand in the sand chamber is at least 0.75 times the Y or N treatment volume. 2. The elevation of the bypass device is set at or above the Y N ponding depth associated with the storage volume. or 3. The ponding depth above the sand surface is six feet or less. Y or N C. Sand Media / Drawdown / SHWT 1. Does the sand media meet ASTM C33 or equivalent? Y or N 2. The depth of the sand media is consistent with the approved Y N tans andspecs and is a minimum of 18". or 3. The depth of the sand media over the underdrain is consistent with the approved plans and specs and is a Y or N minimum of 12 inches. 4. The sand media provides a minimum drawdown of two Y N inches per hour at the sand surface. or 5. Open -bottom design — the minimum separation to the SHWT at the lowest point of the sand filter is consistent with the Y or N approved plans andspecs and is a minimum of 2 feet. Page 5of8 State Stormwater Management Permit No. SW5200602 6. Closed -bottom design — The minimum separation to the SHWT at the lowest point of the sand filter is consistent with Y or N the approved plans and is a minimum of 1 foot. 7. At least one capped clean -out pipe has been provided at the Y N low point of each underdrain. or Provide an explanation for every MDC that was not met, or for every deviation from the permitted condition below: Page 6of8 SEDIMENTATION CHAMBER 1�\ 3 MIN INFLOW PIPE SAND FILTER 1 BMP SUMMARY CHART-ASBUILT r PEAK CONTROL STORM EVENT POST -DEVELOPMENT RUNOFF ICFS} POST -ROUTING RUNOFF ICFS} ELEVATIONr TOP OF DAM 446.80 r 2YR 15.64 1.1 443.39 r 10 YR 28.93 2.75 444.36 r 25 YR 39.72 7.37 444.94 r r 100 YR 60.86 43,44 445.55 r PROVIDED REQUIRED ELEVATION r DDV 1 10044 CF 8935 CF 443.10 r ---SAND FILTER----4616 -SF --- 4468 -SF __-- 442.00 _J SAND FILTER 1 BMP SUMMARY CHART 6" #57 WASHED 2' RIP RAP STONE 3" GRAVEL / STONE SURFACE EL 439.5 CLEAN -OUT (PVC PIPE W / GLUED CLEAN -OUT FITTINGS AND SCREW TYPE CAP) PEAK CONTROL STORM EVENT POST -DEVELOPMENT RUNOFF (CFS) POST -ROUTING RUNOFF (CFS) ELEVATION TOP OF DAM 447.00 2YR 21.18 1.2 443.45 10 YR 28.93 3.17 444.40 25 YR 39.72 8.47 445.01 100 YR 60.86 45.75 445.57 PROVIDED REQUIRED ELEVATION DDV 10267 CIF 8935 CIF 443.10 SAND FILTER 4500 S F 4468 S F 442.00 NOTE: 1. SAND FILTER IS SIZED FOR DDV AND CHECKED FOR FREEBOARD. 2. PER GEO-TECHNICAL REPORT PREPARED BY TERRACON CONSULTANTS, INC. RALEIGH, NC. THERE IS NOT ANY GROUND WATER ENCOUNTERED AT SAND FILTER 1 LOCATION. 3. CONSTRUCTION OF SAND FILTER FACILITY AND STORM STRUCTURES COMPLY WITH NC DEQ GUIDELINES. 4. MAINTENANCE AND INSPECTION REQUIREMENT COMPLY WITH NC DEQ GUIDELINES. 5. SAND FILTER SHALL BE INSPECTED ONCE A QUARTER AND WITHIN 24 HOURS AFTER EVERY STORM EVENT GREATER THAN 1.0 INCHES (OR 1.5 INCHES IF IN A COASTAL COUNTY). RECORD OF OPERATION AND MAINTENANCE WILL BE KEPT IN A KNOWN SET LOCATION AND WILL BE AVAILABLE UPON REQUEST. 