Loading...
HomeMy WebLinkAbout20200605 Ver 2_More Info Received_20220516Strickland, Bev From: Chris Madden <cmadden2004@gmail.com> Sent: Monday, May 16, 2022 6:38 PM To: Perez, Douglas J Subject: [External] Re: 9667 Island Point Rd. (DWR #20-0605 V2) Attachments: Catawba Notification Form.docx; Catawba Notification Form.pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Mr. Perez, Please find attached the required form. The shoreline is approximately 150' long and we are planning 3' of rip rap above full pond as well as 3' below full pond. Thanks for help and please let me know what else you may need. Chris Madden 336-655-7087 On May 10, 2022, at 3:52 PM, Perez, Douglas J <doug.perez@ncdenr.gov> wrote: Hello Mr. Madden, In reviewing your shoreline stabilization application, I had a few questions/comments. First, if you could fill out the attached Catawba Riparian Buffer form. I have attached it in two formats. Please use whichever one works best for you. Second, approximately how long is the shoreline in question? It seems that you had gotten approval two years ago to stabilize the shoreline. Based on the pictures it seems that it has eroded considerably since. How many feet above and below full pond are you planning on placing the new rip rap? If you could let me know that would be great. Thanks, Doug DWR blkkion of Water Resources Doug Perez — Environmental Specialist NC Dept. of Environmental Quality (NCDEQ) Division of Water Resources - Water Quality Regional Operations 6io East Center Ave., Suite 3oi, Mooresville, NC 28115 Phone: (7o4) 235-2162 Fax: (704) 663-6040 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. 1 CATAWBA RIPARIAN BUFFER NOTIFICATION FORM Project Name/address: County: Owner: Print Signature Contractor/agent: Print Signature The approval is for the purpose and design described in your application. Impacts not indicated in the application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC 02H .0506 and 15A NCAC 02B .0243(8)] Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed. Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B .0243(6)] Benching and grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243 (6)] Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved by the Division. There are limitation on size for decks. [15A NCAC 02B .0243(4) and (6)] Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 02B .0243 (4), (6), (8)] Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow at non -erosive velocities to the lake. [15A NCAC 02B .0243(5), (6)] Acknowledgement of Notification I, , hereby state that I have been informed of the Catawba Riparian Buffer Rule. Any work conducted in the buffer, not specifically stated in the application and approved by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be taken such that the construction will be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plan(s) and specification(s), and other supporting materials. Signature (owner): Date: CATAWBA RIPARIAN BUFFER NOTIFICATION FORM Project Name/address: County: Owner: Print Contractor/agent: Signature Print Signature The approval is for the purpose and design described in your application. Impacts not indicated in the application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC 02H .0506 and 15A NCAC 02B .0243(8)] Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed. Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B .0243(6)] Benching and grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243 (6)] Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved by the Division. There are limitation on size for decks. [15A NCAC 02B .0243(4) and (6)] Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 02B .0243 (4), (6), (8)] Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow at non -erosive velocities to the lake. [15A NCAC 02B .0243(5), (6)] Acknowledgement of Notification I, , hereby state that I have been informed of the Catawba Riparian Buffer Rule. Any work conducted in the buffer, not specifically stated in the application and approved by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be taken such that the construction will be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plan(s) and specification(s), and other supporting materials. Signature (owner): Date: