Loading...
HomeMy WebLinkAbout20210364 Ver 1_More Information Received_20220513Staff Review Form NORTH CAROLINA Envlronm¢ntcl Qvofiry Updated September 4, 2020 Staff Review Does this application have all the attachments needed to accept it into the review process?* Yes No ID# * 20210364 Version* 1 Is this project a public transportation project?* Yes • No Reviewer List: * Colleen Cohn:eads\cmcohn Select Reviewing Office: * Raleigh Regional Office - (919) 791-4200 Does this project require a request for payment to be sent?* Yes No Project Submittal Form Please note: fields marked with a red asterisk * below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type: * For the Record Only (Courtesy Copy) New Project Modification/New Project with Existing ID More Information Response Other Agency Comments Pre -Application Submittal Re-Issuance\Renewal Request Stream or Buffer Appeal Pre -Filing Meeting Date Request was submitted on: Is this supplemental information that needs to be sent to the Corps?* Yes No Project Contact Information Name: John Farmer Who is submitting the information? Email Address: john.farmer@eli-Ilc.com Project Information Existing ID #: 20210364 20170001 (no dashes) Project Name: PNG Line 142 Is this a public transportation project? Yes No Existing Version: 1 Is the project located within a NC DCM Area of Environmental Concern (AEC)? Yes No Unknown County (ies) Wake Johnston Please upload all files that need to be submited. Click the upload button or drag and drop files here to attach document PNG SAW-2021-01288 Plans 13 May 22.pdf PNG SAW-2021-01288 Water Resource Impacts 13 May 22.pdf Only pdf or kmz files are accepted. 24.59MB 215.84KB Describe the attachments or comments: Sign and Submit By checking the box and signing box below, I certify that: • I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief. • I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I agree that submission of this online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the online form. Signature: Submittal Date: Is filled in automatically. 2a. Site # 2a1. Reason 2b. Impact Type Wetland Impacts 2c. Type of Wetland 2d. Wetland Name 2e. Forested 2f. Type of 2g. Impact Area - 2g. Impact Area - Jurisdiction temporary (acres) permanent (acres) Wl Open cut, temporary wetland crossing/mat placement, potential sheet pile, dewatering structure T Headwater Forest Wetland W1 No Corps 0.062 W1A Temporary wetland crossing/ mat placement T Headwater Forest Wetland W1A Yes Corps 0.149 W1B Open cut, temporary wetland crossing/mat placement, potential sheet pile, dewatering structure. Permanent impact due to transition of forested to non -forest wetland. P Headwater Forest Wetland W1B Yes Corps 0.058 W2 Temporary wetland crossing/ mat placement. HDD bore of gas line. Permanent impact due to transition of forested to non- forest wetland. P Headwater Forest Wetland W2 Yes Corps 0.066 W3 Open cut, temporary wetland crossing/mat placement, potential sheet pile, dewatering structure. Permanent impact due to transition of forested to non -forest wetland. P Headwater Forest Wetland W3 Yes Corps 0.015 W5B-A Open cut, temporary wetland crossing/mat placement, potential sheet pile, dewatering structure. Permanent impact due to transition of forested to non -forest wetland. P Headwater Forest Wetland W5B Yes Corps 0.013 W5B-B Open cut, temporary wetland crossing/mat placement, potential sheet pile, dewatering structure. Temporary impact within temporary easement. T Headwater Forest Wetland W5B Yes Corps 0.026 W4C Temporary wetland crossing/ mat placement. HDD bore of gas line. Permanent impact due to transition of forested to non- forest wetland. P Bottomland Hardwood Forest W4C Yes Corps 0.001 W4D Temporary wetland crossing/ mat placement. HDD bore of gas line. Permanent impact due to transition of forested to non- forest wetland. P Bottomland Hardwood Forest W4D Yes Corps 0.025 W4A-A Temporary wetland crossing/ mat placement. HDD bore of gas line. Permanent impact due to transition of forested to non- forest wetland. P Bottomland Hardwood Forest W4A Yes Corps 0.213 W4A-B Temporary wetland crossing/ mat placement T Bottomland Hardwood Forest W4A Yes Corps 0.194 W4E Temporary wetland crossing/ mat placement. HDD bore of gas line. Permanent impact due to transition of forested to non- forest wetland. P Bottomland Hardwood Forest W4E Yes Corps 0.099 W4F Open cut, temporary wetland crossing/mat placement, dewatering structure. Permanent impact due to transition of forested to non -forest wetland. P Bottomland Hardwood Forest W4F Yes Corps 0.058 W5-A Open cut, temporary wetland crossing/mat placement, potential sheet pile, dewatering structure. Permanent impact due to transition of forested to non -forest wetland. P Headwater Forest Wetland W5 Yes Corps 0.111 W5-B Temporary wetland crossing/mat placement. Temporary impact within temporary easement. T Headwater Forest Wetland W5 Yes Corps 0.070 W6-Al Open cut, temporary wetland crossing/mat placement, potential sheet pile, dewatering structure. Permanent impact due to transition of forested to non -forest wetland. P Headwater Forest Wetland W6 Yes Corps 0.190 W6-B1 Temporary wetland crossing/mat placement. Temporary impact within temporary easement. T Headwater Forest Wetland W6 Yes Corps 0.064 W6B Temporary wetland crossing/ mat placement (Access road) Headwater Forest Wetland W6B Yes Corps 0.022 2a. Site # 2a1. Reason 2b. Impact Type Wetland Impacts 2c. Type of Wetland 2d. Wetland Name 2e. Forested 2f. Type of 2g. Impact Area - 2g. Impact Area - Jurisdiction temporary (acres) permanent (acres) W6A Temporary wetland crossing/ mat placement. HDD bore of gas line. Permanent impact due to transition of forested to non- forest wetland. P Bottomland Hardwood Forest W6A Yes Corps 0.017 W7-A Open cut, temporary wetland crossing/mat placement, potential sheet pile, dewatering structure. Permanent impact due to transition of forested to non -forest wetland. P Bottomland Hardwood Forest W7 Yes Corps 0.320 W7-B Temporary wetland crossing/mat placement. Temporary impact within temporary easement. T Bottomland Hardwood Forest W7 Yes Corps 0.096 W7C-A Open cut, temporary wetland crossing/mat placement, potential sheet pile, dewatering structure. Permanent impact due to transition of forested to non -forest wetland. P Bottomland Hardwood Forest W7C Yes Corps 0.014 W7C-B Temporary wetland crossing/mat placement. Temporary impact within temporary easement. T Bottomland Hardwood Forest W7C Yes Corps 0.053 W7D-A Open cut, temporary wetland crossing/mat placement, potential sheet pile, dewatering structure. Permanent impact due to transition of forested to non -forest wetland. P Bottomland Hardwood Forest W7D Yes Corps 0.017 W7D-B Temporary wetland crossing/mat placement. Temporary impact within temporary easement. T Bottomland Hardwood Forest W7D Yes Corps 0.027 W7E-A Open cut, temporary wetland crossing/mat placement, potential sheet pile, dewatering structure. Permanent impact due to transition of forested to non -forest wetland. P Headwater Forest Wetland W7E Yes Corps 0.008 W7E-B Temporary wetland crossing/mat placement. Temporary impact within temporary easement. T Headwater Forest Wetland W7E Yes Corps 0.015 W8-A Open cut, temporary wetland crossing/mat placement, potential sheet pile, dewatering structure. Permanent impact due to transition of forested to non -forest wetland. P Headwater Forest Wetland W8 Yes Corps 0.014 W8-B Temporary wetland crossing/mat placement. Temporary impact within temporary easement. T Headwater Forest Wetland W8 Yes Corps 0.048 W9-A Open cut, temporary wetland crossing/mat placement, potential sheet pile, dewatering structure. Permanent impact due to transition of forested to non -forest wetland. P Bottomland Hardwood Forest W9 Yes Corps 0.184 W9-B Temporary wetland crossing/mat placement. Temporary impact within temporary easement. T Bottomland Hardwood Forest W9 Yes Corps 0.533 W9C-A Open cut, temporary wetland crossing/mat placement, potential sheet pile, dewatering structure. Permanent impact due to transition of forested to non -forest wetland. P Headwater Forest Wetland W9C Yes Corps 0.008 2a. Site # 2a1. Reason 2b. Impact Type Wetland Impacts 2c. Type of Wetland 2d. Wetland Name 2e. Forested 2f. Type of 2g. Impact Area - 2g. Impact Area - Jurisdiction temporary (acres) permanent (acres) W9C-B Temporary wetland crossing/mat placement. Temporary impact within temporary easement. T Headwater Forest Wetland W9C Yes Corps 0.060 W9D-A Open cut, temporary wetland crossing/mat placement, potential sheet pile, dewatering structure. Permanent impact due to transition of forested to non -forest wetland. P Headwater Forest Wetland W9D Yes Corps 0.008 W9D-B Temporary wetland crossing/mat placement. Temporary impact within temporary easement. T Headwater Forest Wetland W9D Yes Corps 0.023 W9E-A Open cut, temporary wetland crossing/mat placement, potential sheet pile, dewatering structure. Permanent impact due to transition of forested to non -forest wetland. P Headwater Forest Wetland W9E Yes Corps 0.007 W9E-A Permanent acces road crossing in forested wetland P Headwater Forest Wetland W9E Yes Corps 0.002 W9E-B Temporary wetland crossing/mat placement. Temporary impact within temporary easement. T Headwater Forest Wetland W9E Yes Corps 0.015 Permanent fill mitigation ratio 2:1 Permanent conversion mitigation ratio 1:1 Total: 1.457 Acres 1.448 Acres 3a. Reason for Impact Stream Impacts 3b. Impact 3c. Type of 3d. Stream 3e. Stream 3f. Type of 3g. Stream 3h. Impact Area of Impact - Area of Impact - Type Impact Name Type Jurisdiction Width (ft) Length (ft) Temporary (SF) Permanent (SF) S1 Open cut, temporary stream crossing/ mat placement, potential blasting, dewatering structure T Other S1 Intermittent Both 4 78 312 S2 Open cut, temporary stream crossing/ mat placement, potential blasting, dewatering structure T Other S2 Intermittent Both 4 81 324 S3 Open cut, temporary stream crossing/ mat placement, potential blasting, dewatering structure T Other S3 Intermittent Both 5 106 530 S4 Open cut, temporary stream crossing/ mat placement, potential blasting, dewatering structure T Other S4 Perennial Both 4 59 236 S5 Open cut, temporary stream crossing/ mat placement, potential blasting, dewatering structure T Other S5 Intermittent Both 2 93 186 S6 Temporary stream crossing/ mat placement T Other S6 Intermittent Both 2 19 38 S7 HDD bore. Temporary stream crossing/ mat placement. T Other S7 Perennial Both 2 20 40 S8 HDD bore. Temporary stream crossing/ mat placement. T Other S8 Perennial Both 10 20 200 S9 HDD bore. Temporary stream crossing/ mat placement. T Other S9 Intermittent Both 4 20 80 S10 HDD bore. Temporary stream crossing/ mat placement. T Other S10A Intermittent Both 10 20 200 S11 HDD bore. Temporary stream crossing/ mat placement. T Other S10 Intermittent Both 12 20 240 S12 HDD bore. Temporary stream crossing/ mat placement. T Other S10B Intermittent Both 3 68 204 S13 Temporary stream crossing - pullback area T Culvert S11B Intermittent Both 2 20 40 S14 Temporary stream crossing - pullback area T Culvert S11C Intermittent Both 2 20 40 S15 Open cut, temporary stream crossing/ mat placement, potential blasting, dewatering structure T Other S11A Intermittent Both 2 145 290 S16 Open cut, temporary stream crossing/ mat placement, potential blasting, dewatering structure T Other S12 Intermittent Both 3 91 273 S17 Open cut, temporary stream crossing/ mat placement, potential blasting, dewatering structure T Other S13 Intermittent Both 2 87 174 S18 HDD bore. Temporary stream crossing/ mat placement. T Other S14 Intermittent Both 5 20 100 S19 Open cut, temporary stream crossing/ mat placement, potential blasting, dewatering structure T Other S15A Intermittent Both 8 94 752 3a. Reason for Impact Stream Impacts 3b. Impact 3c. Type of 3d. Stream 3e. Stream 3f. Type of 3g. Stream 3h. Impact Area of Impact - Area of Impact - Type Impact Name Type Jurisdiction Width (ft) Length (ft) Temporary (SF) Permanent (SF) S20 Open cut, temporary stream crossing/ mat placement, potential blasting, dewatering structure T Other S15B Intermittent Both 8 84 672 S21 Open cut, temporary stream crossing/ mat placement, potential blasting, dewatering structure T Other S16 Intermittent Both 8 82 656 S22 Open cut, temporary stream crossing/ mat placement, potential blasting, dewatering structure T Other S17 Perennial Both 18 80 1440 S23 Open cut, temporary stream crossing/ mat placement, potential blasting, dewatering structure T Other S18 Intermittent Both 4 110 440 S24 Open cut, temporary stream crossing/ mat placement, potential blasting, dewatering structure T Other S19 Intermittent Both 3 155 465 S25 Open cut, temporary stream crossing/ mat placement, potential blasting, dewatering structure T Other S20 Perennial Both 8 81 648 S26 Open cut, temporary stream crossing/ mat placement, potential blasting, dewatering structure T Other S21 Intermittent Both 3 111 333 S27 Open cut, temporary stream crossing/ mat placement, potential blasting, dewatering structure T Other S22 Intermittent Both 5 84 420 S28 Open cut, temporary stream crossing/ mat placement, potential blasting, dewatering structure T Other S23 Intermittent Both 4 85 340 S29 Temporary stream crossing/ mat placement T Other S23A Intermittent Both 2 28 56 S30 Temporary stream crossing/ mat placement T Other S23B Intermittent Both 2 10 20 S31 Open cut, temporary stream crossing/ mat placement, potential blasting, dewatering structure. Stabilize using Geogrid Channel bank stabilization method seen in plans. T Other S24 Intermittent Both 4 85 340 S32 Open cut, temporary stream crossing/ mat placement, potential blasting, dewatering structure T Other S24A Intermittent Both 4 85 340 S33 Open cut, temporary stream crossing/ mat placement, potential blasting, dewatering structure T Other S25 Intermittent Both 4 85 340 S34 Permanent stream crossing for operations and maintenance access. P Culvert S25 Intermittent Both 4 15 60 S35 Open cut, temporary stream crossing/ mat placement, potential blasting, dewatering structure. Stabilize using Geogrid Channel bank stabilization method seen in plans. T Other S26 Perennial Both 12 200 2400 3a. Reason for Impact Stream Impacts 3b. Impact 3c. Type of 3d. Stream 3e. Stream 3f. Type of 3g. Stream 3h. Impact Area of Impact - Area of Impact - Type Impact Name Type Jurisdiction Width (ft) Length (ft) Temporary (SF) Permanent (SF) S36 Open cut, temporary stream crossing/ mat placement, potential blasting, dewatering structure T Other S27 Intermittent Both 5 201 1005 S37 Open cut, temporary stream crossing/ mat placement, potential blasting, dewatering structure T Other S28 Perennial Both 2 60 120 Permanent stream crossing for regulator station S38 P Culvert S28 Perennial Both 2 20 40 access. Tota I: 14,294 100 Sheet List Table 70 E&SC PLAN-15 PNG-C-142-0001069 0 71 E&SC PLAN-16 PNG-C-142-0001070 0 SHEET TITLE PNG REVISIONS 72 E&SC PLAN-17 PNG-C-142-0001071 0 CONSTRUCTION PLANS NUMBER NUMBER 73 E&SC PLAN-18 PNG-C-142-0001072 0 1 COVER SHEET PNG-G-142-0001000 0 74 E&SC PLAN-19 PNG-C-142-0001073 0 2 GENERAL NOTES &ABBREVIATIONS PNG-G-142-0001001 0 75 E&SC PLAN-20 PNG-C-142-0001074 0 FOR 3 CIVIL DETAILS PNG-G-142-0001002 0 76 E&SC PLAN-21 PNG-C-142-0001075 0 4 CATHODIC DETAILS PNG-G-142-0001004 0 77 E&SC PLAN-22 PNG-C-142-0001076 0 5 CATHODIC TEST STATION SUMMARY PNG-G-142-0001003 0 78 E&SC PLAN-23 PNG-C-142-0001077 0 6 TYPICAL RIGHT-OF-WAY LAYOUT PNG-G-142-0001005 0 79 E&SC NOTES PNG-C-142-0001079 0 LINE 14.2 PIPELINE 7 CONSTRUCTION ACCESS ROADS PNG-C-142-0001000 0 80 E&SC SEEDING REQUIREMENTS PNG-C-142-0001081 0 8 CONSTRUCTION ACCESS ROADS PNG-C-142-0001001 0 81 E&SC DETAILS PNG-C-142-0001082 0 9 CONSTRUCTION ACCESS ROADS PNG-C-142-0001002 0 82 E&SC DETAILS PNG-C-142-0001083 0 10 CONSTRUCTION ACCESS ROADS PNG-C-142-0001003 0 83 E&SC DETAILS PNG-C-142-0001084 0 C LAYT O N , NORTH CA RO L I N A 11 CONSTRUCTION ACCESS ROADS PNG-C-142-0001004 0 84 E&SC DETAILS PNG-C-142-0001085 0 12 CONSTRUCTION ACCESS ROADS PNG-C-142-0001005 0 85 E&SC DETAILS PNG-C-142-0001091 0 CP#: 0232195 13 BILL OF MATERIALS PNG-C-142-0001006 0 86 NCRR NORFOLK SOUTHERN 092.26-NC PNG-C-142-0001086 0 14 HYDROSTATIC TEST MAP PNG-C-142-0001010 0 87 DUKE ENERGY CROSSING-1 PNG-C-142-0001087 0 15 MLV-2 DRIVEWAY PERMIT PLAN PNG-C-142-0001007 0 88 DUKE ENERGY CROSSING-2 PNG-C-142-0001088 0 16 AR-003 PERMIT PLAN PNG-C-142-0001008 0 89 DUKE ENERGY CROSSING-3 PNG-C-142-0001089 0 17 AR-009 PERMIT PLAN PNG-C-142-0001009 0 90 DUKE ENERGY CROSSING-4 PNG-C-142-0001090 0 i:! _ "� :'" 18 CLAYTON COMPRESSOR SITE PLAN PNG-C-142-0001103 0 91 ACCESS RD 003 GRADING & EPSC PNG-C-142-0001092 0 r� 4 N 19 12 IN ALIGNMENT PLAN & PROFILE PNG-C-142-0001016 0 92 ACCESS RD 003 GRADING & EPSC (2) PNG-C-142-0001093 0 93 ACCESS RD 003 GRADING & EPSC (3) PNG-C-142-0001094 0 rAi ,, 11 20 12 IN ALIGNMENT PLAN & PROFILE PNG-C-142-0001017 0 i ' ----"-`• ' at . - 'J - 21 12 IN ALIGNMENT PLAN & PROFILE PNG-C-142-0001018 0 94 ACCESS RD 007 GRADING & EPSC PNG-C-142-0001011 0 95 ACCESS RD 007 GRADING & EPSC (2) PNG-C-142-0001012 0 � /0 22 12 IN ALIGNMENT PLAN & PROFILE PNG-C-142-0001019 0 /� 23 12 IN ALIGNMENT PLAN & PROFILE PNG-C-142-0001020 0 96 ACCESS RD 007 GRADING & EPSC (3) PNG-C-142-0001013 0 24 12 IN ALIGNMENT PLAN & PROFILE PNG-C-142-0001021 0 97 ACCESS RD 009 GRADING & EPSC PNG-C-142-0001014 0 ' -OJT ,,,- 1F 25 12 IN ALIGNMENT PLAN & PROFILE PNG-C-142-0001022 0 98 ACCESS RD 009 GRADING & EPSC (2) PNG-C-142-0001015 0 �(.�'G.�O� ilio 26 12 IN ALIGNMENT PLAN & PROFILE PNG-C-142-0001023 0 99 ACCESS RD 009 GRADING & EPSC (3) PNG-C-142-0001053 0 �, �� _ R- f . ;rA .J 27 12 IN ALIGNMENT PLAN & PROFILE PNG-C-142-0001024 0 100 ACCESS RD 009 GRADING & EPSC (4) PNG C 142 0001054 0 C'' �' ^ 28 12 IN ALIGNMENT PLAN & PROFILE PNG-C-142-0001025 0 101 ACCESS RD 009 GRADING & EPSC (5) PNG-C-142-0001078 0 i, :: 'iip �"a _ 29 12 IN ALIGNMENT PLAN & PROFILE PNG-C-142-0001026 0 102 ACCESS RD 011 GRADING & EPSC PNG-C-142-0001080 0 a ' f 0,.o`e.: -47: sOc ' + 30 12 IN ALIGNMENT PLAN & PROFILE PNG-C-142-0001027 0 103 ACCESS RD 011 GRADING & EPSC (2) PNG-C-142-0001095 0 • -4,. PROPOSED L :. t..r - ' • - 4 . ■ t • • + • - - r r � 104 ACCESS RD 011 GRADING & EPSC (3) PNG-C-142-0001101 0 ROUTE _ 31 12 IN ALIGNMENT PLAN & PROFILE PNG-C-142-0001028 0 { �lx "� `.i ` .i. ` - . 32 12 IN ALIGNMENT PLAN & PROFILE PNG-C-142-0001029 0 105 ACCESS RD 011 GRADING & EPSC (4) PNG-C-017-0001100 0 a _ _ ;'� ', �- - _ _ 106 ACCESS RD 012 GRADING & EPSC PNG-C-142-0001107 0 i "ly r w ..� . 33 12 IN ALIGNMENT PLAN & PROFILE PNG C 142-0001030 0 �. ' ;-.4' - - 107 ACCESS RD 012 GRADING & EPSC (2) PNG-C-142-0001115 0 -. 34 12 IN ALIGNMENT PLAN & PROFILE PNG-C-142-0001031 0 - `" 35 12 IN ALIGNMENT PLAN & PROFILE PNG-C-142-0001032 0 108 ACCESS RD 013 GRADING & EPSC PNG-C-142-0001102 0 END PROJECT Jy $ '°' -4,,,-4,,,LAT: N 35.414252° 36 12 IN ALIGNMENT PLAN & PROFILE PNG-C-142-0001033 0 109 COVERED BRIDGE RS GRADING PLAN PNG-C-025-0001104 0 • LONG: W 78.231302° f ,` -� : Mr 37 12 IN ALIGNMENT PLAN & PROFILE PNG-C-142-0001034 0 110 MLV-2 GRADING PLAN PNG-C-142-0001105 0 US 70 � ill �• ti $ 38 12 IN ALIGNMENT PLAN & PROFILE PNG-C-142-0001035 0 111 LAUNCHER & RECEIVER PIPING SECTIONS PNG-M-142-0001004 0 _ 4119 I. 39 12 IN ALIGNMENT PLAN & PROFILE PNG-C-142-0001036 0 112 STREAM BUFFER DETAILS PNG-C-142-0001108 0 % Y' f' ' '; P 1 rlr 40 10 IN ALIGNMENT PLAN & PROFILE PNG-C-142-0001037 0 113 STREAM BUFFER DETAILS PNG-C-142-0001109 0 eli BEGIN PROJECT `� I - ' i 4' Vy -''' .:( ,V , - "V geiLiP LAT: N 35.402170° - `- _ L ''� ��,.# " 41 US 70-NCRR HDD-1 PNG-C-142-0001038 0 114 STREAM BUFFER DETAILS PNG-C-142-0001110 0 LONG: W 78.311459° _ .�'��'" 1 r ia wio 42 CITY OF RALEIGH HDD-2 PNG-C-142-0001039 0 115 STREAM BUFFER DETAILS PNG-C-142-0001111 0 ':•I*f ' I~ ` .� ti.`.�- ':i,': ; i wA 43 SHOTWELL RD HDD 3 PNG-C-142-0001040 0 116 STREAM BUFFER DETAILS PNG-C-142-0001112 0 ''' 3 cfs 44 SHOTWELL RD HDD 3 PNG-C-142-0001041 0 117 STREAM BUFFER DETAILS PNG-C-142-0001116 0 Iu •PN, _ { fit /� �C.° , f r �-' ., '° s _ • •�r ..1 .! -� 45 NEUSE RIVER HDD-4 PNG-C-142-0001042 0 118 STREAM BUFFER DETAILS PNG-C-142-0001117 0 _ ,' ll',•, mil}{ � I� �. - � � •3 { xi 46 E GARNER ROAD BORE PNG-C-142-0001043 0 119 STREAM BUFFER DETAILS PNG-C-142-0001118 0 �� „ � � `4wt. 4 ', .. : 47 BALLOT ROAD BORE PNG-C-142-0001044 0 REF LAUNCHER SKID DETAIL 1 2 - NS; '� ;11 - ' 1 • f�''Y f 48 PRITCHARD ROAD BORE PNG-C-142-0001045 0 REF LAUNCHER SKID DETAIL 2 -- 2 — iiiii_ - - - REF LAUNCHER SKID DETAIL 3 -- 2 ��* _p. '." •,w. ;4, ' .,' + 49 MEDLIN ROAD BORE PNG C 142 0001046 0 1, r'' , t >r '°' 50 GEOTECH BORE LOGS 1 PNG-C-142-0001047 0 REF LAUNCHER SKID DETAIL 4 2 � -- 51 GEOTECH BORE LOGS 2 PNG-C-142-0001048 0 REF LAUNCHER SKID DETAIL 5 -- 2 52 GEOTECH BORE LOGS 3 PNG-C-142-0001049 0 REF LAUNCHER SKID DETAIL 6 -- 2 LOCATION MAP 53 GEOTECH BORE LOGS 4 PNG-C-142-0001050 0 REF LAUNCHER SKID DETAIL 7 -- 2 NOT TO SCALE 54 GEOTECH BORE LOGS 5 PNG-C-142-0001051 0 REF RECEIVER SKID DETAIL 1 -- 2 55 GEOTECH BORE LOGS 6 PNG-C-142-0001052 0 REF RECEIVER SKID DETAIL 2 -- 2 56 E&SC PLAN-1 PNG-C-142-0001055 0 REF RECEIVER SKID DETAIL 3 -- 2 57 E&SC PLAN-2 PNG-C-142-0001056 0 REF RECEIVER SKID DETAIL 4 -- 2 ISSUE FOR CONSTRUCTION DESIGN CONSULTANTS: 58 E&SC PLAN-3 PNG-C-142-0001057 0 REF RECEIVER SKID DETAIL 5 -- 2 59 E&SC PLAN-4 PNG-C-142-0001058 0 REF RECEIVER SKID DETAIL 6 -- 2 ENGINEER: 60 E&SC PLAN-5 PNG-C-142-0001059 0 REF RECEIVER SKID DETAIL 7 -- 2 W. KEITH GUALTIERI, P.E. 61 E&SC PLAN-6 PNG-C-142-0001060 0 2 ENERGY, LAND, & INFRASTRUCTURE, LLC. 4250 NORTH FAIRFAX DRIVE, SUITE 60 62 E&SC PLAN-7 PNG-C-142-0001061 0 ARLINGTON, VA 22203cs, 63 E&SC PLAN-8 PNG-C-142-0001062 0 703-994-0429 Iiiir N ISSUE DATE: 05/09/2022 64 E&SC PLAN-9 PNG-C-142-0001063 0 I Z SURVEYOR: 65 E&SC PLAN-10 PNG-C-142-0001064 0 i- w. s TIM VAN GELDER, PLS 66 E&SC PLAN-11 PNG-C-142-0001065 0 w g 8020 & CREED 67 E&SC PLAN-12 PNG-C-142-0001066 0 ENERGY LAND & o 4 o RI 8020 TOWER POINT DRIVE d w CHARLOTTE, NC 28227 68 E&SC PLAN-13 PNG-C-142-0001067 0 INFRASTRUCTURE z EN°,NEERs =a�E oas.,ER.=TaraE.EN,aoNNENT.. m w 704-841-2588 ° 69 E&SC PLAN-14 PNG-C-142-0001068 0 NASHVIU"E•TENNESSEE 2 CARY.NORTH CAROUNA ARLINGTON.VIRGINIA w w w U` NC LICENSE*P-299 333 O,7'o aaaa 0 0 ©2021 ENERGY LAND&INFRASTRUCTURE.LLC..ALL RIGHTS RESERVED U 0 U \0,,,�CAIR,, PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY REF. DWG(S) PIEDMONT 'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN o :°° �Ess/0 .", ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 =;°QUO ��°°°� = NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS SHEET(S) 1 OF 119 DWG SCALE NOT TO SCALE I 1 Itt 0 05/09/2022 ISSUE FOR CONSTRUCTION JB TFG WKG AREA CODE 1853 DATE INITIALS REGIONAL LINE 142 PIPELINE N ,�09/ 2Q22°g ACCOUNT NUMBER 10700 ENGINEER DWG DATE 09/17/2021 SUPERSEDED — � ° .'vG 11\1 •'`� DATE INITIALS • DUKE Piedmont COVER SHEET ,9° \, ; PROJECT NUMBER 0232195 MGR TECH AIM Piedmont GAS DRAWING NUMBER REVISION ��'�.,��kE I TH`�•��� DRAWING BY JB REC &STD ENERGY CLAYTON NORTH CAROLINA PNG -G-1 42-0001 000 0 STATION ID DATE INITIALS PRINCIPAL f- PROFESSIONALENG/ARCHSTAMP CHECKER INITIALS TFG 05/09/2022 WKG ENGINEER COPYRIGHT 2018 Resource Center GOLDSBORO, NC DISCIPLINE/RESOURCE CENTER/LINE NUMBER LEGEND z Q a L // /// //\\ I II �' /1�/\/ \ /\/ //1\ / I 1 ' / / 1 I I ° /' / / 11 \ 1 I / / / / I \\ , I /' / / ( \ \ / / \ \ / — — — — — / Q•F(� \ ��' \ \/ \\// 4'! �/ / \ �S , ?` I - 601 / pO o °� / \v/' /' l // ////1/ // \\ \— \ I //�' / /// 1 \ \ \ \ \ / / / / l ///// — — \\\\✓— /1\ \ \ / /CD / / / 1 / \ --� \ \ N \ — — — — / / / / / /' / 1 ✓ ✓ \ \ \ \\ \ N \ ✓ / / / / / / / \ \ \ \ \ \ \ \ \ ,� / / / / / // / N \ N \ \ \ ,1 / c. TCE TEMPORARY CONSTRUCTION ENTRANCE ���� LOD CHECKDAM LIMITS OF DISTURBANCE - LOD — SF SILT FENCE SFJ SFO SILT FENCE JHOOK SILT FENCE OUTLET 0 / / / / / l II I\ // / I / 1 \ / \ / \ \ /� / — — — — \ I I \ \ \ I N — / ✓ \ ° \ ` -� o\ / °°4 L LO J LOO \ r \ a Q I \ �� / / / / /' / / / N N \ \ \ \ \ \ N / / /' ' / N \ \ \ J / // /� / /\\ \\ \\ / /' / /' / 7 / N \ \ \ \ / // / / / / \ \ \ \ / / / IIIIIIIIIIII 11IIIIIIIIIII III 111IIIIIIIIL,,,,oIOIII ill //—__// _ — / / ✓ i ✓ CS CSIP SFB TSC TWC COMPOST SOCK COMPOST SOCK INLET PROTECTION SEDIMENT FILTER BAG TEMPORARY STREAM CROSSING TEMPORARY WETLAND CROSSING ^� / SFB SB OSF TB TTP CX PS SLOPE BREAKER �� ORANGE SAFETY FENCE - OSF — TRENCH BREAKER ® TEMPORARY TRENCH PLUG o CURLEXPLACEMENT j/ PERMANENT SEEDING PS WETLAND W1A \ \ \ \ \ - o \ / / I /' / \ \ _ 100 GRAPHIC SCALE (IN 100 FEET)" zoo / / / / \ / / / \\ I \ ' // / I\ TEMPORARY WETLANDFORESTED, I / \ / \ \ I / — — \ \ —� / CROSSING/MAT PLACEMENT, NO PERMANENT IMPACT. 360 — — ��..=IffffO/ 'N ° Ho ° ^ BOG........O r \ / I / \ — \ 1 inch = 100 ft. \ I / / N \ / ' / / \ \ \ / / /' / CTWO PT CWD SWC WASHOUT CONCRETE TRUCK TOILET PORTABLE TOILET TEMPORARY IMPACT THROUGH WETLAND PERMANENT IMPACT THROUGH WETLAND EXISTING STREAM HROUGHIINPACT PERMANENT IMPACT THROUGH STREAM CLEAN WATER DIVERSION — TEMPORARYSTORMWATER \ ❑ PT /�• �/ CVVD — / / \ NRCS NJ-1 O `"' lOD' — O `� SF — \ / I 1 \ I /' ' \ \ 1 // /' I / \I \ I / / / SOD c-- ✓ _ — — — — — ✓o ��i4��p►a►aj��iY`• \'�\, `O•-"a►Jr►a►S►J►ait►Yaa7• — — —-►"a►ai:a'�► — '•''�►.'�w�tp►jar�i�.1► \ _ \ — ✓ — _ _ — — 1 \ I PIPELINE PULLBACK AREA COD - _ \ \ /°� � / iia► t0 i °` ,08� / °, ✓ _ p 0• ✓( y pO,V / _ 01 _ — _ — ° pp1 — ✓ _ o / p� / �p� \ \ \ \ / /1 / 11,' \ ' \\ I / / / /� I / I / I / \ ( / / / I I ( I \ / / / / / / \ / I / / / / \ \ / I / /' / / // / \ \ ' I / ' ' / / / / / I \ / / / / / / ' / / / 1 // / ✓ \ / \ / / I / CONVEYANCE / NVETLANDIMPACT TYPES N — — — — — — \ \ c°p �� _ — '�`` 4�►� O 1 INSET /' / (�✓ / \ / ♦� / / � / \ / / / `` 07 s,c _ �`.0� ` °� 4OD O+\ / \ \ COD \ ` co° ` c0 \ Qc _ _ l ✓ ✓ \ — / _ eV / �' I �3.7° I / / 1 \ ✓ ��? / / / / 'O / / I / / / / / / / / /' TRANSITION OF FORESTED TO NON -FORESTED OR PERMANENT CROSSING (PERMANENT) CROSSINGIMATPLACEMENT (TEMPORARY) ✓� �` 0 — ° �' OI / I I / / / ✓ / WETLAND W1 / �`.. 1� + \ / — / / BEGIN HDD BORE 7+50) / / ` — / / / / / NON -FORESTED OPEN CUT FOR GAS LINE, \ \ o / O O / c0 O -- / °� c°D� _ — / / / 7 / r / 7 6$ / PROPOSED ACCESS ROAD ' 'ib / / / / TEMPORARY WETLAND CROSSING/MAT PLACEMENT, \\ \ �a?J o' c°o` \ o / / / ' I \ TCE / / / AR-001 / \ TEMPORARY) / / / / / / / / / POTENTIAL SHEET PILE, DEWATERING STRUCTURE, NOo°O/ PERMANENT IMPACT. c°o c� / 00 `9 ;.. °p' ° c°o` oo / / / D \ / wo cOo / /)/ / \ / / / / \I ` / _ f ///// / / / / / / / / , / — \ II / / —. ,J \ 007 0°7 co� cOo i 7 / / 00+5 coo` oo, - . ` c°o o t�' _ PROPOSED 12" STEEL ° ' c I \ GAS LINE — — —moo .� �00 �, ro \ \' `oo� \ o I" // / /' / \\ — — — — — — — _ � — / / �� ' / / / /' \ O / / / \ / / * / CO/ / o / / / /' Gj \ _ — i F►� / / /M� / cO coD \ /// o/ G� T / / / / c, _- a a / / ) `copes o / / '��H I P. • / Q I`� / / / I _��—_\\� — 0 ° ° WETLAND W1 B i // / oot �,,�°°� / +o _' — / 4t, I 0+� o fe o I co FORESTED, OPEN CUT FOR GAS LINE, / / �o°� �� d / o / (n / / \'-\,,\ Op \� I o / / / �O o WETLAND W2 FORESTED ) / — — / • �"� 1 ` TEMPORARY WETLAND CROSSING / MAT PLACEMENT, \. \-` NRCS NJ-2 \ _ — N +o _ ✓ _ / / ' \,` _ HDD BORE TEMPORARY WETLAND / / co / • . a POTENTIAL SHEET PILE, / O / // — \ _ / \`.\ CROSSING/MAT PLACEMENT. �O \ o 0p+c DEWATERING STRUCTURE, \.x / / _ / 4 / STORM WATER T` N — — �O PERMANENT IMPACT DUE TO .� , / N oo — �� _ / \ o \ `\ � D M / / i / ?� — \ \' NO GRUBBING ALLOWED. PERMANENT IMPACT DUE TO TCE POND o TRANSITION OF FORESTED TO \ o / `�� / c N/ �/ qi �i �� TRANSITION OF FORESTED TO / .p / / . ` NON -FORESTED WETLANDS. \ / \0 �� 7(,?' o . D NON -FORESTED WETLANDS. . ' v / / / ' ., ::: sa // ,.. c cv — — / / / \ — / v '04-..,,,.....44., z -1--....„ ° a""...... ,Get o / �J / / / . ° 1 ✓ ✓ ,---364_ ---j ,, N oo i \/ \-\ , S START� J ' CONTRACTOR TO INSTALL RAIN GAUGE °e SFO / - / — — 1 — — — — / PROPOSED HDD BORE / `co' N o ^ \ +' C�D� D \ \ �- / PROJECT 1 / / SEE NOTE 1. SEE LINE 142 o°\�- \ / / \ — 7 CLEARING REQUIREMENTS '- — — \ \ I' \ / ON SHEET 79 \ /o , �` \ OSF o \ M o SEE INSET SHEET \ _ — \ / �` \ \ \ \------- _��— �_-- I \ / /� .. °O�� / o \ y. - / / \ \\7----_____ ' \ / / / \ /j / / .S \-'\ / ° NRCS NJ-3 OSF "� O o / / J cop / \.., \ — I / / +moo _EN EbualRE 3 c0 / rSr / p1 \ \ N \ / `\ \ . / / / O \ o -- /col / \\ s6 \ / // °, \ � / / / / / 1 — --_ �p \ \ \ \ / / \ / \ / / I 1 _ ! LOB \ \ / / / / \ I \\ \ / \\._//. / —\ / / .3. % — — — — _ — — _ _ \ / / �h EXIST 180' ELECTRIC / TRANSMISSION EASEMENT \ \ \ — — — _ \ \ \ — — / / / /' /\ - --�� N \� / /35a. 1 I / / \/ \ / \' / / 1 / `, :.._..._..a 007 \ \' ORANGE SAFETY --`.\ _36� \ _ _ NOTES: ( / 1 / / ' / \ \ \ / \ 1. SEE LINE 142 CLEARING REQUIREMENTS ON SHEET 79. I \ ( , / I _ __ \ o o \ --� 1 I \ 1 I N \ (h / \ ( \ \ \ \ \ \ N ) I / /' I 1 I / EXIST 200' RAILROAD I / I I \ \ / / _ _ \ \ \\ \ / I / / / // // / / I EASEMENT / / �1 ( \ \\ ___-------- /— \\ \ I ( ` / / / 1 I \ I I // // // / \ \ _ _ / \\ \\ \ I (\ \ / // / / \ \\\ \ I ( / / / / / / — --/ \ \ \\—___�/ / \ \ I 1 / / I — — — — — — \ \ N / \ \ \ I 1 / M / p ) / \ / �\ �� ���—__— / / I \ \\ '► / / ( /, l /' /' ,/ '( --, ///--1 1, / `' /' / /'\, /' \ 1 to ► 1 / / 1// I 1 1 '� _ , II I \���� A R ,,,''„ O�. o�ESS /o °° 4, ° Q. ��°°°� = ' 4 09/ 2 2°�; �' tiG I NEti ° �` `\ '',, -9 ° ° ° , ...r.,` \.` "�„ kEITH �,..� �,"I,����I,,,` PROFESSIONAL ENG/ARCH STAMP PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING *USE DIMENSIONS ONLY * * REF. DWG(S) PNG-G-142-0001000 PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) DRAWING IS CUf'i ovr ONLY THROUGH THE LATEST REVISED DATE TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS SHEET(S) 56 OF 119 DWG SCALE AS SHOWN 0 05/09/2022 ISSUE FOR CONSTRUCTION JB TFG WKG AREA CODE 1853 DATE INITIALS REGIONAL LINE 142 PIPELINE ACCOUNT NUMBER 10700 ENGINEER DWG DATE 09/17/2021 SUPERSEDED PROJECT NUMBER 0232195 DATE INITIALS MGR TECH DUPE rill 1 Piedmont Natural Gas E &SC PLAN-1 DRAWING NUMBER REVISION DRAWING BY JB REC &STD ENERGY CLAYTON, NORTH CAROLINA PNG —C-142-0001055 0 STATION ID DATE NITIALS PRINCIPAL CHECKER INITIALS TFG 05/09/2022 WKG ENGINEER COPYRIGHT 2018 Resource Center GOLDSBORO, NC DISCIPLINE / RESOURCE CENTER / LINE NUMBER LEGEND Z / 1 I ) / / // / / / I I / /// /// / / / / 1 I �� / / / — — — // // / / / / /// / / /' / / I I — / // /I / / / �� J// / 1 I / / — / / / I I / // 1 / / / — — 7' / / / / / / / / — \ I I / // /// / / Il \ / / \ / / _ _ / / / / I \ / / / \ ( / / \ I / / // / / / / / / / I / 1 I / \ 1 / I / / / / / / / / / / I / / 1 \ / / \ I / I \\ \ 1 1 I / /1 / / / / , // /' / / / / i' — — — \ \\ \ \\ \ \\ / / (/, \ I I // / / I I / / // // // / / \ \ \ _ _ / / / _. // /I / / / \ \ \ / / 1 I I 1 I I 1I 1 7 / I / / /' /—�\\ \ \ \\ \ \\ _ —__ I l I / l / / / / I �O / / I / / / I I / / / / / / \ \ \ 1 1 N \ 46' I / / '� / / / I I ► / / \ \ \ 1 \ /3 I / / // / / / / / I I I 1 / / \ 1 1 \ \ — — — _ _ / _ — _ \ / I I I I ( // / / / / / / / / — .-- _ _ _ ` J I I I I I 1 (/ �- \ 1\ 1 \ 1 \ \ — — — / / _ _ / \ \ \ 1 I ( / / / / / / / I I \ \ \ \ \ \ \ ._ _ — — — — _ / ' \ / ' I \ / ' \ 1 1 CODE TCE TEMPORARY CONSTRUCTION ENTRANCE :����1 CD CHECK DAM O LOD LIMITS OF DISTURBANCE - LOD — SF SILT FENCE SFJ SILT FENCE JHOOK SFO SILT FENCE OUTLET O I / ) I / / / / I I I / / 0 / \ / 1 \ CS COMPOST SOCK CSIP COMPOSTSOCKINLETPROTECTION SFB SEDIMENT FILTER BAG TSC TEMPORARY STREAM CROSSING TWC TEMPORARY WETLAND CROSSING SFB ( / \ / J / I / I \ / / / / 1 / / / / / / / / / / / / I I I I I / / / / / / / \ \ \ I / (I I i I I / 7 \ I / / / / / I / / / / / \ / I / / I I / / / / / 4 I I I I d. 1 / / / / / / 1 / �' / I ( / M M / / / ,1 / / / / \ / / / / / \ 1\ \ I I ( v / // / / / '' ���� / / / 1 ))) / \ \ / / / / / I 1 I I / \ \ \ 1 I / / / \ 1/ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \` 1 \ \ \ \ \ \ \ \ \ — \ \ \ \ \ \ \ \ \ \ ` 9 cy \ \ \ GRAPHIC .A> \ \ \ \ \ 100 0 ` \ — YIP / - SCALE (IN 50 100 350 —- I \ / / / / O \ \ \ I 1 FEET) \ 11 1 200 1 SB SLOPE BREAKER OSF ORANGE SAFETY FENCE - TB TRENCH BREAKER TTP TEMPORARY TRENCH PLUG CX CURLEXPLACEMENT/ PS PERMANENT SEEDING �� OSF ® 0 PS — ( � / ` / I I / \ 1\ / \ / V \ \ \ \ / / I / a I 1 / / \ WETLAND (W3) x�ti0 \ \ \ \ / / / _ I / / ) I I ( / \ \ ` \ I I I / / I ( I / / 1 \ I \ I 1 1 \ / 1 I% STREAM (Si)(INTERMITTENT) OPEN CUT FOR GAS LINE, TEMPORARY STREAM CROSSING/MAT \ \\ \\ \ \ \ \ \ \ \ / / // •>� ' % / / FORESTED OPEN CUT FOR GAS LINE, TEMPORARY WETLAND PLACEMENT, \ / / \ i-- 1 inch = 100 ft. / \\ \ \ 1 / \ \\ \ \ \ I I / / / \ \ I \\ \ \ / / I I \\ \ / / CT WO CONCRETE TRUCK WASHOUT PT PORTABLE TOILET TEMPORARYIMPACTMI THROUGH WETLAND PERMANENT IMPACT THROUGH WETLAND EXISTING STREAM THROUGH IMPACT STREAMENT IMPACT THROUGH CWD CLEAN WATER DIVERSION —CWD swc TEMPORARYSTORMWATER \ PT �� — / / \ 1 1 \ II 4• \ I / f \ _ / \ / —. I in \ St6, \ / I y \ I \ I / 1 / / M \ PLACEMENT, POTENTIAL BLASTING, DEWATERING STRUCTURE \CROSSING/MAT \I \\ 1 \ 1 1 \ ° \ -3. • /o \ \ / / / // / POTENTIAL SHEET PILE, DEWATERING STRUCTURE PERMANENT IMPACT DUE TO — _ _ — _ � // \ i \ — / I \ / 1 l \ \ \ 360 - / // // \ — / / / / / / / / / / / I \ v / I \ \ I 1 1 / / / ( I \ \ / \ \ 1 I I ( �I \ \ \ 1 \ / AI I I \ \ TRANSITION OF FORRESTED TO NON-FORRESTED WETLAND \ \ \ /- _ — — / / / / ( — _ / / / I I 1 i — — _ / / / // / / / I / / / / \ / / / / / / \ �z I I // \ I :M: 1 I / \ wer N \ \ •Vi \ / \ II I\ \ 1 ` \ \ _ _ / I / 1 \ I ` / / I Ok 456 — I / I - 's //�OO ' O°O° ' / /r,/ / / — \ — _ _ V�O / �1 V°O I I/ I <6 /�°° �� I/ I S 'S. / 360 _ di. I o a / <0 / / / — / / / / / / / / / / 1 / / , / / / / / / / / / / / / / O / / / 6^ // / / / / / / / O / — / 6 I / / / / �9 / / / / �'�/ / / / / / / / / / / / / / / CONVEYANCE / WETLAND IMPACT TYPES \ 1024 \ I / ( ( / \ I 1 I\ \in \ \ \ \ ORANGE SAFETY 4 I \ \ — _ `� 9 ( \ - \ \ / �- t'pO 1 1 \ \ O _ I�f ` \ ` _ _ — o�.* 1' �Pj ". �'� \ oo '• --- \\ \��—� LOp ®°o _/ \ t9 \ FENCE _ _ \11141S ______...._ „c\i0C \\ \\ I 11�, ss / / '-- "\ _ _ r `� - / / / I / / / / / \ O.��. / / _ - - . •y • . // O / / / / — �_ / / / /- / / /' /// ' — ° / / / / / i / , / /..., _ / / / / / / / / / / / / / / / / / / - _ _ _ — / / / / / / / / / / __-- — — —' / // / // /' // / / / / / / 3 / / ,�� ; / / / / // 5 / ooX�/ I / TRANSITION OF FORESTED TO/ CROSSINGSPERMANENRMANENT ) CROSSING/MAT PLACEMENT (TEMPORARY) \ N 1 \\ \' goo �/ a � O \ \ \\ \ ...._ 1 \ % // / / / / / / .9 / / \ �/ k \ \ \ --1 �? / o cn �.. „ _ _ \ \ I / / / / / / / ® / / EXIST 180 / / \ciestP T �' <''' — — \ \ \ \ /' I 1 I / / / y i , / / / TRANSMISSION // / \ \ \ k 110 4 // \ \ _ \'/ \ I I l // / / /,.00 �/ / < oo // / \\® o oo� / 1 I I �c6 / / / / / oo ,(X / r O \ "� �, \\ /7 //// °^ / 6 /' / / / / / \4p O °C� .Q ,_ / I / �. i 5 ELECTRIC / / 7 / / / ^ EASEMENT / / / / / / / / / / / Q� / o° ��� \// ////// / / / / / 00 / Qi ^� a \ / / / / / / / / / 6S / i•` / / / 1� — 7 / / �/ / / / m� HDD BORE 32+90 / �%i �� 1 oo` I ��' /� 1 \ \ I 1 / / / / / / / / it; u / / \ - .� / \ / s0 / I .70 — / \ \ o ` /.. .4. 1 1 I 1 \ v ` / / , /o°^� �tf'o° / / I I 1 o I �' OSF� .i oo` \ — l l / I \ \ / / / // / �/ / /� / ` ( o / 1 / / k oo C �✓` / / \ / / / / / 1 / / / <° XO / 1 O o °�i '� / i / \°� I ok I \ ` do / / / /0O/ / / %�/ //71/ / II / / ( \' PROPOSED O N i �' qo �'O '"/ \ / / / 350- \ / / / / I I 1 \ \<o x� / / / o / ` /' /7 I I / — / \ o � / / i �\ k ode \ /. / \ ^� / / / / I I / 01 I I / / /�\ // / I \ \\ \ °° / / / / / G. \ / \ %6N 1,.0 --. ,.--. : • / ' goo / I /'' \ i PROPOSED ROAD BORE \/ \ \ oio / / / ' \ % / \ Q) / , :. I I I / PROPOSED HDD 1 \ \ \ \ I / I \ \ � \ / ° /r ° /'/� SEE NOTE1.SEELINE142 \ \ I I \ / 1 / I / \ \ \ \ / I / 1 / �o°"'� I I /.-/ I\ ON SHEET CLEARING R7EQUIREMENTS I \ \ \ \ / \ /I / 1 / I ®,' / / ,'�o 9 / o� / / / 4 # / / 3� / 6p / /O / /, / / �3 — / / / / / o / °^ / / / _ /--- / / ° / / — \ / S / y \ / i/ /��'� �-356- /__— __-- / / ./ °°^ 12" STEEL GAS LINE — _ _ ,' J� / / \ / / / / — — / �/ / / / \ — — — o^ / / / _350� _ — / / / / — // s // 5 °° �\ / / / / 0 / / ,, N\ \ / /\ / / / / / j\ / / Q _ _ � \ \ / / / / / /� °,O — -- 400 / / / �� % ----_ \ \\`-- / / / / / 00% /' �� / / /� — — — _ _ \° \ \ \ \ 3q0\ / (/ \ I \ \ $y`L / / ' ?% " / \ \ \ N / / / A) /, _ - \"\ / ,/' go ) \\ \ °\° ( (/ \ \ \\ \\ \ \ \ \\"3 —�'' '/ // / /'// //// // / / \ \ \ o \\ \�`--�� / / / / / °° / �� °oho S ( °o /I g / —_—_ w 33 \ / 7 ��/ 4� \_ \,, _40 • °, /,' / \ / —\ 33U — N \� /\ \ �� /• PROPOSED ROAD BORE \ \ \ \ \ \ / / / / 006 / __— \/� / \ \ \ \ \ /� �' _ _ / /' / \ \ \ \ \ \ \ \ — _ — / / / / / / � \ \ \ \ 36p / / / / Po �` �� \ \ \ \ \ \ \ \ \ / / / / I I I :�t / I 4 o \ \/ ° �Nx 5i I I % _ ,�^ ® •/ // / I O - / / °^ / / / / / / / STREAM (S2) (INTERMITTENT) OPEN CUT FOR GAS LINE, `TEMPORARY STREAM CROSSING/MAT \ - \ \ \ \ \ \ \ \ \ N \ \ G \ \ / \ \ \ / .� / / I cfl I I `^ \ \ V / , \ '� \ fy2 k ' \ — N\ \\ / N \ — _ /,/ I I M I I / I I 1 / \ > 1 was 3s4. /// / / / _ y / // / ,, �•�� .� / / �" / / / ( ( // / / �.,_;®v /� / / / PLACEMENT, DEWATERING STRUCTURE \ \\ N — -- \ N N N \ \ \ // N \ \ /` / / / / / \ \\ Ya i �, \ \\ \\ // /// / /� // �O'��--°°,`� \T3 \ \ 1/ \CM M I N \ / />c/ / \ ( I 1 \ / / // \ / / I \ ( ( / ( / \ 0i /' \ — i.�G /, // 1 \1\\\\\ l\ l.\ 1 \\ /c�`�' // \,\ N \_ — _ \ \ \1 \ I N _� —� / �_ / /// —\ \\\ \\ \ \\\ 1 \ \ —�\ I \ \ — \ \ NOTES: ( / \ / \ �/ \ \ \ \ \ \\ \ 1 -�\ ��� \ \ \ \ / 1 —/ \ \ \ 1. SEE LINE 142 CLEARING REQUIREMENTS ON SHEET 79. `I / \ 1 �- \ \ \\ / / / \ \ I \ 1 \ \ \ \'3 / / — — \ \ \ \ \ \\ \ 1 1,_ \� \\ `\,_ \ \_-- \ \\ N \ \ \\ I \ \ \ _ ` \ \ \I I \ / \ \ / \ \ — // / \ \ / �\ \ \ ) __ / \ \ f/ �/ --- —_—_-- \ \ / — — / — —� \ — ///� \ 1 ° / / i / /// / ;) 11\ 1 ► 1 / '\; \\_,/' ,/ / / /I /l / //// // / / / / �' / �l / J 1 )I l ^3ro ' / / / / /// // / // / //// \— --- /� / /' / /' / / // / //// ////// `-__^_--- //---- 3yo / / / / / / / __ // / / /3o` /// // ////////2// / —_I\ / \\ / /�o// /////,y0/ // / / \ \ \ N/ \ 1 N \ 1 \ \ 1 _\\ \\ \ 1 — EXIST 200' RAILROAD _ _ _ // / / _ — — \ l \ \C l / \ EASEMENT 1 I / / /-------_ / / \ / / /_/_-----_ / \ \ 1 \ / / / / _---_ —_— I I \ \ \ 1 \ \ / // --_ I 1 \ \ \ \ / / / / / / / / /// _- ��- I — — ' / / / / / // / / /// / / 7 / / /3i6�' / — \\\ _— / / / / / 3 / / / /i /� /—\ \\ \\\\��_—_ _\ ---- /// /7 7 / / /// r / \\ \\ \ ----\ / / / — \ \ --- �,/ / /'� �/� /�1' / /`'// / 7/ \ \\ N ---- / _/ // //7// // — / / / \ \ \ —_ \ / /7 // / �//// / \ \\\___ �\� \\ \ \ 1 / ( / / / N \ I I \ / // /l / / l I / // l / / /I I I I I / // f// —— l \ \ ( 7 /// ---_/ .7/%/�//// ///��� ��/ i \ N� -\ \ \ \ —/�// / / �__ ////// / \� l _—_�// ///--_— ///// // / _ \ 1 ) I ,��\\‘„, cA,,,„,„ ,,' N• o<,%, -, _.�. '' _SS /o.• . /4, •Q. -7° Z". �5� 09/ 2��°�, i ••;LG I NEB•°�� `PROJECT PROFESSIONAL ENG/ARCH STAMP PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING *USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLYTHROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAIMNG MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 REF. DWG(S) PNG-G-142-0001000 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS SHEET(S)57 OF 119 DWG SCALE AS SHOWN 0 05/09/2022 ISSUE FOR CONSTRUCTION JB TFG WKG AREA CODE 1853 DATE INITIALS REGIONALLINE 142 PIPELINE DWG DATE09/17/2021 SUPERSEDED ACCOUNT NUMBER 10700 ENGINEERNEER PNG DRAWING —C-142-0001056 NUMBER REVISION 0 NUMBER 0232195 DATE NITIALS MGR TECHENERGY� 1 DUKE nig Piedmont Natural Gas E&SC PLAN 2 DRAWING BY JB REC&STD CLAYTON, NORTH CAROLINA STATION ID DATE INITIALS PRINCIPAL DISCIPLINE / RESOURCE CENTER / LINE NUMBER CHECKER INITIALS TFG 05/09/2022 WKG ENGINEER COPYRIGHT 2018 Resource Center GOLDSBORO, NC LEGEND z Q J • - — \ / / / / / \ \ \ \ /" I I \ \ \ \ \ / / / / - \ N \\\s\\ \\ - - - - - \ --- _-\ \ / / - - N N \ / / / / / N \ \ \ \ / // \ \ \ \ \ \ / / / / / / ( ` _ _ _ _ _ _ \ \\\ \\ \\ \� _ '- - \ N N \ \ \ / / N \ N 1 \ / / \\ \ ' ' \ ` I / CODE TCE TEMPORARY CONSTRUCTION ENTRANCE ♦�♦ �� _ \ / / / / \ \ v \ \ \ \ \ / / / / / I I \ \ \ 1 / / / 7 7/ / / / _- _ _ -- - = \\ \ \ \ N - - - \ \ \ N\ N - \ \ \ N /' 7 N \ N N N / / / / / \ l I \ - _ \ \ \ \ \ 1 \ \ \ - / / 7\ \ 1 / / / / - \ \ \ ` i / - \ / / /' / / /\ CD LOD CHECK DAM LIMITS OF DISTURBANCE Q - LOD - // \ \ \ // /� \ - \ \ / / / \ 1 / // \ \ \ \ N N \ / / / / / `\ \ \ I 1 \ \ �' / / 1 \ - - - ---' \ N \ \ \ \ \ / / \ 1 \ / / \ \ \ / / / \ \ \ I / / / \ \ \ / / 1 1 \ \ / 1 - \ \ \ \ — _ _ / I \ / / - - \ \ \ / / / / / ti 1 Tr 1 \ // / / ' / / - / _ \ \ \ \ / V I M 1 \ / / / ' / /' 7 /' - _ - \\ \ / _ _ \ \ \I / / / / ,' /' / 7/ / / / / / `�-' / /' ' _ - - _ \ /' /' /' / �' ' �— I / / / / / / / \ I / / 71 7 / __� \ - - - - / / / / // / / / ' / ' I / ' ' ' \ / / / / ' 1 \ \\ \ \ N N / \ ` / \\ \\ _ / _ _ - \ N NN. \ \ -� / ' / - ` N \ \ N \\ \\ \ N N \ \ ._� /� \\ \\ \ \ \ `` ` \ \ SF SILT FENCE SFJ SFO SILT FENCE JHOOK SILT FENCE OUTLET CS CSIP SFB TSC TWC COMPOST SOCK COMPOST SOCK INLET PROTECTION SEDIMENT FILTER BAG TEMPORARY STREAM CROSSING TEMPORARY WETLAND CROSSING SFB / w / / / , - - - ' N / \ / / / / / 1 1 / / \ \/ I o \ o I / _ - --� \ \_ / / / / �_ / / 1 � 1 1 11 \ 1 I _ _ / / / / _ / / 1 \ \ \ \ \ I `340 / / / / / / / 1 \ M I / / / // / / _ _ / / // �' / / / - - - \ \ 1 \ 1 1 \ - / / / / / / / 1 I ) 1 / / / / / / , / / / / \ _ _ _ _ _ _ _ _ - _ ' / / / ...--/ / 77 / / - - \ \ \I 1 1 1 \\ \ \ / / / I I I / / / �2 / / / / / / // l / / / / / \ I ,` / I I 1 I 1 \ / / / 1 \ / / I 1 goo / I GRAPHIC SCoALE (IN OVET)/ / �o / I SB OSF TB TTP CX PS SLOPE BREAKER �� ORANGE SAFETY FENCE - OSF - TRENCH BREAKER ® TEMPORARY TRENCH PLUG 0 CURLEXPLACEMENT / PERMANENT SEEDING PS _ / / // / / , / / / \ / / 1 N \ - - / / 1 , / / / / / _ _ - i / / \ I I / I I \ - - _ / / _ / I ` \ / / / / / / / //_ - / / / \ \ / / / / 1 I 1 1 I 1 1 1 \ 1 I 1 1 \ \ \ 1 \ \\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ 1 I \ \ \ \ I \ \ / / / / / / / / \ \ \ ` ' ' / / / / /' / / / I \ \ \ ' / , / / , / / /' / / \ N \ \ \ / / .' / // 7 \ N \ / / _ 346 //// °p \ \ / / / \ \ \ \ \ ' \ / ,''\ / co , / / \ \ \ i N N / \\ \ NOTE:.. \ \ \ \ -350— \ / TEMPORARY EASEMENT AREA TO BE USED \`\ \ \ ( / IF NEEDED. SILT FENCE WILL BE INSTALLED IF \ ` _ - - - - - - / / I I THIS AREA IS USED. AAp� / / / / �r / / ,/ / / / / / ' / / mod` ' /' / / // / / / / 1 / / �o / / / / / / /// ( / / / J // / /� - / / / / / / / - - 7 / / / /' / / / , / // / ' i // ///___------- / �/ /� _� -� / /� j / __ _- �- ,—_ - / 7/ _ ' REINFORCED SF _—_ /' �� / /� / i' i - DOWNHILL _ - \ / / ^o / / / / 1 inch = 100 ft. / / / \ \ \ .� _ - - _ _ _ / I / / / ' ' / / / /' / \ - - - - - - - - - - - � \v \i / / / // // / // / \ 1 / \ \ \ / / / / / / / / / \ ' \ \ / / /1 / /\\_ \ / /l ITHROUGH ( / _ - - - - / _ _ N / 1 1 - \ /\ \ 7 / / 306 _ - - - - - -� 7 7_ - \ \ \ \ -- -' / I \ \ N \ _ - _ \ / \ / ' i _ _ - - - - / / - \ \ \ \ \ \ \ - ---_ �� / \� �_/ / \ \ \ _ - _ _ _ - _ _ �' \ \ 7 / p0 \ \ \ \ \ \ \ to, \ \ \ \ - -_-_- -�300 - - — - - - - \ ` - 7- / / - - \ / N ` \ \ - \ - \ i CTWO PT CWD SWC CONCRETE TRUCK WASHOUT PORTABLE TOILET TEMPORARY IMPACT WETLAND PERMANENT IMPACT THROUGH WETLAND EXISTING STREAM THROUGH IINPACT PERMANENTIMPACTTHROUGH STREAM CLEAN WATER DIVERSION — TEMPORARYSTORMWATER \ PT j� �/ CWD - / ___.-- _ ,ALONG - - _ 1 1 \ \ \ _ _ / �_ - / \ N. N \ N \ \ -- \ \ \ _ \ \ `� - ��� ) / / �'• \ I / /'� i // jSIDE OFSIDESLOPE -- _ ��-�___��'--' ---� \\\\ \` \ \ N N`\ N N \\ / �' \ - - / \ _ _ - - 4 I I / \ \I \\ \ \ N\ \\\ 1 \yyy \ CONVEYANCE / VVETLANDIIvIPACTTYPES N I 1 1 \ 1 \ 1 I \ \ \ \ \ \ \ \ \ �_-- / I \ / / I \ 360 \��\ \\ I ' // / \ \ \ 1 Cp \ \ -3S6 \ / / I \ 1 /X \ 1 I \ Cc)) ` 1 \ \ 1 1 I \ 1 I 1 \ ko /-,. 1 I III \ / I 1 / / I / $�: 1 / 1 / Z 1 / / II / / / ( / o S'FO' i / --�� �PROPOSED12"STEEL GAS LINE �\\\`�-----� �'\\�_- \ \ ( _ = - .....„,...z.:„...___ \ ` _ \ \ \ \ \ \ \\ ` = \ \ \ \� ` _ _ / \ - - - _ _ - - - \ \ �\ \\\ -- \ \\- \_/ \ 1 I I. - \ \ .\ \ \ \ \ \ \ \ \ - / / _ \ \ - - _ _ \ / 1 I I ° o\�. _- _-� �a \ \`�__�`\\\ p ��\ _ --___ — --� \/ I ) 1 \ \ _ -7:_-_----'\\\ \\\ \ / / _ _ _ \ _ _ \ \ \ \':-::-.-.1": I . �',, \ \ \ \ \\, \ _ - \ \ \N.,..::,_,-...----- / / / \ ` - - - -_ ` - - \ / / w . / ---- - - ---- -------- -I- - - -7-- ----- ----- - - - - - - - - - N 2 TRANSITION OF FORESTED TO NON -FORESTED OR PERMANENT CROSSING (PERMANENT) CROSSING/MAT PLACEMENT (TEMPORARY) :.:::::: / \ \ \ , NX-N -,--NX\-- / - --- - - \\ \ \ \�-_-' /' / / /366� / / // / / / / / / ok , ^/// // / `__4 \\�N.�00 \ N---------- / g,\/\ / 7// ,g , --_ o __\\ \\\\\��\\-`'�--_--- -.` \ \ \ \- / / / / \ ` 713 < \ /'/ / / / °/ _ ) / / / / ' / \�� / / / / / / / <°" `"' �^ `\I�� / / / I�;\ \ \ ` '-- _ \ \ \ \ \ \ / / OD / / / / - /N \\ \ \ —--�_�- — \ \\\\ °I° \\ \ — — _ — — — \ `\ \ / , , / _ — — — — _ / — / p \ _ - _ — `i \ \ \ \ — / / / /'/ / / / / / , / V / / 4°�/ \ \ \ \ \ I //�[ / ,[� / ® / r �/ ' \ \ — _ — ' " \ \ \ —_ \ \ \ \ \ \ 28o _ _� • � \�'Sp m� \\ \ /-o �_�� __i ��� ) I\ !\� \ I ��-----\\\\\\\-_ --_ 7/, , 7 // / /' 7 // / / / ,% c9 / __F\°ol.•."pe / 4°��\.0 \\ \ \ \ \ I / �O�/ �° ° AI / /' / ,' / / / / o/ / / �O '•:�'� °/ \ \ \ 1 I 1 I / // / / ®°FO \ \ �\\\��\ ^,-___- ,'---___- , ) \\\�\\a..� -- __ \� \\\`�----------_ / , / \ / / // / % / "' ..,.. \ \ I I 1 1 I / l Sg \ m * N sF 1—_'�------� / )11 \ \ \ r-., — — — --: \ \ —_ = 270 —� .i _ / / ' / / / / / / ' /`� / / 'o�'o ' \ \ ° \ 1 1 I I 1 f ( I I \`°°` �i \\ \ \ \\1 __ - �,�_ ° II \ \ �.,�--�\�\ `__--__ ___Z CO \_ ,, /,/ \ /' /' , o / \ \9. \ 1 I I ' , I ' ®\ t°O s -\ \ -F=- _= = -4-�/ /1I ► \ \ `�-)_--\, I� ��--_- -= 260 -___ ;� �; / / // / / / / / c� ® / ° \ r / \ \ \\ \ 1 I 1 I 1 \ \ I \ \ \ \ re ��\ \ 1 $ `\" .� (\\\ =� may_/ I \ \��/'�--� �� \ 7 r� --� �— ��� `\ / / / O °^ \ \ \ 1 \ \ \ �_ \\ --+� __, �— ,;\� \ _�,_ may\\\\ / / / /0 O ° ` _ \ \ \ \ \ ` \ \ `` oq \ \ \ ZD �, 1 / 7 \ \\ \ \ \ \ \ / / / ,,_,,,) 7 ,, / / -1/,1 k 7 // // / /\�. \ 1 1 \ / /.'\\ \\` `\ \\N / r:H:11/41-°:71/8/ --_ / / x 4 o^ \ / j I I I \ \ \ \ \ \ N ' \ \ \ \ \ \25/ �� -\�/o\ \ \\\ \\ -'`'yam-� \ \/� / , //1 1 \ 1 //\\\�IP-21----------Tic---1 _ °/ / \I �/1 r '\./\ \\ \ \/ N — o \ , /-- / / / 1 / \ \/ / / 1 / / I �°°^ / \ -/ _�/'// /�.i / /-___-/////////,//��\_J/erg.1///////-��-// \/\ / / ��. ( / /��''Y1 / -'::.6. 10 11 1I / ,- �// // /// I �/ / ( \��� / / Lop ��� SF' \ --4o„ / • / SPO oA 7 - - - - N .-----__ / / / ,, ,_ / / / 7 0. / / ---� �- \\• oir \ \\ \\��°� \ \\ \ / �\ \ l �\ // // �� / // // �// / / / //\ // / l/ \\ \ / ��----�//' I /� �\ \ 30 \ / °°�--\ \ \ ° 1 N - 7 / / N N / / / / N / / N / 7 \ 15. N Ni \ / N \ 1 w\ -- -- \ — \ o 14,, ° \ / \ 7 \ \ \ / '- - — 33 ` \ \ ` \ X \ \ X --, N ___-..‘-' ___, -, gadik N.- - ''•-. N . \ \ \ \ \ \ ,,,:'- I N \ \ \ \ / / / \ \ \ \ \ \ N \ - - °�D �'�o' \\ \ \ \ \ ` - N. PROPOSED ACCESS ROAD \ \ / / / _ / ' 7,\ _ o\° _ \ \\ °\ \ \ \\ \\, \-__ ��. TCE o�D��'� N \ \ ��''''. / / / // \ �/ O \�\ \ \ \ \ \ \\N N Ns,\ \ \ N AR-002 �\ \\ \ N / -- \ \ (TEMPORARY) N \ \ / // / \ \\ \ \\ am'-- \\\\ \\\ \\ \\\�.\ _ 1' r--326\ \\ \ \ \ NOTES: N\ /' \\� �`\\\\o °\\� \\\ \ \ \\ ////// // _ \ \ / / \ \ 1. SEE LINE 142 CLEARING REQUIREMENTS ON SHEET 79. N ` - \ \ \ \ / / - - / \ \ \ \ \ \ \� \ \ \\\\ / h / \ \ \ _ \ \ \ \ \ \ / / \ SFO \ \ \ / / 1 - \ II / 33o -7 '_ - / ��/ / / / /' `\ V \ \ \ \ O \ \ \ iA \ \ \ \ N \ /st \ 2 / I \ \ \ N \-� / °� / I \ 1 / b / / -- ) 1 1 / - - - -___ N \ \ // \\1 11 I I \ \ 9 C� \\ \\ \ \\ - / \ /'-336---.\ 1 1 / / / I LOD SF - \\ \` '-_,� `\ \ \\ \ �� _\� _/ ,� /� / / //---\ — N J \ \ \\ 1 1 \ \ \ / \ 1 I %/ /1 I 1 \\ k • \_ ,- / // _---,\ \ \ / / / /1301 \\ —e°, �= `\ , /' moo/ ' /' \ / \ \ o' \j N - - - \ \ / / \ N N \ N \ \ \ ` -, J / / / / / / �j te° — /�"��-�►/ °,-�' - °° os / `t' ' II \ \ \ I / \ \ \ ! �_/ / / / ep��°►,�{ ►. ' �- ', ---__ '/ii' /'�bp / / i I I \ �7s \N N \ -\ \I I 1 \ \� I \\ \\\\� N\ ` --' �/ / ///// / // �`V�/ / 5,�' ���%��� �___ LOD eif 7-/// ////// \ \ \, \ --�\\ I 1 I �\ \ \ \\ \_-_/ // / -� \ \ __ _ \ \ \\�` /'/' / / / / ' / ' /' �� / ' /� // / 'N \ I \ I N \ \ \ I / ( / I/ — _-,� _%/'''/' ''tip/ / / / \���� CAR ���''/ 0 • o�ESS /o °° 1 ° Q. ��°°°� = ' ,- )4 09/ 2Q22: -' �GINEti ° ,`` '''";1� ° ° ° ° ° ° °G ,,\., ,,,,, _ , , .. •�0.• ''-1I.I1III,,o� PROFESSIONAL ENG/ARCH STAMP PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING *USE DIMENSIONS ONLY * * REF. DWG(S) PNG-G-142-0001000 PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1 W1 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS SHEET(S)58 OF 119 DWG SCALE AS SHOWN 0 05/09/2022 ISSUE FOR CONSTRUCTION JB TFG WKG AREA CODE 1853 DATE NITIALS REGIONAL LINE 142 PIPELINE ACCOUNT NUMBER 10700 ENGINEER DWG DATE09/17/2021 SUPERSEDED PROJECT NUMBER 0232195 DATE INITIALS MGR TECH DUKE rar Piedmont Natural Gals E&SC PLAN-3 DRAWING NUMBER REVISION DRAWING BY JB REC &STD ENERGY CLAYTON NORTH CAROLI NA PNG -C-142-0001057 0 STATION IDPRINCIPAL DATE INITIALS CHECKER INITIALS TFG 05/09/2022 WKG ENGINEER COPYRIGHT 2018 Resource Center GOLDSBORO, NC DISCIPLINE / RESOURCE CENTER / LINE NUMBER LEGEND Q N. / \ \ -`_____ '_-----__---- _ / 1 _ / � _� \ \ / / / ice' // / N \\ \\ \ \ \ \\ \ \ \ \ \ \ \-� / \�/ / /----\ - , / / / / / \ \ // \ --- / / / // I I I \ \ \� / _ \ \ \ \ \ \ \ \ \ \ \� \ // \ / / /// / / / I \ \ \ \ 1 o I 1 I \ \ \ CODE TCE TEMPORARY CONSTRUCTION ENTRANCE ���� _� ----- I - - _ \ �' \ \ , _ _ i \ \ \ \ \ \ \ \ N \ \ , \ \ _/ Iii / \ / 7 I\ 1 / \ \ ._ - i / - \ \ \ \ \ \ \ \ \ \ \ \ , \ \ / / - - / / / // / iiii I// \`/\ \ \ / / /// /_//\ \ I \\ \\I \ \_\--// \\__1/// ////, //// \ \ I I 1 _ _ / / \ \ - \ \ �� \ / / / / / / 7 7 / / \ 1 I \ \ \ \ \ \ \ \ \ \ \\ 1 I 1 I\ \ \ j / - \ \ _/ / \/ / - - \ _ —� _ _ \ \ / / / // / / I / f\ \ N / _ \ -- \ \ I l / / ////// I I \ _ _ / / i \ --\ \ \ O / / / / I I 1 \ \ \ I 1 \ _ _ _ \ , / / ...---, l / / l l I I I / / J 1 \ / \ \ / I \ \ \ \ \ I I \� \ \i \/ _ __ \ \ I / / / / I\ \ \ \ _ _ _ / / - _ \ \ - _ \ \ ` / / / \ 1 I I I I \ II I ` --(\ \\ \ ,///' ------ \\ \ I / 1 / / / // / I I / 1 1 \ - / \ \ \ 1 / ' / , I \ , 1 1 \ ' / / - - - - - -� I \ \ \ 1 / l I I I I \ - - - \ - _ _ \ `� _ / / / / / / - - - - - - - _ \ \ \ \ \ \ _ - _ _ _ 2%$" - / I 1 \ I I I I I I 1 \ ` -� \ \ \ _ - / / / \ /� ^ \\\ \\\ \ \ II 1 I I I 1 I / I I I I I 1 1 I I 1 '/ / �� \ / / / - - - \ \ J I I I 1 "ill _ - _ \ \ / i� / / \ \ \ 1 1 I 1 1 I I 1 ! \ - ' / \ / \ \\\ \ \ \ \ 1 \ \ 1 \ 1 I \ 1 \ 1 I - I \ ` \ NI 1 I I , \ \ N. _ - - - / / N \ - / / I 1 - - \ \ \ / / —' \ \ \ / / / I 1 \ \ \ \ \ \ \`\\ \ \ \ \ \ \\\ \ 1 \ iSB - \\\ \ \\\\ i/' / / 7/_-___ \ \\ \\ //- --\\_\ /' I/ I I \ \\ __\ \\ \ / ,// \\ /' / / \\\\ \ \\\\\\\\\\\\\\\\\\\\\ \ I \ \ \ \ \ / \ _ - / - - _ \ _ / I I 1 \ \ \ _ \ \ / N / / / / \1 \\\ \\ \ \ \ \ \ \\ \ \ \ \ / GRAPHIC — — 1 _ ^ 100 0 1 / N \ \LOD / / \ \ \ \ , \ \ \ \ / / \ \ \ \ \ � \\ \ \ ��`` \ 1 I / \ \ \ \ ` I 1 �� N \ 1 ` \ \ \ `` \ \ \ \ \\ SCkE (It�FEET) 50 100 200 CD CHECK DAM 0 LIMITS OFDISTURBANCE - LOD - SF SILT FENCE SFJ SFO SILT FENCE JHOOK SILT FENCE OUTLET O CS CSIP SFB TSC TWC COMPOST SOCK /� COMPOSTSOCKINLETPROTECTION / SEDIMENT FILTER BAG SFB TEMPORARY STREAM CROSSING TEMPORARY WETLAND CROSSING OSF TB TTP CX PS � w SLOPE BREAKER -V\0- ORANGE SAFETY FENCE -OSF- TRENCH BREAKER ® TEMPORARY TRENCH PLUG 0 CURLEX PLACEMENT /, PERMANENT SEEDING PS l / , \ \ / , \ \ / 7 \ I \ \ , / I / — J , \ \ I \ / / I \ \ \\ \ \ 1 \ \ \ / _ \ \ / / ' / / / ' /' / _ _ \ \ \ '� _ _ \ I \ \ \ \ \ \ / \ 1 ) I 1 1 \ I I \ / / 0� / , / / // �� / // ___ \\\\\`—__ \ \ \ / \ \ \ \ \ \ / / I / / 1 I\I I 1111 \ / / -28 / / / _ _ _ i / / / / \ \ \ \ \ v / \ \ \-� \ / I / /? 1 III / , / _ / / / / / / / , - / / �- \ \ \ - - - - _ \ \ \ \ \ \ \ \ /' `\ \ / / \ /' / / / / l I I 1 1 / ' _ _ _ - _ / / / / / / / _ _ - / / I / \ \ _ _ \ \ \ \ 1 / 7 / / 7 / / _ _ / / ' / / - ' \ \ \ \ \ \ / I \ \ \ \ \ \ ' ' / \ \ - -' / / / / / / / / / / I II I / / // / 7 / ,/ / / /////_ // / ��--_- \ \ _-_ \ \ \ \ \ \ \ \ \ \ //� \ \\ / / / // // / /I ICI / / / / / , / / / / / i ' \ \ \ / / / / / / ' ' \ \ -2 / \ \ \ / \ Y \ N / / 2 1 \ I1 1\11\ \ \ I ► I\\ \ 1 I I \ \ 1 I \ 1 \ \ 11 11 II 1 I 1 1 I I \ 1\\ 1inch =100ft. 1 / \\ \ \ \ \ \ 1 \ / I \ \ I \ \ I \ \ \ I \ / / 1 1 CTWO PT CWD SWC CONCRETE TRUCK WASHOUT PORTABLE TOILET TEMPORARY IMPACT THROUGH WETLAND PERMANENT IMPACT THROUGH WETLAND EXISTING STREAM THROUGH IMPACT PERMANENT IMPACT THROUGH STREAM CLEAN WATER DIVERSION — TEMPORARY STORMWATER N ❑ PT j/. �/ CWD - , _ _ _ - - - _ _ \ -_ _ _ I / / , , / \ \ \ \ .3 /O1 / , / r 7 / / ' ' / / / / / / / / ' , / ' - - \ \ \ \ \ \ \ \ / / 1 \ \ \ \ �� \ \ \ ` / / / / / / / / / / i - - - - _ / / / / / / % / i / _ - _ \ \ _ \ N \ \ \ \ \ \ \ 1 \ \ \ \ ` i / / / / , I I I / , / / n Q / / / - \ / \ / , . / / / / / / - - - - - - - - - - - - \ \ \ \ \ \ , / I \ / / V I I 1 1 1 I 1 1 I 1 1 I 1 / ( \ / / I \ 1 / 1 / 1 I PROPOSED ACCESS ROAD / / / I Y� /' / / / - - - \ _ - i / / / / / / / / / / - i \ \ \ \ \ \ \ \ / \ / / I I I \ / / I I 1 1 1 I 1 / I / ////lI / / 7 \ \ - - ` / / 1 1 ,/ / / / / I / / / / /-� -_ _--// , / / / , // __---� .......\ \ \ \\ 7 1 ---- \ \ / I I I / / / / \ \ N /' / / I I I I III 1 / / / / 1 / / / // - _ _ - - _ _ / / , /, ! / / / / i - - - ` -Q _ \ \ \ \ _ _ _ _ _ / \ / / / / / ' / / 1 / / / / / _ \ -_ - -- ' _ _ / / / / / / - - _ - _o - - _ \ \ \ \ \ \ \ \ N \ \ \ \ ` 1 / / / , 7 / // / / , / , I I I i 1 1 1 1 1 1 i / - ' / / / / / _ = = = _ _ \ \ \ / / / / / , / , - \ // /-260 / / / / // - '// \ `\\ \ \ - _ _ _ 1 / / / / / / 1 I \---- ��\� 1 I/'/ / / !' 1/ II''11 ,'__ AR-003 / \ I / , PERMANENT / / I I 1\ _ 1 / /O Gi I / ,\ _ •- \ \ \ \ / I I \ \ CONVEYANCE / WETLAND IMPACT TYPES \ / /, �- -- _ _, \ \ _ / \ I ///// / / // / / / / / / / _ - - - _ _ _ /// ' '/ I /' _ \\ \ \ \ \ \ \ \ \\ \ \ \ ` - - \ et I 1 // // // / ''AV• // / / / - \ \ \ \ 1TRANSITION �� - - - - / / // // // / / / / / / / ' I /_-_\_ - ^ \ \ \\ \ \ \ \ \ co I I I((f/( _-- / / / //// / ///----� \ \ \ \ \ / / _ _ / / ///250 . / / / \ \ \ _[/( / _ - _ / - \ \EXIST /J I / /O \ \\� a/''/ / / /� / // / / / / // ,ryry ��j`o , /I\NON-FORESTED / / \ \ I I/ r/ / / / / / �// I \ \ I OF FORESTED TO OR PERMANENT CROSSING(PERMANENT) CROSSINGIINATPLACEINENT (TEMPORARY) _� 180 ELECTRIC ' - - \ I , _ - - / / / / / /- _ / / - \ _ _ \ \ N \ ,� \ \ \ 270 �� - _ - - _ _ _ - / / / / / / - 244 _ _ - - / r -' TRANSMISSION EASEMENT - — 1 \ \ \ , \ \1 -- / /j / \ — �\ \ \ \ PROPOSED 12" STEEL GAS LINE \ \ \ 1I 1 \ 1 \ 1 1 I I I / ---_ I / / / / -_"_"_-"- 1 I l �__------- 0 \_ \ \ \ \ \ — — — \\ \ \ _ \ ' %' _ / \ _ , _ _ _ _ , , \ I \ I --- / - \ \ \ - - - - \�" -1 " l ) % _ _ _ - \ , -----�-� \� - _ \ \ \ �` - \ 1 \ I \N/ \ \ l , , / / l I - , 1 \ I l , / ,III l / • STREAMS4 \I \ N / /2 // / \\ _ c. -- / \ \ - \\\ \\ y� i I I I 6 i� '�\\ - - --- = - \ / / / / \ \ \ /- \ \ \ \ \ \ —� \ \ \ \/<\\ O\ \ \ \ \ 11 I / -� // I \ + ,� It ., 77 0 —j / � _� -_ _ / \ _ _ \ _—/ /�_ �O\ \ _ / / \ \--' _ \\\\ \\ \ \\`\ \\\ \\\\\\\`� / —""—\— —�— -z\— —"� —\:8+\— — — o— \ \ \ \+\ I o\ \ \ \I \ \ \ \ - - o� \ al \ \ \ \ / / / 0 I \ \ 1 \ \ \ \ \ 1 1 I 1 I I 1 la; I ` \ \ o \` 00 1 , \I \ \\\\ \ X ►_.4 I \� �\ SF - \ / / \ I — 1 -_' I / \ \ 1 \ ---1"-i__-_,_-- o - o \+ / " Ln �i \� \ \\ i / \ I � �. - —� - / \ x , �\ SF ---,--o o / \ \ \ Y\ - / o \ + N - / co \ \ \\\\\ \� \. \ I 1 / _, - \ \ \ T' \ \S - . \ \\ \ \ o� OO - D r O g O } \ / c _ \ \ \ \ . d \_� ��,-� N.\ \ �' / \\ CX TSC'.TB - J H �-- / F F \ \ _ \ X vim+ \���\ F� \\ \ \o / /; - ��� _ �\—� \JH\SB `- .- \s'� ^ 1 / � \\// �\ / /°° ?�O _SFO \ —SF SFO -- A. \_ t: �:.-...„...t.744 0,-1 �� \\ \ — — l \ \ — , — — � \\rt\ �� �\' � �\ L\�\\ \ °m° ii,__,.� / \ SF \ w1.�A��iI�I�. _ \ \ - SFO - F 1\ C!� , .:..,�.. - (1) \ ' - LSD \�\ \ �> /� _ _ - - _ SF �� S \ \Oe, ; TB = - ,_L \ yD L \ \ �° \ G �. _ %,,,l. � - F \ I \ LODE LOD °D$��—F I \ SF LOD — F_ \ \ \\\ TB \ TBA \/ o <_ / F \ — / LOD SF / \ L \ \ \ Cam\ \� _\ \ _ i \ =`,��� I ° �SF LODE LOD LOD\ L SF S \ / N ' — — — — 1 \ ���..\ OD L \ \ LOD SF — — \ \\\ \\\ \ \ \ \ \�O `� / ` Oi �/ �\ \ \�\ \ \ \ \� \ �\ \ \/ �' may= -/ _ -+� — — � SF S LODE LOD F \ L D , �� \\ _ \ \ \ \ / _ / _- _�_� - \\\ \ \ \ \ \ \ \\� ` \\ / i 1 \\ / �c — I i LOD SS SF — / % _ \ \ \ \\ i LWjF� LODE 10DL LODE L� OD �T \ LOD N / — \\ JHT� �i �' QB \ \\ ` ^� JH \ \pp \ \,\\\\`\\ _ ` _ _ \ \ \ \ \ / _ _ \ / / / _ _ / / I I 1 \ \\\\ \ \ \ \\ \ \ ` \ _�\ \ i / \ OOP—°:=_r�\\O�S�►9�► / / /'\\O�LOD'LODL\ LOD 7,....., LOD LOD — ��—� -- _ \, \ \ OA\ /-_LOD SF // // / \ // /J \ 1\\ \ OI. \\\`\ /' --/'// \ \ \ \ \ \\`X\ �,b \ \ \1�\\\\\\ \ \\\/ / /-__ \ \\/ \\\\\\\ \\\\\ \ �' 1 \ \ \ \ \\ \ \ �\ ; ` _- C�/��'•�r- G _ _ _ '� \ \ -- LOD LODLO r /\\ \/ /—/ I `, \ \\\ \\ O / ! _ moo/ ,� / \ \\\ �\ \ °\ \ \ \-- --- / I \ \� \\ \ DSO I / I / \\ \ —'/ \\\ _ \ - ' V _- iif\\ 1 \ \ \ \ ,; o= _ ti \ / / \ \, __ 220= y��� \ N // X■\ \\-- .� , / \ \ ! �-- \ /" // o- / \\�\\\�\ \ \%�� \� \ \ — •LOD�\LD \ \ \ \ , ) /-' �260 \ \ �\ \\\�\ ` \\\. \ \ N \ 1 ( - \\ \\ \ N ___=__-\\ --_-_'__--� \ ` \\ \ \- --___ --CX--� \ \\\\ �y\ _---_-I , _- \\ \• ° / / \\ \ \ \ \ / / I I / / // /' / /- -__ / 1 \\ \ \\ \\ \ \ ram\ \ \ \ \ \ \ \ \ \ \ _- -__ \ \` _-' i i-\\` \ \ �� 1 / / I \ \\ /' / ' ' $6/� - \ N \ \\ \ \ \ / / // / / /''/ i� 250 ---- 11 \ \ \\\\\\1 111 1 \ 1 11 1 \I \ \\\\ \ ? 4. N \ \ \ _ \ \ \ 1 1 I / ' I / / I ` \ / /' / / I I�Oh°" \ \ \\ \I \ 1 ( I � \ \ 7 V /' \ \ \ \ \ 1�°I° / / / I Il / / /' - I / / / / / \ \ \ \ \ / / / / / / % ' l l l l ' �' /' / 1 / , ,/ / I I l I I \ \ \ \ \ / , / // / / / / / / / \ / — STREAM (S3)I OPEN CUT FOR GAS LINE, TEMPORARY STREAM CROSSING/MAT 1 \ \ \\ 1 \ \ \ \ \ N N \ r , / ) 1 1 1 \ \\\ \\1 I 1 1 I \ I \\ \ \ \ \ Sto \ \ \ \ , \ / l / / // \ \ \ \� I 1 / / / //��� 1 1 \\ \ \ \ \ \ \ \--- / I I \\ \ I 1 \ \ \ \ \ ?� \ \ \ \ \ \ / / / / / / // // // \\\\\ / _ _ \ �---� \ N \ / \ \ \ \ / �' -_ \ \ \ \ \ \ - _ \ \ \ \ / 1 \ 1 I I _ ��\� \\ \ - 1 I 1 I II \ \ \ - 1 / �// - _ _ - \\\ \ \ 1 / / I I \ / / I I / \ / / I , I \ \ I 1 / / / // / \ \ \ \ \ I I I / / / ' , // / // / 1 I\ \ \ I \ \ 1 /' / // / / / _ _ \/ o, / / / _ \ I \ \ \ 1 I / / / O , / / / / \ - I / \ \\ \ PLACEMENT, POTENTIAL BLASTING, DEWATERING STRUCTURE -- 1 \ \ \ o N \ \ // I \ \ \ \ \// �/ / // // // / I \\ \ \ \\ \ \\ \ \ \\ \ 7 / / / / ' - _ _ \ \ a \ \\ \ \ \ N N \ _ / / // / // // / \\ \\\ \ \ \ \ / - _ _ - 1 \ \ \\\ O \ \ \ \ \ \ / / / /// /, / // /� ' , /,/' ',// — \ \ \ \ 2 \ / \\ \\ __—_30 I \ \ 1 I II ' / i �/ \ \ \ \ \ \ \ / / / / / ' \ \ \\ \ - - \ \ \/ / / / / _ \ \ \ \ \ \ I I / / \\ \ \ _ _ _ _ \ 1 — — \ \ 1 1 1 1 ,7 / / �\ \\\\\\\ I / / i. \ 1 / / I / / / / , o / \ \ \ \ \ — — \ - - \ \ \ \ , , / \ \\ I / �\\\ \ \ �_ _- / / / \ I 1 , III / / /, / — _ \ \ \\ ,� \__ -, �_ \ \ \ \ / / / / \ \ \ \ — \ 1 \ \ 1 \ \ \ \ \ �232-- NOTES: /,// / \ __ / 1 \ \ _ \ \ N - / 1 I \ \ I 1 \\\ , / I I 1 I l / / / - - _ _ _ \ \ \ \ < I / ` - - - _ �\ \ \ \ - _ / ) )\ \ \ \ \ -� \ \ /11\1 \\\ l l \\_ 1. SEE LINE 142 CLEARING REQUIREMENTS ON SHEET 79./j'�' _ / 1 I \\ \\ \ \ \ \ / —220- \\ \\ \\ \T -- -� 1 I 11 \ ,' % l l l l / /'///'/ // l ----_= �� \ \\\\\\\\\\ r-� —_23 _- �I/ \\\ /., j�/ / / \\ \ \ \ \ O PROPOSED ACCESS ROAD / \\ \ \ \ \ - / \ _ - / , / �/ -� / / / / / AR-002 l /7 j , -- -\\\ \ \ \ \ \ \ \\� __ \ \ \ \ -// / ( \ \\ \� \ \ ////// // / / / OO O— \ \ \ \ \N N \ \ \\ \ \\ -_ \ \ \ \ \ \\ / ° / / / / / / / / \ \ \\ \\ �\ -- / 1 \1\\\N \ �\ -\ \ \ \ \ ( 1 \ \ \ _ \ \ 2.1 \ \\ \ _ \ \ \ \ �_ 1 \ \ _�\ \ \ \ / / •..... // / \�---—\\\\\\ \ ....... \ _ // / / \ \ �•• \ \�,---� \ \\ V _ . -�\ \ \ / p a I / / / \\\ \ \ \ -240 \ss. //,�� \ \ - \ \ \ 1 1 / / / \\ \ \ \ _ / /� N \ \ \ \ ,___ / // I / / / / I I \ \ \ \ N __ \ \ \ / / 1 �, /,'%;�' // o ° J-- _,/ / / /// , / / / / // // �/ ///, r / I I III \ \ \ \\ \ \ \\ \,,\ _ \ \ \\ \ \ \� \\ \ \ \ \ \\ \� //I� //,'//;�/!�%_�\\\\\\\\`\ / �,// /,//// _ / // 1 )1 11\\ \\\ \\ �\// // /� /// ,�/� / / / / / / / I , , \ \ \ \ \ `\`\ `\ \ \ `\ / /;/ va,/ / / / �/// j/ ,' / C. ,/ ///// 1 \—' I I 1 \ \ \\\ \ \ 2s 1 \ \ \ \\ \ \ / // / / / / / / / / / I \ \ \ \ \ \ o, \ \ \ \ \ \ \ / /i, ' \// // / / / \ \ 1 \ \ \ \ \ \ I 1 1 \ I / / / /, / o, �j 7 7/// / / // / / / // / / / / \\�7/ , I I \ \ \ \ \ \ \\ \\ \ 1 I \ \ \ \\ 1 I ) 1 I I I / - //,/�j/�/ ,/ / / /' , / , / / / I _ / / , / / / / I I \ \ \ \ \\ \ \ \ \ , I 1 \ \ \ \ 1\ I II I I / I 1 \ \\� / //, // , / / �_ / /l _/ / // / // / ,/ // / / / \ 1 I II i // / \ \ I ) / / / / 1 1 1 \ \ \ \ \ 1 \1 IIIIII / / / //�/// /1/ / �/ / . W.4 / / (' ( 1 1 I\\----,�/ ,' / / //' /' / I \ \ \ \ \ \ \ \ \ I I I I / l 1 I 1 I/ I I / / I / ��'////l/ /111 / / ,-� ZN / \ /I\ \ /— \ , /, _ \ \ `--- / , / 1 I I / / / / l 1 / l _ __� / /// I I 1 \` / ,/ / / / 1 \ \ \ \ \ \ I I / / / ////// // / / / / I I / — �\ \ \1 \ ; _ �;� \\�\ \\ C I ► ► 1 \ _/ \ \ \\� 1 1 1 I I I \ \ \\\\ \\ \\\ \ \ \ \ 1 /—\\ \ 1 I I 1I \ \ \ \\ \ \\1 1 / �-, \ I \\ _ -\ \ \ 1 \ \ 1 \ 1 I 1 \ \ ��__ 1 , \ \\ \ \ \ \ I I \ \ \ \ \ \ N \ 1 I 1 I 1 1\ \\\\ 1 I �`1 \ \ \\ \\\ \ --_- \ 1 1 1 I I I\\\ \IIIIII I I \ \\ \ \\ ��--- I II I1111 III I \ -�� \� - 1 I 1 1 1 I 1 \\ \ \\ - _ - - \ 1 1 I 1 I I 1 1 11111I 1 1 \ \ \\�_-__\ \\ - _ 1 1 I \ I I I 11111 III ► \ \ -_\ \\ . 1 I 1 I / / I I II I \ N _-----� ,�-' ---7 7%// / J� \ \ -- - -- ,- / / / / / \ \ \ \ 1 \ I I / / / / , / / / // / / --- �// , I I / / / / / / / 7/�/ i-Q N — / / / ) I / /'//� /i/ / / //i//// / / / I \ — \ \,-- I I I 11 - I I I / / I 1 1 \ \ \ _ l l / I I 1 1 \ I \ N \ �- _ — — / / / , / / 1 I I / / \ / // / ///// 1 II\�\\ \ _-- — — __/) Q N \\ \\ `` -- — /' / /� I / / //— /, / / / I _ -- / / \ \ \\ \\ \ \\ ----- \` 1 ,' / / /' / ,- / / / / \ N \ \ / / / I / 1 I /I 1 1 I I 1 / 1 1 I I i ,l , /'/� /// �� / (/777/// / '' / / _ I I /////, / / /// / / / / / ( \ ,/ / // / I \ --- I I / / // i / / ///// I l / l //// ''/ / -' -/ //// / / \ \ \`____/ / /I / / // y /// // I / / / // / / • /i/// / � l / (\'�'/ // , i '// /'�' / / / / 1 /// / I \\ \\ I\\\//// \---___ // //I \\_\ / // / I I I I \ \\ \\\ \ \ /------- — --__ // I \ \� \ \ / I \\ \ \\ 1\ \ \ _ \ / 1 \ \ \) 11 I \ 1 I ) l / / \ 1 / //� / i ; �'/i i i%/� �l \ \ \ \\ \, \�� =�.o�ss/o!�'- •°4z °••� �_ ° � ` A- %05�09/22°�, - tiG 1 NEti°..'N '',, ./ ° ° ... ° *(-;'; '.• .,,, ,, ITH �,..� �,,,,,„ ,,0 PROFESSIONAL ENG/ARCH STAMP PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING *USE DIMENSIONS ONLY * * REF. DWG(S) PNG-G-142-0001000 PIFnMONT s NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) DRAWING IS CUf'RENT ONLY THROUGH THE LATEST REVISED DATE TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS SHEET(S)59 OF 119 DWG SCALE AS SHOWN 0 05/09/2022 ISSUE FOR CONSTRUCTION JB TFG WKG AREA CODE 1853 DATE NITIALS REGIONAL LINE 142 PIPELINE DWG DATE09/1712021 SUPERSEDED ACCOUNT NUMBER 10700 ENGINEER PNG DRAWING —C-142-0001058 NUMBER REVISION 0 PROJECT NUMBER 0232195 DATE INITIALS MGR TECH E rap Piedmont Natural Gas E&SC PLAN-4 DRAWING BY JB REC &STDle ENERGY CLAYTON NORTH CAROLI NA STATION IDPRINCIPAL DATE INITIALS DISCIPLINE / RESOURCE CENTER / LINE NUMBER CHECKER INITIALS TFG 05/09/2022 WKG ENGINEER COPYRIGHT 2018 Resource Center GOLDSBORO, NC LEGEND ` / \ �// \\ \\ \ i \ / / \ \ \ ( \ \ / / \ \ _ / / \ \ \ \ \ N \ \ ^ \ \\ \ \ \ \ \\ � / / \\ 1 �\ \ \ \ \ - / 6�0 _ \ \ \ \ \ \ \ \ 1 •. \ \ \ N N \ \ \ \ - / , / I 1 \ \ I \ \ \ / / ^\ \ \ \ N I \ \ N \ \ - _ / \ \ \ N N \ \ \ \ \ 1 \` N �� / \ \ \ \ , / \ \ \ \ \ - / \ O / / ,' / ((' / l I 1 I // I d \ / 1 1 I /' / / /' // // / / / / // I 1 \\ \ - \ \ \� \ / \ / / / / I I 11 I I 1 \ 1 l �_,/ / // / / / II 1 I \ / / / , I I I \ \ \ \ \ 1 \ \ /' / / / / / / / / / // I 1 \ \ \\ /\ \ �� — \ _ —/ / 7' / 1 1 \ " / / / / rf - / / y� \\ / / / / /I J I / \ \ \ \ \ \ \ \ / 7/ / / ' / / / l I I \ \ \ - - _ _ _ - / / I / / / / / / / \ \ \ \ \ \\ -' / /' O / / , / / I ( I \\ \ \ \/-- "' / 7 / -_ ry� , / / / I \ / / / / / / / \ \ \ \ \ \ \ \ \ / / / ,..-- I I 1 \ \ \ \ \ \ \ /'\/ �\ \ \ 1 /' 11 \ \\ / '/ / / / \\ \ \' \ \ \ N- ' , / / / ' / I 1 \ \ \ \ \ \? \ \ .% \ \ \ \ \ \ N. _ 1 1 \ \ FOR CONTINUATION SEE SHEET PNG-C-142-0001074 , \ \\ \ N / / / � \ \ \\ — — -' �./" \ \ \ N x \ — — —___---- \ \ , -� \ \ \ / / " " \ \ �! - \ G \ \ N N - _ \ \ \ \ \ 1 1 I \ `\ \ \ `\ \ \ \ / / \nt C`I \ \ \ / .% \ \ \ N \ N - - - \ /N� N \ \ \ \ 1 \ ( N \ \ N \ \ \ \ , / / \ \ I \ /,.% \ \ \ N \ Y %� \ \ \ \ N \ \ \ \ _ _ / \ \ I 4Q /, \ \\ ,- \ \\ \ \ \ \\ \ \N \ \ — \ .— \ \ \ \ N \ - \\ \ \ \ \ \ \\ \ \ \ \ \ \ \ \ \ \ \ / / \ / / / / - - \ \ \ _ _ _ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ _ / ' _ \ / / ,/ 'G..�' / �. - \ \ N \ \ \ \ /-�/ \ \ \ \ \ \ \ \ \ \ \ \ \ --- / / ' ' \ \ \ /' \ \ \ \ \ \ \ \ \ \ \ \ ` \ \ \ \ \ \ \ \ \ \\ - -�' / / / N \ \ \ _ -'` - _ \ \ \. \ \ \ \ \ \ \ 1 I \ \ / \ \ 100 \ \ \ 1 \ \ \ 1 I I / \ \ '7:_. ___ _ ( \ \ \\ \ /-. I \ \ \\ _. 1 _ 1 \ /, 1 \,/ / \ -- -- \ 1 \ \ ���\ \ \ \ \ \ \ \ \ \ N \ N \ \ \ \\ \ \ \ \ \ \ G�Ai�k-ILC S6E (17J FEE \ \ \ \ 0 50 1 I 2� \ \ CODE TCE TEMPORARY CONSTRUCTION ENTRANCE �����1 CD LOD CHECK DAM O LIMITS OF DISTURBANCE - LOD - SF SILT FENCE SFJ SFO SILT FENCE JHOOK SILT FENCE OUTLET O CS CSIP SFB TSC TWC COMPOST SOCK COMPOSTSOCKINLETPROTECTION / SEDIMENT FILTER BAG SFB TEMPORARY STREAM CROSSING TEMPORARY WETLAND CROSSING SB OSF TB TTP CX PS SLOPE BREAKER ORANGE SAFETY FENCE - OSF - TRENCH BREAKER ® TEMPORARY TRENCH PLUG 0 CURLEXPLCEMENT /, PERMANENT SEEDING PS \ \ \ \ 1 / / \ - N \ NN -/ / \ N- - / I / / / / I \ \ \ \ \--- J 1 I I Gr -f 240 - \ \ /' \ I \ \ I \ N N \ y� \ \ / \ \ \ - \ N \ \ \ \- / / / / / / / / / / / / \ \ -- _ \ \tl \ I \ / / / / / / \1 (5� f I / / \ '� \ \ \ finch=100ft. N —\ _- !!AA``!F`G /�! I '�- \ \ \ \ \ \ \ Q / / - - \ \ I /-' \ \ \ \ \ \ N \ \ \ CTWO PT CWD swc CONCRETE TRUCK WASHOUT PORTABLE TOILET TEPAPORARYIMPACT THROUGH WETLAND PERMANENT IMPACT THROUGH WETLAND EXISTING STREAM THRPEROANENMIMP CT THROUGH STREAM CLEAN WATER DIVERSION — TEMPORARYSTORMWATER \ ❑ PT j/, �/ CWD - / PROVIDE \ \ \///// 1 \//// \I-- \ 1 1 1 _ / / / / , / \ I I ( \ 1 \ \ 1 I / / - / // / I I I 1 \ \ Q •� 1 \ \ Q / / / / / I I l N O 1 \ \ \ \ n-pt / / / / / I \ \ \ �/ 1 \ \ \ \ / V / / / / / / /// / I I I I \ \ \ 1 Q \ \ \ \ / / / / _ 1 I I \ \ O \ \ / / / / / / // \ I \ _ _ NOTE: \ \ y 1 \ \ \ \ \ / / / / / / 1 ACCESS FOR \ \ 1 ` \ \ / / / /' / // / I 1 I \ \ \/ \ \ \ / / / \ \ DOMINION ENERGY \ .. 1 \ \/ \ \ \. / EASEMENTI \\ \ ` \ \\ \\ \ PROPOSED ACCESS ROAD - — ' �/ / /, 11\ \ y \ AR-003 - - J / / / '1 1 \ \\ 1\ —/p 1 (PERMANENT) _ /\-_ I\ \ \ //\ 1 -/\1�I'\\\\\\ - \ \ \ \ N \ \ \ \ \ \ \ \ ` - / / , f / ' / / / / - -� \ 236- \ \ \ _of \ - - / - \ / ' \ \ \ N \ \ \ - — — _ \ \ \ \ \ \\ \ \ \ \ / \ \ \ ,-� \ \ \ \ / �- 7 \ \ N,-- \ \ \ \ \ \ \ \ \ \ \ \ \ \ N N \ \ \ \ \ \ \ / \ i\ \ \ \ N \ \ \ \ \ \ \ \ _ _ / /,-/ _ / 7 / _ _ \ \ \ /\-/ \ \ \ \ \ \ \ \ \ \ \ - _ _ \ N\ \ \ \ \ \ \ \ \ \ \ \ / \ / / \ \ \ \ \ \ \ --- \ \ \ \ \ \ \\\ \\ \ _ / / ,/ / / / / ' -� \ / \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ ` \ N \ \ \ \ \ \ \ \ \ \ - ./' \ _ _ " �' \ N \ \ \ _ _ _ _ \ / \ / �- \ \ \ \ \ \ x\ \ \ \ \ — \ \ \ \ N \ \ \ \\ \\ \ \ /� .a/ �/— �� �3p\ N \ \ \ \ N \\ \\ I \ \ \ \ �� \\ \N \\ \ \ \ \ \ \ \\ \ \ - " O / ,./' \ \ \ \ \ \ \ / \ \ \ \ \ \ \ \ \ \ \\ \ \ \ / \\ \ " / / / o \ ` \ \ \ \ \ \ \ N N \ - _' \ \ \ \ \ \ \ — ` \ \ \ \ \ \ \ \ \ \ \ \\ \\\\\\ \\ / /-.�"'___7-- - / \ \ \ - - N \ \ \ \ \ \ \ \ \ / // EXIST 180 ELECTRIC \rRANSITIONOFFORESTEDro /-//- TRANSMISSIONEASEMENT \ - \ \ \ \ \ \ \ \ \ \ \ \ \ \, -,/" //// \ i\CROSSING(PERMANENT) / \ -� \ \ ' - / \ / \ \ \ \ \ \ \ CONVEYANCE / wETLANDIMPACT TYPES \ NON -FORESTED OR PERMANENT\// CROSSINGIINATPLACEINENT (TEMPORARY) // / \ 1 Q �/oor / '\ . \ \ \ / ff/// - _ / / I 1 I I \ _ ;/'=�^ / / 7 �Q \ \ \ / / / /• I I I \S� - /, /' NRCS NJ-4 \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ 1 \ \ ( \ \ \ // / \ \\ \�/// /�/ I //" _ \\ \ /\/\ -�s / /'// / ' 1 0 _ I I/ / / o) / - \1 I I \ PROPOSED 12" STEEL GAS LINE \ \ _ ) \ / ,/l I I //� /� 'moo //� //o' \� I I \\ \ \� —� \ \\ \\`— —'// _,� 1 \ \ \\ I l S/ / // I \/ ,/ --� ,' I� '\,\ ---; \\ \, — ,� \\ \ L / / —< -- \ `\ / / ////9/, \ / / o /�O /c-k _ — _ / I Ic l I -_----,o�� /fa / / �� / // I \0 I. \ `\ ___------------- / \ -__ �_ ------- / /' I I I0 I ` / F�°o� moo t° 7� / / \ / �O, o \\, -___--,------N \ _ — \ / /d / eV kf1 I 1 \ - ---- 00 SFO ,_ __ \ I / / \ M o -- \ N `� _____ \� — / / --N —SFO / i \ \ / o , / /`cel //r' 1 I \ \!—220- / / / I `�`__ ��� N \ _ ��\ \\ \\_,/ �0) Z a �,./ I \-/ \ \ \ \ \ / /'lam \\ = �\ ��'\\\ \ \\\ � \ k 'o� cal \`°o\ \ \ \\ — / / / N i -//j�°o `'°° \ S� /// - -�\ / // / / / // °off \\ /—_ \\ \\ \ Q' Q' \ \\ // / // / `o\G/ ,/,,,.. '\ �o \ \ __ o / N \ \ \ , `° �4.8 / \ \ / / / o / 1 \ tO S� / \ \ \ ^ 0 OYS _ \ \ \ \ \ \ \ \ �— / / / / / / ' N •�\ gF�!/j/ �p� •, N I S / / �./' \\ / '' o° \ \\ ..-A--(, �/ / // I / / / / ' // / STREAM (S5) (INTERMITTENT) OPEN CUT FOR GAS LINE, TEMPORARY STREAM CROSSING/MAT // 1 \ 1\ / /' / , / °�F�O�� t° \\ `O / / - M� \\ 7\\ o \ \ \ \ — —'' / / — - - _ _ - -,� •\ 1 / / / °� 4 y� \\ /- - - / \ \ \, / °off ``F \ \ \ / / \ \\ \ O �" s�-� O��/ / / / 1 I I / ' oo \ /// (/ 1 I / PLACEMENT, / / / / - - \ $F \\ ` \ \ , — o / \ / \ t° ��� /o \ \ o� \ oot-/ - \ \ // F\i\ / S o - _ / / O \ \ / \ I / \ I I I -c, POTENTIAL BLASTING, \ - / NOTES: /� / / - \ �� - \ \ ^ - _ / / — \ \ �� \ / \\d- / / /---- \ i` ,� � \\ SF \ \ \ - / I ` ' / ° \ I I I DEWATERING STRUCTURE 1. SEE LINE 142 CLEARING REQUIREMENTS ON SHEET 79. / \ \ ob / / \ ^\ _ / / — - _ _ / / _ \ �Fo_�,� \ /* / ' - _ _ / . \ I / _ 'jam. %/ I /\ \` / �� \��,\°-- / I I 1 1 1 \. / // / / //°\° -_ \\\\ \� � _ `°��\ \ �— ���, /' /—� //' �'—\ �� -- �^ -- ef.��'O� _ ' �-� �� \\` //-� "�\ \ I I 1 1 \\ \\ / / 1 l / / / h' -\- \ \ \ �� S-°e�to \\ _ / // // / o , �+' o, ° �L f -\ \N- \\\-�\ \ I \ 1 \ \ \ �\ \ // it \ ` \ /' / / / /� -_-� \\\ \ \�\� /// `°°.� F \ /' /°4 /— N / ii'� _��\��\\ \\ \ \ \ \ \�\\ �;\��\� \\�� -210� / / \ \ \ \\ / 7 /' / I \\ \ \ \ \\� �'��/' \ \\ _- °��� �'\ ///._-. o' /;_ \\\� \ , \�_\° \\ \� �,\\\ \ `\ /- \ \-"� \ \ \ \ / /- \ // - /:.- _ _— ii/— — \\\ \\\ \ \ \ � \ \\�c\ \ / \ �/ N \ \ / \ \ \ -- / \ 7 / _i �F --- '_— \ \\\\ \ 1 \ —\\, �\\\\\\\Z, / \\ /' / / \ \ / //'' \ \ \ \ \ 06�/' \ \ \ —/� —--'�'�� SFO`°° �'i� N. \ — — CX % \ -' N N -22/// �� / / \ N 'sr: • V.\ N \_ \\ -—\\ / / \N \ \ \\\ \ \ \ N _ _ N / 1 N / / /N \_ /// — — __\ \/ �-. 1 / N — _,`L / / / - \ N. \ \\ \ \ 1 \ \ o \ \/ \ \ 1 / / 7 -/ / / \ \-- \ \ -- \ I--- / / // / / — / / / / -- / ( 1 \- 1 / . ,\\ \\.. STREAM (S4) (PERENNIAL) OPEN CUT FOR GAS LINE, TEMPORARY STREAM CROSSING/MAT \ _— / i / \\\ _ \ \ \ \ / 1 / / \ \ / \ ' / I 94 \ — — " //'�/\ \ \ I / __ �� _ \ \ l \I / �� \ \ \\ I N / \ I I ,--'s \ �/ �/ / N --_ \ I \N \ — — / — ' ^ \\\ \ \ \\ \ I \ ` . / I \ / / �/ / \ I \_" �--\ 1 \ \ \ \ / 1 / / \- \ \ 1 l \-/ // / / / \ \ \ \ I I \ I \� --/ _ - - - - - - - - - - - PLACEMENT,\�\�\� POTENTIAL BLASTING, DEWATERING STRUCTURE \\\� \ \ ---. �'�� \ I 1 \ \ \ I / / ^� \ \ -\\ /,-- �J \ \ \\ \ ( \`-�/ / j/ / \\\ \ \ 1 1 11 V \ \� - - �/ �\ \ 11 1 I \ \ - \ \ l \ - / / /I / \ _ _ \ \ - \ \ 1 \ I► I I \I \\ �--/\\ \\\\\\ \\ / / , \\ N. \ \\ 1 //� _ / / \ N\ N\ \ I\ 49°, 7 /// //"� \\\ - \\ \\ \ \ I\ \/\ \ \ \ / -— \ \ \ \--'^ \ 111II — i9p \� \\ / / \ \ N \\ •230— — \ \ \ \ II I \ \ I /// -\ \- i \ \ / / o \ \ 7 -___ \ I 111\I \ �,_\ \ \ \ \\ \ / \\` \\__/'/ ;%/\\\-- \_ \-/ 7 /--\ \ \ / N \ \ /— —_/ \ / / _ \_ — __ _ \ 7 L -------/ \�r-\\-— I / -// ////'/ --- ) --— / \ ///, �_-�\ N / / �\ C/ -- -\ / /\ - \ J _---��_----\�\\1 1\ \\ \ \\ / /N 7 '" -----' i //�//////// /' /, \// \-_-,�---/----�,./ I` /\ 7/ /// 7//' / ---- \ N. \ \ \ \\ N. \\\\ \ / // / \ (_/ / / /// � / /%/�/ // �7" ____ -\ \\ \\ \\ \� -- -- /------ \ \ \ ,__— // // / / �- _, \ / / —\ \\ \ _ — _�; NN\ 1 \ \ I \ //// / / / —�/—�� \ N. —/ /— _ /// / / // /-- \ \ / i / 1 .7 7/ // // / / — — —— \ \ \ \---- --\\\ NNN \ 7 \ / --\ /2op� \ \\\\\\--___// / 7 —_ 7 ///l// // / / 1 / _ / / 7 / /' — _-- \\ \\ \\ \\ _ ---_� —\ \ \\\ // / / — \ --__ \ \ \ / \ / / / \ \\ \``— \\ \ \ \---- i' /' /' /"/ / / / / ( -�^1 -\ — ^_ / / / / / \ \ \ \� --__�\ \\\ 1\ \ \ ,,, ,0 N° ° C A R O. ''% ,°°Q� `9 °°� ; 1 .. �QS� 09/ 2 2°!ry ; ° 'LG I NEB°°°, N /,9 °° \, `,. ,''ii,MkEITH �`�, 'i",IIIIIII\t�\\ PROFESSIONAL ENG/ARCH STAMP PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY * * REF. DWG(S) PNG-G-142-0001000 PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS SHEET(S)60 OF 119 DWG SCALE AS SHOWN 0 05/09/2022 ISSUE FOR CONSTRUCTION JB TFG WKG AREA CODE 1853 DATE INITIALS REGIONAL LINE 142 PIPELINE DWG DATE0911712021 SUPERSEDED ACCOUNT NUMBER 10700 ENGINEER { F PNG DRAWING -C-142-0001059 NUMBER REVISION 0 PROJECT NUMBER 0232195 DATE INITIALS MGR TECH DUKE DUKE _ rail Piedmont Piedmont Natural E&SC PLAN-5 DRAWING BY JB REC &STD ENERGY CLAYTON NORTH CAROLI NA STATION IDPRINCIPAL DATE INITIALS DISCIPLINE / RESOURCE CENTER / LINE NUMBER CHECKER INITIALS TFG 05/09/2022 WKG ENGINEER COPYRIGHT 2018 Resource Center GOLDSBORO, NC LEGEND Z Q a / 7 7 / / / \ / / / , I / \ \ N \ \ j 1 I I \ / / / / / / / / _ \ \ \ - - / / / / - _ _. / / \ \ I / \ N N \ \ \ I I I I I \ - - / / / / , / // / \ \ \ \ \ \ Nk / g\P'it, / W Tr Z + NI + r • G 1'/_�' y \, y`\` OQQQ p \ ` Nek , OqNT_ ` C , \ I 1 \ 1 I ) I� I I I I / \ // \ \\ _ / \ IN Ij Yf awl CODE - / \� -- / // �� ) / \ \ 1 I I 1 I \ // p� ' /' / / �------- ( _ \\ 1 / / / / \ _ - ...- _ - _ - / / / / / / / ' \ \ / / / ' \ \ \ 1 I I I \ \ — — — — / Vr ' S / r 1 / / / / \ \ / \ \ 1 1\ I I ` y / O N,� O TCE TEMPORARY CONSTRUCTION ENTRANCE ='='% CD LOD CHECK DAM Q LIMITS OF DISTURBANCE - LOD - / / / ' , / _ _ / / / /' / I / OI I I I / N\ \ \ 1 ( I 1 \ 7 / \ l \ �(/ _ - ' / - \ 1 I I \ \ \ \ 1 1 \ \ / - - - - / / I \ N / Ili _ - - - - 1 / / / ' \ I \ \ \ \ / i - - / / / \ l I \ I / / 1 /.1 / l l SF SILT FENCE SFJ SFO SILT FENCE JHOOK SILT FENCE OUTLET O - - -_ _ _ / �_ / / \ I I \ \ \ / — I /\ \ \ \ \ \ -__ - 7SFO �- / / \�j, / / / \ I I I \ \ \ \ \ \ \ \ - \ _ \ - _ / / / / / / 1 I \ \ / / / 1 \ N / / / �_' - / \ \ I I I /\ \ \ \ \ \ \ \ \ \ \ \ / ' / - 214 / 1 / / --. N \ \ \ _ - _ 1 1 I / / \ \\\ \ \ \ \ \ \ \ \ /' 1 / / - \ I 1 \ \ ' / / / / / / tak / / > I \C\ 10 CS CSIP SFB TSC TWC COMPOST SOCK �y� COMPOST SOCK INLET PROTECTION / ! SEDIMENT FILTER BAG SFB TEMPORARY STREAM CROSSING TEMPORARY WETLAND CROSSING 1 \ / \ \N \ \ _ / - / \\\----_ - / \- -/ \ / / / \ \� \--� / 1 \ \ \ \\ \ \\ _- / 1 N / / \ \ \ 1 - - - _ - - - _ \ \ / 1 1 I I \ \ \ \ \ \ _ - - - - \ N \ / / / / / ' - \ _ / / - - - - \ \ -t \ 1 ` \ \ \ _I \ \\ \ - _ _ \ \ N N \ - - i / / / \ / / \ \\\\\ - \ \ _ / \ / - - - \ / - \ _ _ _ \ \ \ \ \ \ \ \ \ \\\ \ \ _ \ \ \ \ N N _ / / / / / / \ N /' - -- \\\\\ \\\ N\\ \ �_ �_ - \\ \_-_ N \\\\\\ \\ \\_-/'' \\\ / \\_/ / / / / / / GRAPHIC SCALE (IN FEET) / 100 0 50 100 2 SB OSF TB TTP CX PS SLOPE BREAKER �� ORANGE SAFETY FENCE - OSF - TRENCH BREAKER I= TEMPORARY TRENCH PLUG 0 CURLEX PLACEMENT /, PERMANENT SEEDING PS /' //' \ _ // _ _ \ N \ \ \ / \ \ - / / - - _ _ _ _ - \ \ \ ' _ --� \�� \ \ \ \ \ \ \ \ \ / / \ \ \ / / _ -�� \ - _ _ / \ \ \ \ \ \ \ \ \ \ N \ \ \ \ \ \ \ \ N\ \ \ / / / / / / / _ - _ _ _ - - \\ \ \ \ \ \ \ \' ` \ \ \ \ \ \, \ N \ \ /' / // \ // \ \ \ \ \ \ 1 1 1 \ \ 1 \ \ \ \' \ \ \ \ \ \ \ \ \ \ \/ / / / / \ \ \ \ \ \ \ \ \ \ 1 I / / ) I 1 1 \ \ \ \ \ \ \ \ \ \ , \ \ \ \ \ \ \ \ , , �Q / / r \ \ / \ \ \ ` � � \ \ � \ / - - \ / / / / / I 1 1 \ \ \\ � \ \ \ N \ \ \ \ \ \ \ \ \ \ 1 � / // \ ` � \ \ - \ \ \ \ / / \ I \ \ \ \ \ \ \ C: \ \ \ - - ' ' I s O / / // / / ,/ 1 '\ \ \ \\ \ \ / ^ \ \ \ \ \ \ \ \ \ \ \ \ \ \ N \ N \ \ \ \ \ 11 / / \ \ \ \ \ \ N\ N \ \ \ N \ N 1 I / / / / / I \ \ \ \ \ \ \ \ \ \ \ N N \ N/ \ \ N\ N \ / / \ //' \ \ / \ \ \ \ / / // / / / / / \ \ \ \ \ \ \ l \ \ \ \ \ \ \ \ \ \ \ \ / N \ \ 1 \ / / / / 1 \ \ \ \ \ \ X. \ \ \ N\ \ �OS / J \ 1` / \ \ \ N \ -� \ \ \ \ 1 \\ / / / / / // / / // / // / / 1I \\ \ \\\ \ \\ , \ \ \ \\ \ \ \ \ NO \ \ \ \ \ \ ) I \ ) / / 0 , / /•/ / 1 \ \ \ \ \ \ \ N \ \ O \ \ I\ -1' / \ \ \ \ 1 1 inch = 100 ft. I 1 1 \ \\ \ \ \ �p 1) CTWO PT CWD SWC CONCRETE TRUCK WASHOUT PORTABLE TOILET TEMPORARY IMPACT THROUGH WETLAND WETLANENT IMPACT THROUGH D EXISTING STREAM THROUGH IMPACT PERMANENT IMPACT THROUGH STREAM CLEAN WATER DIVERSION —CWD TEMPORARYSTORMWATER \ j/i �/ - / CONVEYANCE / WETLAND IMPACT TYPES N / / N \ ' /) / // ,�Y , / \ \ \ \ \ \ \— % % / / /' / /' / // ' _ '_ \\ \ \\\ \ \ \\\ 8s\ \-0\ \ \\ \\ C O \ \ ✓ / / N \ \ \ \ / / / / / \ \\ APPROX. LIMITS OF / / / / / / / / / / / ' \ \ \ \ \ \ \ \ \ N \ \ \ / / / _ / / / p / / \ \, \ \ \ 7 \ \ \ \ \ \\ \\ \ \ CONSERVATION AREA / / / / I / / / / / / / \ \ \ \ ♦90 \ \ \ \ \\ \ N / / / / / / �' / / I \ \ N. \ \ \\ \ \\ \ / _ / / a \ \ \/ - \ \ \ /' /' / 1/ - _ , / / , / \\ 0 \ \\ \ \ \ \ N \ \ \ \ \ \ \ \ \\ \ / / /' / / 7 / /, / - / / ,/ // - \ \ \ \ \�^ \ 1 \ \ \ \\ \ \\ \I 7 / 7 / / / / / / - / / // \ \ \ \ \d,• \ \ \ \ \ \\� \ 7 7 / / �` N N \ \ N. \ \ \ \ \\ \N. / 7' �/' ♦i / // ' �^ / / / ' / I \ \ \\\\ \\ \\ \\\\\\\ // p / / / / 1 \ \\ \ \ \ -\ \ \ \ \ \\ / WETLAND W5B-A FORESTED OPEN CUT FOR GAS LINE, TEMPORARY WETLAND CROSSING / MAT PLACEMENT, POTENTIAL SHEET PILE, DEWATERING STRUCTURE. PERMANENT IMPACT DUE TO TRANSITION OF FORESTED TO NON -FORESTED WETLANDS // / \ \ \ \ \ \\ \ — / \ \ ^ — '\ I \ \ \ 1 \ \_// _/— — \ ) \ \ / \ ' \ \ \ \ \ I _ -_ \ 1 _ - \ I - I ° 1 -- T. / / \\ / TRANSITION OF FORESTED TO NON -FORESTED OR PERMANENT CROSSING (PERMANENT) cRosswennATPLACEMENr (TEMPORARY) / N \ \\\ 7' — / / / �/ .� �/ �� / / / / / o \ \ N N \ \ \ \ .\ \ \ \ \\\\ \\ _� / \ _—�/� — / \ \ / / / /' 7' / / 7 _ — — — / / NRCS NJ-5 I 1 N \ \ \ \ \ \ \ \ NRCS NJ-6\ _ - - - \ \ \ / / ___ \ // / / ' \1 / \\\\ \\\\7\\\\\\ \ \ (END HDD BORE/163->&1 \ / - \ \ \ _—_ __— \ Q. \ • PROPOSED 12" STEEL GAS LINE / 0 / co / // / / / o O O \ \ \ \ \ \ \ \ 7 \ /- / _------,\ ' \ 9 o \ \\ \ \ \\\\\� —__ �,__7 / / \ _ / \ \\ \\_ / // / / /' — _ o / // ,/ /o ,/ / o LOD o \ \ I \\ \,= 7— N N % M \ \ \ \ +\ \ \ \g'� \ \�\\ o c) / 6 ,-' ,----___ \\ \\ \ / / \ o + d- , moo, —oo uu, —o Ln �, \ 2 \ \ \ _ ea \ \ + - O / — — e O \\ + , , 0.), LO +oi , 42, awl / !! 2 , ---.. CD ,..? /CID \ � / / _ oo, / — oo, — oo, — oo, �rao, — oo, L O D — — — �:::: oo, oo, / / — oo, OOl OOYs .OT — — -/ I / / \�C—aoNi \ T00, 00, — /' / •Li— JTB O�l�00, �1J / LLJJ QO\ 00, OOl \ / = _ OOl ��OOl curl �- LOD LOD LODLOD D— LOD— 00, awl / T / / / / / . /-�- LOD — OD — LOD LO Welli Ol OOl O / / \- L TB �- / LOb� CLOD _ 1 al �, / L\ — LOD — LOD -/ ;', N / \ \ \- \ A —_ \� — LOD �,L T LOWS /il / 1q1 r /�/T� \ - \ / / — -L:: / /� r `oD,,or=roD� tt�_ LOD_SPOD� SF SF \ \ \\\ \\ \ ' • — — — _ _ / - — / / DD 1 LOD LO.� LOD L D \ \ \ \ \ ` / — — �/ L • - F I / ' r / LOD \ \ \ \ f \ �7�77�7A7 I S SF ,�a \ - \ \ \ L \ L '•-- �_ ' \ T \ LOD SF SFO _ D LOD LOD LOD — \ \ \ \ / F S F r /� / "►/) TSC I / / / // STREAM (S7) \ \\ \ \ \ J LOD LO �o / / ^ � T LOD LOD LOD pD 1� SF -LOD /,fir S F F LOD �.r \ SFO L L% LOD / iF / (PERENNIAL) \ \\\I�\- _\ \ / _ _ �\ N \ \ _ / \ \ \� \\ ,\ `�� SFO S O LOD SF LOD ��L-- —=0D LOSS / L LOD \ \ _ \ \ �\ \ \ \ \ \ \ \ \ \ \ \ \ \ 1 \ _ _ - \ \ \ \ \ x LOD C �/ I\\ / \ \ / ' N // / / \ / SFO / \ I/ / / , / HDD BORE 150+06 HDD BORE, TEMPORARY \ \ \ \ \ \ \ \ / / l (- / �O / / / SFO `BEGIN / / / v - \ / /� / / / / / I I I $ I \ / STREAM CROSSING. \ \ \\� \ \ \ \ \\ \ ` \ \ \ PROPOSED HDD 2 / / / / I / / / - \ \ / / / / / / l 19 / \ \ \ \ \ \ \ \ \ SEE NOTE1. / / / / �' \ // \ —/ / / ��— —/ \ \ ` \ _ / / I \ \ T \ \ \ \ \ \ N SEE LINE 142 CLEARING _ / /� /___ / / / __ - / \ 90 \ \ \ \ \ \ N \ REQUIREMENTS ON / / / j ///��% - - — — '/' / \ \ \ \ \ i / 7 - /' \ \ \ \ N \ o \\ N N \ / / / \ \ p \ \ \ \ pAn / / // / / / / - - - / \ \ \ \ /' , \ \ \ \ \ \ \ \ \ \ - I �7_�/� — \ \ \I \,_ / / \ \ APPROX. LIMITS v \ \ \ \ \ \\ \ WETLAND W5B-B FORESTED OPEN CUT FOR TEMPORARY GAS LINE, WETLAND CROSSING / / ' — — — N / \ ' / / \ N \ \ ' / _ _/--� ___� ' \ ) \I \ \ \ / \ CONSERVATION AREA \\ \ \ \ / MAT PLACEMENT, \ - \ \ \\ _ _ - - -� \ \ N \ STREAM(S6)(INTERMITTENT)/ _ _ / /I / /' / N / ,,�90 / \ N / l ) / I / - _ J ♦6,\ \ l / / / e� POTENTIAL SHEET DEWATERING PILE, STRUCTURE. / - - - - \ \o \ \ \ - \ \ \ TEMPORARY STREAM CROSSING/MAT PLACEMENT �/ / / , - _ _ \ \ _ - _ - - - / / - - / / /l / / / / _ •. —\ \ \ - - _ - — — _ 7- - / - / / \ \� \ // /// TEMPORARY OF FORESTED IMPACT DUE TO TRANSITION TO NON -FORESTED - \ -_ \ y \ , /' / .— / / 17 \ 1 - / m / WETLANDS. N _ - - — / _ / / / ' �''///''----- \ N. /\\ 1 - \\ \ \\ \N l l 1 _ -� \ \� \ -- --' —// /—\\ ��/�—___ --/' / / /---T \1 /' _' ° �\ _—_'_\ --/ /�// I I �`-- \ \ —_ // _�\ ---' — __ /�.— --_ 1�// — -- \ \ — \ \ \ / `\ _,-� _ -' /-- _ �__ __ / / ,' -_ \_ \ \ \ /--- - ----- __ ,__//// �/ / \ 1 -- — -- \\ \ /— —,�/ - / 1 \ -\ \`—\ \ -- ___- - - \� __— — _ -� \\ �'/i/'�- \\\\ \ \ \ \ \ \ -- _-- \ \ \ \ / 'l6 - /- NOTES: �\ \ \, - / \ -_ \ — — %' ' \ \ \ — / 7 7 / /''/ \ \ \ \ \ / — \\ 1. SEE LINE 142 CLEARING REQUIREMENTS ON SHEET 79. \ — — — �' — \� — — \ — — \ �_ — \ _ ' \\\--�'/'�� ' \ — \---_— /—�-- \\\ / 7 /'— / \ / // 7' / ///' i'%---- \\\N\ — ��1ao� — \ \ ` 1 \ \ \\\\\ / / N /—/ /� \\ / / /--Z 4. \ --- 7 \ \ \ \\\ \ \ \ \ \ \ / \—7/ \--. 7 _ 7/7 /,7 7 //77 7/7 =—__ \\\\\ N ' �� -----7_ \\\\ d \ \ \ / / / / \ \ �� _--�;-- _\\\ \ \\\ - \\ \\ •\ 7 i / / _ lw /— \ \ \ \ \ \ \ \ \ \ �-- \ / / / // / / / / // \ \\ \ \` J/ —/ — _ / / / N \\ // / / / Q \ \ \ \ \\\ \ \ —_---_ \ \_ / / --- ///// / / // / / \\\ \\ \ \\ _-- ------ N \ \ —� / 7�� / // // / / / / \\\ \ \ \\\ — — — — \ \N —, _ \ \ \ \ \ \ / / ' ' I �\�\ \\\\\ / / \ \ / I 1 / / / / -_ \ / /�� _—______ _ I 1 I 1 I II I I / \ 1 I /11 1 / / / \ I ' \\\-- / I \ / I \ \ I \ �— -_ \ \-190�\\ \ / / III I \\ �_ _ _ ___—\ \ \ \— -- \\\\\ �/' 7� /� // /// /// / / / // I I _ --\-/:00\\ \ \ / / ��_ -� / / / / ////// / / l I \ \ -- _-'- 1 --- \\ ? -_ \\\\ \\ \ / // ' - \ / / / / / / / \ I / \ \ I I I l l / / —� / / / / / / / / I I / I / / — — _— — — 210 \\ \ 1 1 1111 III / ////�///� \�� \\ ) I / /I // / / / // �// ,//// — — _ —-- \ II I // / / I l I —_— I IIIIIIII I ///.////�ii—\� .�: `, 1 I I I I I / / / / / ,/ / \ \\ 1 \ \\\\�\ �\ __— 1 - / \�_ — •/ / / / / - \� _�� \��—� —_� 210 — — �,_ / / ___ \\ ----- / / / i / �� \ \ \\\�\ \ \ — / //// _� // / / // _ \\\\\_ \ \ \ - —_� / _ �_ \\ \ \\\\ \ \ / ,/ / ./,/i/l i /��— —-- \�����\\\��\\\\ —' /' - -�\\ \ -_- ---/ � /,'/ /� \ \ �� _ / // // _ \ \ \ \ \\\ \\ �'��� / / / / \ \\ \ \ \ \ \\ \ ��\ \ \ \ / \ \ �_,�, \ / \ \ \ \ \ / \ \—J_ N N / �\ \ \ \\ \ \ '....---N N N \\ '/ /' \� \\ \ \\\,— �"""I""'/11 ..• �� N CA R o/%,, o, o�-ss/o••!2\ - ft • 7 "_ Ip ,t- /1/G 2° ' tiG I NEB.° ' '%,��-9 >.. , , . • °,\p�'`,,� C�" ., kE I TH `�,\� PROFESSIONAL ENG/ARCH STAMP PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING *USE DIMENSIONS ONLY * * REF. DWG(S) PNG-G-142-0001000 PIFnMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS SHEET(S)61 OF 119 DWG SCALE AS SHOWN 0 05/09/2022 ISSUE FOR CONSTRUCTION JB TFG WKG AREA CODE 1853 DATE INITIALS REGIONAL LINE 142 PIPELINE DWG DATE09/17/2021 SUPERSEDED _ ACCOUNT NUMBER 10700 ENGINEER PNG DRAWING -C-142-0001060 NUMBER REVISION 0 PROJECT NUMBER 0232195 DATE NITIALS MGR TECH DUKE DUKE rap F� PICCIrIiCrlt Natural ,aS E&SC PLAN-6 DRAWING BY JB REC&STDCLAYTON, ENERGY, NORTH CAROLINA STATION ID DATE INITIALS PRINCIPAL DISCIPLINE / RESOURCE CENTER / LINE NUMBER CHECKER INITIALS TFG 05/09/2022 WKG ENGINEER COPYRIGHT 2018 Resource Center GOLDSBORO, NC LEGEND z ' \ / O O / 1 I C I - N \ \ -� / / I _ N N -\ \ �\ \ \ / / / 1 / / / \ \ \ \ MATCHLINE - SEE INSET / _ - - \ \ \ \ / / / / / \ \ / / THIS SHEET J / / / \ \ \ \ \ \ \ \ / I / / / / / \ \ \ \\ N. N / I / / \ fI 1 / `_- •• / I \-_- \ \ \ \ \ \ \ \\ \ ?•• / \ 0 1 I \ \ \ \ \ \ \ \ \ \ _ _ o \ \ I / — - /' ` / \ N I I \ 1 \ \ \ \ \\ \\ \ I I \ \ \ / / ��►��► I -� / / \ \ I 1 I \ \ \ \ \ \ _/ I C4► 1 I / / \ \ 1 I \ \ \ \ I I CODE TCE TEMPORARY CONSTRUCTION ENTRANCE ��� ��� CD LOD CHECK DAM LIMITS OF DISTURBANCE - LOD - ,yrn_ ``� I 3�` 'C I I \C\ / I I Q _\ �p l / O ( / \ \ N / I / \ / ���i I / — —-' // \ 1 \ I I , / / .-- \ \ \ \ \ \ \ \ / / ` / V:: / \ / / / \ \ \ / / / I I I / / / N NN \ N \ \ \ \ \ / /( `T_ — — _ _ — _ ? i / , / ' / / / \ \ \ _ / / / �� / / l l I / / / 7 / — \ \ \ \ / N \ / \ / — — _ — _ _ / \ -� / / / / / / \ — — / / / / , / / I I/ / \ N�\ \ \ \ \ / / \ — — / / / / / \ / / / / / / �OCSIP / / SF SILT FENCE SFJ SFO SILT FENCE JHOOK SILT FENCE OUTLET O CS SFB TSC TWC COMPOST SOCK /� COMPOST SOCK INLET PROTECTION / tt SEDIMENT FILTER BAG SFB TEMPORARY STREAM CROSSING TEMPORARY WETLAND CROSSING \ / `(06 \ _ / — — / / / / \ \ ` \ \ \ \ \ / / / \ / / — — _ — — — _ ( / / / PROPOSED ACCESS ROAD / / / / / \ 1 \ N \ N N / // / / / / - - \ \ / / / \ \ \ - - / (PERMANENT)/ / /// \\ \\ \\ \N — - \ - \ \ / I /•/ / \ \ \ / ' ^ \ \ \ \ \ J N /-\ / / / //^�\ \ � \ \\ \ \ - --�-� — _ =� / \ N \ / / / / / \ N \ N \ - / 1 \ \ / \\— / �_ Z — / / / / / \ \ N \ I I - J \ P. / / / / v �- — _ — _ / / / / / / /� �� — -� — / / / / / I \ / / - / / / / - / / / / — — / -- / /1 / / / / / 7 GRAPHIC SCALFIN F�E� — — / - — 286- SB OSF TB TTP CX PS SLOPE BREAKER �� ORANGE SAFETY FENCE - OSF - TRENCH BREAKER ® TEMPORARY TRENCH PLUG 0 i CURLEX PLACEMENT /, PERMANENT SEEDING PS \ p / p \ / \ _ i / / — \ I 1 / \ N\ \ / / ' _-- \ \ I I I I — — I \ ___ \\ \\ / I \ i / / — — — — N. \ \ \ I / I I N \ _ _ // / / \ \ \ 1 II / / -- \ \ \ _� / I \ \\ \ \ \ / / \ 7 // 1 \ \ \ I\ \ \ / / \ \ X — _ \ \ / / / / — \ N \ / N \ �/ \ / _ I \\ \ I /-- _ — \ finch =100 7 �— / \ /.-- \ _ _ — , \_ \� __ \\ \-� / I 1 ` \ / -\ ,/� / \ / /ft// /� -__,// \----- \ \ \ \ -IV \ — \ \ \ \ \ \ — — / / / / / / / / // / / - — / / / / .--- \ \ \ / \ / \ \ \ \ _ — //\ \ \ / — _ _ / / — / / - \ \ — \ \ \ \ / _ / / / / / / / / — / / \ \ i N `/ — _ _ — _ \ \ \ \ \ \ — — _ — — / i / / N I f II / / / / / / / — — / / / / , --- — \ — _ \ \ \ \ — \ \ \ \ \ \ \ — — 1 I I1 / / / / / / / / / CTWO PT CWD SWC CONCRETE TRUCK WASHOUT PORTABLE TOILET THROUGH THROUGH WETLAND PERMANENT IMPACT THROUGH WETLANDEXISTIN WETLAGsrREAae THROUGH IMPACT STREAMPERkIANENTIMPACTTHROUGH CLEAN WATER DIVERSION — TEMPORARYSTORMWATER \, ❑ PT //i �/\\ CWD —\ \ 4' O O I \ \ \ \ /NOTES: O \ \ \ \ _ _ _ _\ \ \ _ — — _ — _ _ \ \ / / _ — — -- _ _ — — — I - - \ \ �'80 -- \ \ \ \ \ \ \ \ \ \ \ / — / — — — / — — — — — — N N / ( I / ' I / / / / ' / / / / / / - - \ I \ t90 I \ \ \\\ \ \` 1. DEWATER STRUCTURE CAN BE BUILT IN THE 20 FT HDD \ _ _ %'>/ // \ / / — — \ N \ / — I - _ - \ \ \ N N \ __ \ // / / / 7 , / \ o \ \ \ I \ \ \ \ \ AREA TO GET TEST WATER OFF ROW, \ \ _ _ _ \ \ _190-I / ----- _ N —I \ / /\ / / / \ _ r\ \\\\ I / /�j// / //_ - \ \ ////// - \ \ \\\\ \ \ \ \ \ \ \ \ _ \\\ \ \\ _i--' ___L—\/// /\/�/ I / k\// \\\\ _ _ \\ \ \\N \ \ \ ` i ' \ \ \ \\ \x\�-I \\\\\ \ NOTES - �-- - \ / l / l l / / /�8. / / // / N / \ N I \ / 1. SEE LINE 142 CLEARING REQUIREMENTS ON SHEET 79.\ I\ / / / /i� \ N \ \ \ \ \ N _ --\ \ \\\\\/\\\ / //�/�/ // / \ — _\ / -.WETLAND \ \\ \ \\\\\.\/_ -\\_ —_1%0— \—__\\\ \ — _/�/ / \\\ \/ / \ / �FORESTED/� �-�\\\\\ \ \I/ \-�\�\\\\\/ /_HDD \ \ \ \ \ �' \ W4A-A/ BORE, TEMPORARY WETLAND CROSSING / / / / \CONVEYANCE'�I\\\\\ / / \ // /\/ //// / / //\\\ / // /, / /�/ \ // // / /TRANSITION WETLAND IMPACTTYPEs \I\®p9\\\ OF FORESTED To\ OR PERMANENT CROSSING(PERMANENT)II\ (TEMPORARY) :------- \\\ \ \ \ \\ /\ \ / \ \ \ \ \ \\ ' \\\ \\ \ \ \ I�\ \ \ \// / 1\\\ I 1 1 1 \ 1 \\ \1\\\ vJ\\\\\\\\\\, / /�TRANSITION \ \/,l1\ \ \ O \� -\I / .�O I / \\r , O\ \ /` I I \ \ \1V MAT PLACEMENT, PERMANENT IMPACT DUE TO OF FORESTED TO NON -FORESTED WESTLAND i / / / //\ /oNON-FORESTED // x j / // / / / \ ' /y,Pc " ///,/// //cRosswennATPLACEMENr/I\ // / / / // /// //'//y I/ /// , 1 \ \\\ 11/ /� \ // /\ /I I I / / /I\ \\\�V//I\\\\/ / i_ \/ / /// / LI/ \pSTREAM // (S8) (PERENNIAL)� OI /\\ \ I\ / ' / / \ _ - , / / �// //// / .\C"l/ \-\\ \ \ \ \ \ \/� j �/ O,7 \ /�\/ I\/////\ \>I.�HDD NO\--- /CROSSING. BORE,TEMPORARY STREAM 1 /// \ \\ \\\ \ \ / / / �6 / /Op^ / I \ ,I \ / r - N - - - I \ - / ---/ o / /Cb NRCS NJ-7 1 \ `� _ I / \ \ \ \ - - WETLAND W4D - _ / \ - -' / / I / 0 // \ ` \ N N ' / " o I I O / \FORESTED WETLAND W4C / / / /)1,10 / -' ° =' - - - - / / - \ LOD SFO.c) = SFO LOD / / •6 I \ / - V / / 1 `- I 1 r I I / , \ - - / / _\ \ HDD BORE, \ FORESTED HDD BORE, - v/ / / \ / ,L / // / - \ \ °° oo I \ TEMPORARY WETLAND \ TEMPORARY WETLAND \ / I - + + + 0 + \ o ^ I I I / /� \ \ —\ \ / \/ CROSSING / MAT PLACEMENT, CROSSING / MAT PLACEMENT, \ / / 6, ,. 1 \ moN. o/ N I / r` r` /' 7'- COL� t ' / I // /_ N.o % , I / g / `-+ ° / �'> ' I7 / '� - STREAM(S9)(INTERMITTENT)\ - — N — — \ \ ____\ r \'f. / - ^ - - _ PERMANENT IMPACT DUE TO TRANSITION OF FORESTED TO \ \^I PERMANENT IMPACT DUE TO TRANSITION OF FORESTED TO -� / / / \\ \ _ oo / / --x 7 - -/ - 00 \ � ° I I I / / •HDD BORE, TEMPORARY STREAM \ \ 0 ' \ / /�6'`/ - - _ 7 7CROSSING. \ \ NON -FORESTED WETLANDS. - NON -FORESTED WETLANDS. , ^y�/ / / _ : / - - —x6- p / / :mow. -- / \ �L \ t- / = _ ` ' \ If° NO ACCESS TO \ / % ' / \ \ — / 1 \ I / / i �-/- —f�l _ Q gyp- / . r�w w� _ \ / << \ \— / / k / i — _ r _� \ �\ \ \I // I / _ _ - _ \ \ .. r 1 \ I 1 ( I % _ _ - - _ �\ t \ ALIGNMENT FROM - — --� / �.ii�asP�+o��' -/ - \ _ - _ _ - _ / / \ / vas. � J / N sew. / / f �—-v+a� \ /I I SHOTWELL RD. - - _ :'...;. / \ / / _ - L/S�F\SF , ,p, QV\\ �w, \ / / I___-----:_-- \ \� i O •� \ \ —� �o, I \ — \ / / \ / i . '•I.. �A 77A7A7 7j7+7+`.. — — - ♦IIa l N / y / '•,_ \ — — ---co F LODE / / — — — \\ \ + \ / o°• ..�.�� / \ SF $F I \ \ \ `vv`\ SF I LOD�iLOD� LOD L LOD L LOD SF SF / LOD _� \ / `p /-— I �/ I \ \` \ \ / I / `// / \I '+'7, / It / / \ LSD LOD 7 O _ / _ LOD LOD LOD LOD I I O ° L� SF LO1I - \ / ° ^ i, // / \ °' �°o, LOp \ I � O _'�- - / \ / \ \ SFO \ LOD SF41 . LOD SFO I Lo, I J / p� OD �\ \\ o� •'a�a \ \ \ r\ o + — — \ O Lr/ / ao \ I r \ N \ \ 0 � / / 7�°°,/ 'T' \\ \ II \ \ I \ ��� +- - - �\ / rn - op / T.o // — \ \ / / L • D - OOlci.i 1 I /cy) .' _ / / r �- // — \\ — \ \\ \ PROPOSED12"STEELGASLINE-/ _ _ �'��' _-/ / / l //////ice 1 / / /\I t�T_� �, L.D w ���0,°�� - I `\ _ \\-, ��_- -- - `---�/-LOp"-- _ °°� j /N� �/ / Lx °p, / <O / LO Imo °o, pp, \ / ' / �JC \ II i / / I 1 I I LOD / \ ` L,D i �/ — °o� — — — — / / //// I \ \ / / / / \ \ \ / - - / - - — Y �88 LO _ —Oo, Qo, \ / N \ - et /7� PLACE TIMBER MATS TO PROVIDE I \ \ it I. Dp, '''_ / y 1 41 7 N N \ - _/ / IT:_ \ / / \ \ \ \ \ 1 TSC \\ LOD— O°, �- - °O� _ - / / - \ \ / / \ / _ \ // - ACCESS FROM EASON DRIVE. \ \ \ — Lp;........\-. °°, �° , _°O, spp, p��`.;. LOD ./. \ / _ - - / / _ \ \ \ / \ BEGIN BORF 16 5 /�� AVOID TRACKING MUD ONTO 1 J I \ L°D— L D— —\ / — / \ \ \ LOD ' k \ \ \—/o\ LODE \ 1 \ \\ `- /,��(O /- \ \ \ \ 1 \\ \ \�eD�Lo --�/- ---- \ / \ __---_//// I \-_,--// /// -- \\\/_---- �'PAVED ROAD., \ \ \\\,�\°lo\\1`\ 1 \ — _ ,\_ // �- _--- __-`\\ / (TI�- _ _ / ,�/ /11 \ / -- /// - -` ., / __ ___ - - -- -- __ __ - / -- ' N_ 1 \ -- "'Z.\ % p \\„-- ________T_H2 \INSTALL 0. ?� \\ \ J // / / /- ` / \ MARKERS @ 50 FT //-\ \ `N \ \ / / — \ \ �// / I / I 1 / / / I \\\/\ \ - - / / QlI / \ \ \\ \ / \ /�� INTERVALS ALONG BORE PATH - - - \ we;..,� �'/ .�- \\ - _ - --\,- _ _----\\\--//-!�` �� / /\ / / // \ \ \ / - - — _ \ \ - \ / // _ / /I/I 4// I I / / I \ \ \ (\ \ O \ _ / — — \— \�_ O 01 \ / /` _ _ _ \\ / I I / / '� \ \ \ \ O 1 \ 1 / \ / /\/ - _ _ \\_-/_--\\-/// // i \I // / 1 I I I / / 9 \ \ \ \ ----_- - - / J // ''---` / ✓ / // I I I I I I 1 I I I \ \ \ \ I / / / / --!--_ I / \ J \ _ _i _ O-__ -=_ __- __ _ _ _ _ — — _ = _ __ _= _ _ .PROPOSED SEE NOTE LINE142RMENTS -_ _ - WETLAND W4A-B FORESTED TEMPORARY ACCESS ROAD- WETLAND CROSSING/MAT \ \ \ SV0 C I / I_ \• \ I. - _ ,C / -,�- /— \ \�\"� _r ---\� \ /(/\ \ \ �_--___ /� —!- J —� - _ _ _ \ - —� \ / l / l I I I + t15 $°/ \ \ 1 1 l) / / / , - - - -180 = � _ -_ _ __ Irl _ _ ON SHEET \ - \� \ \ \ \ \/ ^ _ _ �- �' / \-\ / I I / / / \\ \ \ \ / / �J-----__ _ _-_- PLACEMENT. _ '�O, _-// / / -_ _\ / I I/ 07/ /(( _ = �- TEMPORARY IMPACT DUE TO \\\\\\\ 11\\I�I (-\ / / /� \ I I / / TRANSITION OF FORESTED \ \ \ \ \� \ 1 1/ \- _ , - \ i �_/ / , / / / // _\\\gyp / ///// \\\\` I I 1 - TCE _ i \ \ \ \ \ -- - \ \ -\\\ \ -� \\\ / ( / I / _ - __ - _ - - _ _ _ 11 I / / / /�/ _ _ =--=\\\ I� / / // \-�\-\WETLANDS. TO NON -FORESTED ' 7� \ \ 1 \ I / \ ��\ \ \\\ \ 11 \\ \4 \--�\/// ////�/��/_ p� \\\\ \\ \\•I / f ,\� /- \ \ / /- -- 0----------� III1 I lI //i - ° ------_, \ -\\ \\\\\ _ \\\ \,,� 1 \ \ \ \ \ / / I / /%// /ice-� �\ 8p\ / /�+. ��\>`C \ \ \ \\ 1111 1 / / 2- - -- �\ \\\ \ -c\\\ \ / / //7 _ \ \ \\ \ \ \ \ / ik \ \ J \ \ .. 7 / / / \ \ -` '\` >\ / ' \ AMP ) 1 \ I /1 l / _�-- \ \ \ \ \ \\\ \ \ \ - _- \ \\ • PROPOSED ACCESS ROAD , / \ ?\ \ \\ \ \ I / / / I(1 \\\ _- \\AR-006 / / / // / // / / /\�\ \ / /// ZO — _--_� \� N\\\\ ��\ \ 4/' (TEMPORARY) -\\\\11 // --. \\ \�\ \ \\\\\\\\\ \\ \ 111111II \\ \ \ \A-----2- \\\\ \ \ \ \ \- \\\\���---- \\1 \ I l-- / \f/1/ °o?o \ --�\�%//,/ 1-� / / / \ \ /\ 1 \\\ I // ,/,//�/,/// /�/�J I / : : /// /�/ / / \\\NN �\ \���\- - - \ / / ,:, _ _ _ ___- - - : 7 ° )1III I11 \\\1III : 0 :N / //�/// \1 f / _ \\\\ \\\\\\\NN // / 1 1 I I /:::\\ \\ \\- :1 / 1 \\ \\\\ II\ \N \ \\ . . / / , I I 11 I / , \\\\\ \\�\\ \ \\ 1 \---\ \\\ \ \ I \\\ Z +�� \ \ \ --_-- - - - - - _ ----_ \ \\ \ -- " \ \ \ / _ \ 1 / / / \�_ \\ \ I I �? T p ?oo \ \\ t- / 1 I ( ( \ I I / / /// / / / / / / 1 \111 1 1 \ \ \ I I I I / / /// / / / , / / III \\1 1 \ \ \ 1 I / \ o \ \ \ \\ \ \ _- _� \\ \\\ \ \ \ / \ N. I / / \\\ \ \ \ \\\\\N. \\\N. � -,-- \_ \ \ \\\ \\\ 1 / / �- \ \ \ \ \ \\ \ \\\ \ \ \\ \\ \ \ \\�- \\\\ \\� �\\\\ \\ s \ - --_ -_\ \ \\ \ \ I _ I I \ \ / / / / / 1 \\ / \ \ I \\\\\\ \\ \ \\ \ \\ \\\\ / / �- \ \ - \ \ \ - - - -� �\ \\ \\\ \ 1 - -\ I I I 1 / 1 111 ( I / / 1 \\1\ \ \\ \ 1 I \ \ \\ \ \ \\\\\\ \ --� \ \ \ \ \\ 1 \ \\\a \ la-\ \ \\\ �,\\ \\ \ \ \ \\\\\ \\\ \\\ _-- \ \ / \ \�\ _ ����_-___ \\ \\� \ '� \ \ \ _- --- \ \� \\ N ,--- \ III \ \ _ - - - �\ ...... \ \ \ \ --/— _ — -\ \ \ \\ 1 ►/ N. -- \ \ \ \ \ 1 I _— \ \\ \ \ \ I I / _ ! --_-- \\ \ I / I \ / -;- ;-_-=__j _ \\ \\\ \ N \ \ \ \ `�//�j/ I \ — \ \ \/ \ \ - \__- \ \ \\ < - -�\\ \ I \ \ I \ / O \ MATCHLINE I C) , N -_-- \ \ \ oll I / \ I \ ~\\ I I / I \ \ \ /„\ -� I / /o / / , \ �O \\ / \\/ .\ I \ 1 1 / //// I 1 1\\ \ \ \ I I I r/(/ / I I I 1 / / ' \� \ \\ \ 1 1 \ \ 1 \ I I I 1 I I / \ \ \ \ \ \ 1 \ 1 \� 1 \1\\III / ( I 1 \ \ I \ \\ \ \ \ \ \ \ \ \ I \ 1 l 111 I I 1 I ` \\\ 1 1 11 (\ \\ I I ( I \ I \ 1 'WWI \ 1 I I I 1 I I I I \\\\ \ 1 I\1\\\III \\\ \� 1 \ \ \ \ \ 111 1 1 I I I I I l I \ I 1 5 \ \ \\ \ \\\\\\�� \ \ \ 1 11 1 \1\ I I I ) \ \ \ \ \ �\ \\ \ \ \ \ I / I I I , \ \\\ \\ \ \ \\ \ \ I 1 Il) II/II)/I11 I 1 \ \ \\\ \\ \\\\ \\\\ \\ \ \ \ / /// /////J/ 1 \ N N \ I �/ // l I 1 N \\\\\\ \\ \ \ \ \ / /// / /// - \ \\ \ \ \\ \\\ \ \ \ I I // //// / I I \ \ \ N \ N \ \ \ \ / //// // // �_. 1 I \ \ \ \ \\ \ \ \ \\ \ \ \ \ \ I l I/ ////%/// I-, \ \ \ \ — — -_ -- --_ N. �\1 _ — — \ \ \ \ \ \ \I -----\ \ \ I /}/;//// I /2DD / / \ \ GPC LE 11N FEAT) o/ o' DD 2DD 4DD I / O / 1 I 1 \ \\1 II I 1 \ I 1 I 11 \ \ \ I \ \\ \\ I I / \I/ J 1\ \ \\ \ \ \ \\\/ I I \ \ \ \ / // / / \\ \ / \ \ I 1 I \ 1 \ \ \ / // i / / - \\\\ \\\ III // //// / \\ \\ \\\\1 I / 111 1 1 1 I \ \ // /r/ \ _ __�_ \ / / / 200 \ \ \ \ \\ \ \ \ \ I IN/ /I / / �/ \ - / \ \_ // / / _� — — — \ \ \ I I / / - - _ — \ \ ) / /� / / / / _ \\ \ \ I / / /� / / / / / / � // � - - \N. \\. \ \\. I I I / / // ./ � / ,// i 1) 1 inch = ft. \ \\\\\\1\ \ \ \ \\\ 1 I J \ \\\ \ \ \ \ \ . \ \\ \ \\\\\\ ,1\ \\ \ I\ 1 I \ \ \ \ 1 \ .\\\\ \, . \ / \ I \ \\ \ ,\ \ \ \ \ \ \ I \ \ \ \ \ , \ \ I I \ \ I \ \ \ \ \ \ \ I II/ //�/ , I / 1 I I (I / / / I I l / / /� II..\\\ //.1,I�, / \o"'iI"""' ,',\\N"CA R °< > _ Q. o ° �•° � '= 4, 0:,,,,g o�J , 05 09/ 2Q22°- <<°.�GIN°'''' �' �'9 °° �' `' l',• ,,,,,I,,, ,,, PROFESSIONAL ENG/ARCH STAMP PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY * * REF. DWG(S) PNG-G-142-0001000 PIEDMONTS NATURAL GAS FACILF f Y DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) DRAWING IS CURREI\ff ONLY THROUGH THE LATEST REVISED DATE TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS SHEET(S)62 OF 119 DWG SCALE AS SHOWN 0 05/09/2022 ISSUE FOR CONSTRUCTION JB TFG WKG AREA CODE 1853 DATE I NITIALS REGIONAL LINE 142 PIPELINE DWG DATE09/17/2021 SUPERSEDED ACCOUNT NUMBER 10700 ENGINEER PNG DRAWING -C-142-0001061 NUMBER REVISION PROJECT NUMBER 0232195 DATE NITIALS MGR TECH DUKE _rap Piedmont Natural Gas E&SC PLAN-7 DRAWING BY JB REC &STD ENER1 CLAYTON NORTH CAROLI NA STATION ID DATE NITIALS PRINCIPAL DISCIPLINE / RESOURCE CENTER / LINE NUMBER CHECKER INITIALS TFG 05/09/2022 WKG ENGINEER COPYRIGHT 2018 Resource Center GOLDSBORO, NC LEGEND zr. �' 7 \ 1 � \ N \ I \ N I \ \ \ \ I \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ I I I I ' I \_ i \ I 1 I I I \ 1 I I I \ 1 I I I I I I I, I ( \ / / / I I I I 1 \ \ \1 ` \ \ / I \ 1 1 \ I I 1 1I II \ / / \ I \ \ �/ \, 1 1I \I \ 1 \ \ / // , 11 \ I , I I I \ \ / / I I I I 1 1 \ / - _ _ \ \ nQQ /' I I I I I 1 I / / \� 1� I I I I I I / \ // / I I I I 1 I I 1 1 I \ 1 I i 1 I I I I 1 I I I II11/l III I I I 1 I 1 I 1 1 I I I 1 I 1 I 1 1 I I I 1 I I I I I I I I,// I I / , I 1 1 // �/ / //// 1 / / / l////' (/ I I I I I I / 1 willow I I I I I I I I I I I 11 I III l (\ 11 I / /. ) \ / / / / / I I I I / / -� i\ / / I I I I I I / /--�'/ -� / /\\_ // /' \// / / I 1 /1 /1 / 7 7 / ' / / / - - / / / / I I / / I /' / / I / / I a 1 ' / / \ / l // // / l / ( / /-\-___7) / / / I / / / / \ / / / / / / / / / I I I /' / _ / / / / / 7 I \ / / / / / / / / I / 1 \ / / / /' /' / / / / ' _ / / 1 / / / / _ -- - / I ( / I 1 / \\�\ / / / ' 11 \l 1 I -./ /' l l / 7 I \ /' // \ \ _ �\ / / \ /\ / 7 \ / ' / '- 1 / / / , / ' , / `\ ` / " / //-�� / ....-- ' / / / / / ' 7� �` _ / ' i / / I \ W et Z N J to N N a a G v`% -- \ i — / \ / v' \ / /'\ /' ' \ / / / / /\ / ' / / / / / / / // / / // / -// / / / / / / // / / / / / I / / / / , / / / / / / l / I / / / / / / / / // /� / // / / / / / / / / / / / / / / / / // / // / / / // / / p o/ / t� / / �/ / / I ' / / I / I / // // / 1 CODE TCE TEMPORARY CONSTRUCTION ENTRANCE :����1 CD LOD CHECK DAM 0 LIMITS OF DISTURBANCE - LOD - SF SILT FENCE SFJ SFO SILT FENCE JHOOK SILT FENCE OUTLET O CS CSIP SFB TSC TWC COMPOST SOCK COMPOST SOCK INLET PROTECTION / ! SEDIMENT FILTER BAG SFB TEMPORARY STREAM CROSSING TEMPORARY WETLAND CROSSING \ \ �\ \ \ N \ \ \ \\ N \<\ \ \1 \ \ \ 1 \ \/ / / - - _ - / / 1 I 1N / , N -' / I I I I 1 1 1 I I I I I / / I 1 I I \ / \ / - - - \ _ -� / --7 I / \ \ - ' / ' / / - - - \ - - - / ,/ 1 I I , ' I l I I '' I ' I / ' _ - / \ / \ 1 / 1 / ' I % /' / _ / I \ l\ N / / /' / / _ \\ \ \ I 1 I 1 I \ / I I I 1 1 \ \ 1 1 I ) 1 \ \ 1 \ \ - - �' / / / / / / / / / \ \ \ \ ` _ I I'1 I I 1 I I I \ // / / I \\ 1 ,/ / / /' / ///' / / - -� \ \\ GRAPHIC 'GALE (IN FET� \ / / / / N I 100 0 50 100 / 200IIMP I 1 1 I I SB OSF TB TTP CX PS SLOPE BREAKER �� ORANGE SAFETY FENCE -OSF- TRENCH BREAKER I= TEMPORARY TRENCH PLUG 0 CURLEXPLACEMENT /i PERMANENT SEEDING PS \ 1 / / / / / I / I 1 / / I 1 / / / / / / \ l l 1 I \ / 1 I / / \ \ \ I C \ / -- - / / \ / / / I I I I / / / // / / L I / \ 1 / / / / / / / / \ 1 \ \ _ _ / 1 \\ \ \ I / / \\ \ 1 I / 1 \\ \ \\ 1 1 \ 1 \ \\ \ \ \ \ \ \ ` / NN \\\ \ \ \ \/_i--_ "\ \ \\\N N N\\\\\\/// N N \ \ \ \ \ - I \ - --" - / I1 ( / / // /l 1 1 I I I I I I I 1 / / l / / / / /1 \ \ - / / / / 1 I I I I I 1 //////// / / 1 \ 1 \ \ \ \ \ _ -__. / / / / / I I I I I I 1 / 1 I / l / / / / / '1 /' \ / \\\ ,/ / 1 1 1 I I I // / I/////// / / ///N __/\ \ o///1II1/ l/// /111/ \ --- \ ` - / / I I I I I //// :///11/1 \/ /--_ __ __\ \\\ \ �9 /// 1 // / // / / / \\ // //// //1,//�� / i-- -� \ \ // \ / I / / / / / // / / / / / \ 1 ` �l / / / / / / / / / / / \ 1 �_ / / - I \7/ _ / / / / / / / / // / / / / / / \ \ \ \\ I / ' // / I I \ , \\ \\-_-__// // / / / // ////// \ \ \ I / / / / \ \/ / ///\ /1�\/ / / / / / / // / / \ \ \\/ /1/ //' I / / /EXISTING / I \\ / /' '� // �'/ � \, 1 \I I I / ' / / // / / 1 inch = 100 ft. I \ I /--I \ ///i / ' ' / / / / CTWO PT CWD SWC CONCRETE TRUCK WASHOUT PORTABLE TOILET TEMPORARY IMPACT THROUGH �AIETLAND\ WETLANDPERMANENT IMPACT THROUGH STREAM THROUGH IMPACT PERMANENT IMPACT THROUGH STREAM CLEAN WATER DIVERSION —CWD TEMPORARY STORMWATER N ❑ PT\\\\ / - / - \ \ \\ \ \ \ \ \ \\ \\\ \ \ \ _ _ \ \ \ \ \ \\\ \ \ \ �__, \ \ \ \ \ \\ \ \\ \\ - - - \ \ \ \ \ \ \ \ _ -_ \ \ \ _ - - - \ -- - / 1 / ._ /� - \ N / // / // ////// / / / / / / / 7 / / I / 1\ / ,� - - - _ _ \ \ N \ _ - - - / // / / / I / _ \ i / o / / / / / / I 1 I / ,-�/ \\\\ _ //,,//// / \ i / / / /�, __ _/1 /, N N.\ - - - - o �'/ // 6:// /// / / / /' / I / / / / / - \ ' / ' / / 7 / / / / / / / / 1 I / / // _ - - _ _ \ \ N N/ I / / / / / / / J / / -�NN \ / / / 71 \ / / / \ i / - _ / 7 / /' - \ \ N \ \ _ / /''/�/'7/ O/, / r / \ / / / / / - ' / i 7 / / / / / / / - �� / / �y. _ _ / / 7 ` \ \ \ \ \ \ �- / / Q ////7 / , / I 1 / / / / / / / / / 7 / / / , / \ �A80 /' /� / / \ N \ ` _ i w / // -- - \ \ \ - / NA // - / \ 1 \ / 7 / / /• - /' / / •/ / / / , / / / / -�--\\ // // 1 // / / / /\ / / / / / I / / / / I I / / / I — — / / / -7 CONVEYANCE / WETLAND IMPACT TYPES N TRANSITION OF FORESTED TO NON -FORESTED OR PERMANENT CROSSING (PERMANENT) CROSSING/MAT PLACEMENT (TEMPORARY) \ \\ \ \�\ \_��///r,//,///// / / 1 / 90/ / / - / / / / / / c / I / / \ \ - _ _ _ 1 / 1 / - - 7 t- --- _ \ / /// // // // ( ' / / / \ \ - /�/ /// /, / / 1 I / / WETLAND W5-A / / / / 7 7 / / / / / \ \ ` _ _ i / / \ \ \ _ \ . \ \ 6Q / / / / / / / \ _ _ // / \ / / / / ( ' 1 ,� ` \ FORESTED / / / 7 / / / WETLAND W6-A1 / / / / \ _ - - _ _ /� j// / - / \ - / J /// -/ WETLAND W4F / \ OPEN CUT FOR GAS LINE, / / / / FORESTED / / / / / \ \ \ — - _ \ % /, / IFORESTED \ \ \ _ /// / / / \1 / I TEMPORARY WETLAND CROSSING / / /'/ / / / / CUT FOR GAS LINE,C / / / - \ \ / / / 1 \ - / // / / OPEN CUT FOR GAS LINE MAT PLACEMENT, POTENTIAL / / / TEMPORARYP WETLAND CROSSING / / / / \ -- - - - - _ \ // / / / / SHEET PILE, DEWATERING / / / \ _ // T TEMPORARY WETLAND CROSSING 7 MAT PLACEMENT, POTENTIAL / N \-- - N - 1 - \ 1 STREAM (S10) (INTERMITTENT) / / / ( / _ 1 / 1 1 DEWATERING STRUCTURE STRUCTURE. / / SHEET PILE, DEWATERING J / / - - / / / /� \ 1 \ \ \ 1 _ l - HDD BORE, 1 TEMPORARY STREAM CROSSING / / 1 I PERMANENT IMPACT DUE TO TRANSITION OF FORESTED TO 7 7 PERMANENT IMPACT DUE TO TRANSITION OF FORESTED TO / .S / / / /• / o / STRUCTURE. PERMANENT IMPACT DUE TO / / / / / / - \ o / // /' STREAM (S11) (INTERMITTENT) NON -FORESTED WETLAND. / NON -FORESTED WETLANDS. 7 / TRANSITION OF FORESTED TO �rO6 / / / /' 1 / NON -FORESTED WETLANDS. / �^. \ / / _ - - _- / 7 H HDD BORE, // / // // / / // / ,� - °) o� - / J / / i I TEMPORARY STREAM CROSSING. // / \ / / 7 / / / / / Q / / \ �\ + ` - -E,\- d O O / o / O O o O O , O O O O o/ // I // \�/ \ `: : ;.. T1p� v�/G' w' \ v o/ a_/ �, ,o O O O O O o A: O`er O O O O/ O O/ \� —� - + `/ + +/I + \\ ^ -qq ' \ N / ' c� �� 1 c0 a0 rn / �_ / / �� J \ \ Cvl _ N N N \ / / IN N N O N/ N 1 N/ / l I / O O O/ / O O O O O O O O / P+ + + / / + / + + + + + + + / (r LC� CD a0 C) O N "O / N I / / rr / / / 91 / / / N / / N/ AN / / � N \ N N N N N N / O + + / / / / / RI I N N / / / N / / / / �- �/ I i �- / I / / / / / / / \ \ . _ / \ \ 1 1 LOD SF // / / / / / / i / CS \ CS LOD SF JH LOD \\ / / / �� / \ w se�� so, °oa �es�� eo, °o: rive► w.►«.:�.-. . ►�►,<>f<��ff>�1,.'i<�� —'— i �►-�r -- —r..? �� n%ai:,1i u�: SF l Rio opia►.'. SF >. -►ar.. gF SF F S / ,SF / / I I Sr i _- _ •:::::;;::. ► 0 `Li►tiQ0 iMIA<a ••' .. ..�..�_sr.....ve►.a. _.. �a�... �I/ / SF F �e►a... _ r.... SF SF _ - _..:?.�G►.. �.. ar�:�. ii�> �► ::..... .... go, , uo, �— Do, �. - l / / / / _ --- TB ! / �►► a►;P' a� ao, ao, Do, Do, Do, Do, Do, Do,� oL —m / i i �I 1 ' . lJi <C �., 1, w.. o� L m— LOD / /, • ,'LOD ,-...— L LOD LOD D� L D� LOD _ • -- — -- .►..,..� I — � TB v � V � / / TB .►,>►a <��I`Ow� ►Q►.><dD<►<►. "• <"•►• TB v, a1,►a 7 /� \ / 'l \ � btu><i� ,►f V��•� .,r t. SF SFL SF SF SF <f\, C S ii<►►U, ` \ .��.,►='�a►!• SF SF SF .a�►.P..-_ SF ''�'�.> ' / LOD TSC��-..,�..►��..r,, LOD LO LOD O LOD O LOD LOD L D LOD .emu LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD / — \ -154- / \ LOD 0 LOD LOD LOD �� LOD OD LOD LOD LOD \ 1 .� I _ \ \ / \ / \`✓ ) I F S O / / / CS TB LOD SF JH TB L4-7 LOX LOD \ \ \ \ \\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \/ \ \ \\ \ \ \ \ \ \ \ ) \ / I \ - -7 \ o \ / --'\ \ \ TSC \ LOD SF / / CS / --it \ \ ' \ \ END HDD BORE 208+860 1 1 \ I 1 T/- - - - - - - , \ >\ / — �160- \ 1 - ' 1 1 X / ,1 \ „� \ - _ - - / \ \ �� \ \ \ \ \ k / /' / -n° - _ \ \ \ \ PROPOSED 12" STEEL GAS LINE N N \ , 1 /r— 7 N -t- \ \ \ \\\ I 1 \ \ \ WETLAND W6-B1 I I \ I \ \ \ ` \ /� / / o \ \ \ N \ \ 1 1 / / r' 1 ` \ ' FORESTED \ \ /t \ \ \ \ \ - , I I / / i' \ 1 \ — WETLAND W4E \ \ STREAM (S12) (INTERMITTENT) / TEMPORARY WETLAND CROSSING / 1 \ \ \ \ \ 1 / / / \ 1 \ \ PROPOSED HDD 3 FORESTED \ TEMPORARY STREAM / / MAT PLACEMENT, TEMPORARY \ _ \ \ \ I I 1 \ / / / , - \ \ / / \ \ \ SEE NOTE 1. SEE HDD BORE, \ CROSSING / MAT PLACEMENT WETLAND W5-B / IMPACT DUE TO TRANSITION OF \ \ 0 1 \ ` �� - / / \ 1 \ \ 1 \ / 6 \ \ - LINE 142 CLEARING /777 '' ' \ TEMPORARY WETLAND CROSSING / \ \ \ FORESTED _- WETLANFORESTED DS. NON -FORESTED \\ \ 1 \ 6 / / �\ \ \ MAT PLACEMENT. \ \ TEMPORARY WETLAND CROSSING / ° / / 1 / / / \ - \ \ \ \ ON SHEET 79. - - / 1 \ - / \ / �� \ 1 /' / . 1 \ \ / / / \ / - \ \ _ - / /' /' _ \ \ \ \ \ // - / , / / / - 1 -7 0 \ \ \ \ - \ PERMANENT IMPACT DUE TO TRANSITION OF FORESTED TO NON -FORESTED WETLAND. \ _ - \ \ _ �66 / MAT PLACEMENT, TEMPORARY IMPACT DUE TO TRANSITION OF FORESTED TO NON -FORESTED / / / 1 / / / / 7 J /1 / IN / / / / 7 - \ _ - \ \ \ \ N / WETLANDS. ` / / / / / I/�7��__EXIST80ELECTRIC \//l/ / .7.---' \\1 ,' //7;//' 7 / //__- _-__ \N \ \ ��_--- / / / r 6, \ \\ \\TRANSMISSION EASEMENT/ / ,' / _ ---r- \ . \\\ \\ \\ \� \\ \° /'`� \\\\ \\ • \ x \ / 7 __ ---.' / / //° /7/' /--/ // /-' //77 -' - /' //7 /7------ 7 7 „.7 ........ 7 ...---' / -------- ---� - \ \� \� \ \ \ \ \ \ \ N. N\ \\ \ \ \ \ \ \ \ \\ \ 1 1 1 /I I / l I - - _ -- . \ \ \ \ \ \ \ \\ \ \ N N \ \ \ \ \ \ 1 \ \ I 11 \ \ 1 \\ 1 \ �' -' ' �\ \ \\ \ \ \ \ 1 \ \� / \ \r8q� NOTES: / 7' "7' 7 // / // //'/� - - / / /' /' \ - \ \\\ \� \ - \ \ \ \ 1. SEE LINE 142 CLEARING REQUIREMENTS ON SHEET 79. / _ 7/ 7 / /' / / 7' /' - — _ _ / / 1 c / I ///////,/ 1 / \/ / / / / �_,, / / 7 / / / / 7 / ,���, / / / /� _ / - //--- ,, /' , \ \\ \ \\ 7 7 / /'' \ \ \\ \\ \ \ \ _ -- - ../ \ --� — /' /, \ \ \ \ \ / \ — —— �. ��---�/ \ \ I 1 \ \ ) 7,7 N N 1 I I I\ l\ \\ °o \\\ / \ --\ _�/ // / / // \ I \ N N I — — / / I 4s• N _---- / I 1 - \.\ / - / / / \ \ \ \ / \ I / / / \ \ 1 I / / —/ / / \ \ / / ---- o — \\\\ \\ 1 / / /— / // / 7/ 7/' ,0"- /— _- —, � // // /' �/ ,/ //7 ',/'/'/ /'/ „' _^\ / V / // / / / \ / / 7 / / / / / / / / / / / / \ / / / / / / / / / / / / / / /— / / / / \ ' / / / _ / / / v /N // ---- // ___� / _ 9s I 1 1 I I \ \ \ --- 1 ) / \ N \ _ \ 1 / /-- ,-- -- ��� / ;�, —_— / I \ \ \ \ \ \ \ _— \ / / / - / / / --- —_ / / \ \ \ - / _-_ -� _ — // // // �/ / / / / /' / / --\ /� /-,' // / / / / / -/ / -\ / / / / / / /_-\ // ,/ /// /// /�--\\\\\ \ \\ / / / / I „lid I \\ \ \ \ � 1 1 1 7 -� F- /V�-_- f / / \ \ \ I ( \I 1 \ I \' 1 -� / / / ?o I / / \ l \ N \ \ \ I \ \ \ \ \ \ \ \ \ \ \ N \ \ \ \ \ \ \ I \. I \. \\ 1 \ \ \ —� \_ \ -- -----7 / ' o \/ / 9 \ \\ \ \ \ \ \ / \ \ \ I /� J / / // / / / A / / _ / / \ �- /_ \ 7 _ -� / 7 \ / / / 77 7 /-- / / \ \ \ \ \ \\ \ \ I / / / / 7 7 // / / \ \ \ \ 1 / /- \ \\ \ \ I 1 1 \ I / / / / / // / - //'/'/'////// 7 , 7 , _.-- „ 7 ---- ,-- ...-- \ \ \ \ I 1 �. / / \ I I / \ / \ \ \ 1 / / / / / 7 /' // //� ' \) / I / I / / / / / / / 7 - / ' ' /% \\ \\ \ \ I I I I\ / l / l I I l / / // // ,/ / �i / //// /,�,//7�/ //���// / // / / /- __ / // / / /, / v / / / / 1' -- -� / / / / \\\ / / / _ _ / /--� / / / _ / / / o / / / / _ o / / / \ \ ////--�\ / / / / / / / / / \ 7 7 --- -- 7 , --- -- - -... ---. --- ---- / / / / / / / ) ' / �� / O �\ \ /� /I -� 2 \V/ / / / I l __ ��;--� \�\\\\ /�/ / I I \ / ,�\\, ,c `` C. A R �,'',/„ off° oFESS /o `' �4 ", =•°'Q� by •'ems q.J°4L6sYQ. 2 ,Q409/ 2-e�\; �j ., G I Ne�.� �'''/gMkEIT ' �`�\/\\' ,,,, ,,, PROFESSIONAL ENG/ARCH STAMP PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY * * REF. DWG(S) PNG-G-142-0001000 PIEDMONTS NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) DRAWING IS CURf'.CNT ONLY THROUGH THE LATEST REVISED DATE TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS SHEET(S)63 OF 119 DWG SCALE AS SHOWN 0 05/09/2022 ISSUE FOR CONSTRUCTION JB TFG WKG AREA CODE 1853 DATE NITIALS REGIONAL LINE 142 PIPELINE DWGDATE0911712021 SUPERSEDED ACCOUNT NUMBER 10700 ENGINEER PNG DRAWING -C-142-0001062 NUMBER REVISION 0 PROJECT NUMBER 0232195 DATE INITIALS MGR TECH S _ rap Piedmont Natural E &SC PLAN - 8 DRAWING BY JB REC &STD ENERGY. CLAYTON NORTH CAROLI NA STATION ID DATE INITIALS PRINCIPAL DISCIPLINE / RESOURCE CENTER / LINE NUMBER CHECKER INITIALS TFG 05/09/2022 WKG ENGINEER COPYRIGHT 2018 Resource Center GOLDSBORO, NC LEGEND / / , / , / / / / / / / / / / / , ,,,, / , / / / / / / /// / „ / — / / / / / / / / / / / / 7 / / / / / 7 / / / ,/ , ,/ // / •I / / / / / / / / / / / / / / / / / / / 7 / / / / /// //////// / /// / / ///// / / / 7 / / / /// / / / / / / / / / / / / / - -- / / / // / / / ' — / / / // / / / / / / / / // / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /' I / ' / / / / / / / / / / / / / / // / / 1 I / / / / / / / / / f / l / I / / / / ' / / / I I I I I 1� / / / I — / / / / / / / / / / I / ' / / / / / �\ i I / /' / / ' / / / / / / / / I I 1 I��✓' / / / / / /, , , / / / ,, / , / / / / / / / / / / / / / / /, / / / / / / /Ay/�/ / // / / // ' / / /''/ / / / / /// //, / / OOO /� / / I 7 / / '� l ° I I / I ` / ,�/� I I I OQ I 1 / I I , I / v0 I I I I I V I I I 1`. /� ( I 1 1 11 \ \ \ \ \ \ \ \ \ \ \ \ \ 1 \ o/ / - 4,>/ y / / / , / / I I I l ' I I I I I I 11 1 I \ °� \ \ 1 \ 1 1 1 \ / / / _ _ - _ / / / \ \ \\ \ \\ /, / " --/ / // // \ ___,, ___ , , \\ \ 1\ \I III I lI' ( ) 1 `` \ \ \ \ \ \ \N\\ / / — — // / I 1` 1 11 \ \ \\ \ \� \ _ \ \ \ \ \ \\ \ \ \\\ \ / / / .... _ _ _ _ / / \ _.... \ \,,,, \ \ \ \ \\\ \\ \ \ \ \ \ \ \ \ \ / / / / / / / / j / / / — — — I- —\ \ \ \ \ \ \\\\\\\\ \---,_ \\ — — �\ \` \\ \ \ \ \ \ \\ \ \ \\\\ \ / / / / / / / \ \ \ \ \ \ \ \ \ \ \ \ �- — \\ \ \ \\ \ \ \ \ \ \ / // \\\\\\\ \\\ \\\\ \\\\\\ \\ / / / / / / / / \ \ \\ \ \ \ \ \ \ \\\ \ — — — \ \ \ \ \ / // / //,�/ /\ \ \ \ \ \\ \ \\._— \\\\\ \\ \. \\ \ \ \ \ \ \\\\\\\\\\\ / / / / / / / \ \\ \ \ \ \\\\\\\ \ / � \ \ \ \\ \ \ \ ` / \ \ \ \ ` \ \ \ \ l / / / ' / / / // / 7 / — \ \ \ \\ \ \\ \ \ \ \ \ _i - � \ \ \\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ I / N \ \ \ \\\ \ \ / / / / / / / \ \ \ \ \ \ \ \\\ \ \ \\\ \\ — _ — _ _ \ \\ \\\\ \\\ \ \ \ \ N \ \ \ \ \ \ \ \\ \ \ \ \ \ \ \ \ \ \ \\\\ \\ I I l 1 / / / / \ \ \ \ \ \ \\\\ I I / / / / �/ / / / \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \\ \\\ \ \ \ \ \\ 1 1 ( ) I / / \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ I 1 1 I I I / \ \ \\ \\ \ \ \\ \ \\\ \ \ \\\\\\\\\\\\ \\\ \ \ \ \ \ I I I I / / \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \\\ \ \\\ \ \ \\\ \ \ \ \ \ \ \ ) I I I / / \ \ \ \ \ \ \ \ \ \ \ \ \ \\ \�\\ \ \ \\ \ \ \ \ 1 1 \ 1 1 1 1 I 1 1 I \ \ \ \ \ \ \ \ \ \ \ \\\\\ \ \ \ \ \\ \ \ I I I I I I I \ \ \\ \ \\\ \ \ I I / I \ \ \\ \ \ \ \ \ \\ \ \ \ \ \ \\\ \\ \ i-- \ \ \\ \\\\ \ \ \ \ \ \\ \ \\\ \ `\ \\\ \ \ \ \\ \ \ \ \ \ \ I \ \ \\\\ \ \ \ \ 1 I /_\ \\\ \ \ \ \ \ 1 1 \ \ / \ \ \ \ \ \ / I 1 I \ \ \ \ 1 % 0 \ \ \ \ \ \ 1 ) \ \ \ \ \ \ \ \ �: / — \ \ \ \ \ \ \ \tV I\ 11 \ \ i . i \ \ / � \\\\ \\ \\ \ `=\_ \ \ \ \ \ ' \ \ \ \ / \\ \\ \\ \ \ \\- \. IGRAP �C l7 A Y E� \ \ 1 \ \ \ o /o �� „o \ \ \ I \ 1 �00 \ \\ \ \ \\\\NN \\\\\. \\\ \\\\\\\1 \ \\\�\\ \ \ \ \ \ \ \\\\\\ \\ \ \ \ \ \ \\ �\ \\\ \\\ W N \\\\\\' Z CODE TCE TEMPORARY CONSTRUCTION ENTRANCE : 1 CD LOD CHECK DAM LIMITS OF DISTURBANCE -LOD- SF SILT FENCE SFJ SFOSILTOUTLET SILT FENCEJHOOK FENCEO CS CSIP SFB TSC TWC COMPOST SOCK /� COMPOST SOCK INLET PROTECTION / SEDIMENT FILTER BAG SFB TEMPORARY STREAM CROSSING TEMPORARY WETLAND CROSSING SB OSF TB TTP CX SLOPE BREAKER �� ORANGE SAFETY FENCE -OSF- TRENCH BREAKER ® TEMPORARY TRENCH PLUG 0 CURLEX PLACEMENT //, PERMANENTSEEDING PS / / / / ^ \ 1 1 1 / \ \ \ \ \ \ \ / / / / / / / / / 1 b° 1 tc \ \ \ I I 1 1 1 1) Ij 1 I I 1 1 I N \ \ \ \ \ \ \ \ \ \ \ \ \\ \\ \ \ I / lip I t 1 / / \ 1 \ \ \ \ ( / / \\ \\\ I ' ' / / y� \1 I I 1 I 1 I 1 1 ( / \ \ \ \ \ \ \ \ \ \ \ _ co \\ / \ / / / / / / / I Io0 I I / \ / / / / / / ^ 1 I I 1 1 / 1 / / / / I / / / o Y I I / / I / / oI I 0,/I' , \ 1 /l . I PULLBACK AREA FOR HDD 1 \ \\ \\ \ \ 1 I I I 1 1 1 / \ \ \ \ \ \ N \ \ \ \ \ \ \ \ \ \ \ 1 / 1 inch = 100 ft. \ \ 1 1 I 1 \ \ \ \ \ \ \ \ \ \ \ \\ \ \ \ I I / / / , \VN\��—,/ I I / \\ \ \\ \ \ \ \ 1 I / // I1 \1I1/I I I 1 / T� �� \\\ S \ 1\\PS 1/ / / / I I / / / / / 1 \ / I / / / / N— /' — — _ _ _ — / ' 7 / / / I / / — — I l / / 7 / I / // -l / I `_ J/ /_---/ O / l I I / — -- — — _ 16 ///II1 / / /'--_—`— _ _ /// //I1IIII0 \ / ' / / — — — —`--/ //I \ — / _ _ — - / / / / �'_---- �� �64'-_ --� / I / / / / `\/ / I ///////�/—__ —___ � Io.,/ / / / _ _ .1' --- / / I I I I I I 1 I I I 1 I I I 1 1 I l o 1 I /LOoI' I)/ I�I I"°9 OI N, // /tt / / / I / ,� / l / l I I I I l l I I,°�d /y�/J pQ l l l 1 y/ / 00"/ , / / l / l / I / I l / l l / / / l / I I l I l b°^ I / l I / I l l l / / I l I / / l l l I y``yI v°O/ / l l / l / ' 11 I' I l ' l l' / I ll'l / I /l //II1I\\,\\ / l /// I I 1I l / / l / /// / / lI I IIIIII / / / / / / , I / /// / �// / I I I 11 I I I / ////////////III\II11 / // /// , / I / / / / '/ / / o / / I +' N 1 1 I 1 1 \ / / 0 1 / I �\ / \ I l I � lIl l l l l l l l 1 1 1 / l l I 1 1 I IIIl I I I I I 1 I \\ 1 I 1 \ \ \ \\ I / / II 1/.\\ \ \\ / I I / / \ \ \ \ \ \ \ / 1 / 1 I { l / \ \ \ ' l / l l l l l / / \\ \ \\ \ \ / l l l l / I l l l 1 \ \ \ \\ l / / I 1 \ '/ I I I i' lI I II \\\ \ \ I 1II1 1 1 \ \ \ \ I I 1 I II\\\\\\\ \ IIII 1 \ \ \ N \ \ \ I / I I I \ \\ \ 1 \ I I I \\\\\\\\IIIIII \ \\ \ \IIII1II I// \ \\\ \\ \ \ \ I I I I I 1 I I I \ \ \ \ \` \ \ I I \\\\\\\\\\ \ \ \ \ I I I / / l / / /' / // / / / / /// / / /////////l / /// '' /11 //l' I / / / ' / ' / I I I / / I \ 1 `1 \\\\\ 1 I 1 1 I) I I I // I I // l I J / // / /II11II / / "// //// ' ////llI ////// / / / I I 1 \ \ \ \ \ \ \ \ \ \ \ 1\\\ �11\\ I 1 \ \ 1 1 1 1 1\ \ \ \ \ \ I III 1 1 1\ I I I I 11 I ill I I1111 IIII IIIIIIIII1I I/ I I I I I 1II I III / / / /II I I II 1 IIII I I I I I 1 I I / / / I I I I I 111) II l / / /// /// I ( / III \ \ \ \ 1 I I 1 I I I I 11 I 1 I I I I I 1 II II I 1 I 11 I I / / 1 \ 1 I I l / / / / / I / / / \ \ 1 I 1 1 1 1 1 I I I IIII\ I I I 1 / / / / / / 1 I \ \ \ \ \ I I I I I 1 I I I I I / \ \ I I I I I I I I I I I I' \ \\ \\ \ \ I / ' 1 I I I I I II \\ I I I 1 I I/1/// 11 \ \\\\\\\II11ry'// I 1I11 • \ \\ \ \\ \ I 1IIII II1 1 I \ \ I II/'1/'///\/ \ \ \ \1\STREAM/ I 1 1 I I 1 1 1 1 \ \ \ \ \\ \ \ \ \ 1 I I I \ 1 1 \ \ \ \ \ \ \ I 1 I 1111 \ \1 II/\/ 1 \ \\\ \ \ 1 1 I \\/CONVEYANCE 1 \ \ \ \ 1 I 1 I I 1 1 I I\ \\\ \\✓�—^\ \\�\ \ \ / \ 11 1 1 \ \ \\\ \\ \ \ \1/\ I I I I I / I I II I IIII ' f I I I I I / / / / / / / / f / I 1 / I I IIII a a \\\\\ /Fw-� v+� \ \\\ \ \ \ \\ \ \EXISTING /_ \`PERMANENT / / \ / \SWC / / \ I / 1 CTWO PT CWD CONCRETE TRUCK WASHOUT PORTABLE TOILET TEMPORARY IMPACT THROUGH WETLAND IMPACT THROUGH WETLAND STREAM THROUGH IMPACT IMPACT THROUGH CLEAN WATER DIVERSION — TEMPORARY STORMWATER\ ❑ PT i j/i �/i'- CWD — //--/00I//Ill/ / WETLAND IMPACT TYPES N / / / // / / / / — — — \ \ \ ' / — — TSC /g ,y`o�/ / / / / 0 / / / / N I 1 /\ \ \ \ \ \ \ \ \ \\ \ \\\1\\/11IIIIIf 1II1II\\1(/ I I/I/I1I I111\\\/\ \ \\ \� 1\/\ \ \I I / — 1 I 1( I11I1 /—\ \( \ \/IIII I 1 / \ I \ 1\ \ \ \\\\\\1 1\ l'1\\\ III1 1TRANSITION I 1NON-FORESTED OF FORESTED TO/ OR PERMANENT/ (PERMANENT)//// / / // / — —\r'O00^/o lI II \ \ \ \ \I\1 \ \ \\ \\ \ \\\\ \ \ I I I/II I I \ \I1 11111I1\\ 1\\\\\\ / / / / / / / / 1 / , I I I I I l/ / / 1\ \ \ \\\ \\\\ \//1 I II I 111 \ \ \ \ \ 1\ \\\\ \\\\\\1111II1\^\\ 1 \ \ \ \\ 1 \ 1 ICROSSING // /v°O / // / /\\\\\\\ \\\\ \\1 1 1II11\ \\ II1\ 1I1\\\\\\\\\ \ \ I __ //// ///j' _-_ `STREAM ///////// //— / v v (S13) (INTERMITTENT)° TEMPORARY STREAM CROSSING I l I I I l coy A I II\\ \\\\\\ \ \\\\\\\\\ 1I1II l°° V A.�V A VA V AV A A \ V \ V A \ I 1 1 \ 1 AA A A A A\ A A :I:\ \\\ \ \\\I1\/\ \ \ \ 1CROSSING/MATPLACEMENr/// I II I 1 I 1 I I I 1 \ \ \ \ \ I II I \111\ I1 1 I I I I I I I 1 -- \ III 1 \ \\ \ I \ \ \ \ \ \ \\\ \1 \ \ \ \ \(TEMPORARY) (II I II1\1VII /II I IIII, VA\\\\\VA\ \\�A\/ ////�) %//I//II11 1 1 1 1 \\\ \\\�VA\\\\\\ \\// I I I 1 I 1 1 1 // ___ / ----- \ l I II I\ / /'/ VAV V V A V \VA1 V \ \ I I I III 1 \-/ \ I l/ /l l / I/ \ \\\ \ \ \ \ \ \ 1 I \ II\ 1 IIIII\I1\/ \\ 1 \\\\\\ \/,/////// / / //' / / , �\�� / 8 / / / / — \\\ o\ ^/ / / / / / / / / /\ N N \ \ \\ °��/TEMPORARY STREAM S14 INTERMITTENT ( )( ) STREAM CROSSING \\\ \ \ \ o \ \ \ \ \ \ \ \ \ II I \\\ \\\ \ \ \ \ \ \// I//////////// I \ \ \ \ \ \ \ \ N \ \ \\1 \\\ \\ / / /II1I IIIIl /////�/ / IIII) II 1 \\ \ \ \ \// \ \ \ \ \ \ \ \ \ \\ \\\ \\\`\\// I I IIIII IIIIIIlI II// l////// ll I II1 I I IIIIII I1 I // \ I \\ \ \ \ \ \ \ \\\ \ \ \ \/�/ / \I IIII1\\\ \\\ \// \\/' / p\1111 / / ///__\\ \ //1 \ \ \ \ M\ 1 1 1 \ 1\ //I 1 I o IIII //// ///// \ I \ I / l l 1\ \\ \\ \\\ \\ \\ \\ // ////// //// \ \ \ \ \\\\\\\\ \ ° -_\/ \ \ \ / / / /// / / /—� \ J 1 \ \ \ \ / / \ o \ \ \ oo \ \ \ //�/•�/ / / / // / \ \ �/\ \ \ \ \ ^ \ �J / \ \ \ \ / ' / / / / / / / O• 9U� \ \ \ \ o \ '� \ \ \ \ \ `\\\\\ /1\\ \ \ / \ \ \ \ \ / / / ///j / / \ \ \ \ �94 \ \ \ \ \ \\ \ / /I \ \\\ // / / / // // / // \ \ \ ` \ \ \ \�\ o\ \\ \\ \\\\\I \\ STREAM (S15) (INTERMITTENT) OPEN CUT FOR GAS LINE, TEMPORARY STREAM CROSSING/MAT PLACEMENT, POTENTIAL BLASTING,\ DEWATERING STRUCTURE \ \ \ N \ 1 1 \ \ \ \ \ \ \ \ / / I I I N I / I 1 I 1 1 1 1 I I I III I / I / l l / l l l \ 1 1 O \ \ \I \ I I I I I I I I I ll I \ \ \ \ \ \ \ \ \ \ / / / IO I I I III / I / \ \ \ N \ \ \ --, I / 1 I / 1 \ \ \I\\\ N\ \ \ \ ?S l l / l I / I / l N I I I ' ' I I1IIIIIIIll I l I/ l I I \ \ \ \ sr \ \ \ / / / / IIoI// I I / \ \ \ \ \ \ \ O \ O� /l/ IIIl 1 I I I I I III\\ \ \\ \ \ \ \ \ \ \ \ \ \ / / / 1 I I M 1 I I I I I I I \ \ I N OI I l \\\\\\\\\ \ \ ///' // I /I//,/o11`-/ // II \ \\\\ \\\\\\ \\ \ // ' l lI NNll1/lIol1\ \\ \\\ - �' / / l / / l / l l 1 I I I ) \ I \ \ / / / / / \ / / / \ \ \ ///l / I \ \ \ / j'/ / / /j// / / /I\\\\\\\`\\\\\\%//'/�///- //// / /\\\\ / // / / — — \I l / / /_ 1/ // // / / / �— - _ _ \ \ // /' /— \\\1 //_� \ \ \\ \ \ \ \ \ \ \\ \ \ \ \ \ \\ \ \ \ \ \/ 15L.//// 1 I1°� \�i I 1 1 1/ \113 \c\I 1\I1 1I 1 \/// I 1 11 1 1/'/ / / / \ \ i\io__ �/ / /_ \ \ SFO \, \ \ \ %—\ \\ II \ \ \ \ \/l lI,I// N////o/IIII/////// / / �\ \\ I1II 1\ \\/ `r v ?e +o\ \ \ \ \ / / f \ \ \ \ \\ \\- 8 / \ \ \\ \ \ 3tio D /// / / I / / \\\III 1/ ( �sX S\ \ \\\ 1/// / /// /////// / / \ II I \ \ \\\ L \1 \\\ \ I ///�/ /\\\\,\\I01 // 1 \I \\\N \\ \\\y�,� ocs SFO\I\N \ 1 \ \ q \ \ c� \ \ \ \ \ \ \ \\\\\\\I 1//' \M1 \ PROPOSED 12" STEEL GAS LINE D / /Lii//////// /I I1// / /^ / / / STREAM (S16) (INTERMITTENT)\ 1 0 1 \(I \ \ �e°7 \ \\\ 1 1 I 1 �\ \o / / //I11II//// �/l/) /ill" I 1r11\z 1 \ \ \\\ \SF` �DTSC1 I - \ \ \\/\\\SF����7 \N1 /// \ \ \ // //// /' / 1 \ \ I 1 1N 1 t 1 1\ \ \ / // // ////III// / /%!/ I OPEN CUT FOR GAS LINE,\ 1J BOO, \ \ \ \ \ \ ��\ - _ \ �\ \\ SF �°}1 \ \ \ \\\ \ \\\ - \� \ \ \ \ N \ Xo ®/ 1 \_\\ \ \ \ I1 ` -__1 oy LbD \ \ \ JioD Lo�_-®m L0Q //I 1 iTB IINII1- I 7-L' ° I I�o� ►1 •/\ + / // 1 I 1• \ / // - �' I I 11 \ o / / / // / / // / / I I I ° /\ \ o / / /o / ,/ / /PLACEMENT,\/l \ JH / I 1\ \ /://+/ /�// I I I / -�'///////// / / d / + / /// 6 // / / '/ II \ \ �LV' / / / / / / I IoI//�/�// //i/ / �js_® I I \ \ N / /°////// + o % /j %%i \ \/ // /// / /// / / '— TEMPORARY STREAM CROSSING/MAT POTENTIAL BLASTING, DEWATERING STRUCTU �E\� 1� \ ` \ \�a \\\ \\\ O \ \ \ \\\\\ \ \\ /\�- \ \\\ \\ \ 11 \\\ \\\\ �' LOD J \too tooL \\ \\\ \ — \ \_ \ _ — / s �� �.. iti \ \ \ \\\\\ \ \ \ \ \ \ \ \LOD r. I ILOD \ \ \ \ 1 \ QI\\ \'- - / /- l \ \\\ \ 1 0 11 \OQI\\\/y—I I —__//—o / / \\\ I 1 J\ \ \ \ \ \1I I ��\® / / \o co \ / / / / ,I \ \ \ \ \ \ I \ I \-- / / / l \ \ p0\ ---\ \. / t. / / I I il // / I I/ \ f —I— I —L / I "1 \ / /L //l /IIN/ // s� / —\/��`i°� llll I ° T I l / O I l sF/ �`-`� '/ / // / /'l l i�� ' ll 'am/ �.,�°�F//--�/_/ '/���- -"`d I� I / I / �%LOD. yF / �►/LD�sF1 // �-��, �;/ /// /s',�/ / /�/0 — _ LSD -- / �F / / / / / !!'�°---\ I / I I l OI l 40\ SF ° r / / / / / / / // / /, / / /totjl T/L°o% LOFT LOD�F,c /,L►:.i/:///1/7/;/ / � O IoI / / I 2 � _ o / / / / r / / NI/M/ \//° ' �°' / / / / // / /////i o oD%�/foI��/N TiI ///// \\\7 / / \ \ \ \ \\ \� \ \\U. // go o \ o\ 1 \ \ \\ /%/ \\ \ \�\\\\— \ \ \\ \\ �17 // / /—\ \ \ \\ \\\ \ \ \ \\\\\\\\\� \�\\\ / o / / ° / \ \\ \ ^ \\\ \\► \YI ,\ / /�2, — -�_ \ \\ �\ •• 1 1 \ / �� / Ln � � + \ \ /�/ /;�/ \\ \ \\�\\\\ \\\\�\\\owl N__ N\ \ In� \ \ /\\ cs1\A'\ _-- —/ I III I I d Il /L _/' / / // / / / .� , / / / / LOD—SFB I I N. \ ` \ \\\ \\�\\\r\\ \ 1 \ \ \ \o\\ \ \.., _— °°,�°°, ---_ \ I 1 I I I I I \ \ / .230 ' ( \ aD, 1 I I I 1 ' /'�//// \ I' // F'�—°�0,° ' \__ 6 / 1\ \ \��s,, �� } \ \� L _— / /� ° 1 OD /\ \ / I I \ C� T /' \ o QQ°o, ) 1 \ I I I / / 1 // / l l SF 7 ° sF�Q\F :.., 00, - / / \ \ \ \ \ \ �� LOD �F� OD _ LOD — °Ol \ \ \ / - ' \ \ \ 1 1 I \ \ \ \ \ / / / / / / / / / / / /' /°O I I \ I I l / / / / 1 0 \ �z� LDD LDD LC'I�+���°°, \ / / i 1 \ \\ \ \ \ \ \�\ \ \ \ / / — / / 7 / / / / / I 1 / / / /'/ / / / �'-7-— 1•' / // // /// \ \ \ -` � I. 40 \ — \— \ \ \ I / — / / 1 O \ \I/��ti@ \ LOD \_ 0�� 0Oj / / ) \ \ \ \ \ ----/ / / I I 1 / / / '/x�/ O/� \ v / / p/ / / / 1 I I ® Y \ L_V _ — L OD`�—� _ °Oj / / \ \ \ \ \ \ \ / / / / / / / / / , l // / / / ^- / L� yOD T� LOD LOD • ` OD _ � °� \ \ \ / / l // O �\O cr� / l / / I \ \ \ / no / / / / / /// / / I ® \ \ \ \ I 1�O �I�OD L� \ ` \ 1 1 1 �\ LOD �� LOD }� I 1 1 o� N Co \ Lp O 00, \ / / o 1' / / / 3f / / �- \ 1 \ / / / \\ LOp 1 / — 0, l \ L _ ° I \ \ \ ^ \ \\LODLO ADD, \\ \ --- x \\ — \ -- SFp\\ SFO — / / l / l / / .� // / / '/ / / / / / / I LOD I \ \ °1 I \ • \ \ \ 1 1I\\ \ _ _ — — LOD — 007 I \ \ �\ �ry // // // // / LOD \ \ t \ Ts�\ — / / /I/ / �// I A1 // // / \ \L ADD,1 \\ \_I / / / / / // / I✓ / / �- --- / /-� ` „® \\ , \ ADD °°\ \ \ — o OD_ -- l r / / / _/ ___/ / I / / // // / / // I///1; 40/%40 N N \ _--_ 790 NNN 40,.v N \ SFO SOD \ ,�° -0— N 1 I /// / /�i�/ / / // , / N/ / \ \ \ \ \ \ \ \ LOD N \N 1 \ \ \ \\ _LD I / ///�7 / // /�/ o / / / \ \ \ \I �CCl \ \ \ \ 0\0 1 \ \V \,\ �: —\N\ N1 1 _ \ \\ N \ \ I \\\\\oo \ \ \\\\ \\ , \ \ • co 4 N\NN \ \ \ \ \ \ \ \ \ \ \ I rA I \ \ I \ q cy / /' /' `\ \\ \ \ ` \ \\ \\\ �.? \�-----\\ \ \ `-_-' 1 PROPOSED ACCESS ROAD / AR-007A (TEMPORARY) / / / / / / / \ \ \ \ \ \\ \O \ // j / / / / / / / \ `\ \ \ o \ \ \ \ 00 \ \\\\ / / / / / " \ \\N\ \ \ \ N 1 \ \ \\ N \IIII \` 'i/ / o/' /// /' \ / \ N. \ \ \ O\ // /' / / / / \ N \ a/• \ \ • \ \ c�6,xl�:� /' / /' / / --_ \ \ ? /, /__ _ \ y�® \\ St/ / / / __ -_- \\ //, / / �— _—_ --_ PROPOSED ACCESS ROAD AR-007 N \ \ _ \ \\ `\ `\_--- O \ ° �► > \\_� \ \ \ _ \ `wo( 1 I \'�°o > 1 / /O // (//////////////////////1/ ,1//o// , / N/// /S / ''/////�\\\\111\\\ I I \\ Il ► I►I I /� // ,y0 ,/,/ / I ,I I I 1 I \\ N \ \ I 1 I I 1 / // // 2 / / / / I I 1 N \ III / 7 \ -__ - — //Pi / I I 1 ( \ %/ 1 \ \ / , �/ \\tea °D> \\ J I I / / 41(7 / // // / / / \ 1 III 1 II \ \ / / /// �// �_-- \NOTES: \ \ 1 / / N \ \ \ /// // / N \ \ \ I I l //// / ///// %'// / / 7/ I \ \ \\ 1\1 \ \ ✓ I I I \ \ \ \ / / ,//// ///%/ // -_-_ \ I / / / / / / 7 7 i \ _ 1. SEE LINE 142 CLEARING REQUIREMENTS ON SHEET 79. / // \ \ \ ` I I \ 1 J �l / J / // / / / / / / / / _ I 1 \ \ \ \ \ \ \ 1 \ / \ \ \ °a / // I I \ \ \ \\ \ / / / / / // / / \ N \ \ 1 \ / ' / /'/'/// /4' // i7,/' %' /' ,-----\ _— ,\\\/ / / \\ \ Nio°� (///// /(////// \ I / _ \\ / I) ti i / I / / //// /N \ / / / / / / / / / // --- `\ \ \ `\ `-__' / 7 /' /—-----------------i// ��I I I I\ \ / \ // ///'///// r/' // o-\ 1 1 I \ \\ \\ \ \\ \ \\ \ \ \\\` / / // /\ \ —\ \ \ 1 ( / / \ \ \ \ \ \ \ \, 1 / / / , / / / / /—�— / i __ --� __--7 o _ — / I / / / / / 1 \ N \N \ \ \ \ \ k \ \ ,' \ / / / / _ - / / - / - \ \ (P / _ FOR CONTINUATION SEE SHEET PNG-C-142-0001075 \ / // ► ► / - '-- - -�\\\ °\° I \ '' l \Ill �\ \\ ,\\\\\\\\ \ \ \\\\ I II . _ \/ \, / / / f , //__ \___/___ \ / l l l l I I / I I I I 1 I I / / ' // / /— _ / / \ \ \ a 9 \ \\ \ \ \ \ .\`0„,,,,,,,,,,,,,,,, c A R 0,,, , ot.o�Ess/o '/2 -, 2�.9Q� 'y`'.-y ; let .0 ��09/ 22°!ry c `.'LG I NEB.°.' N //qkEITH c�� -,,,,,,,I,,,,,,,�� PROFESSIONAL ENG/ARCH STAMP PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED *DO NOT SCALE THIS DRAWING *USE DIMENSIONS ONLY * * REF. DWG(S) PNG-G-142-0001000 PIEDMONTS NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS SHEET(S)64 OF 119 DWG SCALE AS SHOWN 05/09/2022 ISSUE FOR CONSTRUCTION JB TFG WKG AREA CODE 1853 DATE INITIALS REGIONAL LINE 142 PIPELINE DWG DATE0911712021 SUPERSEDED ACCOUNT NUMBER 10700 ENGINEER Q PNG DRAWING _ _ C 142 NUMBER _ 0001063 REVISION 0 PROJECT NUMBER 0232195 DATE INITIALS MGR TECH E Piedmont Natural Gas E&SC PLAN-9 DRAWING BY JB REC &STD ENERGY. CLAYTON NORTH CAROLI NA STATION ID DATE NI PRINCIPAL DISCIPLINE / RESOURCE CENTER / LINE NUMBER CHECKER INITIALS TFG 05/09/2022 WKG ENGINEER COPYRIGHT 2018 Resource Center GOLDSBORO, NC LEGEND J a I \ I \ 1 I I I/ \ \\ I I \ 'II \\\\ 1 „1i / \ \ \ \ 1 I I I I \ \ \\ \ \ 1 I I I I I \ 1 1 \\ \ \ \ \ I I I I I I I I \\\\ \\ I \ I I I I I I1 1 I \\ \\ \ \ 1 \ / I I I 1 I I I 1 I \ 1 1 1 \ \ ( I 1 \ / I I 1 \\\ I1 I I 1 I 1�/ I I \ I l I I 1 I I I 1,/I I I I I I I I I I III I \ \ \ \ \ \ l l I 1 1 ( I \ \ \ 1 1 I I I\ / \ IIII 1 \ \ \ 1 I 1 I 1\\ \ \ \ 11\ 1 1 I I \ \ I \ \ \ \ / 111 1 / / / \ \\\\\ \\ j I I 1 I / \ � III I\ \\ / \ \ II // ///_\\ \\\\\�/JI IIIII / / \ \ \\ \\\\ 1 I / \ / l / / \\ \\\ / I I 1 / / \ \ \\\\ \\\ / // / /1 / // / //\\\\\\\\\V�/// //1//�'/ i I / I / / / \ \ \ \ \ \\ ///// 1 1 1 1' / / \ \\\ \\ \ - / /// I I \ \ \/ //// I \ I - I I I I I / \ \ \\\ - / I I \ \ \ , / // I I 1 ► I \ , \_/, , 1 \ / \ \\ \ 1 1 \ �� / \ \ / / \ \ \ - - / / / �/ \ \ 'Ili/ ' / / \ — \ I \ /\ I / �,_� / / II I i'-_ / -\\\ I I 1 I / / \ \ _ ✓ / / / / / \ \ 1 I l / / 1 / \ 11 — \ // / / / / - / I ( \ \ -------_�/ I 1 / \ \ 1 // / / I 1 1 / \ \ I // / / / /- jI I \ 1 I / I /\ \ /1 / / / I l \ \ I // - - - - / I \ / / ' — — — 1 I \ \ \ I / I\ / _ 1 \ \ \ / / I \ / _� I \ / / _ / \ / / / _ _ — _ / il / \ / \ \ I / / / / l / / \ / \ / / / ► l 111// \ I I / / / / / l l I I / / / / / / I 1/ / / / I / / / / / / / I l 1 I / / / / / / / /I I I 1\\ I 1 1 1 1 / / /1 I \ \ 1 / 1 / / / / / 1 \ \ I I I ( \ / \ I 1 l 1 \ \\\ 1 1 l \ \ \ \ \ 1 I \ \ \ \ \ \ \\ \\ \ \ \ �\ \ \ \ \ \ \ \ \ \ ` \ \ \ \ \ \ \ \ \ \ \\\\\ / / l I I I //// ��, (/I I /// I I 1 1 / I 1 I 1 III I \ V I I !dill \ \ N / I 1 \ \ l \ \\ N,/ // I \ \ I \ \ \ \ I I \ \ 1 \ \, ,,1 \ \\ \ \ )/ \ \N/i \ \ \\ \ /// \\ \J 1/ / �� / _ \ \ \ \\ / \ \ \ / I \ /l / ----\\ // / // _---_\\ \\ \ / / I / / / \ \ I / / i - I / / ,-- — \ I 1 I / / / - \ N \ \ / ///'i -� \\ \ \ I l 1 1 1 / / / / / _ - - _ \ N \ \ 1 I 1 I 1 / / \ \ \ I, I / /'---_ \\ \ I 1 / \ \ I I I l / /_ \ I 11 I 1 / // / - _ \ \ \ \ \ \ 1 1 1 / / - - - - _ \ I \ , / \ 1\ 1, // -- \ II \ / / / / / / - - - \ \ 1 `"-----.....N // / / \ / / \ / // / / / / / \ \ \ A /// /// / ///- / \ \\ \\ \ \ \\ \\\\ \ 1 \ \\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ / / / �\ \\\\ / \ \ \\ \ \ \ \ \ I \ \� \� \ \ \ \\ \\\\\ \ 1 / \ \\\ \ \\ \`� �_--_\ \ \\\\\\\\ \ \\ \\\\\\\� \ \ / \ \\\\ \\\\ \ \ \ \\ \\ \ / \ \ \ \ \\ \\ 1 \\\\\ \\\\\\ \ \ \ \ \ 1 ( \ \ \\ \ \ \ \ \ \ \ // ' \ \ \ \ \\ ✓ \ \ \ \ \ \ \ \ \ J / \ \ \\\ \\ \ \\\\ \ \ \\\ I \ \ \ \ I \ / __ \ \ I \, 1 \ \\ \ I \ \\\\\ \ \ \ \ \ \ \ / \ \ \ \\ \. \ \ \ \ N / . / N 'IIIII\\\\\\ A \\\\\ \\\\\\\\ \ / \\-\ \\\\\\ Al\\\� \ \ 1 \\ \\� \ \ I I I I 1 \ \ \\ N \ f \ \\\\\\ \ \ \ \ \ \\ \ 1 N N \ \ \ \ \ \ \ \ \ l \ \ \ \ \ \\ \ \ \ \ \ 1 \ \ II \ \ I I I \\ ` \ \�_)\\ \ \ \I\\ \/-\\ \ \ \ ✓ \ \ \ \ / �_` \ �\ \\ \\ \\ \\\\ \ \ \ \ \ \ \ / 1 \ \\ - \ \ \ I \ / `_ \ \ \ N _- „\ \\ \\\\\\\ v\\ \ \ 1 / \ \ \ \ \ I I 1 I ?j Jr / \ \ \ - \ \\ \\ \ \ I 1 / d' / \ N______—___— \\ \ \\ \ \\\ \ \ \ \ 1 \ �\ \__\ \� �\ \\\\\\\ _ \\ I 1 --' / - / / \\\\ \ \\ / \\\\\ \ \ \ \ \ \ I 1 % CA �_\\_/ �\\\\\\ \ \ \\\ \ 1 \ \ \ / 1 I l \ 0 / \ / \ \ \ \ \ \ \ \ \\ % - ` \ \\\ \ - \ \\\\ \ \ \ \ I \ Q r / ' / ' -// / \ \\ \ \\\\\\\\\\\ \ \ \\ I1 \ 1 I V• / \ \ \ CODE TCE TEMPORARY CONSTRUCTION ENTRANCE ������ CD LOD CHECK DAM O LIMITS OF DISTURBANCE - LOD - SF SILT FENCE SFJ SFO SILT FENCE JHOOK SILT FENCE OUTLET O CS CSIP SFB TSC TWC COMPOST SOCK /� COMPOST SOCK INLET PROTECTION / SEDIMENT FILTER BAG SFB TEMPORARY STREAM CROSSING TEMPORARY WETLAND CROSSING SB OSF TB TTP CX PS SLOPE BREAKER �w V� ORANGE SAFETY FENCE - OSF - TRENCH BREAKER ® TEMPORARY TRENCH PLUG 0 CURLEX PLACEMENT /i PERMANENT SEEDING PS / / / I I I / 1 / I / 1 / / 1 / / 1 / \\\ \ - _� \\\ �, / \\\ \ \ \ \ \ / / ---- \ \\ \ \ / I I 11 \ \ 1 \ \ I / \ \ \ \ \\\\\ \ I 1 /// / --- \ \ \ \--- \ — /� \\ \\\\\�\ \ \\\\� \ \ \ \ \ I I I \ 1 1 1 \ \ / - / / \ I I 1 / / / - \ _ // \ \ \ \ \ \\ \ \ J \ / / / / / I 1 1 I \ \ \ \ 1 1 I / / / \ \\ \ \ \ \ \ \\\\ \ , I I /� / // /' O \ \ \\ \ \ \ � � � \ \ \ '_ \ \ \\\\\\ , .,0 \ \\\\ \\\ \ \ \ \ \ \ \ \ \ / / / l l/ , / / / / / 1 / / / / 1 / / I` / \ J \ 1 \ \ 1 / \ \ \ \ \ \ \ \ \\ \ I III(/ / / / - -Ai \ _ - - \ / 1 1 \ 1 \ l \\ \ \\ \ \ \ \ \ \ \ \ _ 198 - I 1 \ 1 1 1 I I / / / — / \ \ \ \ \ \ \\\\ \ III / �\ \\\ \ _- _/ \ I 1 II 1 \ 1 >>1 \\ \ \ I \\\ \ \ \ - i a� \ \ \ \ \ \ 1 1 \ \ 1 1 I 1 / / / / / \ / \ \ \ \ \ \ \ \ \ / I 1 I I I I / / / _ -- \ \ \ \ - - \ \ - - 1 III J \ \ \ ` \ \ \ \ \ \ _� �_ i / / / / I \ \ \ \ \ \ \ / // / / \ ._ - \ / \ \ \ \ \ \ / Ear \ \ \ \ \ \ \ 1 \ 1 I / / / \ \� \ \ \ \ \ \ \\ \\\ 1 I \ _ \----_____----- 1 1 1 1 1 1 I I I / /' / / \ \ ` / \\ \ \ \ \ \\ \ \ \\\\ \ \ \ / ' \ \ \ _- \ \ \ I III I \\ \\ 1 \ \ \ = / 1 1 1 I I 1 / / / / \ \ \ \ \ \ \\ 1 I I ( / \ \ \ \ - \ \ 1 I I 1 1 1I I \ 1 \ \ ' / \ ` ----� — \ I _ _ 1 \ - \ ` \ \ -_ \ \1 \ / - \ l \/ / —� \ \ oAVAA \\\ 11 /l / \ �v / 1 \\\ \ 21 \ _ 1 1 I 1 \ 11 \ I \ 1 I / / / - \ \ / \ \ \ \ \ \ \ \ \ \\\ \\ \ - - _ - _ \ \ \ \ \ I 1 I 1 (I 1 ( �/ // _ \ J 1 1 1\ 1 1 \ \I Io 1 I 1 1 / Z / / -- \\ \\`�/ \ \ \ \\ \ N. \ \\\\\\\6� \\\\\\\I III --_ \ \ \ —\ \ \ 1 \I 1l l //III\ 1 \ \ 1 \ \ \ \ \ I = \ \ I Ii1I5�'��IQ 1 1 1 1 I 1 \ I / / — �\ \ \ \\ \ \ \ \ \\ \ \ I 1 \\I I / N \ \ �\ \ \\\ 1I /�/�/ �\ I IIII 1 / I I ( / ' \ \ \ \ \ I 1 I \ \ \\ 11 \ CTWO PT CWD SWC CONCRETE TRUCK WASHOUT PORTABLE TOILET TEMPORARIMLAND PERMANENT IMPACT THROUGH WETLAND EXISTING STREAM THROUGH IMPACT PERMANENT IMPACT THROUGH STREAM CLEAN WATER DIVERSION — TEMPORARYSTORMWATER \ ❑ PT / //i �/ CWD - / j �� \ \ I I I /�\\ \\\\ \ 1 lid -- �\ \II \\ \ \ \ / / 1 ) I I 1 1 1 I \ / \ \ \ \ \N \ \ \ \ I \ \ \ \ \ 1 1 I \ \ N \ \ - - - - _ \ \ \ \ \ \ \I l \1 \ / /� \ \ 1 \ 1 I 1 1 1 \ \ I \ 1 1 1 1 \ 1 \ 1 1 I 1 // / // // \ \ \\ /-\ \ \\ \\\\\ \ \ \\\\\\\\\/ II\I\\\\\\\\ l /"—� \ \ \\_��----- \\\\\ \ \\\ \\\�/ //—\ \\� J I I 1 11 1 \ \\ \ \��/ / G'APHICSCALE IN FEET \\ I I\/ / /'-- \ \\ \_/ \ \ \ \ \ \\ \ \ \ \\ \1\\I \ 1 N N \ �__ N \\\ \\\\ 1I1 \\ ) I I I I \ / \ \I\ \ 1 \\\\\\\ \\ \\ \ \ 1 1 1 I \ \ 100 0 50 100 -200- - 1 1 \ \ \ \ 1 I 1 I / / / / \ \ \ \ \ \ \ 1 _ _ \ \\ \ \ / /, I I \ \ \ \ \ \ - - - \\\\ / / / \ ` , ^ / \ \ --\ \ \\\ \ I I 0 I 1 0 / / i-- \ \ \ \ \ \ I I \ \IIII\\ \ \ \ \\- / / I I % \ \ \ / \ \\\ IJl III \ \\ \ I -\ \\\\\I1 / �//1 I \ \ \ / I \ \ \ / I111 1 1 i N?/ / \ 1 \\ 1 \\ \ \\�\\ l \\ \ \ / I / \ \ 1 1l \\ I o\1\1NI \\ / \ \ \ I I \\\A\ 1 N / \ \ \ \ \ \ \ \/ / \ - \\ \ 1 \ \ I / 1 1 1 \ 1 \ 1 I I 1 I ry / - \ \ \ / \ \ \ \ \ 1 I\ \ \ \ A \ \ \ / \ \ \ 1 / 1 inch = 100 ft. \ \ \ \ I 1 1 I I I �1 1 1 I 1 I I I / / / / \ \ \ \ \ \ \ \ \ \ \ \ \ l ` \ \ ` / I 1 \ \ \ / \ \ \ \ \\\\\ \ \ N-. / /•l / / - \ 1 1 \ 1 1 1 I / � 1 I \ 1 \ \ \` 1 I I 1 / I / / \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ I 1 1 \\ \ \ \ \ 1 I \ _ _ \ \ N. \ \ \\ \ `� / / /' \ _/ / \ \ / - - \ \ \ \ \ \ / ( 1 \ I I / / \ \\ \ \ \ \ / / / / \ i 1 \ I l r /'/I \ \\ \\ \\ \ \ \�\\\\ / —2Oo— \\ \ \ \ \ \ \ ' \ A \ 1 I 1 \ \ A\\\\\\ \ \ \%l' \\ \\\ \ \ \ \ \\A \\ \ 1 \ 1 01 \ \ \ \ \ i \ \ 1 I I \ \ \ \ I STREAM (S17) (INTERMITTENT) OPEN CUT FOR GAS LINE, \ TEMPORARY STREAM CROSSING/MAT / oo \ \ \ \ \ \ \\ \7 \ / \\ \ \ \ ___ �� �// —�;_�/ / \/ 1 I 22 I \ \ \ \ \ \ \ \ 90 - ) 1 \ \ \ \ \ \ _ - _ _ \ \ / / - / /I - i • \ \ \ , \ _ - _ \ \ \ \ \ / / / / , 1 I I \ \ \\ \ \ \\ \ \ \ \ \ \ \�\\ \\ \ I \\ \\\\\ \ \ \ --__ \\ \\ \\ \\\\\\\\ / / \ _- / / /_----_ __ \ 1 \ \ \ \ \ \ \ \ \ / 1 \\\\\\ \ \ \ \ \ _/ /- / / I 1 \ 1 \\ 1 \ \\ \ / \ \ \ \ - \\ \ / I l J / / - - - \ \\ \ \\ \ I l \\ \ \ \ \ \ \\\\\\\, CONVEYANCE / WETLAND IMPACT TYPES N \ \\\ \\\\ \ 1 CI \I\ \ \ \15, ,\\•.\ \\ \ \ ` \ \ \ 1 \ \ \\ \O \\\ 0\ I \ A \ \ \ \ \\ \ 0\ \\ \ \ \ \ 1 \ \\\ \ \ \ \ PLACEMENT, \POTENTIAL BLASTING, DEWATERING STRUCTURE I \� \\ \ \ / _ \ \ \ \,\ \ 1 1 \ \ \ \ \ \ \ _ ///'/ / — _ / — — I \ I 1 \ \ \ \ \ \ \ \ \ \\ \ \\\ I \ \ \ \\ \ / \ \\ \ \ \ \ \ / / /' _ /' \ / / \ N \ \ I 1 l ,. \ \ _ - - - _ N \ \\ \\ \ \ \ N \ \ \\\ \ J \\ \\ \ \\\\\\ - _ _ \\ \ \ \ \\ \\ \ / / — ' ' 1\ \\ / // / // /' - -20 \ \ N 1 I \ \\ \ \ \ \ \\\ ? \ \ \ 1 - \ \ \ \ \ \ \ \\ / / / _ _ - — 1 \ 1 / ' s - - - \ \ \ 1 \\ \\ \ \ \ \ \00\ 1 \ \ \ \ I \ // \ TRANSITION OF FORESTED TO NON-FORESTED RNEERIANENT CROSSING/MAT PLACEMENT (TEMPORARY) \ \ \ \ \ \\ \\\ \ \ \ \ \ ` \ \ \ \\ \\ \\ \ N\ \ \ \ \ \ \ \\\\\ \ \ \ \ \\ \ \ \ \\ \\ \ \\ \ \ \ \\� \ \\\\ \1 \\ \\ \ \ \ \ \\A \ \A\ '1\ \ 1 I I I 0 ) I 1 1 I I I 1 \ I 1 I I I \ 1 \ I \II I 1 II 1 \ \ IIIII ►I \ \ I \ \ \ I 1 I I 1 \ \ \ I I I \ \\\ \ \ 1\ \ - _ 1 \ \ \ \ \ \ \ \ \ \\ \ \ \ \ ) \ \ \ \\ \ \ I / \ \ \ I 1 \ \ \ / / , / /'\ 1\ \ / / / / i - - - _ _ - - \ \ \ \ \ I 1 \ \ \ _ _ _ - - \ \ \ \ ?y \ \\ \ ` I \ \ \ \ \ I 1 I \ 1 I 1 / 1 \ / \ \ \ -\ \ \ \ \ \ O \ \\\ 1 \ \ \ \\ \ \ A \ \ 1 \ 1 1 \ \-// // I / / / \ \ 1 I \ \ \ \ \ \ \ \ \ \ \ \ \ \\ \\ \\ 7 \ 1 I I \ I \/ / / \ \ I N. \ \ \\\\\\ \ 1 \ 1 \ \ \ \ 1 1 1 \ \ \_/ 1 I / \ \ \ 1 1 1 \ \ \ \ \ \ \ \\ / \ \ \ \ / / / \ \ O \ \ \\ \ \ \ \ I I 1 \ \ \ I \ \ \—/ / I \ I I I o \\\\ o \ \ C CD\j \\ y \11 1 I TB I 1 1 \ 18 \------\ \ / / \ \ \ \ I / ,I \I +\\ \\ ? 1 /� I,\ \ ► ► I \ \\\ �� I , I ,— \ \ , l \_\ \ \o\ \ \\ \ \ I I I I c,k °d'' 1JH I 1 \ \ \ \ o \ \ \ \ \\ O \\\\\ \ 1 1 \ \`_///,/ / / 1 1 1 I I I \ \ \ -• p6 / \ \ \ \ \ \c\ \ NN \ \ \ \ \ \)/ \ \ \ N \� \ \ \ w�,s�► �rw 1I �0 . �� I \ 1' (1� re \ \ \ \ \ o \\—./ \ \ \ \ \ 1 // / 1 1 I \ \ / ,, \ l \ \ \ \ w o\° \ \ \ \ \ \ / / / / I I \ / N oo III \ C o o ^ \ \\ \\ \ \ \ \\ \ \ / / . �// / / \ \ \ I 1 / +\ . \tea, . �1 + \ \ \ \ / / / /,- __ J 1 \ ° 1 \ \ \ \ \ \ \ 3�c� O� 4. \ \ \ \ \ \ \ \ \ 1 ;✓' F , yy,:�y� �.o � I I — �o \ co O — \ \ \ \ \ \ \\ \ \\ \ / / / / — _ — `�D \ \ 1 N +o - ' \ \ \ \ \ / / PROPOSED 12 STEEL GAS LINE \ ,,_ D�F1/,! , , 'C \ ►F.Y" \ O \ \ \\ 1/// �_ _ \ \ \ \ o .� \ cq SF \ \ I LOp 1 \LDD I \ �M- LOD 1 I 1 0 1 I \ \LOD \ 1 ► 0o I I �I \ I I �.�• 1 \\ ' , \ l� \ 1 �ao I I r LOp I 1 '1 I ��IIIIII 1 l ,�� i l 1 I �1 `� \ \ ` \ \ \\\ A\ \ \\\\ 1, 1 1c1c Dy��_ c., F\� , ',�' 1 LD� I� 1 SFO� 1 I I 1I 1 \ 1 \ \ \ I 1 1\ 1 1 1 1 1 1 \ I� I 1 1 I I1 I �� �o� I 1 1 I I I I 1 I / I o I O I oI ICI I I ► o I I 1I ►I- III' N i \ - l \ i -�, _\ _ 1 - U'® �° \ 0 o\s \ Imork„ I \��! LOp 1 D ®� L.. ,,�\' I I 1 I I .� D o r : . - Co o \ \ \ \ \ \ \ �,/cc 1 / 1 / °1° �'� N , \o \ \ \ \ \ \ .� - - - - .a. \ O D / S� uDD / o \\ \ \ \ / / 1 / ��\ o N �°SF �1 / //\ N \ .. \ b\ \ \\ \ \ \ / / - - - - \ \ O �' D ® 5��/, -// i /\ � �' / / \ \ 8 \ \ \ \ \ \ / 1 / / / / _ \ \ o N LO ° c� �/� °'\ \ / \ \ \ Cfl \ \ \ \ 1 \ / / / \ O , D g / 1 / \ �° / / �a /Z �� SF ��� \ \A \ 1 1 1 \ 1 \ J / / /1- / / / o _ _ \ \ ��o o N ° s �°� � A. ` 1 / � / SF ° LOp / r.// o — \ \ O r /° \/ _� 1 I I \ \ / / /� \ N ,/ / \ SF D I SF b \ `\� / �i/ //\ I \ \ \_j. \ I \ \\AA \\ \ \ \ A ► I i ► / I I I I I /I I I I III / I I I ' _ / F I ` S® °° C, '� SFO / /' N Q Nlirjo°yam �� , / / o \ +/ 5�,I \ A\ S� '' O �SF \ \ \ \ \ \ \ 1 1 I I I I I 1 I 1 ` I I \ A \ \ \\ 1 I , I \ \ \ 1 \ \ 1 \ \ — \ 1 \ \ 0 1 \ \ I \ N \ \ \ \ \ I \ \ 1 \ \ 1 \ \ \ 1 \ \ \ \ I \ \ \ \ A \ \ \ \ \\ 1\ I \\ \ \ \ I \ o \ \ \ \ \\\ \\ \ \ \ \ \ \i1 \ \ \ \ IQ 1 \ \ \ \ as 1 o \ II N 1 \ \ 1 1 \I 1 III 1 I I I I 11 II I 1\ II I /III 1 I III 1 I IliI , I 1 111 1I 11,1,11 11\ I 1 I I 1 I 1 11 I 1 1 11 11111 A A \\/ \ 1 1 \III 1 \ 1 I I / I I 1 I 1 / 1 / • l -/ I•— I I I III / I IIIII / II I \ I \1\\1 / I / ( /1 1 / I 1 I 1 I I 1 , IIII III 11 \ 1 I\ 1 1 I / // l I J I / 1 / / / / / / / / / ) / I c / / / / / / / / / / / / I / N / I / I / / / / / / / / / / / / / / / / / / I / / / / / / I / - • D I / / / / / / / I•i I I / / / / // / /' / / / / / / I / I OHM / / / / / 1 I 1 1 I l l 1/ / I 1 1 hill 11 / /// I 1 \ \ IIIII l / 1 / / / / / / / / / Y l I \ \ IIII I 1 1 / 1 / / / / / / 1 / \ \ II I111 / / I 1 I I I I 1 I I 1 / \ 1 1 I I I I 1 l l l \ I \ l \ I I I I I \ \\\\I \ \ \ 1 I 1 1 I l / I I I N \ \ / / + o °D / �OD` l /', / - ,co 1N , S_ F \ /' / ® `Op ' _ �I� \ \ SF / `v 1 1 �p ! Sr-) (A i // `°D \ \ \ . 4� ° 1 LOD_ LOD / // \ \ �_ / SF O: 1 /E O/ . ��D/ 60D ® \ \ // , �� / / - \ _ _ _ LOD LOD J. —\ \ sF OO7 °� I '1s - \ / F/� \ N. ` - / / 1 / L LOD \ \ _ ,sr,° o / D,G/F 1 �a'�b / — \ / \ Op J Lo �oD ° 1 S / / / LOD \ / I \ \ i \ \ �Dy— LOD ' —/ � `oDS `Ov / /' / \ / 1 / \ \ �� / / / \ / A \ \ `°° coo —�— j°D / / _ l I 1 \ \ �LoD— ,.•D / \ / \ \N \-- / / 1 1 °.,) / /-------------------- // / ,.OD, `° 7 / — , / / / \ / I _ 1 \ o°�, °�/ / / / /�D ��- \ / / / / /_ / / \ \ / / / — I°°,�% / y �oD// / / %/_ // / j' ' _ �\ \� \\// / I / / °°,-5 ,°5 if. // / / / / / / °°i /SF i �� D� a F j/i SOD / / / / // // / �= / / / — �v_ \ / I / / I /o°�/�/ /�`oo °D / // / / / �S�o / / /� y/ / 7--\ / ,/ / / / / \ N \ \ \ I\\1\I\\\1 I I N \ \ \I \ 1 \ \\ \A\\\\\ \11 \III \ \ \ / I I I \ I\ \\\/ LO�o®isj SF°D�LOD __ SFO / / / -- / / / 1/ �� / \ — ',---�' / / / ' \ \ \ \\ \ \ 1 \ \ \ \ \ \\\\ \ \ \\\\\1 \ \ \ \ \ \ \ . \\\\�\\) \ \\\\ \\ \\\ \ \ v v v v 1V�\ \A\ \ \ \ \ \ 1 I \ \ j/ \ \\\I I\ / \\ \\\\\ \ \ \ \ ) / / / \\\\\\\\1 / \\ \ I AVA \ 1 \ 1 I I / / \\\V \ / / °o, / �y/`oD /' // / 1 / \ \ ao� / j iF �oD / (p / / / / �_ / / / / °o,/ S/ / / / \ __/— / S. ,DD _, /°° OD/ t.o0 _ --� / \ ��\ \ \ / \ \ \\ �° \ \ \ \\ 1 \ 1 I I / / �\ 1 \\\ \\\ \ \\\\\\ \ \ / ' / \\ \\ ) SFuo0/ I. NOTES: /' / / ` \ _ _ �' - - ��C \ \ \ \ \ �' \ \ \ \\\\\ \ 1 \\ \ \ 1 1 I I / // \ \ 1 II \\\ \\\\\1\\ \\ I / o^�j o tiro / y 1. SEE LINE 142 CLEARING REQUIREMENTS ON SHEET 79. ( Y ' / \ ` - - - , _ - / -- / �' I / / _/ /. �7 \ \ \ \ N \ I 1\ 1 I I 1 \ \ \ \ \ \ \ \\ \ \ \ \\\\� \ / J I1\\ \\\ \\\ 1 1 I \ \ \ 1 \ \ \\ \\ \ \ \\\\ \\\� \ �\\ /III\\\\\\\ \\\ \ \\\ \ \ \ \ \ \ \ \ \\ 1 1 \ \\\ \ 1\\ A\\\\ \ \ \ \ ( \ \\ \ \ \ \ \ \ \ \ \ \ \`\\ I \ 11 \\ \ \ \ \ \ \ \ \\ \ \\� \ \\` 1� \\\\ \ \ \ \ \ \ \ \ I I\\11 \ I i'llift( Ia 5� — i 0 / // \ \ // o /i I 1 \ \ I r _ I I I / — / /ZZ /' / / I I I I I /' ,_ . , I 1 1 / 1 / / // // / // // // //' / / I / II/ S, ° , / 1 11 1 / �— / / /—__ / (�_/// ,-- \ \ \ \ \ \ \ \\ \\ \ \ \ \ \ \ 1 \ \ \ \ \ \ \ \ �\ \ \ 1 1 \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \\ \ \ \I \\ \\\\ \\\\\ \ \ 1 \I \ 1 I \ \ \ \ \ \ \ 1 1 1 I 1 \ i \ \\ \ \ \ \A 1 \ \ \ \ I ° I I I I y I ly I g / I PROPOSED ACCESS ROAD AR-008 (PERMANENT) // / / 1 1 \ I 1\ / 1 1 l// // / / / / / / I I \ \ \ \ I I / / / _ - �' ��/ __// /- / / 11 I 1 1 \ \ \ \ \ \I A\ I /�/- / /�L - / / - \ \ \ \ \ \ / / , 1 I I / / 1 / I W �/ ZN J c./ 2Nocsi 1 ~a 1 1 1 \ \ \ I / / ► \ \\\\1\ 1 1 1 1 I 1 / / / I \ \A \\\ IIII / / / / ) / 1 I / \ \ \ \\ \ l II IIII\ / / / / / 1 I\ \ \ \ \ \ \ 1 \ / / / // // 1 �`_\\\ \\\ \ \ 1 I11 1 // /\ \\ \ 1\ IIII / / 7 / / / \_ _ _ — \�\\\\\\ \ 11 --'\\\\\\A \\\ \\\\\A 1 /\__-1-111: \ \ \\ \\ \\A\A\ ' \\\\AA\ 1\ \ \ \ \ \ \\ \ \ \A\ \ \ \ ,— \ \ �_---_ \ \ \�\\\ \ \ 11\ \ \ \ \ \ \ \ \ \\ \ \ \ \ l \ \ \ \ \ \ \ \\ \\\ \ \ \ \ \ I 1\\ \\ \ \\ \ 1 \11111)1 - \ I I IJ 111/ 1 ) / / 1/�/I// I 1'/11 ////,//I \ \ 1 1 I I \ 1 1 \ I 1 I 1 1 \\11 \ \ \ A A \ 1111 1 I I I I I 1 1 1 1 I 1111 Jill II III I \ \ 1 \ I \ 1 1 I I I I I 1 I 1I 1 1 I 1 1 ► \ 1 I I I \ 1 1 I I I I I 1 1 III 1 III IIIII I 1 1 1 II i I I 1 \ 1 I 1 I 1 I 1 11 I 1 I 1 I I I I I 1 I I I' I 1 1 I I \ 1 I I III I \ 1 \ \ I 1 I 1 ' \ 1 1 -9. I I I I I I I I 1 I 1 I I I I I \ I I 11 I II 1 �I o J \ \ s °� Iyl I I II I1 I I IiI I I I It 1y I �� lco I N° J 1 o o I g J I O t LD' O\ I I \ 1 1 \ 1 1 I 1 1 I / I I 1 1 I ► l / / / \ \ / 1 /' '� \ \ �/ / // /'/ /'� __— _ -/ / l / / \ �\ \. �\ ( \ // // / // // /Z��' //� —' // / I \\ \ 1 \ \ I \ / // / / 7' ' / / / I \ \ / / / i �/ ( /— / / // / \ \ \ _ / / / / / 1 I 1 .210 / / / I 1 // / J / // / / // 7 / / 1 / / 1 ( _____ / 1 / \ \ \ (� / 1 / / / / ) /' // //' I FOR CONTINUATION SEE SHEET PNG-C-142-0001075 \ \ \ \ - // / / / �' / ' / / / / /' / /' _ / ) / / / / �_- / / I \ \ \ \ \ \ \ I / / / / / / / / (/ / / / / \ \ \ 1 / 1 / / / I / / / 11 \ \\ / l /' / ��/ J _ \ \ \ \ \ / /� /// / \ \ \ \ 1\ \ \ __/ I 1 1 \ •1 _s'. ° _ss /•0ti /�'- ••Q� •••� �_ 1��y q • , E)4 09/ 2 2: ' �GINEti `.'\`` ^ , .... G�.\.� „ KEITH G,.` '',,,,11111,,,` PROFESSIONAL ENG/ARCH STAMP PROPRIETARY * & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY * REF. DWG(S) PNG-G-142-0001000 PIEDMONTS NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS SHEET(S�5 OF 119 DWG SCALE AS SHOWN 0 05/09/2022 ISSUE FOR CONSTRUCTION JB TFG WKG AREA CODE 1853 DATE INITIALS REGIONAL LINE 142 PIPELINE DWG DATE0911712021 SUPERSEDED — ACCOUNT NUMBER 10700 ENGINEER PNG DRAWING -C-142-0001064 NUMBER REVISION 0 PROJECT NUMBER 0232195 DATE INITIALS MGR TECH DUPE I Piedmont Natural Gas E&SC PLAN-1 0 DRAWING BY JB REC &STD ENERGY CLAYTON NORTH CAROLI NA STATION ID DATE INITIALS PRINCIPAL DISCIPLINE / RESOURCE CENTER / LINE NUMBER CHECKER INITIALS TFG 05/09/2022 WKG ENGINEER COPYRIGHT 2018 Resource Center GOLDSBORO, NC LEGEND z Q a N % I I /' // / / /' \ \ \ I 1 1 ' ' \ _ _ - — \ \ _ \\ \` \ I ( \ \\ \ \ \ \\ \ \ \ \ \ \ \ \ / /\ \ 1 v _-__ ---\ \ \ \ \ \ \ \ ` \\ \ \ \ \ \ \ \\ ` \\ I \ \ \ ` \ \ 1 \ 1 \ \ \ I I \✓ / / / \ \ \ \ \\ \ / �- ---\ \\\ -/ \\\\` \\\ \`\ \ \` ` \ \ \ \ \ \ \ \ I ' ' I / / / / \ \ -- / / \ \ i - \ \ \\ \\ \ , / \ \ \ 1+ \ 1 \ \ \ \ \ \ \ \ \ \ 1 I I I ( / / / \ \ \ \ - __ \ \ \\ _/ \ \ \ \ \ \ \ \ \ \ \ \ \ N \ \ \\ \ \ \ \ 1 I I I I I / ' , I \ , / \ N. / / -� \ \ \ N \ \ i -\ \ \ \ \ \ / \ \ \ \\ \ 1 \ \ I I // / \ \ \ \ \ \ \ \ \ \ \\ \ 1 \ \ \ 1\\ \ \ \ \ 1 \ \ \ \ \ \ \ I I I I I I I I I /\ �� \ \ \_ /�\ \ \\ \ \ I I \ \\ \ ` \ \ \ \ \ I I I I I I I i / ( / / / / - \ \ \ \ \ \ \ \ \ \ \ \ \ ` 1 \ \ \ \ \ \ \ ' I I / ' / ' / / \ \ \ - \ \ \ \ \ \ \ \ \\ \ \ \ \ \ \ 1 / I I I / / ' / / / / \ \ \ \ -� \ \ \ \ \ \ \\"\\\\ \\ \ \\ \\\\ \\ \ \ \\1'IIIlll/1// / III\ //,II/ / //\\\\\\\\\\\ \\ \ \ \ \` \ I \ \ / / I I I ' I / / / / J / , I / \ \ \ \ \ \ \ \ \ \ I I II Il� 111 / /, / \ \ \ \ \ \ \ \ \ I / / / 1 �� \ \ \ \\ \\-� \ \ \ 1 \ \ / I / I I I / , I \ \ \ \ \ N \ \\ \ \\ \\\\\ \\\ \ I\ 1 \ \ \\\\\\ I \ \ \ / 1 1 1 I 1 I I I I I / / I �' ' / ' / / I \ 1 f I / , I I I \ \ V A \ \ \ \ V A \ V A \V' \ V A \ L ' \ \ \ V A V A \ \ \ \ 1 I I I I I I I I I I �--�( \ \ / I 1 / \ \ \ \ \\ \ \\ \'\\\\\\\\\\\ \ \ \ \\\`\\`\\\ \ \\ \\ \ \\ '\ I 1 \ III , \ 1 \ \ I 1 1 ( I I \I\//VA \ \A V A' \ V\VA \VI \ V \ \ 1 \ VA\ V AA\ \ \ \ V A VA\ \ \ \I\V1\1 - 1 1 \ // I A 7 A / V I I \ \ A \A V` V �\ \VA\ \VA V \ ' V \ \ A \ \ \ \ VA`\ \ V A \ \ \ \ \ \V A A IA \\ V A A `V A \ \ \A \ V A \ 1 / I \._ _ / / \ _ / J1 1 / I I \ \ \ \ \\\ \\ \\\\ \ \ \ \ \\ \ \\\ \ \ \ \\ \ \ \ \ \ \ \ \ \ \ \ \ / / / / / / / / \ \ \ \ \\ \ \ \ 1 \ 1 \ \ \ \ \ \ \ \ \ l \ \ \ \ \ \ \ // / I I ( I \ \ \ . \ \ 1 ' I \ \ \\ \ / I I `\ \\ \ \ \ \ \ 1 1 1 I 1 1 \ `\\\ \ \ 1 I I I ` --� I \ 1 I 1 1\\ \ \ \ N \ \ \ \ \ \ 1 1 1 1 I 1 \ I \ \ \ \ \ \ 1 \ I I I , 1 \) \ N \ \ \ \ \ \ \ 1 \ I I 1 \ \ \ \ \ \ \ \ \ \ \ \ \ _ J \ \ \ \ \ \ \ \ \ \ _ / \ N \ \ \ \ \ \ \ \ \ \ \\- - -\\\\ \ \\ \ \` \ \_.__\\\\ ' I _ N \ \ \ / \ \ \ \ \ \ \ \ \ \ I / / /--_ I \ \ N \\\ \- _ _ �- / / / / \ _ _ _ _ _ _= - \ N \ / / _ - - .... J \ \ \ \ ( / / _ __` ) \ __, --;\-""- - - _A \ V 1 / - - - - - - - _ / \ \ \ I \ \ \ \ \ / \_ GRAPHIC - 100 0 \ \ ` \ \ 1 \ I ' \ \ \ \ \ \ \ \ N \ \ \ \ \ \ \ \ \ \ \ \ \ \\ \ \ \ \ \ \ \ \ - - _ _ ` \ \\ \ \ \`\\/11\\\\\N ,\ \\\SFO N \ \ \ \ \ . \ " \ \ \ _ \ \ \ Z + \ \ N. \ \ 1 J M \ A , �TSC 1 \44 Tr; \ :)\ \11� `\ \\ ySCAL (IN FET)I \) \ \ \ \ 50 200 CODE TCE TEMPORARY CONSTRUCTION ENTRANCE : 1 -'� CD LOD CHECK DAM O LIMITS OF DISTURBANCE - LOD - SF SILT FENCE SFJ SILT FENCE JHOOK SILT FENCE OUTLETO CS CSIP SFB TWC COMPOST SOCK COMPOST SOCK INLET PROTECTION / SEDIMENT FILTER BAG SFB TEMPORARY STREAM CROSSING TEMPORARY WETLAND CROSSINGI1 SB OSF TB TTP CX PS SLOPE BREAKER ORANGE SAFETY FENCE -OSF- TRENCH BREAKER ® TEMPORARY TRENCH PLUG 0 CURLEX PLACEMENT PERMANENT SEEDING PS _ - \ - / \ \ \ ` / \ \ 1 \ \ .....�- / \ / / / 1 \ L / �' ----\ \ \\ \ \ / \ I 11' \ \ \ \ \ 1 / \ \ \ \ \ \ \ \ \_ \ \ \ \ \ / / / / ' \1 \ -----\ 1 /� �\ / / // // // / / I 1 \ 111\11 11 1 ' \ \ \ / \\\ \ \ I I 1 1 \\\\\ \ \\ \\ \ \\ \ \ \ \ \ \ \ / \ \ / / / / / / / I 1 I I I I I \ \ t \ \ \ \ \ \ 1 1 I I \ \ \ \ \ ` \ \ \ \ \ \ \ \ \ \ / / / 1 I I / / \ \� \ \ 1 I \\ N.„.„ \\\\\ \ \ 1 / / / / // I11 I\ \\\ ,1 1\111 I \ \\\\\\\ \ \\ \ \ \ \ \ I / ( / i - _ _ / / / _--------- / / - _ / / / / / - -/ _ - - - - = �-' / / / / //. \/ / 7 7 CTWO PT SWC CONCRETE TRUCK WASHOUT PORTABLE TOILET TEMPORARY IMPACT THROUGH WETLAND PERMANENT IMPACT THROUGH WETLAND EXISTING STREAM THROUGH IMPACT PERMANENT IMPACT THROUGH STREAM CLEAN WATER DIVERSION - TEMPORARY STORMWATER \ PT / //i CWD - / /, __-/ / / / Il 11 _ __--__ �\ \ / / 11 1 l / / - / / /_ / / / \ \ \ \\, 1111\l \ \ \` \ \ \ 1 / / / \\\ \ \ / _ / / / / \ \ \ / - _ - \__ / /�/ /// _ / / / // / // ll l / / \ \ \\1 1 I 1 \ \ 1 \ \\ \ \ \ \ \\ \ \ \\ \ I 1 ) I / / / / -\ `�/ / _ \ \ \ / / / / / / / / / / / \ \ \ \ \ \ I \ \ \ / / / _ / / / / / -- - \ \ \ \ \ \ \ / - --' / / / / / / / / / / // / // // /� / / _ - \ \ \ \ I I \ \ \ \ \ \ 1 \ \ \ \ l I I I / / / - / / \ ` / / / ? / _-\ os / / / / -- \ \ \\ \\ \ 1 \ \ I 1 ) I 1 I ) I I / J 1/, / // / / �/ // / / - -� - \ \ O \ \ _ / // / / // // / l \ \\ \ 1 \ \ \ l % l l l / / / / / / APPROX. LIMITS OF CONSERVATION AREA / / - / \ \ \ O N. I _ / / / / / / / / _ \ I \ 1 \ \ \ I I / / / / \ / / \ \ \ \ I / / �- _ _ _ - / , / / / / / / / / / / / / / /, ` \ \ \ \ ) \ 1 1 \ \ \ \ \ , I , / / / / _/ / / / / / / / / / / /-- \ \ \ \ \ \ / - _ ` // / -----\ I \ 1 I I / / / / / / / / \ - _ _ \ 1 / / / / / / / / / - - - 77 / // / /CWD \ \ \ \\// /'/// `/ \ \ \\I 11 1 \ \ 1 I I / /// ///,/// , / I \ \ , / / /N \ 1\ 1 / �_ _/ / / / // / / // 7 �_ \ \ / \ \ 11 1 1 1 \ \ I I I (!// \ l llI\-_ \ \ `\ / / // \\\\\\I /7 '/' _ _ / �I1I \ 1 ///' / 11 /l ' /'/'CONVEYANCE l l / / / I \\_ / - \\\ \\ / I ZZD • - \ \ / / / / -�-� 1 1 I o / // I \ _ \ / \ \ \ \ \ \ \` -___ ; / /„/ / ('_// ��_______-\ \ \\\ \ \_ \\\I\ \ I\li , ► , 11 I I ,III /C, / / / / / \ _ _ / _ _ 1 v ///__ \ \ \ / — \ \ \ \ \ \ \ \ \ \ \ \ \ ( - - - _ �" / _// / / / / / 7,..........., �- _ - �� \ \\ \ \ \ \\ \ \ , \ 0 1 1 1 c 1 1 I Q 1 1 00 I I - \\ \ \ / / - - \ \ \ \ / / // -- --- \ I \\ 1 1 I 0 I 1 I I (I / / / ff. / / \ \�-__ \ \ \ ( / , / \ �' \ \ \ \ I WETLAND IMPACT TYPES TRANSITION OF FORESTED TO - NON -FORESTED OR PERMANENT CROSSING(PERMANENT CROSSING/MAT PLACEMENT (TEMPORARY) _ \ \ \ \ \ \ \ \ \ \\ \ / // / / / - - \ \ \ \ \ t- - �, \ \ �/ / / / \ \ \ I �� 1 1 \ 1 \ 1 I / / / - - - - - - \ \ \ \ \ \ I l / / i - - \ \ \ \ \ \ - - / / // /N 1 \ \ \ - I I I \ \ , \ \ \ \ ` / / / /� -/ / \ \ \\ 1 1 1 1 1,1 1 1 \ 1 \ 1 1 / \ 2i0— \ \ / / - ° I \\ \ _ - - , \ I O / /\ 1 / \ �_ \ \ I 1 1 \ 1 \ \ \ \ \ \ \ \ \ \ ,- / / /// / / / / \ \ \\ \ APPROX. LIMITS OF CONSERVATION AREA 1 \ \ I 1 I I \\ \ \\ \ 1 1\ \ 1 \ 1 1 1 ( I _ _ _ - - - _ - - \\ \ \ \ o \ / / / / i a— - ' ` < \ \ \ \ \ 1 \ /��p \ 1 1 ,\ \` \ \ \ \\ N\ \ < J '// / \\ 1 \ \ \ \ 1 I I I \ \ \ N. \ \ \ / / / \ \ \ I I I \ \ ) \ \ \\\\ ///� \ \ \ \ \ I \ 1 \` \ \ 1 1 \ I I 1 \�1 \ l 1 1 I STREAM (S18) INTERMITTEN _ - _ \ 1 _ _ - - - _ _ _ --' _ _ \ \ \ • \ / - - \ \ \ \ \ \ _ _ _ - - - -/ \\ ` ` ` \ 1 1 I ' ' \ \ \` `` / ' 1 ) \\ =\ \ _ /\ I I // / I \ \ / ' ' 1,11 I' / 11 (INTERMITTENT) \\\\\\\ _ _�__-----_� _ ���\``\ \`\ 1 // /'/' \�\ \ \ \`�\`\``\ ' / / l �----- O / // / / / I // / / / , / �/ / / J / / ,/ / cv, / / ,/ / / / / / , \`�__ \\ \��//// / r I \\ _ \ \>p� /,/ / �' I ` I l - \\ \ \\��// / \ / I \ I IIIII111I I I II III I I 1 1111 \' III 1 1 I I 1 \ 1 \ 1 111\ i I 1I111 I I 1 ` / \ 1 1 1111 I \ HDD BORE, TEMPORARY STREAM CROSSING.\ \\ \\\\ \�� \\\\ \\ �\ \\ \ \\� - \ \\\`\\�\\\\\ \� _\- __ — :__: -� ) \ 1) 1 / / / / /' /� - -- __ — - - _ - - -_ _ \ \ �� 1 J J ) I \ I / I I I I J / ' / / / / / / / // / _ ___ = \ \ I I / / / // / J/ 1/ l I l l / l / / / / / / //�// 9�` / / / / / I -\ ,\\ / / \ ( Hill / // / // / I 1 \ \ ��s -J / \ I \ \ \\\ 111 11 I I 1 \ \ 1 \111111 I I \\ \111 I I 1 I I I / \11\ 1 1 Z \ I \ I°I° \ \ \\\`\\`\`\\� �� ( '�' \ 1`\1\\\\\\\\\`\�\\ ----' \\ _— 4. ___--__� \ \ 1 I I // // // //// / / / // / / / / / / o/ / / 00 �- o �___� --�\ \ \ 1 I I 1 1 I / I l ( 11 lI l I l l I l I I l l l / / P l _ / / / _�s2 —� \ / \ 1 \ I I \1II \II 1 \ \ \ , \ \�-- S / /�__ I 1\\\ \ 1\ \1 l I I m \ �\ I 1 \\ \\ -' \ 1 \ —— N 1 1 I I d I I , ( — �L\ 1 I I 1 1 I I I I I +I I I I `�' I /M o , 1 \ \ _ _ _ ° , / PROPOSED 12"STEEL GAS LINE \ \ \ \ J \ \ 1 C \ \ 1 ` 1 \ \ J I' oo / /, �- -\ \ o \ I I I 1 1\\\\\ \\\\\\\\\\\ \ \ ' 11'\11 N \\\1\ \ \ ) 1 1 1111\\\\\-__�-�`�`� SF I x I \ I 1 1\\\\ \\ \ \ I I 1 RI \\ ) 1 1 1 1 \ Z— / oo I __ \ \ \ \ \ \ \ \\\ 1 \1 1' \ \ \ \ 1 \\� ___-¢s- F �►°5, N \ oo \ \ \ \°°I° \\ I \ ' \' \ \\ 11 \ I \1f1\ 1� oI \,___.-----...--2_ _---� l \ \ \ \1 \ \ 1 \ 70 \ \\ 1 o\ 1 1 \/ 0 F \ X \ I I \ I \ \ \ \ _ \ 1 11 \ 1 `\\ _ _ _ _ --\ \\ \ o )\, I)/ I� I /I / //'/ / `��// > �, // //. �// M� i' /// I �+' 1 I I I O I I I I 1 111 1 1 1 1 11 I 1 1 1� I l l( I I I 1 1 1 , 1 1 I/ Ili 1 1 I I 1 1 1 1 I I I \ 1 1 I I/ I I 1 I 1 I I I 1 I I I 1 1► I 1 1 1 \- I\ I 1 1 1 1-� _- - I �\ LOD LOD � ' \o^ \ BEGIN i� ":OR 291 87 N ) \ 11 1 \ I I I o \ \ \ / i i /�j// // LOD / /' /gym 1 I I I I. 1 L ■ °°� °D, �� °'' _ 1 1 1 1 / 1 o I I'I I 1 DD / \ o �F �\ `� N. �O. / �!\ F�-Qp\ \ \ \ \ �°° �� _ \ \ too S \ - 190 O \ F� lSF O \ I I o o n O / I 1 I I I I 1 ' 1 ' 1 ' 1 1 1 101 I I I I \ 1 1 1 1 1 I I O -F l II III 11'1 rn `i I NI 1 I I I ° OD, -� I 1 co \- l / / // / / / I OD �, I I I 1 \ \ \ / /^ / / // T/ OD L�D O, . O� �\ �\ y I = / °' I ' I II m s \ _ /��1� / / / LO��y° D, I - \ I \ 1 1 `I I - \ \-_. /j j / / //� / �D l L' Oo, D, °' / ,� -/- / m 1 I \ \ \ \ \ \ \ \ °uL�D, °.. / / I N N 1 \ _ SF N� / to .. \ \ <O rn \ o + S F O 1 1 CD \ N I I I I I I I I I I I - / N\ N\ ` — a6, \ 1 \ la D �\ LOD '' / / / / / \ \ \ \ \ v ° F \ S O \ O } V�ry� \ �OO �Oo I \ ` ® ' ntao,, S 1_ ` \ `��+�D v I I 1 1 N N _-oo� - �.Di q' I , t-1 ��nl°L¢D ! LOD \ SF \ LOD / / i / / / \ '\ao,�///// DO, \ / / / / /// OD, LOD 1 - - / \ / , . , / / / OD, OD \ — _\\\ / ) /'/ ///"'//// /�i// / // ,' // l f I I LODE \ �� ////� / / I \ \ \ \ ,//////1\\\ \ \ \ \ \ \ / I I I \ \ \\ \ \ \7 o r I r 1 I I \ \ \� ` \\ \\ems \\\\ I 1 \ \ \ cry•) J I I °° '"g°D,°D, °D, =°D IL \ \ r \ \ LOD \ \ III /// / , // I l \ \ \ \ \ \ / �� �/ \ \ \ \ \ \ \ �\ \ \ \ END F / / / / ,/ \ \ / / �/ o1f/ // / ~• \ 1 ��- / ° / l- - / -�- Cs// / OOD LOD F / F 1SLbD /C F SF LOD -� III LOD LOD I ' _ / /II II1 / I 1 I I I I / ° �, III I IIIIII LOD •LOD I I I I I I I I / \ \\\I\\\ 1 \ /�`�, ' I 1 0 1 I .- / \ I//I �\ I Ilcll 11 1 _�k III \ s I I 1 1' / , I o 1 I\ \ \ / 1 111\I \1,\ I III 11 \ \_--_ \ \ \ 1 \ I. \ \ \ •\ \ \ \ ///// / / //I I \ \ \ \ \ \ \ \ \ \ \ \ \ \\ \ \ \ \ \ Ao \\ \ \ \ \. \ , /III I I I �� \ \ \ \ \ \ \ \ \ \ \\ \ \ \ \ \ \ \ \ \ \ \ \ \ / II/((11( 111\\ \ \ \ \ \\ \ \ \ \ \\ \ \\ \ \ \ \ I I \ \\ 3 \ \ \ \ \ \ , I\ Ill \ \\\ \ \,\ _; �\\\\\\\ \ _ \ \ 11 II I I \ \ \\�\\\ -�� \� \_ p \ \ \ \ \ \/ ' \ \ \ - _ \ \ \ \ \ \ \ \ \ 1 1 \ \ \ \ \ \ -- \ \ \ \ \ \ \ \ 1 I \ \ o O \ \ \ \ \ �� \ \ \ ` ` \ \ \ I \ \1 LOD / / /' LODE LODE LODE SFd / LODE LODE j- SFO I I I I III r 1 PROPOSED HDD 4 I I tSr- \ \ \ \ J 1 NEUSE RIVER TRAIL. �\ -180 \ \\ \? \ \ \ \ \ \ \ O \ \ \ \ \ \ II1 \ /, / , / , 1\ \ \\ ` _ _ \ \ \ \ \ i \ \ 1 \I SEE NOTE 1. SEE NOTE 2 ON \\ \ \ 1 \ _ i / / / / / / / \ � -\ \\\ \\ \ I/ \ 1 \ ) \ \ \ l J I I \ i , / WETLAND W6A 1 \ l \ \\\ \\ SHEET 6T >p\ N \ l j ' J \O \ \ \ \ -Aoi0°/ / / I , LOD SF ( / / FORESTED r .�9/ i \ i 1 1 I 1 I \ \ \ \\ \ ) //%/// / // // // // _ _ / / /' / / / 7 I I I \�___-/ // // _- /cb ,S - \ _ _ - - _ / / / \ e- / % I J / - - -- , _ _ \ -\------ // �_ \ / >L� ,\ // / / / r / / I _ I I 1 1 / I I HDD BORE TEMPORARY WETLAND CROSSING / MAT PLACEMENT. PERMANENT IMPACT DUE TO \ TRANSITION OF FORESTED TO NON -FORESTED WETLAND. — ,1I \ \ I \ 1 1 \\I11\II1 ��) J / //I ) I / /I I I 1 1 I 1 1 I \ \ \ "6O \ \ ) l �/ , / �i /� _ / // / / J l /l / , , / I 1 \ 111 1 \ ) / / / , / / / // / /' - �� / //// / / / , / / / 1 1 / // // / / / / 111I 1 1 I \111 NEUSE RIVER \ I / /= ii//// /%,/�jj// /�/ �// / // / / // / / I / - I I 1 \ 1 \ \ \ 1 I , I CROSSING BY HDD / l / / / / // // //i //�/ // /� % // // �� ; / j / / // // / // / 1 \ \1 I I \/ // // / / // /( BORE / /�/ \ 1 \ \' \' I I 111 I 1 1 I//% ////i i/�i%/'/�/,%,>--- /// /�� �/ // / 1 �y ( / / 1Y►,I1 I ,,,�////i/;///;/,/,,,, , / / / I // / / I , / I I \ / / / , / / / // / // / / / _____- ,__ ,, \I'II` _____--______,-__ ,, o \ ► -_ - ► ► I ____ ___ 1 II /� III _---- ___------ -�\ \\ \--_ ,/ �' // / 1 \ \ l I --- -� / I 1 I 1 \/ I III �- _-- __ \ \ / \ \ l / - / Y/ J I I 1 II _,-- __----- a - �\ N \_-- / 1 1 \ '' _— I I I / I I 1,/ / //// , / , / / / ,/ /_/7- 7- / ,/ / / / / / / ► I 111 \ I r / / / 71 I I ' 1\11,\`\ \ I \ 1 I I� l,�ll//�/, /ice �' /'/'/'' /'' /' / / // /' /'� /' ' /' I I I \ I \ I / 11// / / / / // / / / // / /, I 1 11 ) 1 1 11 11,1 I III111 /�/ // /� // / / // / /' / / / / / / ' / / 1 / / / /l �- _ / -� - -ram \ \\--- / 1 1 \ 7/ 1 \1 / III/ I / 1 1 11 1,,11 11 I (/ , / / / / / / / / // / / / - 1 \ \ \ \ / i /_ -- \ \ \ \ \_\\ \\\ \ \ / \-`---- ------___ IN \ _ / /\\J/�-�-�__-------__ ----J/ \\ \\ \\�\N N�\\ \ \ -� -_ -_ \ \\ \ \ 1. SEE LINE 142 CLEARING REQUIREMENTS ON SHEET 79. 2. INSTALL MAT BRIDGE OR FLUME AND FABRIC CROSSING ACROSS FILL WIDTH OF EASEMENT. I 1 1 \ 111 1 \ \ ,1 \1 \\\\ III \ \ 11 \\II 1111 \ I// I \ 11\\11 I111 \ , \ \ 1 \ \ \ l / / 9(0 \ \ \ \ \ \ \ \ \ l 1 ( , // / / / I I1111 \ \ \ \ \ \ \\ \\ \\\\ \ \ \\ \ \ 1 / / 1 \ \ / I // // / / / / ///- �_ \�`___-_\I flI\II \ 1 \ \�\�\� \\ \\� \\\\ \\\` I / / / / 11111 I111 / __\ - \\\ III ►II►I ---,_\\\\,\\ - \ S I \\11\\\1\\\\�;-- ;;;; -;�\\\\\\\\ \ �- __ �; ,„;, \\ // �- -\ - --/ - _ _\ \\ \\\\ \\\\\\ \ \ \\ \\ \ \ / 1 ) - \\ \� \ \ \ -. \ \ \ \ / vr \ \ \ / // \\\ \ \ \\ N\ \ _ \\ \ \ \ / _ _ \ \ \ \\ \ \ \ \\ \ \ \� \ \ \ \ \ \ \ / / / \ \ \ \ \ \ \ \ \ \ \ \ \ / / / / \ \ \ _ \ \ \\ \ \\ \ \ --- \ \ \ \ \ \ \ \ \ \ �\\ \ \\ \\ \ \ \ \ \ 1 \ 1 \ \ \ \ \ \ \\\\ \\\\\\\\\\\\\\ \ \I /1 \ \\ \ \ \ \\ ,\ 1 \ \ \\\\\\\\\\ \\\ �\\ \\ ., / ` `\\\ \\`\\\\\\ \\ \1111 1\\ \ \ \ \ \ \ \\\\\ \\\ \ \ N \ \\\\\\\ \\�I I\ 1 \ 1 1 \ \ \ \ \ `\ \\ \\ \\ \ '- \. \\\_ \\ / / 1 I I \ \ \ \_ \ N. \ \ \ / / ►\\\\\\\\ \\\\\;\\ \ \ ,/ / \ \ \ \ \ \ \ 1 \ \\\ , III,\ 1 1 \ \ \ \\ \\ \ \ \ 11 1 1 I 1 \ \\ \\\\\\\\\\\\ \ 1 \ \" \\ \ \ / \IJ II / \\\ ►I ( \ \ \ \ \ \ 1 / , 1 \ I I I \ \ \\ / I \ \ \ 1 1 \ / 1 1 I 1 I I \ i 1 1 \ \ I 1 11�111� I 11\1 1 \ 1 1\ 1 1 1 \ II11II 1 1 I 1 1 1 11 I 1 1 I I I1 I I\\\\/I I I) 1 II I \\\ // I I I11 / I I\ f//II I II11I 1 \ \ \ \\I / I I II \ / I I 1 ' \ 1 1 1 \ N , I I I I I I I ' ' 1 1 1 \ \ I I I I I I I \ 11 I ►11 I 11\,,, 1 1,1 ,� I1111►1 I 1, 1, 1 1 I I 1 11 III IIII III III I�� I I III\/II1 I11I II1 III 111 \ ( I \ \ \ \\ \\\\ ( I \ \\\\\ \ 1 \ I I I \ I I I \ I I I / I I II\ /I I 1 \ `\\1\\\1 I I ` \ \ 1 \ 1 1 i ) , 1 / / \ \// l / l I f 1\\1�\\ 1 11 �/ / I I _ ��� \�\\\ \\\\\\\\\\\ \ \ \ \ -_\\\ 1 , / 11) I I \ 1\I11 \\\\\\\\\\\\\\\\\\ \\\/ / ,i/// / / / // \\\\ // / 77 / // \ \ \II 1 \ /// //7/, //7/ //� 7 / 7� / / � / I I I I _ / / // / / i / // // / // / / / 1 / / // // /, ,�/// �� �i/ �// //� /, l //// �/ / ////// �/ /�/ , , l / / /\ ,,I, /�/j/� //'/ i ii // / l /(ill{ I �I / / / // / / / / Il 1 1 1 11 I I 1 I / l 1/ / / ( �/ I ( / / / / I \` ://////:////1//1///1//1111j'iliii://///////////: 11\111\ I\I \ I I I \ I\I I \ 1 1 II/1 /I\ \ \\ , 1 1 ` \ \ \ \� \ \ \\ l I I `\ \\\\\ \\\ \\\\�\\ \ \\\ \ \ \\\ \ 1 1 I \ \, \1' \ \ \ \` \` \\ \ \ \ \\ \\ \ \ / ,1 \ \ '\\\`\\\ \\\\ \\ \\ \ \�\\\\\\`\ \\\'\'\ \ \\ \ / \\ \\\)\ 11\\ \\\� \� \`\\►\ 1• 111 111,/--/, �' \\\\ \� �) / J // J� / / )/, 1i \ / / / / / / / / / / , / / / /// /// / / / / / l // / /ll l l / l / / I l , / / // / / / 11 II\ // I // / / //// , / I I / / / / / // /_��- / / '/./,///_ / \\ I M.ss /ti"Q� • °•� -_ q ' ��` A- 05�09/2�2°�, tiG I NEti°` '`` ' .... G ',,,, kEITH �„\\ ��,����I������� PROFESSIONAL ENG/ARCH STAMP PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING *USE DIMENSIONS ONLY * * REF. DWG(S) PNG-G-142-0001000 PIEDMONTS NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (0M-1095) DRAWING IS CUf'RENT ONLY THROUGH THE LATEST REVISED DATE TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS SHEET(S)66 OF 119 DWG SCALE AS SHOWN 0 05/09/2022 ISSUE FOR CONSTRUCTION JB TFG WKG AREA CODE 1853 DATE INITIALS REGIONAL LINE 142 PIPELINE DWG DATE091171202 SUPERSEDED ACCOUNT NUMBER 10700 ENGINEER PNG DRAWING -C-142-0001065 NUMBER REVISION 0 PROJECT NUMBER 0232195 DATE INITIALS MGR TECH DUKE rNiiNatural Piedmont Gas E&SC PLAN-11- DRAWING BY JB REC &STD ENERGY CLAYTON NORTH CAROLI NA STATION ID DATE INITIALS PRINCIPAL DISCIPLINE/RESOURCE CENTER / LINE NUMBER CHECKER INITIALS TFG 05/09/2022 WKG ENGINEER COPYRIGHT 2018 Resource Center GOLDSBORO, NC LEGEND a • • • \ \/ '/ICODEIIII \ II I 11 / , /.,, \ \ \\\ �__—�j °�`/,/ __/ I 1) I I �l /� �_/ / 1�\I \ \ \ \ \\ \\\\\ \ I \ \\ \ \\\ / 11 \III /N \ \ _ / 7. /I ,r- / /\ \ 1 1 111\\/I I \\\\ \\\\\\ \\ \ / 1I /I \ \\\ \/JIB/ // / // I 1 1 I I I \ / ' 1 Il II 11\ ` \ \ \ \\\` \ /' / I I I \I 1 I II1 1\ \ \ \\\/ O/ \I / //'/ /'/ / I I / / IIIIIII\ lII//IlI\\\`\\\\ `\' \ `\`\\\\\`\\_/'/1LOD 'I \/ \\/ 1 I I \ I I / / / / / \ \ NN \�_ -- °'/ / \ 1 , — \ .\\\ I `\211)\\:\\\::1:::: TCE TEMPORARY CONSTRUCTION ENTRANCE ���1\ CD CHECKDAMOIII/I LIMITS OF DISTURBANCE- LOD —III1 1 1 I I�, \ \ \ \ \__0/ —/ i / / /lIl /— 1 %I , II ,,,I\\\\\ \ \\ \\\ - 1 I1 \ \ I I I 1 1I1,(\ \ \ \ \ \ \ %_-- i ///�/ l / — \/I/ I JII\\/'/// ' / / / I1 \ \\ \ \\ \`\\ \ \ \ \\—— / / // / —SF \\\\ \ \ \I I 1 1 I \ \\_.i 6 '/// / / —— \\ \\II II \ \hil / /—/ / _ /,/ \I //// I \_ __ ,/ / /I II I I \_/ /\ \ \ \I III / =—/////// / / / / /I I 1 I I \CS \\ \ \ \ \\ I IIII \ o /////i — ��/�� // ////III 1 ` /— JI I I\ / 1 \ \ ���\\CSIP SILT FENCE, SFJ SFO SILT FENCE JHOOK SILT FENCE OUTLETO TSC COMPOSTSOCK /� COMPOST SOCK INLET PROTECTION / sEDIMENrFILTERBAcsFB\ TEMPORARY STREAM CROSSING\ TEMPORARY WETLAND CROSSING\ \ \ _ /// \ ( // I / ' I I I l \ \ /_ \\\\ \ \ \ \`\\I\ —'/I I(//--/�' — \ \ \\ \ \ \ y�/��/I�/ ((1 \ \ `\\\\\ \\ \ \\�O`'7 I F FOR CONTINUATION SEE SHEET PNG C 142-0001076 l / // / / / I / \I 1 \ ` : ` ♦ l l I I llII\�_—//// / / /' /' /' \ / ' I / _ — / ,/ / —� I I ((\ / , , / / , II , I \ \ I I / / ///I/ / I / /\ \` ``` -/ \\ i / \ \sFB \ \ \ NN.1 \ \ \ \ \ \III1\\ \ I 11 1 ` \ \ \ \ \ \ II /` — /// _I l I ( \\ _--// / / / / / \ — \ \ \ `` \/ II 1 ' '' \ \ \ \ l \ \ \\ \ �__//'/ / , /'//I I I I / \\\� \`\�_ v^11I //\\\\ \\\----__//IIII1\\ / \ \ \ I\ N \\/ /— // \ \ \/ //I\ /I 1 \\ \ \ \\ \\ )1I I\\ / /\\ _ _ _ _ //// I II \\\\\\\\\ \ I \ \ \\ \ \ / _ / / \ \ /I Gft�APHI� GALE (FPl I 1 \\ \ \ \ \ \ \ \ _ ,� , I ,< < \ \ \ \ \,__ / I► I l�\,.. o I / / / / / / / 1 / I \ \ \ \\ \ O�^ \ \ `\ / / --\ \ \\ \ 1 �� 1 ` \ •,& ��TWC \'SB \I FEET) — ,o, —20\ \ \\� \ OSF TB TTP CX SLOPE BREAKER—V \�\ ORANGE SAFETY FENCE- OSF —\II TRENCH BREAKER ® TEMPORARY TRENCH PLUG 0 CURLEX PLACEMENT �. PERMANENTSEEDINGPS\`=_//1 1 1 I \ \ \ \ \ \ \ I t�s \ \ \ \ \ \ N \\ I / / \ \\ \ — — / \ \ \ O 1 \ \ I \ \ 7 1 \ \ I / / / / \ \ \ \ \ \ 1 / I I \ \ \ \ \ 1 \ \ l \ \ \ \ \ \ \ I\_ / / / \ \ \ \ \ \ \ — \ \ \ "-\ — 1 \ \ \ I \ \ \ \ J 1 \ \ \ \ \ \ \ ) / 1 Q \ I I / ----/ —\ \ \ / / / / \ \ \ \ \ \ \ \ / \ finch=100t<-- \ \ \ / I \ \\ \ \ \ 1 I \\\\ \\ \\ 1 I I I /I \ \ \ I I /)\\ \ \1II \; ___ —/1\ \ \ \ \\ \\1 — — _ _--,/ 1 \ \ \\\\,I\\I —/I \ \ \°OI _ _ J — — — _/I\ \\IO /\ \ 1 I I II I I�/vO° �•$°�°1I\\ III I / O I°/ \ \ 'v\ O \ ° \I \\ \ \ \ \ \ \ \ \ \ \ \ \ \\ N \ \\\ I / / -- / /// \\\\\\ \ \ / / I 1 1 \ ) \ \ \\\PS \\\\ ` \ \ \\\ \\\\ I I —\/,,//�\\\\\\\ \ \ _ \ �O/// /\\\ \\ / --�\\ \\ \\\`\ I, °\ \\\ \ \\ \\ \ \\\ II//—�/ 1 \ \\ \ \ \ \\_----\ \\\//' / / �- I 1 \ \ \\ \\ \��\//� \� \\CTWO -S.I7 /O \ \1( ,\\\\\/— \ \ .� \ \\✓ / _ \ \ \/ \ \/ \ \\ )\\\\\\\1 ,1 \II II\\\ \ \'-_ �\\// ' / I I I\\ \' � 1 / / / 1 1 ` /—,\ \ 1 \ \ 1\\\\111 1 I ( \\ \J , I I ) \ `\ \ \ \ \—i/\ \\\ \—/ /// \1\ \ \\` `(/ \ \ `\ \\ `\/ �TEMPORARY ,/ �-III1\ \\\ I //'(\\\ _� \ \ II I\\\ \ I 1 1 l \ \)II _\\ \\\\\ \\\ o� it II \ \Ng I _ 1 \ / 1 I \ \/ \\\\\ /. I I 1 \ \\ \ I \ \ \ \\ I \,,EXISTINGSTREAPn I PT SWC CONCRETE TRUCK WASHOUT\\ PORTABLE TOILETPT IMPACT— THROUGH WETLAND___ PERMANENT IMPACT THROUGH IMPACT/ PERMANENT IMPACT THROUGH STREAM CLEAN WATER DIVERSION — TEMPORARY STORMWATER N j�— �/ CWD — / __ _ — \_� I \\ I — _ _ = \ \ \ / / _ / j \ \ \ —\ \\I 1I / //PROPOSED / ACCESS ROAD — I \ \\\\11 /— \ 1 / _ — — _ ll)II\ \\\ / \ — \ \WETLAND /\\� \ _°\\\ // / — Io 10 \\/I II \\\\ /\ \\ \\„/// \\rI1o0 \ \ I %\ \ \THROUGH \ _/ / I \ \ NN I \\ 1 E � \ / / � — — I ) \O° / \\\ I\ I I II/1(PERMANENT) \ /— I I IOn // \\ o / / '///— �\— �/I I / I I \�1 I l 11 I I 1 1 \ /\ !'\ \\ \\\/�,!\/\ \I1 / / ` I \CWD `\ \\\\\\ \ \)\\_/// /_\\II\\\ \\ \\ \ \7 / _ \ \\ \ / II / \\ �_// — o I I I I I I I I / N N \ / \ M ( i / 7 i — \ N..."--- / / \ \ N , I I I I I I / /\ I I I I I //// — \ \\� ��_�/ \`\ / I I I 1 / \ \ — N / / I — — \\\\ / /IIIIII1 /l //,//// ° ® / / / / / / / / / / /\� —J / / — / / / — -� / / / / / / / / / / / / \ \ — — _ / ° O� ' / / / / ' / / /' /' I / I /— — —_— —' ///�// v ',^" -- ' / // // / / /'/ /// I I -----_ // / 1 I IJ 1 I ►I\ / / / //� \//\ / \�—III \\\ \ 1 \ \ I 1 f \ \ \— \ I I I \ / / / i / \ 1 \ \ \ I _ �� ' \ \ \ \ \ / 1 \ \ \ \ / / / / / \ \ _ — _- / \ I \ \ — / — / 1 \ \ _ I I — \ I I \ ` \ �„� , \\ )I \ / /,/ �' `\ \\_ 1 \\\\l\ �'- --- 7 \ \ \\ \ \� 1 \ \ \ 1 \ / / / \ \ \ \ \ ___/ \ \ \ / N. / \ \ \ 2.0/ / / \ 1 \ \ 1 \ \ CONVEYANCE WETLAND IMPACT TYPES _ 7— — \ _ _ _ _ \ \ / / I / — _ 44 /,' / // ////I 1 1 I/ / / / I \ \ / / C // / STREAM S19 INTERMITTENTN \ \ \ I \ \ / \ —\ \ / \ \ ` rRANsmoNOFFORESTEDro -FORESTED OR PERMANENT/\\ CROSSING (PERMANENT) CROSSING/MATPLACEMENr - (TEMPORARY) \ \ / , / I1 \ / / / — — \ — / _-- / / /7 \ ` _ _ \ \ / / / — — — \ / / / I _-- — — — \ \ / / / // //��\\---\\ 4p / / / / o� 77// o j / 1 / / / / / 1 \ \ / 1 I I \ \ — /' / / l / / / / 1 \ \ \ \ 1\ \ / / / / I / \ 1 \ \ \ N \ \ — / / I 1 / / / / 1 I I \ \ \ \ \ \ _ — \ / I 1 / / / 1 \ \ \ \ — — _ — — / / / , 1 / / l I , \ \\\\ \ _ OPEN CUT FOR GAS LINE, TEMPORARY STREAM CROSSING/MAT PLACEMENT, POTENTIAL BLASTING, \� \ \ \\ \ \ — \ �� \ \ \\ \ \ \ \ \ ' STREAM S20 INTERMITTENT OPEN CUT FOR GAS LINE, TEMPORARY STREAM CROSSING/MAT \NON \ \ \ \ \ \ \ \ \ \ = ' \` ` \ _ _ \ \ \ \ \ \ — N \ \ \ \ \ \ \ \\ \\ \ \ \ \ - / / \ \ \ '----— Nr fi ki / ( / I r -- ...., -- o / //O--`\ \\ \\�_ / ( I N \ / //\ \b Q O� 1 \\1 // \N \ O \1/N,/,O///1,d0\\\ I lYJ l 1 — / o 8 i r .17 _C7/M ` / I \ co M \\— M / / cM / / % / , T FO--- _ _ O ?S \\ /� /'J1\\1 \\1 \ I / \ / \ MIc I 1 \ \ ) / , / / / / \ \ \ I I o `�' \ 6I / / / 1 ( 1\0 \—\ ,�\\\\ M 4\ /--__--�/ // / \ _ / / I I I \/ , \ \ / �,----- I / An �►�o� LOD s• \\ °� ^ / / / oA `��" i��� \ O °° s�p°�s + \ —I- I F —�� goo` \ $ / F �o0 4'ij O V -t— — ^ o� •. ° 1 I / o / / , / ti'� / / \ o of f�l I / / /� / / I / N / / , / / / / O / O I I + 1 N"� / O + N1 1MI 1 I I I I / ' / ' S /'' cNv N I 1 co 1 \ I f 1 I N �`� I I I\ l y� / / / / + / �, / l \ V v \ 1Pr __� \ \\\\ \ _ _ — \ \ \ \ \ \ SF - TB \ \ \ TB _ SFJ _ �oo {' °� -i I ____ �/ / / I I 1 I —_ Sro� / \ LOD /�------/ //// I I) oo� � $� �P oo� l l l -- goo / // / �too-� \ goo / / ���`� sF /�"td �°° �— / / / I I \ �� A \ / / / )1 vo, goo �dP o� \ Lo� //o° SFO O I $ / /O / ,� / / / / / / M / \ \ \ \ \ , 1 \ 1 \ =p�.r —w7 \ — _ \ = oq� / / `! 161 \___ , \ �� � -- �_ _,_ LOD 15,4-1 • \ \ \ \ ,F °o, o, Faoi LI \ — — — o .,„ / / / I SFO a ILOD \ \ \ o / / /�,00� N ` O, I F /--____ _ J, I SF ITI°IY' // / \ °� _�� / �� Se \ \ \ / // /-__ / -,---N \ I I J \�\ �i»�� � \ \ �� /°� ° II I / / —� - N \ \ \ 1 l ,,. S FO S FO \ / , _ _ _ / " 1 1 I ` o \ o I I I I I I / I �� Or Q� o°� {; \ \ \ °o, SF — Ltt99����p = / / 1 NN.\� -_: \ „..-f + o I 1 ...es\ c, . /_ co I I I / `� \ / II \ S FO ' \ °°' �F°o� — _ �— \ \�0, 1 1 \ 11 / \ / — / \ I I o, S FO — —°, \ / // I ` �°°' �- I \` / M S / °d, 1 \ A. / / /-- / —�- I 1 1 I I I °'� \ \ ` \ /\/ I I I I/I ;. -�• \ \ \cro \ \ \\`—I58/ °° d //�� /� __--- // / s °O,SFO\\`I \illiSlIF\20\\\\\.‘"\\ \\CWD I \\ \ \ \\ \ \/ o / // , _ _/ /°O—�a��°O, \\\ III 1 1 \1 \ \\ \\\ \ /��I / / / / r8 II \�` \ — / / >, \ o I III \ \ - 1 ��0� �,°O, \ 1 \ I I I \ 1 \I \ \\\\ \\s0 ,�� \ \ /' , ; I,'�� /,/,� \\ ►► N /i / .// / °° I ' ���\ I I1 ''I��x %`�'�\ I \ ° /� o, — F�� I \ I I I \ \\ \\\ \\\\\\k\\\\\ / 1 / , _ \II \\\ \ r° � LOD_ IN// 1 // I r 1 /\ /b, —„... I I I / �' sF °O, �- _ I I 1 \� \ -\ \\ \\\ / ►II 11 1H\DRe • -/ 1 I/ (I , / ► I \ ��\\ , , 1-- J, I ,,-�, \__- I / / / 1 II / I 1 \ \\ \ / \\ \ I/ / /I Z N \ / /// / /moo\ \ \ / / / / // /// -fc — NRCSNJ-8 \—// \ \ II I I ° 11 / � ��__.� 1 \ \ \\ \ o I I I -�. /0 1 -- ��7 1 I / \\ \_i \\\;\__ ❑� ��\\\\—/ ,/ l �l I1 /r+ I I ( / /oo/ / / \--\\ /o _ 0 M ) • \ \ \_ / / // / / /�/ / //// -\; \ I i l / , / / / //o/ / ��—\ \\ \ \ \/ / / / / /rs)N/ / \ \ \ N N \1 / \ \ ///"7'2'2/" 11 \\\ \\\�/ • \ I I I I ____ '--__ � _ -- -_- \ \ � -- ° — / \ \ \ \ \ 1 1 I I (/ / ----__ �_—� \ \ \ r \\\\ \\\\ \\\III / / �_ �� �-- // \ 1 1 1 1 1 I III — \ 9 \ \ \ \\\ / / / �-- -- —__ --- ,/ / / I \ 1 1 \ I II I _ `` / \ / ( -- _ �� / �_\\\ \ \ \ \ \ \ 1 I I I —NOTES: N\\\\ 1 11 I I - 7 - \ I I I I I / \ \ 7 / /, // // / / / /// \ \ \ \ \ \\ \ \ \ / / I I I I \ \ / // / / / / / / / / // //*O, \\ \\\ \ \ \ \ \ \ \ \ \ / / / I 1 I I I 1 I \ I 1 / \ / ' / //N / ,- \ \\ \ \ \ \ \ \ \ — — — / ' I I / I I I 1 I 1 r / 1. SEE LINE 142 CLEARING REQUIREMENTS ON SHEET 79. 2. INSTALL MAT BRIDGE OR FLUME AND FABRIC CROSSING ACROSS FULL WIDTH OF EASEMENT. \ \ \ I\ \1I \ I I ___—/ 1 1 III 1 I I I I 1 I I i 1 1 \ ( \ — 1 — — — I / �' — �- / 1 \ \ I —/ _ — — _ N \ \ — — —\ / / / / — — — \ \ \ \ \ / / I \ \ �,/— `\ 'S N I 111111,1 \ /„ // / I/ \\ \\\\\\\\\\ _/ / / / / , , / , / \ \ \\ \ \ \ \ ��__ / / 1 I I I / / / / I / 200 \ \ \ \ —_ _/ I I I 11 / / / N.N. — / , , I /,- _ _\—,---/i//' I ►�\\ 1 --_-� 1 \ \ I / / -� \ — \� _ 1 ' _ —__ 1 / — / / / 1 \ 1 I \ \ I \ I / / / _ _ \ _� — \\\ i 1111 1\ 1 \ I I 1 -� I / /� \\ \ \ \ // / �7 — \ / / / / , �/ // ,//// /--\ \\ \ \\ \� --- \\ -- III I I I I� ► 1 I 1 �, -_- _ -- —===-1 \� \,�_—_ ___ �� /,11 // \ / / I 1 I I l/ ///i I I• I� ` / �/� - I.--,, \��_— I,/ /— y2\\ //i\ \ \ 1 / / / /' ' \ /�/ —, / __ \—/ / / / / --��\\/ / // // — —\ \\ l l l 1 I I I \ / I I / _ \ \ _ —___ II II ' ' %' / ' // /i i/ --,,, \ \� \___ / II/1 / / i / / / \ / / / — —_ I I / / // /// /, /// —\\ \� \\�� \ \ — ---., I 1 / /�/ / / —190� \ \ \ 111 I I /// /// /// /j//�,—�_---� \� \ \ \ \ ��� '� / II I I I IIII I / /,////// /(/-_. \--__\�� \\ \ \\� \ \ / l I 1 1 1 \ /// I ► I I / / / ///// / \ \ \ \ \\ \ \_// / / / I 1I11 ////� / \ \ / / , 1 __ __ �� _-- —/ III 1 / �_--- --_ _ �� ——/ ��----_ I I I 1 — — 1 I I I I 1// // -------------'--�-------- / l I I I I I ,�// __ iI / l/ 1111 11 / —� —_ \�/V 11, I /// //l J l ,l � —__-- _ _ _____ = � �\ �— 1 /^ —\\\ i XI I / // / _, ___,---, \ / — / ///////////// / / /- \\ \ C/ / / \ \ \ I \ \\ \ I\ I / / // / Flj: r l \iNNN:: II/ // \ I 1 2 // � \ \o\ \ I / / �- \ \ ' / / // / // \ \ \\ \ \\\ \ \ \ / / l / / / ' ._ \ \ \ / • N ___ — / , / / \O\\ N \,, / I / I // ____ __ i i \ _ ,-- III /// ,-- \ \\\ \\ \\\\ \ \_\\ \\ \ --- / '/ // /, ",/ // / / /-, __- \ / �/ //', , / / ,—\, \ \\\\ \\� ; �� �__ _ ,/. / '/ y / / /// // / / // / 1 ///,/ //, / / _—_ _\ _` \ — / I I 1 // //� / \ \\ \ \ \ \ \__,,/� , --- — \ I 1 / /, / / / / __ \ \ \ \\ \\ �_—— — — —_/-- / \\`\`\ \\_ / l 1I 1 II/1 // // / �— `\� \\\ \ \� \� \ — /// / /�//,/ �// / //// / ( / / ,_--- \�\ -, r / I / / / // / / / / — \ \ \\\\ \ \ -- '__ ---- _. \ \ \ / / I l I l/ , N NN \ \ \�\� \ — ' // // / /� // ll / .--/ // — —, -_\\� I, / / / / \ \ _ NN 7 ill / \ \ \\\ \\ \ — l l / / \\ / / / \\ \ �� l,//III 11 /, l �/ '' / / l --- l 1 \ ��\ �/ / \\ / / / — , / / \\ ? / I / / // //,^ \ \ \ \ � /�. \ \ \\\ / l II II l( //— - N \ \\� —J/ /�/, / l/l/l , l / / ////—`�—� ' \��\\\\ l l l/ll / / / // /_� \�\ / \\\`\\\\ \\\\\ / '/ 1 1 II I1111I,1 ((< < 1 I r — —— 170 \ �\\ �— �,-- — - // / /i�/,/ l� Il l �— ,/�/ __\ \\ \ \ < l / —�_ \ // —N\ \\\ \ \ / 1 Ill \ \ \ \ \ \\\ // / / / // // I // / /\ / / / —��� \\\ \\ \ / // // // / / \\\ \ \ \ \ \ \\ �� /// 1 l //j // �// l l l —200 \ \ / \ \\ \ \ \ / / I 1 / \\ \\\ \ \ / / , I / � \\\\ \ \� , I I / ��\NN \ \ \ \\ I I I // / \ \ \ \\\ \\ / l I �—\ \ \\ \ \ \ �, / / I \ / \\ \ \\ \ \\ \/ / I / \ \ \ \ \__ //��\\\\ \\\\\\�\ — // / / _ \ / / / \\ —_ / 1I \\\ \ \ \\ \ \ / /\ \ \ \\\ — — / I ( /l / \„ // — //i / 7/7/ (l \\ \ \\� \ \� \ \ \ /- - - -- -' / / / i / // / l ll/ �/// / / // _ \ / I \ \ \\ \ \ \ \� \ \ \ \ i \ - --- -� ,- i' / l I l/// /// 7 1 1 \\\\\\\ \\\\ \\ \ \ \ \ \ `--'— _— / / / / / '/ / / •//// /// / \ y\ \ \ _ / / / 1 \ \ \ \\ �\ \\ \y' \ \\ \ — / / / / l���� ////� I 1 >\ \ \\\\ \\ \ \ \ \ \ \ / / / / / \ // / / \ \ \ \ \ / / / / // /// / / / // 1 1 \ \ \ �\ \ \\ \� \\\\ \\ \\ \_ / / / / / / /// / / ///—\ / / / / / / / /, / \ ,/ / I 1 / \ \` \\ \ \�� \ \ \ \\ \ \ _\ \ \ ////' / / // / // // �_—� \ \ \ \ \ \ \ \ \ \� \\\ \\ \ \ \ ' �, / / / �/ / / / /,/// / \ / 11/1( / \ \ \ \ \/ \ \ / // / / / /// /�\, Jil / \ \\ \ / /� _ \\\\\ \\\\ / // 11 1 / / \ \ 1 \ / / / / / 7 - \\ \\ \ \ \\ - J // l l l l / \\ \\\\\ \\ \ \ \ \\�— / // / 1 I / / �/ ,� \ \ \ \\\ \\ / / / / 1 I / / \ \ \\ / / / / \ \ \\ \ \ \ \ \ / / / / / I 1 I \ \ \ \ \ / / 1 I \ \ \�\\ \ 1 / / / / ' / ' III ( / \ \\\\\\\\ / \ \ \ // / / I I / , \ \ \ \ l/ / / / \ \ N N \ \ \\\\ \ l l / / �� N N \ \ \ \ \ \\ \ / I I I / / \ \\ \\ \ \ I I I /' \\ \ \ \ \\\� \\ \\\ \ I \ I I I \ \ \ \ \ \ \ , 1 I \ \ \ \ \ \\\ N\ \ \ \ \N ,.\, �,� � CA R o�''�%, off:. _ss/o .`/2:, 2�,'Q, 'y`.-7 let • —_ ��09/ 22°r <� ° .'LG, NE�.•`'N� /,'''/q�KEITH ,�',` -,,,,,,,I,,,,,,��� PROFESSIONAL ENG/ARCH STAMP PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY * * REF. DWG(S) PNG-G-142-0001000 PIEDMONTS NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (0M-1095) DRAWING IS CUMENT ONLY THROUGH THE LATEST REVISED DATE TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS SHEET(S)67 OF 119 DWG SCALE AS SHOWN 0 05/09/2022 ISSUE FOR CONSTRUCTION JB TFG WKG AREA CODE 1 853 DATE NITIALS REGIONAL LINE 142 PIPELINE DWG DATE0911712021 SUPERSEDED ACCOUNT NUMBER 10700 ENGINEER PNG DRAWING _ _ C 142 NUMBER _ 0001066 REVISION 0 PROJECT NUMBER 0232195 DATE INITIALS MGR TECH tra, E rap Piedmont Natural Gas E&SC PLAN-12 DRAWING BY JB REC &STD EIER1 CLAYTON, NORTH CAROLINA STATION ID DATE NI PRINCIPAL DISCIPLINE / RESOURCE CENTER / LINE NUMBER CHECKER INITIALS TFG 05/09/2022 WKG ENGINEER COPYRIGHT 2018 Resource Center GOLDSBORO, NC LEGEND Z Q a / / / I I I / / / I I 1 \ 1 I I I /' I / 1 / / / l / / I I / l l I III I /I I 1 I I I I I _ �' / / / / / I I f / I I I I \ \ \ 1 \ 1 \ / / I I I , 1 , I I _ - 1 1 \ \ / I I I I I I \ \ \ I I I I \ \ \ \ \ \ —� / I I I •1 I 1 \ / I 1 \ \ \\\\\ / I I 1 \ \ \ \ \ \ 1 I \, / \ \ \ I \ \ '� _ _ / / 1 1 \ \ \ \ / I \ \ \ \ I\ — / I / 1 \ \ \ \ \ 1 1 1 / 1 1 \ --- 7 / / / ) 1 / \ I 1 \ \ _ — \ \ /' / QQ J ) / ) 1 1 1 I I / \ I / I \ 1 1 / / 1 I \ / / /1I / / / / / / / \� / � / / ' ' / �1� / /// // ////// / ' �/ ' / �/ //'/ / // / // // �// ////IL --- / / / I / / /////// // / / / / /I///// ////'I//////\ / / // / ' / / // I \ 1 \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \\ ` \ \ I N N \\ \ 1 \ \ , I 1 1 \ \ \ j 1 I I 1 \ 1 I I \ 1 I I I 1 1 I I 1 1 I ,� //JI 1 / / / / // / / / / II //I / / / I Y 1 1 I ' t I l 1, / �\ \ \ \ 1 1 I / /// // / -1 _/-\ \ \ / \ \ \ \ \ \ \\ / / / / , / / /////// / �_ - _ — I \ 1 / / / , / ' /, / / / ,/ \ j / \ 1 1 \ \ / / / / / --\ I 1 I `_-- / 1/ / \ / I , I 1 \ ///// /� I I I I I I // // I / / / / / I I �-\ I 1 1 1 \ \ ` / / / ' I / / / I / , / I I ' I / 1 ' ' , / ' I I ' ' I I \ \ / /� I I III / / I I 1 1 , / / / / / 1,11 I I I I 1 /, Y� I/ / / ° / / / I I // I 1 11 \ 1 / I I l \ / 1 '//I/''/ ''/I\ \�1,�• ////ll//l/ l/l\\ \\, \\ / / / ei / /// I / I /^\ \ \\ \ \ \ \\`// 1 1 \ / / / / / / / / / / / / / / / I \ \ \ \ \ 1 f 1 \ \ \ \ \ —� / / /` \ \ ---- / -----------_ / / \ I \ \ / / \ \ \ \ / / \ \ /' 1 I I \ \ / / / / \ \ \ _ \ \ 190 / '\ j I / / / \ / / I I \ / / \ \ / / / / \ / / / /_ \ N \`—_ _— _— / / / I \ / / / / / N \ \ \ \ \ / // / I / / / \ \ , /II / / \ \ \ _ _ / \ ' ' _ \ _ — _ _ _ / 7 7 / / \ \ \ .- \ / \ ' \ \ _ _ , , "' / \ / \ '/ \I \\/ I \\\ — — /'/\ \ / \ \ --/ 1 1 I 1 / N \ \ \ / / \ \ / , 1 // �� // /' /\ ,/ ` \ I / / ,/ / / \ 1 \ \ / / / , / I \ \ \ \ \ \ I 1 ' ~ \ \ \ \ \ \ I \ \ \ \\ \ _ \ \\ \ \ \ 1 ` ` \ \ \ \ \ — — \ \ \\\ \ \ \ \ 1 \ \_���__�_ _\\ \ \ I \ _ — \ \\ \\\ / , = = = ` \ \ \ \ \\ \ \ 1 \ \ \ �� \ \��\ tea\ \ \\ \\��\\\\\\\\'TWC \\ \\\ \\\\\\\\\`\\\\\\\\\\\\\SB \ \ \ \\\ ,\\\\\\\ \ \ \ \\\ \ N \``I /'\\\\\ \ \ \GRf1D1.4-1C—SCALD (I1\11 FIEI T \ N \ / / / / / / I / I I \ I \ \ I \ \ \\ \\\ \ \ \\\ \\TSC \\\ 1 I\ \ \ l / '' 2co M Q .. \ti \ \ \ \\ \ \\\ \ \ \ CODE TCE TEMPORARY CONSTRUCTION ENTRANCE _ _ �����1 CD LOD CHECK DAM LIMITS OF DISTURBANCE -LOD- SF SILT FENCE SFJ SFO SILT FENCE JHOOK SILT FENCE OUTLET O CS SFB COMPOST SOCK SEDIMENT FILTER BAG SFB TEMPORARY STREAM CROSSING- TEMPORARY WETLAND CROSSING_--—=/�'//♦�__/'/II/ OSF TB TTP CX PS SLOPE BREAKER �w -V�J ORANGE SAFETY FENCE -OSF- TRENCH BREAKER I= EMPORARvrRENCHPLUc o / CURLEX PLACEMENT ��• PERMANENT SEEDING PS / / / - 16 / yI/ / , / 1 I / / / - / / / / /, / / \ \ I I - / \ 100\ \ 0 50 1 �0 2 \ \ \ / / / I / / ( \ \ — < N \ \ I / / 1 \ N \ /- — \ \ STREAM (S21) (INTERMITTENT) OPEN CUT FOR GAS LINE, TEMPORARY STREAM / / , / / // / / 1 \ / / /� f / •/ \ I I / \ / / \ \ \ \ \ \ I 1 , \\ _ _ / / \ \ \ �i / / _ _ — / /' // j /� j // / , 1 1 1 I I I / \ \ _ / \ N `I I 1 \ / / / ' 1 L // ' / ' ' / / ' \ \I 1 I I I / I \ 78 / ' \ \ N \ ft./ 1 \ / / / ,00.. / / / / / / / / / / \ I 1 / / \ \ / p \ \ _ \ \ \ \ch �-1boI I I \ \ \ I 1 I 1 ' 1 I \ / \ \ N \ \ / _ \ N N / -\ \ \ _ _ — \ / / — \ \ / I N N \ \ 1 / \ \ \ \ I I / _ \ 1 I I I / \ \/ CROSSING/MAT PLACEMENT, �/ POTENTIAL BLASTING, DEWATERING STRUCTURE, BANK STABILIZATION. I ', — — / / i /i i' ' '/ /' / /' / 1 I II 1 / / \�_ \\� N N N --� / //// / I 1 I / / / \ \ N \ / / ,. / / / / / / / 1 I\ / -\ - \ \ \ \ / 1 / 7 / / $ / / / / �'� / /� �_ �� _ — / I I I I I I I/ \ / / / \ \ \ N':/ / / / //�� 0 1 / / / \ \ _-�\ / \\ \ �—_—_ / / / / i _-\ I\ / / '�/ i/ ��= ) J I I I I I 1 ` / / / \ \ \—�' \ I I / ,--_i_________:\N\ / / / / / ' '-i_---_�I I / / �__ \\\ / /// ' I II \I/PERMANENT 1 1 1 I 1 1 1 � III I I / / / / / /)//1 ///TEMPORARY III / /THROUGH / / CTWO PT SWC CONCRETE TRUCK WASHOUT PORTABLE TOILET IMPACT WETLAND IMPACT THROUGH EXISTING STREAPAI PERkIAN CLEANVVATERDIVERSION —CWD TEMPORARY STORMWATER PT //i — , / / /�'�/ II////\ — //\ \\_ _ / I III / / `_ // / / / o / / / // /// // /i _ i - _ \\ \, I I /,\--_\ \ — I (/ \\ / ' / / / / / / 6 / ' - - \ 1 / / I I \ I \ \ \I I / ' 6 /'/ / ' , / / /////// \ —II\ /' /' / / \ \—-_/// //`WETLAND\ // / X/ / ♦ / / / / I'/I3//;'I // / / / — — / _ _ \ /I I ' / '/I / / //' / / / / // 7.2' // — ^ N 1 1 1 \ \ ' \ I N' / / / \\ENTIMPACTTHROUGH // O I I I "r 0\/ O / / ///,//_-- / i/ / — _ _ —// //CWD / / / //// / / <\ \ \ \ ' \ \ ` / / / 7 \ \ �� I / 1 r/- / / // / / // / / / _ / - - \ \/ / \7 — i \--\ / / / \ \ 1 N \ \ \ \ \ \ \-:=. I I / / / I I /\I \ / / J H 7 / i \ \ / / / i \ \ \ \ \ / Kri .� / \ \ \ \ \ \ \ \ \ \ / / / // / / / / / / / / \\ / / / / ' O / LOD / / / C' / /' /\ / \ \ / / \ • / / / / / /, / / / / ' \ \ ---------- _ ` / / \NN \ \ CONVEYANCE WETLAND IMPACT TYPES i e r I- 0/34 / / / / �� F / / / / \ I ( � ///' ° j 1 7�/ // ' / ' / / ...- '''' r / / / // '40) / / /4,10 \ (,43_ L/ / / / \ — \ \// / / \ \N ////♦ / i — -- `— — _ / ' / / \ \ - - -' \ ' 11\li ; / / / / _ \ / ` \` — _ / I \ N \ / N \ — -�r_;_/:1717.1:7::11117.4.,_../7z, \ \ _ O• / / / / O / ( N N / /(TEMPORARY) TRANSITION OF FORESTED TO NON -FORESTED OR PERMANENT CROSSING (PERMANENT) CROSSING/MAT7 PLACEMENT \ \ \ ��� H • , I _ �/_/,/ \ CY// C �sC (�i�IOp `� /// /M /� UD,��i //// /_\ \1II\\\\ / // / I \ 1� //i/� IIIIII \// / /\\\\--__ I I I II\ I \\/ , / \ \ =/ / �\�bo ,/ / /\ / / //-� \ \ III I \ ,// / ----__------ °° \�' \ �\ \l' MSFO// TBLOD-SF/ /'c /i/ �'i/-� 1 \//......\ II11 ®// \ \ \\\ \ , / / 1 ` — _ _- I I (-> \ \ \- \ \ \ \ N- \\\\\\ 1 �� 1 G —�� - _ _160_ / /\ / / / /%/ /-'�°077�°oY Gj�� //%'� 1\ IIIIII _ \ \ / / / /' - \ —\ \ \ \ oF�\\p \ �\\\\�,1 1 / / l /- �� ��' // �,� / I/ SFO // / /_I N\ \ — _/ A-- , / °/ �, ////_\ 1 1 1 \I 11 I N \ °�, \ - \ \ \ / / / / _- \\ /_-- , / �' \ II\ \ / / \ \ / - /O°, \ o\ \\ \ \ 1 ' I/I I I ` / '� ' ' �� / ° 7 go' `�'� \ \ o� I Ico -� �' / / / / /� /"/ \ \\\\\\\\ \ /h \ \ / / / 7 / ,\\ I\ \\ \ \ \ I Tt /// �/ / 7, / \ \\ \\ \ \/ `\� ,/ / / /� / /_\`I/// ' \ ..nn?� / / // / J\_�/ // / / J \ \\\V'1/—'/ / / / / / / C / / \l °,►° / I , / / / j / \ \ / �i \ \\� // / \ , I \ c� / i /'III \ \° I I / ` \ I 1k�� \ \ I _ I>Y, / \ ./ _ I\� \ o \ \ - N/// / \ / -- \ \\ 1,1 II \ \ \ \ y \ \ \ \ / \ \ / / / / / \\\�\1\\\ \� \ '�\\\\ \ \ \ \ ' N `-"/ / /' \� /� -r - / \\ \ \ \ \ \ \ \ / N / / / / \\\\ \� \ \\ \\ \ \ \� N \ \ / \ / / f \\�\\ \ \ — �, / \\\\\\ �� \ - \ /' / / i\\\\\\\ \\\ \ \ \ \ \ — �_ / / I_/ / / \\\\ \\\\ \ — — \ \ \ \ — \ -�3. / 1 / / I / / \\ \ \ / / _/ \ \ \\ _ — ' / 7 / 7 / — / 11 / 1 1 , I 1 I 1 \ \ \ \ I \ I \ I 1 1 X \ / \ \ \ \ �� \ \ 6b , \\\\ \ \ \ — \ \ !� \\\\ \\\ \ \ \ N / / WETLAND W7-A FORESTED I — �' / / >T/ \ i / ) 1 \ _ \ \ I 1 / / -' ' - ) 1�J `y k�2� / / /elv STREAM (S22)PERENNIAL (PERENNIAL) `— 1 I I \ \ \ \ � \ \ \ \ \ \ `b \ \\ \ / ° \� / \ / / / \ \1 \\\\\\\�\ \ — — — ^/ / PROPOSED 12" STEEL GAS LINE N 7 / — \ \ \ \\\\ \ -/ 7 OPEN CUT FOR GAS LINE. \ / / / / / \ /r / 1 / ' / / 1° / / J I\ / / / )T ✓ - / / / I 1 I OPEN CUT FOR GAS LINE, TEMPORARY STREAM CROSSING/MAT N \ N \ + \ \ 1 \ \ , `'� \\ \OOQ \ M N - 1 / o 111\ o / 1 / I \ \\ I \\\\ \ — \ 1 \ \ 11 \ STREAM (S23) (INTERMITTENT) ' ' 7 / 7 TEMPORARY WETLAND CROSSING / MAT PLACEMENT, / , / /r 11 1 60 /1 / / //// / \ N. \\ �+ / \\ \��\\ \ \ \ OPEN CUT FOR GAS LINE, / POTENTIAL SHEET PILE, \ / \ \\ _ / / / / / // / Oh / PLACEMENT, \ \ .�\� \ \ \ -, M / / I 1 \ �\\tea \ \ \ \ \ \, \ ) TEMPORARY STREAM CROSSING/MAT / / \ ____ I / / - \ \ - / / /// / / POTENTIAL BLASTING,' \ \ y _ J/ / \ \ \ 7 DEWATERING STRUCTURE.\ / 1 _ , I — �/ /'// / / 1 / / / /' /7 7 / " I / ' / / 1� DEWATERING STRUCTURE, BANK STABILIZATION. \ \ O \ \ \ \ \ \ 1 I \ \ �� \ \ 1 \ / ` I\ \ \ l \ \.2\\\ \ \ / \\ N. " �-, b\ N N. \ `� \ \ \ - \\ `\\ \ \ \ \ / 1 \ \ PLACEMENT, POTENTIAL BLASTING, DEWATERING STRUCTURE / / ` 1 PERMANENT IMPACT DUE TO TRANSITION OF FORESTED TO / \ _ / / ) / / , \`) \ \ / / \ ` - - ) / ,� N ° - \\ \� o. \ NON -FORESTED WETLANDS. / /' / \ \ ;'� // / // ,'//1j •y, o \ ` \ I �� 1 Imo...:.. • / / /' /' // /— / /// / / A \ I 'D7 $F ;411ne / _ / / \ I D ,_,, 1 / / //// , / \ I l /T Imo \ / �,°.\ •:�;�::I \\\\ \\NNNNNN \ \ `F c \ \\\ \\ o\ \ \ X / y\'\ \ \ �\ I / ,, N • \--- \ N �\/ N ► \- ' / \ �- / / \. ° / / I ,__ I __/ \\ / ///i/'/ /'/ /' / \ \// / / l I / / /TCE, / \\�\ o �O \\� \\� \I �o \ �� - / < - - -�54, �-/ 1' / 1 _-,_ _ - '15 \� ' / �' ////�/ / / / ,'\ \ \ / / / / / / / / TCE °\ \� 1 ® , \ ^_ N \-_/ / --�-_ /' ---� -\ _ -, �� \ / I , / / / . / / , )0N -f_._., ti I \ \ (1°' / / / / /,/'/ / 11'°// FO ''_ _---_� -//�// �// /' // \\ \ / / / �/ / / /' --��—� _ 162— — _ —____ —i // i'/ /'/ // // \\ PROPOSED ROAD BORE / ' - — __ - -- -- �_ �/i i / / \ \ / I/ / ,//%//ij�----=17p-,�� --_� %j /'� ��� /// /—�\ \ \ \ / / / / / / / /*y0 / 7 / /, / =--_\ \\ __�— �/ �� � / \ \ \ / / / / /, 1/ / / / / / ♦ / --- \—— _ — / / \ / , / / / / / / Y / \ \ \ — _ „ / 180\ \ \ / / / / / / / /— \ \_ _� �� —�i / / / / — _ \ \ / / / / / / / ' �// - \\_/7/' /1/ / / , , / / / / \ / = / \ 1 I I I ( / I 1pIi I ( I /—/m �e /"--_ 1/ — \ \ 1 1 I \ 1 ° , \ \ I I 1 I 1 \ \\ \ \ �\ ,\�o°� y� \'. ��d 1 / \ . \ 1 \\\\ \ \`\°\ \ �0 a / '�/ / \ CLEAR, SEED & \ \ \ \\ \ \ % .v® cc \ \ / / // // �! / \ STRAW USSE AREA \\ \ \ \ -\ ` \\` = -°.s` �� �� ___ /'/' ___ =a �_�_\ `-------__�_ -- --- �\---- -___ /___ � _ —_— __�' =_ ==160= - —_ �F✓ — _ ��� __�-- —'— Zs- 0 ,— �_ -Ps�—��—_o--\ \ o — —� — _ -s170_ —_+ — — — + / / _— — _ -� — — \ \ _ _ SF _ �c� \ \c \ co / I_ �\ \ \ ,� \\ \ \ , - _/'� — - \ \ - / \\ 0 0 : 0 0 0 0 o \ o .. 0 7 0 0 + + + + + + co cocc) I� M M M OM co co co \ / / / / / //-=!8p�--___-- - - - ,/' \ \ / //// /// / // : \ \ \ \ \\ \\ 1 I , °� //boo 1 %g /� /`�,•. ,/ ���\ \` / / / - - �_ — — - / / / / / / / ' I / / \\ \ \\- \ \ \ \ 3°/b I / / ` 1 / _ ' / De `_ `/' �� SFO TB \ \ , 1 TB LOD SF \ I I ' - \ / / / / / QQ ' /�'// / \ \ \ \ \ \ I 1 SFO/ ��! \ 0 \ �� b / // I 1 / / _----_---__---- /, // el, /-\ \ \ I I cv / /,/ L oD� t9B 6D LOBS== L,... _ -LOBES 9D - yq,1 ;�..:<.�<<'��'`o' {C6B�-L �� 1 I I it / ,__ ----_ \ / / ---- _____ -\ /// /, I ► \\��/ /// // // / \ \ \ 1 1 / \ \ \ \\11 1 , I —\ \ \ I IlII I F <o /°>//� \ \ \ \ \ \\� o �� \ TB/ -==:_<. C`Lfr. ��$'¢ ls�i.'�a.i i ;w �'• r 1 //// —__ \ \ / / / / / / / 0- — — — /, — — — — — — \ / / / / 11 I / / \ \ \ \ \ \ 1 1 I 1 1 1 I 1�1 I I / / / / / °� / /\' d \ \ \ \1 \ I \ I — / I - i 19 _ — , \ \ \ \ \ 1 I I I I / / \ / / / /I 1/ \ N \ \ \ \ \ 1 1 1 1 I 1 I / / / I / / / \ ❑ ate.:. a.'-�wc ar re +a- - / / %mod, \�\� m - - \ \ — — — _ _ — — / / / l ' / / �,/ /' I \ \ / / / ,/ x 1 / / I / cn \ -- — .. .,.a-.,: - \ ley a�.p "l�Ap a�� '!i><`.0 TB \ 1 I \ \ I I I I / ----------� _ _�-� \ / /,/ / �_ / / \ \ \s1111:2111',11'1 ' 1 I I / r.�P • / / / / o O C c C - a►jr._ d'11"- ., J c C / \ C � aa► / _ — — _ \ ` / / , / / /� I / — \ / I I I / / / \ \ \ \ \ I / I I _ / / / I I / ,-!►• a -- m= ..;. _^. aka♦ / cqr♦ 1'al.�! • / Do,� 5� °o, ° , °o, Y °o,— °o , o, Lo, °o, o, °d7 F °o, �M1 ° 1 \ 1 I I / / _ \ / / / / \ \ \ \ r I 1 I 1 I I I / \ \ \IIIIII I I / .� / / / / \ 1 _ - _ - - — — - - - - - _ _ - — — _ \ \ 1 / // __ __ - �\ \ \ \_�/ / /'// / / \ \ \ \ \ 1 I \/ / / // / \ \ \I I I I I 1 1 1I I I I / �- -_ ------ I / I I1 / / /II , o/ /'/ II \ olI o 1 1111 ,_/ / / /�� \�� \ \ \ \ \ \\\ CX\ �� \ \�TWC LOD SF N I 1 I I -----_ - \ \�- ' ' /' / / -i 1 1 , I 1 / / / ' \ / \\ I y \ // 0� \ \ I I — `\ \ �I11 oQ//',_ / ' / .� o /�/ / -\ \\ \� \.\ ,.. N // 1 \ I I I I 1 1 I 1 \ \ 1 I 1 I \ I I I / / — — — \ \ / ,' ,' // / ,.� 2� \ I , Op _ _ , I I I / / / 2 ----- ---- \ / / / / \ \ I I I IIIIII ' 1 I I I 1 I 1 1 1 " I I / II / / //'�-- ------ -__ '�\ \ \ \ \ 7 / / / 9 ° / / , / I / -� \ 1 I 1 1 , I I I I I I ( / \ \ \ / / I I \11\ // I \\ / I I I 11, I I / (I 11` \ v I �I ,III 11 //'/ I I 1 I l // ,, /-- - _ / 7 _ — ' _ — — / _ _ — — / — ��/ /'- -__�� / / _ ��� STREAM S24 (INTERMITTENT) ( )( OPEN CUT FOR GAS LINE, TEMPORARY STREAM CROSSING/MAT \ 760 7 �\ / / / I/------- I I 1 I I I I I ( / , — — N \ \ \ / / / / / / I — —\ \�� / // /,NOTES: / Zp0 _ �% \ /— PLACEMENT,\\ — \ --\ I \ \\\ 1, Ill11111111 I( lIII / / — \\\ / / \ \ \ \ \ / / / //// /\ I I \ \\ 1. SEE LINE 142 CLEARING REQUIREMENTS ON SHEET 79. ////// / �_�—\ / / / — '� //__---POTENTIAL BLASTING, — —,\\ I ,, \\\I I I 1 \ 1 / //\ \ \ ,' // // / / /f I ' ) r I / // �I\\\, \\, / �, / /'21� �'---\DEWATERING �'/ , � STRUCTURE \\\,, I \1\ \\\\ \\ , , , , , I , \,\,\.\\, ,,\,,, I I I1 ;,IIIIII \ , 1,\ 1 1 I \ \\I \ \, , I I I I 1 \\\ \ I I \ 1 \ \ \ \ \\ \ \ \ \ / / / ' / / / / I / I I , \ \ \ \\ I III 1 I I1111 1 \\\\ \ 11\\ \\ \ \ \ N --. \ / / I \ \ \ \ I I I�I I II III1111'' I I I I (/ ,_ __ \\ll�l 1 25.0,° -- ///'� - - \ \, I►►►I'►'� I I / /' ,, - 1 I I \ ' _ \ \ I \ \ > / / / / / \ \\ \\ / / / <I 1` I\I\\\ \ \ \ \ \ \ \\ \ \ \ \\\� \ \ r \\ \ \\\\\\_/ / / / / / / / I I I / / I \ \ \ \ 1 \ \ / / / / / /\, III 1 1\ \ \\\ \ \ \\\ \ \\ \\\\ \ \ \ \ \\ \ \ / / ' / / /' I'/ I ' / 1 I \N \ ` \ \ \ \\ 1 ) I 1 ( I , \ \ \\ 1 1 \ \ 1 / 1 II1 I II l I111 I I II I I 1 I 111I II/ I "'lll 1 II11 II1111 1 1 I /// ►I I I► II I' 1 1 I I 1 11 I \ 1 I ,.' __ \ I I I / / \ \ HIM 111 111 1\ \ \ I' / / ,__-- \ \ 1111111I I I 1111 \\\ \ \ I I I I I I / / 1 I I 11 I \ \`\ \ \ / 0— \ 1 I 1 I I 1 I 1 \ \ \ \ \ 1 1 \ \ wETLANDW7-B FORESTED — �� ° _� 7 - _---- __— ---__ — _ c�_ \ \ // \ \ �8 \\ / I III I 1 \ \\ \\\\\ \\ \ \ \ \ \ \ \ \ / l / / / / / I '/ / / ) I I I I I I I // l I I / / I 1 I I I I 1 I IIIII I / / / -22 , \ \ / \ 111 \ \ \ \\\ Off\\ \\ \ \ / 1 / / /// / /I III I / 1 \\ \ 1 \7 TEMPORARY WETLAND CROSSING / 1-- / % / — _'/ I I \\ \\ \ \ \\ \ \\\\\ \ \ \ \ \ \ �� / , / / , / I I I I IIII/�// lIl ' / / ' IIIIII / I / / / / 1 \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ / / / / I I I I 1 \ \ \ N \ \ \ N \\ \ \ l , , / / /-- / / / , / / l I 111 l 11 / / I II ' / \ I I I \ \ \ \ \ \ \\ \ \ \\ \ \ \ \ \ / / // / / , / / 11 / /// ` 1 I III 1111 \� \ I/ / / // // / / I I \ / / I 1 1 1 1 \ \ \ \ N. \ \ \\ — \ \\ \ \ ` \ \ \ \ \ \ - / / / / / / / , / / / / / / / / , „/ / / ., I / I I I / I I 1 1 \ \ \ \� -_��-� \\\\\ \ \ \ \ / / / / / I , / / / // i// / /// / / 11 1 II I /—_ C \ \I I I I I I I / / 1 I I I I / I 1 \ 1�\ \ \ NO \ \ `9 \ , \ \ 1 \ II I I I \ N O\\ \o \ \ \ 1 I I I I I I I I f I I , 1 1 I \\\\ \ \ \ I I ( \ \ \ \\ \\ \ \ 1 1 1 1 I I 1 I -- 1 1 \ \ 1 I I 11 1 1 I \ 1 I 1 \ \ 1 1 \ \\ \\\ \\ N \\ I I I - MAT PLACEMENT, TEMPORARY IMPACT DUE TO TRANSITION OF FORESTED TO NON -FORESTED WETLAND. — 7 , /--__--- — / / / — — _ - _- ///, -- / / / / — — — / / / / / // / 7--------- _^ / 1 1 1 \ - I , \ \ \ 1 I I I I II 11II I \ \ \ \ \ / / __�/ __- \ - ,_� \ \\ \\ \ \ / / / / / / / \11 1 1 \ \ \ \ \ \ 1 \ \\ \ \ \ \ \ \III \ / / / \\ \--= '_ -_ \�\\�\ \\ \\\ \ \ \ \x\\_ / /�� I / / / //, / 7// y/ it/ //// / �-- \11 \\\ \1 1 \ \ \ \ \ \\ \�\\\\\\ \\\ \ 1 \ �/ / / // �/ / , 7 7 N -- N. /:: 1 11 / \ -� \ / / / / /II — \\ \ \\ I 1 / \\ i// / /I \ \ \ \ \\ \ \ \ \ I �- �/// / l l l ' I I ,/��' \1 1 III I Il , /�-- ___=--��\ \ \\ \ \ \\\\ \\` \ \ \ \ \11 1 \ \\\\ \ 1 1 / \ \ \_/ / / //I /\\\\�\-` / / / I / / 1 1 1 I III I i \ -'\/ \ _/ // I I I 1 1 / ----- / 1 III ( ��� -_— _ �_ \\\ \ \ \ \\ \ 1 1 \\:1\11\111:111\1\ I / I ��\ 1 / ��-\ - / ,__ / — I . I l // // // 1 I III I I I // �=___ -\\\-�\\ \ \\\\ \\ \ \ \\1 I1 \ \ \\ -,\\ II \i // // / II IIII / // ---_--�� \�\\ \ \\\\\ \ \ \ \ \ \ l\ \\\\\\1I// \ \ __�\ //7 7 / / // \ / I I IIIII \ / 1 \ \ �\ \ `` \ -- '�, l l I ,,,-\ \\� =; _\\ ____ - ,\; / / / 1\\ -_ _/// ///// // // ` -- ////// / / // �// \\`� �'/, `_/ / / , / , / / 1 I , / II Il /IIIIII / / Ill lllll I / l ... I Irl, liiii l \\ \ \�/ —--\�\\\ �\ \ \ 11 \// / \ \i/ // - \ \\\\ \\ \ \ \ 1 / �\ \\ \\�\\�\\ \\ 1IL/// //i- _---- \\ \\\ \\ \ \ _ \ \\ I I\_ //, / i \ \\ .\\\ \\\\N./ \,\\\\\,..\\\ , \ \ \ \ I t \ Illlli , ii- \/ / / - \ I/-, //_ /-�\ -,/-- \ - \�,\--/ \I; ,',',I / , _ -%. \ _ _ / / . I I 1.,. •� I _� . _ss /o /2'- ,•Q� °••� -- - _ ° 1��y / 09/ 2 2: ' �G1NEti °-. ZT -',,, .°...°.G;,,,,, .,,, kEITH �,.\� ,,,,,,IIIiiw PROFESSIONAL ENG/ARCH STAMP PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING *USE DIMENSIONS ONLY * * REF. DWG(S) PNG-G-1 42-0001 000 PIEDMONTS NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (0M-1095) DRAWING IS CUf'.:CM- ONLY THROUGH THE LATEST REVISED DATE TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1 001 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS SHEET(S)68 OF 119 DWG SCALE AS SHOWN 0 05/09/2022 ISSUE FOR CONSTRUCTION JB TFG WKG AREA CODE 1853 DATE INITIALS REGIONAL LINE 142 PIPELINE DWG DATE0911712021 SUPERSEDED — ACCOUNT NUMBER 10700 ENGINEER PNG DRAWING -C-142-0001067 NUMBER REVISION 0 PROJECT NUMBER 0232195 DATE INITIALS MGR TECH DUKE rap Piedmont Natural �I E&SC PLAN-13 DRAWING BY JB REC&STD ENERGY CLAYTON NORTH CAROLI NA STATION IDPRINCIPAL DATE INITIALS DISCIPLINE / RESOURCE CENTER / LINE NUMBER CHECKER INITIALS TFG 05/09/2022 WKG ENGINEER COPYRIGHT 2018 Resource Center GOLDSBORO, NC LEGEND J----- a //�'\// �� -_� �, \ \ \ 1 I / / ( / I / // /' / \\—�// �\ \\ \ J 1 I / / / // / / \\ \ \\\ / / 7 \ \,/ / / / / / / / \ / / / \ \ / / \ \ / / \ \ \ \ / / / / / / \ / // / \ \\ \_�/ / / / 1 I ( / / \ \ / / �. \ / / / / \ / / / / — / \ \ \ � / / I /I II 1 I I / / f 1 \ \ / \ / I /' \ 1 / I / I \ / l I / \ I I / ( / / ' \ J I / \ 1 / \ \ \ I 7 / ' r I \ \ l / / / ' I I I / \ / \ ` / / / / 1( �J �\ / / / ' '� / /' / \ / / / / / / /� / \/ /\ / // / / / 7 / J / / / / / / / I \ / l / / / l / \ — J ' / \ l NN - 7 \ /, I I l \ �\ \ \\\ \\ \ \\ \ \\ \ / / \ \ \ \ / I I I `\ �\ \\ \\ \ \\\ \\ \ \\ \ \ \ \\ \\\ \ \`—�/ // 7 /�—\ \ 1 I \ \ \ \_ N \ \ \ \ \ \ / / \ \ \ I I I \ \ \ \ \ \ \ \ \ \ N \ \ \ \ / / / \ \ 1 \ \ \ \ \ \ \ \ \\\ \ 1 I \ I \ \ \ \\ �\ \ \\ \\ \ \I \\ \ \\ \\ \\\ \\\ \\ \ '' ,- \I \ \ \ \ \ \ \ \ \ 1 \ \ \ \ \ \ i \ 1 1 \ \ \ \\ \ \ \\ \ \ \ \ \ \ \ /J // /' 1 \ \ \ \ \\ \_ \ I 1 1 \ \ \ \ \ \ \ N \ \ \ \ I / / / / % \ \ \ \ \ \ \ \ \ 1 \ I \ \ \ \ \ \ \ \ \ \ \ \ I / / / 7 / \ N \ \ 1 I I I 1 / \ \ N / / \ i�� I \ \ \ \ \ \ / \ N \ 1 / / / / / \ �� ' / \ \ \ 1 0 -\\ 11 1 I \ \ / / \ \ / \ \ \ 1 \ \ / I I i \ I / I \ / / • / 1 I I / l I / ) / / / I \ \ N 1 / / I / / / / / / \ \ \ \ I / I I I \ \ / / / / / V. V / / / / / / / / / \ \ \ \ 1 / / I I I \\ \ \ \ 1 I / / I 1 / / I 1 I / I I / / / -____ / % / / / / \ /' /l I I I \ \\\\ \ I I I I \ I I I / I / \ / / I \ \ I GF(APHFC SC LE (IN FEET)I / / / / / / 1 \ \ \ \ 100 0 50 \ 10� 200 / 1 I I I I / I I I \ I I \ I 1 \ I 1 \ I I \ I \\ \ \ \ \ \ \ CODE TCE TEMPORARY CONSTRUCTION ENTRANCE :jfr�1 CD LOD CHECK DAM LIMITS OF DISTURBANCE - LOD — SF SILT FENCE SFJ SFO SILT FENCE JHOOK SILT FENCE OUTLET 0 CS CSIP SFB TSC TWC COMPOST SOCK /� COMPOST SOCK INLET PROTECTION / SEDIMENT FILTER BAG SFB TEMPORARY STREAM CROSSING TEMPORARY WETLAND CROSSING SB OSF TB TTP CX PS �� SLOPE BREAKER J V \� ORANGE SAFETY FENCE -OSF— TRENCH BREAKER ® TEMPORARY TRENCH PLUG 0 CURLEXPLACEMENT /, PERMANENT PS I / — 1 / / / / / / / \ / — — _ 1 / / / I \ \ / \ --■ ---� \ / — \ \ \ \ \ / / / / / / / — — / / / \ I \ \ \ ) / ( I \ \ I \ N. _ \ \ / \ \ = 0 / / I \ / N \ \ \ \ ( / // // / — \ I \ \ I 1 inch \ \ 9 _ _ I 1 \ N \ \ I/ — — / / / / �' �'// / / — — — _ — _ / \\ I / \ I I ' \ \ \ \ \ \ \ \ \ \\ \� I I I I / \ \ \ \ \ \ \ \ / (\ \ \ \ / _ _ — -- J / / ' / / / / \ \ \ \ \ 1 I I I / \ \ \ \ \ \ \ / /////// / I I / I I \ \ \ \ \ \\ 1 I I /\ \ \ N \ \ \ CTWO PT cwD swc CONCRETE TRUCKING WASHOUT PORTABLE TOILET ORYIWEMPAC THROUGH/ PERMANENT IMPACT THROUGH WETLAND EXISTINGFSTREAM IMPACT PERMANENT IMPACT THROUGH STREAM aEANvunrERDIVERSION — TEMPORARYSTORMWATER N PT j� �� cwD - / _ _ / / 7 i — \ \ \ \ \ \ I I \I /' /' / — / / / / // // \� WETLAND W7D-A FORESTED OPEN CUT FOR GAS LINE, TEMPORARY WETLAND CROSSING/ / \ \�\ / /I // / /' \/ // / 1 \ \ \ \ \ \ \\ 1 / / / I ' 1 / N N \\ \ \\ \ / / / / /J / \ I \ \ \ \ _ / / / I \ \\ N / / / / / / I \ \ \ \ v \\ _ / / / / // / \ \\ \\ _ _ _ / / / I / I I \ \ \ \ \ \ - / // / / / `\ \ \ \ / / \ \ -- \ W d' \ \ �( / / \\ ` - \ N \ \ \ - - - - \ \\ \ / \ \ \ \ I / \ \ N — \ ` MAT PLACEMENT, POTENTIAL SHEET PILE, - - - / 1 1 \ I \ \ \ \ / \ \ \ \ _ \ \ \ \ - -\ WETLAND W7E-A FORESTED - /� \ / / / / / \ \ \ \ / \ \ �\ / / \ \ \ / \\ \ Z + J 1 - \ / \ N \ \ \� _ - - \ \ N \ \ I / ( \ N\ \ _ - _ . / J / -\ ` \ \ - - - \ / - _ - _ \ \ \ \ \ \ \ - - _ - - \ \ I\ ( / \ \ ( 1 \ \ \ \ / '` 1 1 \ \ - - DEWATERING STRUCTURE. PERMANENT IMPACT DUE TO TRANSITION OF FORESTED TO NON -FORESTED WETLAND. N \ \ \ \ \ \ I / \ \ \ \ \ \ \ \ \ \ \ \ o \ \ 1 \ \ \ \ \ 1 \ \ \ \ \ 1 OPEN CUT FOR GAS LINE, TEMPORARY WETLAND CROSSING/ MAT PLACEMENT, POTENTIAL SHEET PILE, / / \ \ / / / \ \ \ - � / / / / \ \ / / / / \ \1 \ \ / / / / / / \ I I 1 / / / \ M \ r,. \ Q Q ~ \ E 6 CONVEYANCE / WETLAND IMPACT TYPES N \ \ �. l \ \ \ \ \ \ \ 1 \\ \ N \ \ _ \ \ \ \ \ \ 1 I / I I \ \ \ �' \ \ \ 1 I I I / \ \ \ \ \ \ \ \ \ \ \ \ \ O I I \ \\ \ \ _ \ \ 1 \ / I I % / \ \ \ \ / 1 i \ \ I / / / \ 1. \N \ / \ / DEWATERING STRUCTURE. PERMANENT IMPACT DUE TO_ TRANSITION OF FORESTED TO / / / , / / \ I I - _ - / / j / / / - \ I I I 1 - / / \ — _ — —' / /' \ I \f / / ' \ o I o l ' TRANSITION OF FORESTED TO CROSSIING(PERMANENRIANENr CROSSING/MAT PLACEMENT (TEMPORARY) \ \ \ \ \\ \ \ \ \ 1 / I I / \ \ - / / / \� I / \ \ WETLAND W7C-A I 1 / / \ \ / / J / 1 \ \ I / / / 1 NON -FORESTED WETLAND. _ _ - / / % / / \ I ll / / l / \\ \\\\\ \ \ NN \\\\ \\\\\\\ \ \ / \\\ \ \\\ \ \ \\ \\ \ / 1 / \ \\\\ \\ \\ \\\ \ \ 1 \ I I \ \\\\ ' \ \ \ I \\ \ \\\\ \ / / ,, \ / ( \ IJ \ \ FORESTED OPEN CUT FOR GAS LINE, TEMPORARY WETLAND CROSSING/ MAT PLACEMENT, POTENTIAL SHEET PILE, --- \ / / / / \ 1 I I ) / / / \ / / 1 I _ / / / / / / \ \ \ I I \ \ / i/ _ / // / / // \ \ 1 �,, \ \ \ 1 I 1\ , - / / / / / - / / - - - / / / / / / / / \ ' / / \ N N \ \ \ ?O. \ N \\ \ N \ \ 5.0 1 \ 1\ \ \\ \ N / // / / / '' I // /' //' ' ' / N N \ / - / I I / ! / S - - - - - ' / \ \ 1 l \ \ \\ \\\\ \\\ \ 1 \ / / \ \\ I / \ I \ I \ DEWATERING STRUCTURE. PERMANENT IMPACT DUE TO \ \ \ \ \ \ \ \ + a \ \_ / / / ( 1 • \ \ —\ \ ^� o \ \ \�, \ o\\_ / / / / 1 I < < ` ,,,,/ _ * \a. \ o _ `oo�\ \ \ / / \ I 1 `% \ �o� I J I \ \ \ \\\ 1 \ \ 1 - / / \ // 1 ^ I / TRANSITION OF FORESTED TO / \ N N\ \ \ \ \ \ SFO\ �_ c - / yl \ \ \ \ \ \ \\ c� O / // / / :111-11 NRCS NJ-10 \ - - - - - _ -_\\\\\III o\ -' IIII / \ \ I I \ / / 1/' NON -FORESTED WETLAND. — 160- \\ �' \ _ - - /\ \\ \\ \�\t \ / 1 \\\�\IlI l �'/-�\ /'\' _/' / 1 \ \\ \ \\1\ I l ( / / / / / /--L-_ \ \ \ `\ \ _- �M''/ //// M /'� 0 / I I I \\_- _ -- I \ / \ 1 / \ \ \ N.\ �-� �� / / / /°' + I / LOD / \ \\ \ \ / / ` \ I I / \ - \ /� -1- �\ \ / / \ / 00 \ / L � "' I / a` \ \ \ ` — \ xr / \\\� \ ( \\` ,/ \ 1 / _ \ =°°� to / , +++ o \\ /\ 1 I I--� M \ / \ —_\ \ \ �\ 1 �\ �— / '° 1 I / \ o /' \\N\�---�� J� // 1 \ i\°°,�-�a / 1 __--3 O _ -N . \\ \ ,__ ... t , ,% ].N / ? •••••••••.§C \, YilP 004 1 \ N\ \ \ / I / / \.—'; ' =' ' % / �\ °— TSC \ \ ' \\\\ \\� °• _ — ' °' '" I \ 1 LOD°o, \� \\ \ / %/)/ l �I / ram\ '/v— \ 1 ( SFO i • —_ \-- / �' `-- -\ \-/ / / / 1 / /\ / \ 7 \ / /' /-\ / `- ,- �- - �� \ 1 \ ' / / \ i 1 0 /SFO ° �� \_ - \ / / / ;� / / / I , -- \`_,/ / / // / v / / / / /' /'- :=i- �\ \ \'� / 1 \ TB o° \ \\\\ \ \\ -_ __ I / 1® ( °°'� �. \ \\ I / °o,� -_ \ / 7 7/ / / \ / 1 / /�\ / -�- ;-,\ I /- a \ o / I / \ \ �_,- / // / / / \ -- / // / \-- /-_,--\\ 1 p o/ �.� y �` \ \o / \ \ Sao -\\_����/� ��/'/'/'�/) / ( - _ or/�`'�8� //'J SFO �� \ / / I \\ \\\ °o�Sy�°�—°o°'Ge; /���__- _�/ \\ % / // / // -��� ��/�'1� �;_,--\\\\\\\\\ o� %<oa f-\\\\\\\\\�. //// /' - �/ \\ �0 I / \/ SFO , __ , / / // /' ---_-_'- / _ \ \\\ \ ��- _ ��, / / / v / -_\\\ \ \ \\ \\ ,\- , -' /'7 /7 / �' \ �- / /' / // /� // / - / 7 / __ _ ..... / ./__/i 1- _- \\ \ \�� \�\� .it e °N / / / �- _ A \ \ \ \ 1 / / / '-�� / / / - -- i __/ / / / ,' ' __--- ` gyp' \ \\ $F '7i+,� \\ \\ T� \ \ / / / / --- / ) / / \ \ \\ 6� \ / WETLAND W7E-B FORESTED TEMPORARY WETLAND CROSSING/ \ \ \ \ I/ \ / / // / I / / / \ — / /\ / / / / ? - - i / / \ \ \ ` ✓g \ v>.Ao�° .. <? I ° f _ - / 190 - \ \ \ \ \ s.<. \ STREAM S25 PERENNIAL \ \ _ \ \ N / / / / \ \ \ / / MAT PLACEMENT, TEMPORARY IMPACT \ \ \ \ / 2 \ / ' \ ��/ 1 1 / I 1 / / / ( / / / / c� \ \ ' �' �� 7 / / o�_ \ P� \ 5..: I / / / "� / SF0 / OPEN CUT FOR GAS LINE, \ \ '- / \ \ / / / DUE TO TRANSITION OF FORESTED TO NON -FOREST WETLANDS. \ \ \ \ \ ��/43 / / / / 1 I I 1 I / / / �� \ o^ / \\ \ / / \ \ W / // / I r0- �/ / ( / \ I\ \ S I vo o I \ \\ \\I (\ I / I/ Ioo / \ \ \ \ \ \ \ \\\ \ l 1 o>�' I \ \ \ \ PLACEMENT, BLASTING, // \ N. ' / \ \\\\ �/ \ / /' \ \ \ \ \ \ ' -POTENTIAL - 1 / \ N N WETLAND W7-A \\ \ \ \ \ \ •%96` \\ o,\ \ \ \ \ \ \ \ 1\ `" ` \ \ �\/� \ \ \ \ \ \\\\ DEWATER NG STRUCTURE _ \\ \ / - - - - \ I \ \ / / \ \ \ - \ \ \ \ _ ( /` \� ^ 1 ` ( \ ' FORESTED \\ \ \ \ \ \oo \ \ \ x �o� \ \ oo \ \ N N \ \\ `cr \, \ \ \� y \ SB \ \ / / \ \ \\ \ \ \ \ \ \ \ / / \ \ \ \ \ \ \ \ \�__� \ \ N /' \ I y - __-� \ / \\ \\ 1/ '\\ \ OPEN CUT FOR GAS LINE, TEMPORARY WETLAND CROSSING / \\\\ \ ( \ \ \ \ / F o \ \\ \ ) \ \ �\ 11 \\ \ \' \ \ \ \ \ \ \ \I\ \ \ 1 \ ) MAT PLACEMENT, POTENTIAL \ \ N O \ \ N. �� \ x oo��° I 1 \ \ \ \ ,\ \ \ \ \ \ - \ \ \ ��' \ .. �/ I \ \ \ \ WETLAND W7D-B \ \ \ \ v \ \ 1 1 I \ I I 7 I / 1 / / / - - - / /) /1 1v / / _ _ J / / / / // - / SHEET PILE, DEWATERING STRUCTURE. PERMANENT IMPACT DUE TO TRANSITION OF FORESTED TO NON -FORESTED WETLAND. N \ \ \ \ \ \ \ c \\ \ Sp? moo �� \� Q oo^� 1 \ \ ' \ J x\ \ �� \ 5 \ ,o\ // \/ co \ \ \ \ X \ \ oo \ \, \'S , \ j �\ \ �,��° ` \ \ \ °°^ S \ \ 1\ /®\ \\ \\ WETLAND W7C-B FORESTED TEMPORARY WETLAND CROSSING/ MAT PLACEMENT, TEMPORARY IMPACT DUE TO TRANSITION OF FORESTED TO \ \ \ \ \ N \ - \ 7 \ \�O\ ` _ \ \ \ \ \ N \\ \ FORESTED TEMPORARY WETLAND CROSSING/ MAT PLACEMENT, TEMPORARY IMPACT DUE TO TRANSITION OF FORESTED TO NON -FOREST WETLANDS. \ - / I \ \ / 1 \ k_ - _ \ \ �/ / ' \ / -� - 7 - / \ \ \ / _ - - ' ` - ' ( \ \ • \ \ I I I I I I II / / / ' oo `� \ / / / 1 '�/ NON -FOREST WETLANDS. \ \ \ N \ \ \ \ \ \ _I 1` I / / \ - - _ 1 7 I� /` \ / / / / - / /SFO / / co Q° p0 \ j \J// /I I/1 I I / i PROPOSED 12 STEEL GAS LINE` \ \ \ \ \ \ \ \ \ N \ \ \ \ / \ 1 / 1 II / I/ 1 1 I // / I p0 'I/� oo I I ' I l l / l / /\\\� N \\ \\o\ \ \\\ \ \ \ \ \\ \\\—/�� // I W \ \ I 1 ( CO C \ SF / oo^// I 1 I I I 1 / // / / / // /' ' \\ \\\\\\ \\Of \\ \\\ \\\ \ \\ N / 1" N \ O // / / / I I / / / / / //^�\ \ \ N \\\ \ - \ \ \ \ \ \�-1\ \\ / \ I It O 7 o� \ oo� / / / I I / / / \ \/ / / /N54_% 1 / 1 \ 1 \ \ I \I I/ /\ oo�_///// / IiI[//////// //// �7--� \\ \NOTES: \ \ / // // _ / / 1 / / / \ v Q / k 0- / I I 0 / / / / / / // \\ \ 1. SEE LINE 142 CLEARING REQUIREMENTS ON SHEET 79. / \ \ / /' / \ (� \ /'�o/' /' a I / /- / / \ \ \ \ \ \ \ / \ \\ J \ / / O \ oo I I / / I / / / / / / / \ \ \ \ \ \ \ \ / — \ --/ / — —-/ // \ ./)'‘ / / % / / / / / / / / / o / / / _\ \ \ \ \ \ \ \ \\ \ / I —� / // NRCS NJ-9 / / / / / / / / / / / / / / // / / / \ \ \ \ \ \ \ \ \ \\ \ \ \ \ \ \ \ \ \ \ /' ` \ ` \ \ // \\ r /�// \\ / .� _ c 1 ' _ —u� .�'v. '%i`•`' ! ..aa� o•S�/oo / / / / / / / / // // / // / // Z�0 ' _\ \ \ \ \ \\ \ \\ \\ \ \\\\\ \ \\ \ \ \\ // // / -- \ \\�\ \ \ �L� ` .:R .<VA A A�><>`,- /��I //////// // /// \ \ \\\ \ \ \ \ \ \ \ \ \ \ \ \ \ / / / — — ` \ _ \71/, / / / \ \ \ \ \ \ ( / N 11►V VAVA q� I I // \ \ \ \ \ \ •>oGVfV.`�1�1^r<V.< �.�70 1 / / / / // /// ////_ \ \ \ \ \ \ \ \ \ // \ \\\/ NN N / ,/^V 1l/ O \ / O \ c9 cn �� ��ri ��..tr • .' %"`� "'i`a►ia►i��.c� / ,.-`` / / o°_ _ J WETLAND W7-B FORESTED TEMPORARY WETLAND CROSSING / / / / / / / / / \ \ \ \ \ \NN N \N \ i / \ o \ \ \ \\ \ / / / / /• / / / / / / / / _ \ \ \ \ \ \ \ \ \ \ \ \ \ 1 I / — — \ \ \ / / / / / / / / / / / / / / / ' \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ 1 I \ 1 I ( / gD _ _ \ \ \ N. / / \ \ \ \ \ \ \ \ \ \ \\ \\ /' / / / '/ ' ' / ' / / / / / \\ \ \ `\ \ \ \ \ N. i / / /� / / / / / / N \ \ \ \ \ N \\ \ \ \ \ 1 / I 1 / / / / l \ \ \ \ \ \ \ \ \\ \ / 1I /� /--_� \� \\ \\\\ `\ ,- \ / / / I \ / / / N\`9 \oox ��//, � g�6o^� / WC MAT PLACEMENT, TEMPORARY IMPACT DUE TO TRANSITION OF l //// // j// / j j/ / / / / \ \ \ 11 \ \ \ \ \ \ \ / / / / / �/ / / / / / / I / / N \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ 1 \ 1\ /1 1 1 I \ \ \ \ \ \ J / \ \ \\ \ i / 1 / / / / c9 ^ � '/ \ _ / / / / / / / / N \\ \ \ \ \ \ 1 I ` \ \ \ - / 160 FORESTED TO NON -FORESTED WETLANDS. _ - - / / / / / \ \ \ \ \ \ \ \ 1 1 \ \ N \ \ / / / / / / / / / /\ N. \ \ \ \ \ \ \ \ \ \ / I \ \ \ \ _ / / / / / 2 \ N\ \ \ \ \ \ \ \ \ \ \ / / / / / / \ \ \ \ \ \ N \ /I / / / \\ \ \ I I I \ `- \ 1 1 / o°// oo� - \\ \ \ / //� i�// �� -��\\\ l / IlI 11 „/-\ \1 1 / \ �� /� _/_ - /i i� /- \\\\ lI l _, , -_,,,,, ,..„, N N /o^Sj / / ,:'/ //%',/',/ �\\\\\\\ 1 \\\\\lt \ II / / / \ \ \ \ \ \ \\ \ \ - \ /l / / / / l l l / / /-� \ \ \ \ \ \ \\ \ \\ \\ \ \ \ \ \ \ \ / I \ \ \ \ \\ \ 1 \ \ , — - I ( \ \1 N l l I / / l l / / `\ \ \ \ N\ \\\\ \ \ \ \ \\\\\ \\\ \ \ 1 1 \ \ \ \ \ \ \ \ \-- N N N x N I \ \ \ 1 7 \\ \ \ \ \ \ \ \, \ I / / / \ \ \ \ \ \ \\ \ \\\\\ \\\\\ \. / / /_ - /j / 7 ____ _/ /, , ,\\� �,� � CA R o.. , , off.o�•Ess/o •/4,:, 2•••Q- 'y•••-7 ; g • — ��09/ 22°ry < ` .tiG I N�•••'N� /-, -/�KEITH c ,''-` ''�kEII1111++�`` PROFESSIONAL ENG/ARCH STAMP PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY * * REF. DWG(S) PNG-G-142-0001000 PIEDMONTS NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (01VI-1095) DRAWING IS CUMEN1- ONLY THROUGH THE LATEST REVISED DATE TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS SHEET(S)69 OF 119 DWG SCALE AS SHOWN 0 05/09/2022 ISSUE FOR CONSTRUCTION JB TFG WKG AREA CODE 1853 DATE INITIALS REGIONAL LINE 142 PIPELINE DWG DATE0911712021 SUPERSEDED— ACCOUNT NUMBER 10700 ENGINEER PNG DRAWING C 142 NUMBER 0001068 REVISION 0 PROJECT NUMBER 0232195 DATE INITIALS MGR TECHtr.) ENERGY. Piedmont Natural Gas E&SC PLAN-14 DRAWING BY JB REC & STD CLAYTON NORTH CAROLI NA STATION ID DATE INITIALS PRINCIPAL DISCIPLINE / RESOURCE CENTER / LINE NUMBER CHECKER INITIALS TFG 05/09/2022 WKG ENGINEER COPYRIGHT 2018 Resource Center GOLDSBORO, NC LEGEND z Q J a - 1 I \ I \ \ \ I \ I 1 I I I / / I I/ I / 1 I / / I I I \ \ r \ \ \ \ \ \ \ \ \ \ \ \ \ I I \ \ / /_ \ '\ \ --- �\ // ,- \ /- N / I 1 / / / I 1 \ / // /,--\\ \\ \\ \ \\ \\_-�� // / \ \ \\N \��/ �_� N N\ J J I I I I-- I / \ \ \ 7 _ \ \ I I / I 1 \ ' / / / \ \ \ \ \ \ -__. - / / / \ \ I 1 I I \ / / \ \ \ \\ -/ \ / \ \ I 1 I \ \ \ / / / \ N N \ \ \ \ / / - - \ N" / \ \ \ - / 1 I I \ / / / N\ \ -----� / �\ \ -\ \ \\ I I I I I I I \ \ \ / / / / - _ \ \ \ _ / / \ \ \ \ \ \ I 1 I \ \ 1 1 \ \ / / / / / \ \ \ \ \ \ - _ _ \ \ ✓ \ \ 1 \ 1 I \_ / / / / / \ \ \ \ / - \ \ \ / \ \ N\ I I1 1 1 \ \ \ \_ / \ \ \ / N \ \ \ \ 1 \ \ \ / / / / N i - - - - - - - - - - - \ \ - / % I I \/ \ / / / / \ \ N ' / / _ _ \ \\ - .\ \ \ N \ I 1 I I 1 \ \ \ / �\ ' \ \ \ \ / -- _ _ _ _ \ / / \ \ \ \ / I I I I \ / __/// \ \ \ \ /\\I I / T \ \ - \ N-/ 1 _\I \ \ / / / \ \ ` / ' / - - - \ \ \ \ \ X. \ / /\ \ \ / 1 I I I / / \ \ / \ N a / // / \ \ �� / / / \ \ \ \ \ \ \ / - \ \ \ \ \ \ \ / I 1 1 / \ O / / / \ \ \ / _ \ / I I / \ \ O i - - \ \ - -- \ \ \ \ l I N / / / / \ \ / / \ \ \ / \ \ \ / / / \ \ \ / \ \ \ / \ \ \ \ \ / / 1 / / / • / I 1 / / \ \ \ \ \ \ \ / ' ' 1 \ \ \ 1 \�----// / / / / I / / \ \ \ \ \ \ \ \` / / I \ \ \ \ \ \ I _____ // l / /l / \ I / ^ - ' / / \ \ \ \ \ \ I _ 1 1 I / \ - / V. / / \ \ \ \ / / / \ \ \ r� // / // \ \ \ \ \ / I I ` \ I 1 / / \ / / / / / / / / ,� \ \ \ \ \ \ \ \�-/ /' ' I 1 1 \ 1 1 I / �- _7 / / ' ////'/ I / / / / \ \ \ \ \ \ \ / / I 1 I I 1 1 / / / / / /� // / / / \ \ \ \ \ \ \ \ / / ' I I I I I 1 _ _ / / /� / / I 1 / ' \ \ \ \ \ \ \ \ /' / l I I I / / / / / / // 1 I / I \ \ \ \ \ \ / / / I I I I I /-� / d,. /// / / / \ / I I / - �_ / W c��/i / \ \ / I / ' /^ 1 \ \ \ \ \ \ \ \ \ N \ / / / / / / / 1 / / / /' / / /% = /' / '-/ / / I I \ \ \ �O / / ' / i / j % , / / / \ \ \ J / / / / / / / / / - / \\\ /'/ / /////\ I \ \ \ \ A / / / :id / / / \ \ /�___ a / I 1 I I \ \ \ \ \ `- / / , / / / / / / / /_i / /' / ,/ 1" / I \ \ / / / 1 / I \ \ \ \ \ \ \ \ \ / / / / / / / l / / / / / ' / / //// / G N/ / / 1 \ \ \ / / / / / / / / I \ \ N \ "R / / / / / / / / / \ \ \ / / / / / GRAPHIC SCALE (IN FEET) / ( I I ( / \ \ \ \ N / / / / / / / / / ( 1 I 1 1 \ / 100 0 50 1 0 2 0 CODE TCE TEMPORARY CONSTRUCTION ENTRANCE CD LOD CHECK DAM LIMITS OF DISTURBANCE - LOD - SF SILT FENCE SFJ SFO SILT FENCE JHOOK SILT FENCE OUTLET O CS CSIP SFB TSC TWC COMPOST SOCK /� COMPOSTSOCKINLETPROTECTION / SEDIMENT FILTER BAG SFB TEMPORARY STREAM CROSSING TEMPORARY WETLAND CROSSING SB OSF TB TTP PS SLOPE BREAKER w - V ORANGE SAFETY FENCE -OSF- TRENCH BREAKER ® TEMPORARY TRENCH PLUG 0 CURLEXPLACEMENT /, PERMANENT SEEDING PS \ \ \ / \ \ / I 1 \ \ \ \ / / / / \ O \ \ / \ \\ \ \ \ \ / I 1 \ \ l \ \ N. / / I \ \ - / / \\\\\ '...-\ l l -� \ — / / \ \ / — ` \ \ \ \ \ , I I / \ / / / / ///// 1 �\ -,,,,N......., \ \\\\ , \ \ \ \ \ \\ \ \ \\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ I \1 1 \\ \ I I I // \ \ \ / \ \ \'- / / \`^ \ \ \ \\/ / / \ \ \` \ \ p /' / / / \\\ \\\ --'� \ / \\ \� \ \ / / / \ \ \ \ / I / / - \ \ \ ` _ / / \ \ / q / �_ \ / \ \ \ / \ \ \ / \ \ \p / 1 i \ \ / / /- \ \ - / \ - \ \ I / -� \ / / \ / 2 \ \ I 1 I �\ o \ \ 1 I / I \ 1 / \ O` / \� \ / 1 / \ / \ \ \ /e I/ I \ \ \ / \ \ ^ / / / \ /' I c \ / / / / \ / \ / \ / , 1 - - / \ 1 \ \ \ I , I I _ ---- _-\ I I I , \ \ I 1 I I 1 I - - - - - _ \ I I I \ 1 _ I 1` I I I I \ \ \ \ - _ / / / / / I I �\ \ \ \ 1 / / / \ \ // I I 1 \ / / / / l 1 / / / / / / / \ / / / / \ / / / / / / / ' / \ / / / / / \ \ / / /' , \ \ / / 1 I I I \\\\\\/ ,///// 1 inch = 100 ft. I I \ \ \ 1 I I \ \ I 11 I N\\\\ \ \\ \\� /' // / 1 ( / / / / \ \ \ \ \\\ \ \ \ \ \ \ 7 I 1 / / / / 1 1 \ \ \ \ \ \ \\ \ \ \\ \\ \ I I \ / / \ \ \\\\ N\ \ \ ' ( ' \ \ \ \ \ \ \ \ \ \ \ \ \ /' AOO/ 1 \ \ \ I I / \ \ \ \ \ \ \\ \ \ \ \\ \ N\ N \ \ \ \ \ \ \ \ \ \ \ \ \ / / ' --� \ 1 \ \ 1 / // // \\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ / \ I \ I \ \ \ \ \ \ \ \ \ \ \ ,��\ 1 ( \\ \ \ \ \ \ \ \ \ \ \ \ / \- \ \ \ \ \ \ \ I I I \ N \\ \ N 1 I\ \ N \ \ \ \ \ \ \ \ \ \ \ N I \ \ \ \ \ \ N N 1 \\\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ / \l \ \ \ ` \ \ \ \\ \ \ \ \ \ \ \ N . \ \ / \ \ \ \ \ \ \ \ \ \\ \ \ \ \ \ \ \ `) \\ \ \ \ 1 \ \ \ \ \ \ _CX \\ \\ \\ \ \ \ \ N \ N \\ \ \ \I \ I \\ \ \ I \ 1 I I 1 I I \1 11 II I 1 I I I I I I I I II CTWO PT CWD SWC CO C UC\ CONCRETE TRUCK WASHOUT PORTABLE TOILET THROUGHRYIMPA D THROUGH WETLAND PERMANENTIMPACTTHROUGH WETLAND EXISTING STREAIA THROUGH IMPACT PERMANENT IMPACT THROUGH STREAM CLEAN WATER DIVERSION — TEMPORARY STORMWATER PT j� • �/ CWD - \ / 1 I - 1 1 I / /_ _ \ \ \\ \ ICONVEYANCEI /I //I/ / I / // / _ -_ - -\ \ \\ \ \ 1/ / I / �// / \ / / // /i /--j \ \ \ \ \ / / / / / /\� /______-// \1\\\\ \_HERETOAVOID // / \\\_/DUMPING / ///// I /^I///_ff l / / / \ \ i\ / / //// / / / / /- /// / \\ II II\\\\\\ / O�/WETLAND / o/ I // J1 / / \ _ /// -- I / I \ \ / �1 / / / / /// 1 / / / / I \ \ / / / /I / \\ ADDRESS EXISTING CHANNEL RUNOFF INTO AREA (BOTH11\rRAN DURING &POST CONSTRUCTION) 1 1 I I \ II////// I 1WETLANDIMPACTTYPES 1 \\ \ ORESTE FORESTEDro/ NON -FORESTED ORPERMANENT CROSSING (PERMANENT) CRosswennATPLACEMENT (TEMPORARY) // _ - _ i ��i / / / \ , '- - - _ _ - - _ / \ / / / / / / \ I / / / / / - I I I \ 1 I I 1 I / / \ . \ \ ` i \ \ 1 \ \ N /' / I / j / / \ , _ _ \ IWETLAND / I / / l o \ \ 1 / / / / / / / /21a, \ / / / / - - - - - \ \ 1 ' \ / / I I \ I / / I I / _ _ _ \ \ \ / 1 1 I I �' J/ I I / / ' / - \ 1 W9-A FORESTED STREAM (S27)1 (INTERMITTENT) I \ \ 1 \ \ ` I I \ \ \ \ \ _ /' / / / / o I_ / STREAM (S26) (INTERMITTENT) I \ \ l I I / 1 / / / / \ \ \ \ \ \ / / / / \ / I I II I III I I \ 1 1 1 \ / / o / / / / \ \ \ \ \ \ I I I / / I OPEN CUT FOR GAS LINE, TEMPORARY WETLAND CROSSING / OPEN CUT FOR GAS LINE, TEMPORARY STREAM CROSSING/MAT \ N \ \ , I I \ N \, / / I I I I \ \ \ \ \ / / �' / / - \ / I \ / PLACEMENT, I I \ \ / / i OPEN CUT FOR GAS LINE, I \ I I \ \ / N / \ \ \ \ \ / / / / I I MAT PLACEMENT, POTENTIAL `\ \ i _ - - // / -� TEMPORARY STREAM CROSSING/MAT \\ WETLAND W8-A / /� / / / / / / / N. \ \ \ \ \ \ \ I / / SHEET PILE, DEWATERING POTENTIAL BLASTING, I I -�" ) / - - - - - / ' `POTENTIAL PLACEMENT, I / I / \ FORESTED \OPEN — / / / / O / \ \ \ / / / ) - / / / / N / / / \ \ \ \ / / / / STRUCTURE. \ _ _ \ DEWATERING STRUCTURE 1 / 1 / / - \ g/ /- - BLASTING, / / \ 1 CUT FOR GAS LINE, / / / / / / / / / / / \ \ \ \ \ \\ \ \ ` / / / / / / PERMANENT IMPACT DUE TO \ 1 1 / / / oo \L, CTWO / DEWATERING STRUCTURE / / I TEMPORARY WETLAND CROSSING / MAT PLACEMENT, POTENTIAL \ _ _ / / - / / / iI r/ \ \ \ / / / \ \ \ / / TRANSITION OF FORESTED TO` 101Io// \ \ 'b+ - ° / `' I / / , o Lam- / SHEET PILE, DEWATERING _ \ \\\ / / / I I I / / \ \ \ \ \ \ \ \ _ / / - 2 I NON -FORESTED WETLAND. o//SFO \ \ 0 1 I o / / + ` / _ Y \ / / /, _ "o \ o \ o / / / \ \ I STRUCTURE. / 9 \ N \ \ - _ - - / I 1 / / \ \ \ N. \ \ \ / / PROPOSED 12" STEEL GAS LINE / \ o o Q �/ / / \ \ \ o \ \ o o + '- -- in \ ca / a co �' / / _ 2/ I °\o _ - / / \ \ o / o h / / / \ 1 °��..to \ D / \ 1 PERMANENT IMPACT DUE TO TRANSITION OF FORESTED TO NON -FORESTED WETLAND. / 1 �9 \ \ \ ot° / / / 1 \0 \ \ / / 1 / _-- \ / / I I 1 0 \ F, \ \ o o\ \ o + \ c.i o / O / o c c� _/ \ \ o - + I I IN c� /•/ !:. 1 1 L 7, - _ S />�o o + o / / / I (` / Io/ \ \ / \ / / / \ \ \ / ::,e- - 00 F \ / r \y M \/ o - I \ I 1 \ p / I I +/ M \ \ \ \ / o d/ / 1 1 TB __ / / Y..v�ay.��t1K617Ai� \ \ \ / / 1 cp o / I 1 o / / t \ \ \ + cN \ .i, \ I I I d I / 1 1 I O 1 \ _Q — o l l I 1 1 1 \ �\ \ �\ \ \ / \ \ TB \ / / / / 1 \ ❑ - _ ♦t lw�1 qc ,- 71+� �1�. I i� t .-.!. ` e �� a v3♦ vw.• .�. ._ ♦'♦-.� o al _ _ _ \ ` \ - '-_.. TB 1_ 1/ I (76 �i. -� / /�jf LOD , I \ I I 1 I / 1 I \co\ r /� / \ \ \ \ 1 I I 1 I / l / ^ \ \\ \ ��� / 1 }- {9B�- �- L `..fit 7-7♦_ �q'; ,,A'Li'r�G �.�..w.- - \ / / / • -Y �- LO♦r� D \ LOB- W I � - r _T1 ❑ �/ ••��<s a 2 l / 1 . ) - \ 00 \ \ SFO i'.'�_L-9D ' / I / L / \ 1 ,, �I \ I I I I — — �l I 1 \ \ l \ \ / I 1 I \ �� \ \ TB / \�{9°�� tt(p vv. \ L r I ae.>O11A<lw i1�1!ll1.�l� +i1 / - \ --.<wc�.!_ <IGllC�1♦ VAVAA.,/I / 1 >1 F oo, 1-a Y. O, —% ,I <. e - <l♦ ! ♦ vevA vl. Q - 9@�� / DD, - / / \ s` lt9D I // 00 tan- �■■■■uii.�ii■i■u — \ _ _ L OD I I LOD.'''' .'•" \ \ / / / \ ,,1P��!<t1c`I-101i•7VA,VV�1<17t1<l<l<l<�L•Lri!`!1!1!♦1VAVAVA a>7� F .� �i c717.1<♦<♦♦< !.G . ♦1 7AA 1111.<1L.�..y.1!vvwvAY�. L<„� ��♦...<S T ♦ 71 • OO, O / J i■■■■■■ -, -- -' TB �•-_ \ 1 TB \ \ \ \ ° \ VAVAw !>vv 7�1!♦ .11�- <_4��C'a / �ijf. r �:. G. , -1 ! .1 ! _.�: 4 OHO / 1�� I , `7A ` ♦ 'L L O!♦ i 701� �i♦ ♦, \ \ = \ -�D LOb' IM / / n t9t� , '• \ I L�00,, / / _ 1�A4 14 LW.. D y, — \ \ G , ILL 1 \ _ 1 \ �- ¢- // I aiC - W I �% R O, 00, /O, / NIF oo, /j /' /' \ \ - _ _ _j/ ,I \cn 1t \ \� M b SF oo, o 'i v� 1 SFDn ❑ — \ �� ° / 1 / / , — ' cF°I s J' _ - _ - - _ __ m \ / — — \ F°O,J'`' °O, +- I 1 S F O / \ 1 / , I / / / / I \\ / ' ' TB \ — —/ I / - DD, —� '�-° I / / ' ' I .O, SOD, \ ►� 1 '���� \ \ - / �DF °-`- °,� / / 1 ( --C TSC / ' \ / / \ LOD / ° !<> 1 - - \ / I I FO,��$EDD, \ \ / , SFO / I 1 TWC / / / / / / - - / ' \ \ TSC 1 ® �0 / �:> ,, \ \ ° ail\ \ \ / / �-1' / / \ / / l \ / \ \\ Z SFO DD\ O, _°�;..>•a�;,-°��°o �° , �e i \ I / / \ \ \ / / / / 1 1 \ / / / \ \ / p / I // // / \ / \ acy,-S,O, ��F—I°O, I SFO \ \ \ / / I / I I \ \ \ / / / o _ \ I \ /SFO -J \ TWC '' \ \ \ L LOD SF �� I I I I I I 1 / \ / ' \ \ \ \ / / 1 / / / / \ I I I I Pi \ \ \ SFO\ - _ \\ \\ \ SFO I \ \ \\ / // I \ \ \ / /' / / I / I / \ \ \ _ /G / / /' �,o�/ / N - / /' / / /\ \ , \ \ \ -- \ \ \ \ _ \ / iJ, I \ \ �`//'\ I///1 I I // L / �111 II / / I ) . o // I I/ oo 1I bi\ \ \ - / / /--�/-�\ / / \ I 1 \ \\ I \ \ / oI I I I ' \ \ \ \ \ I I / - \ / \ / \ 1 / / / 1 / / / / / / /_7�� I I / / / / I / 1 I \ \ / \ \ \ / PROPOSED ROAD BORE / / / / C / ` \ ` - - - \ \ ,� / / v- I / \ \ \ , \ \ 1 1 1 \ \ \ \ l 1 I \ \ \ \ / / \ 1 , / / / '8, I / / / WETLAND W9-B / / J / I \ \ _ / �b \ ` \ N \ / J I o / / / / \ \ \ I / / / \ \ N. N / \ \ \ \ \ / /\ \ \ \ \ 0 / / \ 1 l 1 \ / // / / / / / / \ \ - \ / / / / \ \ \ / \\ \\ / / / / / / / / / / / / / FORESTED TEMPORARY WETLAND CROSSING / MAT PLACEMENT, TEMPORARY ,' /' / / / / / Z + \ \ NII \ / / / / \ \oo \ \ \ / \ / \ \ / \ \ \ \ \ \ \ \ - - - _ \ \ \ \ \ _ / / ! / / \ \ o / / \ \ \ \ / / / \ / 76,/ / \ yyo \ / \ - / / / / / 7 IMPACT DUE TO TRANSITION OF / / / / / n \ \ / _ _ / / =p) \ , \ -/ �_-� / C) M 1 \ \ I ` --' WETLANDWB-B FORESTED \ \ \ `, \ \ \ \ - - \ \ \ / / / O \ V. \ \ \\ _ / \ \ \ \ \ \ \ \_////// 4/ / / / \ \ /�, \ \ \ \ , / ^ \ \ \ \\_-� / / / / \ \ //' \ \ \ \ \ _ _ N \ \ \ / / / / / / \ \ \ \ \ \ I — / FORESTED TO NON -FORESTED WETLANDS. I / I / / / 1� / I 1 / ' /' Q / ' I I \ \ / - / / _ __I --TEMPORARY \ _/ / I i y ( I / I I / \ - / / / I I 1 / . / I I / \ - _ / / 11 / / WETLAND CROSSING / - MAT PLACEMENT, TEMPORARY IMPACT DUE TO TRANSITION OF FORESTED TO NON -FORESTED WETLANDS. \ \ \ \ \ \ \ \ \ _ // / / \ \ \ \ I / \ \ /' /' / \ \ \ \ \ \ \ \ \ \ \ - , / / / / / / \ 1 1 \ \ \ / / / / \ \ \ \ / / / / 1 I / N \ N \\ \ \ \ \ — �/ / j/ �// \ / \ \ \ \ \ \ \ \/ 1 / / N \ \ \\_// / / / I I I I N \ N N / / / / \ \ \ / / N \ \ / / I I 1 1 I N N N \ \ \ \ _- - // j / j / ,' / 1 \ \ 1 1 \ \ \ \ N / / ' / O \ \ \ /' / / I 1 I 1 I\ \ \ I /\ \ \ \ \ \ \ \ - / / , / I/ / �� \ \ / / \ l _\ \ \ \ - _ / / I \ \ \\ _ / / \ \ / / \\ \ N \ \ - - j / / / \ I 1 \ N. \ \ \ / /// / \ \ \ / /' I i I\ \ \ \ \ \ \ 7 / - N N \ / / / \\ ,- �-�\ \\ \' - -\\ \ \ / / // _ \ / ----_\ -"\ ---„ /\ \`'� / ,/ --77- \\ — /_\ / / / / / / 1 \ � \ \\\ -/ / , l / / j/ \ \-J \ \ \ \/// 1 \_/ / \ \ / \ \-/�-� //\ I / -� 1 \ ��-�l 1 / NOTES: / // ` /--�\ I \ \\_ // / / N. / / / \ \ \ \ / - _ - _ - \ / _ \�-/ 1. SEE LINE 142 CLEARING REQUIREMENTS ON SHEET 79. 1 /l / _ _ / , \ �- -------\ \ /\ • / / \ \ \ ( 1 _- \� / �- / N / // //_- // // \\ //// I \\ _�\ 7 /k.�R \\ \ [:1- -_-_ / , N / / \ \ \ \ \ / \ N \ ,-// 1 / / N\ ,/ / \ \�---_-//////7/-_� -___ 0_ --\,� -, / „ -- // \ \ / \\`_ /1 /\ ._ /' ,---\ ,_� // %///// , / -� \�` _--�� \\\\\\\ \ \ \ \ l \ �\ ,,ego/� /_ / / /\ / \/ / / \ -\ \\ \\\\\ / \�--- / / �--' // __ N'\-/ / // /// / / /�_\\ 200__ \ \\\ \\\ \ \\ \ \`\ /' / /' / —\ -� / /��) ' / - �_� \ ,\` 7/ _ \ N 7 // // / /7 / \\\-__\ N N \ / / 7 / /' -,\ \\\ \ __ // / / �_ - -- -� \\\ \ /- \ 7_-� \\ \ \ \ _� - \ �/ /- •\\ \ / \ \ \ \ \ \ \ \\\\\ \ N \ ��___� / / \ \-///--_ �, _ — _// / �/ /�\ \ \ / / I \ \ I 1 1 \ 1 \\ \\\\\ \\ \ — — J / 7///i / \ / / - ~\ N \' / / ---�� \ \� I ot. '' _ss /0ti //, •°Q� °••� -_ ° `�� A- 05�09/2�2°�, tiG 11\0 .. '``` -,,,/q ° ° ... ° °G\)Q\•�•, .,,, /CEITH �,.\\ ,JimiIi11111� PROFESSIONAL ENG/ARCH STAMP PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY * *TO REF. DWG(S) PNG-G-1 42-0001 000 PIEDMONT PIEDMON NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) DRAWING IS CUf'RENT ONLY THROUGH THE LATEST REVISED DATE INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS SHEET(S)70 OF 119 DWG SCALE AS SHOWN 0 05/09/2022 ISSUE FOR CONSTRUCTION JB TFG WKG AREA CODE 1 853 DATE INITIALS REGIONAL LINE 142 PIPELINE DWG DATE09/17/2021 SUPERSEDED ACCOUNT NUMBER 10700 ENGINEER PNG DRAWING -C-142-0001069 NUMBER REVISION 0 PROJECT NUMBER 0232195 DATE INITIALS MGR TECH DUPLE rap Piedmont Natural Gas E&SC PLAN-15 DRAWING BY JB REC &STD ENERGY:. CLAYTON NORTH CAROLI NA STATION IDPRINCIPAL DATE INITIALS DISCIPLINE / RESOURCE CENTER / LINE NUMBER CHECKER INITIALS TFG 05/09/2022 WKG ENGINEER COPYRIGHT 2018 Resource Center GOLDSBORO, NC LEGEND z Q J • /1 /� / //�/�/'_ \� N �\ / I \ \ �\ �\ ��`\� N\ \\ \ I / /' / , / // ---�\ - __- /h /, °o I/ / / / / //, / \ _ _r/ / I \ \ N \ \ N. _ lI / / / / ' / ' \ •/ �� I / / 7 / // \ / / // / / - - \ \ \ \ \ 1 / / ' / ' / / / - ' / / I / / / ( /// / \ \ \ \ \ 1 l �i Op \ ` / / / // /� I // / // ' / \ \\ 1 ` \ \ \ \ / / / ' / ' / / - O/ / I �' / / / / / 1 / / / / / \ \ I \ \ \ \ 1 / / / / / / / / / 7 / / / / / / / / / / 1 / // / / �� / / / i -� \ \ \ \ \ \ \ / \ 1 1 ) , / / , / / / / / / / / /p'` I I / / / I / / , / / ////, / / / / / \\ �O \ O / I / / / / // / /• \ I I /J ////// // /'// // - _ \\\ \ \\\ \ �/ / I ` 1 I /� // / / l / / / I /�, / // / / \ \\\ \\ \ \ \ 1 / / / / / / / / / / / / / / / / / \ \ // I / / / / / I / //'//'/ / // / / \ \ \ \ \ \ \ \ i / / / / / / / / / / l / / / / / / /' — - \ \ / o° °°� \ \ FOR CONTINUATION SEE SHEET PNG-C-142-0001077 / / \ / / / // /// // / / , / / \ \ \ \ \ \ / / / / / / / / / / / / / , / / 7 / \ \ \ \ �/ / \ / / O O / / \ \ / // /// // / / / / / -� \ \ \ \ \ / / / / / / / / / I I / / - - \ //" OQ/ \ \ \ \ .i / / / / / / 1 \ \ \ / / / / I I I / / I / / — \ \ N7 \ O \ // //,/// // / // / / \ \ \ \ \\ \ \ \ ,' / / / / / // / / / / I I I I / / /' / /' _ _ -� \ \ 7 \ y\ .�/ \ \\ \/' ' / / / / / 1I 1 1 , ///, / 7 - \ \ \ \ \ / / / / / , / / 1 / _ \ \ / p \ , / / I I // / / / / / \ \ \ \ \ \ / / /' / / 1 I a / /' \ \ O \ \ \ / ` / / / I / / / / 1 / / \ \ ` \ \ \\\ \ / / / / // / / / / / // / 7 / / / / / / I / / ' ` ,/ \ / \ \ / / I I I �/, I I / / \ ` \ \ \\ -- ,� /, / /, �, / )/ , / - \ /\D� /\ \/ \ _ ' / / / \\\\ III/II I / '/ / __-- I \ \ \ \ i / / / / /\ \ I f/ / I \ ` \ ` / / / / / / / / /'/ / / / // / / I PROPOSED ACCESS ROAD / / /\ \//` II1`\I //I I\\\ \ \ ` \ / /' / ' / / / / / / / /' ' / / / I AR-011 I / /�O O` \/ / \ \ ` O ° \ 1 1 \ \ \ \ / / / / / / / / - \ \ \ \ I I / \ / / / I \ \ \ N \ ` \ \ / / / / / / / 1 (PERMANENT) I \ �� \ -250 / \ I I \ \ \ \ / / / / ( • , / / / I ' / / / / I , l l , / l I l I l l / f I / ' , I II' I I 1 I I / / / / 1 I I I I I / I 1 I I / I I 1 I I , I \/ ` I I I I I I / , I I I ' I/ ` I I 1 / / / \ I I I I I / I I l I / /� � ' / �. / I I / / / / I I I // / I I \ / I II I I I \ C -� / I I / 1 1 I / I I `— — — I I \ / I / ' 1 - ' I I I 1 1 \ .....- _ - -' 1\\`�_.— —_'�-'� \_ _-_- - \ _ 1 \ \ _ - \ \ ` �/ / \ \ \ _ / i \ \ \ _ __ -GRAPHIL \ \ \ \ \ —_ /100 0 1 / %' / j / / / / \ / / -\ / / / //' / / I / /' / / \ \ \ J / // // _ \ \ / / / \ \ 7/ / / 1 / j / '- \ \ \ \ / / / -\ \ \ / \ \ /�I�\ �I /� / /�� \ \ \ \ / //" \ \ \ \ L / \ \ \ ` \ \\ a� /// \ \/ —� \ ` ` \ --N., \ \ ` \ \ \ \ SCALE/TN EE ) \ 50Q \ \ \ ?�00 \ ) 1 \ / 1 1 % , l ISV Z i - Q\ / �-,�TWC - - \ - ' i / 7 / _ _ i �% CODE TCE TEMPORARY CONSTRUCTION ENTRANCE ��� ��� CD LOD CHECK DAM O LIMITS OF DISTURBANCE -LOD- SF SILT FENCE SFJ SFO SILT FENCE JHOOK SILT FENCE OUTLET O CS CSIP SFB TSC COMPOST SOCK /� COMPOST SOCK INLET PROTECTION / SEDIMENT FILTER BAG SFB TEMPORARY STREAM CROSSING TEMPORARY WETLAND CROSSING sB OSF TB TTP CX PS sLOPE BREAKER ORANGE SAFETY FENCE -OSF- TRENCH BREAKER ® TEMPORARY TRENCH PLUG 0 CURLEX PLACEMENT /i PERMANENT SEEDING PS \ / / / / I I \ \ \ \ / / / / / I I / / / / ' /I/ O \ ` 1 `\ / I \ ` \\ \ \- / I \ \ \ \ \ \ \\ \ \ / // // /' / ,' / /' , _ - - - - - I \ \ / / 1 / \ �' \ / / , I \ \ ( / I _ - /�- / ? S„ / I / / \ 1 _ --- I 1 1 / \ \ 7 7 I - }-/— / / / / \ \ \ / / 1 / ' \ ' / i ` I / I 1 ► / J `__/ I ► A— I // 7/ IIIIII I°p 1 \ \ \ /' / / 1 /'1 I �\ 1 / \ / / / /' / / �� I 1 / 1 I 1 / \ \ \ \ N \ \ - - - - - / / _ 1 inch = 100 ft. 1 1 / / - / / / 7 / ` \ \ \ \ / _ I - I / \ \ \ \ - / / I / / / / , __,----o----__ '_, 1 \�----'- ,- I� / / /�, I ` \ - _ / / I / / / \ \ ` \ \ \ \ \ \ 1 I I / ( / / / // / / I 1 CTWO PT SWC CONCRETE TRUCK WASHOUT PORTABLE TOILET TEMPORARY IMPACT WETLAND PERMANENT IMPACT THROUGH WETLAND EXISTING STREAM THROUGH IMPACT PERMANENT IMPACT THROUGH STREAM CLEANWATERD VERS ON —CWD TEMPORARY STORMWATER PT j� • D - / ► I //__/ - �y 1 ___-- ,\ /,�/, \` \ \ \ __� /\ _ III I / /-/7 /// .._ / 1 / / \ \ \ _ / - \/ / 1 \f(\^ \ \ \ // / / \ \\ \ \ / 7 / I I 1 \..- / / / /'' _ \1 I / r 1 1 / / / I \ -- �� --- - / 1 \ �2 / I�_ \ / / A SFO\ \ \/i-- -//l / l \-//�\ \ I1I \\ //// // //THROUGH iI I I \\� \ \ 1 \ / / \ \ \ _ I \ f \ / / I / / / \ \ \ / / / _ - \ 1 1 O / / / / / / / / / 1 \ \ / - / / / - - - , \ \ \ 1 1?� 10 \ // /' // %' / / / I \ \ / // // --__-/ - _ \ \ \ \ \ \ \ ` - - / / , \ \ / / i / / \ //1 \ \ //- \ \ /// \// / / \ / / / / / \/ \ \ \ \ �- 240 —� / r / \ \ \ 7 \ 1 1 \ �61\ / / / / \ \ \ _ _ _ _ N I I / \ \ \\ \ \ \ \ ' ' \ \ \\ / / // ` / / - \ ' \ \ I \ \ \ // �\ \ \\\ / / I I I I I 7\\\\\\\\ \ \�._/ / \ \\\\\ \ \ \ O\ // / / // // I -� - - - _ _ ` \ / / \ \ \ \ \ \ \\\/ \ \ \ \ \ \ \ /\ \ \ \ _ / /N \ \ \ \ \CWD /\ - \ n 0 \ \\\ \ \ \ \ \ \ N \, ,---_\ \ - - - \ \ \ \ \ \ \ - - ' \ ` \ \ \ \ \ \ \ - -- / I \ \ \ \ \ \ \ \ \ i 1 \ 1 \ \ \ \ \ \ _ _ i - 1 1 1 / ` ` \ \ \ \ // / \ / / / - \ I / ' \ / \ I/ \ \ / / / 2 �_—_ ��/ I 1 l \ / / I \ \ \ N \ \ \ /' / / / / / / --- _ \ \ \ - /' \59%\ — \ \ \ / / / / / / \ ----1" I 1 \ \ \ \ \ ` _ / / / / / / - I ( \ \ \ \ ` \ _ _ _ - / / / / , / / / / / - - \ _ \ 7 / 7 7 I �/I)--------------\(/ // /// �� / \I / \ / /12 / I / �� G / / /III/ NN_ \ \ \\ \ \ / \ \ \ \ / // / \ I I I \ N \ \ \ - \ \ \ \ �\ /' / / / '/, \I �\ \\ /� '/ \ ` \ i i l \\ \� \\ \ ,— --\\ `\ \� `\ \\sow`\_ / / / / \ / - - - - - \ I I 1 \ \ - - \ \ / / / / i - - .\ \ \ \\ / / / / / / \ \ N i __ 11 / / / / - 230 \ \ \ \ \ I I I 1 \ \ \ \ \ - / ___, '\ / / / _ \ \ \ \ \ I I I 1 I / / '� \` \ _ _ _ - ! \ \ \\ \ \ \ / / / / /// / \ I I \ ` , \ \ I I I / \ \ \ \ \ \ \ \ \ / 1 \ \ \ - / / / / / \ \ \ \ 1 1 ) I I I I I I I I \ \ \ \ \ / \ N \ \ \\ \ \ \ / / j % ////////, / I 1 I I I I I / \ \ \ / / \ ' \ / I \ CONVEYANCE WETLAND IMPACT TYPES TRANSITION OF FORESTED TO NON -FORESTED OR PERMANENT CROSSING (PERMANENT) CROSSING/MAT PLACEMENT (TEMPORARY) \ \ \ \ �_'t10 - \l I 1 I \ - _ / / / , / / �- \ \ \ \ \ \\ \ \ \ \ ....... 1 1 1 I \ \ \ N / / /' / / Q� / - - - - \ \\---- I I N 7 / / 2 -- 1� ' - 1 $ii J I 1 \ / / \ \ \ I I \ \ / / \ I / / / \ --- / \ \ \\ 11 I I 1 1\ I I WETLAND W9C-A FORESTED �- - - - \ , \ \ \ \ WETLANDW9D-A / / // / / // / / / ' /// //'/. \ \ I \ \ ` \ _ \ - ` \ -�� I l I // _-�'\ 1 \ \ / ' / / / - - \ I \ \ / I; \\ / �- - \ \ \ °/ / OPEN CUT FOR GAS LINE, __- FORESTED OPEN CUT FOR GAS LINE, / /, �// \ \ \ \ \� - \ I I I \ / / -- I I \ - / \ - _ // / \ \ \\\ \ \ \ \ I I / I \ PROPOSED 12" STEEL GAS LINE ,/ STREAM (S28) (INTERMITTENT) / - _ / - - ' I I I I ° \ \.�"' \° \ \ / / / / \ \ \ \ -TEMPORARY `� �- / / \ \ \ \ � \ WETLAND CROSSING / _ \TEMPORARY WETLAND CROSSING / o / / / / / / / / / N. — \ // I \ \ \ \ 1 I / I \ \ \ ` ?0 0� \ 1 I I I _ _ - - / o 0 1 I /TEMPORARY OPEN CUT FOR GAS LINE, / / / c — - 1 , / \ \ \ / _ \ _ / / / \ \ \ \ \ \ \ _ / / \ \ \ \ / ` MAT PLACEMENT. POTENTIAL SHEET PILE, DEWATERING _ _ - _ M MAT PLACEMENT. POTENTIAL SHEET PILE, DEWATERING / / / / / / \ \ _ _ ` , I , I 1 1 1 /o / STREAM CROSSING/MAT , / / / 1 °\ \ / / \ \ \ ` STRUCTURE. �' /' / \ \ I J / ' l , I \ \ / I , / \ \ \ - \ I ) / I Po°ate I / / PLACEMENT, DEWATERING / / - / , I , / SFO �\ _ - / / \ \ \ \ \ <oo - / / \ \ \ \ \ - PERMANENT IMPACT DUE TO TRANSITION OF _ - STRUCTURE. PERMANENT IMPACT DUE TO TRANSITION OF / / / i / / / / / _ goo c� o \ \ \/ 1 k \ I I / \ I / / / °o� �� I d1 / STRUCTURE / \ / / 1 / \ ° ` _ / \ �? _ / // / \ \ \ \ \ _ FORESTED TO NON -FORESTED WETLANDS. FORESTED TO NON -FORESTED WETLANDS. / / / / \ / 1 \o �\� o / / / , / / / / / Dp.�L I I \ / / / / / / _ / �p / , / \ I / / , , \ \ \ , co 1 I I / I 1 \ ht. \ - \°o, \ \\ \ / ,ti / \ \ \ �3 ° i _ / , I / / / 1 lei/ / / k \ \ \ / \ \ �D / / / d. / / , O / / I / I 1 \ . �� / / AY` /\ 1 11 1 \ \ '\ / / \ ` \ \ I I I I / / / / °p i/ \ . ,�—,, �\ 1 1 \ /, I I \ / po, \ \ , F °, �,, \ k I �� o \ \ �_ C / \ 1 0 ®l \\ \ \ `°aj' STREAM (S30) (INTERMITTENT) \ \ / I /� \ o I / / ( �O° \ ,� 1. ^ GO SFO v 7 _ - / \ \ I LOB / /' �.�I \ \ \ 1 ` 0 1 ° \ \ / ° / \ / \•`� / / / / NN \ TEMPORARY CROSSING STREAM \ , o ( \ \ \ - - - \ 1 2 1 0 \ o /7 / �' o 1 k I I \ \.. Q \ \ - V \ \ \ \ o \� \ X 1 Oo' \ \ \ � �\ \ m \ D 4113 ,• \�/ CQ \ \ \ \� \ F v� \ \ \ \ (� WOE \ \ \ \ '•vo 1 -p \ \ \ F P ► / \ \ / \ \ ® �Dp; �Di I I \ �\\ \ \ N \rh \ �`� \ p o o / �jil �_/ a - \o + O / } \ + \ \ CO �� ,' Og�� - - / \ �\ ' \ \ o \ o O \ I ) I I (\ 1 CD + N M / / �t \ a -- / ' / / / / / / / I I \ \ + 1 / / / \---- \ I / // / / / / / / \ 1 / / / / I I I l� �- am— �.:,\•(� �`'�/ ` �tP 1 \ \ /\ \\\\\\ \� vO L Dp) I , $ \\\_ / I - 1 2 - - \ I- - - \ \ —\ \ _J- LOD \ I I I D I I D T L / /// I if �•" L°9I� iff ��\ O/^OO )/ _ \ \ \ \ �' ' I I I l `I/\ \ .�.. ° D 1 / / / / I I / I \ \ �/ \ \ I t9B19 D �'".'' �)5, \ / , 60 \ \ \ I I 1 ap' , �\L / / / ' I / / / \ LOB• _ / J — �\ LOB- t9B��:--FT\N- 1 I /� % / ctl� �.O � 11� �!\ 1 1 ,.:.,. � \ TB \ per`- \ / TB - I—/ I I \ _ \ - - — - I / it \ / �� \C-� / \ / I �� \� —•► °' � /1''awl / / 1 l l TB TSC \ °° , \ / — �_ ¢F I��°�' / �_ ' TSCI I� ,l/\\ \\\` I I \\Y', 1 ,.>,.,>, \ dT pp° / Jl \ // l I ,�1 °° Ps. -.°)Flo, �I I//1 II I\\\\\\ lII/\ \\ \ \ \ _pp, pp, —p p, — ��/S , SFO \_\ /' / SFO \ '� / /7"/ / 7J\ I r/ / \ 'L / I 1\I I SFO \ \onop.,-p,�, / /�A `�� ��, r \ I / r/ / \ ° / / I I / \ `\ \ p01Fip , LODSF-20 \ \ ` \/o'/ I / SFO I 1I I N \ ° `I �� \ I I / I 1 \\ `\ \\ \� / \///\ _ / IIII 8\1 \ I \ ° \////I- 71 / I I \--_\� �\ �\ / ry , / \\`\ ` `\ 1 '�2�9� ` I I 1 I \ I I I \ \ l o I l / 1 / \ \ \ %� \ �\ / / / N 1 \ _� I \ \ N \ \ ��� / / ' 1 1 1 I I n \ \ —�\\\\ \\ \\ \\\_ / / / / / \ / �_ \ \ \\_, ry / °/ ^I I �\_// / / / \� // / \� \ \ \ \ \ / /, / )�/I I I I 7� `\\).,°.'\ �, I I I I ICI 1 — � ( I /' / "\ \ \\ \\ \ \\ // / I 1 I 1 1 1 \ \ \\--_— =\�\\� N \� // /I / / 1 I to/ I / I 1" \ \ / / I 1 \\ p\ r / / fig. / I -��/// \ I 1 _- I \ \ \ \ \ \\ ��-' ' / ' I III 1 I ` \ _-_��\\\` 7 / \\ \ _ _ / /WETLAND \ \ \ \\\ `/ I \ \\ \\\\ \\ \ /' / I III 1 1 I \ \� \�_���____��� \__ / /�� \ _ I I \ N N 1 �___ \\ N \ \\ \ -� // / / I I III \ \ �_-�' Cs - �\\\\ _ /' - 1 \ 1 1�\ \ \ W9D-B FORESTED TEMPORARY WETLAND CROSSING/ N \ \ //l l� / I Ilwl l/ \ \ \\ / ry / -__ \ N / l /� I 1 II ( / / ( \ \ \ \ \ \ / / 1 \ \ \ / / // /� I I I \ \ \ \ \ \—/ / , I 1_� \ J 1 �_ I���I 1 �� N --'' / 1 \\ 1 \ \ MAT PLACEMENT. 1 \ \\\ \\ 7/� I --�� 1 -\ \\\\\\\\\ � / / / ' / I _��/ �� / / / I / / / / / ti / / I I 1 \ \ — N \ \ - -- \ \ \ l \ STREAM (S29) (INTERMITTENT) TEMPORARY IMPACT DUE TO TRANSITION OF ___-_\\�\�\\ /'////,\ I _ \ \\ \ -' / / \ I l ` - - / / / l ► I 7 \ \ \ — —— ' / / , / / / / / I - — — _ 7 \ N \ N N \ / , / / I \ 1 / \ N \ TEMPORARY STREAM CROSSING FORESTED TO NON -FORESTED WETLANDS. \ , \\NN N N / // 1 \ ` — — - \ NN N \ / / / \ \ \ \� _ \ / I I / / / I ) \ \ \ \ N / / / -_\ \ \\\\\ N\�-//�/ / \ I / /' /' — /� / / / \ 7 I / /"� \\\\_- _- \__-- �_= __ / „./ \\\ \\\\ \\` N\ \ \ \ \ \_ -71 / \ \-I 1 I I 1 I / 1 / I I 1 I I- I 1 I I 1 I \ /'/ /-�/ _ \\ / //^ /' //'//ZOO/ �/' - / / / \ N / - \ \ / / /' / / / -� \ \ i \ \ \ \-�� �� / / \ / \ / / / / WETLAND W9C-B FORESTED TEMPORARY WETLAND CROSSING / - 194' \ \ \ _ \\ \ / / \ _ _ __-� \ __ \ \ \ �� / - \ \ _ �' / \ / ,---204---. / \ - - _ - I \ \ \ N / \ \ \\ - �� /���� 1 I I 1 MAT PLACEMENT. \ NOTES: ---- -- / \---'�\_ \ / --- 1 I \ \ / / ' , N N // \ \ \ ' ' 1. SEE LINE 142 CLEARING REQUIREMENTS ON SHEET 79. / \ / TEMPORARY IMPACT DUE TO TRANSITION OF \ / 7/'/ \ \ \ \ \ \ \ \ `\ / / / / /r / \ N \ / / - \ \ \\ \ - - / 7/ i / �/ ,_..-- - • FORESTED TO NON -FORESTED WETLANDS . / - \ \ / , / \--, \ 11 \ -\ \\\�- / �/� \\ \�------' _-- /' \_�/ /// / 7 / NN \\---\\ // _ \� / ) \/ // / / \\ \ -\ I // \\�// / - (I I ( I \ '1\\ �.---__-- -- � __I / N \�/^ / rJ I / l 1\ / /I _�� / -\ 1 / _ 7 \\�� //'/ ��_-__ \ / /' \\\ -'/ ��--_--\ // / / �/ N r \�1 - / /��7//Z1� /' \. i'\N. /% \ \ i// - - ,/) /� I,� \ \\_ / 1 1 I I / / / i r/r/ /-_ --� \� ��\\�------//---� / - -`\ N�►� v \ / // �\ i / I 1 1 / I ( ( I I / �' 1 \�\\ N,, ...\ \\ / - / 7 / ////�////;;_ _ _ \ \\ \ \ / / / / / / - //// /'/�----�\\\\ \\ \ / / / // /// �• / \ I. \ ` / / 1 \ 1 \ \ 1 I ( titi0 _ \ \ \\\ \\\\\ \__ - - - - - -.\ \_/ / N \ / / 1 \ \ \ \ \ I I / �' \\\I\�\��\ -�__ / =- --\\ �-- - N. /-- /1 I \ \\\\\ \\-//��___---\ // / -\� -- - \ 1 / 1 I/ /--� \ \\� - // --- \ �\ �,,, /i// //7i /-- -�\ \\\ \\\ \ / / `�// / / /// // / //_--�� \ \\\ // / / / / / / / / 7 //// / \ \\ \\ - r/ / / / \ \ - / / �//,r,// \\ - , --- \/ / N�- // // /I ► I �_\\ \\\\ \_ , ....... ;;/ �- \\\ /��-\\-_ - ,� /,/ /- , \ \ I 1 1 I I / ( / \\� \\\ \ _ // / \\ 111 1 / ,_—\ — ,/ —1 ► 1 1 - \� \; ` -_; ___ _\ \ \ 1► 1I / ;; //,/ /' _\\__ --- \ // /// — — / / / I \ \ I 0. \\\ \\ \\\ \\ /�/ / \ \ \\\11\ 1 J ( 1/(// 1 ', / 7 \ ---- _— \__�� ��� —�� �/ / / 1 \ / \\ N NNN .—�_/ 7/ / \ \ \\ \\\ I 1 I \ / /,-\ \ \ \ \ \ \ / /1111 /� , / —\ \ \,/' /—/ ' II, III l l // \ \\ \ \ I I II I / / \ ` \ \ \ ( / II III /j/ 1 \\�/ II \ \ 1 1 V 1 ► ' N I I V / I 1 / / 11 // I / /\ _----�'--- � / __ \------------- ---�--_--_ \ ///��� 1 / — ••—�� \ �i�-- 1\\\\\1\I\\�\ �/ �\ \ I-� /I I II \ \ \ \ I \ \\ \ \_— i \ \ `\\ \\\ I II�II f \ \ I ( \ , II// I I I I I \ \ \ \\ \\ \\ ' 111' I I I I\ / /�— \ \ \_�' _ — —_-_ �/� ----'�, \ \ ,—/ \ \ /' / /_-- _--_� - /////�— — \ \\ \// / / ` \ \ \ \ 1 1 II� `/---_--_�\ ///7/_ / �i / -- _-_-\\, ///i/.=-_ -\\ \\\ I I \ \ 1 \ \ 1 1� I _—� �� \\ \ 11 \ I \ \\ \\� �__--- \\ \ \\\\\\\\ \ 1 I11 1111 II I I I I I \ \\ \\ \\� \� \��/ / I I 1 \�. \� \�- �'_�'- -\ \ \\� \`�\\��\\\\ \�I I I\IIIIIII(I� 1 I I 1 I \� \ \\� �� ! I I I 1 1 I I \ \. `. \� I _q'. " _ss /o !2'- °Q� °•� -- - _ ° ��` A- %05�09/2�2°�, ' tiG I NEti°° '`` ;,,%-9 °°...°..;.\/,,, �,,, kEITH ��,.� ',,,,,III,,,�,0 PROFESSIONAL ENG/ARCH STAMP PROPRIETARY &CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING *USE DIMENSIONS ONLY * * REF. DWG(S) PNG-G-142-0001000 PIEDMONTS NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) DRAWING IS CUf'RENT ONLY THROUGH THE LATEST REVISED DATE TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS SHEET(S)71 OF 119 DWG SCALE AS SHOWN 0 05/09/2022 ISSUE FOR CONSTRUCTION JB TFG WKG AREA CODE 1 853 DATE INITIALS REGIONAL LINE 142 PIPELINE DWG DATE0911712021 SUPERSEDED ACCOUNT NUMBER 10700 ENGINEER PNG DRAWING —C-142-0001070 NUMBER REVISION 0 PROJECT NUMBER 0232195 DATE NITIALS MGR TECH DUPLE rap Piedmont Natural �I E&SC PLAN-16 DRAWING BY JB REC&STD ENERGY. CLAYTON NORTH CAROLI NA STATION ID DATE INITIALS PRINCIPAL DISCIPLINE / RESOURCE CENTER / LINE NUMBER CHECKER INITIALS TFG 05/09/2022 WKG ENGINEER COPYRIGHT 2018 Resource Center GOLDSBORO, NC LEGEND z a — \ \ \ _\ 1 \ \ _ \ J \ \ ► \ \ ` _ — — / / i, /i / i/ / / // '///// --/ /" / / / / / ' / / / / I \ / \ I / \ _ 1 1 I `_ _-/ 7 / /// �//� / / -/ / / / // 777 / / / / / / \ / / \ \__ / \\ �\ \ \\ / 1 I / //.7/ / / // / l\ / / ` /1� /' / / / % /� / / / / /� /' / / / / ' \ \ \ \ / I _ - \ \ ' ' // / / / / / 11 ( // / \ \/ / / -- -`-� - _ CODE TCE TEMPORARY CONSTRUCTION ENTRANCE ������ CD LOD CHECK DAM O LIMITS OF DISTURBANCE - LOD - - - \ I - - - - / / / // / / / / `_ \ / \ \ / \ l / l/// // '� .. / ///' �// i-� /// / / /- / / / / j� / / / \ / / I/ \ \ N i/ / I I \\ N \ / / _ - \ 1 I I / / / / // / /�// / 1 /// / /// // / / / / / \ / \ �' - / / \ \ \ I I I I /// /,/ // V 7 / / //, // / / / / / / / \( / I 1 \ \ / l / \ \ \ \ / I I / \ \ \ \ \ / / I / / - / /// / / / / / / / / / \ \ � \ \ / / \ \ IIIII (\\`__/ /� /'/////'��� //"////�/ //// �// // / / / ) \ Q/ / `---/ / l / \\ \ \ \ / I / / \ \ \ - -/ l/ I --\ \ \ I I I 1 // / V/// / // // / / // / / / / \ - / / / / / / / ( \ \ 3� / / — - _ / / \ \ \ \ / / / - - \ \ / / / I \ 1 I ( I N \\ \ - /' /' / /// / / //// // /// / /// / III/ /( / I \ / / / / I I /' / - - _ // / �� \ \ \ \ / / / /, ---. \ N \ / I / \ / / \ / / \ \ / I I /// /// / / \ 1 O \ / / // / / // / / //„//—/ / I I / / / / / /�--�\/ / _ \ \\ \ I 11 \\ \\� I I \ \ I ` I \ \ _ i '� / / /// / J I \ \ / / \ / / / \ \ \ /-"� i I 1\ y\ /_ \ _� - \ \ - \ \ \ \ \ \ \ /�N. � \ \ \ \ \ W Z + \ \ \ \ \ I SF SILT FENCE SFJ SFO SILT FENCE JHOOK SILT FENCE OUTLET CS CSIP SFB TSC TWC COMPOST SOCK /� COMPOST SOCK INLET PROTECTION / tt SEDIMENT FILTER BAG SFB TEMPORARY STREAM CROSSING TEMPORARY WETLAND CROSSING _ - / / \ / / / / / / /// -� / \ \ / / / / / l \ \ \ /\ \ \ / / / / / \ \ \ \ \ \ \ \ / / / X. - / / N \ - / / \ / / �\\ \ �.- / / // (�///i //----' I /—� / \ \ _ / \ _ / \ N\ j i� \\\\ =� \ I I ) I I / \ \ \ \\ / / / \ \ N \ / / / / \ - - / / / // /- \ \ \ \ N \ 7 , / / / / / / / / \I i \ \ \ j l I i _ \ \ \ \ / / / / , , / '/ / //� //� _= / \\ - \ / / / \ \ N N. / / - _ / \ \ / \ \ \ / \ \ \ \ \ // ' // /// J \ \ ` - ' \ / / / ` . \ I I I I / Q I I / \ I / \ \ \ \ / _ _ _ \ / / \ - _ _ / ' ' \ \ / // / 7/ / / / / -� / / / \ / 1 \ / // G N I I / // I / \ \ \ \��\ \ \ ` / / / / / ///////// / / -/ 1 / / \ \ \- / / / \ - / / - \ \ J \\ \ o\ \ / / / / / / /�� / / //i / / / /-\---- 1 l l \ \ X. - / — // / / // / ' -�' / / / I \ ?90 _� / / // /�-\ \ \ \ / // /' \ \ \ \ �,__�� / / / -\ 1 \ _- / �/ \ \ \ \ \\ \ \ \ \' /// / /// // /(//�/ // // /// / /- -/// //\// /\\\`-- // /\\ \\/ ' '/)I////\ ` \ \ //\ / �// / / \/'/'/ /1\ \ \ /' '\\ ////% \ \ - GPHSC rv-�EE \ \/// // / // // //// \\\ \/ I \ \ \ \ \ \ \ N // / / // // / / 1 I / /// // // / / 1 / / / /' / / / L — \ N ` / / 1 \ \ ` - / / \ \ N / I / / / _ -� 100 0 50 / 10� \ \ ' / / / \ / / 1 1 I I 7BREAKER J Ii/ 2 0 / / / / I l I I TB TTP CX PS FENCE -OSF- TRENCH BREAKER ® TEMPORARY TRENCH PLUG 0 CURLEX PLACEMENT /i PERMANENT SEEDING PS _ \ \ / // — _ \ — / \ \ \ \ \ \ / / \ \ \\\ / /, /// //I , 1 \ \ \ ( / / \\ N7 / /I �\\ / \ \-/ / I / / / l l ///////1 \ /- ,/ \ I \ / / / A�_---- / \ \ / / / \ \ \ \ \ \ \ \ \ \ / / // // / / /// /// // / / • N ` N \ \ \ \ N - - _ _ - - \ ` NN. \ \ \ N / /' / I / \ ` \ / ' / \ \ \ \ \ \ \ / / / / 1 I / / \ \ \ // / / / / //�� / N 1 I / \ N I I `� \\\ ,_ �� / / I / / If1C U6 ft. /� / I / / / / / / / '/ / I \ \ / \ \ _ / / \ \ \ \ \ / / // / / _� / - _ \ \ 1 1 \7 / - _ ' 1 \ \ 1 \1 1 N �-�/�/ jj // /� \ 1 \l \ 1 \ 1 \ X.„.„... / / , / / / I / . / STREAM (S31) (INTERMITTENT) OPEN CUT FOR GAS LINE, PERMANENT STREAM CROSSING, POTENTIAL BLASTING, ' ♦V \ / / / / / /- ) 1 \ \ / \ \ / / /I \ / _ / \ / \ 1 I \ \ / 1 \ I / - \ \ 7 / / / \ \\ �/ / ' _ \ / / \/ /\ // \ \ \ - - / / \ �- /'/ ' 1 / / \ / / / \ / / / / 1 / / \ \ \ \ \ / ' ' // / / / \ / 1 \ \\ \ N.� \ \ \ \ ��/ i \ \ \ \ \ \` �// // / /// - \ /'/ �- ) i/ / / / \ _/ / / / / 1 / / / / \ \ \ \ / / 7 / \ \ \ \ \ - - - -/ // / \ -- / I / / / \ \ O \ .� \/ 7 / // \\ J / /I / / / \ \ \ / / / -- \ \ N / / / / / / �\ / I / / / / / \ / / _ / / �- - l / / l / / / / �� ��-- / // / / / / / / / / / / / / / // / / / / / // / / I / / / / / / / / / / / / / / l l / / / / / I I �O / CTWO PT CWD SWC CONCRETE TRUCK WASHOUT PORTABLE TOILET TEMPORARY IMPACT THROUGH WETLAND WETLAND STREAPA CLEAN WATER DIVERSION — TEMPORARYSTORMWATER N PT %� CWD - / _/I 1 \ \ \ 1 / / / ° / / III DEWATERING STRUCTURE. STABILIZE STREAM 24 CROSSING �. �/ .. \ \ / ///,/, I / / / \ \ , / / / / /// /, \\ / / / / \ /1/ - / / / / / / \ \ \ \ \ - - / \ \ - - / / //, //' \� �- / // / / / / / I I \ /// \ \ \ /l I\PERMANENrIMPACTTHRoucH-\ , \ 1 I 1 \i/// '0 z / 1 I I I ,/ / 0, 1 // / I I ) I I1 .� / /' / / 1 I I / / / I \ / // ' I I / III iIISEE 11 USING THE GEOGRID CHANNEL BANK STABILIZATION METHOD. DETAIL SHEET PNG-C-142-0001082 / , \ \ \ // \ / \ _ / / // \ / //// / // // I/ \\// /,/EXISTING _ _ _ / \ / / 1 / / \ /\ \ \ \ \ /, �- \ 1 \ \ -- / /, / // - \ / / \ , / / / / \ / / \1 - / / /// /// /- / / // // / / I I / / / \ \ `' / / ' '' ////////// / / / / I / / / / / 1 1 1 \ Q,0 / / / / // / \\ \\ \\`----//// \ \\ I I 1 1 1 \\ // /'//' /'/// �. /////////// \ \ \ \ �,/ / / 1 \ \ //'V / '/ ' I / / /i/ / / / / �-, 1 I `�' / / / �// /// / / / / / ///I\/ / \THROUGHIMPACr \ \\3TREAMENTIMPACTTHROUGH / / \ \ \ N / \\ /' /' / \ \ / , / I 2 i /J \ \ \ \ \ i - / 7 \ 1 1 1\ i 7 / / / / // / / / / / / / / / / / I 1 / / 1 / / / / / / / / /I \-� / /\ — / / / o / /, / II I I ► \ \ \__-' - / / \ \1 \\ -___-- 7 , / /, /, //\ // // / / / / / / / / / / \ ` ////// /� I 1 / I / III \ \ 1 \ \ / / // \ / / / / / I / / % / \ 1, 1 / / / I I ( 1 \ _ _ _ \ - N \ \ \ 1 / 1 / / /> N .` / / / \ / I I 1 \ / / / N / / 1 _ \ \ \ \ \ _ _ / // / ////// / / // / / / I I / / 1 III 1 \ \ \\ \ \ \ - '/ / / \ \ 1 \ \\ \ \ - / ' / / /// / /// % / " > / ' / / / / / / / / / I I I \--- / /// /' I I N 1 \ \ \ \ \__/ / �__--, \ \ \ \ \ _-� �� / // / / / / /// / / / Ip I / I / / / I I III \\ \ \\ \\ \\ \ \ 1 \ \ -_--// -\ \ \ \ \\ ////// �'//'////// -7 /I/ �� /�/ / / / / / / / // // i '/' 1 / // \ \ 1 \ N \ % - \ \ \ \ \ \ / / /// / / / // ) M / I I \ ` ' ' / / / ' / / I / / / / /� I \ \ \ \ Nam\ \ \ \ // /PERMANENT ./ STREAM (S33/34) (INTERMITTENT) OPEN CUT FOR GAS LINE,\/' / / / / / 1 I I I / / / / / \IIIII I I I I 1 / I I I0I / -\ 11 / / // /N//// / \\ 11 I I I I I I I 1 / \ I I 1 I I I / / I I I \ / -� \ \ \ ` / __ - -\?90� / - - - \. N CONVEYANCE / WETLAND IMPACT TYPES N TRANSITION OF FORESTED TO NON -FORESTED OR PERMANENT CROSSING (PERMANENT) CROSSING/MAT PLACEMENT (TEMPORARY) \per i I \ / _ _- \ / I - _ / / _ p / / / \ \ 1 \ o \ \ 1 \ \ \ �_� / / / / /// / I / / / // , '' / / + / _� - / / / o \ I _ - _- / I \ 1 / / / // / A / / / // / I I ( \ / / / / / M ) 1 \ \ \ \ \ - - _ _ _ - / \ \ \ , / J/ / , / / I I / / / / / / O - / 1 1 - _ ' - 1 / / / / / / / / / �i _ _ I I I \ \ / / / / / / / / / �/ / / I I 1 \ `0 / / / / 1 - _ J ?, / I / / I 1 \ / / / / / / / / 1 / 7 7 / / / / I 1 _ _ / / / / / / / I \ / � / / / , /�/ / �/ I 1 \ / / / / V / / I / / / I 1 \ / STREAM CROSSING, POTENTIAL BLASTING, DEWATERING STRUCTURE / / / \\ 11 \ / / / / o\ 1 1 1 1 ` l \ / / I 11 I I \ \ / / I I I \ - / - ?/ o / I 1 to \ - / / /��/I I ^\a \ / / / I 11 \ \ \__/ _ / / - \ // _ - - \ \ \ / 7 \ / / • / / i � ' ' / / / 0' 7 /CWD -� _ _ - _ / / / \N / / / � O / / / / / ' /7 / / / / / / I \ - - - !� • - / / / / / / /1 // / / // 1 \ \ ,__ / _ // / / iv 1 / // / //21/4 \ ok / / / / \ \ (1/ / -� / / // / / / /� I I `- - - \�- / / / / WETLAND W9E-A // 60 / 1 I 1 ( \ \ \ / / / \ �4�T \ - - - // ____ •• I I \ / / // i2 - ` / °'\ /� / / I I \ I \ N \ \ - �r�/-� - 1, / / _ "/ 11 1 / /� I \ NRCSNJ-11 / /� // / FORESTED �/ 11 -_�� 1 \ -_ 1 \ _ - -- -'i — / �E -� \`b 7 7 , / / �_ ' / I I \ \ \/ / -I\ TB �- it OPEN CUT FOR GAS LINE, / v. ( °%p o \ \ \ + TEMPORARY WETLAND CROSSING / / j \ \ \ \ / / /�- Imo\ \-� ` / o, 1 \ \ PROPOSED 12 STEEL GAS LINE MAT PLACEMENT, / / \ 1 -471 \ \ \ -___ \ r�\ ��-� /P/ \ 111 O I - - I _ / r00 / / 1 I / �� / / 1\\\\ ' /i ' I 1 \ \ ` \ / ���°O'��� -� ,� / p -�°----cs---_� ' �� moo+ \, °"� / % � \ / / / / - \� � I \ \ POTENTIAL SHEET BLASTING, / _ \I I ) \ \ \ / / / // 1 I 9°' Le°� 7/0 1 TSC ' a -+ - - - �o^ o ' / �� o ' / / /--Ill \ \ \ \ ) DEWATERING STRUCTURE. ' 1 o \ - °° / / 1 / / \ \__ o - ° / / / / I 1 \ / / SFO \ SF ` - - _ g / / /`c� / 1 SFO -+- z / �- _ sari 7\ ry v?/ I / o , / / \ 1 �` / 1 \ �y / / , / / / \ _ LOD / /250 o + _ c� / \ �\ 'r \ / / / / / I \p / PERMANENT IMPACT DUE TO / l / / / I �� \ /� 6 Q \ N +�- - / / / / / I \ _ - - / / / \ / + / / / �1 ,- - - (- - / / / l \/ / SF %- / I d \ \ \ _g,�o / - / / / / l / / / �Op, \ / I I / 1 1 \ \ �� / / S \ / / / / / `7 / / / l FO / // / °o, SF i� / �/ l l I I \ 6\ \\ \ o\ 1 I I TRANSITION OF FORESTED TO NON -FORESTED WETLAND. , / / / / I / / // / / / / / / WETLANDW9E-A FORESTED - \ - _ / /o/ 2% O + / �2----_ - �9 / / / I 'o / "cam / 1 / l \rn i \ - _ / o \ N. ti / / t-- ,� 7- / �r ' / - ':----_ \ / / /i - i \ - _ 1 / \ \ /i �/ v\ / % 2� - - - / 1 • / / /�0/ / /?.90 / moo / / 0 1 / o / / / / �, / I / / / % / I \ I / / / / / PERMANENT CROSSING / // N I ///i'FILLPLACEMENT / /,-iii/ / / // /o/ / / / ( / // . / / o _ \ I I I I b / / / / /- / / - ��� \\�' ��°��\\ //// �- _ I 1 o OC) / °�---� / I I �' O I I I I \ \ \ / // /� - /-� /i/____ / \ - o / X / /' %'� - - _ _ I /--- N \� //' //'/ / ) `-.i%ii' �'7/g0- _ I I \\ \ - - \ \ - _ �\\ \ \ \ N\ �'/ ���d`l / / / NA/ / / /�v� o pi �/ \ 1 I I ► l �. , / / / / / / / SFLop \ 1 Iop o O / 'i / / / / I I / �\g I 1 N II / I./ ).1 � ^ / I N I o \/ / -� / / / / /// //� �////��7%2�- ___ I //� / ///�/// /���- --� \\ \ NN N \- / V I; - IL • S y r / / / \ ` ' / / 1 I �'� ��` co' / / eS / �° I f I ( \ \230 / I I I \ \ 1 \ + / 1 l - - ---- / / / 1 �' I�1, \ \ \�, / // / // / \ \ - -__ /I 1 o// I \ / I \ �00 \ / / / / /9 \ I \\ \, -, \\ / / / I I ( ( \\ S O F1 \ \\ - / / / \ I F \ \ _`��- / / // / I I I / / /eo o / \ / / / I / o o / / I I I I I I l l / I _� �/ / / I I I // I // / �' _ ---\ 1 /'/'/' p I I / \ \__ -- / / 26 / I I / cs,� -\ / / / Ili, I / I / INSTALL PERMANENT CROSSING / 7 FOR O&M ACCESS. (TWIN 36 CMP PIPE SIZE) // / /// / / / / / 270_ / - // / / , / / / / / / / / / / / / / / - - /\\ / // / ,/ // _-_ / // / / / / /, �/// /-\ \ ` \ ` - - \ - \ \\\ - N ` \\ ry -- \\ \ - \, �, / , /' _ o O `_ \ \\-__ - \ \ \ \ r / 1 I I 1 7 \ \`00,� \ /// // / I_ \ III I/ I I I�% / ��. / ///// ,/ / \ \ \ p N - / \ �\ \ �__\\ \\\\\ \ / �\ I I I 1 \ \_�Z'� / - \ vn, \ o // / / \ \ \- \ \� \ / - \ \ �I \ \ \ / I I 1 /-\ \ I \ \_� / / I I ( I \ `_�, o/ ^_ -^ \ / // / I I4 I / Gs�i / I \ / / \ \ \ _ - / / 11 1# / $o / / / / / / / // /// // // // / / / / / / / -- // / /� / // / // / / / \ \-\-_ \\\\--_-- \ \ _\� -� - \� \ �` \ \-/, / 1 I I I \ / III I 1 \ ,�/ \\\ \ \__\\ Sp- \� �° �/ / 1 \ _ / / \ \ I 1 // `'`/ \ \ \ \//\ }T =14 1/ \ )1 II r \ \o\ -- i' °,-//�'\ ` i'^--=I//7/40//// II11 SF / / --\ \__/ / \7__�// /// //�/' / / / / / / /� / / / // i / // / / /\/ // //////7�� / 1 (r / / / / -- 1 1 1 -/ _ �__- __ - - \ \ \ \ \\ \ \ / �- \ 1 \ _ / I 1 -- / / 1 I \ \ INSTALL PERMANENT CROSSING / / /�,,, ` �":�� ..: ;ire r I / O \ N - — / / - %,! S� \ - - - / �_ ` / / i �i �%- - 1 1 1 \\ \\\- (// - - - - \ \\ \ \ \� I 1 1 \ \ \\ \220� /'-I I / / I / ///7a�C '°�'�='��' /� /\�' o/o^/ /_ _ _ __� 7'/ / ,'e \ /�/� // // /� -- '/ //2////ii%/,':-----77/\ '// 7v,-_\ \ \ \ \ \ \ 1 ( /-- \ / / ry'3�/j�-,I1\\FORO&MACCESS. \ \ \ VA V N // / / / / / 1 I 1 \-_ \ // (TWIN CMP PIPE SIZE) -/ SFO ;- �����. �`4''' / -�_ �1 /7 / /7 ��- __ % _;��_� -� %//��-/ /� / j ////,� /,///// / v-- I A \ \ \ l/ ////�i "7 - \ l A vA \ ( -- ---- --__-- ��//�/ __ v / 1 V A v -� / / / I / / /�v I I v o-// ,' °o / ,� _'_/ / /--___---- - / ' / II // / / / / --- / //- J////Ti / \ \ 1 \ \\_\ 1 I / / / 1 I 1 \ ,o� �'// / /f ��//i �i fi� ��i �/ / - _ _______ _-_-/ / / / // \ \ �\ ► I I / / / /\ 1 -\ `\_�- ___ ��//�' i/ / ///,/�%//- / j�-= _-=___% %� 1//-//�/�/ / \\ �// 1 1/ /i%''/// / / / __ _i / \ 1 /// /// / //----` \ \ \ I 1 \) \l 1 /' // �- / \� \ /�- I ill 1 1 / ///+R/ / I I / ------_� // _ _;,/ �, �// / / - // �_- / \ �__ 1 / / // /--- -----\ \ \ \ \ \ / \ \ / / \ / ' _ _ - \ \ 1 \ \ y0\ \ \ 1 1 1 I 1 \\ v / / // ^ l\ \- _ % i - - - - \ / \ \ 1 1 I \ /7 / 1 / \ \ STREAM (S32) (INTERMITTENT) - OPEN CUT FOR GAS LINE, / /// / / / ( // / , 0o/ / �/ //// / / \ / / / / / / , // / 7/ / /- /// WETLAND FORESTED TEMPORARY WETLAND CROSSING / _ — �-- /// / //�— �_— ��__ _ / //�// / _ _ _ _ / // / - // // / //-- _-� \ - /- /// '/////// / ( _ - / i I .--'------- / / / / I i 1 I // / l ( ( _ _ - _ 1 / l I I \ / -- / I ` \ / I I / / / I I l / / , - - - \ \ N. „// \ �� \\ \ 1 I 1 \�_/ / / //\\ �//�_ POTENTIAL BLASTING, / / / / �/ / // /,/ O / _ / - \ \ / - % /�/// / //, \\/ ////�i// _// / / \ _ - _ I 1 \ \ I \ \ 1 -210- _ - 1 \ 1 I / / \ _ DEWATERING STRUCTURE. //� / / , / / ////�// , / / / MAT PLACEMENT. TEMPORARY IMPACT DUE TO / 7/ __ \ // / / - \ / / // // / / / / I \ �- __-/ / / / / / 1 \ \ \ / / - - / / I I I / / _-- - -_ / a / ' - \\ \\ \ I\ \ I \ \ 1 1 1 ` / / �' / / \ - . \ _ - _ - - / // /// 25 / z \ \ \�/ \ 1 \1 11 \ `/ /'/ / / /-- - - --\\ \ _--- \ / y//��/�/I / ( /� / p'/ /NON;FORESTEDWETLANDS. ' TRANSITION OF FORESTED TO \ / / / ///// N \ \ / / //%// ' / /__\/ \ N \ /-� /, j/////// /// \ \ 7 ---- / /' 7 / / \ \ I I / / / / - / / / // 1 / / l / / / 7 - / I I I ' I / I / / �--\\ \ // / //� �°- /�/ / / __�/J / / - - \ - 1 /,'� \\\\\\ ► \ ` % -/ -� --- SEE INSET 1 -/, %/ // / / / / / // o _ / 1 // // / / / / /,/ �, / /// \,7/- / //,,,,� l , / / / / / 7 __-- / / / / / / l \� ___ ^ \ \/ / � // // / / / /' \ \ - 1 / / _ -' ' / 1 / /'�' /'%/ �/ � / 1 ' / '' �`� ' / - __-----_ // /,///.,, // „ ► _ / ' / / // //' I/ / 7 ' 7 / / _ �. / - '\ \\ 1 \ \ \// \ 1 / / // / //////� / // ///'b�/ / // NOTES: I7 / / / _ - / _ / - - \ \ �� / \ \ \ // /� _ _ _ / \ ' / / j/ / // / /' / / // // j // // / > / - - - _ / / / /' /// / %�____ / -.\ .\ INSET1 \ , / / \ /- \--/ i 7 �// / / ////i / /�/ / 0 / /��_ -_-- 1. SEE LINE 142 CLEARING REQUIREMENTS ON SHEET 79. _ I I / / / // / / ' ' i / - _ - - - - ' / / / / / / / ' / ' / / - ' / / �' / / \ 11 11 /7 / ///i/ // �/ /i %� -_ / / // / , / /- F 5 / `\ / i 1 c/ i t \ \ / // / / I I \ \ - / // / / - _ �\ _ / \\\\\\\\\\\\\\ \\ \\ , / // ,,77 7/ / / // /� %/� /,// - \\� \\ \)) \ \ \\\\ \\\ //�/�' / /'/1,. //i'//////III ///' /' \`N\--- i'7'' / / / / i / — ...----- / '/ /// / / / - / /' /' / / ` \ `\ 1 / f --��\ -',// \\ 11 I/ \ \\\\\\� �� �� / �-J/ / // // // /� I / / \ \\ \ \___ / 7/ _ / // / / III \ IIIII -' / /// / / / / / / _/ / / / I 7 / \ <° g� N \I -.�/ \ , --1 / ` I \ �< \ % \ I / \ 4 Wt...._ , /\ /\ I 11I1111 1111 I \l\\\\\\\ / - I \ \ \\ \\ -\--__---__-_-_---,. / / // / ///////// I \ \-__ / / /7i /---' I / \ \_�;�/ // / 1 1 \\ \ / , / -/ 1\ \ // 1 \\ / ,/ — %--7// // I \\\\ \\\ \�\\\\ \ `\\ `\ \ \ \`__-,/ / / // / , �_- //_--___ \� \ \ \ \\ \ \ N \ - / /�/ / / Mk \ / % --- _ -� _t \ \ \\\ \\\ \ \ \ \ \\ / / 1 I -- \ \ �_- \ \\ \ /� / ///'� / _- ---- --- \N N\ \ \ \ - \ N N -__ / �, / / / / I // _ // / //' / 1 \ N / — / / N \ \ \ \ / / / \ ` N -\ \ \ \ \ _--,_ 7 // / -\ \ 4 / 1 it I / / / - \ \ \ \ _, ,, / ir� / 5 / �\ ����� / 1 \\ < /' / \\\ \_/ - - \ I I IIII 1 \ \\\ \ (( I 1 I 1 1 / / / / ----\ \\��� _--� \ \ \ N \�� -,-� _ \�\\ \\\-\� / / \\ \ I 1 I \ / \ _ 1 / I \ - \ \_ �\ I I \ ( - - - \___- ---� \ `\\\\ \ \\ \\ -\ ----_ \ \ \ \ \ \ \ \ \\ \\ \\ //\__/ --_�&YAW °°, . �� \\\ \\ \\ ) IIII \ \\\\ \ ` // \\ __-_��� / // 7 �� \ \ \ �\ \\ \ \\�\ / I \ \ \ \--__— -___ - _ -_ _--- _�- \\ \ \ \- -- \ \ \ \� \\ \ \ \ 5 / _�\ \\\ \ I \\ \\\\\\\\ —_ - - ------- \ \ -\ \ \ \ \ \ _ - o , ti 1 // \ \ \\ \ \ \ \\ \ \ \\ \ ,----- .-- , \\ ..\ - 11 I .\\, �,,. C A /? 0.. /„, 0 . oESs /o . /,y :, 2•,'Q� 'y•',7 ,1,,- g 09/ 2 2°!ry �`.tiGINE�,•`,N; -�� '41'11E1TH c ,s -,,,,,,,I,,,,,,��‘ PROFESSIONAL ENG/ARCH STAMP PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY * * REF. DWG(S) PNG-G-142-0001000 PIEDMONTS NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) DRAWING IS CURREI\ff ONLY THROUGH THE LATEST REVISED DATE TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS SHEET(S)72 OF 119 DWG SCALE AS SHOWN 0 05/09/2022 ISSUE FOR CONSTRUCTION JB TFG WKG AREA CODE 1 853 DATE INITIALS REGIONAL LINE 142 PIPELINE DWG DATE09/17/2021 SUPERSEDED- ACCOUNT NUMBER 10700 ENGINEER PNG DRAWING _ _ C 142 NUMBER _ 0001071 REVISION 0 PROJECT NUMBER 0232195 DATE INITIALS MGR TECH DUKE rap Piedmont Natural Gas E&SC PLAN-17 DRAWING BY JB REC & STD ENERGY. CLAYTON, NORTH CAROLINA STATION ID DATE INITIALS PRINCIPAL DISCIPLINE / RESOURCE CENTER / LINE NUMBER CHECKER INITIALS TFG 05/09/2022 WKG ENGINEER COPYRIGHT 2018 Resource Center GOLDSBORO, NC LEGEND Z\\ J 1 I 1 \ \ \ \ \ \t / \ \ \ \\��Y• \\\\\\/////'/l/ 1 \\ \ \ \ \ \ ° \\\'//// \ I \ \ I ( \\ \\_-_// /' / /' �/ / // \\\_ ) l 1 -__-_-_ /'/ �' /'�1\\/ / _ 1 \ \ / � _ —�t / ///TCE / \ \ -., I\ / / / / ' i ' / / ' —/ICD CODEI\\ TEMPORARY CONSTRUCTION ENTRANCE :����1I 1\\ \\\\ I lIf _ 1 /\ 1 /_//////// LOD CHECK DAMOIII\\I LIMITS OF DISTURBANCE- LOD —1 \\\\ \ //, // 1 \ / /�/// ///////'�//// 1N ::--- \ III\ \\\\\/1 II1 I III/ \\/ , / / / / — — _/, /\/i//�',/// //// / ----____`-�SF \\\\\�`\I II i\ //\\/ //-- 'i ' I I \ 1 \ Y t I11 0 \O1 F FOR CONTINUATION SEE SHEET PNG-C-142-0001077 /1 // /// / / / / / //// / / \\ _ _ 1 III III\ \/ // / / / _ _ __ // / / — / / /// _ _ _SFJ I / / _ / / \ I I \ SILT FENCE- SFO SILT FENCE JHOOK SILT FENCE OUTLET11 1 1 1 1 \ \\\ I II \ 1 1 \ \ )1 / 00 \ \\t1 I I I I _ I \ \ °° I I ►�1 1 \ \\ 1'I 1 \ O \\N V► I I I _ / //// / ,/'_ _ // // / / / % / /////_ _ _ '' /\ I I / / \ \ \ _ / // , / / , / / /��/ / / / / ' /— — ' ' //j�%�/Ii/� / \ ' ',',;�/ / /-%—_�/_/'— — / , _CSIP 1I / \ _, / / / / / /// / ' / / / I _ CS SFB TSC TWC COMPOST SOCK COMPOST SOCK INLET PROTECTION / SEDIMENT FILTER BAG SFB TEMPORARY STREAM CROSSING TEMPORARY WETLAND CROSSING - \ \ \ t \ I 1 1 \ \ \ o T TEMPORARY ACCESS I / , / / / I / /j / ' — _ — —. _ — / / / I 1 I I / / / / / / , / z,, , / / \ / \ ° \ \ \ \ \ / 1 I 1 1 \\ \ \ \ p> \ \ ` FOR CONSTRUCTION / / / / I I I _ _ / \ 7 / / / / / / ,/ / /,/ / I I I / / /i//\> �' �'/'i----__�/ /' /---- %4'),,' / / / / -=-__�// _//// \_ _ , /, \ \ \ \ \ \ t ° /I1''I I111 / _ / / / '/// / / / / _ — / // //'/ /j /_ — — _ \ / 7 7 / r, 1 1 / i� \ ` \ Ai / / / I 1I 1 / _ _ _i \. , / / — _ _ _ /// / / / 7 7 / \ / / / 1 -� / I / / /- _/ / / / ,/ / \ \ , , 1 \ / — _ / / / / 1 / j // / /, / _ _ 1 GRAPHIC SCALE (IN FEET) / / \ O t0 / / l l l / / I 1 1 \ _ / ° '8 / ' ' I I / �'/ /// / // / / \ \ \ 100 0 50 100 200 I \ \ \ / 1 \ SB OSF TB TTP CX PS SLOPE BREAKER ORANGE SAFETY FENCE -OSF— TRENCH BREAKER ® TEMPORARY TRENCH PLUG 0 CURLEXPLACEMENT / PERMANENT SEEDING PS -- / / \ \ \ / / / 1 ° / / / / 1 \ / / 1 / / / / / / /— _ \ / / 1 \ \ I 1 ( I ' ' / \ N \ \� / __ r I 1 I , // / / / // \ / , , I \ \ \ \ \ / / / I \ 7 / / / I I \ ` OO / / / / NN \ II / \ — — ' / / / 00>y 1 X p_ / / , / / , I \ \ \ \ \ \ I \ / / �j \ I I I I \ \ �/ ' / / / \ ` \\ V'v / / / ' / I / / I I \ \ \ \ \ \ \ 1 I / ji I I 1 I / 1/ \ - I I I I / /, // / /// / / 7 \ \ \ \ 1 inch - 100 ft. I I I / / / / / / \ ` \ \ \ \ \ — — PERMANENT ACCESS ROAD \ \ \ 1 I I \ /, CTWO PT OWD SWC CONCRETE TRUCK was lour PORTABLE TOILET TEMPORARY IMPACT THROUGH WETLAND PERMANENT IMPACT THROUGH WETLAND STREAM1/\ IMPACT STREAMENT IMPACT THROUGH CLEAN WATER DIVERSION — TEMPORARYSTORMWATER \ PT j� j/ CWD — / . / _ _ _ _ _ - - /' —' - _ — / TO BE CONSTRUCTED DURING I RESTORATION PHASE OF PROJECT. I \ \ _ \ `py \ I I °>s//�\` /' I \ _ �o°\A0 PROPOSED ACCESS ROAD AR-012 1 I I I II I , I I 1 '�1(qo / / / / / / \ 1 O I I / / l I / I /' \N. I I I 1 / col / /' l I I I l 11 l/ I I I/ /' / / / I l / / / 1 / / / N\ \\ / I / / / 1, , , / / / 1li 1 l0 l , l / l f / / \ \ , r / \(I \ \ \ \ I �\ \ I I I 1 I 1( \ \\ 1 1 I 1 \ 00 \ 5 / / / / / /A-O / ^° / V I > i// / / / 0 1 I '/ I/// ti°// //lry/l / I N // / (�'�/THROUGH I p0 ° / / / / / / / / / / / / / / / 1 1 / 1 ° —o —\� 4` — — ' / / — — /, / / 1 / / / / / / / / / / / / 1 / I / �t / / , / // \ / I I IO /I Q� , / / ° / , / / 1 ) / \ I I I1 I�il I I 1N l/ /Ml I 1 1 O I / l I / //-- \EXISTING / I 1 I I I I / / / I l I / \ I )/l 11 I I I I I / I / / / I I I / / / / / / / \ \ \ . ` \ \ \ \ s \ \ \ , / , / / /I f / - \ / / 1 / / / / I I l I / // l I 1 I 1 1 I STABILIZE STREAM 35 CROSSING __ / / / / / / / f / - \ \ Sd / / ,/ / // / / I I \ / / ' \ \ \ N \ \ \ \ \ \ \ I---- \ \ - _ / / 2 \ \ \ \ \ 0Q °/ / _ / ' / \ \ \ N\ � - / / 7 J \ \ �- - �' - USING THE GEOGRID CHANNEL BANK STABILIZATION METHOD. , SEE DETAIL SHEET PNG-C-142-0001082 / , / , / , / / / / / , / / / / / / / , , , , . STREAM (S35) (PERENNIAL) OPEN CUT FOR GAS LINE, TEMPORARY STREAM CROSSING/MAT ' I / / , 1 _ \ / . I o / / / 7/ ) - /� �\ •70 1 / o / / ( \ CONVEYANCE WETLAND IMPACT TYPES N _ _ - \ 1 7 ---1 \ 1 \ ' , 4.° -\ �xc' / / / / // / / / / / / >> \ \ J / / N lI 1 \ / / / - \ oo / / / / / / / /d / / _ \ I I I / / O — ` \ \/ / / , / / / / / / / \ \ \ / / / N \ I J / / /\ 1 1 \ \ v / /i i - \ N \ \ 1 1 7 / / / / / -� \ \ \\ o / S� ^�40 /' / /' / // / // / /// I� / / / / / \ I` / ° / / / / / / / / .� \ \ 1 I I I I / / / / / / ! \Off\ ` / A l S'e / / / 11 PLACEMENT POTENTIAL BLASTING I DEWATERING STRUCTURE. BANK STABILIZATION. I ' / / , 77 ) / / / / //' \--�� _---\ ^\ / / I I O / - - - / I I / ° / / — \ _ — — — - / / 1 I I I I / \ I / / / - - - - - - / / / // / I 1 / / _ \ / 1 1 1 1 I I TRANSITION O FORESTEDTO\ NON -FORESTED OR PERMANENT CROSSING (PERMANENT) IT PLACEMENT (TEMPORARY) \ // j /�/ \ 1 / / / �\ t x�\ / / / 11 / / — � \ \ \ 1 I \ / / , / / / o° \ 62oyF � / T'' 7 / / * // // / / \ \ \ I / // / / / I \�\ // / q .0 / / 11,1 - I 1 I \ \ \ \ I \ / / / / / 1 \a" / / �l Tg I I 1 \ \ I \ \ \ \ \ \ / / / /I /, / •�Y \ \ - / , ►\\ N \ \\\ ,\\\ / / , /, ,,_;o.\� ,� � �Te..�rQ II \ \ I\ / / / / / / \ / / / 1►il� ° 1 _ I I 1 1 Id I I I ( (• 1 l I I 1 1 1 / 1 I 1 \ _ . I q III \ I l \ I I I _/ / - : I I I \ b / / / / I 3y % - III I 1 I o\ \ �\ / I \ - II \\\ \\\\ �,__ /- , lI; ,\ 11 °� \\ I I \ \ \ o -- / / / \ / _ \ \\\�\\\ \\ \ / / / // / / / // // �o — � '' / / °% ' •'� ,, Ism _ / \ \ \ \ \ \ \ 1 \ PROPOSED 12 STEEL GAS LINE /, /, \ \ ��_ _ - - /�5 / / / ` 1 I 1 / - ,o, / / I 44- , ;17% \ / \ \ / /, / // / / l/l �.—,,—// ''\ \ ` \LOD '�,—_ /— / / / \ N -\___ 1 \ \ \off \ _ _ , / / / \ _ - 1 \ N N , , - _ _ - \\�\\\\ \ )/// / // j / / / / / \ \ / / j / --_�- // / � 1 11111 I I I I _—_/ \ °p \ c _ - - - i / 1 1 1 \ 300. / / /'/'/' / • / /,(/-\\ °��, __-- ,%�/ / / / / lli t � �\ \\ \ �\� \_--- *_/'�/ ' \\ _ --\ / _ �_ _ \\ \ \ _ cs \ \ / / / / o / / A / / / / / / _ \ \ as \�\ \ \ \ - h _ _ 1 \ \ \ / / / ° / / / / - '\ — — - / / / / / / / ( \ l SF \ \� \� \ \ _�.F - - - / / / / / / / // )_ O\\\ \� \� °per STREAM S36,�// ( ) (INTERMITTENT) OPEN CUT FOR GAS LINE, TEMPORARY STREAM CROSSING/MAT v4, I �,�P / 5 / / ' / / / / -- -, / / / / / / /\ / / / / / / \ / / / / / / I I I I 1 I I 1 I �- _ _ _ / / •\ ��' /�� -290 I 1 \ \ / / / // / / //71 \ O" 0� -- l \ >_ •LO \ . \ ___-c /� / /I\ ® O� \\ \ I \ - - - - - / / / / / /�/ / '� ��5� ? - - ' / // // / \� \\�\\ _ - -4� - -� / / / / / / / // \ ? / / / / j ? ,, \ \ \� \ \ PLACEMENT, POTENTIAL BLASTING, / / / / i , / / // / / / / / / _ .°` _ / \ \ \\ / o i / -- \ \ 1 \ / / \-\- / / - / o _ /'/' I— '� \ \ \ moo\ % / �— � DEWATERING STRUCTURE / / / / / / / / —_—— �/ o��C+�cQ/'� --�� �' / _ --7 / / / \ I \1 \ _ / O / / ` / // --- — / /--�/ __ \ \\�\\ N.\,gip°, �/ / // / / / / / /' / / / - \ / / / / 1 \ c. ' / // / / '� I I 1 / / / / �T / / Qi /Z6e6- - -_c I / /,�// i111 III/ - = _ -Y///// j _ ooJ _�1� /' ///cQ -- /\ / / / // _ 1S/ _ — /\O // / /// /� ///Z ///' ///,/ //ice-_ \\\\�� N N \ h \ S �j7 / , how ---,-- END PROPOSED12"PIPELINE•/ / // / / / / / \ / / / 1 1 III / / / / // /- / \ \ / / , l'/ I I I I \ \ / 1 / / / / I I I \._ / / / / I ,, / / / / I I 1 \ // / 1 1 / II I 1 I / / / / / / ///�°// / -7 -- / / / /i /i/ /// --- ------ \\ \--_ \\ ////// //// _-- -\\\� —_\�� \\ \ / 0/ / o� /// / / / /!-7:-- 2 / i o-.7-7 / / /// /i/ // / Jr \ I 1 I 1 / / i a /' / /' ---' / /ii '/ ------ \�\\\�\-�-=� V /400'\'///' I I 1 ` \ / / / / / / / / / /dam / / / / / / / / //i/ / / j i \ \ \ \ \ — _ -� \ \ _��r30� - / / / / // / / // o \ \ _ \ / / / / / / / / ` / / / / / /// / // 7 / o / / _ _ _ _ \ \ \ \ \ _— _� / \ \ / �/ / / / Q _ _ 250 - / / / / / / - _ \ \ N. \ \ / / / // x /// / // / i // / / /-- - \ \ d� / / / 60 / / / / \/ `t co �Y Q / --_ — '3 / / / / / po�� ,`;; / — _ / s / / --_\�_ / .`�o ' / / / / / Q _ — / c / / x/ / / / / (/ / D \ / / / / \ \ \ / O / / / / / \ \ jI I I I I �\ \ \ ) / ['"l'7" 1 1 1 1 1 1' \\\\\\ \\ \ \ \\_// �// /' // O ��-- �� / /' / / / /i' //''//'' I I I 1 / 1 '/ / / //-_,\--\ N_,\\\\ N \\\\\ \1 1 I \\ \ // /// — / 7 / / / // / / I \ \ _ __ \ \ N \ o \ \ /i/ I I 1 v v ° —i/ �// / /i fs _ __// _ / / \ \ \ —_ v v V 1 1 I 1 /\� \\\\\'\ --'%i %%/ :� / ///l __- / / ' / i'/ii�,'/'- / 1 \\\\\ \ \\ \\ \ —\ \ \ \\ \ 1 1 \ 1 1 I 1 II I 1 1 1 I _� , / ci) I 1 1 �� �S- \ I q II 1 1 \ \ Ei� \\ �� ° - I_ `. �1 /�' / I/ / \ \ ao \ 1 \ \ , �� / /j / / / / / / / / / / / \ \ \ \ \ \ \ \ 1 1 I I I I I 1 , \ \ \-� N 1 \ \ \ \ \ ��\\\\;�\_ ��- 7,,,„ '' y%,>,� '\/ 7 '� �'�///� ;—_ __ —/ /�— / ,\ \\\ \ \ \ , __ \ \ \ I I ,, III I 1 I( . \N ) \ \ rN \ \ \ \ / fr '/ / // /__// / / / ---1�,// ��—_/► \� \ \ \ \ / \ \ \ \ \ . I 1 \ 1 . �// , 1►J \ \ \ \\ N I \\//// / / / / /// / / // _—\\ / 2 \ \ / / - - / / /// / )\ \ \ \ I \ O \ 100 x100 STATION SITE \ I \ \ \ \ \1 \\ / /( / 7 7 / / /// / / / �,--- \\_, / �— \ \\\ O \ 1 I \ 1 �� \ \ / 6 /7 / \ \ \ \ \ 1 \ 1 1 I \�� / ,/ /1 / -----// // / --1 1 1 \ \ \ \ I \ c' \ ` \ 1 \ \ \ 1 \ - ?.�°b 6 �i6v ' 7 i -- - 7 77v//', i/, / , ,/;-__ �\ - _ /--' \ 1 , 1 \ \ \I 1/,�/ / I / \ \ \ \ \\/1 I / // ... i/ / .. / _/ I 1 \ \ \ \ I / I I/ \ \ 504+6 — g / \ \ 8 — --- _ - + 10 ,— _I I 00 - �I \ y _ \ \ �\ \ I - �, \N \ IYe' `-,- _ ►''' \ \ \ \ , I /j //yo?/ / 7 �- \ I I , 1 ®" `\ // 2/�-I / / / / / �-__ o / \ 1 \ / G/ NOTES:/ -_/l J 1 I \ II<l 1 ..* \ I 1 I I \11 \\1I \ \\ 1 l I I \ + o - \`', o \ \\\\ 1 \ o / // / / / / //� _ _ _ _ - _ \ \ \ \N i I 1 , 1 1 �\ / / /1 /1. SEE LINE 142 CLEARING REQUIREMENTS ON SHEET 79. I I 1\ \ I O 1 I I \ \ \ \ ✓ 1 \ SFO \ \ + PROPOSED 10"STEEL GAS LINE ' rl o \ � / `ti I \ \ \ \\ \ \ \ 1 1 1���x��,� / / /' // ---' �// i /'�/ /// /--\ \ \ -- 1 \ \ \ \\ \\\ \ \ \ \ \ / 1 \ \ O,�s // /� �j /poi/------' /�/ / / / / / \ \ \ / ___/ / 1 , I \ \_\- \ \ \ \ \ \ \ \ '� \ / / / / / O / — — — / /// / // // / / - - \ N \ \ - / / / I BEGIN PROPOSED 10" PIPELINE / ,_/ // // //// /// /o'/ ,-- / 7 �// / / / / - \ N__/ / I \ I I 1\11 I \ \ \ \' �� �1 / 1 __-- // / / / / / / \\ N / / \ �s \ I I I 1 1 I I I\/ // /// / 1 1 1 1 I \ \ \ `.�,. \ I \ \ / \� // , , / / / / / / / / / / / / / \ \ \ \ / / ' I \ •G Ox I I1 / i ooV►lo�' ' \ `_I ' / STREAMS25/ / / ° '/ / / Z / \ \ \�/ // //' \ \4�' �\\\\ --\ 1 , I I 1 I I / \ ���`q, ,� c', I I \/ I// /�,/ / , �, I l / A.w /� / // / / , / \ \ / / l 1 \ \ _-� � p0 y �\ \ \ \ \ luo'— \ \ \� \ \ \ ?9 \_ \/ tkCTW O'\ \ \ \ \ \ ►_ �00 �\� ��-- S� COX \ \ �o,� �.o0j - \ \ \ \ \\ \� \ `)et\---------\-- \\ \ \ xoo 1 iI I I IIllllr \I III 300 ° \ / // /// /// ,/// //, ////// / / // , / / / \ \/� / , \ Li °> II/ /, / / / / \ \ N N \ 1 /�/Op \ — I I I , / / /// / // /, // / / / , / , \ _/ / _ \ \ \ \ / \ \� / + — \ -�� ///// %/ / 0 7/j 7/(3//�/ / / / / , \ \ \ 1 I I 1 \ (\ \\ �,____,� / \ \ �, \ N 30\ j I \ \ `° 1 / I 1 �00 // // ,'p0 , 1 / 1 / / `TB\ —_---/ / 11 ,ll / \ I/Il1/1,7, 11 ' I \\ \\ \ \ \ \ / / \\ �`,�--�\\\\\\ \\ \ ( SF \ I `--__ � too / ) I / I / / 1 \ °^ o I 1 ox_—____, / // I / / I l l I°I I / 6) / / 1 /III I I I °I ' \ I �'�/II ( I I1I / ,max1\ \\\ /— ////\IhI1►I\11\\\�\\\l\ l y4 \ \ \ \\ \\ \ \ \ \ /' / / / 1 / i . / \\\ 1 l f \ _-__�// --/ / 11, l l I / 1 I \ \ \ \ \ \ ----- / / N \ \ \ \� / /' �o° \\ \ S'\ \ \ / /------ / /N \ \ \ // ,, �o / I I f I I I I \ N. 11 I 1 11 �� -- \ '9 \ \ \ 1 I / \\ -- - \ \ \ \ \ \S� / 0. // �x'ti I1'Jl _ l f 1► ,� // // I \ \ \ N.\ 1 / / / / / :� / // / / ' _ - - - / / 1 \ \ \ I I 1 1 \ PROPOSED ACCESS ROAD / - _ / / / , \ \ \\\ \ \ \ \ // ' ^ I \ \ 1 \ / / N / O / ^ 1 1 / °, °� / / / �% / / / I I / y/ ,-\ /' I\' I �''/' / l �� / \ � l ,l\II l 1l/. ____ — - / \ 1 / / / 1 /,// /// /),) / \ ) / / /// / / / / / / / / / / / ' \-- i N\ \ \ AR-013 / / / \ 1 I / /// / /i / / -' / / / / / / / /' / , / / / / /' / 1 1 1 1 / / / ////�'/j �/ /'/'/-�_ /// //,/ / / // / / / /, / / / / / \ \ _ / /-.7 7\ \ \ 1 I 1 / - • s' / // / / / / // / // / / // i)4,47)//////49/ / l l�,/�j //�/�// // / // / I / / // / , 7/ / / / / / -- — 7-- // \ \. / / ,•° /' / /// / /, / l 11 / // 1, 1 //'1 / / / / 1 I f / // / / /' / /' /' / / / -' \ I i' / / / ///// 1/ /I, ///,I1 I 1 1 ( 1 I 1 / / / / 7 / / / / / 1 1 1 1 I I \ I I / / / / ///''/'/// / I�' I� 1 l\\\/ '''/ i - _--/ / //'/ / / 1 i 111 I Ii( 1 I 1 \. - , 1 I 1 / / / / / / / / / ) \\ I _�'. o�Ess /o !2'- ,•Q� • 1 °•� '_ 1��y liJ° %05� 09/ 2 2: �GINEti -',N -„,!-9 °°...°°G;p\,,,, .,,, icEITH \\\\\ ''��1111111j1\\ PROFESSIONAL ENG/ARCH STAMP PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING *USE DIMENSIONS ONLY * * REF. DWG(S) PNG-G-142-0001000 PIEDMONTS NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) DRAWING IS CUf'REI\ T ONLY THROUGH THE LATEST REVISED DATE TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS SHEET(S)73 OF 119 DWG SCALE AS SHOWN 0 05/09/2022 ISSUE FOR CONSTRUCTION JB TFG WKG AREA CODE 1853 DATE INITIALS REGIONAL LINE 142 PIPELINE DWG DATE0911712021 SUPERSEDED — ACCOUNT NUMBER 10700 ENGINEER Q PNG DRAWING -C-142-0001072 NUMBER REVISION 0 PROJECT PROJECT NUMBER 0232195 DATE INITIALS MGR TECH DUPE rap Piedmont NaturalGas E&SC PLAN-1 V DRAWING BY JB REC&STD ENERGY CLAYTON, NORTH CAROLINA STATION ID DATE INITIALS PRINCIPAL DISCIPLINE / RESOURCE CENTER / LINE NUMBER CHECKER INITIALS TFG 05/09/2022 WKG ENGINEER COPYRIGHT 2018 Resource Center GOLDSBORO, NC LEGEND J__ �" i i / /�\ 1 I I I i / / I I I / I / / / / 1 /' // / / / /\ 1 / , / / / / \ \ 7 / / / \ \ / / _ _ — _ ' / / / // // \ \ / �- _ / / / \ /i �� / N — —� _ / / / \ _ _ - - 4� — / - I ' -29U �\ I , / /, �- - / / _ - --- / / / / / / ,'- \ l I I /-----_---1� �/ / /' ,�'� ��/ // / / / / / / / / // / \ I I I 11 / \� l \ — -- — i ' / / / /' / — — — — ' / / / / / // / / / / I l I I I 1 �_ —• \\ / / / // / /'' / — — / / / // / / / // // / / / \ \ 3y — —_— / / / — / / / / / / / / Q. -� \ // / I \ \ \ \ N / \ \ / // / / — / / / / / 1 // 7' / / / \ \ _ _ \ N \ / / \ \ / / / / / / / / / / I / / - / / \ — — - \ \ - - - - / / / / // / / ' / / / / / / / / \ \ N / \ \ \ A. 1 1 / / / / / — / / I r / _ _ / / / // , // / / / Ili/ / �- — 1 y� I I / / I I / / \\ \ I ��`Ot%� 1 I I / / / / / / ) / 7/ / / / / / / / /� \ I 4�1�� I / / / / // / I —�/ / // I I�A1Q.tP, / \ / I / / / / / / / — / / / / / / / / I I I I " G'� i - j'� / / l l / / / / / / / / 1 / / / / l / _ — 7 / / / \/ / / / CODE TCE TEMPORARY CONSTRUCTION ENTRANCE :����1 CD LOD CHECK DAM Q LIMITS OF DISTURBANCE - LOD - SF SILT FENCE SFJ SFO SILT FENCE JHOOK SILT FENCE OUTLET CS CSIP SFB TSC TWC COMPOST SOCK COMPOST SOCK INLET PROTECTION /• SEDIMENT FILTER BAG SFB TEMPORARY STREAM CROSSING TEMPORARY WETLAND CROSSING SB OSF TB TTP CX PS SLOPE BREAKER - V \,- ORANGE SAFETY FENCE -OSF- TRENCH BREAKER ® TEMPORARY TRENCH PLUG 0 CURLEX PLACEMENT // PERMANENT SEEDING PS / / / - / / / / / / / / / GRAPHIC SCALE (I6EET) / I I I I I 1 I / / / / / / / / 100 0 50 100 200 / / / — / _ \ \ / I / / / / , / / / / / 1 1 / / / / / / / / _ \ — —/ // I / / // 1 oo /��— 1— — _ / // // �' /'/ II /' // / / / // 1inch=100ft. .- /// // ' / / I / / \er'r �/ /// G / ? / / STREAM S36 / / /' I / , / / / / N / / / / / / / / / / / / / 5' r j / / / / / / / 1 I / / / / / / / 7 CTWO PT CWD SWC CONCRETE TRUCK WASHOUT PORTABLE TOILET TEMPORARY IMPACT THROUGH WETLAND PERMANENT IMPACT THROUGH WETLAND EXISTING STREAM THROUGH IMPACT PERMANENT IMPACT THROUGH CLEANWATERDIVERSION — TEMPORARYSTORMWATER \ ❑ PT / ��� ' �� CWD — / ,J OC4i/F ►` .e. / / / / / / / // j / / Ov Q� /' / / /' / / / /' / / / / 7 / // / / / / \ // // 7 /' / / / `c, — �41\ pp�� '/ X ri, ?° / / / _ / / ' / ' / ' //' , / / / � ' / / / / V l / / / / - — — --i \ • / * //'/ / / v / / / ��� / / / / / / / / ' / / / / A ) / / / / A O fit• - / / \ 1 C ° / % / _ — / S / / / / / / / / / // / / I I A / V% /V / / / _ / / / /\ \ _ - 280 / / V / / O — O / // / / / / / - , ' / / \ / I A \ — — — A /••(� / / / / •• / / / ��� ,� \Y'/ / / //— / / /STREAM _// / //////// / / / / //-/ \\I I /_'\1 A II 1 I I /EOSED12" 1 1 / STEEL GAS LINE / \ I / / ` \ / / / / / \ ( 1 / - _ / / \ / f / / / / / \ \ I 1 \/ / / I \ 1 \ \►\II \ \ I \ S I O / / / C'i I / ' / 1 \ \ \ I " 1 1 1 / \N I 1 _— --- I I \ \ / CONVEYANCE / WETLAND IMPACT TYPES N / / / 1 \ \ \ // I ��S °}� 11I 1 \\ \\ \ 41� �- • _ BEGIN PROPOSED 10" STEEL GAS LINE \ \ 1N/ / \ \ \\ \ \?� �� °I° \ 1 // / - _ - \ N — / \ \ \ / rRANsmoNOFFORESTED ro CROSSNON-FOING(PERMANENRESTED OR RIANENT CROSSING/MAT PLACEMENT (TEMPORARY) 1 11 I I I / I 1 / • \ 1 I l f l III 1 \ \ \ \�=6g _ °O _ \ N \ \ ' \ 1 I I I \ \N 1\ \ N \ ' / \ J / \ \ \ \ ` f — / \ \ \ \ \ 1 1 \ \ \ N \ \ ' 1 _� \ \ \ \ \ / Al_ �_ N \ \ \ /'/// 1 I \ \ 1 I / / // SF- I+oo \ I y - \ - \\ \ \ \ \ \ \ \ \ \ \ \ / / I. /7 \ _ \ \ o �' I COVERED BRIDGE ( RS SITE °., * ' \ \S \\ Fp \ \ \ \ 7 \ \ \\ �+ je o - - - , , , —\= _ \ \ N \ \ \ \\ \ \ \ / / \ / // \ \ 7 �I o ��--- � \ \\ \ \ \ \ ,��--�\ \ \ \ \ \/ o \ I� \ \ d0 / \ \ \ �,� \ �o C \� �— � \\� _ _ \ \ \-----------� \ 1 1 \ �� \ '� I / \ \ / \ \\\ - - < \ _\ \ \ � ^� / - ca ,, \\\\ \ a Tip — \ �� �� \ \ � \ 1 ) \ �� U. \ Op _ —� \ \ \ _ \ \ I / i / \ SFr) , \\� \� \ \ \ t°° sip Lob -wall - _ _ _ _ \ � N \ \ \ \ \ \ \ _, \ \\ I / 11 I I ��o / / / _ _ / / ii / - ,,\\_/ \\ \� 0.0 <°a / / �� __-- \ / / 1 I \ \ \\ \ / J \ \ \`•'�ii��<,': -- o - / / / / \/\ / I / // / / i / \ I \ I \ 00 \ \\ )�`J I \°>5 ° ° 1 /- / /- / / o / / / \ I / / / N / `yo „ \ \ N / / // // o7 M / / \ 1 I \`- " ' \ \ \ \ -� \ \< \\ STREAM S37/38 PERENNIAL ( )( ) / TSC \ t % / o — / 5o / 33 , / - - _ \ I �/ / / �ti / / -/ I \ \ \\ \ \ \ \ OPEN CUT FOR GAS LINE, _ . °' \ `Opp / ^� o -- / / / / / - - / / ` � / / I 1 �� I \ \ \ \ - \ \ 1 \ N \ \ 1 \ i \ PERMANENT STREAM CROSSING, POTENTIAL BLASTING, DEWATERING STRUCTURE / \ i� // �+� o , / . // // / / _ �o° / / / j ‹� // ` _ o �� \ .. \ I ` -o - - / - / / �' / / / \ 0 LOD / I I \ / / \ / _ ; •' + / -_ PROPOSED 10 STEEL GAS LINE / al-/ 1 / / / / / / too - - - - ' +/ / / o _ _ _ EXISTING I ° - I \ 0 1 I 1 \ _ \\ \ \ \/// / /'.4 / // /// -LOb / / 1/ /o - PRIVATE DRIVE\ \\\ \\1\ \ \\// / / /, / 7 TCE �nt°°/I\ / / ,, \\\ \\\\\\\//\ \\ \ \ \\ 1 / / / 1 \ \ \ to//I/ `\� ' �� �\ °T o 8°% /' N / o\\ —\� END II' / °' N/ N. \ \ \ \ I / I/ PROPOSED ACCESS ROAD _ _ _ \ \\ \\ \\ \ \ \ \ \ \ % I AR-013 -\ N \\ \ \ \ \ \ \ \ \\ \\ \, 1 I \\ \ \ \ \ \ \ _ _ _ \ \ \ \ \ \ \ \ \ \ \ \ \\ \ \ \ \\ \ \ \\ \ \ \\ \ \ ------ \ 1 \\ \ \ \ \ \ \ \ \ \ \ \ -------- -\\ \ I \ \ \ \ \ \\ \ \ \ \ _ \ \ \ \ \ \ N \\ \\ \\ \\ \ \ \ \ \ \ \ I \ \ - \ 1 2°0 \ \ \ — \ \ \\ \ \\ \�-- \� SA0 / \ - \ \ °o �° 320_ \\ \ \ �a \ \ \�\ �\ \ \ �' tea` START OF NEW \ \ \� ROAD SECTION. \ \ \ N \ \ \ \\ \ °'i \ \ \ \ \ REFER TO \ \ \ \ \ ACCESS ROAD \ \ \ \ \ \ \ \\ GRADING PLAN \ \ \ \ \ SHEET. \ \\ \ \ \ \ \ / \ I \ / \ \ \ \ \/ I N \ o \ -PROJECT / I �`a�\t \ + / ` ` °p�to`� \� N �� o / ;� / 7 t°n N o \ \°per too _ \ \ \ N \ o ' / / / °p' oD` \\ / / // / M \ LOD �oo,�v°too \ N / // _� arw'O� taati, — — Q / / / �' \ `t� \ /^\ \ °°7� \ \ // \\ \\ \ \ \ - / 1 \ \ \ \ \ \ N \ \\ \ \\ \\\ \\ \I \ \\ \\ \ \ °' \ L D �°�`o NOTE: SWEEP ROAD AS NEEDED \ \ \ // 7 /' / / _ \ \ \ \ \ \ \ \ \ \ / / / �\ _ \ \ \ °I° \ 1 \ \ 1 \ \ N \\ \\ /J I ��� \ \ \ 6. \ ,` \ \\ /\/ N \\ 11 \ \I \ \ \\\ / , \ \ n/ \ \ 1 \ \ \ O \\ \C \ \\ \ 1\ \ \ \ / 2 NOTES: \ \ \ \ \ \ / \ \\ \ 1 \ ` \ \ / 1. SEE LINE 142 CLEARING REQUIREMENTS ON SHEET 79. \ \ _ \ \ , �\ \\ N \ \ \ \ \ / _ \ \ I \ \\ \ \\ �/ i �3Zp \ \ \ 1 \ \ \ _ \ \ N - _____--__ \ \ \\ \, / ///, - ,\\ �/ \ \ \ \ \\ \\ i ____--- -__ �'\ \ \ \ /i /�, _ __ ���\ \\\ \I \ \\ I _ \ i/ �/ I 1 ---- - \\\ \\\ / \ \ //II/ N / / /' /--- �� \, �—� \ \ . / I 1 I / / / // _ \ -� N\ \ / I I / / / ' -, �\ \ \ / j/ / / // /\\ \ \\ \\ I I / / / / - \ \ ____- / / / / \ // / / / / / \ N / N\ N \ \ \ \ \ \ I N �_ \ \\ \\ \\\ // o ,\\ -�\, / n0, \ \ \ \\ \\ N // / \ \ \ \\ \\ \\ / 'ri/ / N \ \ \ N / / N ,- \ \ \ \\ \\ \N '// N\ J/ \ \ \ \ \\ / �- �-- / / \\ \ \ \ \ \\ \ \\ \ \ / \ \ \ \\ �`\ \ \ \ \ __ / \ \ \\ \ \\ _�' / \ \ \ \ / i �� I 'ot. o�Ess /o !4 ,•Q� ••� �_ '��y 1 • ;E)4 09/ 2Q22: tiG I NEti `',``` ''''/.1 ^ , .... •G\'\.� .,,, kEITH �,..• ���� PROFESSIONAL ENG/ARCH STAMP PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED *DO NOT SCALE THIS DRAWING *USE DIMENSIONS ONLY * * REF. DWG(S) PNG-G-142-0001000 PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) DRAWING IS CUf'REI\ T ONLY THROUGH THE LATEST REVISED DATE TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS SHEET(S)74 OF 119 DWG SCALE AS SHOWN 0 05/09/2022 ISSUE FOR CONSTRUCTION JB TFG WKG AREA CODE 1853 DATE INITIALS REGIONAL LINE 142 PIPELINE DWG DATE0911712021 SUPERSEDED — ACCOUNT NUMBER 10700 ENGINEER Q PNG DRAWING —C-142-0001073 NUMBER REVISION 0 PROJECT NUMBER 0232195 DATE INITIALS MGR TECH DUPE 1 Piedmont Natural Gas E&SC P LAN-1 9 DRAWING BY JB REC &STD ENERGY. CLAYTON NORTH CAROLI NA STATION ID DATE INITIALS PRINCIPAL DISCIPLINE / RESOURCE CENTER / LINE NUMBER CHECKER INITIALS TFG 05/09/2022 WKG ENGINEER COPYRIGHT 2018 Resource Center GOLDSBORO, NC LEGEND / \\ \\ \ \ —/' / // \ / i//\ \ \ `\ �_—/' /, // / /' / I \ -- \ \ / / \ \ N / / ,/ I 1 \ \ / \ \ \ 7 / / / / 1 7 I I I \ 1 I 1 CODE / / \ \ \ \ / / \ / / 7 \ \ \ \ \ / I ' / %> 1 TCE \ \ \ / / I \� \\ \ \ \ / / / 7 7 / / / / / / I \ \ \ 1 I 1 / TCE TEMPORARY CONSTRUCTION ENTRANCE :����� I / _ / \ 1 \ 1 I / / I / / / / 7 / I 1 I ) I — _ / / 1 /// / ' ' ° I 1 \ 1 1 / / / // I ' // \ \ // __ /'I i / / \ _ — ' / / / / \ / — ' / / / J / / / \ / 7 / / / / / / / / / \ / / 7 / / / / / / ( I ) ( / / 7 7 / / / ,' / /' / / —' \ \ \ / /' \ \ /' /' ' I / ° /' / / / \ / / / / / \ / / \ _ _ / / / / / • / / / / \ / / / / 7 / / %• / / \ / / / _ / / / / \ / / / / / / / / / / —� / /—_ / / / / / / / / , / / ---- / / / // / / / / \ / / / / / / , // , / I / / / , N / / , / / / � ° / y I / / / \ \ / / 7 / I / / / / // / \ \ _� / / / / / / / / / — — — _ — — — / / / / 7 / / / / I \ / // ' : / \ / 7 — / / / / / / , / / \ \ _ / / 7 — \ \ _ ' ' `� / \\\ \ \ \ \ / / / / I \ I \ I / i��� \ \\ \ \ / / / / , I ���� \ \ \ �_ \ 7 7 \ \ 1 / / , \\ \ \ \ \O \ \ \ \ \ \ ` - / , / / / / / 7/ \ ' \�_,,/, '// ,' / / 1I, /SFO CS COMPOST SOCK CSI P COMPOST SOCK INLET PROTECTION SFB SEDIMENT FILTER BAG TSC TEMPORARY STREAM CROSSING TWC TEMPORARY WETLAND CROSSING q� / SFB SB SLOPE BREAKER OSF ORANGE SAFETY FENCE - TB TRENCH BREAKER TTP TEMPORARY TRENCH PLUG CX CURLEXPLACEMENT PS PERMANENT SEEDING �� OSF ® 0 / PS — CTWO CONCRETE TRUCK WASHOUT PT PORTABLE TOILET TEMPORARY IMPACT THROUGH WETLAND PERMANENT IMPACT THROUGH WETLAND EXISTING STREAM THROUGH IMPACT STREAMENT IMPACT THROUGH CWD CLEAN WATER DIVERSION —CWD SWC TEMPORARY STORMWATER \ ❑ PT / /� ■ j/ �`�' — 7 _ / / / / I ' \ /' /' / ' o / / WETLAND W4 \ I \ \ \ \ \ / / / ` \N \' \1 \ �\ 1 ' I , / / 1 / / / / / \ \ \ _ _ / , / / / / \ , / \ ` (NO IMPACT) \ / / / / - - \ \ \ \ \ _ / / ' ` \ % \ \ \ \ \ 1 — / ' / / , / / \ / / 7 / / \ / / / / / / 7 / /�\ \ ,/ , / / // , /' / / \\ / / / / / / / — — / / / \ / / / / / / \ \ \ / / / / / / / / 7 / / \ 7 / / / / /,' ,/ -/7 / /' /\\ \ \`-/' // / / / _—� / / \ —— / 7 / /� —/ / / \ \ // 7/ / �� /,-- /\ \ / I / / \ \ / N \ 1 \ / / �/ \\ — — \ \ \ \ \ \ \ \ \ \ / / \ , \ 1 \\ \\ \\ \ \ 1 / / \ \ _ ' \ _ i / 7 / \ \ 7 / -7 i u -- — _ 7- 160 N N \ \ / / // \ \ \ \ \ \ \ \ \ \ \ / , / /I /) \i \ \ , \ / // _ \ \ �_ / , /// / \ \ \ // / / / // , �\ \\\ — - — — / / \ \ //�^� 1 I \\ \ / / 1 \ \ \ \ \\ //'/ / r / ' / // \\ \\ \ \ \ _ — — — vJ I \ _ / / / / I 1 / 1 I \ �— _/ / / / / / \-\\ / / \ \ / / / 1 / / / 1 \ / / / / — — _/ \ \ \ / 7 7 / / / / / / /l 7 1 ) X \ X / I / X \ X \ / / / / / / / i 7 N / / / / / / // / / / \ \ \ \�\\ \ �\ `\ \\ \\ \ \ \\\-J / /' /' /' , ' \ \ , \ \ \ .----_ _/J \ \ \ \ \ \ \ / / // / 7 \ \ 1 1 / \ \ I ' _--, \ \ \ \ \ \ / , / / 7- \ N \ I I 1 ,-\\\ \ \ 1\ _/ -.____-- __-� \ \ \\ \ \ \`�/--� \� /- / , / // / \ \ 1 \ \ \ \ \ - \ \ N \ \ \ \ �__ , / / / I \\ \ 1\ 1 \ \ \ \ \ �'\\ \ \\ N\ --____ I \ \ \ \ \ -- / / / / / / I' / / \ \ \ \ \ \ \ \ \ \ \ \ \ / , \ / \ \ \ 7 / / // / GRAPHIC( 1 / / / 100 0 /"--\ \ 1 \ ' `\ \\ \ \\ \ \\\ \\ \ ` \\ ' `_. \ \� \ —i �\ \ \ \\ ��\ t� SCALE (IN 50 \ 1 \ 1 \ - ' 1 I \ '\ ��\\ / \ \\ 7 l N \ / / // / FEET) I 100 200 CONVEYANCE / WETLAND IMPACT TYPES \ TRANSITIONFOROF OR PERMANFORESTED ENT CROSSING (PERMANENT) CROSSING/MAT PLACEMENT\ (TEMPORARY) \ /' 7/ / \ / --- �' // , \ 1 / /' \ /� N / 1 1 N \\\\ \ / / \1 \\ \\1 \\\\1 /' -) ) \ / / 7 I))///, /I / / /, ; _-- �,�,���//,/,�� // / --/ / // / //// / // / ' /__----,.../ // / // / -- �/ / / __� / ,� / / / —� / / l __�-/ ,� ,, / /, //1\ 1 I 1 /' \ I lI i 11Ii /\ / I \ \ 1 / \ / 1 \ \ / \ 1 1 1 \ I / / /'-- I I I 1: I \ \ I //'/ '--� I 1 /I ��\\ \\ �- /' / / //� / / I \� \ \ \\ \\ \ \ , 11 , , \ \ \ �010 , , /7\ \\ \ \ 1 / / \_, \\ J// // / �o ,/ J \\ \ \\ \ / \ \ —\ \ \ \ / / / / N \ \ \ \ \ \ \ \ N \ / // PROPOSED ACCESS ROAD \ \ \ \ \ \ \ \ // \ \ \ i/ \ \ \ \ \ \ \ \ / / AR-003 \ \ \ \ \ 1 \ \ \ \ \ \ \ \-- \ \ ,, / PERMANENT) \\ \ \ \ \ \ \ \ —/ \ \ \ \ \ \ \ \., / „' / / ___ \ \ \ \ �\ \ 1 \ \ so \ \ \ \ \ \ \ , /;r / l -- \ \ \ \ \ I \ \ \ \ \ \ \ \ -7 /- /7 \\ \ \ \`11 1'11 I\ \\__// / / / �\ / '\ / -� \\----�' I / /' /' 7 / �/N \ \ / '/ ,, � \ / �� / 77 \ N ��—� I I \ 1 7 - / I / - - / \ \ / I / ��/ \ , / I ,� �—' �'-\ \\ N\ / / / / / \ \ / �/ 7-� \\ // / / __/ / 1 inc ' 1 I `\ I \ 1 I \ �\ \ \ \\//// 1 \—�' __ --- _ ) -�- ---- = 100 ft. / I Il I ( I '� /I I I / ,�I , , l' / / 11 / / //N ' /'/ /' / c / ,/ / //'/ / / _, , i '�'/'' N \ _---- 1 / / \\-.,---\ \ \ \ ° O 1 , / /- 1 / \ \ P o, o / I l \ \ 1 1 \ \ ' �% / / / �'\ I / / / ' \— 1 1 1 \ \\ /' — \ , / ,/ / / / 1 // / \ \ \ 1 \ \ 1 I 1 \ a\� \ , / / \ I / / / / / / //// �\ I N �• \ \ / / / I / / / / // / �\ N I I 1 I \ \—/' \\ ` \:, \\ /' / / / /I / I / I / // I7 /' / 1 1 \ / / // //// \\ \l / / , \ \ '., \ \ — / // ' /' / / \ / / 1 I 1 / I \ \ / / / / / / i1 \ \--/,7 // / / /\ 1 I I I I l 1 \ \ \ \ / / / / / / \ \ �/ /�� �'/ 1 I I I \ \ \ \� //—\ \ \ \\ /' / / /'/'/' 1 \ \ \\ / / / / / �o I I \ \ \ \ -----� \ \ \ _/ / // �/ / \ \ / / / / '/ ° I \ \ \ \ _ \ \ / / / / / \ \ / / / // / I \ \ \ - \ \ \ / // / / \ \ \ / , / I I I \ ;, \ \ \ _ / // / \ \_ �,,_ ___// /, // _ \ N\ \ \\ �// I / I I \ \ \\\ --- �\ \ / / /� / / \ �`--', /,� � / '/�/ / I / / \ N —_ N / \ I I I / I �� I / I I I / 1 I I , 1 1 / / I \ 1 1 \ \ 1 1 \ \ 1 1 I 1 I I 1 / I 1 // / / / / ,' / / ' / / / / / / / ,/ I I / ' / I I / , I / I I I 1 / _ _ ,- -- I \ \ \ / / N / I I 1 \ \\ \ \\ / \\ N /� \ N �� \ 1 \ \ \ \ \ �_� \ �/ \\ 1 I I 1 1 \ \ \ \\ \ \ \ \��_�� / \\ \\ \ N \ \ \ \ N I \ N 1 \ / \ N \ I I 1\ \\ \ \ \\ \ \ , 1 \ \ \ \ \ \ I \ I \ \ \ \\ \ I I ' \ ` \ ` \ \ \ _ \ \ I \ \ \ �' I \ ` \ \ \ ` \ \ \ \ \ 1 \ \ \ \ 1 \ \ \ \ \ \ / \\ \ \ \ \ \ \ \ 1 \ N \ \ \ \ \ \ \ \ 11 1 I 1 \ \\ \ \ \ I 1 \ \\ ��� \�� 2 \ I I I I 1 ' \ \ \ \ 1 1 / / \\ \\ \�\ — Ji I i 1 1 1 \ \ \ \ \ 1 / 1 \ \\ �__ \�\ I I 1 \ 1 \ 1 1 I ( `_ --� __� I 1 \ \ \ I I \ \ 1 1 I — _�:�-- i I I 1 I / / 1 \ \ 1 I , / I I 1 _,---_, — \\ ,__-- , I \ \1 I I / / I I / I � \\ \ \—, / ' l \\\; — �' \ / / / / \ / /1 7 / l —//' / // /� / / \ 1 / / \ / / / ' I I I I I I I 1 I I I 1 \ III 1, 1 I I l,\ \ II I 1 l ,. '\- \ \ 11 1/ \ \ \ ' I 1''I \ \ \ / / \ \ / / / / / / / / / / / I I \ I \ - I /,/ 7- \ \ \\ . \ \ I \ _ \\ \_'//7/ // �// 1` \\\ \\\ ° N N //7'- \ I_ \ \ -� 7/^\ \ \ 1 —\ \ \ \ \ \� 1 ► I I \\ 1 / / / , I 1 7 , / / I I <\ ,' / ► / // // //' 1 \ I IC 1 1\ 11 1 _�/� /�� �� /�/ / �/ , // // / // / I 1 C (.--- < 'f � /'l / 7 / / / % / \ \ \ \ / / / / I ''�---___ ,�� 1 // / / \ \ \ o / / / / �. 1 — If i / / / I / // \ /N \ \ \ \ \\ \\ _ 1 — .- k'" , `\‘, CAR �''', 0 •• oESS /o °° /1 _° Q. ��°°°� = 1) ` - 1��y Q5� 09/ 2Q22:N ; /VG11.1 .``�;� ',,,,,,,kEITH`G\\\`\ PROFESSIONAL ENG/ARCH STAMP PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLYTHROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE Wf TF I RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 REF. DWG(S) PNG-G-142-0001000 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS SHEET(S)75 OF 119 DWG SCALE AS SHOWN 0 05/09/2022 ISSUE FOR CONSTRUCTION JB TFG WKG AREA CODE 1853 DATE INITIALS REGIONAL LINE 142 PIPELINE DWG DATE09117/2021 SUPERSEDED ACCOUNT NUMBER 10700 ENGINEER PNG DRAWING -C-142-0001074 NUMBER REVISION 0 NUMBER 0232195 DATE INITIALS MGR TECH f�QUKE ENERGY Milli Piedmont Pie Natural Gas E&SC PLAN 20PROJECT DRAWING BY JB REC&STD CLAYTON NORTH CAROLINA STATION ID DATE INITIALS PRINCIPAL DISCIPLINE / RESOURCE CENTER / LINE NUMBER CHECKER INITIALS TFG 05/09/2022 WKG ENGINEER COPYRIGHT 2018 Resource Center GOLDSBORO, NC LEGEND z Q J I�X �' I - - oo \ \ o '' ��1+, guy ' • / / \ I I v./ ^\ \ .l - - ✓ - v / / 1 II 1 I 1 / //- \ \� �/ \ \ \ \/ \ \ \ \/ .,,�/ \ \ '-\ ` - \1,\N _ �u ��/ \\ - \ � 1 \ _ `' .,, 1 /O //�-�\\ \�� 1 11 �I I \ \\ \ - � D PP%IIII1\\ \ ////,// / / % /� f i - - \\ 1 I 1 I I \ oI o / / \ \ \ \ \ \ \\ \ \ \ ( \ - \\\\\�/ r \ ` / I � \ / \ \ - BEG�M F�DD ��E �o I ' :711�' 1 \ / \ 111 \\NIIINI'I \\__ 11 \\ \\\ \� / \ \ \ o\1 1\\\ / //// //''II /, ///�\///��-\\\11 III) \I/ \ \ \ - \. \// / // I // ✓ /� 1 ,.o - \ �o o / �'a /// / r/ii� ////l I r� i///i �� /// --� \\1 111/ ao I 1 \ \ \ +� -- / / / // / '%/ \ \ I I' r ' \.o _✓N/ //p////o j °'- / //i//,/,� ll�I I / ///O/i/�/�i\\\\\\\1 s \ j, \ 1\1\ Q \ */ `7 - -_\ \ / / / /p /A / / '/ _ �°I'L�� %1 / // / /'% = \\\ \\\\ Q\\ \ \ \' ��- LOD \/ / /•♦ / N / / / / / / / / 7_ I�.y 0 / / / // /� 0-\ \), \,. \ \ \ `\ 1. `t /// o ��- // r /,rag ✓ \1 E- ��i // / / I/I N p/// / l l �✓�� ///// i� � \\\ d0\ , O� I 1 ` \ \\ \\ `�t.` -�OQ�\\\ / / III / / , I Qj1�,II i4o/b�.�-' ,1/ i ��// V'�\\V \\a. \\ �\\\ \ \\ r��l •.S.,O\\-\\,-- -IIv0/ _ _ / // / /7�/ D �f ,/// /V� • \ \• �J11\ 1 I 1 \ / / /� • � � t. �,\ \ �0 1III \� -� ���\ \ Q, / //\\11(11 l \ -- ; 30 11.)/ /// / �,.D '' %'i � ,��: --\ \�\ \\I\l\l\ \, \ °° /, \\ �\\ \ ? / // ► / / y\ 1 \ \ \ __/ • // �,,,��. / , / 00 \ \ I 1 1 \ \ \ \\ \ \ - \ `O / ) \\\\\ \ \ \ \\- _ / •/ / / /// I / \ / /// :::....'� / \�\ \\\\ ✓\ I III 1 \\ \ \ \, \ \ D� \ \ \\\\\ / I / /— q \ — \ \ \ \ sF \ �/% : \ \ \ ,.� 111\ ,. �°\ \ \ \ \__ / /I// i \\ \ \ \ \ - _ \ 7y \ \ \ \ \\ po / / I /, i /° �f.� \ .' \\\\\ J \ \ O. \ ° \ \ _ _ - / r/ / / / / / //�/ \ \ \ \ \ \ \ - - -° -/ `1' // / //// / /� /''ri \ \ \ I \ ///\\\\\\'\-- �/// /// / �/ .` / �� �D \ �� / //%__/// / 143�11° '` I l / / / \\\\ � \ ►n� \\... `�•/ / / /�/� `/// / � \ r1 1 (�.� �I 1 I /\ o \ / \ //////��� \ \ 1I 1 / /�V ,1 1 / I 111 / / \ 11 1 I I / I 1 1 / / 1 IIO 1 11 1 I I o T 11 C710 1 I 1 (1� I1 11 1 1 1 I I \ \\� 1 1 I 1 1 I I 1 1 I\ \ \\ , 111 \\ \ 1 I \ \ r l i•I� y� I1 1 OD IY \q N/ \\ \\\ \\\\1\II \ \1 \\_� \\\\\\/�\/J II / \_-\\\\�-�- / / o�p \ \ \ \\\ \� 11 \ \ \\ - \ \ \�/ / l \ / \ \ �I 1 \\ \\\\ �� //// , I ,( \ \\ - __\ \\ \\ 1 / \ \ \ \ 9 - \\ 1 _-� _\\\ /- �, I \ -200- / l \ \\ \ \ \\ \\\\ r � II \ \ I _ \ \ \ / / \''1\\ I I f \ \ \ \ \ \\ \\\\\\� ) \\1\\\\\\ \ \ - _ \ \\ \ \ /// // I //_-_=_\\1\\/r�\LOD I I \ 1 \ \ \ \\ \\ \ \ \ , \\ 11 \\ \ �-\\\\\\\ \ , / - /j \ I / / / _ _ _ I 1 \ \ /� \ \ \\ ?\ \ \ \\ \ \ '\1 \ / \ / / J \ \ \ \\\\\ \ \ \ - - \ \\ /// - \ I / - 2os - \\\ \\\\\ \\O0� \)\ \\\\ \\/ I1 1\\�/ /^1 \ , / / - -� _ _ \\ \ \ \\ 1 \\/ �,/ / /- I �*\ o \ /\\\\\\?y \\ �\\\\ \1 1 \I ///\ 11 \ o \+\\ 1 + �\ \ \ \\o \ \ \ 1��`o\ \ o \ \ ) 1 \ \SFO \��• \' \�\ \\\\ /► 1\ \� I I\ \ j 1 , �,o / ,� / �o - - \ \ \ 1 / \ / cg \ \ \ `� ( �' O \ �O \ \?Q \ \ \ \ \ / 6 1 \ �_ I / N \ \ \ I N ° - o\ \��\\\\II �� °/�I I I 1 1 /\\N -- / to / �_"o ; o \ \ N _/0 �. \ \ / } �,.\\ O O\ \ 'Q \\ / • ,/ / I/ \ \ O oo/ N\\-,�. 1 1 1 �\ is / �- J I + \ N _� • 230 •-*,, \ !� \ \\ \\ O /i1\I \ \ 5- 6� - 1 1 N \�\\\ \\ \ct///i =-O J} \\ 'o � 3 1 _ \ �'(�\ \\ I/ , L7\ \ + o\. �\\ \ \\ \\ \\ \ l If1/ I� \ C�\ / \ 11\._/ r\ - - \ \CODE \\611,\ -� �\ \ 1\\� /o \ g 1 \ /�- \I \ /r-- co (q/ \\ \ )SF 11 I 1_, o\ \ k1 I/\/kw,/\°SFJ NI IN \ / - C�\ I I 1 \ \/°• �iCS COMPOST SOCK /� COMPOST SOCK INLET PROTECTION /tt SEDIMENT FILTER BAG SFB TEMPORARY STREAM CROSSING TEMPORARY WETLAND CROSSING \ /// \ • \TP /-_\ \ \ \ \ \ . \ \ \ \ \ _ / // �/ / / - -/N6 /�- �// o \ \ \\ \ I / /V/%/ - - \\\\\\N / 1/ I l ///o i/// ,- / \ j�° ..�I��,t ��o- \I// //-_\\ \\ r0_ I /�% / / / / \ \ `y I Il'll \\\ I / _ '4 I \ \ Io / ///// � _- _ _ \\\ _// 11 /�� °/ O \ \ \\\\.\ ` I \ ///////// \ _ \ J ) \ \\ \\ \ - �\ \ ` \ \ I l I I // ,,- ///, /tl� / / / / / ,\ \ \ \ \ I \ \ Q - - 1 I \\o \ l/ / // j/ /� '/--� �_ -- \ \ I I )II/, /I�// ///// �\� \1 I 1�\\ 6.�0/ /// // - _ \ \ _/ / / \ \ \ \ \ — --� I 1 0/ I / / / / \ \ \ /// -- \_ \ /\\\ O / / // / 1 \Q11 / ) \ \ \ I ry // 1 // / / - �o� \ \ \ 0\ \\\o� \ 1// I/// ///// // - - - - \ \ \ _/ \\1 //// �/// // / / N r \ /// // \ \ // // /// / / / o / N 1 1 1 N 1 \ 1 I \ ' \III/// /___\ \ //= _/ \ \✓ f,� / ZZ / /// ) 11 \ N I 1 \////_\\ \ / / , . / //, / / ///////////////// / _ _ --- \ \ \ \ / /- __--_/\ \ \ \ / /�/// / / / / / III I I \ \ \ ' I I l 1I1/i)I I\/ l /// llI �/ '- _,\ \\\� \\ \� /-_-___ \ \ Il r�iii//� // /// / IIII` \ \ 1 I,11 ) I l / l l l l I 1 I / // // ' _�- \ \ \ \\ - // Z1,0 ` - - - - _ / \`. Ill/ / // / / / ' / / / / \ / l l I \ \ \ f I // / / =_ _ I //l //// \ \ III 1 / / ///II I __ \ \ �_\`-- �_\\--- I r// / / / I 1 \ \ I II I \/ - \ � � , / Ill 1 1 I / / \ \ \ - \ �— �/ \ _- \ - / \ /Y / / III / / / \\ \ _ \ - _ �/ \ \ \ / / / / / \ I \ \ I I l / l/// l 11 1 / //(//// _\ \ \ \-----_- ___ -� / -�� //7 l/�I/If1\I �/ // ��_/ Z�jO� 1 1 l \ \ ` \ \ 11 \I1111\IIII\\\\ / / l l l / I I 1 / / l I I / / \ \ \\ \ _-_- - - \ - / i i - \\ \ \ ° r 7: l/ [ \ \ \\I �/ / / - �' \ \ \ \ \ \ \ \ \ \\ \\\ / / / '\ - _ _ _ _ - - _ J 11 / 1 \ \ \ \ \ l / l III I I ( / \ \ \ \ - / �� \ \ / ;, \ \\ \ / \ \ \ \ \ \ \ \ \\ II lI IIII I I 1 — --220- `-/ --�\ \ \ \ 11 //'\\\_J\\\ \\1 ( ( I / I \ \\\\ \\\\ \,`o\\\\�\\\\\ / / / //// / / I 1 I \ 1 \ I \ \ ' - _ _ _ _ - ` / / _ _ \ \ \ / '� ) ) \\ \\\ \ \ \ C , \ \ \ \ al \`\It III I I .- - \ v / \ \� \ \ I \ \ \ \ \ \ \ / l l I I I I 1 I \ I -- - / - _ _ - / \ \ \ \ \ \ \ \\ \ / I / I 1 \ 1 \ \ I \ / - i -- \ — — _ // — \ \ \\ \ \ \ \ \ ./ / \ \ \ \ \ \ \ , I\\ ) III \ - - \\\ 1 \ \ \ \\� \ II \ // / I) / I l I 1 1 \ \\ \\\ \ 1 \ �- / / \\ -- /-� \ \ \ \ l \\ \\\ °1° , \ 1 \ 1 I / / / / / / / \ \ \ \ I / J% J 1 \ \ \ I \ / / / /\J\\_� / - \\\\\\ \ \ , 1 1; / I , I I �! 11 III 1 \\ \ \ 1 \\\ \ / ✓ I1� I 1L41\ 1 \ jsv--rN� `s'c�3` l 1 I \ \ °���\1 \ \� i \ /� / _ \ I Q' Q I Q I 1\ I 1 11\/// �,\\N \\ \\\� I o 1 1101, I I �' I I I� I // - — N \O \ \/\ I � IN I I I 1 1 \ - / / _ !' I N I I I ac //,\ \ 1/� l 11 / I I I o / 1 - - - �5�°• /► I1 /I I I I �wD OD 1 I l / / / ) ) l I IN ILoD �_ :// / / // Q \IIODI\ `i I / / 1 /3.D"� tom\ Do, , DD I / / I N \ !L �_ ! �� / / \/ // /, //, I `' \ ° �-� ADD i o�T / ` lODL/CTWO II I I///// % / „„....---------/____---- �331007, /L / IIIIlIlllll , / / 1 f / 11 1\ \ 1 ` \ \\�/ j / I III I I / / Q 11 I I `I III I I ►/ 1 \ 1 \ ll 1 I/ 1 1 11 \ // \ \ \\ i IIII 1 \ // \ \ \ \/ \ \\ \ \\\ \ \\\\\\\\\II \\l l / / 1 \\ \ / /I \ \ \ 1 \ 1 I I/ '♦ / \\`\\\\ \ 1 I / / O / 1 \\ IIII - - _ i. O / / / / o, - _ , 1SWC NN \\\ / / De / / 1\1\\ \1 I :1ir D o \/ 1 D Sly \ 1 1 \�I 1OSF /I// \ 1�� 1 I /\\ D _� , I I I / / / - /� ° l I 1 1�TB / /// 4•�0 / I I I / / ,TTP / OI / // _/// \_ / / I // ,° \::700........ ' / //CX / / / ^ \ I / / l // / ///// / / \ / II -�/ //�/// / / _ / / ,‘ �i ( / \ \ \ I / ' / / / // // / / /l I ///, / �� / - ' �� �� / / - // -- _/i/ // � / PS SLOPE BREAKER ORANGE SAFETY FENCE -OSF- TRENCH BREAKER I= TEMPORARY TRENCH PLUG 0 CURLEX PLACEMENT /i PERMANENT SEEDING PS PT CWD CONCRETE TRUCK WASHOUT) PORTABLE TOILET STREAM CLEAN WATER DIVERSION — TEMPORARYSTORMWATER ❑ PT �/ CWD- Y / - / / I\/ / / / / // / // / _� / // // /_—/ / I1 _�/ // / / \ \ ` ) - ` / - -// - ( / / / CO A� / \ \ / / / / / / \ _ \ o / �� \ J \ \ \\\ \ I I 1 J ) / / I I\\ \ \ \ 11 1 1 1 I \ i / / // / / ryp /// • ♦ / / / // --- \ / / / / - - _\ \ \ \\ \ \ \ \ \ \ \\ \ \ I N _ \ \ ) / / / / I \ \ \ \ 11 / / // / / \ / / \ 1 \ \ , \ / / / / ` \\\ \ \ I I I //l /l /i ,. \ \ / // l / \\ \ \ \ \\ i :1� / / / / / \ ._-_-_------\ \ \\ 1 11 111 / /, /// //// /// ///////1\I( \ I \ 1 \ \\ \ \ \\� - \ \ \ I 1 \ \- / / / I I 1/ / / \ - = = \\\ \ \\IM 1 /i "�// ill�llil�I(I I � ���) / \ \ (l � \ \ \\ � J / \ �� � � \� ` \ \ _ i I I I 1 \_--__- \\ \, \\N\11 \ \ \ \\ \ \ \ \ \ I \ 1 ) \ d \\\ \\\ \\I / //// 1 1 1 1 1 1 \ I I1 I I I 1 11 L�I —° o I, p I 1 r I I G \ . O \ r 1 1 I I Zo / / / / / / / pt -- '- ---/ l \ \ \ \ ( / / i \ \ I / / A� / / / I \ \ \ \ =/ / / _ - '� \ 1 Y / \ \ 1 , / c \ 2���- -- , / / 1 1 �- / /,/,/,/-�\ ) I / \ \ \ \ \ ( _ _ - / / / PH SCA �IN FEE �/ / \ / I / / i / 1 •I � � y \ I l \ \ \ \ / 200 1 2q0 0� TRANSITION OF FORESTED TO NON -FORESTED OR PERMANENT CROSSING (PERMANENT) CROSSING/M TPLACEMENT // / /IIII 1 I I 1 \\\� \ / \ \ \ \ \ \ \ ' / / \ \ \ \ \\ \ \ \ e / 1 �� I 1 1 \\ \ \\ 1 I \ \\ I \\ \ \ \l 1 -I 1 i \ / I I \ \ \ \ \ \ __-- 1 _ _ �- �/ �/ l/// llll II\1\\\ \\ \\ \\ \\_ \ \ _--__ 1 \ II III1 I // I I \ \ ( / / / / I 1 1 \ \ \ II \ \ \ --_—/ / T/ \\\ } I l / // IIII III \ \ \ \ // �'\ \\\\\ \----- I IIII /I�� / \� \\�—_\ \\ \\\\ \ 1I1 111 IIIIIIII I 1 I I 1_�. I r is -\ \ I / 1 \ \ / // / , 1iacfZ(�ft. / \ �J I ( \ \\ \____ �\ \ \ \ \ \ ` I ) / / / \ / / / // / l I \\\ �__--_� \ , \\ --, \ II I/ of I / / / - / /�\\ \ IIII / / ' IIII l l I 1 I 1 I 1 / I // I� ►►1►I1 III 1 \\\ \ \\\ \\ \ \ \ - / \ \ \ \ / /-\ \ \\ \ — — \ \ /_ N \\ \ ____ \ \\ - / /, - \\ \\ \\ \ ` -- 1 / \\ \ -__- / PROPOSED ACCESS ROAD AR-007 (PERMANENT) _ = \ ` IS I - Z / '�^ ,pDO\\\ �\ \ /�\ \�-_ \ no0 1 I / / / / _ _ - -\� \ \ \ j / / / / II I 1 I I 1 / 1 I \\ -- A III 111 I ( / / / \\` 1 1 / / /// / I \� 1 I 1 1 1 \ /) 1 , / / - -� 1\ I // / ////// /// //1 I I 1 \ I 1 I 1 I I \ \ / I \ / // / / I I/r/ / //IIII I �J / \I �� J/ __ \ \ \ I 1 / / / \ \ \ \ \ \ I \ \ \ \ \ \ I / 1 / // / _ _ / _ / °1 i \ \\ \ I / \\ //� , / 1 �1rto/d ?� \ \ , \ 1 I I \ \ \1 / f \\ \ \�\ - // j / / _ \ / / o \ I I I I I 1 / �/ \ \\ _ /�/ \ 1 it \\ \ / /,\\\\\ \ \— ___ _� ? III / \\ \ \ \ -�-\ 30 lIllll I / \ \--- //i\ \� \\ \ - -� / \ III ( _---- \ \--- \ / / \ (' / /� \ 1 \ � - �\ /-'\ \ 111 1 \\\ \ \/ 11 \ \-_\ l / /// \ - \ ► / — ///%/,// // -/— ,� /)1/ \ �/ // / // // / /i � /// / I /' /� / // _� 1 \ / / I / // - / / / 1 l l / � l I/l % / / / 11 l \ / ► l / l // 1 I II I l l�l / / \ 1 I _- \_/ 1 , \ \ I \ I I I -- b \ \ \ \ \ ) / / ) I I I ```-/'-\_ � // /-\\ / , \ \ \_ -- ( \ \ I / / 1 ��-\ \1 \ _ 1\ \\\N \-- /'\ l \ - 1 / ///////// �-\ \ \\\\�\ \ \-- / / \ \ \\ /// / /r / DRIVEWAY BREAK IN SF /i/�-\ \ 1 ` I l I I \`/ // /11111 I/////--��/l11/ / / / / / / I I / -� // I \ I \ \ / / I / / o \ \ 1 1 / I 1 I / ` / - /__-_--` \ \ \ / / \ N. 1 o / \ I I I 1 \ \ \ \ \ \ ( / 1 \ / \ \\\\\\ \ \\�---- _- i/�-�\ \ \ �)//,/ �= - / / / / // --� \\ \\ _ /� \\ \� \ �_ /// l 1111/ll1l 1 /ll l/ram^ \�/ I l ,° �- _ — \ \ \ / 1 \ \\\ 1 I / 1 \ \ \\ / \ - - / / —\ \ — I \ �/ / // / / IIII l \� ����:—_—� 1 /�/// ///// // / / / /�/ \ \_� \ / // �/ / / ��ol ( I / I / l I 1 1 I I \ \\\ / — \ �/ / / \ II I / / \ \ \ / \ \\ \ \ \\\ _ \ \ \ I \ \ \ \ \ a— :/ \ / / / // IN / �/ �\ \ // �j// / /// l \ \\ ° 4 -/ // //�/ / N/N/ ) / / \ \\ \ - //// // // // / ( \�\ i 1 I ( \ o � / o I I PROPOSED ACCESS ROAD \—/ �- /__ / \ \ \ \ / , \ \ \ \� / \ \ \ I // \ \ - \ \ / / � - � / ,/ / , / \ � \ \ � _ _ � � - \ \\ N \ /, 1 / / // / / l \ \ \ \ \' \ \ \ // / / / /� ( I \ \ \ \ \ \ \ - 1 \ \ \ \ _ \ \ \ \ \\i/ /,�i /// ( l I l l \ \\\ \ \ \�\ \ \ \\ _ ' \ -��—__ `•-� \ - \\ N( D DRIVEWAY WILL NEED BREAK IN SF / / / r/ /i, / M / / / // / \ / / / / / - / / / ey '- \ �/ // / / \ / // \ / / / f I 1 / AR-008 (PERMANENT) / \ \ N. \ \_/ \ // / \ \ I / , -\ \ \ \ / \ _ _ - _ -- N / �/ _ / \ \ \ \ N \ \ I / / - \ _ J\ �\/\\\\ -- // < - \\ \\ \ -- \ I 1 I 1 \\ \ \ / /At/(/4 ;�- — ���\\\\ \\ \`\ \=�� - �� - /-\\ �� / III Imo\ \\\\ \ �, \\\ \ \ i _ _ \ \� \ \\\ \ a _�_� �,�\ ,\--__-„,\ \\\\ \ \ \ \ \ ---�• __, \� \\ \ I 1 \ 1 I II%\\\_ \ \ co 1 1I I 1 l \ \ 1 \ \ M __ D o 1 \ \ 1 \ �- \ \ \\ \ / —_�-----_�\\�\—��� ��/>// 1, ����\\� � \\ \\ \ \\ \ ( /256-/--1� \�\ \ \ \ \\ \ \\��\==�—\\\\\ \\\ \N\ \ �� -�� 7 %/i�i%/ � -\\\\ \\� \ \\ \\ I 1 \ \ / \\ \ \ \ \ \ \ \ \ -� — \\� \ \ \\ \\ I �_ / / 1 \\1 \ \ \ \ / J / \ \ \\ \ / / / / — /- / \ � I - - -. = = _ \-- // //( /�/ // �_\,` J 1 1 / ) I 1 \ \ \ \ 1 1 I 1 \ \\ \ o \ \ 1 ) / ( \ r ,\ \,,\\ \ \ \ �O �T-i°i / / 1 EXISTING FARM PATH. \ \ . \ / -\ \ - / i / / //i / ' \ / / ) \\ \\ ) 1 \ \\ \ - - \� / � \\ \ \ -,\ � � �) 1 - \\ \ \ \ \\\ \ 1 I I l \• \ \ 1 / ( \ � \ \ \� / � \ 1 / \� ) \ \ l - / J \ \ \ 1 \\ \ \� \ \ \ \ \ \ \ \ / \ \ \� \ \ \ \ G� ) % \\\ \ / \\ 1 \ / / - CONTRACTOR TO IMPROVE AS NEEDED TO SUPPORT 1 CONSTRUCTION TRAFFIC. \ \ N N \ \ / \ / _ ' / / \ \ \ — \ \ _ _ _ _ _- ' / / / \ \ \ I _ / / / / / / 1 / \ \ = �� �_ ;�� \ \\. N., ( /. /- -_ 1 \ \\\\ ` / - --, j \ \� \ / _�///_-� \ N\\ // \\ \\ \ \\ \ \\ ii2�-�-i% ���\\--' \\ \ / /-- J 1 \\ 1 1 \\\\ \1 1 \� \ 1 ) ) / / -, J \\ \ \ ( /-/ / / I 1 \ \ N-- 1) / / // // / I ��/ / \ / I \ / / / \\ \, /,, .. N ,Nx\ \ \ \ \ — // ..„, ,, , ,, ______ ___ / / / / , / 1 , i \\ \ \\\\ , „, _ / \ \ \\ 1/I 1 ` �\ \/ -- o _ \ \`1o\.� 1 1 I I 1 / / \ 1 I \ \\ \ \ / ti �\ / / / / \ \ \\ \ '�\ \ \ \ \ 1\\ �i/ \ �'\ \ i l / co \ \ \ o \ \ J l / \ / o \ \ \// `y 1 \, ,\, ,, (I, 1 -l(7\\/ _ \\ ,, , 7- ....... 7 , ,,,,,, , , ,, , ,1, -\ \ / I \ \ \ / 1 ----- � �-___//// j /// I > / % \ / / / / �/ / / / / - — `— \ . ,\(//// // // �_ / (\\\\\ l \ ,„......___., ..... ,_. _...- ...,.., „ ( , , _ , s , ..., _ , , / — \_— ,,_ , — , „. N ___ ,- 7 7 , \ \ \ , \ \ I� /// /-� \\ Ill - --- \ \ \ \ \ \\ ) I J I \ \ \ J \ \ \ I / // / '-\\\ \� \\ --�_ __ -�J \\\ \ 1 111 11l l / / �� \� N�� \ ----- _-_/ / \ // \ \\ \( EXISTING PRIVATE DRIVE/ ROAD \ ` 1 1 N. �� O ' I I \� \ O I III �\ N. ` / ) / / / a / \ \ / \ / �\ / \ 1 I \ - I/ //// n ///7 / / \ // ) 1 (\ 1 \ ♦ \ 1 / / / / �i �� C✓ i -\ \ \ \\ \ / I 1 L —• — I // / / / �� / ,, �/ I \ __ __=_�— -\ \ / / �_=— — _ ; --/ /,/ // / \ \ :, \ , 1\ \ / / / /// ,_�,— __=_-� \ \\ /---_�-�_- //l //l1/I//i// \\\\\�1 (- /�— _ --' \\ \ \ I 111 /r // o // -_// -- )/ / / / \ / / //// \ \ / / / /// //,/ /// / \\ \\\ / / — — \ \ \ \ \ , / 1 / / \ / — __ -____/ \ \ ss / / / \ / \\ \\ \ ?S / / \ // / / \\7. ,\� ao �/ / / i /�_---__-��- \ \_ \ \ /-- --_ / / l /ll lllll / \\ \\�\ / I / /-----------------) ___-_ / j ///II II)I 111 I ( / \� \�\ \\\�/ l l l / / / //-----_— —J 1 \ \ \ \ \ \ e \ / / 1 \ //�i / / / z�/. -- --_--- \ \ 1 / �/„ _— \\\___ \\� \\ \ \ \ \ / ////// —\\ \�--:: / I I I 1\\\\\1`\\\ \\\ lr\ \\ \\\\ \/ / / I / / _ -� \ \ \\ \ \ \\\ /— / 2 -- / / ( \ / / \\ \\ \� — — 1 \ 1 \ \\\ \\ \\\ \ \ \\ \ \ , / l l ) � ' '— j� \ J / \\ \ ' \\ \r. ' 1 / \\, / _ / / I �' ' - \ / \ \ 1 \11 \ _ � - - - I / \\\\ \\\\\\\\\ \ \ \ \\ \ / / / 1 1 \ \ / __ \i/Ijiii; -- _ --- N. ----- \ \ r ( , , ,,„_.., ._.„- .-.— , 7 , \ , , ,„.. . , , , _, , \ • 7 __ .... , , , , 7 \ 111I I I 1 \ 1 / 1 / \ \-"'\ _ ,_ 1 1 \ I r / \ 1 _ -� - -- / \ \ \' 1 I / / / /___. __. ,.... „. , �\ \\✓ _,\\ --- \ I // / - / - \ \.., , \ \ I /// / \ I 1 / 1 /�// ( \ \ �__ / / // \\ \ \1 \� \1�1111ii I 1111\ \\ \\�\\ I\I\‘,1, \ / '\ //// 11 \� 1 \ / ) / I / /�� / 1 \__ '/-- 260 \ \ \ I `r \moo \ I \ I \ y /I� ,-// \ .- _-_/ / \ \ \\\ \ \\\ \ \\`/I ���� 1 / 1 I / / \\\\ I - _ — \ y2 llll\11�\ \\\--// /---���� \ --- \ 1 TCE'\ /// - o \ _ 1 I \/ / / \ 1 l / / \ \ \ _ / / 1 \ 1 1 \ \ / / / 1 ) / /�\ \ --___-�/ / / I \ I 1 \\\\\\\\\\\\\ /'� I / / 1 ) %�\\\\�� \ \\\\� -/ / /\ \\ \`\_/ ��,� \ I / 1 / / 1 I / / / \ \ \\ / /_ \ 1 1 / _ /� 1 1 / 1 //�/ \/ / I \\ \ \ \\ o / °,\ O ,__,/--. 1 _-\ \ \ -�.a/° \ \ / 1_, ___/ / / / / / l _� \ \ \ / — / 1 \ \ \ 1 1 / �/ / / / I I — A I 11 \\ 1 \\\ \ \\// \ \\� /^\ \�-_-/// 1 1 / I 1 ( �\ \ $ \ \ 1 1 \ // _ \ \ N. — - / , I \\\\ \ \\ \\\\ \ \\ N--- / / \\\ \ \_ // \ ��_ =-/ 1 1 I I I 1 \ •\ \ _\ 1 I , -Z o et,,,oa ®/ ) I I 1 1 \ \\ I /� /� / \ \ \ \ \ - - - - -- / / \ 1 l \ \\\\ \\ \\ \\\\�/ i^_ 1 I _ /_ �__-_- 1 I \ \ \�\ \ N \__� -_-__ \\1\ i ( 7 \ ..- / �\ 1 X _ I I 1 \ \ \ I / \ \ N N \ �, -_ -_---___�\ 1 \ 1 \ \ / / •1 I 1 � I \ 1 \ ` 1 / I I/--/' \ -----_\ 1 \ \ \\\\\\\\ \ l\\\ \\\\\�-/�J 1 -- \ \ \\ =_ �\ / / I I -� ��\\ \ _ _ \\\\ .,, _--_�/ __ / \ \ \ \ _ \ \ \ \\ -- \\\\ - N / / 1 I �' 1 I I I ) I) 1 NOTES: - \ \ 1 I \ _-_\\ \\� l \\ \ \ /o 1 1 / __-_/ \ \ -_ \ \ / \ \ 1 \ \ \\ \\ - \ \ „_ / / _ _ _ _ /� - �- \ \ \ _ _ _ \ - 7 _ \\\ \\\ \\ \\ pb` I - , \� \ ` \\ \\ \ _ - \ \_/ / /-___ \ ---- \- 7/_ / \\\\\\\\ -_ 1 l 1 \ \ \\ \ \ _ / — — _ / J _ �� �/i = �� \ \\ \ \\\ \ _ \ \ I I / J \ \ 1 \ \\\ \\\\\\\\\-/--� , / / / _�//-_-_-__-_-__-1-_-- l/-- �__>//-\N\ \\\ \\ \ \ / / \ 1 1 \ - \ \\ \ ` / / / /i/ /% - - / x�, \ \ \ \ / \ ' / / / (� / / / _ ---- / / / / / I-i// --- / �- _ 1. CONTRACTOR TO PROVIDE BREAKS IN SILT FENCE WHERE DRIVEWAY CONNECTS ALONG THE ACCESS ROAD IS LOCATED. \ \ \ \ \ \ \ 1 \ \ \ \ \ \ N \ 1 \ \ \ \ I \ \ /1 7 \ l 1 1 \ / // / / / /—_ \ \ \ \ \ / / \ --_ l / / / \\ \\ \ 11 l�� /,//�=,�,,/�//// /�, / // //-__ ___. ,-- JJ A\\ \; N. \ \ 1 11• ° / ?S _ / ,,/-- - \ / I / , ,/--,,/ ,/- ,/ , /- N. N\ // \ \ �// // / // \ -_-_J \ \\ \ \ `o \ O //_�----� / 1 / ! / -- \\ N. / // / / / // /- _ i- \\ \ \ / /� �-, --\ \\\\\\ \� -_�/ \ / //// / / / / / // / —" - \ - ✓ \ \\ \' I 1 (/�\ / \ 1 \\\\\�_� �l j/,)�////II / / / /�/ ----- \ � � /�-/� \ \ \ \ o / C CLEAN ROAD IF NEEDED - -- / / \ \ / / / / ( \� _ // l .- �/� _--__ \ I/ / '' _ / / I I// , -_ \ '\\\�`- /// //// / , 1 \ 1 { /----__ _ -� / �/ ' \ --- % / 1 1 ( / 1 \ / \ \ \ 1 // /�---_____-�/ // / l l//�\�/��\\\ / / / �/ / l 1 1 1 I \ \ 1 1 l / �� �� //// // AID 1 I \ / / ( \ 1 \ I 1 I \ ��--„'\_/__' /_- //�//,�j 1 \ ///// -� \_ / \ \. \ , //// (I \ \ \-_ \ \\\ \ I \ /�'/ ( /----�\�\\\-1 I / / (\ \ \ \ \\__�\\\ \N \\\ \\ \ �\11 1, /i1 ,il\\\, i ./ --^� \�;�\ I \ , .1.\A\\\\ � N \� :�\\\� .\\ \ �//.// J,I I /--� /-\\ \__/ ___, o -\ _ ► ( 1 \ / //�� \-� - -/ / N / I 1 - ,/ /_\ \ \ \ \ \ 1 I / 1 1 1 /// / / / / / / \ I I I I / / \ \ \ I 1 I \ I �i / ► I I/ / / �/ / J I I \• _� . " ..ss /o !�'- ,•Q� ' ••• � -_ • 05� 09/ 2Q22: �G I NEG •°' N ;,, �-/ . , .....G;p\,,,, �,,, kEITH �,.�� ��"��II,IA,,,� PROFESSIONAL ENG/ARCH STAMP PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY * * REF. DWG(S) PNG-G-142-0001000 PIEDMONTS NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) DRAWING IS CUf'RENT ONLY THROUGH THE LATEST REVISED DATE TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS SHEET(S)76 OF 119 DWG SCALE AS SHOWN 0 05/09/2022 ISSUE FOR CONSTRUCTION JB TFG WKG AREA CODE 1853 DATE INITIALS REGIONAL LINE 142 PIPELINE DWG DATE0911712021 SUPERSEDED — ACCOUNT NUMBER 10700 ENGINEER PNG DRAWING —C-142-0001075 NUMBER REVISION 0 PROJECT NUMBER 0232195 DATE INITIALS MGR TECH DUKE Piedmont Natural ' GIs E&SC PLAN-21 DRAWING BY JB REC &STD ENERGY, CLAYTON, NORTH CAROLINA STATION ID DATE INITIALS PRINCIPAL DISCIPLINE / RESOURCE CENTER / LINE NUMBER CHECKER INITIALS TFG 05/09/2022 WKG ENGINEER COPYRIGHT 2018 Resource Center GOLDSBORO, NC LEGEND Q a/ -\\\��\\ \ �' / --, / / ��// //-� \\ \\\\ / / /// // / , 1 / I \/ I I I 1/'/' \ / / /// // I / \_ ///////'�///� \C/ \ / / �-\\//\ \\\\\\//,/I I,\\\ ✓ / ,,�_- _i� / ///��//I- _ _ 1 \ \ \ \\ \ \ '\ / f / % - / / / , \ \\\\ / I I / r / / / I I I 1 1 \ / / -'/ / ://i \/ \ I \\1 1 / / / \ _ \\ \` % \ \\ \ // \ \- -// // / // // //I_ \�\\ \ \ \ \ \//I-�\ \\ \\I \//// // �// // I \\\\\ \\\\ \\ \ \\ \ \ \ \I /// \\\\\\\\ \\\\ \\\\ // \\_ 1l \\\ \` \ \ `\ \ \ \\ \\\\\ \\ \\\` \\\\ /'// \\\ ��-- 1 I I I I1 I `/\ \\\\\ ` \ \ \ \ \\ 1 ' //\N \ \ \\ \\ \ \ \ \ ` \ \ \\ 1 _ \ // - /\ \ \\\\ / / II \\\I\/j���==�\J\\\�\\,\\\\\\\\\II//7/\\\\�\\\\\ \,\\\\\\ \ \\\\\\ \/ I\ \`// // _�/ / �J \ I I J I// ///JI\1 -\ \\ \ �\\\\\TCE �'_ _CD \ \\1 \;11 1\\SF SILT FENCE\\\\\ SFO SILT FENCEJHOOK SILT FENCE OUTLET♦\\`\ CSIP TSC COMPOSTSOCK COMPOST SOCK INLET PROTECTION / SEDIMENT FILTER BAGSFB TEMPORARY STREAM CROSSINGI TEMPORARY WETLAND CROSSING\ \ I / -_ \ ,\\\\ \ 11 I\ ' ' ' '\I / // I 1IIIlf// \ 1\//___\/ / �/ : \ \\1 r /—� \\ \\) / / / /Ao/ I\ \ \ \ / / //— _ _ , / / //�'/// // I -, _- _ _ ✓ / / J / ) 1 I(/\ \ \` \/ p`I \\ / C / _ \/// / - _ _ -� \\ \ ,� / / /� // / II 1 -�\\/ / /\ / _ / 7/ / // / / / ____- //f / / l \ \ \ \\ \ \\/I I // / / )\/ / / 1\ �\// �\\\ ,. /// ////// //�- \ ) I �` (Ir//SFB I \ / l \ \ / > l�llllll\\\ / / // l I\�� \TWC 1 `- \ \ _ // /_ __'\\ _I I ( I I \ -\ (II 1\ \ \\ _ / \\ \ \ \/I1 \ \\\\\.� _ _ - \\\N I \ 1 11 ` //' / / I I \ \ \\ \ \\\ \1(I,/ , /1\ / I \ \ -\\ \\ - / //// / / / �� \� / //' // \ \ \ I o I ) I I / / ) \ \ \ ( \ \�//�/ //�____ 11SB . 1� / / //\\ / / \ I % \\ / // / / /,_-_//,/, /,\OSF \\1\/ / \I - / / \ \ / ( -/ / / GRAPHIC SCALE IN FEET- \ \\ ) / / / \ I �\ // / /-- / I 1 1TB 200 ) /// 0100 200 400 ///_ / /// II(/ / /j/ / l J �-\ \\ 1 I \ \ TTP CX SLOPE BREAKER ORANGE SAFETY FENCE-OSF-\ TRENCH BREAKER®_ TEMPORARY TRENCH PLUGQ\/ CURLEX PLACEMENT/, PERMANENT SEEDINGPS//_ \\1II\\\\\\\/III1/////// __\\\\\-\\ - \ \ \ \ \ \I1/_\\\\///��\\// \\_`i I I I / / // / / C 1 I �- �_- / / / / / I / /// - / \ \ 1\-___� I/ I/�//�-_~_ _ _ _ \\\ \ I I ► \ / J I I I I / / / I / //Ill\l \ ��� \\ / -�__ -_�// L-- I -�/I \ II / / I \\ \\\`_ \ \ III►II / /' 1 -_ \ \1 inch = 200 ft. I\ \ \ \ I/ /o-\ I \-� _ / // - ---� I// \ \\ I \ I 1 I I /ZOO I 1 / /'\\\\ \\\ \ /� — -� / / /� / / / \ I 1 / I 1 \ \ �� ^ - - 1PS j N._\\ _�_ \\\\\� _ \ \ _ / �_/ �= / \ _ 1 I \ 1/ / / 1 - \ ^\ /� - / / -_- \CTWO 'I'1' �' \ \\` 1 IIII \ \ \ // /I //N ^ I \ \ \ \ \\ \" \ \ \\ \\\\ \ 1 //I 1 I l \ \ \ J II I \ \ \\\\ /( r co _ \ \� \ \ \\ \�� \�\ �_�/�� 1 / \\ I /PT \ / I l 'I 11' N 1 \ \ \ \ \\\\\\\\ \ /�///1 ///lll/)I \ `-/ / /IF4. SWC CONCRETE TRUCK WASHOUT PORTABLE TOILETPT TEMPORARY IMPACT\\ THROUGH WETLAND/\ PERMANENT IMPACT THROUGH STREAPA\ THROUGH IMPACT/--\\\\\\\ STREAM//- CLEAN WATER DIVERSION — TEMPORARYSTORMWATER \ j�\\\\\ / CWD - /�)III1 \\`\\`\\\�,I \ \ /'I \\ \ \ \\\\\`\\\\`////)\ \\\\\` °/O/ \ \\\ \`\\/ // \ \ �+�1 SFO r' /' �\�\\)I\\\\\ ���� �_�1 / / %'// 1 \ 1 \ I\ \ /,, /,/// //�/ l\�/�_- �\�i_\11(///'//'///// J/1I/ /I/�II/ I //N \ \ \\\\ `- / / J f // \\ \\ I\\\\\ \\\\/ l\ \ \ \- //1 1/I / / //_— _ - - \\\ / / ` \ / , /I /9 /1 II(/ // - - _ ` \ \`_� \\\\ I / // / / I ` / /t / / / \I\\I//////IIWETLAND\ NNN \ _ \ / ///1 // / //// / / / III\1- / / / \\ 1(I ( \ N \`- / 1EXISTING - \ \ \\ ` \ \ \ NOTES:\` / / /.mob // \�i \\ \\ \\\ \1 \ / / // / // / //\ 1 \\ \\ II1 �` ` _ \\ \ \\ \\\ 1I// / / / _ \ \ l // / / I 1 � 1 \ \ - _� \ \ \ \ \ 1 1 ) \ \ \ \ \ I \\�-\ 1. REFER TO ACCESS ROAD GRADING PLAN FOR IMPROVEMENTSl NEED ON ACCESS ROAD AR-009.\ -, / / / /'��//_-' \j-- / / - 1 - -\) \ \ \� \\\\ I\/ / / � //-\\ \ I 1 II 1`i-\ _ \ \ ` \\` \ IIII / /_ - / / / / \ // / / \\ 1 I I -_ _-_\i /_ - �\��\1\II ` \_ I'/11/ \\ \PERMANENrIMPAOTTHRouGH I / ll I I II III(r//II1_ IIIII/fIr() \1 \// / ICWD I1 \/II11\ \ `1 '/ ^// / \ I II \\ \\///\- \ \\\ III1 \\\ \� \/� \ \\ \ /-__�/ / /// / // \ \\� \ I I/ �__ \�\ \ 1 Ill) I `�`-� _/� �\" \ �- - \ \\ \ \_ \ \\ \J / o ( \ ? \ I l / / /�- _ �:\(\:\. • 1 I I 1 I \ \ \ \ \ i = / _ \ / \ I N \ \ \ / / /// / / / / / / O \ \ 1 \ \ \ / /, _ \ \ \ \ \ 1 I I III 1 1 \ \ \ \\ _ - _ - / / \ \` \ �� \ \ 7/ , \ O I 1 \ \ \ / /// - - _ - r ` J II/ 111 l�lllllll)/ \Io / / 1 - \�/ ///�///I \\\\\\\�____i�= ���\\\\\`___\ 1 1 \ N __ \ , \ \ I ( / , ,i III (� r I ( ( O ) 1 1 / ll(�/--_- _� ll, �j/// \ \\ _ _i%/'�\\\\_ _-\\\- _ _ \\\\\// // I 1 N\ \ \ \ \ \\ ®\\ I/ / / / \ 1 /_-- 1\ \\ \ / /��/�///� /,/ \\ — �i/--//�\\\\ \\ I l \ ---- \\ \ 1 \/ 1 \ \�' \\ \ // / / \ \ I - \\ ///////////// -- __ _, _ \ \ \ _ i �- \-----\\\1\\/ f/// I \ �-II / \ \\ \ I- \ \ -�/ // \ \ - -_ _ / �- _- - �_ \ ` \ \- \\\\ \ ` - -- - \\ \ \ \ \/I/I\ \O \ \ \ 1 I / I / / I I \ C t' - \ \ / /// / /// \ -_-'�_/=�\\^\ \ �' i— _ \\\\\\�_1/ 1 J\ \ 1 \ \ I 1 / / o I l l/ )\I l l 1 / �//J\\` \ \ \ �� / /�/,/////// -///� - / -- _ ,�\ \ 1 > d / / \\\ \\ `� //// //// - / / _ /i = _ \\\— / _ \ \\\\\� 7 > / / / , \ \ \ \ \ I o° �• //cC l \ l f '/l t� .� / J \I \ \ / �/ / - ° cv \ i 11\ I \\ \ \ \` /� ' 1 1 \ �.� 1 / �� \��'�///%/�/�/ I II I III r/ / I 1 �\ \\` \ I 1 I I I I 1 / / \ \\ \ I 11 I I / / / / // I 2 ) I I I / r // i l ll / / \ IlI\WETLAND /// // / ! / / \ \\\ \ \ \ I \\ 1\ I I\\\\\\\�\ /\\ \ / I I I \\ \\ \\ \ I /\\ \ \�__--\\\\\1\\\\\ / 1 1 J / -/ \\`\ I \` ////___\�//) \ \11/ \ \ 1 \ \ I \ \ \ \ \ I \ \ \ \ \\ \\ I \��� \ _-_ \\\ �-- -�\TRANSITION - ^\\NON \ \ _ \ \ \ \ \ \ \-- \\\ \N 1 \\\\\\\1 CONVEYANCE / IMPACT TYPES\ \ OF FORESTED TO -FORESTED OR PERMANENT\\\\\ CROSSING (PERMANENT) CROSSINGIINATPLACEINENT\ / _�� \� \\�=__ \\� / / �� J\\ \I/ 1 \\ _//// ° �\\ 1 ( \�\ \ �/ /ii��_ _ \\ / / / 1 I \(TEMPORARY)1 _ \ \ �- / / / / / / ///% \1 I \ \ \ \\ 1 ( ( / / \ \ \ \ \ \ \ \/ / / // / _ / _\ / \ \\/ / // /// __-- _ / \\\\\ \ / /��_.---�\\ \ /jam ��/////�/ //- /1 / \\\ \\/ \I\\\\\\\� \ \ //'''l r I(l '// -� /'/ /''� / 1\\\\\��,/ _ //�/ I \ _ \\\\ � \\ \\\\I -1---- // I �/ \ 1\\\�\ =�/ / / - __�/� ,�%� - _� /ice - // /l l , o /\1\1\ �\\\ \ \\ \\ , \ \ \ \ \q\\\ //// _/ 1( // _- ' - \-_,\�--;%/ �. --- -/ �_;-_= %/ -/ ; =,�=-- / / /, /� , � I - \\\\\\\\ \ \\ \\ ° \\\ \\ \ \\\\ \ 1\\(_,,,,,, ( III , r / ��- ,__ ,__- ;-,/ ,- __/ \ ' - -%'�! //�=%��//-� -_i/ // / , / — / / -_- // �/ / / / Z6rD// / °/,) ��\\\ \\\\ \\ \ /�\\ \\- \ \\ \ \ \ \ 1 I \\ /� / ( III 1 ( I / /--/- i//- -- -� //z\ / lll, - / / i / / - N ,,\� \ \ I 1/ l /11 \\\ \ / !I� I,\ \ r / / // / / - -��__ --- // / /_, _ /'' , ( / / \ \ \\ 1 1 ) I 1/ l /lrl I I I 1 / / I // / / \\,\ \\ /-/ / / 1 \`, �ll// // - �/ / / / / / -'� jJ / /i J/ 11 / ( ( r / // / / \ ( I / / / / /' / / / / / / / _- 1 \\\ \ \ \\ 1 -/-/ // it, l\ \ \ (/ / (( \ \ I / / / / / / / /// // _/ / /�\ \ \ 11 // _ / / �/� / I \ \ \ \\ - / ^ \ \ \ ( ( ` \ \\ 1 / / / ' / / ( I o / / - ' 1 , 3 J \� \\ \\( \ I \\°� �--- )// ‘°// //Ill\`�\,, -,,. �\ \\l l \ I\\STREAMS15 III 1 \\\\ `ti// /I ( l XN \\ \\ \ / - \ -� / \ \ x\ \\ \\\ \�\\\ \ 1 \ I I �/ / \EXISTING STREAM CROSSING TO REMAIN. /. -1/////- \ - - - /// /�- / _ - - - - �_ / / - 1 \\ ) , , (/� // // li3/// / \ /1 \ -/ ) \ \ \ \\ J N /I \\\ \`_, -- �I I 1 \\� -// /'/3 ),J,r \` 1 I f/ �l1 \\\ / \\\ \ SFO,/1\ _ I\` \ � \\`�_- _ %_/l / \,_/ (\\�-/ / /, -ti%/ //rl `\ \1 \\\ _ - - _- 1 , - / / / 11 \ 1 / / / .PROPOSED ACCESS ROAD - / / / / // J 1 I ( \ \ / %� / / / 1 �\ \\ \ - \\ \• - / ' y° ^ / // / / % _ \ ) \ \\ \\ \ \ r - / / / / / /'/ 1 1 1 I \_ _�� _ - \ \\ \ \ / / - ) I 1 / / / / /— / -,\� \\\ \\\N f // �- J ,, \ \.� / / /-„;„-- \ \ l )III / / /i (PERMANENT) / - i 1 \ \ ( / N-.) I I1111 1 / / / / // — / / \ I J/ / / I / / --_ /// / 1 \ I Icv\\\ \ _ o//J/// I \ / I I / -_� / I I I 1 \® / WETLAND W6B TEMPORARY MAT PLACEMENT „//77v �- - / ' -� ` �// - -/j - //i /i / / /- /i/-- /77/� \ _- \\\-�� / / �// / ,---.._-/ / // --\ \\ ) I / / / \ `- \\ I l l _ / / / /, //, / / _ // I 1\\, \ /- �- 1 I \ \ \ \\ 1 / /p, �/ SFO / �' \ -� `\ I , 11 I \ \ / / I�\(lr -\ \\\ I\I `_ -\ \II/ //�---- /- �_ �`\�////' 1\1 \ \ I / , \ \ \ / / \\II/ -- \� \ //,.^,// \ ��\ / / - �\ \ " \ -__- / / 1 \\ / I - — \ / ///SFO I // 1 / it \\\ I \_ C 1 I h lj 4� m /i/ -� -- _ _ -__ / \\\NNN � \\ /•\r..,.!\- �. //-_ _ ___- Co;,� 1 I ( °° ,. \ / 1 I \ / 1\II/ \� -\\ ✓ �/ 'l �_ /i 1 \ l \ \ ( _- / / \ I I \ % \ I I l \ / /� 1 \ \\\\ \\N \ 0 1 , / , 1 /- -- \ \ \ / , , I 1 \ \\III (� \\\\N N - \ \\ \ / 1/ / / / / / / / .-,„ \ \ \ \ \ SFO _ /--_ \� / / / �/ / - / / ct,, // _�� \� _ _ J / II I _ / y / / I \ , ,. �\ \ l / / I I 1 1 \ / .- l/// / // / i / /�/, ,,// , ////- \\\� �— \ / /// I \\ I 1 II /lI I \ \ \ o - I ►1I _�\\\\ \`/ i l II\ / /—�\ \\ / / l\\ — // _\\\J \ \ I / / / I 1 1 \ \ \\ / / �/ / \� L� �/ I \ `\ I 1 \ \ \ `ro o/ / \ N / / - �// I IIIII//��\\\\\\ \_� \ / 1 / I l) IIIII I(\�\\\\J/// \\\��/ �/ 2"/ \ \ / I /// / / 1 \/, �__/ /\\\ �\\ \\ \-, / I / __/ \\\\ s_ / / II \ -� / / / 1I111\\\\ / \ \1 \ \\ Ill \ \\ \ \ moo\ / /// I �\ \�l \\\��\- \ /�_/ / / / I I '.yg�--\.\ / \\\ \\\ � / /V \ '� p \ �\� _�/��\ \\\` //�///�// ////// / \`_ SFO\ --/ _- \\ \ // / 1 / / / _ i/ 1 / \\ of _--_/ ����—/� ) \\ '/ // v° / / 11 / l I �v __/ / / — \\\\\ \\\\_ \— , I I 1/ \\\ \\ � \\ \\\ \\ \137\ \ •4 \ `---- I I I `--/ ' - \\ \\� \\\� \ 1 ) /' ryo° 1\\\\\\I \\ - __-/// \\\\ / / ) \\ _� — \\ / i / j ' /,�� / // o I \ \ 1 \\` /�\\ \\ \�� / / / //// / / / �/, l I l \ \�� // \ I // / / / ' ( /�%.�\ III \ \\ \\\ / \ \\ \ \ \ \ \\\\ \� 1 1 111\ °� SFO/ \ _= I I 111\\\1\\\1\\I f \ \ \`-__ , /7= \\\\ \! -_,'N \� __-� - -/ \ \\ C I- __ �_ / / I \\�\\�\�\r �\\ \\\\\\\ �`�\ \�--- / ..,,/ / CONTRACTOR TO PLACE // ` ///0-// .>l / ,,R=/ _-_-/ / \ / 1 1 l / r �- -`- / - _ r ///,'`l�•///���/ I ( I \ �' -� / _/ I�\\\\ l I l / I 1 / 7-\ _ I `---'/ // \ \\ \_ / / III N /' \\ I I I \\\\\\\ � \\\ I \ \\ \ / / )III 1 \ \ •7i:1)\ MATS ACROSS EXISTING // r \ \\\\`/ / °p l / �i / �90 / / / 1 / \ / / \\\ -/11 1\1I / %/1\) II // / I \ I \���-_ / JJ ,— //7 \ \\ —__ / / 1/ \ I \ \ \ \ \ 1 CULVERTTOPREVENTDAMAGE \— / __ \�__\\\��_/� _/ \ I , /— _,,1 /I/ / /__ / / =--\_ / //I/ / I 1 \ 1 //� //\\\\I \ I///--\\\�\\�`_-_-�/Il/ 11/ �' /7 I 1 /-�\\\�- -- /// - �-_J \\ ��,�/,\l' \ 1I1\ /// o_\\� / __� // // 1\ - / I \ I \��_///�i/f-////ll/r \\a�__ 1\\\ \ - ( ° / \ \ \ \\\\ I - // -/ / \ \o, \ -- \\ \\- \`\\\ /' \\\\ \\ ��\ _ __ I 1 / \ � �/ 1 1 / , / �\ -_ I I \ ►I / - \ \ \� _; - ;SFO 1 / /— /__� -� J� \ I / / / / I 1 �/ \ \1 / I \\\\\ \\ \\ I I 1 1 III / — \\\ \ \ \\ 1 NI _ J\\ 1 \ I I \ \ \\ \ \\\ \ \\ \\\ / I I I \ \ r / / l \ \ I I�- III \� \\11 \ \ \ / _ -- - I I \ \ \\\�\\\ //�/ / / I I I \\\ / / ( \ - / I 1 � 1 / \\ -��—,/ // / / ---� — // ///,) I / I I I 1 \ \ 1 I I ^\\\` \� _ZA / / �, �/ \ 1 /i =/ 111 1 P\\``\\ \\\ \\ I l Iqiii 11 \\ JI/ �_ llll \ l / I /J/ I \\ / _ I \\\ \,_�\\\11 /� IIII \ / \\ \\ \ \ \\ \__ I 1 \ \\ �II 1 I \ \\\ \ \\� \� 1/ / 23 __ ,/ / I J / / ) /\\ \ \ �\ \\ \1 1 \\\ \\ \ r / / ' / \ \ \ \ \ \ 1 I \ \ 1 I \ 1\ I \ \ \ II I / \ \ -- I �— o I SFO /�___ ��� _ // / _--_ —_ —_ / / /// I\\\�\\ \1\\ \ \\ — �/ --- ��/ \\,_\\ 1 �' — � //�//���/l//l/, \ - / /j 11 \ \ l / \ °° _/ / / > \ 1 \\\\ \ I I I \ JO '' - /'// \ 1 \ _ \\� ;;\\\\\ \\II l f / /� _ �_ �// / / I \ \\ l\ I / / / / w v3 — /1/ I l //// / / / I I 1 1 \ I I I \ I 1 111 \ — i \ I / - / / 2 1 o I / /�-_----i/�_-� //� t / / / II 11 1 I \--- / 1 \ \ i l I I \ // -\/ I I 1 \ \ \ 1 /� / 1 \ I/, I / / / �\ TCE / I / / / / - - - - / \ \ _ __-- / I / , • \\\\ - \ \ \\\ \� \ �? \ ° --------7/ / /-1 _ /// / II \\ /� \ �/ 1 I it, / \` \ \ \\ \\ 1\ \\ \ \ \\ \ N. — s I I I I ( // l _ _ // \\ 1 I I \\\ \ \ ( \ J I I 1 \ \ \ / / \\\\\\\\�___--/ / / _; \ I 1 \ \ \\� \ \ 1 I I I \ \\ \ /// \' /�\ �\ -- — /l 1 IIIII \ \ ? \ \ N. \ \ \\ / / \ \\\\� _-__-/ / / / Oil J \ 1 \ \ I(� /�\ / // ll \ 111 _-= __\ /// I/ / /�\ \ \ \ , / _- - \ / / \ / / I I / / ,I / \1 �\,% _ 1 // // / 1 / //�'\ I 1%! - / // 1 1 \ \\ \ \ \ \ \ \ \ •O •'�-- / _ \ - I (/ I \\ \ �/ _� \ _ - / / / /// / / ( I I 1 / / ri' /\ \ , \ \ _ O / /'/ — — \ / ( \\\ / /-\`-\ \ / / // // / \\ I / ) II 1 \ \ \/ - v// /// / / /' / I I I /' �\ �' _�__/ '/ ) \\ \\ \ \ \ \\ �' / / /' //� III \\ \\; //_-__\\\\ / / //'// //// / I I 1 I // �- �-1 \\ 11 I f /// I 1 \ \ -/ / / -� / / / - 1 \ / �/ / I / / // \\ —\ _ / \ \ \ I ��-__ I I ) \ \\ \ \III -,_==J \ _-- \\ ___ _-_, / I \\\ \\\\ - /// -_- - /I / \\� ---- 1 \\ /�-�\\\_ / 1 \ / �- \\\- /� �o ll / / �, /\\ MI \\ - / / \ �� / N II / / -�\ _-_ \ I I I lI I I I 1 1 1 I II I I I 1 I ) \ \ / \ \ \ \ Ill i —\ f �. \ \111 (/ \ II \ \ \ \\\ \\1, \ \\ II I I /\ I I(/ 1 1) --- 1 1\\\1\II \ I I \1 / -�- / \ \\ �\ // l // _ I / // I Ill1\I / / �// / ��� �J I \\ 1 \\`I / / -/ /l I /i—, 1 \\/ I // �' / -- -� / J o / /// / l I=//// 1 \� p - //j ///l I �_-_ ,/� I /// /// 1 1 I �\ 1( 1 II I Il // \ _ /-/ \ \\ \_ - ,•o / / \\ \\--� \\ \ \__- \ / / / / \\ \ \\\ ° \ ° / \vr / \ �P \ \ / ,-\ \\ \�/-r \1 \ / // \ / /� \ \\ I \ / // \\/ I I / / \ I "" \ \ \s20p// //// \ \ \ / /7 I 11 \ \ / \\ \ J / / / I _ \ I I \\\ \\/ /- \ \ / / / / / I / / / /-� \\ �\ \ I / / / / \ / / / / N / I1 \ \\ / \ \\ \_ / / //� / 1 1 — \\ \ \\\ \\ / / / / l�� /� ( / / // / / / \ \ \ �\ \ / // / / l / / / / I I/ / \\ \ / / I� of 1 I \ \ \ / / / / // / / ½//7Nx \\ \ 1 , / / / / �/ / a�l1\o\\I/\\\ \\ k /1 �I \ /, \ \ \ \ \ / ( / ( \ _---- / / / / / ,-J \ 1 \\_-J \ / / / // /// / / / / // / / \ �j / / \ / / ,/ -\ _ \ I 1 \_/ / , / / / / / \\\ \\ ) \ \ \ l - �\ \\\._ /// / / / / / / / // / \\ \ 1 I \ \\ \ f / \ \�- // 7'// // / / / /' / j // i \_ - / 1 \ \ -�\\\ \ / / / `--\\—) \/1 / / //// 1 \ ) l I / \_ \\� ---// \\\\ - / 1 / ( I �I / / _ -; _ / / / I ____- ( / \ ) \N\\\ i-- -\ \- - - - \\\\--- II // / 1 r / / // 1 I // \ \ \ \ /// / \\ I / / \ \\/, ///- \\ / I /� �\ N , / / I �� \ \, //// 1 / \ / _ I I \ \ / - /. \_\\ 7 --. \ � l , / ,/ / ll \\\\ -/ J/ - __ l / 7/l 1/ // I \1 \ \\ < <__ \\ ( 1 \�\ O/ � / I I \ �° ,_Q-• \\ \11 Iol1 //-- = a \'_' y /oI I 1 \0\\`3` \ �' 1 ''` \�\!01 '� / �-\\�S /H to bo�'+ \\;+ -� \ \\Nlo o�/F`'1�11\\ - - - ° N o+q/Ml N\ M o \ /I,�! . \\\\o / /— — \' .� -� / I+ \ N/ / \ 1 I \ I I \ _ \\\ /--�css\\Mv S. NI M)��///'��/ )\C IN\IIII///I`�_\�\\l\ f I 1 / l l l / //' / /'N\\\�.__-- o _ L / �/ /l�//,�°°� _- / \\ - \ \\ � _ \\\\\a-/O/l /o \ \ \\\\ -- co, Mw\\,_ / 1 `� /- // \\ \ �� --- \ _- /) 1\\ f / II1 \/ 1 \ \ \-/ _ \ \ \ 1111 \ - , -_ =,, , \ 1, —/ \ // -- / / /l / l / 1111__ Ito/ /\//---_/ ////j//, i ((tl;-_�— f-� — - _ _� ,' /j i 1�w\ :�I,. -/lll/1 / l 1 \/1,�,,_J 1�1\\11''II► i/, /-,, 7/ l -_ I / \ \ )1; I / ///2 1 // l / / -/ /Jl III /// `-� / 1/ / I \__ -_� N I 1 1 1 I / // :--9»111/// _/ i / -/ ,- \ \ \/ f / // _--__ \` \ �� I I 1 1 / l /I (( / // -� -\ \ \ \ I I \\ -� �- �/ / Irl/(/� r / /,-_1/).--j/////://---/7 s°�/I ��'�j/— / ` / I I I/ / , % / 1 I ��� \\ \ 1 f ,y, ( \ _ \ \ \ ,- / `) \ — / / // I I I f /� i \\ \ \/ I l // ,%/� 1\\�\\11I1/I,// >��i_� \111\\/-7 7���1\\ \\\\N ////II/////,°°\ - /�= �- / /// /// /l, �/ ' I ( ` ����� __ % \ \\�\\ \\- / / - \1I \\ \/ / / / / II / /- \ "rt%- i / \ J 1 / \-'-/ \ \`-/ / ' \ / -� J ' -- _ / r�lll / -1-II \\\\\�17� / / \.�- \'`mil /o /` //___/��I _ \\\ / �_/ //�/// `�\ \ 1\�% h160ii 7 \\o \_ %// -�\- \���`� �°° v(^6� \_/// / \\ \/ -- \ / / I III. IO• - �y''i ---- ' / / �/ / \`\\\ --- /-./// / \\ %///// II('( �\_/ \ CX\ �i // / ////�� /^�\ \\\ \ � -� of o <• / /--% o/ / �---- //i// / — �//%/� \ \\ I \ / \ // I �/ SAS-�'a� \\ II / / I \ - \\\\ // - 1 / \ I I o / / // //// / / 6i,1�-/ �/ \ \�r\\\ \ o / //1 1 I \\ I I ���\��\I \\ \� // moo/ / \o eo ,(, l�- I 1' �- °°,dc/ f JSad 1 \ �) I� \\ \�\ s�\ //I / I I / //-\ \ - o� / / /\ \\\\\\\\\1\ i / / II/f / \\� //,/ —\\__o /�• /// <y�o ♦ ,i oo �t.o x I / / /� \ \ /\ �"/ /1 _- Ill / / I I -_- /' Jl/ (( /\ \ \ / /////\---SFO \\\�\ \\J// __ / /�// \\ \\I I ► II1 / �o\--- I \\�-I _ 190= �/ /J�/1111 \ �' J II '� _ 1 /�// i/ /�/ //'\\ \ _// -� / //////-I1\\\I 1 I\ \ \\ /ryv� /// - 1I I I I- f \ \-\� / co°/� (`-- _-180_ - / �/ /l'\ I1\ 1 l I \ \\_��_/ I ' \ l \ 1 \ \// _ J \///j/o'/ll�/'``\ \ II\ (/ /- --_�- --J` �'\\\Il / ��•�_y _ = 1 - - �_ I \ - l 1 1 1 o\�\\\1 / / /�/ / \- l\ I1 //j �'ry�///�°/ o \\\\\\ �/ \ 1 1 I I , _��!--\\ J \_ / \_ _ _o_ // // / \\ \\ I \ 1\ \1 I( �_ \90�\\�\\I / - __ ` �/l\' =_ -_ -_ __=-so,\\_� -_ / /' ` -'' \ I \--/ \ ///%/1 1 1 / --_- \ // •/r, 1 \ 1 I 1 -\- \1 -11 o =-o. ��\ I I - 1 \ / • ^\\\\ \ \ 1 I \ 1 II // 1 /---=--� �_- " \ \ \ - // / \/ �- 5 k/ , \ // /////// //*/\,\\\\\\\\�_,, 1 II--\ \\\�) l►�1 -- 1 - \ _ ► // \ ///� \ /� �/ __/ /, - //,,, 1► , ti / \, __ I )1 I , 1=L,---=-\\\\� \�_/ /III 1 / / / / // / \ \\\\ \ - / I 111\ (/ _ , __- / /// l 112 \\\\\� �____/�1 III11 111 lI / /,���-_- �; � ,, /� �,/,_ _ , I III. I , ► , ,.. - �_ _ II /�l� I �� \\ 1 '/-- _ /-_,\\ s l -- L�1so 1\�, 1 /// -_°' % �,��\ 1 - \fa - % / _\\ \- \\\� \ ,\ ,-�// - \_ \ J//ii/ // I \ \ \--- / \ --\ / / \\ \ \_-,N \F� �.� �li r\\\��f/.i //,/ \ `\ \\ \\ / \/- �� \ /// \ \\ \ \\\ 11 I 1 \ \ _ / 1 I; 111 �„ I _0••. o�ESs /o '4 = °Q� °•� -- - _ 1 �`�� A- %0�09/22°�, ' tiG I NEti°° '``` -„,!./4 °°...°°G;\'\, ,,,, KEITH G,.� ��,�II�I�II���� PROFESSIONAL ENG/ARCH STAMP PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY * * REF. DWG(S) PNG-G-142-0001000 PIEDMONTS NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) DRAWING IS CUf'REM- ONLY THROUGH THE LATEST REVISED DATE TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS SHEET(S)77 OF 119 DWG SCALE AS SHOWN 0 05/09/2022 ISSUE FOR CONSTRUCTION JB TFG WKG AREA CODE 1853 DATE NITIALS REGIONAL LINE 142 PIPELINE DWG DATE0911712021 SUPERSEDED ACCOUNT NUMBER 10700 ENGINEER PNG DRAWING -C-142-0001076 NUMBER REVISION 0 PROJECT NUMBER 0232195 DATE NITIALS MGR TECH DUPLE I PICCJr ono Natural �I s E&SC PLAN-22 DRAWING BY JB REC&STD ENERGY, CLAYTON NORTH CAROLI NA STATION ID DATE INITIALS PRINCIPAL DISCIPLINE / RESOURCE CENTER / LINE NUMBER CHECKER INITIALS TFG 05/09/2022 WKG ENGINEER COPYRIGHT 2018 Resource Center GOLDSBORO, NC LEGEND Z a_ -�, \ -% - _ _ \� \^.J \\\\�\\\\`/� 1 \\\ \\I,\, - _ I rl \ �� 'f \ \ I I I ( \ I (\\`/ I / I/ /�\\ \\\\\\\ \\\ \\\�////// / 1 / ' (- / __/ Ill\\\ \\\ N , / i_ /(\\ \ \ \\ 1 \ \ CODE1�\\_ // \ 1►►1 �__----- _ _ i - \ - - _ \\\/�� _� _/ _ - _ \\\� _ = \ \ \\ \ \ N \ \ \ \ \ \ / / / \ \ \ \ \\ \ \ I I -N _ / / \\\ / \ \\ -�_ � \ v \ \ \ � � \ / I / \ \ \ ...,"./ i, \ \ \ / - \ \ \ l / i /- \ \ \ /( / \\ — -- /'r \\\\ \ \ I 1 \ l l / \ \ \\ \ ` I �- 1 \ ) \ \\� 1,—\\\ \\\ 1 / \\� %�=_ __ \I I I'll, \ ,\\\ i r //, /� / / / / \ \ I / / / \ / I / I / / TCE TEMPORARY CONSTRUCTION ENTRANCE :����1 CD LOD CHECK DAM LIMITS OF DISTURBANCE - LOD - SF SILT FENCE - / 1 ) I 11 I 1 I 1 I 1 III 1 I / /// 1 _,\\\\,,, 1 1 ` \ \` \ \ _ // / \ \ J I .- \\ / / _ _= \\\_\ \ 1\ \\\ I / / / /' / /------/ / / \ \ \ / / ) 1 \ - - - - \ \\ / \ / / / / / / / \ \�- // �/ - - _ \\\ -�_ \\ \\ \\ \\ 1 I / , / / / / / / / / - 1 I I 1 I 1 r \ \ / / / \ \ / / / / \ \ \ \ ( / / / I I tf // / \� SFJ SFO SILT FENCE JHOOK SILT FENCE OUTLET/ O / 1 IIII _— 1 1 I \ _ / _ \ / / / \ 11// // � \-----_� I I /'\\ / /,----------__/ ---� / / /� -� = -=1 �,-//11\\\\ I ( / / / / / / / / \ I l I l l0 1 I o I / / -` \ // / \ \ \ / / ( I I I I I 1 / I - - - I -/ \I 11 II \ \ \ \ I I �/4/ , _ / / / ^ \ / / - _ % / / _� J \ 1 I / I O I N 1 C 1 I lull I 1 I 1 I 1 I ( I (/ \ / \ \ / / / / / � 1 \ \ 1 1 / / / ` II �- / // - ' / / //-- \ ) II 1 I // / // / I I Ii i 1 1 \ / _ / \ // / / / / \\ \ ' I 1 / / I\11 II i �Oi /� / CS CSIP SFB TSC TWC COMPOST SOCK /� COMPOST SOCK INLET PROTECTION / � SEDIMENT FILTER BAG SFB TEMPORARY STREAM CROSSING TEMPORARY WETLAND CROSSING \ _ - \ \ / 1 1 \ \ _ ' --� / / // / l/ /lIIV / / _ - 1 \ \ \ `\ \\ / / \ \\ _ \ \ / / / / / / / / // \ / I ( I \\ \ \ \ \\ \ \ i /I///_II / //////II \ \\ \ `-----'- \\�\I / / // / / �- // / /// / \\\\• /I III / / / / // / / \ III•I , / / / 1 / / / / 1 i ( ( I I l (\\\ 1 I ( 1 I 1 1 \ 1 I I \ \ tt \ I I \ \ I \ \ / / - I•I / I \ \ \ \ \ \ 1 _ - - _ \ _ \\ \ / \ \ I I I I I \\\� I I \ \ \ ------ \ \ / / / / / -�\ \ \\ 1 II \ \ / / \ \ \ ' ' / / ' / / ' \ \ I ' / / l I I \\ \\ \ \ IIII l 1 ( \ \� - _� \ I I / / / / / / / / // / / / / - -� \\\\ \ 1 I \ I �/// //// I I I I I , I \ ( ' \ \ \ 7� I� \ \ \ 1 TCE \ ��� \ I \ \ � 1 1 1 \ 1 \ \ \ I \ \ \ \ 1 \ \� \ SB OSF TB TTP PS SLOPE BREAKER �� ORANGE SAFETY FENCE -OSF- TRENCH BREAKER ® TEMPORARY TRENCH PLUG0/\�-CX CURLEXPLACEMENT/i/\\`\-/ PERMANENT SEEDINGPSX/\\\I — i \ \ 111 I / 1 \\ \ / IIII I1 \ �_ -----\ 1 1 > / // / / / ----\_/ // \\ \\\ 1 II / / 1 1 \ \ \ \ \ I l I I 1 \ \ = _ = _ _ _ / / // / / / �\ \ \ \ 1 I 1 I I / / / I \ \ \ I \ � _ — — — ) / / / / / / / / / / / / / / / / / / / // \ \\ \\ \\ I I I 1 \\ \\ / III I I I \ \ \ \ \ I I I 1 / I I I ` \ \ \ - _ - / / / / / / / / / / / / / / / / // / / -\ \ / / / / \ II \ \ \ °:;� I 1 \ \\ \ \\\ I I \ \ \ ;•°S'' / I I / - I \ \ \ \ 1 \ \ �I�AP�iI AL�` IN FEET) \ \ I I I \ \ \ \ \ \ \ \ ., .I I '\ I 1 I \ \ 200 0 0 200 / 400 \ \ \ / / \\ \/ / \ l 111 / / I \\ 1 \\\ \� �//// / / / /i/ // / / / / / //// / ///, // \\ \1\ II III � \ \ � 1 I \\� � \ Il i'/�/ /, 11 1III I/ II\\\\ / / // / \ \\ II III\� \\ .,IIf �\—,\ \\ _—/ // /)/ / II 11I I I1 \ \\\\\ I / /�/�/ice/ / / /// / /( I( ( \ \\\ //// ///// 1//////\\\'11\ \\\\1 _ _ /' /// l/\\\ ,1 / / /// -=�///1/ \\\\//// /// \__ j/ / / / /ll///// \ \ \ 1// / / _/ / / / / / l \ \ `\\ \ \ \//l /11 /\\1 ,\\\ \\\ _ _ - - // l////// / 1 \ \ r ///l \ \ / _-- / / /lll�/�I 1 \ \ \ 11/ �/111 I I( /,1 \ \ \ \ \ \ \ \\I I / / / / / ////�/ / 1 ' \\ \\\\ / ' - - / / / / / / ,\\ 1I ( ( \ \\\\ \r / / ////\ \\ l I I 1\\\�\ \\\_\\\\\\\\\\��\f'II \\\ \'IIf1Ci1=200f�. \\ _/ \ --- --\\ -- \ \\ \ 'I\\V\ \CTWO \ _ \ \ :\\\:.\\4\1\\:\ �--\\�� \ \` \ \ 1I1( \ -__- \ \ \\ \ O 1 1 11I\ \ I \ 1 \ .- PT CWD SWC CONCRETE TRUCK WASHOUT\\ PORTABLE TOILET TEMPORARY IMPACT� THROUGH WETLAND PERMANENT IMPACT THROUGH WETLAND EXISTING STREAPA THROUGH IMPACT PERMANENT IMPACT THROUGH STREAM CLEAN WATER DIVERSION —CWD TEMPORARY STORMWATER \ PT �/ - / _ ' \ \ \ \ `\ \ -�\ /-\ 1\\\\ \ I I -_- )1 \ \\ 1 I I-6. \TCE\--� \ ( \ \ ( 1 \ ( 1 1 / / // / "/ \ \ \\\`\ \I1 I I ��\ - _ _ \ -- // /11l ) \ �_ �_ '� / \\\\\ \1 1 1 \ 1 1 \ \ \\ \\` \ \ \ \� \ \ \ \ 1 \ \ / //// \\\ \\\\\\ ) I \\Io) \ 1 \ 1 I 1 \ , \ \ \ \ \\\ \\\ \\ \ \ \ \\ \ \\ \ \ \ \ \\ \ \ \ \\ \\\\ y I \�\\ 1 1 l JI / , - / �. _ _ \ \ _ ___\' \ \ \ - / - - - / / I I I I / / .