3" GRAVEL / STONE SURFACE EL. 444.00 RIP RAP BERM (CLASS B) SANFILTER MEDIA (ASTM C-33 SAND OR EQUIVALENT) 1.5' MEDIA V DDV ELEV. = 443.10 ELEV. = 442.25 6'X6' OVERFLOW OUTLET CONTROLSTRUCTURE - RIM. ELEV 445.00 6" PERFORATED UNDER DRAIN @ 0.5% SLOPE \� 100 YR ELEV. = 445.57 PROFILE VIEW 3" GRAVEL / STONE SURFACE 1.5' SAND FILTER MEDIA (ASTM C-33 SAND OR EQUIVALENT) 12" 2.0'xl' rec weir EL 444.00 EL 447.00 3 MIN. 30" RCP OUTFLOW PIPE ELEV 436.79 V GRAVEL LAYER N.T.S NOTICE TO CONTRACTOR: SCARIFY BOTTOM PRIOR TO INSTALLATION OF UNDER DRAIN SYSTEM (DO NOT COMPACT) FII TFR EL 442.25 Sandfilter) ABRIC WASHED #57 STONE E / GRAVEL UNDER DRAIN SYSTEM TYPICAL SECTION N.T.S SANDFILTER 1- Environnierrrnl Envir�nn,<n,al Enviranmemol NCDEQ Stormwater BMP Manual Qrar" NCDEQ Stormwater BMP Manual ¢""io. NCDEQ Stormwater BMP Manual Qunlr°, Maintenance Table 9: Sample Operation and Maintenance Provisions for Sand Filters filter bed media and replace. If water still ponds, then consult Sand filters shall be inspected at least once a quarter and shall be maintained as needed to I an expert. remove surface sediment accumulation, trash, debris, and leaf litter to prevent the filter from clogging. Sediment should be cleaned out of the forebay/sedimentation chamber when it Outlet device Clogging has occurred. Clean out the outlet device. accumulates to a depth of more than 6 inches. During inspection, structures such as outlets Entire BMP Trash/debris is present. Remove the trash/debris. Dispose of the sediment offsite. and flow diversions should be checked at least annually for damage or degradation. Figure 6 shows an example of a sand filter that is overdue for maintenance. Adjacent pavement (if Sediment is present on the Sweep or vacuum the sediment applicable) pavement surface. as soon as possible. The outlet device is damaged Repair or replace the outlet device. Figure 6: Sand Filter Overdue for Maintenance Perimeter of sand filter Areas of bare soil and/or Regrade soil if necessary to Clogged Sediment Chamber Clogged Sand Chamber erosive gullies have formed. remove the gully, and then Receiving water Erosion or other signs of Contact the NC Division of 99 99 anamer plant a ground cover and water damage have occurred at the Water Resources. until it is established. Provide outlet. lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at an long. appropriate hei ht. 9 ` Flow diversion structure The structure is clogged. Unclog the conveyance and dispose of any sediment offsite. The structure is damaged. Make any necessary repairs or replace if damage is too large for repair. Forebay or pretreatment area Sediment has accumulated to a Search for the source of the depth of greater than six sediment and remedy the inches. problem if possible. Remove the sediment and stabilize or Important maintenance procedures for a sand filter include: dispose of it in a location where it will not cause impacts to 1. Manage the drainage area to reduce the sediment load to the sand filter. streams or the BMP. 2. Clean out the sedimentation chamber or forebay whenever sediment depth exceeds six Erosion has occurred. Provide additional erosion inches. protection such as reinforced turf matting or riprap if needed 3. At least once a year, skim the sand media. to prevent future erosion problems. 