Loading...
HomeMy WebLinkAboutNC0087963_Authorization to Construct_20220513 North Carolina Department of Environmental Quality | Division of Water Resources 512 North Salisbury Street | 1611 Mail Service Center | Raleigh, North Carolina 27699-1611 919.707.9000 May 13, 2022 Mr. James E. Harrill II President The Bluffs at Blowing Rock Property Owner’s Association, Inc. 133 Echota Pkwy Boone, North Carolina 28607 SUBJECT: Authorization to Construct A to C No. 087963A01 The Bluffs at Blowing Rock Property Owner’s Association, Inc. Buckeye Creek WWTP NPDES Permit No. NC0087963 Dear Mr. Harrill: A letter of request for an Authorization to Construct was received November 22, 2021, by the Division of Water Resources (Division). With additional information received on May 13, 2022, final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of the new 0.05 MGD Buckeye Creek WWTP, with discharge of treated wastewater into the Thunderhole Creek in the Catawba River Basin. This authorization is for a new 0.05 MGD wastewater treatment plant, and is awarded for the following specific construction: Installation of one (1) 0.125 MGD manual bar screen (another 0.125 MGD standby manual bar screen is provided onsite), one (1) 12,500-gallon flow equalization tank with two (2) 50 SCFM blowers and two (2) 69.44 GPM EQ pumps, a dual train extended aeration system with each train containing one (1) 2,500-gallon anoxic zone with one (1) 0.5 HP mixer, and one (1) 25,000-gallon aerobic zone; Installation of three (3) 200 SCFM blowers in total for aeration basins and sludge holding tanks, two (2) 142 square feet rectangular secondary clarifiers with 9.5 feet side water depth, two (2) 34.75 square feet tertiary sand filters with two (2) 520 GPM backwash pumps and two (2) 40 SCFM blowers for air scouring, two (2) 69.44 GPM RAS pumps, two (2) 50 GPM internal recycle pumps for aeration basins, two (2) 60 GPM mudwell pumps to return backwash liquid to the EQ tank, one (1) 5,325-gallon post aeration tank, a dual channel ultraviolet disinfection system consisting of one (1) bank in each channel with each bank rated at 0.1 MGD peak hourly flow, two (2) 3,750-gallon aerobic sludge holding tanks, and all necessary piping and controls; in conformity with the project plans, specifications, and other supporting Mr. James E. Harrill II, President May 13, 2022 Page 2 of 3 documentation comprising the ATC Permit Application package submitted to the Department of Environmental Quality. This ATC is issued in accordance with Part III, Paragraph A of NPDES Permit No. NC0087963 issued effective March 1, 2022, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0087963. It is the Owner’s responsibility to ensure that the as-constructed project meets the requirements of all applicable regulations and statutes, the ATC Permit Application package, and all of the requirements contained herein. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the Division. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by the Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Winston-Salem Regional Office, telephone number 336-776-9800, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an on-site inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a Professional Engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit and the ATC Permit Application package. Mail the Certification to: Division of Water Resources, WQ Permitting – NPDES, 1617 Mail Service Center, Raleigh, NC 27699-1617. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding weekends and holidays, must properly manage the facility, must documen t daily operation and maintenance of the facility, and must comply with all other conditions of T15A:8G.0202. Mr. James E. Harrill II, President May 13, 2022 Page 3 of 3 A copy of the project plans and specifications shall be maintained on file by the Permittee for the life of the facility. During the construction of the proposed additions/modifications, the Permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor’s responsibilities shall be in complying with these Acts. Prior to entering into any contract(s) for construction, the recipient must have obtained all applicable permits from the State. The issuance of this ATC does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. If you have any questions or need additional information, please contact Min Xiao, PE at telephone number (919) 707-3644 or by email at min.xiao@ncdenr.gov. Sincerely, for Richard E. Rogers, Jr. Director, Division of Water Resources by Min Xiao, PE NPDES Industrial Permitting Unit With Engineer’s Certificate attached: cc: NPDES Files ecopy: Manjiang Chen, PE McGill Associates, PA Email: mj.chen@mcgillassociates.com DWR Winston-Salem Regional Office, Water Quality Programs Without Engineer’s Certificate attached: cc: Watauga County Health The Bluffs at Blowing Rock Property Owner’s Association, Inc. Buckeye Creek WWTP Authorization to Construct No. 087963A01 Issued May 13, 2022 NPDES Permit No. NC0087963 Engineer's Certification I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the modifications and improvements to the Buckeye Creek Wastewater Treatment Plant, located in Watauga County, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following construction: Installation of one (1) 0.125 MGD manual bar screen (another 0.125 MGD standby manual bar screen is provided onsite), one (1) 12,500-gallon flow equalization tank with two (2) 50 SCFM blowers and two (2) 69.44 GPM EQ pumps, a dual train extended aeration system with each train containing one (1) 2,500-gallon anoxic zone with one (1) 0.5 HP mixer, and one (1) 25,000-gallon aerobic zone; Installation of three (3) 200 SCFM blowers in total for aeration basins and sludge holding tanks, two (2) 142 square feet rectangular secondary clarifiers with 9.5 feet side water depth, two (2) 34.75 square feet tertiary sand filters with two (2) 520 GPM backwash pumps and two (2) 40 SCFM blowers for air scouring, two (2) 69.44 GPM RAS pumps, two (2) 50 GPM internal recycle pumps for aeration basins, two (2) 60 GPM mudwell pumps to return backwash liquid to the EQ tank, one (1) 5,325-gallon post aeration tank, a dual channel ultraviolet disinfection system consisting of one (1) bank in each channel with each bank rated at 0.1 MGD peak hourly flow, two (2) 3,750-gallon aerobic sludge holding tanks, and all necessary piping and controls; in conformity with the project plans, specifications, and other supporting documentation comprising the ATC Permit Application package submitted to the Department of Environmental Quality. I certify that the construction of the above referenced project was observed to be built within substantial compliance, intent and in conformity with all applicable regulations and statutes and the project plans, specifications, and other supporting documentation comprising the Authorization to Construct Permit Application package. Signature Registration No.____________________ Date__________________ Mail this Certification to: Attn: Min Xiao, PE NPDES Industrial Permitting Unit DEQ/DWR/Water Quality Programs 1617 Mail Service Center Raleigh, NC 27699-1617