__. \\\\ \ \ \� \\\\ \ \ \ \ �. -i - - \ \ \ \ \ \ \ \ \\ \ \ \\ 1 1 ( 1 / - / / / I \ // - \\\\\ --- -\\ \-- \ \ \ \ \ \ \ \ \ _ I _ _ -� \\\\\\ \ \ \\ \\ \1 I 1 1`\\ ///- \ \ \ \\\\ \ l / / l/ //ice= -- \ \\\ `=-- \�- \ \ \ \ _-� \ \ �\\ \\\ \\ \� \ \ \ \ / / ' - - / / \ / i - \ \\ \\\ \ \\\� __ \\\ _ \ ) \ \\ - \\ \ \ \ \ \ \ \\ \ \ \ \ \-- /- \ \ \\ \ 1 I I \ \_-- \�_ _ _- -� _, \ \\ - \ \ \ \ \ \ / - - / / - - - / j / \ 1 // , ///� _� \ \\\ \\ \ \\� �\ \ �\ \ _ _ _ ' \ \1 \ \ �- \ \ \ \\\\\\\ \\\\\\ \ \ \ \ \ \ / / - / �� \ \\ \ \ \\\ \ 1 / - \ - - / / \ \ \ \ \ - \ \ \ \ \ \ \ \ \ \ \ \ ( / - 111 l I�(/ f \ \\\ \ ) \ / - \ \ )\� \ \ \ \\ \ \ \ \ \ \ \ \ l 111 / \ \\ \ \ - \� \ \\ 1 I 1 /' / I 1 \ / // / / / \ f \ \ \ \ \ \ \ \ \ 1 \ 11 \ \ \ \ \ \\ \ / I / III ` \ \\ \ 1 1 \ /� 1 / / i ) ) \\�\\\ \I II \� \\ \ \ \ \ \ \ \ \ I i / \ - I I l I I I \ \ \ \\ \\ \ - - - _ / 1 I 1 1 I \ \ / / j // / \ I / - - / , / 1 1 \ I I I 11 \ \ \ \ \ \ \ \ \ \ J 1 \ / 1 / / / I \ \ \ \ \ \ - _ - \ / // ) \ \ / / / �_ / / _ / // 1 1 I I I I I \ \\ \ \ \ 1 / \\ 111 I( \ \\ \ \\ \\�- — \ / / 111 \\ \ \/ // )// / / / 1 I I i -/// / l I I I \\\\ I /1 II\\ \ \ \ -�/- / /// \ \ \\_ ////// / / III III I \ \\ \ \ \ I 1 /// / ., \ I I I I IIII \\ I \ \ \ \� \'=- -\\\\' IIIII i / / 1 \\=_Y %I / l 1\ \ 1 ) 1 1 1 I // ;/ ///// IIIII1I I�\\\\ \ \ 1 III 1I/\\ 1 1 \ ` \ _ _ - \ I 1 l \ \ III \ //// ///\ ) Hill r / \ I 1 I11� / / / / / 1 /l / I I I I I ( \ II \ \ \ \ \__.�\\ III -� =--: \\\� / / / /// / / / / �,1111 /IIII I \ / / I I / 1 I I I 1 \ �� \ \ _ _ - _ - - \ / / / / - - / / / / / / / // / / / / I 1 I \ I 11 I \ \ \ \ \ \ J 1 \ ` l \ % / / / / / / / / , / / / / / / / / / / / / I I I I \ \ 1\I 1 I I \\ \ \ \ / \ \\\ •• / / // / /// - / // / ( / / / / / / / / / / / / / I I I I 1 / %� \ \ \ \ \\ 1 I \ \ \ \ \ \ r // / // / / / / / / / ` / / // / /// r l / / / / / I I ( / I \IIII I \ \ \ \ \ \ \ \ \\ \ \ \\ _ J \ \ \ ( / / \ \ ` \ 1 I _ \ ( / / / / / / / / / / / // / I -� / 1 /\ \\ 1 \`- \ \ \\\\ \ \ \ \ �� \ \ \\/\ (\\ \\\\ \\�� ` \_ 1 / / / I / / / / / / I I / / I 1 \ \ \ \ \ _ _ \ \ \ _ \ \ \ _ \\\\ \ ( 1 1 / /, / // / l 1 \ \ \-\\ \\\ 1 l \ \\ --, \-�„ --, \,\\\ \ \1I( II /1 1 \ \ \ \ \ \\\ \ _ \ I ( CI" \\ \ \ - \\\ \ \ 1 \ \ \ \ I I \ \ % \ \ N J l I \\ \ \ \ / / 1 \ \ \\ \ \\ / / I \ \ \ \ \ l / 1 \ \ \ \ \ \ \ J / l l \ \\ \\ \ \ \�I \-/ / \ \ \ \ \ \ \ / / \ \ \ _ / \\ \ �_ / // \ \ \ \ / \ \ \\ \\ \\\ �_���/ � / / / \ \ \ \\ \ — 1 \ / \ \ \ \ \ / / \ \ \ - - _ / N,------ / / I \ \ \ ---- N _ \\ \ \ - - - - / // / \ \ _ /\� \ / \ \ \ \ \ \ - �/ / \ \ / I 1 I II I I I I I I I I I I _ l I / / I / / / / I / / / / ( / I I I 1 I 1 / I / / ---- / Ii i I I I I I I I f .i3o� 1 1 I I I I I I1\�s�I \ \ I \ \ V I \ \ I 1 1 /1 I \ \- '�1 \ \ I \ 1 ° \ 1 \ I I \ 1 \ 1 \ \ \ 'I I I I ° ° I 1 \ \ / 1 I l ,J I \ C°l I 1 ,� 1 / \ \ ° / / I , ��/ /I\ I / / 1 \ I 1 O ` , ! I \ \ I \ J < \ \ -( \\\\ \1\ \`-/ \ \ \ , / \ \ \ \ \ \\ / - / I o / \ \ /32 -_ \ \ - - - ' / \ \ `- / - \ \ \ / \ \ \ / \ - - \ j� \ \\ \ \ •S __/ \ \ �- o ___ � \ \\ A� �_-.WETLAND \ ` - \ --_------- \ / - \ \ \ _ _ - / - / - - _ - \ / - / \ \ / / / - \ CONVEYANCE / IMPACT TYPES \ TRANSITION OF FORESTED TO NON -FORESTED OR PERMANENT CROSSING (PERMANENT) CROSSING/MAT PLACEMENT (TEMPORARY) \ ---- 7 / III 11(1 .----------7.----- N 1 / 1 ...- ....- -, -"----------- \\\\ \\ 7 ( 7- --_-_ - - -----:_-_-- - -L-_- = =-. --__.-- -__-__-__ -..:--- _-_, _,-_ _- - - -_-:-.„-_-__— \ \� /� // l I II / / / 1 / �// -�/i / / / I /� /�� NOTES: -/ / ��/i/ =---/j _�_��__ =_- )j) \ \\ \ 1 \ \ / �// / 1 \ \ \ \ / ° / // \ i II / o►- \ \ \ ' \ I�I 4N \ \ \_/ -///1/ / / / / / // // / /// /// - I / /_// // // - / / // / / / ///// \/ // /�'i��// '' I , //� � l / / / \ / \ /// / // % 12. / / -- . / ' /'/ / - I /- - / 1. REFER TO ACCESS ROAD GRADING PLAN FOR IMPROVEMENTS NEEDED ON LAST SECTION OF ACCESS ROAD AR-011. CONTRACTOR TO PROVIDE BREAKS IN SILT FENCE WHERE DRIVEWAY CONNECTS ALONG ACCESS ROAD ARE LOCATED. i /// -j/ --_ __— %���� )) \ /'- \ / / / / // - - //,/ / / ) / 1 1 / / - 7-----//i///� / / I _ \ / / / , / / / / / / // _ /, �_ _ _� ,,, / / / I / / / / / // / / / / / // —// // -- —"-'/ / / / / 1 -- \ ,/ / / / / / - - _ / / / / ( / \ o - / // /���/, / / o\ I / / / / 7 / / / / / / /1 0O/ \\ \\ ;5 / / r \ \ \ / I I \ \ \ \ �i. / I / / / - - \ \ \ / I I \ \ \ \ \ \ / / / \ \ / I I I 1 \ \ \ \\_ / / - - \ \ / / / \ \ / 1 \ \ N _' /i ///ice �� I / \\ \\ — / \ \ / ( - - / / -- - \ / ////// _ - - l / / - / / \ \ \ \� � \,\ \� \ I I ��- // / /- �// 1 / / / \ 1 I ( \ 1 EXISTING PRIVATE DRIVE/ROAD _ / _ \\ /• / / — \ / /\�- / / / , / \ :\\ \\\ 3I I I 3// \ / \\ -�( / / — - \ \\\-��\ IIl III ,,l / / // / - - _ / j / / / / I I \ \CONTRACTOR 1 (//((// (/ / /j // / , / / \\\ \\,./-. \ \\\ ) \ ll \ \ \ \ \ \ - \NEEDED / ( /-� \/ / II1\011 II 1 / -i // // // /// \ \ -- -' N\\\�\\\1\\ \\\\\ \\ \\ \ \_---- -� \ TO IMPROVE AS TO SUPPORT CONSTRUCTION _ TRAFFIC. — 320 \\\/ / - \ \ \ \_ / / -- --- \\\\� - -- \ / ,3`LrO� / // // / /\ ////\ \\\ \ / /'/ \ \ \ \ / / / _/ 1 ( - \ ` /-�\ ///l / \ / \ \�\\ \ \� \\\\\ /1 1 --////////l /111I // -----�\� \\\ \ ��\\� \ \\ \ --_ o / / / 1 - _ ` -\ ' / ///----'i //// // / / l I ( I / \ \\ I l \\__ -� \\ \��_— \���� \\=\_ \\\�\�-_� \ \\\\\� \\�� - _ - \ \ Q / / \ / /- \ _ -300 = \ \ \ \ O i °^ / / /\\ \ \ / / / \ 1 \ P PROPOSED ACCESS ROAD / r - \, / / 1 / - \ __ _ / _ _ / // / \ \ ` _ _ = _ / //'�-/I ///// / /j ( ( ( \ \_ \ \ \\ \ �� \\\ \_ \\\ --- \ \ \ / \ 1 / ) 1 / / / / / \\ \ 1 I AR-012 / \ I ///// \ \ \\\ \ /// // I I ((PERMANENT) l I) \ / / / /�\\ \\ \ \ \ \� �- - - -\\ \\ _\\� \\\ —\\ 1 / !---- -\ i c/ //////i _-_ - --� \ \\ \\\ \\ \ \ \ \\ \ - - -- l / / _ -- i -- \\\\/-� J -� / =�-�\ `r - \ 1 l// �/ //' / // -- -� 1 __ l / I OAD TO \\ 1 / (/ ,�z �// /// /%_ ��-�\�� \ \\ \\ \\\ I l / / \ __ / / // %// / // - - �\\ �- \ \ _ \ 1 1 I / \ 1 \ \ \ PROPOSED ACCESS ROAD \\��/ \_ / — //i- ��_i'//�j// / / / I / / / r l / //-\�/'' - / // /^ / / -_ \\ J / - \ _ / / / / / -' \ / / oo ��// �BESTABILIZEDWITH ( IIIII 1 ( I I / // - /' 1 \ I 1 , ,) 1 ( // //j //i j // / — /��\���� \ \� \AR-011 \ \ - / /------_-- ^\\STONE. \ \ /\ I �' TEMPORARY ACCESS FOR CONSTRUCTION 1 / / % /^ \ \ \ \\ \ / ) \ \\\\ \\ \\ (1(I / �/ j / (PERMANENT) \\ - / START NEW ROAD 1 / / / p I / ' \ 1 1 I / / 1 \ (\1 1 \\ MATS ACROSS FIELD)///1\ ( / % - _ / I \ \\\ \\`\I�(// / \\ / \\\� � \/ — -__-/ /SECTION1) (-3•% //� /' / --/ / / / / tiI 1 // �\ \ \\I/'� (INSTALL //// _ J \� \\\(I ( (I 1/ '/ \ \\\\✓ //����\\ '�\ \\ \\ \\`---\\ \ I /-_\\ (SEE NOTED/// _ / l I I / 1 / ----/` .% 10 I \ 7 \ /_� / ' \ 1 \\\\ I 1 \ \\\ 1 �\ \ \\\\ \ / //�/'/�-= -) o A� \\�--��o// .• - _/- _ \\ \ \ 1 \ \ \ / H \\� \ \ \ 270- I / o \ ,-,\ \\ I I�\\\\ \ \\ \ \ \\ \ ��\\\\`�-/ I 1 /�/ � /cvl \ �,,\ --� _ 1 1 IN// / --\ _ / / / / C l o s` / 1°I°\ \ /// / // \ \ \ 1 / Q to .� \ -�/ / / v o // \\\ \- \ �, \ N. / / / /\ \\ \ \ ` \ l \\ `r l I \ ) I I I 1 I , / I I 1 / \ \-//' 11 l/1 \\_/- /' / / //- \ \ 1 EXISTING FARM PATH CONTRACTOR / / / / / _ - \ \ / / I 1 / ` � 1 1 A / / / I TO IMPROVE AS NEEDED TO o O / / / // / / /, / 1 - \� \ \\ \ - - 1 / \ 1 I / o / ' — \ I / / / r o O 1 I / /\ \ \ 1 I I _ -� / , / _ - \ — \ \ \\\ \ — / / // ( / / - \\ \\��� _ \\ \ , \\\\\ \ \ - \\ \\ / - — - 1 I l / / \ � I I I I (� ( ono° // 1 I / / - -� �o \ O I , / / - \ \ \ \ / I SUPPORT CONSTRUCTION TRAFFIC. 1.— / // \\ \ / / -' - / / / / / /, z ,e(// - \ �_- \ \\ l/ Seto /- / / �r \29 \NN � I I 1 I / \ / t / \� \___� 1 —_—_� \\ �\ �� \\ \ -�/ / �_-/ �o o O I "V/ u� 0_ \� /\\ \ O�\\I \ / / I \ _ \—_ I� \� \ \ \1�\I I / /-_ �/// / / /�T �III M I 1 //2a\\/� \— \`I /' \ \ _-\,// \ \\--\ J 1I // //// / /it 1II// \ \ / \ __- \ \ \--\ I �� I _ / / �� ,/�� I 1 1 1 I I I/ i// \\� \ __ \ \\\ ( \ \ �- / 1 I 1 I /lI I \ / %/// 1 / °' �/ /o // \_ / I•1 III I / /� \\\ \\ \\\ \\ \ }\ / �/ \ I I \ / III �(� r--_ ' /7/ — \ I I o / o/ /11/ \ - '� \� \�I \� / / �. / Il/��_-_- -'\\ I �\ ///O/ // I I r\\ �//' \\� \ \\ \ I \ _ \`_� / �' / I I / / l I ''"__=/� -\ I / 1 1-.\\ 1 I / 111/j / I (_r =--__- - ,1 � l�--1 \ � I� \\� \ \ � - \ \� y \ \\ \\' \/ \ -� �`� \ `--- \\ \ \ \ \\ \ \ \ \ \ \-__.- / ` \ \ \\ \ _\ - J/ I /-��\\) ) � I —\\\ // / l ° / `° °°'�t� / //��//N/// - I I III I I I ® �°o/ o°^ \ \ 1 /// I1 I Q / °,� _ o / / 111 I / O _ \ \ I // ///�/� - \vl I II I / �- oo °�/ _ \\c� �.�idl _� I 1 / , o �r� \ I I III '�'�>/ \ / I ,I 1 � \kl \I I III III \-� \ \\ �, / / \ I I r� \�%\�,,__"\\ � ` , - _ -� -\ 1\ \ \ \ �- \ ) __ -\ \ / I (�\�-�_� � - / I,�i/I> 1 /\ \_ �/ 1 r-\_/ _ I 1 / / \ \ 1 I _-- I _�/� // i / / I/ / �j \ \\ / /,/ II 1�//////„------,-___-_-// ///, / ,� \ / / I I//— \��— / II // /// / l \^\ \1 I \ \1 111 III �� _ �,, � /. / / / I\I � // 1 �-�, _1 � ((� - / - // /O�//'/oo//II III/i- // � �_� I I I `� �� -� I 1 / % // /• o-/// / / �/ // / / 11 11 \�-'/ / / r —� \�� /// / / /�O/O/ '— —� \ \\ -- \�_ _ SEE —� I ^\ \\-_---1-/� / 1 /l 1 �,;//i / / \ /// / ——� / / / / / moo oo� � \ I I ( / / -� \ - /� \ / // �/ ,/ _, 1//I ►1►I ►► 1`;/ - // llll//1/ �- ;/ ( „ ►1 /� ► / 1 I \ _ ,, 11111, \\� / / �f 1 I I / I I \ / / /, / 11 /// / /� I \ I I \ I 1 \ N. \ / / / / // l I I 1/ l J 1 l/II / I 1 /l / _ I \ / / / // // ti/ o , / / / �! / Il ► \ �/ / / \\� / , //; N /o'//= I \ / / /, /i/� ! / l / o // // /� �,/ //' �\\\\ l j // --_--' �C / / /° p�i'/ �\ \\\\� / / / -\_� / /%%ro^ / 26 / /' NN \ / __-7 / I / / _ //� ' ' / / �-\\- / ,/ / / / / / . I / /// 1 / >/ / // �- /°° r l // /I �/ / / / / / /////// ///�/ / / 1 // //i II / // // / / / // / / / \ III// / ,/ / / /� /-\ \ / ° ° / /�/ // \ 1 / r / I fI r / / // ,-, \ \ \ / / /'i / \ I // I I (/ / / / --� \ \ / / / I I\1 / l l 1 / R ,� / l / / / , l (/— \�` Y `--- / I 1 l l I 1 1 \ /�a \ O /� I / //'/'/l I I I 1 /l // / / r� �� ° \O \ 250� IIII//^ \\\\\\\\\—; I / / .ti y \\\\\\\\\\ I 11 11 ( / 111 III I -7 ice/ /ii/i //// /l/// / / / I I 1 % -G- \ - // / //////i z//�// I I 1 l %� //j/ -, I (Il \ / 1 111 /// - ;/ / / / /„// 11` I (/ / 1 I / 7,/,,,/i /-II\\\ lI I /��� l/ //iii/ I 11/ Il( //�j/ - I 1 ////i/ 1 I1 1 ►ICI\Ill ► / - \\ W 1 ,l ////ii ///// /)) )1 1 I1 _// I /j / / ///i� / \ 1 n I /////� / 11 1 l 1 / �/ ////-- \ I? ,} I / / 1 ///7 // \ / l// /ii // l l // 1 IIII 1/(l /, //� \ cr,� /i/ riirr I l/// I 1 1( \� =/i /� /_ \\\1 SN_/ //j/ /�1/ 11/�/ /i—/ /� \ ///////�/� r//li/� \ \\ \- — _ • . •_—/// / �- IIII I �_-__ _-- \\ \ //,„. /�// / // „�,/ /// - - _ - _ \ \ a a //�/ //i ) / l/ l/ r j‹ _\ \\\� �Ii'�/�ci)/ /i/�// \�i/Ill(( 11 \\� /, //, / JJI,� \ \) _-- / ;—� , �, /ii \ \ \ \ \ 11 \ \ \ 1 I 111 1 ) / l / 1 I I , / l/ 11 / l I l / I / / // l I / / / I / l l / ( \ / / \ \ / , l l / / / l / l / / l \ \_�/ / I / I \ \` ///l l I \ _ I ( I \ 290, \ \ \_\ \\ / 1 1 /- \ \\_// / 1 \ / \ / I \ / / / -�-- / 1 \ \ --- / l / _, / /_,\ \ \___/ __ l/ \ ,1, 1 -- / / / l \ N. / / o // / `-\-/ / / ��o / / --- lll,,\ \\\ / \ / / /�\ , / \ \ \ / / / / \ / �( /\�,/ /r /\ �\ \ / / \\\,// // \ J I II l 11 / I II / I I ( r �\\ /i / 11 / 1 1 \,_/ 1 I( ,7 v / �i / I I I / I I / \ / / 1 1 / I 1 \\� 11// / / / 1 / /, /i/1/ / —�� llllil ,11 ,-N \ \� / /7�= / 1 / /' / / / / 1 .. / //� 1/// / / //�j,/ I / // / I / / / / / / /� ��// / /// ') / / / \ / / / I I / I I ��\\ 0 111 ` \11 I�� \ eV,// `\ \\1 11 II/\\\ 111 III ��\\\\ I \\ o \�\ I \ \ 1 I N II I I \ I I co/ \\ I \ - \\ � \1 / l l I / / / / / / ( 11 '/i//28o \- / — — --, -, - (l O �/ � - ./ //i// / i'//N4'�Nc�//o \\ O� '' 7 7/7 \ .� w ////// / / ��V/// o / / \ \\\-/// ;�//�� ///�/// �''�%�/ /p / /\\ /s ,,/ ,/ -_ \ / / -, r ../i // /i//��///1 _ \ -- / ., //� _ ////M / �, ��. //� ^"0— �/ / - - / // // // // / 9 / ..• �_ / v. / o—� / �- - -S/ / / ----- �o� / //� / / / / ° // — =7 /� �= . _ —/ / 4;.,>, / / (b / o �\ • —/ / �,� ,/ / / Xo /- �,=_-� /���270 _ _ / \/1>j\// 11r,�1r 1� l o /�— —�-� ;\ 1 \\ \ ,, •i -e / / `, ` \ \ \ \ \ / �_ -_=2so -� // i l ''� � \ \ / ..�_ _-- — _ _ — k —• \ \\\ \ \ /'�� \-_Q_-c - \\ ///./ r1 \,\ \ / \__ -- 1 \ \\ \ I 1 \ - �/-/ 1-1-r— - / / � I ( `_/ // // _ Asp _ -Z / // \ \ \ /- -- \ \ //,'/p-- \ 23 \ `\/j // "//-\� �// \ //�///—� �I/ \ \_/i/ /// \ _ 7 I \ I / -� o� / f \\240� //° /\\ „ �I \ /\ \ \ _-/ 1\\ \ III \— �/ /, ----- 1 - - - / I / \ \ \ \\ \ \ \ = = �i _ \ I l / i / /�Jl�iii /i / /) � ) / 1 1 � ► � _—�--\ — / \\\\\\� _ _ )1 I (I ////ice// r/�/ , o — / - \ //• I lI( \\_— //,/�//�/���/I \\\\�/ /___\ \ / I //— \\\\\�% \ O / / �/i / // \ \ / I I \\\� \ \ \ \\\ \ /// l / 1111/ 11 (\ \ \ \ _ \ X/ \\\\\\\ //�/////\)I //l1I \? \ _/ `/ '� - -\\ \ III I \ ,\_/ , _ / 1111I/ -_ \ \ / /-- \\ II / \\ \,?s // ///// , //// \ \ O \ \_////\\ / / %` 230 /I \ - \ \ \\O\ // l �l/l \ \ \ \ \\ \ l 111 \ \ \ �� \ \\ \ �/ ////// /( 1(1\_._ \ \\-/////�\\� / \ -- \ ///// 1111�1\__ \ \ l \ l l \ \\ \ (III (/ \ \ - \ \ \\ \\ \ // \ o \ \ //ii \ \ /11 \\\ \ l I/ /i / /// / l /l/// � , , /�, ,/ /l //� \ \ / ///// /�\\\-- / // /� //� / I \ / ///'/ / / / \ \ \ �/ / / l •\\ \\\__/ /�/ // /, /l/ / / / // / / I \ \--/ / / / / I \ \\\ / / / // l 1/ \ \\ // / / / 111111 \ \ //i/ \ �� / / // I l \ \\\ \ o / ( N. l \ Il\I l' / / f /, 7 1 / I 1 29 / / I / \ `his' \ X- / / 1, \ _ /.'% 28 . —, // - / II / / I l / I . / � f 1 l l I('/�/�-_�\--///-�%�- - ) / .! / I I / 1 �r� '/`''/i"�bo�\\~ - \ - / l b-�// �\ - • // //7. / - / / I ( \�/// I /—\ -® // _ / ' / I 1 I �- // // /�`L�'/. / /77 / /i / // // //// // / // // .�J _ ,_- � o- /...,1::—if,\ \� �,_____� ,_ - -� / _ / '260- /— / ___ / ` / - - // - - 70/ \\\\ -i /� _ �� ,2 /I \\�•-%/�� __›\\ /- 1 1p \\\ >,.,....____-:----- / /. �/ \_/ ,-= '' --- �i/ �_=/ = \� -- 7— �// //-- \\� . - o —_ �- // �\\\ �28 - — — — — —\ � \ � /,— ,1�\ \\\ —_ - � - �-�\ -_\--- \ / _- \ \ �\\ \ \\\ r /i/�=\� \� � \\\ \ . (( �/ /-\\\\\�fi\\�\/ III I \\ \\ \\ \ 1 \ \ \ �\ \ ( \ \\\ o �\ II \\ \\ \\ \� \ \ I -\_//j , --� /// �__ / / �- -� \ �iii2� =• _ 1 / \ I I \ \- / / ._ \ 1 11 ` III I \�-_/ / \ \ \I 1111I//// _ _ o \ \ \ \ \ I \ \ / \ \ d �/ 1 - _ \ /\ \\\ \_/ti^ / / \ \ \ / 1 1 1 \ 1/// / // 1 I I \ \� / \ \\ \\\�///// 1\\\\\ \\ \ \ \`,//i/�/ \ \ / \ I \ \ \ \�/ / ►III \ \_ \ \\ / \ // / ,\\\\ \ �__- 1 \ I (/ i /i/ 1 \---\ \\\ \`'s.\,� ,6v� I\\\ \ �`_/i /-� I1 / 60/// \ \\\ Ji o Il / / / // // / / / / / /,/ / / // / ti$ 1_ - _� - / \ - -- \ \� 1 \ ♦' i- _ - ,� �-,\ \\ / / \ \ b �8 / ,_ _-/ _- \ \// -)Il)' I \\\�� \ \/ / - \ \ I 1 \\ \ �0 _ o -/ / ./_--\ c5-/ / / _ M /+ /o, ///� _ �,,� ,0-� cp/i �/./ I 1 I 1 l� != l,l\ ° -//i. \ \ \ 1 l�- I I / / /� \ \ h '� J1 I \\ \ \ o / \I\ la 50 \\\ �� / / / // - \ -\ \` \ / o\ 1 \ \\\ ��� / / / // / //\ \ ) 272 - N 1 I /// / // I((I / \\\_/ I / \\ �-- \ --- `gb // 111� \- \ \- /� /// // / // Z5 /� �,.. / o I/ / / t/i// l/ tt\ - , / / \\ \ \ /lIll/// / \\\\-- \--\ /, //// II \\`-; =� ,// i �/ //////,,// /, -/ <� / ,-. , /tip //yo% .2 //,�I�\,`\ �a / / \ \\\\ / / �� / /1 IIII \\� �� �/ / l / /../�/.////- Il./i\mac // G_ \ Ii/ /,�L//A�i./�.//ii � �,?C.`.\ /( l /\ \ \ \\\ p 1 \ ( �/ — \ \ J 9 1/ I /- \\\ \o '�\ 1 1 1 �\ \\ 2 \ 9/l \ \\\ �' �Q \ \ l / --, \\s ,/�`,1l I / ,,\ 1, ,l \ 1 1 1 / � I / \ \ \ i/� l l 1 10. II IIII , 1.✓� \\\,,.\\" CAR///,,,,,, ,� N. • ° ° • , °� �'- :'0Q-°°� .ss /o • /y _ .. o ` •° Q� tiy•••7 = 1 . 409/ 2�2°Irv; ';�<<j� �GINE�.°�`�` //'%�kEITH G ��� ',,,,,,,,,I,,I,x0\ PROFESSIONAL ENG/ARCH STAMP PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING *USE DIMENSIONS ONLY * * REF. DWG(S) PNG-G-142-0001000 PIEDMONTS NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS SHEET(S)78 OF 119 DWG SCALE AS SHOWN 0 05/09/2022 ISSUE FOR CONSTRUCTION JB TFG WKG AREA CODE 1853 DATE INITIALSREGIONAL LINE 142 P I P E L I N E DWG DATE09/17/2021 SUPERSEDED — ACCOUNT NUMBER 10700 ENGINEER PNG DRAWING -C-142-0001077 NUMBER REVISION 0 PROJECT NUMBER 0232195 DATE INITIALS MGR TECH DUKE Piedmont g Natural Gas E&SC PLAN-23 DRAWING BY JB REC &STD ENERGY, CLAYTON NORTH CAROLINA STATION ID DATE INITIALS PRINCIPAL DISCIPLINE / RESOURCE CENTER / LINE NUMBER CHECKER INITIALS TFG 05/09/2022 WKG ENGINEER COPYRIGHT 2018 Resource Center GOLDSBORO, NC W:\20-31-3008 Line 142_Flowers Plantation\3_CAD\Production\04_EPSC\PNG-C-142-0001079.dwg 5/11/2022 11:27 AM PROJECT DESCRIPTION THIS EROSION AND SEDIMENTATION CONTROL PLAN WILL DISCUSS A PROPOSED PROJECT TO CONSTRUCT A NATURAL GAS PIPELINE IN WAKE AND JOHNSTON COUNTIES IN NORTH CAROLINA. THE PROPOSED PROJECT WILL CONSTRUCT A 12" AND 10" GAS LINE APPROXIMATELY 10.15 MILES. BASED ON THE AREA OF THE PERMANENT AND TEMPORARY EASEMENTS, THE DISTURBED AREA FOR THE LINE 142 PIPELINE PROJECT IS APPROXIMATELY 147.70 ACRES. THIS PROJECT MEETS THE NCGO1 EXEMPTION AS DEFINED IN CLEAN WATER ACT (CNA) SECTION 402(I)(2) FOR TRANSMISSION FACILITIES. THIS PROJECT IS FOR THE CONSTRUCTION OF A TRANSMISSION PIPE, AS DEFINED BY PHMSA AND INCLUDES ACCESS ROADS AND A LAYDOWN YARD EXCLUSIVELY SERVICING THE CONSTRUCTION OF THE PHMSA DEFINED TRANSMISSION PIPE. SITE DESCRIPTION THE SITE IS COMPRISED OF VARIOUS TERRAINS AND USES, INCLUDING RESIDENTIAL, COMMERCIAL, INDUSTRIAL, JURISDICTIONAL WATER CROSSINGS, EXISTING UTILITY EASEMENTS, AND EXISTING ROAD RIGHT-OF-WAY. SCHEDULE CONSTRUCTION OF THE PIPELINE IS SCHEDULED TO BEGIN FEBRUARY 2022 AND BE COMPLETE BY DECEMBER 2022. PLANNED EROSION AND SEDIMENTATION CONTROL PRACTICES ADDITIONALLY, THE EROSION AND SEDIMENT CONTROL MEASURES FOR THIS PROJECT INVOLVE THE STRATEGIC PLACEMENT OF A VARIETY OF DEVICES, INCLUDING: 1. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT - PRACTICE 6.06 TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/ EXITS WILL BE PLACED AT VARIOUS POINTS ALONG THIS LINEAR PROJECT TO PROVIDE A BUFFER WHERE VEHICLES CAN DROP THEIR MUD AND SEDIMENT TO AVOID TRANSPORTING IT ONTO PUBLIC ROADS, TO CONTROL EROSION FROM SURFACE RUNOFF, AND TO HELP CONTROL DUST. THEY ARE DESIGNATED ON THE PLANS WITH A GRAVEL SYMBOL. WATER WILL BE SUPPLIED TO THE AREA SO THAT WHEELS CAN BE CLEANED OF ADDITIONAL SEDIMENT. 2. TEMPORARY STREAM CROSSING AND WETLAND CROSSINGS TEMPORARY STREAM AND WETLAND CROSSINGS PROVIDE A WAY FOR CONSTRUCTION VEHICLES TO CROSS STREAMS WITHOUT MOVING SEDIMENT INTO STREAMS, DAMAGING THE STREAMBED OR CAUSING FLOODING. TEMPORARY STREAM AND WETLAND CROSSINGS ARE PLANNED FOR THIS PROJECT. 3. SILT FENCE - PRACTICE 6.62 SILT (SEDIMENT) FENCE RETAINS SEDIMENT FROM SMALL DISTURBED AREAS BY REDUCING THE VELOCITY OF SHEET FLOWS TO ALLOW SEDIMENT DEPOSITION. SILT FENCE IS TO BE PLACED AT THE EDGE OF THE EASEMENTS ALONG THE PROJECT. SILT FENCE IS NOT TO BE PLACED ACROSS STREAMS, DITCHES, WATERWAYS OR WETLANDS. 4. DEWATERING DEVICE/SEDIMENT FILTER BAG - CONCEPTS FROM PRACTICE 6.60 THE DEWATERING DEVICE AND SEDIMENT FILTER BAG ARE USED TO DETAIN SEDIMENT -LADEN RUNOFF TO ALLOW SEDIMENT TO SETTLE OUT OF WATER BEFORE IT IS DISCHARGED. THESE STRUCTURES WILL BE USED TO ALLOW SEDIMENTS TO FILTER OUT OF WATER THAT HAS BEEN PUMPED OUT OF AN AREA OR HAS BEEN USED FOR HYDROSTATIC TESTING. THESE STRUCTURES WILL BE PLACED AS NEEDED AND ARE NOT SHOWN ON THE PLANS. DEWATER DEVICES AND SEDIMENT FILTER BAGS WILL NOT BE PLACED IN A STREAM. 5. ROLLED EROSION CONTROL PRODUCTS/TEMPORARY MATTING - PRACTICE 6.17 TEMPORARY MATTING WILL BE USED WHERE NECESSARY TO REDUCE SOIL EROSION AND ASSIST IN THE GROWTH, ESTABLISHMENT AND PROTECTION OF VEGETATION. 6. TEMPORARY SEEDING - PRACTICE 6.10 7. PERMANENT SEEDING - PRACTICE 6.11 PROPOSED CONSTRUCTION SCHEDULE: 1. OBTAIN EROSION AND SEDIMENT CONTROL PLAN APPROVAL AND OTHER PERTINENT PERMITS. NO LAND DISTURBING ACTIVITIES (INCLUDING DEMOLITION OR TIMBERING) WILL COMMENCE BEFORE PLAN APPROVAL HAS BEEN OBTAINED. 2. SCHEDULE PRE -CONSTRUCTION MEETING AND NOTIFY NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY (NCDEQ) DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES (DEMLR), LAND QUALITY SECTION, RALEIGH REGIONAL OFFICE (919-791-4200) 48 HOURS PRIOR TO CONSTRUCTION TO DISCUSS EROSION CONTROL PLAN. HOLD PRE -CONSTRUCTION MEETING. 3. A RIPARIAN BUFFER SHALL BE ESTABLISHED AND MAINTAINED 50-FOOT LANDWARD OF ENVIRONMENTALLY SENSITIVE AREA BOUNDARIES THROUGHOUT THE LIMITS OF DISTURBANCE. LANDWARD LIMITS OF THE BUFFER SHALL BE CLEARLY DEMARCATED WITH ORANGE SAFETY CONSTRUCTION FENCING AND PERIMETER EROSION CONTROL MEASURES SHALL BE INSTALLED. GRUBBING OR BELOW GROUND VEGETATION REMOVAL SHOULD BE LIMITED TO THAT NECESSARY FOR INSTALLATION OF EQUIPMENT CROSSINGS AND TRAVEL LANES WITHIN BUFFER. ADDITIONAL GRUBBING PRIOR TO PIPELINE INSTALLATION SHALL BE REVIEWED AND APPROVED BY THE ENGINEER AND ON -SITE ENVIRONMENTAL INSPECTOR. 4. ENVIRONMENTALLY SENSITIVE AREAS INCLUDE, BUT ARE NOT LIMITED TO THE FOLLOWING: STREAMS, CREEKS, WETLANDS, LAKES, AND PONDS. 5. INSTALL CONSTRUCTION ENTRANCES AND ACCESS ROADS PER PLANS AS NEEDED. IMPROVEMENT OR REPLACEMENT OF EXISTING CULVERTS FOR ACCESS ROADS IS LIMITED TO THE EXISTING DIMENSIONS IN WETLANDS AND STREAMS AS SHOWN ON PLANS. ANY OTHER DISTURBANCE MUST BE APPROVED BY NCDEQ - DWR AND USACE. 6. INSTALL PERIMETER EROSION AND SILTATION CONTROL (E&SC) MEASURES SUCH AS SILT FENCE PRIOR TO CLEARING AND GRUBBING WHERE PRACTICAL AND CONCURRENTLY WHEN CLEARING IS REQUIRED TO INSTALL PERIMETER MEASURES. CLEAR ONLY AS NECESSARY TO INSTALL THESE DEVICES. CLEARING SHALL NOT OUTPACE THE INSTALLATION OF PERIMETER CONTROLS. 7. INITIATE CLEARING AND GRUBBING WITHIN LIMITS OF DISTURBANCE. GRUBBING SHALL BE MINIMIZED WHERE PRACTICAL WITHIN 50-FEET OF ENVIRONMENTALLY SENSITIVE AREAS. COMPLETE GRUBBING AS NECESSARY AS PIPELINE INSTALLATION APPROACHES THE BUFFERS AND MINIMIZE DURATION OF BARE SOIL CONDITIONS. 8. INSTALL REMAINING E&SC MEASURES SUCH AS DIVERSIONS, SILT FENCE OUTLETS, J-HOOKS, WATER BARS, CONSTRUCTION ENTRANCES, TEMPORARY BRIDGES AT STREAM CROSSINGS, TIMBER MATS, ETC. AS CLEARING AND GRUBBING IS COMPLETED. (COMPOSITE MATTING SHOULD BE USED IF AVAILABLE) 9. CONTRACTOR TO INSPECT ALL E&SC MEASURES WEEKLY AND AFTER RAIN EVENTS OF 1.0 INCHES OR MORE IN A 24 HOUR PERIOD. DO NOT ALLOW SEDIMENT BUILD-UP TO EXCEED 50% CAPACITY OF MEASURES. STORE REMOVED SEDIMENT IN UPLAND STOCKPILES AREA AND APPLY TEMPORARY SEEDING AND STRAW MULCHING. 10. SILT FENCE WITHIN 50 FEET OF ENVIRONMENTALLY SENSITIVE AREAS (STREAMS AND WETLANDS) WILL BE REINFORCED WITH STEEL MESH. 11. DOUBLE ROWS OF SILT FENCE WITHIN 50 FEET OF ENVIRONMENTALLY SENSITIVE AREAS, OR AS SHOWN ON PLANS, SHALL INCLUDE A PRIMARY ROW OF REINFORCED SILT FENCE AND A SECONDARY ROW OF UNSUPPORTED SILT FENCE. COMPOST FILTER SOCK OR REINFORCED SILT FENCE CAN BE SUBSTITUTED IN SECONDARY ROW BASED ON FIELD CONDITIONS. THERE SHOULD BE A MINIMUM DISTANCE OF 4 FEET BETWEEN THE DOUBLE ROWS OF SILT FENCE. 12.CONTRACTOR SHALL SEQUENCE AND CONDUCT LAND DISTURBING AND CONSTRUCTION ACTIVITIES IN A MANNER THAT MINIMIZES THE AMOUNT OF BARE SOIL EXPOSED AT A GIVEN TIME DURING THE PROJECT. 13.INITIATE TEMPORARY SEEDING AND STRAW MULCHING OF DISTURBED AREAS PER THE GENERAL SEEDING SPECIFICATIONS. IT IS RECOMMENDED THAT SLOPES OF 4 TO 1 OR GREATER BE TEMPORARY SEEDED AND STABILIZED WITHIN ONE DAY OF GROUND DISTURBANCE AND PRIOR TO EXPECTED RAIN EVENTS. 14.CLEARING IN WETLANDS MUST BE CONDUCTED WITH AS MINIMAL DISTURBANCE AS POSSIBLE. TIMBER MATS, LOW -GROUND PRESSURE EQUIPMENT, OR OTHER MEASURES MUST BE UTILIZED TO PREVENT THE MIXING OF TOPSOIL AND SUBSOIL. SUBSURFACE DISTURBANCE OR STUMP REMOVAL WILL ONLY BE CONDUCTED WITHIN THE TRENCH LINE WITHIN WETLANDS. STUMP REMOVAL OR LIGHT GRADING MAY OCCUR ON THE WORKING SIDE OF THE ROW ONLY IF REQUIRED FOR SAFETY REASONS AND WITHIN WETLANDS AFTER CONFIRMING WITH THE ENVIRONMENTAL INSPECTOR. THE WORK WILL BE PERFORMED FROM TIMBER MATS PLACED ALONG THE WORKING SIDE OF THE ROW. IN WETLANDS, SEGREGATE TOPSOIL FROM THE SUBSOIL.THE ENTIRE ROW SHOULD HAVE THE TOPSOIL SEGREGATED FROM THE SUBSOIL, NOT JUST IN CERTAIN AREAS. 15. HAND CLEARING ONLY IS REQUIRED ALONG STREAM BANKS AND WITHIN 20 FEET OF THE TOP OF BANK OR PER AUTHORIZED PERMITS, LEAVING ROOT SYSTEMS IN PLACE. STUMPING, ETC. IS LIMITED TO TRENCH LINE ONLY OR AS NEEDED TO SAFELY INSTALL TEMPORARY BRIDGES, CROSSINGS, AND TRAVEL LANES 16.DURING TRENCH EXCAVATION, SPOILS WILL BE PLACED ON THE "NON -WORKING" SIDE OF THE ROW AND STOCKPILED UPGRADIENT OF TRENCH, WHEREVER PRACTICAL. SPOILS WILL BE TEMPORARY SEEDED AND STABILIZED WITHIN 7 DAYS OR BEFORE EXPECTED RAIN EVENTS. STOCKPILE AREAS TO BE CONTAINED BY PERIMETER CONTROLS SUCH AS SILT FENCE OR EQUIVALENT APPROVED BMP. 17. TEMPORARY TRENCH BREAKERS WILL BE INSTALLED WITHIN THE TRENCH TO SLOW THE FLOW OF SUBSURFACE WATER OR STORMWATER RUNOFF THAT ENTERS THE EXPOSED TRENCH. WHEN WATER IS PUMPED OUT OF THE TRENCH, DISCHARGE MUST BE PUMPED THROUGH FILTER BAGS PRIOR TO LEAVING THE SITE. 18.PIPELINE WILL BE INSTALLED PER ALIGNMENT SHEET SPECIFICATIONS (PAD TRENCH BOTTOM, LOWER IN PIPE AND TIE-IN PIPE, TAKE SURVEY SHOTS ALONG THE "AS -BUILT" SECTIONS OF PIPE, PAD AND BACKFILL WITH SUBSOIL). PERMANENT TRENCH BREAKERS WILL BE INSTALLED AS DIRECTED BY THE ENVIRONMENTAL INSPECTOR OR OWNER'S REPRESENTATIVE. 19.AT WETLAND AND STREAM CROSSINGS, TRENCH BREAKERS WILL BE INSTALLED SUCH THAT THE HYDROLOGY OF THE FEATURE IS NOT IMPACTED AS A RESULT OF PIPELINE INSTALLATION. FOLLOWING INSTALLATION OF TRENCH BREAKERS THE TRENCH WILL BE BACKFILLED. 20.PIPELINE INSTALLATION WITHIN ENVIRONMENTALLY SENSITIVE AREAS SHOULD BE CONDUCTED IN A MANNER TO MINIMIZE DURATION OF OPEN TRENCH AND THESE AREAS SHOULD BE BACKFILLED AND STABILIZED AS SOON AS PRACTICAL. CONTRACTOR TO MONITOR WEATHER WHEN WORKING IN THESE AREAS AND UTILIZE ADDITIONAL E&SC MEASURES AS NECESSARY. 21.AFTER TRENCH IS BACKFILLED, STABILIZE AND RESTORE TO ORIGINAL GRADE. STABILIZE AND TEMPORARY SEED WORK AREA AS SOON AS PRACTICAL AND PRIOR TO UNEXPECTED RAIN EVENTS. 22.CONSTRUCTION ACTIVITIES REQUIRING HORIZONTAL DIRECTIONAL DRILLING OR CONVENTIONAL BORES WILL BE PERFORMED IN ACCORDANCE WITH ALIGNMENT SHEET SPECIFICATIONS. 23.ALL AREAS WILL BE RESTORED TO ORIGINAL GRADE, CONTOUR, AND CONDITION (VEGETATION, PAVING, DITCH LININGS, ETC.) IN ACCORDANCE WITH APPLICABLE PERMITS. PERMANENT SEEDING AND MULCH MAY NOT BE APPLIED TO AREAS IDENTIFIED AS ACTIVE AGRICULTURAL LANDS AT LANDOWNER'S AND TENANT FARMER'S (IF APPLICABLE) REQUEST. EROSION AND SEDIMENT CONTROL MEASURES CAN BE REMOVED FROM AGRICULTURAL LANDS UPON RECEIPT OF WRITTEN LANDOWNER AND TENANT FARMER (IF APPLICABLE) REQUEST AND WAIVER ALLOWING LANDOWNER OR TENANT FARMER TO RESUME AGRICULTURAL ACTIVITIES THAT WOULD RESULT IN SITE STABILIZATION. AGRICULTURAL FIELDS DO REQUIRE STABILIZATION ACCORDING TO THE NCDEQ PERMITS. THE LAND AGENT SHOULD DISCUSS THIS WITH EACH FARMER. 24.IN AREAS WHERE SEGREGATION OF THE SUBSOIL AND TOPSOIL IS NECESSARY, THE TOPSOIL WILL BE REPLACED LAST. AFFECTED AREAS WILL THEN BE "CLEANED UP" BY RESTORING ORIGINAL GRADE AND APPLY TEMPORARY SEEDING, FOLLOWED BY FINAL GRADING, PERMANENT SEEDING AND MULCHING TO RESTORE THE ROW AS CLOSE AS POSSIBLE TO PRE -DISTURBANCE CONTOURS AND CONDITIONS. NO MULCHING WITHIN WETLANDS IS ALLOWED. 25.UPON ESTABLISHMENT OF FINAL VEGETATIVE GROUND COVER (80% COVERAGE), DUKE/PNG ENVIRONMENTAL SUPPORT STAFF CONTACT NCDEQ LAND QUALITY SECTION, RALEIGH REGIONAL OFFICE (919-791-4200) FOR FINAL SITE INSPECTION. DUKE/PNG ENVIRONMENTAL SUPPORT WILL CONTACT NCDEQ WHEN THE REQUIRED 80% PERMANENT VEGETATION IS ESTABLISHED. CONTRACTORS SHOULD NEVER CONTACT THE STATE FOR ANY REASON. 26.UPON APPROVAL FROM NCDEQ LAND QUALITY SECTION, RALEIGH REGIONAL OFFICE INSPECTORS, REMOVE SILT FENCING AND OTHER EROSION CONTROL MEASURES. AREAS DISTURBED DURING THIS PROCESS SHALL BE RESEEDED WITH PERMANENT SEEDING AND STRAW MULCH AS APPROPRIATE. DISTURBED AREAS SHALL BE RESEEDED AND STRAW MULCHED. EROSION CONTROL DEVICE NOTES 1. ALL STREAM AND/OR WETLAND CROSSING LOCATIONS NOTED ON THE PLANS ARE APPROXIMATE. 2. ALL STREAM CROSSINGS WILL BE OPEN -CUT UNLESS OTHERWISE NOTED ON PLANS. 3. SEDIMENT FILTER BAG SHOULD BE USED WHEN WATER IS BEING PUMPED FROM THE TRENCH. 4. ANY FAILURE OF ANY EROSION CONTROL DEVICE TO FUNCTION AS INTENDED FOR ANY REASON SHALL BE REPORTED TO THE ENGINEER IMMEDIATELY AND REPAIRED AS SOON AS POSSIBLE. 5. ADDITIONAL EROSION CONTROL DEVICES SHALL BE INSTALLED IMMEDIATELY AFTER GROUND DISTURBANCE OCCURS. THE LOCATION OF SOME OF THE EROSION CONTROL DEVICES MAY HAVE TO BE ALTERED FROM THAT SHOWN ON THE PLANS IF DRAINAGE PATTERNS DURING CONSTRUCTION ARE DIFFERENT FROM THE FINAL PROPOSED DRAINAGE PATTERNS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ACCOMPLISH EROSION CONTROL FOR ALL DRAINAGE PATTERNS CREATED AT VARIOUS STAGES DURING CONSTRUCTION. 6. CONSTRUCTION ENTRANCE LOCATIONS ARE SHOWN AT APPROXIMATE LOCATIONS. FINAL LOCATIONS WILL BE DETERMINED IN THE FIELD. 7. ALL TIMBER BRIDGES/MATS CROSSING STREAMS, WETLANDS, OR CONVEYANCES MUST BE CLEANED AT THE END OF THE DAY OR IMMEDIATELY AFTER CROSSING IF SEDIMENT IS DEPOSITED BEFORE OR DURING A RAIN EVENT. SEDIMENT REMOVED FROM BRIDGES MUST BE PLACED IN A CONTAINED AREA AWAY FROM JURISDICTIONAL WATERS OR DRAINAGE STRUCTURES. 8. EROSION EEL OR APPROVED EQUAL TRENCHLESS METHOD SHALL BE UTILIZED INSIDE WETLANDS IN PLACE OF SILT FENCE. 9. TREES IN WETLANDS INSIDE THE CORRIDOR MAY BE REMOVED TO GROUND LEVEL. GRUBBING OF STUMPS IN WETLANDS SHALL BE LIMITED TO THAT NEEDED TO INSTALL THE PIPELINE. 10. STRIPPING TOPSOIL WITHIN WETLANDS ALONG THE UTILITY CORRIDOR IS NOT PERMITTED. 11.HYDROSEEDING OR CURLEX (OR APPROVED EQUAL) IS REQUIRED FOR FINAL STABILIZATION ON STEEP SLOPES OVER 15%. 12.ANY DEWATERING SHALL BE DONE THROUGH A SILT BAG AND SHALL BE MONITORED CONSTANTLY WHEN IN USE. MAINTENANCE 1. ALL SEDIMENT AND EROSION CONTROL DEVICES INCLUDING PLANTED AREAS SHALL BE INSPECTED AT LEAST ONCE PER SEVEN CALENDAR DAYS AND WITHIN 24 HOURS OF A RAINFALL EVENT GREATER THAN 1.0 INCH PER 24 HOUR PERIOD. DAMAGED OR INEFFECTIVE DEVICES SHALL BE REPAIRED OR REPLACED AS NECESSARY BY THE END OF THE DAY. 2. CONSTRUCTION ROADS AND PARKING AREAS SHOULD BE INSPECTED PERIODICALLY FOR THE CONDITION OF SURFACE. TOPDRESS WITH NEW GRAVEL AS NEEDED. CHECK ROAD DITCHES AND OTHER SEEDED AREAS FOR EROSION AND SEDIMENTATION AFTER RUNOFF -PRODUCING RAINS. MAINTAIN ALL VEGETATION IN A HEALTHY, VIGOROUS CONDITION. SEDIMENT -PRODUCING AREAS SHOULD BE TREATED IMMEDIATELY. 3. TEMPORARY STREAM CROSSINGS SHOULD BE INSPECTED AFTER RUNOFF -PRODUCING RAINS TO CHECK FOR BLOCKAGE IN CHANNEL, EROSION OF ABUTMENTS, CHANNEL SCOUR, RIPRAP DISPLACEMENT, OR PIPING. MAKE ALL REPAIRS IMMEDIATELY TO PREVENT FURTHER DAMAGE TO THE INSTALLATION. 4. MAINTENANCE ON SILT FENCES, SHALL BE PERFORMED AS NEEDED. CAPTURED SOIL MATERIAL SHALL BE REMOVED WHEN "BULGES" DEVELOP IN THE SILT FENCE AND/OR WHEN EVIDENCE OF FILTER CLOGGING IS OBSERVED. 5. INSPECT DEWATERING DEVICES AND SEDIMENT TRAPS AFTER EACH USE AND EACH SIGNIFICANT RAINFALL EVENT AND MAKE NEEDED REPAIRS IMMEDIATELY. REMOVE SEDIMENT AND RESTORE THE TRAP TO ITS ORIGINAL DIMENSIONS WHEN NEEDED. ROCK DISPLACED FROM THE SPILLWAY MUST BE REPLACED IMMEDIATELY. 6. ROLLED EROSION CONTROL PRODUCTS SHOULD ONLY BE INSTALLED OVER A PROPERLY GRADED, CLEAN CHANNEL. ROUGH SURFACES OR LOOSE CLODS OF DIRT IN THE CHANNEL WILL NOT ALLOW PROPER SOIL CONTACT. 7. INSPECT ROLLED EROSION CONTROL PRODUCTS (RECP) AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1.0" OR GREATER) RAIN FALL EVENT. MAKE REPAIRS IMMEDIATELY. GOOD CONTACT WITH THE GROUND MUST BE MAINTAINED AND EROSION MUST NOT OCCUR BENEATH THE RECP. ANY AREAS OF RECP THAT ARE DAMAGED OR NOT IN CLOSE CONTACT WITH THE GROUND SHALL BE REPAIRED AND STAPLED. IF EROSION OCCURS DUE TO PROPERLY CONTROLLED DRAINAGE, THE PROBLEM SHALL BE FIXED AND THE ERODED AREA PROTECTED. MONITOR AND REPAIR THE RECP AS NECESSARY UNTIL GROUND COVER IS ESTABLISHED. GENERAL NOTES 1. THE CONTRACTOR IS RESPONSIBLE FOR IMPLEMENTATION AND MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL DEVICES. 2. ALL UNDERGROUND UTILITIES SHOULD BE LOCATED AND MARKED IN THE FIELD PRIOR TO COMMENCING CONSTRUCTION. 3. DISTURBED AREA SHALL BE STABILIZED AS SOON AS PRACTICALLY POSSIBLE FOR PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE BEEN COMPLETED. THESE AREAS SHALL BE STABILIZED NO LATER THAN 7 OR 14 DAYS AFTER CONSTRUCTION HAS CEASED PER THE GROUND STABILIZATION CHART. 4. FILL, COVER, AND TEMPORARY STABILIZATION AT THE END OF EACH DAY IS RECOMMENDED WHERE PRACTICAL. IT IS IMPORTANT TO CLOSE AND STABILIZE OPEN TRENCHES ON STEEP SLOPES AS SOON AS POSSIBLE. 5. CONSTRUCTION ENTRANCES SHALL BE UTILIZED AT ALL INGRESS/EGRESS LOCATIONS FROM PUBLIC ROADS. CONTRACTOR SHALL TAKE NECESSARY ACTION TO MINIMIZE THE TRANSPORT OF MATERIAL FROM THE CONSTRUCTION SITE ONTO R.O.W. PERIODIC TOP DRESSING WITH FRESH STONE MAY BE REQUIRED. ALL MATERIALS SPILLED, DROPPED, WASHED, OR TRACKED FROM SITE TRAFFIC ONTO ROADWAYS OR INTO STORM DRAINS MUST BE REMOVED IMMEDIATELY. 6. STREAM AND WETLANDS SHALL BE RETURNED TO ORIGINAL GRADE UPON COMPLETION OF CONSTRUCTION. TEMPORARY BRIDGES OR MATS SHALL BE USED FOR ALL STREAM AND WETLAND EQUIPMENT CROSSINGS. 7. SILT FENCE SHALL BE INSTALLED ALONG STREAMS FOLLOWING PIPELINE INSTALLATION AND FINAL GRADING UNTIL THE AREA IS STABILIZED. 8. ADDITIONAL MEASURES MAY BE NECESSARY TO PROTECT AREA STREAMS AND/OR WETLANDS. 9. THESE PLANS ARE FOR EROSION AND SEDIMENT CONTROL PURPOSES ONLY AND DO NOT APPLY TO CONSTRUCTION PURPOSES. 10.IF A LOSS OF DRILLING MUD IS OBSERVED DURING THE BORING OF A STREAM CROSSING, WORK MUST BE IMMEDIATELY HALTED, AND ALL LOST LUBRICANT/MUD MUST BE REMOVED FROM THE STREAM. THE FRACTURE HOLE WILL BE SEALED AND THE SITE WILL BE EVALUATED BEFORE CONTINUATION OF BORING. 11. CONTRACTOR SHALL MAINTAIN A MINIMUM VERTICAL CLEARANCE OF 24" BETWEEN THE PIPELINE AND ALL EXISTING AND PROPOSED UTILITIES. 12. ANTI -SEEP COLLARS SHALL BE PLACED AT WETLAND BOUNDARIES AND AT 150 FEET (MINIMUM) INTERVALS BETWEEN THE BOUNDARIES (INSIDE THE WETLAND). 13. ANY OFF -SITE BORROW AND WASTE REQUIRED FOR THE PROJECT MUST COME FROM A SITE WITH AN APPROVE EROSION CONTROL PLAN, A SITE REGULATED UNDER THE MINING ACT OF 1971, OR A LAND FILL REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT. 14.TRASH/ DEBRIS FROM DEMOLITION ACTIVITIES MUST BE DISPOSED OF AT A FACILITY REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT. STANDARDS ALL EROSION AND SEDIMENT CONTROLS SHALL BE IN ACCORDANCE WITH THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, LATEST EDITION. SOILS WAKE COUNTY DoA DOTHAN LOAMY SAND, 0 TO 2 PERCENT SLOPES DoB DOTHAN LOAMY SAND, 2 TO 6 PERCENT SLOPES RaA RAINS SANDY LOAM, 0 TO 2 PERCENT SLOPES RgB RAWLINGS-RION COMPLEX, 2 TO 6 PERCENT SLOPES RgC RAWLINGS-RION COMPLEX, 6 TO 10 PERCENT SLOPES RgD RAWLINGS-RION COMPLEX, 10 TO 15 PERCENT SLOPES WaE WAKE-ROLESVILLE COMPLEX, 15 TO 25 PERCENT SLOPES, VERY ROCKY WfB WEDOWEE-SAW COMPLEX, 2 TO 6 PERCENT SLOPE JOHNSTON COUNTY CeB CECIL LOAM, 2 TO 6 PERCENT SLOPES CeC CECIL LOAM, 6 TO 10 PERCENT SLOPES GeB GILEAD SANDY LOAM, 2 TO 8 PERCENT SLOPES RnF RION SANDY LOAM, 15 TO 40 PERCENT SLOPES UcB UCHEE LOAMY COARSE SAND, 2 TO 6 PERCENT SLOPES VaB VANCE COARSE SANDY LOAM, 8 TO 10 PERCENT SLOPES WoB WEDOWEE SANDY LOAM, 2 TO 8 PERCENT SLOPES WoD WEDOWEE SANDY LOAM, 8 TO 15 PERCENT SLOPES Wt WEHADKEE LOAM, 0 TO 2 PERCENT SLOPES FREQUENTLY FLOODED LINE 142 CLEARING REQUIREMENTS CONVENTIONAL WETLAN D LAY HAND CLEAR FULL LIMITS OF DISTURBANCE. CUTTREES NEAR GROUND LEVEL. GRUB DITCHLINE ONLY. REMOVE CUT TREES FROM EASEMENT. GROUNDTO SKY CLEARING BOTH SIDES OF ROW. CONVENTIONAL UPLAND LAY CLEAR & GRUB FULL LIMITS OF DISTURBANCE. REMOVE ALLCUTTREES & DEBRIS FROM ROW. FULL GROUND TO SKYCLEARING ON BOTH SIDES OF PERMANENT EASEMENT. OPEN CUTSTREAM CROSSINGS & BUFFERS. HAND CLEAR FULL LIMITS OF DISTURBANCE. CUTTREES NEAR GROUND LEVEL. GRUB DITCHLINE ONLY. REMOVE CUT TREES FROM EASEMENT. GROUNDTO SKY CLEARING BOTH SIDES OF ROW. HDD OF WETLANDS CLEAR 20 FOOT LINE OF SIGHTCENTERED ON PIPELINE BY HAND. LOP AND DROP TREES. CUT TIMBER IN 5 FT SECTIONS (MAXIMUM) AND LEAVE ON EDGE OF CLEARED AREA. NO GROUND TO SKY CLEARING REQUIRED. NO GRUBBING OF LIMITS OF DISTURBANCE. HDD illCLEAR FROM STATION 14+59TO 26+00 FROM STATION 26+OOTO32+20 & GRUB FULL 50 FOOT WIDE PERMAN ENT EASEMENT. REMOVE ALLCUTTREES & DEBRIS FROM ROW. CLEAR TEMPORAY CONSTRUCTION EASEMENT; GRUB AS NECESSARY. FULL GROUND TO SKY CLEARING ON BOTH SIDES OF PERMANENT EASEMENT. WETLAND AREAS FOLLOW HDD OF WETLANDS GUI DANCE. HDD ill FROM STATION 26+00 TO 29+00 CLEAR 20 FOOT LINE OF SIGHTCENTERED ON PIPELINE BY HAND. CUT TREES NEAR GROUND LEVEL REMOVE CUT TREES FROM EASEMENT. NO GROUND TO SKY CLEARING REQUIRED. NO GRUBBING OF LIMITS OF DISTURBANCE. HDD112 FROM STATION 155+60TO 163+00 CLEAR 20 FOOT LINE OF SIGHTCENTERED ON PIPELINE BY HAND. CUT TREES NEAR GROUND LEVEL REMOVE CUT TREES FROM EASEMENT. NO GROUND TO SKY CLEARING REQUIRED. NO GRUBBING OF LIMITS OF DISTURBANCE. HDD113 FROM STATION 178+70T0 208+70 CLEAR 20 FOOT LINE OF SIGHTCENTERED ON PIPELINE. LOP AND DROP TREES. LEAVE CUT TIMBER IN 5 FT SECTIONS (MAXIMUM) ON EDGE OF CLEARED AREA. NO GROUND TO SKY CLEARING REQUIRED. NO GRUBBING OF LIMITS OF DISTURBANCE. WETLAND AREAS FOLLOW HDD OF WETLANDS GUIDANCE. HDD114 FROM STATION 294+70TO 313+60 CLEAR 20 FOOT LINE OF SIGHTCENTERED ON PIPELINE. LOP AND DROP TREES. LEAVE CUT TIMBER IN 5 FT SECTIONS (MAXIMUM) ON EDGE OF CLEARED AREA. NO GROUND TO SKY CLEARING REQUIRED. NO GRUBBING OF LIMITS OF DISTURBANCE. WETLAND AREAS FOLLOW HDD OF WETLANDS GUIDANCE. THE PERSON TO CONTACT SHOULD ANY EROSION AND SEDIMENT CONTROL ISSUES ARISE DURING LAND -DISTURBING ACTIVITY: MICHAEL PARHAM PH: (865) 771-9841 EMAIL: MICHAEL.PARHAM@DUKE-ENERGY.COM „‘ CA .tCN° R0< zz-OFESS/0.///, �4 09/ 2 2: • 1./ kE I TH PROFESSIONAL ENG/ARCH STAMP PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE *TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 REF. DWG(S) PNG-G-142-0001000 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS 0 05/09/2022 ISSUE FOR CONSTRUCTION JB TFG WKG AREA CODE 1853 ACCOUNT NUMBER 10700 DATE INITIALS REGIONAL ENGINEER PROJECT NUMBER 0232195 DRAWING BY JB DATE INITIALS MGR TECH REC & STD STATION ID CHECKER INITIALS TFG DATE 05/09/2022 INITIALS WKG PRINCIPAL ENGINEER DUKE Piedmont ENERGY. Natural Gas COPYRIGHT 2018 LINE 142 PIPELINE E&SC NOTES CLAYTON, NORTH CAROLINA Resource Center GOLDSBORO, NC SHEET(S)79 OF 119 DWG SCALE NOT TO SCALE DWG DATE 09/17/2021 SUPERSEDED DRAWING NUMBER PNG-C-142-0001079 REVISION 0 DISCIPLINE / RESOURCE CENTER / LINE NUMBER GENERAL SEEDING REQUIREMENTS FOR UPLAND AREAS GENERAL SEEDING REQUIREMENTS FOR RIPARIAN AREAS W:\20-31-3008 Line 142_Flowers Plantation\3_CAD\Production\04_EPSC\PNG-C-142-0001081.dwg 5/11/2022 11:27 AM PERMANENT UPLAND SEEDING SPECIFICATIONS LOCATION SEED MIX APPLICATION TYPE AND RATE (LBS/ACRE) FLEXIBLE GROWTH MEDIUM (IF USED) MULCH OR FLEXIBLE GROWTH MEDIUM (FGM) APPLICATION RATE NOTES LAWNS (RESIDENTIAL, COMMERCIAL, INDUSTRIAL) PENNINGTON TM LAWNS SIGNATURE SERIES TALL FESCUE: 33% REBEL IV TALL FESCUE 34% JUSTICE TALL FESCUE 33% RK4 TALL FESCUE BROADCAST: 200 LBS/ACRE DRILLED: 100 LBS/ACRE PROFILE PRODUCTS TM PROMATRIX (OPTIONAL) MULCH: 4,000 LBS/ACRE FGM: 2,000 LBS/ACRE APPLY MULCH BY ROVING, NETTING, OR ASPHALT TACKING AT 400 GAUACRE. SEED AND SOIL AMENDMENTS WILL BE BROADCAST PRIOR TO APPLYING FGM OR MULCH. PASTURES APPROVED EQUIVALENT FOR UPLAND AREAS BROADCAST: 50 LBS/ACRE DRILLED: 25 LBS/ACRE PROFILE PRODUCTS TM PROMATRIX (OPTIONAL) MULCH: 4,000 LBS/ACRE FGM: 2,000 LBS/ACRE USE SPECIFIED SEED MIX UNLESS LAND OWNER SPECIFICALLY REQUESTS A DIFFERENT SEED MIX. APPLY MULCH BY ROVING, NETTING, OR ASPHALT TACKING AT 400 GAL/ACRE. SEED AND SOIL AMENDMENTS WILL BE BROADCAST PRIOR TO APPLYING FGM OR MULCH. CULTIVATED AGRICULTURAL FIELDS NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE ACTIVELY CULTIVATED FIELDS TYPICALLY DO NOT REQUIRE SEED, MULCH, OR SOIL AMENDMENTS UNLESS SPECIFICALLY REQUESTED BY LAND OWNER. SEED AND SOIL AMENDMENTS WILL BE BROADCAST PRIOR TO APPLYING FGM . REMAINDER OF ROW WITH SLOPES <10% APPROVED EQUIVALENT FOR UPLAND AREAS BROADCAST: 200 LBS/ACRE DRILLED: 100 LBS/ACRE PROFILE PRODUCTS TM PROMATRIX (OPTIONAL) MULCH: 4,000 LBS/ACRE FGM: 2,000 LBS/ACRE APPLY MULCH BY ROVING, NETTING, OR ASPHALT TACKING AT 400 GAUACRE. SEED AND SOIL AMENDMENTS WILL BE BROADCAST PRIOR TO APPLYING FGM OR MULCH. REMAINDER OF ROW WITH SLOPES >10% BUT < 25% APPROVED EQUIVALENT FOR UPLAND AREAS BROADCAST: 200 LBS/ACRE DRILLED: 100 LBS/ACRE PROFILE PRODUCTS TM PROMATRIX (OPTIONAL) FGM: 3,000 LBS/ACRE SEED AND SOIL AMENDMENTS WILL BE BROADCAST PRIOR TO APPLYING FGM. REMAINDER OF ROW WITH SLOPES >25% APPROVED EQUIVALENT FOR UPLAND AREAS BROADCAST: 80 LBS/ACRE DRILLED: 40 LBS/ACRE PROFILE PRODUCTS TM PROMATRIX (OPTIONAL) FGM: 3,500 LBS/ACRE SEED AND SOIL AMENDMENTS WILL BE BROADCAST PRIOR TO APPLYING FGM. GROUND STABILIZATION SHALL BE PERFORMED PER "STABILIZATION TIME FRAMES" CHART OR AS OTHERWISE SPECIFIED FOR SAFETY REASONS. IF PIPELINE INSTALLATION REQUIRES WELDING, MULCH WILL NOT BE APPLIED IN ANY AREA WHERE WELDING ACTIVITIES ARE TO OCCUR. ONCE WELDING ACTIVITIES HAVE BEEN COMPLETED, MULCH SHALL BE APPLED TO SUCH AREAS. SOIL AMENDMENTS (PERMANENT UPLAND SEEDING) STABILIZATION TIME FRAMES (EFFECTIVE AUG. 3, 2011) NOTE AMENDMENT APPLICATION RATE (LBS/ACRE) SITE AREA DESCRIPTION STABILIZATION TIMEFRAME EXCEPTIONS FOLLOW RECOMMENDATIONS OF SOIL TESTS OR AT A MINIMUM APPLY LIME AND FERTILIZER AT THE SPECIFIED RATE GROUND AGRICULTURAL LIMESTONE 4,000 PERIMETER DIKES, SWALES, DITCHES, SLOPES 7 DAYS NONE 10-10-10 FERTILIZER 1,200 HIGH QUALITY WATER (HQW) ZONES 7 DAYS NONE MAINTENANCE SLOPES STEEPER THAN 3:1 7 DAYS IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED RE -FERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, RE -FERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50' IN LENGTH ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 14 DAYS NONE, EXCEPT FOR PERIMETERS AND HQW ZONES DEFINITION CONTROLLING RUNOFF AND EROSION ON DISTURBED UPLAND AREAS BY ESTABLISHING PERENNIAL VEGETATIVE COVER. DUE TO STEEP SLOPES PRESENT ON THE PROJECT, A HYDRAULICALLY APPLIED FLEXIBLE GROWTH MEDIUM (FGM) WILL BE REQUIRED TO ESTABLISH PERMANENT VEGETATION ON SLOPES >10%. OTHER AREAS CAN BE SEEDED AND MULCHED CONVENTIONALLY OR BY USING HYDRAULIC SEEDING PROCEDURES. PURPOSE TO REDUCE EROSION AND DECREASE SEDIMENT YIELD FROM DISTURBED AREAS, AND TO PERMANENTLY STABILIZE SUCH AREAS IN A MANNER THAT IS ECONOMICAL, ADAPTS TO SITE CONDITIONS, AND ALLOWS SELECTION OF THE MOST APPROPRIATE PLANT MATERIALS. SEEDBED REQUIREMENTS ESTABLISHMENT OF VEGETATION SHOULD NOT BE ATTEMPTED ON SITES THAT ARE UNSUITABLE DUE TO EXCESSIVE SOIL COMPACTION, INAPPROPRIATE SOIL TEXTURE, POOR DRAINAGE, CONCENTRATED OVERLAND FLOW, OR STEEPNESS OF SLOPE UNTIL MEASURES HAVE BEEN TAKEN TO CORRECT THESE PROBLEMS. TO MAINTAIN A GOOD STAND OF VEGETATION, THE SOIL MUST MEET CERTAIN MINIMUM REQUIREMENTS AS A GROWTH MEDIUM. THE EXISTING SOIL SHOULD HAVE THESE CRITERIA: • ENOUGH FINE-GRAINED (SILT AND CLAY) MATERIAL TO MAINTAIN ADEQUATE MOISTURE AND NUTRIENT SUPPLY (AVAILABLE WATER CAPACITY OF AT LEAST .05 -INCHES OF WATER TO 1-INCH OF SOIL. • SUFFICIENT PORE SPACE TO PERMIT ROOT PENETRATION. • SUFFICIENT DEPTH OF SOIL TO PROVIDE AN ADEQUATE ROOT ZONE. THE DEPTH TO ROCK OR IMPERMEABLE LAYERS SUCH AS HARDPANS SHOULD BE 12-INCHES OR MORE, EXCEPT ON SLOPES STEEPER THAN 2:1 WHERE THE ADDITION OF SOIL IS NOT FEASIBLE. • A FAVORABLE PH RANGE FOR PLANT GROWTH, USUALLY 6.0 - 6.5. • FREE FROM LARGE ROOTS, BRANCHES, STONES, LARGE CLODS OF EARTH, OR TRASH OF ANY KIND. CLODS AND STONES MAY BE LEFT ON SLOPES STEEPER THAN 3:1 IF THEY ARE TO BE HYDRO SEEDED. IF ANY OF THE ABOVE CRITERIA ARE NOT MET, IE; IF EXISTING SOIL IS TOO COARSE, DENSE, SHALLOW OR ACIDIC TO FOSTER VEGETATION, SPECIAL AMENDMENTS ARE REQUIRED. THE SOIL CONDITIONERS DESCRIBED BELOW MAY BE BENEFICIAL OR, PREFERABLY, TOPSOIL MAY BE APPLIED. SEEDBED PREPARATION INSTALL NECESSARY MECHANICAL EROSION AND SEDIMENTATION CONTROL PRACTICES BEFORE SEEDING, AND COMPLETE GRADING ACCORDING TO THE APPROVED PLAN. LIME AND FERTILIZER NEEDS SHOULD BE DETERMINED BY SOIL TEST, DIRECTIONS, SAMPLE CARTONS, AND INFORMATION SHEETS ARE AVAILABLE THROUGH COUNTY AGRICULTURAL EXTENSION OFFICES. TESTING IS ALSO DONE BY COMMERCIAL LABORATORIES. WHEN SOIL TEST RESULTS ARE NOT AVAILABLE, FOLLOW RATES SUGGESTED IN THE SEEDING SPECIFICATIONS TABLES. APPLY LIME AND FERTILIZER EVENLY AND INCORPORATE INTO THE TOP 4-6-INCHES OF SOIL BY DISKING OR OTHER SUITABLE MEANS. OPERATE MACHINERY ON THE CONTOUR. WHEN USING A HYDRO SEEDER, APPLY LIME AND FERTILIZER TO A ROUGH, LOOSE SURFACE. ROUGHEN SURFACES PRIOR TO SEEDING. COMPLETE SEEDBED PREPARATION BY BREAKING UP LARGE CLODS AND RAKING INTO A SMOOTH, UNIFORM SURFACE (SLOPES LESS THAN 3:1). FILL IN OR LEVEL DEPRESSIONS THAT CAN COLLECT WATER. BROADCAST SEED INTO A FRESHLY LOOSENED SEEDBED THAT HAS NOT BEEN SEALED BY RAINFALL. SEEDING USE CERTIFIED SEED FOR PERMANENT SEEDING WHENEVER POSSIBLE. LABELING OF NON -CERTIFIED SEED IS ALSO REQUIRED BY LAW. LABELS CONTAIN IMPORTANT INFORMATION ON SEED PURITY, GERMINATION, AND PRESENCE OF WOOD SEEDS. SEEDS MUST MEET STATE STANDARDS FOR CONTENT OF NOXIOUS WEEDS. DO NOT ACCEPT SEED CONTAINING "PROHIBITED" NOXIOUS WEED SEED. INOCULATE LEGUME SEED WITH THE RHIZOBIUM BACTERIA APPROPRIATE TO THE SPECIES OF LEGUME. APPLY SEED UNIFORMLY WITH A CYCLONE SEEDER, DROP -TYPE SPREADER. DRILL. CULTIPACKER SEEDER, OR HYDRO SEEDER ON A FIRM, FRIABLE SEEDBED. WHEN USING A DRILL OR CULTIPACKER SEEDER, PLANT SMALL GRAINS NO MORE THE 1-INCH DEEP, GRASSES AND LEGUMES NO MORE THAN 1/2-INCH. EQUIPMENT SHOULD BE CALIBRATED IN THE FIELD FOR DESIRED SEEDING RATE. WHEN USING BROADCAST -SEEDING METHODS, SUBDIVIDE THE AREA INTO WORKABLE SECTIONS AND DETERMINE THE AMOUNT OF SEED NEEDED FOR EACH SECTION. APPLY 1/2 THE SEED WHILE MOVING BACK AND FORTH ACROSS THE AREA, MAKING A UNIFORM PATTERN; THEN APPLY THE SECOND HALF IN THE SAME WAY, BUT MOVING AT RIGHT ANGLES TO THE FIRST PASS. STRAW MULCH ALL PLANTING IMMEDIATELY AFTER SEEDING WHEN USING A DRILL OR BROADCAST SPREADER AND MECHANICALLY AND CRIMP . TEMPORARY UPLAND SEEDING SPECIFICATIONS LOCATION SEED MIX APPLICATION TYPE AND RATE (LBS/ACRE) MULCH, TACKIFIER OR FGM APPLICATION RATE NOTES SLOPES <10% AUGUST 15 - APRIL 15 ANNUAL RYE GRAIN 120 LBS/ACRE MULCH (4,000 LBS/ACRE) APPLY MULCH BY ROVING, NETTING, OR ASPHALT TACKING AT 400 GAUACRE. SEED AND SOIL AMENDMENTS WILL BE BROADCAST PRIOR TO APPLYING MULCH. APRIL 15 - AUGUST 15 GERMAN MILLET 40 LBS/ACRE SLOPES >10% TO <25% ANNUAL RYE GRAIN 45 LBS/ACRE TACKIFIER - PLANTAGO (4,000 LBS/ACRE) OR GUAR (150 LBS/ACRE) SEED AND SOIL AMENDMENTS WILL BE BROADCAST PRIOR TO APPLYING TACKIFIER. SLOPES >25% ANNUAL RYE GRAIN 45 LBS/ACRE FGM - PROMATRIX (1,500 LBS/ACRE) SEED AND SOIL AMENDMENTS WILL BE BROADCAST PRIOR TO APPLYING FGM. HYDRAULIC SEEDING SURFACE ROUGHENING IS PARTICULARY IMPORTANT WHEN HYDRAULICALLY SEEDING, AS A ROUGHENED SLOPE WILL PROVIDE SOME NATURAL COVERAGE FOR LIME, FERTILIZER, FLEXIBLE GROWTH MEDIUM (FGM) AND SEED. THE SURFACE SHOULD NOT BE COMPACTED OR SMOOTH. FINE SEEDBED PREPARATION IS NOT NECESSARY FOR HYDRAULIC SEEDING OPERATIONS; SOIL CLODS, STONES, AND IRREGULARITIES PROVIDE CAVITIES IN WHICH SEEDS CAN LODGE. RATE OF FGM APPLICATION SHOULD VARY BY TYPE AND SHOULD ADHERE TO SEEDING SPECIFICATIONS TABLE. IF A MACHINERY BREAKDOWN OF 1/2 TO 2 HOURS OCCURS, ADD 50% MORE SEED TO THE TANK, BASED ON THE PROPORTION OF THE SLURRY REMAINING. THIS SHOULD COMPENSATE FOR DAMAGE TO SEED. BEYOND 2 HOURS, A FULL RATE OF NEW SEED MAY BE NECESSARY. LIME IS NOT NORMALLY APPLIED WITH A HYDRAULIC SEEDER BECAUSE IT IS ABRASIVE. IT CAN BE BLOWN OR BROADCAST ONTO STEEP SLOPES IN DRY FORM. MAINTENANCE GENERALLY, A STAND OF VEGETATION CANNOT BE DETERMINED TO BE FULLY ESTABLISHED UNTIL SOIL COVER HAS BEEN MAINTAINED FOR ONE FULL YEAR FROM PLANTING. INSPECT SEEDED AREAS FOR FAILURE AND MAKE NECESSARY REPAIRS AND RESEEDINGS WITHIN THE SAME SEASON, IF POSSIBLE. RE -SEEDING - IF A STAND HAS INADEQUATE COVER, RE-EVALUATE CHOICE OF PLANT MATERIALS AND QUANTITIES OF LIME AND FERTILIZER. RE-ESTABLISH THE STAND AFTER SEEDBED PREPARATION OR OVER -SEED THE STAND. CONSIDER SEEDING TEMPORARY, ANNUAL SPECIES IF THE TIME OF YEAR IS NOT APPROPRIATE FOR PERMANENT SEEDING. IF VEGETATION FAILS TO GROW, SOIL MUST BE TESTED TO DETERMINE IF ACIDITY OR NUTRIENT IMBALANCE IS RESPONSIBLE. FERTILIZATION - ON THE TYPICAL DISTURBED SITE, FULL ESTABLISHMENT USUALLY REQUIRES RE -FERTILIZATION IN THE SECOND GROWING SEASON. FINE TURF REQUIRES ANNUAL MAINTENANCE FERTILIZATION. USE SOIL TESTS IF POSSIBLE OR FOLLOW THE GUIDELINES GIVEN FOR THE SPECIFIC SEEDING MIXTURE. SEEDING SPECIFICATIONS SEE TABLES FOR UPLAND AREAS TEMPORARY AND PERMANENT SEEDING SPECIFICATIONS. SEEDING BAR NOTE SEEDING BAR LOCATIONS BASED ON PLAN VIEWS. THESE LOCATIONS ARE GENERALIZED, AND FINAL SEEDING METHODS SHALL BE APPROVED BY THE OWNER OR ON -SITE ENVIRONMENTAL INSPECTOR DURING CONSTRUCTION. SOIL AMENDMENTS (TEMPORARY UPLAND SEEDING) NOTE AMENDMENT APPLICATION RATE (LBS/ACRE) FOLLOW RECOMMENDATIONS OF SOIL TESTS OR AT A MINIMUM APPLY LIME AND FERTILIZER AT THE SPECIFIED RATE GROUND AGRICULTURAL LIMESTONE 2,000 LBS/ACRE 10-10-10 FERTILIZER 750 LBS/ACRE MAINTENANCE RE -FERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, RE -FERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. NATIVE RIPARIAN SEED SPECIFICATIONS SEED MIX APPLICATION TYPE AND RATE (LBS/ACRE) NOTES VIRGINIA WILD RYE 10 LBS/ACRE BASED ON 35 LBS/ACRE VALUE INDIANGRASS 10 LBS/ACRE EXCEEDING MANUFACTURERS 25 LBS/ACRE TYPICAL WITH ELIMINATION OF COMPETITIVE SPECIES OF PLANTS/SHRUBS TO INCLUDE PERENNIAL GRASSES WITH COVER CROP AT HIGHER 35 LBS/ACRE RATE. SOFT RUSH 5 LBS/ACRE DEER TONGUE 5 LBS/ACRE NOTE: THE RECOMMENDED APPLICATION RATE FOR THE RIPARIAN SEED MIXTURE ABOVE IS 20-LBS PER ACRE. APPLY SEED MIXTURE TO DISTURBED UPLAND RIPARIAN AREAS, EXTENDING 10-FEET LANDWARD. SOIL AMENDMENTS APPLICATION OF SOIL AMENDMENTS WITHIN RIPARIAN AREAS SHALL BE CONDUCTED AT AGRONOMIC RATES AND SHALL COMPLY WITH ALL OTHER APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS. SOIL AMENDMENTS SHALL BE APPLIED IN A MANNER THAT MINIMIZES CONTACT WITH SURFACE WATER. MULCH MULCH MAY BE APPLIED WITHIN MULCH IS NOT TO BE APPLIED RIPARIAN AREAS AS PER THE GENERAL SEEDING SPECIFICATIONS. IN WETLAND AREAS. MAINTENANCE RESEED/OVER SEED IF GROWTH IS NOT FULLY ADEQUATE. GROUND STABILIZATION SHALL BE PERFORMED PER TIME FRAMES OUTLINED IN GENERAL SEEDING SPECIFICATIONS. DEFINITION CONTROLLING RUNOFF AND EROSION ON DISTURBED RIPARIAN AREAS BY ESTABLISHING PERENNIAL VEGETATIVE COVER WITH NATIVE RIPARIAN SEED. PURPOSE TO REDUCE EROSION AND DECREASE SEDIMENT YIELD FROM DISTURBED AREAS, AND TO PERMANENTLY STABILIZE SUCH AREAS IN A MANNER THAT IS ECONOMICAL, ADAPTS TO SITE CONDITIONS, AND ALLOWS SELECTION OF THE MOST APPROPRIATE PLANT MATERIALS. SEEDBED REQUIREMENTS TO MAINTAIN A GOOD STAND OF RIPARIAN VEGETATION, THE SOIL MUST BE TOPSOIL THAT HAS BEEN STOCKPILED DURING THE GRADING AND EXCAVATION OPERATIONS. THIS TOPSOIL SHOULD HAVE THESE CRITERIA: • ENOUGH FINE-GRAINED (SILT AND CLAY) MATERIAL TO MAINTAIN ADEQUATE MOISTURE AND NUTRIENT SUPPLY (AVAILABLE WATER CAPACITY OF AT LEAST .05 -INCHES OF WATER TO 1-INCH OF SOIL. • SUFFICIENT PORE SPACE TO PERMIT ROOT PENETRATION. • SUFFICIENT DEPTH OF SOIL TO PROVIDE AN ADEQUATE ROOT ZONE. THE DEPTH TO ROCK OR IMPERMEABLE LAYERS SUCH AS HARDPANS SHOULD BE 12-INCHES OR MORE, EXCEPT ON SLOPES STEEPER THAN 2:1 WHERE THE ADDITION OF SOIL IS NOT FEASIBLE. • A FAVORABLE PH RANGE FOR PLANT GROWTH, USUALLY 6.0 - 6.5. • FREE FROM LARGE ROOTS, BRANCHES, STONES, LARGE CLODS OF EARTH, OR TRASH OF ANY KIND. CLODS AND STONES MAY BE LEFT ON SLOPES STEEPER THAN 3:1 IF THEY ARE TO BE HYDRO SEEDED. IF ANY OF THE ABOVE CRITERIA ARE NOT MET, IE; IF EXISTING SOIL IS TOO COARSE, DENSE, SHALLOW OR ACIDIC TO FOSTER VEGETATION, A ONE TIME APPLICATION OF SPECIAL AMENDMENTS ARE ALLOWED. HOWEVER, FERTILIZER MUST NOT OCCUR WITHIN 10-FT OF BANK OR COME IN CONTACT WITH WATER. THE SOIL CONDITIONERS DESCRIBED BELOW MAY BE BENEFICIAL OR, PREFERABLY, TOPSOIL MAY BE APPLIED. SEEDBED PREPARATION INSTALL NECESSARY EROSION AND SEDIMENTATION CONTROL PRACTICES BEFORE SEEDING, AND COMPLETE GRADING ACCORDING TO THE APPROVED PLAN. ROUGHEN RIPARIAN SURFACES BY DISKING, RAKING, HARROWING, OR OTHER SUITABLE METHODS PRIOR TO SEEDING. COMPLETE SEEDBED PREPARATION BY BREAKING UP LARGE CLODS AND RAKING INTO A SMOOTH, UNIFORM SURFACE. BROADCAST SEED INTO A FRESHLY LOOSENED SEEDBED THAT HAS NOT BEEN SEALED BY RAINFALL. SEEDING USE CERTIFIED SEED FOR NATIVE RIPARIAN SEEDING. LABELING OF NON -CERTIFIED SEED IS ALSO REQUIRED BY LAW. LABELS CONTAIN IMPORTANT INFORMATION ON SEED PURITY, GERMINATION, AND PRESENCE OF WOOD SEEDS. SEEDS MUST MEET STATE STANDARDS FOR CONTENT OF NOXIOUS WEEDS. DO NOT ACCEPT SEED CONTAINING "PROHIBITED" NOXIOUS WEED SEED. APPLY SEED UNIFORMLY BY HAND OR PERSONNEL EQUIPPED WITH A BROADCAST SPREADER. WHEN USING BROADCAST -SEEDING METHODS, SUBDIVIDE THE AREA INTO WORKABLE SECTIONS AND DETERMINE THE AMOUNT OF SEED NEEDED FOR EACH SECTION. APPLY 1/2 THE SEED WHILE MOVING BACK AND FORTH ACROSS THE AREA, MAKING A UNIFORM PATTERN; THEN APPLY THE SECOND HALF IN THE SAME WAY, BUT MOVING AT RIGHT ANGLES TO THE FIRST PASS. MAINTENANCE GENERALLY, A STAND OF VEGETATION CANNOT BE DETERMINED TO BE FULLY ESTABLISHED UNTIL SOIL COVER HAS BEEN MAINTAINED FOR ONE FULL YEAR FROM PLANTING. INSPECT SEEDED AREAS FOR FAILURE AND MAKE NECESSARY REPAIRS AND RESEEDINGS WITHIN THE SAME SEASON, IF POSSIBLE. RE -SEEDING - IF A STAND HAS INADEQUATE COVER, RE-EVALUATE CHOICE OF PLANT MATERIALS. RE-ESTABLISH THE STAND AFTER SEEDBED PREPARATION OR OVER -SEED THE STAND. SEEDING SPECIFICATIONS SEE TABLES FOR RIPARIAN AREAS SEEDING SPECIFICATIONS. THIS CUSTOMIZED SEEDING MIXTURE WAS DEVELOPED FOR THIS PROJECT BY, AND IS TO BE OBTAINED FROM, MELLOW MARSH FARMS (919-742-1200). GENERAL SEEDING REQUIREMENTS FOR WETLAND AREAS DEFINITION CONTROLLING RUNOFF AND EROSION ON DISTURBED WETLAND AREAS BY ESTABLISHING PERENNIAL VEGETATIVE COVER WITH NATIVE WETLAND SEED. NATIVE WETLAND SEED SPECIFICATIONS SEED MIX APPLICATION TYPE AND RATE (LBS/ACRE) NOTES VIRGINIA WILD RYE 10 LBS/ACRE BASED ON 35 LBS/ACRE VALUE INDIANGRASS 10 LBS/ACRE EXCEEDING MANUFACTURERS 25 LBS/ACRE TYPICAL WITH ELIMINATION OF COMPETITIVE SPECIES OF PLANTS/SHRUBS TO INCLUDE PERENNIAL GRASSES WITH COVER CROP AT HIGHER 35 LBS/ACRE RATE. SOFT RUSH 5 LBS/ACRE DEER TONGUE 5 LBS/ACRE NOTE: THE RECOMMENDED APPLICATION RATE FOR THE WETLAND SEED MIXTURE ABOVE IS 20 TO 25-LBS PER ACRE. APPLY SEED MIXTURE TO DISTURBED WETLAND, EXTENDING 10-FEET LANDWARD. SOIL AMENDMENTS SOIL AMENDMENTS ARE NOT TO BE APPLIED IN WETLAND AREAS. MULCH MULCH IS NOT TO APPLIED IN WETLAND AREAS. MAINTENANCE RESEED/OVER SEED IF GROWTH IS NOT FULLY ADEQUATE. GROUND STABILIZATION SHALL BE PERFORMED PER TIME FRAMES OUTLINED IN GENERAL SEEDING SPECIFICATIONS. UPLAND SEEDING SPECIFICATIONS SEED MIX APPLICATION TYPE AND RATE (LBS/ACRE) AMENDMENT NOTES TALL FESCUE 100 LBS/ACRE PELLITIZED LIME (250 LBS/ACRE) SOIL AMENDMENT RATES REDUCED DUE TO CURRENT VEGETATION STATE AND ACTIVE SOIL CONDITION, AS WELL AS AMENDMENTS PLACED WITHIN PROJECT DURATION. BAHIA 25 LBS/ACRE 10-10-10 FERTILIZER (500 LBS/ACRE) GERMAN MILLET 10 LBS/ACRE BASED ON PELLETIZED LIME RATES AT A 1:10 VALUE OF AGRICULTURAL LIME (250 LBS P = 2,500 LBS A). PURPOSE TO REDUCE EROSION AND DECREASE SEDIMENT YIELD FROM DISTURBED AREAS, AND TO PERMANENTLY STABILIZE SUCH AREAS IN A MANNER THAT IS ECONOMICAL, ADAPTS TO SITE CONDITIONS, AND ALLOWS SELECTION OF THE MOST APPROPRIATE PLANT MATERIALS. SEEDBED REQUIREMENTS TO MAINTAIN A GOOD STAND OF WETLAND VEGETATION, THE SOIL MUST BE TOPSOIL THAT HAS BEEN STOCKPILED DURING THE GRADING AND EXCAVATION OPERATIONS. THIS TOPSOIL SHOULD HAVE THESE CRITERIA: • FREE FROM LARGE ROOTS, BRANCHES, STONES, LARGE CLODS OF EARTH, OR TRASH OF ANY KIND. SEEDBED PREPARATION INSTALL NECESSARY ADJACENT (NOT IN WETLAND) MECHANICAL EROSION AND SEDIMENTATION CONTROL PRACTICES BEFORE SEEDING, AND RETURN GRADES TO ORIGINAL CONTOURS AS MUCH AS PRACTICABLE. ROUGHEN WETLAND SURFACES BY DISKING, RAKING, HARROWING, OR OTHER SUITABLE METHODS PRIOR TO SEEDING. COMPLETE SEEDBED PREPARATION BY BREAKING UP LARGE CLODS AND RAKING INTO A SMOOTH, UNIFORM SURFACE. BROADCAST SEED INTO A FRESHLY LOOSENED SEEDBED THAT HAS NOT BEEN SEALED BY RAINFALL. SEEDING USE CERTIFIED SEED FOR NATIVE WETLAND SEEDING. LABELING OF NON -CERTIFIED SEED IS ALSO REQUIRED BY LAW. LABELS CONTAIN IMPORTANT INFORMATION OS SEED PURITY, GERMINATION, AND PRESENCE OF WOOD SEEDS. SEEDS MUST MEET STATE STANDARDS FOR CONTENT OF NOXIOUS WEEDS. DO NOT ACCEPT SEED CONTAINING "PROHIBITED" NOXIOUS WEED SEED. APPLY SEED UNIFORMLY BY HAND OR PERSONNEL EQUIPPED WITH A BROADCAST SPREADER. WHEN USING BROADCAST -SEEDING METHODS, SUBDIVIDE THE AREA INTO WORKABLE SECTIONS AND DETERMINE THE AMOUNT OF SEED NEEDED FOR EACH SECTION. APPLY 1/2 THE SEED WHILE MOVING BACK AND FORTH ACROSS THE AREA, MAKING A UNIFORM PATTERN; THEN APPLY THE SECOND HALF IN THE SAME WAY, BUT MOVING AT RIGHT ANGLES TO THE FIRST PASS. DO NOT APPLY MULCH OR FERTILIZER IN WETLANDS. MAINTENANCE GENERALLY, A STAND OF VEGETATION CANNOT BE DETERMINED TO BE FULLY ESTABLISHED UNTIL SOIL COVER HAS BEEN MAINTAINED FOR ONE FULL YEAR FROM PLANTING. INSPECT SEEDED AREAS FOR FAILURE AND MAKE NECESSARY REPAIRS AND RESEEDINGS WITHIN THE SAME SEASON, IF POSSIBLE. RE -SEEDING - IF A STAND HAS INADEQUATE COVER, RE-EVALUATE CHOICE OF PLANT MATERIALS. RE-ESTABLISH THE STAND AFTER SEEDBED PREPARATION OR OVER -SEED THE STAND. SEEDING SPECIFICATIONS SEE TABLES FOR WETLAND AREAS SEEDING SPECIFICATIONS. FESCUE IS PROHIBITED IN WETLAND AREAS. .