4. Replace the sand filter media whenever it fails to function properly after maintenance. Weeds are present. Remove the weeds, preferably 5. Inspect the sand filter at least quarterly. Any problems that are found shall be repaired by hand. If a pesticide is used, immediately. wipe it on the plants rather than spraying. Maintain operation and maintenance records in a known set location. Operation and maintenance records will be available upon request. Filter bed and underdrain Water is ponding on the surface Check to see if the collector collection system for more than 24 hours after a system is clogged and flush if storm. necessary. If water still ponds, remove the top few inches of TOP OF SAN BOTTOM C BOTTOM OF POND 1 / SANDFILTER - OUTLET STRUCTURE DETAIL N.T.S. NOTE: GRATING SECTION SHALL BE FASTENED TO THE SUPPORTS WITH A MINIMUM OF FOUR (4) SADDLE CLIP ANCHORS DESIGNED TO FIT OVER TWO (2) BEARING BARS WITH STUD BOLTS, WASHERS AND NUTS. ALUMINUM RIVETED GRATIN (1-1/8" X 7") ALUMINUM ANGLE 3" x 2" x 3/8", LLV 1/2"6 S.S. EXP. ANCHORS @ 2'-0" O.C. 3 1/2" MIN. EMBEDMENT INSIDE FACE OF CONIC. BOX GRATING DETAIL NOT TO SCALE CARRY RIP RAP UP SIDES OF SPILLWAY � 1-SILT FENCE CLASS 1 OR 2 x RIP RAP DRIP RAP APRON OUT�FT F� /4" 3' SP/LLW.4 Y LENGTH S DEVSLOPES 12" F� (5' MIN.) ELEVATION OF POND SPILLWAY NOT TO SCALE POND SPILLWAY SPILLWAY CREST SPILLWAY CREST ID BOTTOM LENGTH ELEV. NUMBER WIDTH (L) (H) SF 1 10'MIN. 1 10' 446.00 NOTE: CONTRACTOR TO REMOVE SILT FENCING AFTER POST -CONSTRUCTION ACTIVITIES HAVE BEEN COMPLETED, AND POND SLOPES HAVE BEEN STABILIZED. C-6. Sand Filter 7 Revised: 1-3-2017 C-6. Sand Filter 8 Revised: 1-3-2017 C-6. Sand Filter 9 Revised: 1-3-2017 POND 1 /SANDFILTER OVERFLOW EMERGENCY SPILLWAY N.T.S. #5 WASHED STONE ON OUTER SURFACE OF BERM ACROSS SPILLWAY NO STONE THRU BERM C m . (E i a r c h i t e c t s ARCHITECT: 16150 Main Circle Drive, Suite 100 St. Louis, MO 63017 (636) 449-1175 / fax (636) 449-1176 CONSULTANTS: CIVII: Stantec 801 Jones Franklin Road, Suite 300 Raleigh, NC 27606 MEP/FP: SSC Engineering, Inc. 18207 Edison Ave. Chesterfield, MO 63005 Z O Q O O 0 a ti N U) U � Z UJ J m J UJ � z U � � O IN UJ >_ U UJ Q J UJ Y UJ � Y a Q 00 N � N COOPERATIVE DBUILDING SOLUTIONS PA RIC EXPERIENCE. EXCELLENCE. DESCRIPTION DATE ADDENDUM #2 07/10/2020 ERC/STRM COMMENTS 08/14/2020 PROFESSIONAL RECORD ����trtiirrrfl�� ��`,�►�CARD `'rr AL _ ❑82 = 08/14/202 F1yG 11+16 rrrr �'�R�f • A �R','`� DATE 07-10-2020 PROJECT NUMBER 19.025 TITLE SANDFILTER 1 DETAILS SHEET SEDIMENTATION CHAMBER 1�\ 3 MIN INFLOW PIPE SAND FILTER 2 BMP SUMMARY CHART ASBUILT PEAK CONTROL STORM EVENT POST -DEVELOPMENT RUNOFF (CFS) POST -ROUTING RUNOFF (CFS) ELEVATION TOP OF DAN'. 450,00 2YR 6,61 0,99 447,10 10 Y R 11.63 1,24 447.71 25 YR 1.5.59 1.98 448,13 100 YR 23.25 10,61 448,64 PROVIDED REQUIRED ELEVATION DDV 7320 CF 1 2559 C= 446,80 SAND FILTER 1608 SF 1200 S= 446.D0 SAND FILTER 2 BMP SUMMARY CHART 6" #57 WASHED 2' RIP RAP STONE 3" GRAVEL / STONE SURFACE EL 443.5 CLEAN -OUT (PVC PIPE W / GLUED CLEAN -OUT FITTINGS AND SCREW TYPE CAP) PEAK CONTROL STORM EVENT POST -DEVELOPMENT RUNOFF (CFS) POST -ROUTING RUNOFF (CFS) ELEVATION TOP OF DAM 450.00 2YR 5.8 0.89 446.88 111 10.6 1.14 447.46 25 YR 14.48 1.31 447.93 100 YR 22.07 5.30 448.56 PROVIDED REQUIRED ELEVATION DDV 6713 CF 2559 CF 446.70 SAND FILTER 1500 SF 1200 SF 446.00 NOTE: 1. SAND FILTER IS SIZED FOR DDV AND CHECKED FOR FREEBOARD. 2. PER GEO-TECHNICAL REPORT PREPARED BY TERRACON CONSULTANTS, INC. RALEIGH, NC. THERE IS NOT ANY GROUND WATER ENCOUNTERED AT SAND FILTER 1 LOCATION. 3. CONSTRUCTION OF SAND FILTER FACILITY AND STORM STRUCTURES COMPLY WITH NC DEQ GUIDELINES. 4. MAINTENANCE AND INSPECTION REQUIREMENT COMPLY WITH NC DEQ GUIDELINES. 5. SAND FILTER SHALL BE INSPECTED ONCE A QUARTER AND WITHIN 24 HOURS AFTER EVERY STORM EVENT GREATER THAN 1.0 INCHES (OR 1.5 INCHES IF IN A COASTAL COUNTY). RECORD OF OPERATION AND MAINTENANCE WILL BE KEPT IN A KNOWN SET LOCATION AND WILL BE AVAILABLE UPON REQUEST. NCDEQ Stormwater BMP Manual Maintenance Sand filters shall be inspected at least once a quarter and shall be maintained as needed to remove surface sediment accumulation, trash, debris, and leaf litter to prevent the filter from clogging. Sediment should be cleaned out of the fore bay/sed i me ntatio n chamber when it accumulates to a depth of more than 6 inches. During inspection, structures such as outlets and flow diversions should be checked at least annually for damage or degradation. Figure 6 shows an example of a sand filter that is overdue for maintenance. Figure 6: Sand Filter Overdue for Maintenance Clogged Sediment Chamber Clogged Sand Chamber Iwo Important maintenance procedures for a sand filter include: 1. Manage the drainage area to reduce the sediment load to the sand filter. 2. Clean out the sedimentation chamber or forebay whenever sediment depth exceeds six inches. 3. At least once a year, skim the sand media. 4. Replace the sand filter media whenever it fails to function properly after maintenance. 5. Inspect the sand filter at least quarterly. Any problems that are found shall be repaired immediately. Maintain operation and maintenance records in a known set location. Operation and maintenance records will be available upon request. C-6. Sand Filter 7 Revised: 1-3-2017 NCDEQ Stormwater BMP Manual Table 9: Sample Operation and Maintenance Provisions for Sand Filters 3" GRAVEL / STONE SURFACE EL. 448.00 RIP RAP BERM (CLASS B) SANFILTER MEDIA (ASTM C-33 SAND OR EQUIVALENT) 1.5' MEDIA DDV ELEV. = 446.70 ELEV. = 446.25 4'X4' OVERFLOW OUTLET CONTROLSTRUCTURE - RIM. ELEV 448.50 6" PERFORATED UNDER DRAIN @ 0.5% SLOPE Entire BMP Trash/debris is present. Remove the trash/debris. Adjacent pavement (if Sediment is present on the Sweep or vacuum the sediment applicable) pavement surface. as soon as possible. Perimeter of sand filter Areas of bare soil and/or Regrade soil if necessary to erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at an long. appropriate height. Flow diversion structure The structure is clogged. Unclog the conveyance and dispose of any sediment offsite. The structure is damaged. Make any necessary repairs or replace if damage is too large for repair. Forebay or pretreatment area Sediment has accumulated to a Search for the source of the depth of greater than six sediment and remedy the inches. problem if possible. Remove the sediment and stabilize or dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If a pesticide is used, wipe it on the plants rather than spraying. Filter bed and underdrain Water is ponding on the surface Check to see if the collector collection system for more than 24 hours after a system is clogged and flush if storm. necessary. If water still ponds, remove the top few inches of C-6. Sand Filter 8 Revised: 1-3-2017 100 YR ELEV. = 448.56 2.0'W x 0.5'H rec weir PROFILE VIEW N.T.S 3" GRAVEL / STONE SURFACE 1.5' SAND FILTER MEDIA (ASTM C-33 SAND OR EQUIVALENT) DO FILTER FABRIC EL 450.00 3 MIN. 1 Fj 18" RCP OUTFLOW PIPE ELEV 443.5 V GRAVEL LAYER NOTICE TO CONTRACTOR: SCARIFY BOTTOM PRIOR TO INSTALLATION OF UNDER DRAIN SYSTEM (DO NOT COMPACT) EL 446.25 EL 446.00 (Top Sandfilter) FILTER FABRIC EL 444.5 WASHED #57 STONE EL 443.5 6" PERFORATED PIPE / GRAVEL UNDER DRAIN SYSTEM TYPICAL SECTION N.T.S SANDFILTER 2 Stormwater BMP Manual filter bed media and replace. If water still ponds, then consult an expert. Outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment offsite. The outlet device is damaged Repair or replace the outlet device. Receiving water Erosion or other signs of Contact the NC Division of damage have occurred at the Water Resources. outlet. C-6. Sand Filter 9 Revised: 1-3-2017 AV I X X�X POND 1 / SANDFILTER - OUTLET STRUCTURE DETAIL N.T.S. NOTE: GRATING SECTION SHALL BE FASTENED TO THE SUPPORTS WITH A MINIMUM OF FOUR (4) SADDLE CLIP ANCHORS DESIGNED TO FIT OVER TWO (2) BEARING BARS WITH STUD BOLTS, WASHERS AND NUTS. ALUMINUM RIVETED GRATIN (1-1/8" X 7") /4" ALUMINUM ANGLE 3" x 2" x 3/8", LLV 1/2"0 S.S. EXP. ANCHORS @ 2'-0" O.C. 3 1/2" MIN. EMBEDMENT INSIDE FACE OF CONC. BOX GRATING DETAIL NOT TO SCALE CARRY RIP RAP UP SIDES OF SPILLWAY \X � 1�SILT FENCE CLASS 1 OR 2 X RIP RAP --RIP RAP APRON 3' SPILL WA Y LENG Fr- 12" (5" MIN.) ELEVATION OF POND SPILLWAY NOT TO SCALE POND SPILLWAY SPILLWAY CREST SPILLWAY CREST ID BOTTOM LENGTH ELEV. NUMBER WIDTH (L) (H) SF 2 10'MIN. 1 10' 1 449.00 NOTE: CONTRACTOR TO REMOVE SILT FENCING AFTER POST -CONSTRUCTION ACTIVITIES HAVE BEEN COMPLETED, AND POND SLOPES HAVE BEEN STABILIZED. POND 1 / SANDFILTER OVERFLOW EMERGENCY SPILLWAY N.T.S. 4H:1 V SIDE SLOPES #5 WASHED STONE ON OUTER SURFACE OF BERM ACROSS SPILLWAY NO STONE THRU BERM C m .E a r c h i t e c t s ARCHITECT: 16150 Main Circle Drive, Suite 100 St. Louis, MO 63017 (636) 449-1175 / fax (636) 449-1176 CONSULTANTS: CIVII: Stantec 801 Jones Franklin Road, Suite 300 Raleigh, NC 27606 MEP/FP: SSC Engineering, Inc. 18207 Edison Ave. Chesterfield, MO 63005 Z O Q O O 0 a ti N U) U � Z UJ J m J UJ (D z U � � O UJ U UJ Q J UJ Y UJ Of Y a Q o0 N N COOPERATIVE DBUILDING SOLUTIONS PA RIC EXPERIENCE. EXCELLENCE. DESCRIPTION DATE ADDENDUM #2 07/10/2020 ERC/STRM COMMENTS 08/14/2020 PROFESSIONAL RECORD yv,CARo _ ❑82 08/14/202 �'' ��G 1 IyE�'. •' � rr�r �'�R�f • A �R�,'`� ,`fflfillll ON\ DATE 07-10-2020 PROJECT NUMBER 19.025 TITLE SANDFILTER 2 DETAILS SHEET 305