``��CN° CA R�< OFESS /0 <E)4 09/ 2Q2°, °tiGINE /'/kE I TH \\\ PROFESSIONAL ENG/ARCH STAMP PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE *TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 REF. DWG(S) PNG-G-142-0001000 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS 0 05/09/2022 ISSUE FOR CONSTRUCTION JB TFG WKG AREA CODE 1853 ACCOUNT NUMBER 10700 DATE INITIALS REGIONAL ENGINEER PROJECT NUMBER 0232195 DRAWING BY JB DATE INITIALS MGR TECH REC & STD STATION ID CHECKER INITIALS TFG DATE 05/09/2022 INITIALS WKG PRINCIPAL ENGINEER DUKE III Piedmont ENERGY. Natural Gas COPYRIGHT 2018 LINE 142 PIPELINE E&SC SEEDING REQUIREMENTS CLAYTON, NORTH CAROLINA Resource Center GOLDSBORO, NC SHEET(S)80 OF 119 DWG SCALE NOT TO SCALE DWG DATE 09/17/2021 SUPERSEDED DRAWING NUMBER PNG -C-142-0001081 REVISION 0 DISCIPLINE / RESOURCE CENTER / LINE NUMBER W:\20-31-3008 Line 142_Flowers Plantation\3_CAD\Production\04_EPSC\PNG-C-142-0001082.dwg 5/11/2022 11:27 AM _ �T !III=- s diaTrl to .,: S-W . `, �: '• 3 times the i I, -- �. • MI iMI diameter Min -90'. -,A'"• L Pipe outlet to well +_ defined channel PLAN VIEW N.T.S. Key in 6"-10" (150-230 mm), L recommended for entire perimeter. II d=5' (1.5m) max _ w+_ rock dia. •'- I ILIAC-I1 } 6"(I50 mm) Min Filter Fabric~ SECTION A -A N.T.S. Adapted from: Virginia Erosion & Sediment Control Handbook, 1992 Pipe Diameter in (mm) Discharge ft 3/s (ni /s) Apron Length, L ft (m) Rip -Rap DAL, Diameter Min in (mm) 12 (300) 4.9 (0.14) 9.89 (0.28) 10 (3) 13 (4) 4 (100) 6 (150) 18 (450) 9.89 (0.28) 20.13 (0.57) 30.01 (0.85) 39.90 (1.13) 10 (3) 16 (5) 23 (7) 26 (8) 6 (150) 8 (200) 12 (300) 16 (400) 24 (600) 30.01 (0.85) 39.90 (1.13) 50.14 (1.42) 60.03 (1.70) 16 (5) 26 (8) 26 (8) 30 (9) 8 (200) 8 (200) 12 (300) 16 (400) For larger or higher flows, consult a registered civil engineer Source: Adapted from USDA-SCS OUTLET PROTECTION SEWN -IN CONNECTION SLEEVE FOR PUMP DISCHARGE HOSE (OPTIONAL) SILT FENCE WITH WIRE BACKING GEOTEXTILE FABRIC (TYPE III) UNDER AND COVERING ENTIRE WOOD CHIP PAD SILT -SAVER SEDIMENT FILTER BAG WOOD CHIPS GEOTEXTILE FABRIC (TYPE III) OR EXISTING VEGETATION 2'-0" MIN. 0'-6" MIN. + + + + + + + + + + + + + + + + J. J. J. J. J. J. J. J. + J. VARIES WITH 10' MIN. 1 50' MIN. DISTANCE FROM STREAM j- TOP OF BANK STREAM PLAN VIEW NOTES 1. OPEN CUT STREAM CROSSINGS TO BE SCHEDULED DURING DRY CONDITIONS. CONSTRUCTION OF CROSSING SHALL BE WORKED CONTINUOUSLY FROM START OF EXCAVATION OF THE TRENCH TO INSTALLATION OF THE PIPE TO FINAL RESTORATION OF THE STREAMBED AND STREAM BANKS. 2. TEMPORARY PUMP AROUND BYPASSES EMPLOYED FOR STREAM CROSSING WILL BE MONITORED 24/7 UNTIL CHANNEL IS STABILIZED AND FLOW RESTORED TO CHANNEL. 3. THE CONTRACTOR WILL RESTORE THE CONTOURS OF THE BED AND BANKS OF ALL WATERWAYS IMMEDIATELY AFTER PIPE INSTALLATION AND BACKFILL, EXCEPT OVER THE TRAVEL LANE. TRAVEL LANES AND BRIDGES MAY STAY IN PLACE UNTIL HYDROSTATIC TESTING AND CLEANUP ARE COMPLETE. ALL MATERIALS USED TO SUPPORT CONSTRUCTION ACTIVITIES WILL BE REMOVED FROM WATERBODIES AND WETLANDS, INCLUDING, BUT NOT LIMITED TO, FLUMES, MATS, PLASTIC SHEETING, AND SANDBAGS. 4. THE STREAM BANK CONTOUR SHALL BE RE-ESTABLISHED. ALL DEBRIS SHALL BE REMOVED FROM THE STREAMBED AND BANKS. STREAM BANKS SHALL BE STABILIZED AND TEMPORARY SEDIMENT BARRIERS SHALL BE INSTALLED WITHIN 24 HOURS OF COMPLETING THE CROSSING IF PRACTICABLE. 5. IMMEDIATELY FOLLOWING RECONSTRUCTION OF THE STREAM BANKS, THE CONTRACTOR SHALL INSTALL SEED AND EROSION CONTROL FABRICS ON WATERBODY BANKS. 6. INSTALL AND ANCHOR CURLEX II OR ENGINEER APPROVED EQUIVALENT ACCORDING TO MANUFACTURER'S INSTRUCTIONS. OPTIONAL LIFTING STRAPS VARIES WITH GROUND LINE SLOPE 2'-0" MIN. GRASS SEED IS SPREAD BENEATH EROSION CONTROL FABRIC. SEED MIX CAN BE FOUND WITH EROSION CONTROL DETAILS PROPOSED TEMPORARY WORKSPACE WIDTH OF DISTURBANCE TO CHANNEL TO BE MINIMIZED PROPOSED PERMANENT EASEMENT (WIDTH VARIES) -1 I PLAN VIEW STABILIZED CHANNEL INSTALL CURLEX NETFREE OR ENGINEER APPROVED EQUIVALENT NORMAL WATER LINE I 4 1 1 I I I I ' 5' CURLEX II OR ENGINEER APPROVED EQUIVALENT PROPOSED GAS PIPELINE STABILIZE FILL 4' 12" I I 1 SEE PLAN VIEW TEMPORARY MATTING TYPICAL CROSS SECTION STABILIZED CHANNEL STREAMBANK STABILIZATION NOTES: 1. SEDIMENT FILER BAGS SHOULD NOT BE PLACED WITHIN A JURISDICTIONAL WETLAND OR WITHIN 50 FEET OF A STABILIZED OUTLET, STREAM, OR OTHER NATURAL WATERS RESOURCE. 2. CONTRACTOR SHALL EXERCISE CAUTION NOT TO BURST OR DAMAGE THE SEDIMENT FILTER BAG WHEN PUMPING. 3. SEDIMENT FILTER BAGS SHALL BE REPLACED WHEN SEDIMENT HAS ACCUMULATED TO Y2 OF THE BAGS CAPACITY OR IN ACCORDANCE WITH THE MANUFACTURE'S RECOMMENDATIONS. 2'-0" MIN. SILT FENCE WITH WIRE BACKING GEOTEXTILE FABRIC (TYPE III) OR EXISTING VEGETATION 6" MIN. SILT -SAVER DEWATER FILTER BAG 6" X 15" 2" - 3" PUMP 13" X 15" 0'-4" PUMP 13" X 25" 0'-6" PUMP SEDIMENT FILTER BAG 0'-6" MIN. VARIES USE WOOD CHIPS PAD TO LEVEL BAG FROM NATURAL GROUNDLINE. WOOD CHIPS CAN BE OMITTED WHEN BAG IS POSITIONED ON GROUND LEVEL. TYPICAL SEDIMENT FILTER BAG (NOT TO SCALE) 10'-0" MINIMUM GEOTEXTI LE FABRIC (TYPE III) SECTION A 50' MINIMUM EXISTING VEGETATIVE BUFFER SILT FENCE /- WITH WIRE BACKING 2' MIN. EXISTING GROUNDLINE GEOTEXTILE FABRIC (TYPE III) OR EXISTING VEGETATION TOP OF BANK STREAM III PROPOSED GAS LINE 5EE DETAILS • R 3/9 NOTES: 1, SEE EURLEAO SLOPE AIaPLICAT14H DETAIL SHEET FOR PROPER SLOPE INSTALLATION, FDP CHANNEL T3ENC11INO A1ET1-6'G, SEE DETAIL 8/3 & 9/3 CHANNEL BLANKET END OF ROLL OVERLAP. SEE DETAIL T/.3 2. STAPLE PATTERNS ARE DEPENDENT bN SITE CONDITIONS, SEE CURLEriD STAPLE PATTERN CAA DE FGS DETAILS. 3. E-STAPLE® YAK BE .JSED IN PLACE Cr %IRE STAPLES. /\ CHANNEL UNER MUST EX TEND Ei 3.-0" ASPE T1_. THE AR fIPA-LED HIGH WATER ELEVATION SLOPE 9L. -ET TO BE INST+ILLEO FIRST AND EXTER,'IE6 AT LEAST TO THE ANTICIPATED MAX WATER ELSVAIL CNN ti wad. EL HANF 1 INSTALLATION AIEIHOD A" NC SCALE SLOPE BLANKET TO 6E INSTALLED FIRST AND [XTE7 ]ED 3'-O. BEYOND THE TOE OF THE SLOPE J• CHANNEL L61ER MV T ErrE7ND V-0" ABOVE THE ANTICIPATED HIGH WATER ELEVATVA WY. r T EL CHANNEL INSTALLATION MEIHao "e" NC SCALE w CHANNEL DEW IN SCALE STAPLES SHOULD HE PARALLEL WITH DIRECTION OF FLOW -I HA- G" . I.• F i Y.11. 1. 1• 1 Y•• Y• •.L 1 SEE DETAILS 7/3 k 3/3 N PLAN CHANNEL TERMINATION SIDE SEMI OVERLAP, ' REE DETAIL 8/3. • TRENCH APPROX. 1D' Ai DE x B" DEEP SOIL PILE FP DM TRENCH FOR CH ANNEL TERkINATIC}I. SEE DETAILS 4/3 da 613 BLAIJHET DVERLAP, I " 2•-4- I*3• NE 5'. LE 2 ROWS OF STAPLES +• APART" STAGG-END, 6" O.C., STAPLES TO 6E PLACED CLOSE RJ EDGE 1.)F BLANKET CHANNEL TERMINATION 0 OF Ig,AHRET ROW OF STAPLES. 12" 0,C, 2 RQ1YS OF STAPLES. STAGGERED, 6' ID.C„ EA. DP._ E1 7 ROWS 4F STAPLES. L1w STAGGERED, 6" O.C.. l Eh. DIR. SOIL F1LWJ FROM 'SOIL PILE. ONIPACT MTh FLk7T STEP 7 CHANNEL TRENCHING NEIHIOC A' 5%ALE TRENCH APPROX. SOL PILE TO. MOE x 6' DEER FROM TRDICH FIACOW STAPLES ARE THRLUGH 13OTH BLANKETS. SIDE SEAM OVERLAP STAPLE DErA1L NU Se ALE DYE.NUSQ UPS,OPE 6LPNNEI I�.•� nVEl A SR=TIGLOAFEED A INAKElf 7 ROWS OF STAPLES sPART, STAGGERED E, C. CHANNEL BLANKER END OF ROLL OVERLAP NC SCALE 1 ROW DF STAPLES, 12' O.C. 2 ROWS GF STAPLES. STAGGERED. 6' D.C., EA mR. 4�1 7 RDAS 9P STAPLES 4' APART, STAGCERED, 6' O.G, STAPLES ID SE PLACM CLOSE TO EDGE OF BLANKET .taw S AIL FILLED FROM SOIL PILE, COMPACT WITH FOOT CHANNEL TRENCIING ldIETHOD NC SCALE American Excelsior Company' W Earth Science Division N iwELT S EA cI1ECRE, gx_ BT A�i�PG'A t 8Y- AMERICAN EXCELSIOR COMPANY ARLINGTON, TEXAS SHEET UE`_LE TUN CORLE%'S CHANNEL APPLICATION DETAIL GATE 1/f/ DRAWN SCALE NONE nfh'WD.'T NO SFEET Na 3 CURLEX CHANNEL APPLICATION DETAIL NOTES: 1. INSPECT RECP FOR SIGNS OF RILL OR GULLY EROSION BELOW THE MATERIAL. 2. ANY SIGNS OF EROSION, TEARING OF THE MATERIAL, OR AREAS WHERE THE MATERIAL IS NO LONGER ANCHORED FIRMLY TO THE GROUND SHOULD BE REPAIRED OR REPLACED. EACH L P��TcT A ROF�TTOM FABRIC POWHHFABIr�I ON TOP OF EE ����pp P TREAM _ .5.P a o/ o DIRECTION OF FLOW STAKING PLAN OF ONE LIFT (TM.) DQWN9T iCA,M COIR LE oc Hs S, SEE p 4.0' MIItYMUM T9PWANK 4" MIN. FABRIC OVERLAP STAKING PLAN NOTES: 1. STAKES WILL BE SPACED ACROSS THE LENGTH OF THE COIR BLOCK. LEAVE AT LEAST 2" OF THE DEAD STAKE ABOVE GROUND. 2. INSERT MALE END OF SECOND COIR BLOCK INTO FEMALE END (DOWNSTREAM END) OF COIR BLOCK AND DRIVE STAKES THROUGH OVERLAPPING FABRICS AS SHOWN. ADD ADDITIONAL BLOCKS UNTIL THE DESIRED LENGTH IS ACHIEVED. 3. BACKFILL BOTTOM AND BACK OF COIR BLOCKS AND COMPACT PER INSTALLATION NOTES. 4. REPEAT STEPS AS NECESSARY FOR A MAX OF 2 COIR BLOCK LIFTS TOPPED WITH ADDITIONAL SOIL LIFTS UNTIL DESIRED HEIGHT IS ACHIEVED. INSTALLATION NOTES: 1. VEGETATED GEOGRIDS ARE TO BE CONSTRUCTED WITH A PREFABRICATED COIR BLOCK EQUAL TO MATCH DESIGN SLOPE AND TO PROVIDE OVERLAP OF FABRIC FOR PROPER INSTALLATION OF DEAD STOUT STAKES. SEE STAKING PLAN OF LIFT BEFORE INSTALLING VEGETATED GEOGRID. CLEAN AND GRADE BASE OF PROPOSED BANK. INSTALLATION SHALL BE PER MANUFACTURER'S RECOMMENDATIONS. 2. THE VEGETATED GEOGRID (WITH EROSION CONTROL FABRIC CONSISTING OF AEC PREMIER COCONUT WITH FIBERNET OR CURLEX III WITH FIBERNET) IS INSTALLED IN A SERIES OF INDIVIDUAL LIFTS (12" HIGH) WITH EACH SUCCESSIVE LIFT INSTALLED DIRECTLY ON TOP OF AND OFFSET LANDWARD FROM THE PREVIOUS LIFT AS SHOWN. 3. COMPACT EACH LAYER OF SOIL BACKFILL IN 6" MAXIMUM LIFTS, TO 95% OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY (ATSM D). 4. REFER TO TABLE IN THIS DETAIL FOR NUMBER OF LIFTS. FIRST TWO LIFTS SHALL BE COIR BLOCK LIFTS. ADDITIONAL LIFTS SHALL BE SOIL LIFTS WRAPPED IN EROSION CONTROL FABRIC. 5. AFTER EACH LIFT HAS BEEN COMPACTED, BUT PRIOR TO COVERING WITH ATTACHED COIR FABRIC MAT, BROADCAST APPLY A LAYER OF SEED OVER THE EXPOSED FACE OF VEGETATED GEOGRID. AFTER SEEDING, COVER WITH COIR FABRIC MAT AND STAKE AS SHOWN. 6. EACH COIR BLOCK LIFT SHALL BE PLANTED WITH 2" HERBACEOUS PLUGS AT SPACING OF 3' OC. SOIL LIFTS SHALL BE PLANTED WITH 3 GALLON SHRUBS AT A SPACING OF 3' OC. 7. WHERE STRUCTURE PLACEMENT COINCIDES WITH VEGETATED GEOGRID, COMPLETE THE STRUCTURE AS NOTED IN THE PLANS, AND THEN INSTALL THE VEGETATED GEOGRID SO IT BUTTS UP AGAINST THE STRUCTURE SILLS UPSTREAM AND DOWNSTREAM FACES. SOIL LIFT 1 FhBRIC TRO 2" MERAACEOUS PLUG (TYP_) 4- lr NOTE: STOUT STAKES SHALL DE 25i2" STAKES 2 FT. IN LENGTH AND Si1ARPENED ON ONE END. SECTION kr6 R MANUFACTURERy CFVn BOTTOM GEOGRID CHANNEL BANK STABILIZATION (NOT TO SCALE) 31\111111111III/// \AWN CARo/ 04 09/ 2 2: /LG I NEti ° gMk\ E1TH \\���: ,//III111111111111 PROFESSIONAL ENG/ARCH STAMP PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE *TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 REF. DWG(S) PNG-G-142-0001000 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS 0 05/09/2022 ISSUE FOR CONSTRUCTION JB TFG WKG AREA CODE 1853 ACCOUNT NUMBER 10700 DATE INITIALS REGIONAL ENGINEER PROJECT NUMBER 0232195 DRAWING BY JB DATE INITIALS MGR TECH REC & STD STATION ID CHECKER INITIALS TFG DATE 05/09/2022 INITIALS WKG PRINCIPAL ENGINEER DUKE III Piedmont ENERGY. Natural Gas COPYRIGHT 2018 LINE 142 PIPELINE E&SC DETAILS CLAYTON, NORTH CAROLINA Resource Center GOLDSBORO, NC SHEET(S)81 OF 119 DWG SCALE NOT TO SCALE DWG DATE 09/17/2021 SUPERSEDED DRAWING NUMBER PNG-C-142-0001082 REVISION 0 DISCIPLINE / RESOURCE CENTER / LINE NUMBER SWALE OR OTHER SEDIMENT CONTROL DEVICE NOTES: PLASTIC OR WIRE TIES. W:\20-31-3008 Line 142 Flowers Plantation \3 CAD\Production\04_EPSC\PNG-C-142-0001083.dwg 5/11/2022 11:27 AM EXISTING PAVED ROADWAY /,,, // FILTER FABRIC O J LL R MIN. ro PIPE/CULVERT IF NECESSARY SUPPLY WATER TO WASH WHEELS IF NECESSARY 100' MIN. (WAKE COUNTY) PLAN VIEW NOTE: CONSTRUCT SEDIMENT BARRIER AND CHANNELIZE RUNOFF TO SEDIMENT TRAPPING DEVICE CLASS A STONE /_�-8 MIN. ��•���•��=>•���•� SECTION A f 12' MIN. WIDTH 2:1 OR FLATTER ORIGINAL GRADE /\/ PIPE/CULVERT IF NECESSARY CONSTRUCTION SPECIFICATIONS: 1. STONE SIZE - CLASS A. 2. WIDTH - 25' MIN. 3. WASHING - WHEN NECESSARY, WHEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTRANCE ONTO PUBLIC R.O.W. WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE WITH DRAINS INTO AN APPROVED SEDIMENT TRAP OR SEDIMENT BASIN. ALL SEDIMENT SHALL BE PREVENTED FROM ENTERING ANY STORM DRAIN, DITCH, OR WATERCOURSE THROUGH USE OF SAND BAGS, GRAVEL, BOARDS, OR OTHER APPROVED METHODS. 4. MAINTENANCE - THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC R.O.W. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS DEMAND AND REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. ALL SEDIMENT SPILLED, DROPPED, WASHED, OR TRACKED ONTO PUBLIC R.O.W. MUST BE REMOVED IMMEDIATELY. TYPICAL GRAVEL CONSTRUCTION ENTRANCE/EXIT (TCE) 0% sCI 12" COMPOST \ \ \ SOCK (MIN) \ \ \ \ \\\ \\\ \\ \\\ \\\ \ \ \\\ UNTRENCHED INSTALLATION 1. SILT FENCE WITH WIRE BACKING IS USED TO INTERCEPT SMALL AMOUNTS OF SEDIMENT AND REDUCE VELOCITY FROM SHEET FLOW ONLY. USE SILT FENCE WITH WIRE BACKING UP -GRADIENT TO, AND ALONG THE PERIMETER OF STREAMS, WETLANDS, PONDS, SPRINGS, OR OTHER NATURAL WATER RESOURCES LOCATED WITHIN OR ADJACENT TO THE PROJECT RIGHT OF WAY. 2. THE MAXIMUM DRAINAGE AREA SIZE FOR CONTINUOUS SILT FENCE WITH BACKING SHALL BE 1 ACRE PER 150 LINEAR FEET OF FENCE LENGTH. MAXIMUM SLOPE LENGTH BEHIND FENCE ON UPSLOPE SIDE SHALL BE 290 FEET ( AS MEASURED ALONG GROUND SURFACE) 3. STEEL POSTS SHALL HAVE A PROJECTION FOR FASTENING WIRE TO THEM. WOVEN WIRE FENCE BACKING TO BE FASTENED SECURELY TO FENCE POSTS WITH WIRE TIES. THE WIRE FASTENERS SHOULD BE EVENLY SPACED WITH AT LEAST SIX PER POST. 4. FABRIC SHALL BE FASTENED SECURELY TO WOVEN WIRE FENCE BACKING WITH THE TIES SPACED EVERY 24 INCHES ALONG TOP AND MIDSECTION. 5. STOP SILT FENCE AT PAVED CROSSINGS, USE ALTERNATIVE MEASURE IF NECESSARY. 6. COORDINATE SILT FENCE PLACEMENT IN WATER QUALITY BUFFERS TO MINIMIZE IMPACT. 7. USE DOT #5 OR #57 WASHED STONE TO BACKFLOW TRENCH WHEN FLOW WILL RUN PARRELLEL TO THE TOE OF THE FENCE. WHILE THIS SITUATION IS SOMETIMES UNAVOIDABLE, SILT FENCE, SHOULD GENERALLY NOT BE USED AS A DIVERSION. MAINTENANCE: 1. INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. 2. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE, OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. 3. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT. 4. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. MULCH OR COMPOST FOR UNTRENCHED SOCKS. UP SLOPE STAKE (TYP) WOVEN WIRE FENCE BACKING TOTAL WIDTH 32' MIN. SILT FENCE WIITH WIRE BACKING FABRIC TOTAL WIDTH 36" BOTTOM OF WOVEN WIRE FENCE BACKING SHALL BE POSITIONED AT THE BOTTOM OF THE TRENCH 8' MAX STANDARD FABRIC WITH WIRE FENCE 6' MAX EXTRA STRENGTH FABRIC WITHOUT WIRE FENCE 4'MAX ON PONDING AREAS Tr 2" MIN. TTi .Lh I I I I I I NO MORE THAN 24" OF FABRIC ALLOWED ABOVE GROUND LEVEL 8" MIN. STEEL POST (STD. "T" OR "U" SECTION) POSITION POST/FABRIC ASSEMBLY AT VERTICAL TO A MAX 5° FROM THE VERTICAL (ANGLED TOWARD FLOW) SILT FENCE WITH WIRE BACKING FABRIC AND WOVEN WIRE FENCE BACKING EXISTING GROUND BACKFILL WITH COMPACTED SOIL OR DOT #5 OR #57 WASHED STONE (SEE NOTE 7) ANCHOR SILT FENCE WITH WIRE BACKING FABRIC 8" DEEP WITH 4" RUN -OUT LENGTH. COMPACT BACKFILL. ��'! ik aAir �` _ �V ���-0i yl, '1,1VV.:� i�'I1'4 1.���4 !W 1?, l it DOWN SLOPE STAKE (TYP) 3, OVERLAP (TYP) TOP VIEW o-4 FTC 2 1N 12" COMPOST SOCK (MIN) (TYP) 12" COMPOST SOCK (MIN) CLEAN WATER DIVERSION MAINTENANCE 2. 3. 2" X 2" STAKE FRONT VIEW INSPECT CLEAN WATER DIVERSION AT LEAST WEEKLY AND AFTER EACH RAINFALL EVENT THAT EXCEEDS 1.0 INCHES WITHIN A 24 HOUR PERIOD. MAKE ANY NECESSARY REPAIRS IMMEDIATELY. REMOVE SEDIMENT DEPOSITS WHEN THEY REACH ONE-HALF OF THE HEIGHT OF THE WATTLE. 1441111111, SEE INSET A CLEAN WATER DIVERSION (CWD) (NOT TO SCALE) SECTIONAL VIEW BOTTOM OF TRENCH TT II I I MIN. 24" POST 4" BELOW GROUND III W1 11 11 ll STEEL POST (TYP.) I I' ANCHOR J1 PLATES 2"MIN -f 26" FABRIC ABOVE GROUND Li- EXISTING GROUND 24" MIN. TIEBACK BETWEEN FENCE POST AND ANCHOR STAKE TO BE NO. 8 (0.25") HOLLOW BRAIDED POLYPROPYLENE ROPE WITH MINIMUM TENSILE STRENGTH OF 1,200 POUNDS ANCHOR STAKE MIN. 18" LONG TO BE PLACED 12" INTO GROUND TYPICAL SILT FENCE (SF) FLOW WOOD MULCH OR COMPOST TO 1/2 HEIGHT OF THE LOG 2" X 2" STAKE (TYP) INSET A SECURE TO POST BY WRAPPING SILT FENCE WITH WIRE BACKING EXISTING GROUND SILT FENCE TIEBACK 12" COMPOST SOCK (MIN) AREA TO BE PROTECTED //i\//i //. // WIRE MESH STONE OR COMPOST SOCK PLASTIC OR WIRE TIES MACHINE CLEARING ONLY AREA 1/4 WIRE MESH 2 FTC 14-51 111E111E111=11 1 -1 11- I-11- 1 1=1 1 1=1 1 1=1 1 1=1 1 1=1 1 1=1 1 1=1 1 11-111E111E111-111E111E111EI111-111-I I 1-�I11-- 1 STEEL POST u SILT FENCE OR SILT FENCE WITH WIRE BACKING SEDIMENT CONTROL STONE OR COMPOST SOCK 1 FT MIN 1 - 11=11 I 111=111-1 1 III III 1 I III III:, L 1/4 WIRE MESH-\___, SEDIMENT CONTROL STONE OR 12" COMPOST SOCK f WATER FLOW 1 FT MIN i�Illi ;,4.I IrI IPP:p -aIzIzIIPIaIzI.: 1 FT MIN :1 1 1=111E111-111E111-111= -1 11=111E111E111=I I I :I I I=111=111=111=111 -III-III III-III-� 1/4 WIRE MESH IF STONE IS USED 111E111E111E111E111E111=111 111=111=111=111=111=111=111E III= 111E111E111E111E111E111E11 -1 I I -III -III -III -III -III -III -I 11= 2 FT 1=111-1111=1111=111 1111=111 1111=111=111=I I I-111=I I I-111=1111=1111= =111E111E111E111=III=111=III=111=I I I=111-I I I=1111-111=I I I=I I I=1 1=111E111E111E111E111E111E111E111=111=111=111=111E111=111=111_ FI I I III -III -III -III -III -III -III -III -III -III -III -III -III -III -I STEEL POST - 2 FT DEPTH NOTES: 1. USE NO. 5 OR NO. 57 STONE FOR SEDIMENT CONTROL STONE. 12" COMPOST SOCK MAY ALSO BE USED. 2. USE HARDWARE CLOTH 24 GAUGE WIRE MESH WITH 1/4 INCH MESH OPENINGS. 3. STEEL POSTS SHALL HAVE A PROJECTION FOR FASTING WIRE TO THEM. WIRE MESH (AND WOVEN WIRE FENCE BACKING) TO BE FASTENED SECURELY TO FENCE POSTS WITH WIRE TIES. THE WIRE FASTENERS SHOULD BE EVENLY SPACED WITH AT LEAST 6 PER POST. 4. SPACE POST A MAXIMUM 3FT. 5. FOR INSTALLATION BETWEEN SECTIONS OF SILT FENCE, EXTEND SEDIMENT CONTROL STONE A MINIMUM OF 12" IN WIDTH ON EACH SIDE OF SPECIAL SEDIMENT CONTROL FENCE SECTION. SILT FENCE OUTLET (SFO) 30'-50' DISTURBED AREA FOR ACCESS ROAD 11I1I=iilrI. COMPACTED SOIL INSTALLATION NOTE: 1. USE 6" OF COMPACTED ABC STONE AS SHOWN ON PLANS. STONE TYPICALLY INSTALLED ON SLOPES OF 20% OR MORE. 2. TEMPORARY ACCESS ROAD CAN BE CONSTRUCTED TO SUIT THE NEEDS OF THE CONTRACTOR AS NECESSARY. MAINTENANCE NOTE: 1. MONITOR TO SUPPLEMENT STONE OR BLADE TO MAINTAIN UNIFORM RIDING SURFACE. 2. CONTRACTOR TO MAINTAIN ACCESS ROADS FOR FULL DURATION OF CONSTRUCTION. 3. CONTRACTOR TO CLEAR TREE CANOPY OVER ROAD TO ALLOW FOR PASSAGE OF EQUIPMENT AND TRUCKS CLEARING AND GRUBBING AREA 20' MIN. ACCESS ROAD 10' (TYP) 1=1 1 E�El1 E1T. T 1TII I IT11 1I II EXISTING GRADE 1/4 INCH PER FOOT (2%) SIDE SLOPE (TYPICAL) MACHINE CLEARING ONLY AREA ife.1I I-_-1I el I-�� FILTRATION GEOTEXTILE TO STABILIZE FOUNDATION (ESPECIALLY IMPORTANT WHERE SOFT SOIL IS ANTICIPATED) PERMANENT ACCESS ROAD DETAIL (NEW INSTALLATIONS) PROFESSIONAL ENG/ARCH STAMP PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE *TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 REF. DWG(S) PNG-G-142-0001000 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS 0 05/09/2022 ISSUE FOR CONSTRUCTION JB TFG WKG AREA CODE 1853 ACCOUNT NUMBER 10700 DATE INITIALS REGIONAL ENGINEER PROJECT NUMBER 0232195 DRAWING BY JB DATE INITIALS MGR TECH REC & STD STATION ID CHECKER INITIALS TFG DATE 05/09/2022 INITIALS WKG PRINCIPAL ENGINEER DUKE � � Piedmont'` ENERGY. Natural Gas COPYRIGHT 2018 LINE 142 PIPELINE E&SC DETAILS CLAYTON, NORTH CAROLINA Resource Center GOLDSBORO, NC SHEET(S)82 OF 119 DWG SCALE NOT TO SCALE DWG DATE 09/17/2021 SUPERSEDED DRAWING NUMBER PNG-C-142-0001083 REVISION 0 DISCIPLINE / RESOURCE CENTER / LINE NUMBER W:\20-31-3008 Line 142_Flowers Plantation\3_CAD\Production\04_EPSC\PNG-C-142-0001084.dwg 5/11/2022 11:27 AM FOR SIDE SEAM ABUTMENT, SEE DETAIL 7/1 SLOPE DETAIL NO SCALE END SEAM OF BLANKETS OVERLAP 2--4-. PLACE STAPLES. ONE ON EACH CORNER OF BLANKET. 12" O.C. ALONG BLANKET END THROUGH BOTH BLANKETS UPSLOPE BLANKET LAPS OVER DO01ISLOPE BLANKETS IN A SHINGLE AFFECT. END ROLL OVERLAP NO SCALE 6ft • • -m- 3"-0" MIN. --I STAPLE 12' O.C. ALONG BOTTOM OF BLANKET AT THE ENO OF SLOPE EXTEND BLANKET A MINIUM OF 3.-0- OVER CREST OF SLOPE, SEE DETAIL 4/1. TRENCHING NEEDED IF A MINIMUM OF 3'-0" IS NOT AVAII ARI c AT THE CREST OF SLOPE OR IF OVERLAND FLOW IS ANTICPATE0 FROM UPLAND AREAS, SEE DETAILS 5/I & 6/1 • FOR END ROLL OVERLAP, SEE DETAIL 2/1 OPRONAL ODE SEAM OVERLAP, SEE DETAIL 6/1 BLANKET TO EXTEND A MINIMUM OF 3'-0" BEWAIL TOE OF SLOPE. FOR BOTTOM OF SLOPE TERMINATION, SEE DETAIL 3/1 BOTTOM OF SLOPE TERMINATION STAPLE le D.C. ALONG BLANKET AT SLOPE CHANGE NO SCALE Curlex® Staple Pattern Guide For B ft wide Curlex Erosion Control Blankets Adjust horizontal staple spacing for 4 ft and 16 ft wide Curlex Erosion Control Blankets Application <4H:1V Slope <3H:IV <.5H:IV Staple Pattern A 3 ft 4ft • 6ft • A • = S aple Placement 0 -0 • 0.6 Staples/ydt 4 ft 2ft • 4ft 0 • 3 ftl 0 • 0 • 0 1.9 Stapleslyd: aft 3ft Notes: • 3ft • 4 ft • 1.1 Stappllesfyd' • • I. Recommended staples are minimum 4 in biodegradable E-Staple•, as provided by American Excelsior Company. or 6 in wire for cohesive soils and 6 in biodegradable E-staple., as provided by American Excelsior Company, or 8 in wire for non -cohesive soils. 2. For best results insert staples so heads are parallel to the flow of water. BLANKETS ABUT TOGETHER 1 ROW OF STAPLES, 12" O.C. -• •- OF : NON(' l�PO�I�,�O PROTECTO ']�/J'1�l� +IF111 1.. 3' 0" MIN. OVER SLOPE CREST METHOD NO SCALE 0 DO NOT NEED TO TRENCH BLANKET IN IF IT CAN BE EXTENDED A MINIMUM OF 3'-0" OVER THE CREST Of THE SLOPE. SOIL PILE FROM TRENCH 1 ROW OF STAPLES, 12" O.C. 2 ROWS OF STAPLES. STAGGERED, 6" C.C., EA. DIR. 2 ROWS OF STAPLES, STAGGERED, e- O.C., Ea. DIR, " .�•Q`°r �Ia�•,I�jy SLOPE TRENCHING METHOD A" ND SCALE TRENCH APPROX. 10" WIDE x 8" DEEP SOIL FILLED FROM SOIL PILE 0 SOIL PILE FROkt TRENCH I 18" I 3- > , �� TOP OF BLANKET * "SLOPE IxA- PR0162T 2 ROWS OF STAPLES 4" APART, STAGGERED. 6" 0,0,, STAPLES TO BE PLACED CLOSE TO EDGE OF BLANKET SIDE SEAM ABUT STAPLE DETAIL 1 ROW OF STAPLES, 12" O.C. 2 ROWS Of STAPLES, STAGGERED, 8' 0.C., EA. DIR, SOIL FILLED 4- " r-*/ FROM SOIL PILE �Iq� SLOPE TRENCHING METHOD 13" NO SCALE COMMON ROW OF STAPLES, UONG CORRECT STAPLE PATTERN. SHOULD BE STAPLED INTO EACH BLANKET. ONE STAPLE HOLDS BOTH BLANKETS TO TI-E SOIL. • NO SCALE SIDE SEAM OVERLAP STAPLE DETAIL NO SCALE 0 f STAPLES ARE THROUGH BOTH BLANKETS. American Excelsior Company Earth Science Division 0 1 AMERICAN EXCELSIOR COMPANY ARLINGTON, TEXAS SHEET DESCRIPTION CURLEO SLOPE APPLICATION DETAIL DATE 03/01/18 DRAWN BY SCALE NONE PROJECT NO. SHEET NO. 1 CURLEX SLOPE APPLICATION DETAIL (CX) SILT FENCE OUTLET WOOD MULCH OR COMPOST TO 1/2 HEIGHT OF LOG WOOD OR MULCH COMPOST TO; HEIGHT OF LOG NOTES: 1. INSPECT RECP FOR SIGNS OF RILL OR GULLY EROSION BELOW THE MATERIAL. 2. ANY SIGNS OF EROSION, TEARING OF THE MATERIAL, OR AREAS WHERE THE MATERIAL IS NO LONGER ANCHORED FIRMLY TO THE GROUND SHOULD BE REPAIRED OR REPLACED. 7(4\1° 1. USE SILT FENCE WITH J. HOOKS WHEN THE PIPELINE CONSTRUCTION TRANSVERSES A SLOPE GREATER THAN 10% AND SILT FENCE ALONG EITHER SIDE ALONE IS NOT EFFECTIVE. 2. SILT FENCE SHOULD BE INSTALLED AND MAINTAINED PER SILT FENCE DETAIL. 3. INSTALL A SILT FENCE DETAIL OUTLET (PER DETAIL) IN EVERY OTHER J HOOK. SLOPE 10 TO 20% >20% SLOPE LENGTH BETWEEN HOOKS (FT) 100 50 SILT FENCE OUTLET MAINTENANCE: SILT FENCE OUTLET AGE �o`N% FLOW //,\ 12" MIN. / / \ / //\ y 12" MINIMUM COMPOST SOCK 2" X 2" STAKES SECTION 4' MAX. \ ` \ \\\ \ \ \ ' \ \\\ UNTRENCHED INSTALLATION AREA TO BE PROTECTED ////&\ // MULCH OR COMPOST FOR UNTRENCHED SOCKS AREA TO BE PROTECTED SHEET FLOW 12" MINIMUM COMPOST SOCK INSTALLATION: 1. COMPOST SOCKS SHOULD BE LOCATED AS SHOWN ON THE EROSION AND SEDIMENTATION CONTROL PLAN. 2. PRIOR INSTALLATION, CLEAR ALL OBSTRUCTIONS INCLUDING ROCKS, CLODS, AND OTHER DEBRIS GREATER THAN ONE INCH THAT MAY INTERFERE WITH PROPER FUNCTION OF THE COMPOST SOCK 3. FILL SOCK NETTING UNIFORMLY WITH COMPOST TO THE DESIRED LENGTH SUCH THAT LOGS DO NOT DEFORM. 4. OAK OR OTHER DURABLE HARDWOOD STAKES 2"X2" IN CROSS SECTION SHOULD BE USED. STAJES SHOULD BE PLACED AT A MAXIMUM INTERVAL OF 4 FEET AND SHOULD BE DRIVEN TO A MINIMUM DEPTH OF 12 INCHES, WITH A MINIMUM OF 3 INCHES PROTRUDING ABOVE THE COMPOST SOCK. 5. IN THE EVENT STAKING IS NOT POSSIBLE (I.E., WHEN SOCKS ARE USED ON PAVEMENT) HEAVY CONCRETE BLOCKS SHALL BE USED BEHIND THE SOCK TO HOLD I IN PLACE DURING RUNOFF EVENTS. 6. IF THE COMPOST SOCK IS TO BE LEFT AS PART OF HE NATURAL LANDSCAPE, IT MAY BE SEEDED AT TIME OF INSTALLATION FOR ESTABLISHMENT OF PERMANENT VEGETATION USING THE SEEDING SPECIFICATIONS IN THE EROSION AND SEDIMENTATION CONTROL PLAN. 7. COMPOST SOCKS ARE NOT TO BE USED IN PERENNIAL STREAMS. MAINTENANCE: INSPECT COMPOST SOCKS WEEKLY AFTER EACH SIGNIFICANT RAINFALL EVENT (1 INCH OR GREATER) REMOVE ACCUMULATED SEDIMENT AND ANY DEBRIS. THE COMPOST SOCK IF CLOGGED OR TORN. IF PONDING BECOMES EXCESSIVE, THE SOCK MAY NEED TO BE REPLACED WITH A LARGER DIAMETER OR A DIFFERENT MEASURE. THE SOCK NEEDS TO BE REINSTALLED IF UNDERMINED OR DISLODGED. THE COMPOST SOCK SHALL BE INSPECTED UNTIL LAND DISTURBANCE IS COMPLETE AND THE AREA ABOVE THE MEASURE HAS BEEN PERMANENTLY STABILIZED. WORK AREA COMPOST SOCK INSTALLATION DETAIL (CS) 1. INSPECT SEDIMENT INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY 2. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE, OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. 3. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT. 4. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. J-HOOK DETAIL (SFJ) (NOT TO SCALE) BACKFILL MATERIAL CFI II I I 11111III111III11111 =111=111=111-''-111=111 111E111EQ,=11L--I I L==Wei \ III1II ,�\LIII-III 1=11111=11 /\I11E1 ITI-ITI \, III-ITII 1E111E11 \\ II I II I II I IZ.'1E 111E11 \\ IIIIIIIIIII Li, %=1 I I=1 1111E111 \ 1111E111 a 1E1111E11 41=I1I=1 111=ITI \\� III-1IIL-IIL-I 1E111E11 \ / 111 I T I// , II I II T II I II 1E111E11 \//\ 11111111E �_ ITIITIITIII %\� III=ITI=ITI=IIL=1 L=11 L=11 \/4-LUE111=11= - PLAN VIEW 1• DISPOSAL/RECYCLING: COMPOST MEDIA IS COMPOSTED ORGANIC PRODUCT RECYCLED AND MANUFACTURED FROM LOCALLY GENERATED ORGANIC, NATURAL, AND BIOLOGICALLY BASED MATERIALS. ONCE ALL SOIL HAS BEEN STABILIZED AND CONSTRUCTION ACTIVITY HAS BEN COMPLETED,THE COMPOST MATERIAL MAY BE DISPERSED WITH A LOADER, RAKE, BULLDOZER OR SIMILAR DEVICE AND MAY BE INCORPORATED INTO THE SOIL AS AN AMENDMENT OR LEFT ON THE SOIL SERVICE TO AID IN THE PERMANENT SEEDING AND LANDSCAPING. LEAVING THE COMPOST MEDIA ON SITE REDUCES REMOVAL AND DISPOSAL COSTS COMPARED TO OTHER SEDIMENT CONTROL DEVICES. THE MESH NETTING MATERIAL WILL BE EXTRACTED FROM MEDIA AND DISPOSED OF PROPERLY. THE PHOTODEGRADABLE MESH MATERIAL WITH DEGRADE IN 2 TO 5 YEARS IF LEFT ON SITE. BIODEGRADABLE MESH MATERIAL IS AVAILABLE AND DOES NOT NEED TO BE EXTRACTED AND DISPOSED OF, AS IT WILL COMPLETELY DECOMPOSE IN 6 TO 12 MONTHS. USING BIODEGRADABLE COMPOST SOCKS COMPLETELY ELIMINATES THE NEED AND COST OF REMOVAL AND DISPOSAL. PLAN SLOPE =/>5% PROFILE VIEW NOTES: I. TRENCH PLUGS INSTALLED AT WETLAND/WATERBODY BOUNDARIES SHALL BE CONSTRUCTED OF BENTONITE. SANDBAGS EXTEND 6" (MIN.) INTO TRENCH WALL SANDBAGS (SHALL NOT BE FILLED WITH TOPSOIL) COMPACTED BACKFILL COMPACTED BACKFILL SANDBAGS (SHALL NOT BE FILLED WITH TOPSOIL) TOP SOIL pia\ia\ia\ia\ia\ia,���. \/\//\j\//\�\ 11111I-1I I-1I I-111I -_________--=_=__-=____-=-=' _=-=_ -_ -- 11II11-I I1-I I1-I I1- ___ _ =ITI=ITI=ITI=ITI=ITI __ __== =ITI=ITI=ITI=ITI=- I-1I L=1I L=1 I L=1 I L=1 ___.__ __________ _=r = - - - - - --- I I LI I LI I LI I I-l'? ,7111=IIL-IIL=1 -_ :__:_ ----- _____' _. I -II I -II I -II I -III::, SANDBAGS EXTEND - I I _____ ________ == _____: 111E111E111E111=-: .1=IILIILIIL-III "^M __________ ___________ _ ==sL-111E111E111E. 6" (MIN.) INTO JL11LI11_III_I____ IIL-IIL-IILE11; TRENCH WALL • r111I11I 11I I I -----------: -------- '= - =`- - === -= - LI I LI I LI I h: -1I I -III -III -I m ______ _d _s ____- 111E111-11I1 =III -III -III �--- _ -_ _____ =------------ ----� II -III _'. WI II lEk• .111EI I I=III _" I I I i i I 1=11=I V• :i11-III=III=III=III=1I1=1I1=1I1=1I1=1I1=1I1=1I1=1I1=1I1=1I1=1I/ ^I 1 1=111E111E111E11 11 11=1 111 11=1 11=1 11=1 11=1 11=1 11="= 77ITI=ITI=ITI=ITI=ITI=ITI=ITI=ITIITIITIITIITI- 1III=I1ITI I LI 11 � 1111, I I I L-IIL-III 111119.1 h-IILIII1. 1�> FRONT VIEW TRENCH BREAKER PLUG NOTES: 1. THE PREFERRED CONSTRUCTION MATERIAL FOR THE TRENCH BREAKERS IS SAND BAGS, WHICH ARE DURABLE YET FLEXIBLE AND WILL CONFORM TO THE GRADUAL SHIFTING OF THE PIPELINE AND BACKFILL. 2. IN AGRICULTURAL LANDS, TOP OF THE TRENCH BREAKER WILL NOT BE CLOSER THAN TWO FEET FROM THE RESTORED SURFACE. 3. TRENCH BREAKERS SHOULD BE PLACED ON EITHER SIDE OF STREAM AND WETLAND CROSSINGS. 4. FOR UTILITY LINES CONSTRUCTED WITHIN WETLANDS, AND ANTI -SEEP COLLAR SHALL BE PLACED AT THE DOWNSTREAM (UTILITY LINE GRADIENT) WETLAND BOUNDARY AND EVERY 150 FEET UP THE GRADIENT UNTIL THE UTILITY EXITS THE WETLAND. ANTI -SEEP COLLARS MAY BE CONSTRUCTED WITH CLASS B CONCRETE, COMPACTED CLAY, PVC PIPE, OR METAL COLLARS. WETLAND CROSSINGS THAT ARE DIRECTIONALLY DRILLED, AND PERPENDICULAR WETLAND CROSSINGS THAT ARE OPEN CUT AND LESS THAN 150 FEET LONG DO NOT REQUIRE ANTI -SEEP COLLARS. THE COMPACTED CLAY SHALL HAVE SPECIFIC INFILTRATION OF 1X10-5 CM/SEC OR LESS. A SECTION OR PLAN VIEW DIAGRAM IS ATTACHED FOR THE ANTI SEEP COLLARS. REQUIRED SPACING (L) AND MATERIALS FOR TRENCH TRENCH SLOPE (%) L (FEET) BREAKER MATERIAL 5 TO 15 300 CLAY, BENTONITE, OR FOAM > 15 TO 30 200 CLAY, BENTONITE, OR FOAM > 30 100 CLAY, BENTONITE, OR FOAM CONCRETE FILLED SACKS ARE NOT TO BE USED PROFESSIONAL ENG/ARCH STAMP PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE *TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 REF. DWG(S) PNG-G-142-0001000 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS 0 05/09/2022 ISSUE FOR CONSTRUCTION JB TFG WKG AREA CODE 1853 ACCOUNT NUMBER 10700 DATE REGIONAL ENGINEER PROJECT NUMBER 0232195 DRAWING BY JB DATE MGR TECH STATION ID CHECKER INITIALS TFG DATE 05/09/2022 WKG PRINCIPAL ENGINEER DUKE Till Piedmont ENERGY. tr6,.. Natural Gas COPYRIGHT 2018 LINE 142 PIPELINE E&SC DETAILS CLAYTON, NORTH CAROLINA Resource Center GOLDSBORO, NC DWG SCALE NOT TO SCALE DWG DATE 09/17/2021 SUPERSEDED DRAWING NUMBER PNG -C-142-0001084 REVISION DISCIPLINE / RESOURCE CENTER / LINE NUMBER W:\20-31-3008 Line 142_Flowers Plantation\3_CAD\Production\04_EPSC\PNG-C-142-0001085.dwg 5/11/2022 11:27 AM PLACE f BARRIEF WORK! THE EN TEMPORARY CONSTRUCTION RIGHT OF WAY ..-..-..- ..-. a4 a4 a4 a4 a4 a4 a4 a4 At a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 At a4 a4 a4 a4 a4 a4 a4 a4 a4 At a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 m At a4 a4 a4 a4 a4 ..... a4 a4 a4 ..... At a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 ,4 >. >. ,. ,. ,. ,. ,. ,. - At >. INSTALL ECDS AT EDGE OF WORKSPACE AS N ECESSARY _ •_ it WET LAN D . 4 a& 4 IL IL IL IL IL 4 4. a& ait 4 IL IL IL IL IL 4. 4 a& 4 J. 4 alt. all. all. JJ. AL. . . J. J. J. J. a. all. JJJ. . . . . J. J. J. J. alt. all. J a4 At At a4 a4 a4 a4 a4 a4 a4 a4 a4 J. a4 a4 a4 a4 a4 a4 a4 a4 a4 At At m J. a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 al I I x a4 al, a4 al. al. al. al. a4 a4 a4 a4 a4 J, al. al. al. al. a4 a4 a4 a4 a4 al, a4 al. . al. al, al. al. al. al. al. al. al. al. al. al, al, al. al. al. a.. a.. a.. a.. a.. a.. a., a.. a.. a4 al, a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 al, a4 a4 a4 a4 a4 a4 a4 a4 a4 al, a4 a4 a4 x m m m i 4T4-4- x x BOUNDARY Itx It wti a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 x a4 alt a4 al/ al/ a4 a4 a4 a4 a4 a4 alt At At al/ a4 a4 a4 a4 a4 a4 a4 alt a4 al/ al/ a4 At At At At a4 a4 a4 a4 a4 At At At At a4 a4 a4 a4 a4 a4 At At At At a4 a a4 al. At a! al. a4 a4 a4 a4 a4 a4 a4 al. a4 al. al. a4 a4 a4 a4 a4 a4 al. At a! al. a4 a a4 a4 a4 a4 ai. J. a4 a4 a4 a4 a4 a4 a4 a4 a. ai. a4 a4 a4 a4 a4 a4 a4 a4 a4 ai. J. a4 I x a4 At AL AL TOPSOIL STRIPPED FROM TRENCH IN UNSATURATED WETLAND :� AL a4 a4 J II Aal. al. al. al. .._. ..•-scw f.._-.s.s._..di.•... ..�- •i J _-....r' r..... • -,. .-..�.-,.•• al. al. al. al. a4 a4 -' a! al. „ al. al. a4 a4 a4 a4 a4 a4 -' a! al. a4 J a4 W W,. W W alr a4 �- .e�r:rnI •:•;•:•: �'•; .'= ti.� .. ..•._........:: •.• • r.:.�. 4...... :+.. I x TEMPORARY CONSTRUCTION a4 a.( �'r%`:t_'• 4','=" 4•• x •.r•.; •. '`k'r:• �:.J ;;.,�.. ; TRENCH SPOIL a+ •*:';'• ...�:.a .:ti.r+.s;:,-,•1l. J L••. :••;:. :• x WORKSPACE _ _ .r.G--•..S-.....�r.l.L -�..I r. va�f1L�Y.i�-�1aS li.1 L�.�3J al. a4 a4 a4 a. J. a4 a4 a4 a4 a4 a4 •At a4 a4 •J.••J. a4 a4 a4 a4, IL a4 a4 a4 a. J. a4 J I a4 a4 a4 At 44 44 a4 a4 a4 alk 14 a4 a4 At a4 44 a4 a4 a4 alk alka4 a4 a4 >r a4 a4 NN, , v v v NN Nv v N �, v � N/N/N/N/N/N/N/N/N/N/N/N/N/N/N/N/N/N/N/N/NiNiNiNiNiNiNiNiNiNiNiNiNiNiNiNiN .� • iNiNi.iNiN, //N /N//N /N//N /N//N /N//N // N/ N// , / ,N// / / //N////�// /�/ / /�/ /N/\// /,, \, , `/\/j\/N •NN. /N/ PIPELINE /A/%_/A/%_/A/A/%__%/%/%// TRENCH <//<//<//<//<//</jam/jam/jam/jam//<//</// ��////`��/`\�/`\�/`f/•:' iJ.4a.a4a.a.a.a.a.a.a.a.a.a.a.a.a.a.a.a.a.a.a.a.a.a.a.a. , x al, al. a•- >V ar al. a4 a4 a4 a4 a4 a4 a4 a4 al, al. al. a4 a4 x fLf: a4a4 a..il. a., al.a..a4 a.ma4a4 a4a4 a4a4a4a4a4m a4 a4a4a4a4 a4a4a4a4a4 m a4a4a4a4I II L a4 a4 ar a4 d a4 a4 a4 AL a4 CONSTRUCTION MATS IF NECESSARY A AL a4 a4 a4 a4 a4 a4 a4 a4 a4 -' a4 a4 a4 AL ' Ak "k "k ak AL Ak Ak I EDIMENT CONTROL tS ACROSS THE NG SIDE OF R.O.W. AT D OF EACH DAY ► I. 4 x pI♦► I 44 ► 4 I r 4I I I4 x I 4 ►444 444 r 4 4 4 4I 4I 4 4 4I 4I 4 4444 4N4 44. :*444 4I 14 4I ► 4I 4I 4 �4♦►j4 14 4I ► 4I .4 4 4I II 4I N 14 :4I4 44I4 ► 4I. 0444 4I 14 4I 44 14 4I 4414 4I 4 4I 14 4I I 4I 4I 4 4I4 4414 4I. '444 4I 14 4I ► 44 ♦ 4 4I �4♦►j4 14 4I ► 4I .4 4 44 II 4I N 14 :444 44I4 ► 4I. 444 4I 4I 41 4I 14 44 .4' 4I 4 44 14 4I I 4I 4I 4 4404 4N4 4I. 0444 4I I 41 4I ► 4I I 4i 44 II414 I N 4I ► 4I 4 4. ► 44 4I I4 ` 4I I 41 ►4I4. 4010 r 4 x I x I x x a4a4a4a..a.,a.a.a.a.a.a.a.a.a..a.,a.a.a.a.a.a.a.a.a.a..a.,a.a.a.a.a x Ia4 a4 a4 alt At 44 44 a4 a4 a4 a4 a4 a4 alk a4 a4 a4 alt At 44 44 a4 a4 a I a4 a4 34 a4 a4 a4 a4 34 34 34 a4 a4 J a 1. a & a 1. a 1. a. J. J. J. J. a 1. a 1. a k TEMPORARY al. al. a4 a4 a4 a4 a4 a4 a4 a4 ` a 1. a 1. a 1. a 1. -' J. J. J. J. a .A CONSTRUCTION RIGHT OF WAY x 1 I50' SETBACK xroi _=J STREAM CHANNEL SURFACE FLOW DIVERSION TO TRAP a4 a4 a4 a4 m a4 a4 a4 a4 a4 a4 a4 14 , a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 44 a4 a4 a4 a4 a4 a4 a4 a4 a4 44 44 a4 a4 a4 a4 a4 a4 a4 a4 a4 44 a4 a4 a4 a4 a4 a4 a4 a4 a4 44 44 a4 a4 a4 a4 a4 a4 a4 a4 a4 44 a4 a4 a4 a4 a4 a4 a4 a4 a4 44 44 a4 a4 J a4 a4 a4 a4 a4 a4 _ - a4 a4 a4 a4 a4 a4 a4 a4 At - - a4 a4 a4 a4 a4 a4 a4 a4 _ - a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 44 44 a4 a4 a4 a4 a4 a4 a4 a4 a4 44 a4 a4 a4 a4 a4 a4 a4 a4 a4 44 44 a4 a4 J m a4 a4 a4 a4 a4 a4 a4 44 a4 a4 a4 a4 a4 a4 a4 a4 a4 44 44 a4 a4 a4 a4 a4 a4 a4 a4 a4 44 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 - - a4 a4 a4 a4 a4 a4 a4 a4 a4 - a4 a4 a4 a4 a4 a4 a4 a4 a4 - - a4 a4 J a4 a4 a4 a4 a4 a4 a4 a4 44 44 a4 a4 a4 a4 a4 a4 a4 a4 a4 44 a4 a4 a4 a4 a4 a4 a4 a4 a4 44 44 a4 a4 J a4 a4 a4 a4 a4 a4 a4 a4 _ 44 a4 a4 a4 a4 a4 a4 a4 a4 At 44 44 a4 a4 a4 a4 a4 a4 a4 a4 _ 44 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 44 44 a4 a4 a4 a4 a4 a4 a4 a4 a4 44 a4 a4 a4 a4 a4 a4 a4 a4 a4 44 44 a4 a4 J a4 a4 a4 a4 a4 a4 a4 a4 a4 44 a4 a4 a4 a4 a4 a4 a4 a4 a4 44 44 a4 a4 a4 a4 a4 a4 a4 a4 a4 44 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 44 44 a4 a4 a4 a4 a4 a4 a4 a4 a4 44 a4 a4 a4 a4 a4 a4 a4 a4 a4 44 44 a4 a4 J a4 a4 a4 a4 a4 a4 a4 a4 _ 44 a4 a4 a4 a4 a4 a4 a4 a4 At 44 44 a4 a4 a4 a4 a4 a4 a4 a4 _ 44 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 At a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 At a4 a4 a4 a4 a4 a4 a4 a4 a4 At a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 At a4 a4 a4 a4 a4 a4 a4 a4 a4 At a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 At a4 a4 a4 a4 a a4 a4 a4 a4 a4 a4 At a4 a4 a4 a4 a4 a4 a4 a4 a4 a4 At a4 a4 a4 a4 a4 a4 a4 a4 a4 At a4 a4 a4 a4 a4, STONE APPROACH skrizt \ -j.„Ta/-�.Ta/-��T/-eta/-'4.� �� `�� • • • • ►IIII4I4I4I4Is►,` EXTRA WORKSPACE GENERAL NOTES: 1. NO WASTES, SPOILS, SOLIDS OR FILLS WILL BE PLACED WITHIN WETLANDS, WATERS OR RIPARIAN AREAS. 2. WETLAND CROSSINGS SHALL BE RESTORED TO ORIGINAL CONTOURS ONCE CONSTRUCTION IS COMPLETED. 3. TO RESTORE THE CORRIDOR IN WETLAND AREAS THE CONTRACTOR WILL USE A NATIVE SEED MIX, WHICH WILL BE DISTRIBUTED WITH PLACEHOLDER SPECIES TO PROVIDE SOIL STABILIZATION UNTIL THE PERMANENT SEEDING GERMINATES AND BECOMES ESTABLISHED. THIS SEED MIX WILL BE COMPRISED OF SPECIES THAT ARE NATIVE TO THE COUNTY (WITH THE EXCEPTION OF THE PLACEHOLDER SPECIES. 4. ADDITIONAL MEASURES MAY BE NECESSARY IN ORDER TO PROTECT AFFECTED CREEKS AND WETLANDS. 5. EXCAVATION FOR WETLAND CROSSING AND INSTALLATION OF PIPE SHALL BE CONDUCTED IN THE SAME DAY TO THE FULLEST EXTENT PRACTICAL BACKFILLING AND RESTORATION OF WETLANDS SHOULD OCCUR AS SOON AS PRACTICAL UPON COMPLETION OF PIPE INSTALLATION. 6. TREES WILL BE CUT AND STUMPS LEFT IN PLACE. 7. TOPSOIL REMOVED FROM WETLANDS SHOULD BE KEPT SEPARATELY FROM OTHER TOPSOIL STOCKPILES AND REPLACED IN THE SAME AREA. USE WETLAND MIX OR APPROVED EQUAL FOR FINAL STABILIZATION. NOTE: SEDIMENT BARRIERS MAY ALSO BE INSTALLED AT THE EDGE OF THE CONSTRUCTION R.O.W. AS NECESSARY TO CONTROL SEDIMENT WITHIN WORK AREAS TYPICAL WETLAND CROSSING DETAIL (TWC) 1OPlb" Wit40.41414141410t•‘ /0.� .NINtI-1'�It-1'�It-1'�It-1'�► WV•1r•1t•11•111,.1;•14141t•► ; 1�1 �1•o1 �1�1' STONE APPROACH COMPOST SOCK TO ABUT CROSSING. USE 1 FOOT OVERLAP ON ADJOINING COMPOST SOCK EXTEND STONE UPWARD AND REVEGETATE AS NEEDED TO PROTECT CUT SLOPES COMPOST SOCK TO ABUT CROSSING PERSPECTIVE VIEW STONE APPROACH FILTRATION GEOTEXTILE ROCK OVER EARTH FILL STONE APPROACH SURFACE FLOW 7- DIVERSION INSTALL TRAP ON EITHER SIDE OF CREEK. TRAP SIZE WILL VARY ACCORDING TO LENGTH OF ACCESS ROAD DRAINING TO THIS POINT EQUAL TO 50 CU. FT. PER 100FT OF ROAD .tea s, .�aIL� • • ��� • 1 wI �111 Arn PIPE SIZE AS SHOWN ON PLANS LONGITUDINAL SECTION FILTRATION GEOTEXTILE ORIGINAL STREAMBANK STREAM BED PERMANENT STREAM CROSSING DETAIL MAINTENANCE NOTES: 1. REMOVE AND DISPOSE OF SILT ACCUMULATIONS WHEN THE DEPTH REACHES ONE-HALF OF THE HEIGHT OF THE PERIMETER COMPOST SOCK OR ONE-HALF CAPACITY OF THE TRAPS. 2. REPLACE OR CLEAN THE COMPOST SOCK AS NEEDED TO ALLOW RUNOFF TO SLOWLY DEWATER THROUGH THE DEVICE BETWEEN RAIN EVENTS. 3. MONITOR THE WOODEN STAKES AND STAPLES TO ENSURE THAT THE COMPOST SOCK REMAIN SECURELY ANCHORED AFTER RAIN EVENTS OR HIGH WATER CONDITIONS. 4. MONITOR DAILY TO SUPPLEMENT STONE APPROACHES TO ENSURE PROPER FUNCTIONALITY. 5. CLEAN ANY ERODIBLE MATERIAL TRACKED ONTO THE APPROACHES IMMEDIATELY. SURFACE FLOW DIVERSION TO TRAP •i' / / / / / vc% SOIL SUSCEPTIBLE TO EROSION ,. - \\'M'.AX yc yv GEOTEXTILE FABRIC APRON 8'-10' SECURED WITH tH1-Ffi-Ffi-FN-FNfHi-ffl-Ffi-Nl-FNtfftffi-FftFfi-Ffi-Ffi-FN tHiEfitN-hfi#HfH1-fii-EN-EfitNtNtfil FitNEiitN-ENtNfH1-EfiEN-ENtheiltit#titN }¢Ffi¢fi¢fiffitf#r�-rr.r.„-.„-.,-.,r.,rr-r„-r-.,r.,r-.,-.,r.,r.,r.-,r�r.,rr.,r.,r-rr.,r.„-f#i-ffi-hfitHffitf#t ffrfi H1ffffi Ff4Fii-Ffiffi-F21:421 Fii-ffi-Ffi-Ffiffiffi¢ffi4Ffi-44:44-44:44fFii-Ffi-Ffi-FfiffifFi4ffi-Ff¢Ffiffiffi4fifFf4Fii-Ffif}i-FfiffifFii-ffl-Ffi-Ffi-FH+fffff+ ftrfitNtNfHtF}fH4:44: 4:44: HfHi4ffi-Ffi:44:44ffffffi-4414 NtH1-Ff1-N1-FN-FNfHtNl-Ntrfl 44: ff-FHf 41444 44-44-44f41441444: fay itN NtHi-Ffit WOODEN STAKES OR STAPLES T lint EftFil Filth-hfi+,ifHi f 44:44fff#ffFffH4:44: 4:44: H#fl-ffi-FN-NitNtNfNt rr,Y F4'EFL�:'�1�:72I4- ;_kf;TE+;k;;T+_F#= mmm 'F;_kF,Tr;;k;T'F;EH- 1-44441-H4-Ff-4- ` - H+F4+H+H+144-4H- i- FFftHl- Fiitfl--a-FF - HIH fi-- -- FF�F; 0 -.f-FftFfi-Hi±f4-FF � - -Hf4-;- F iEfft#i-Nitfi-N "tam � h YilUf1W11a11UHIIM lflAhI*111 1illaiilS1511 W11ai11.Y11ib"'ERING' FHf1-N1- ;�-_ a��it� r I DEWAT� ` t FILTER BAG r. T. 1tN+Ni-Nitfl-ff WW'nnHHnn gg„ E+Ni:hfititNt1:44 +i-f 47,4fiN"t`Riliii 7 + I .I -FNtH4-N4-Nltfi- 1-Ffft#1-Hitfi-ff F i*i- i i ti -fitHi-Hff#i-Ffi- 'iff -i1-Ef E^ 1-FNtNi-Nit#i-Ff -fffi-filfiFN1FffNi-- FfF ttlhf1 hh 4111i-N1=f#i-Ffi- +-ENtE+1 R1tH-E+ y GEOTEXTILE ' 4Hi Nfi-Ni- - H. -- - - �-hfffFii- FABRIC LINING - - i-Fff+Ffi-Fii+fl-Ff �fil=fi$f11-I•i'-i-ffl-�i�fi+ rfiffiftffF#i'l7'i+aa Fii-Fi�ff1-Ffi- 144E44-H4+11-4 l5A?lyAt��llBrdhrltihfllSA?lhrtw�'l�a ltihlyhSllrhlSl�lI��lytErdhr��5y111(� �(�_�•(T• _ i-FFitfi-Hit#i-FF� 4451rY44Y94Y4lrY4M�4:Zili1�i 1�4EMO 1�Y14y5h1114yp�140Y 1"yl,lr �Y94Y45•44MF+1l� 0 . . - • - II l 44Y41rN44�45444��:g 1rN441�4�(03:2: 0X 0)401M 44Y41rN402: 4=EF441144-E44±44-14 -f+-i 4111;f1-rti1'Ni-r+i{fi:ki :rt1VM1 111:r - ±I:+;f1;f11'N1NJi Ii;n+-rti1•E11-' H-FH++ EIZEITTH-FH+f i-FF4E4i-Hi±f�-EH i hHfhfi H#fi hfi - = Wes. f4441 44 Hthfi hfi 1-Ffft41-Fiitf1-Ffi- s s - f fi-FfftFii-Hl-ffi-Efi- T1-ininf hi-fi itiinfi-NlfNtfitFfJ hftNl-Ni¢ff-FN¢N¢N1-N-l-Efi-FN¢N¢NtHfl-N+FH+NffitiMaii -Nlffi-FH+Ntl ffl-Ffl-F"-Ltj±f fttt g4P*fiffifh*k Rill-FHtfifHtffit; ... a1.a. hthhitHtHfHthfyhii-Flit?i-hhithithii-hfi-hhi-hhithithithfi-hfthhi-Flit?i-hhithfthii-hfi-hhi-hhithithithfi-hfthhithithithithfthii-hfithi-Efiiflifil SILT FENCE - - - t.1y.t.;y.Iyt;t.ny.�y.;y.. r.,,-.,,r.,-..,r.,r.,,-.,,-.+,-.+,r.r,r.,,-1. -+N1-h#itfi-EN+fit tfit#1-f#thfi-h#itH-ENtEf+N1-E1-EN-ENtfitFit1-Ef+Efltfltff+NtEf+N1-h#itfi-ENtfitFil ff Ffl 1-1;TF1Tf;;-FfT - - - - - - - - - ' ffiFfi-FH-1424fi44* t.yt.t.Iy.;t.;yt.yt; t. t.t.ny.Iyt;y..t.yt.�y.�y:;y.;yt.yt;It.Iy.lt.;y.Iyt;1 Ffi-ffi-Ffi H fifff -1-1-•-..,r.,r.,,-.,,-.+,-..,r.,r.,r.,,-.,r..,r,r+,r.,r.,r.,,-.,,r.,-..,r.,r.,, FH-FH-H-ii- - hfi-hfi-hhitHtHthft / • Sit 4Y4WV • ♦ *Ife r 4,ArAW --I CONSTRUCT DEWATERING STRUCTURE TO ACCOMMODATE ANTICIPATED PUMPING RATES. EXAMPLE PUMPING RATE = 200 G.P.M. STORAGE VOLUME (C.F.) = 16 X 200 G.P.M. = 3200 C.F. HEIGHT OF STRAW BALE STRUCTURE = 3 FEET (2 BALES STACKED) (BASED ON HEIGHT OF BALES, NOT SILT FENCE) INSIDE DIMENSIONS OF STRUCTURE = 33 X 33 FEET SQUARE NOTES: 1. SILT FENCE ENDS MUST BE WRAPPED TO JOIN TWO SECTIONS. 2. INSTALL SILT FENCE 2 INCHES ABOVE TOP OF STRAW BALES, AND ANCHOR A MINIMUM OF 8 INCHES STRAIGHT DOWN. 3. SILT FENCE POST STAKING MUST BE 4 FEET OR LESS. 4. DEWATERING INTAKE HOSE SUPPORTED AT LEAST 1 FOOT FROM BOTTOM OF TRENCH BEING DEWATERED. 5. EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE INSPECTED AND MAINTAINED IN ACCORDANCE WITH THE COMPANY'S UPLAND EROSION CONTROL, REVEGETATION, AND MAINTENANCE PLAN STRAW BALE DEWATERING STRUCTURE WITH FILTER BAG %11 DIVERSION SLOPE 1 \ ► MAX 2%� .. SLOPE BREAKER BACKFILLED PIPE TRENCH ISOMETRIC VIEW SILT FENCE OUTLET WATER BAR SPACING SLOPE (%) SPACING (FT) <5 125 5-10 100 10-20 75 20-33 50 >33 25 WATER BAR NOTES 1. INSTALL WATER BARS ON SLOPES PER NCDEQ'S "RIGHT-OF-WAY DIVERSIONS (WATER BARS)" DETAIL ON SPACING. 2. CONSTRUCT WATER BARS OF COMPACTED EARTH. WATER BARS MUST BE A MINIMUM OF 18-INCH MEASURED FROM CHANNEL BOTTOM TO TOP OF BERM. 3. INSTALL SEDIMENT PIT AT EACH OUTLET OF WATER BAR AND INSTALL A MINIMUM 12-INCH EXCELSIOR COMPOST FILTER SOCK ON UPSTREAM SIDE. USE 2-INCH BY 2-INCH HARD WOODEN STAKES TO ANCHOR IN PLACE WITH A MINIMUM 2-FT SPACING. 4. SILT FENCE OUTLETS SHALL BE USED TO FILTER AND REDUCE THE VELOCITY OF SEDIMENT LADEN WATER WHERE OUTLETS DISCHARGE OFFSITE. 5. SILT FENCE "J-HOOKS" SHALL BE USED TO FILTER AND REDUCE THE VELOCITY OF SEDIMENT LADEN WATER. SILT FENCE "J-HOOKS" SHALL BE SPACED BASED ON CONDITIONS IN THE FIELD. 6. THE USE OF POLYACRYLAMIDES (PAM) IS OPTIONAL WATER BAR INSPECTION & MAINTENANCE 1. INSPECT WATER BARS AT LEAST WEEKLY AND AFTER EACH RAINFALL EVENT THAT EXCEEDS 1.0 INCHES WITHIN A 24 HOUR PERIOD. 2. MAKE ANY NECESSARY REPAIRS IMMEDIATELY. WATER BARS THAT ARE DAMAGED THROUGHOUT THE WORK DAY SHOULD BE REPAIRED AT THE END OF EVERY SHIFT OR EARLIER IN THE EVENT OF A RAIN EVENT APPROACHING. 3. REPLACE COMPOST FILTER SOCK AT SEDIMENT PITS AS NECESSARY AND REAPPLY POLYACRYLAMIDES (PAM) AFTER EACH RAINFALL EVENT THAT EXCEEDS 0.5 INCHES. 4. KEEP WATER BAR FREE OF DEBRIS AND OBSTRUCTIONS. THE CONTRACTOR MAY NEED TO REDRESS OR RESHAPE WATER BARS PERIODICALLY THROUGHOUT THE PROJECT. 5. SEED AND MULCH PERMANENT WATER BARS FOLLOWING CONSTRUCTION. 6. REMOVE ACCUMULATED SEDIMENT FROM OUTLETS AND SEDIMENT PITS AS NECESSARY. TYPICAL WATER BAR / SLOPE BREAKER (SB) / 7 z / PROFESSIONAL ENG/ARCH STAMP PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE *TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 REF. DWG(S) PNG-G-142-0001000 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS 0 05/09/2022 ISSUE FOR CONSTRUCTION JB TFG WKG AREA CODE 1853 ACCOUNT NUMBER 10700 DATE INITIALS REGIONAL ENGINEER PROJECT NUMBER 0232195 DRAWING BY JB DATE INITIALS MGR TECH REC & STD STATION ID CHECKER INITIALS TFG DATE 05/09/2022 INITIALS WKG PRINCIPAL ENGINEER DUKE III Piedmont ENERGY. Natural Gas COPYRIGHT 2018 LINE 142 PIPELINE E&SC DETAILS CLAYTON, NORTH CAROLINA Resource Center GOLDSBORO, NC SHEET(S)84 OF 119 DWG SCALE NOT TO SCALE DWG DATE 09/17/2021 SUPERSEDED DRAWING NUMBER PNG-C-142-0001085 REVISION 0 DISCIPLINE / RESOURCE CENTER / LINE NUMBER W:120-31-3008 Line 142_Flowers Plantation I3_CADIProduction104_EPSCIPNG-C-142-0001091.dwg 5/11/2022 11:27 AM COMPOST FILTER SOCK MATTING SHLD. EDGE OF PAVEMENT SEE INSET A BACK SLOPE ISOMETRIC VIEW 2' (MAX.) • MATTING MATTING PROPOSED 12" PIPELINE SHEET PILING 2' UPSLOPE STAKE 2' DOWNSLOPE STAKE CROSS SECTION VEE DITCH 2' UPSLOPE STAK CROSS SECTION TRAPEZOIDAL DITCH WETLAND 3' MINIMUM 0 2' DOWNSLOPE STAKE NATURAL GROUND • NATURAL GROUND NOTES: 1. USE MINIMUM 12" DIAMETER COMPOST FILTER SOCK. 2. USE 2' WOODEN STAKES WITH A 2" X 2" NOMINAL CROSS SECTION. 3. ONLY INSTALL SOCK(S) TO A HEIGHT IN DITCH SO FLOW WILL NOT WASH AROUND COMPOST SOCK AND SCOUR DITCH SLOPES AND AS DIRECTED. 4. INSTALL A MINIMUM OF 2 UPSLOPE STAKES AND 4 DOWNSLOPE STAKES AT AN ANGLE TO WEDGE COMPOST SOCK TO BOTTOM OF DITCH. 5. INSTALL MATTING IN ACCORDANCE WITH THE NCDOT STANDARD SPECIFICATIONS. 6. MAINTENANCE SHALL CONSIST OF REMOVAL OF LARGE MATERIALS/OBJECTS THAT MAY IMPEDE FLOW AND/OR DAMAGE THE FILTER SOCK. 7. DAMAGED FILTER SOCKS SHALL BE REPLACED IF PUNCTURED, RIPPED, OR NOT FUNCTIONING AS REQUIRED. INSET A / / 12" MIN. / / /UPSLOPE / / / / // STAKE / / / // / / / \ 2' MIN. 6' MIN. A TOP VIEW COMPOST FILTER SOCK CHECK DAM (NOT TO SCALE) TOP APPROX. 12" ABOVE EX GRADE (TYP) UNDISTURBED SOIL SHEET PILING NOTES: 1. REFER TO ALIGNMENT SHEETS FOR LOCATION OF BUOYANCY CONTROL MEASURES. 2. REMOVE SHEET PILING ONCE BACKFILL OF PIPE TRENCH IS COMPLETE. WETLAND CROSSING SHEET PILE INSTALLATION (NOT TO SCALE) INSTALL SHEET PILES 1 FT BEYOND TOP OF BANK ON EACH SIDE OF CROSSING TOP OF BANK SHEET PILE SECTIONS, VARIABLE HEIGHT, INSTALLED PERPENDICULAR TO STREAM CHANNEL. SHEET PILING MEMBERS I CREEK BOTTOM I IIIF," ' �,EHEirliElir11 11, - 711E 1F •IE,IEIIEIIF :u=11F I I TILE EIIF" 7 rrwrvaw 12" PIPELINE MIN COVER 6 SECTION VIEW NOTES: 1. INSTALL SHEET PILING MIN. OF 3' APART CENTERED ON PIPELINE CROSSING. 2. REMOVE SHEET PILING ONCE BACKFILL OF PIPE TRENCH IS COMPLETE. 3, PUMPS SHALL BE OPERATING ONCE THE SHEET PILES ARE INSTALLED AND SHALL REMAIN IN OPERATION UNTIL THE SHEET PILES ARE REMOVED. SPARE PUMPS SHALL BE INSTALLED AND PLUMBED, READY FOR USE IN THE EVENT OF A PRIMARY PUMP FAILURE OR MECHANICAL ISSUE. SHEET PILES EXTEND SHEET PILES 12-INCHES ABOVE THE TOP OF BANK GRADE STREAM 36" MINIMUM INSTALL SIDE BOARDS ACROSS — ENTIRE LENGTH OF BRIDGE (BOTH SIDES) • A44.4 444.40 i0+1434" #4 Ofr ''�OIWOIWI44+9 ADDITIONAL NOTES: 1. SPAN BRIDGE SHALL BE CONSTRUCTED OF TWO LAYERS OF DECKING WITH GEOTECH FABRIC PLACED BETWEEN EACH LAYER. 2. REMOVE AND DISPOSE OF SILT ACCUMULATIONS WHEN THE DEPTH REACHES 1/2 OF THE HEIGHT OF THE PERIMETER COMPOST SOCK OR 1/2 CAPACITY OF THE TRAPS. 3. CLEAN ANY ERODIBLE MATERIAL TRACKED ONTO THE APPROACHES OR SPAN IMMEDIATELY. 4. TWO LAYERS OF MATS (SPAN & DECK) WITH GEOTECH FABRIC BETWEEN EACH LAYER. 3' MINIMUM PIPE CENTERLINE STREAM CROSSING SHEET PILE INSTALLATION (NOT TO SCALE) 1 1 1 1 TOP VIEW 1 sfr SHEET PILES 014 v i sfr WOODEN POSTS FOR SECURING FILTER SOCKS (TYP) STEEL POSTS FOR SILT FENCE INSTALLATION (TYP) sfr w v TRENCH SPOIL • • sfr .1/ .1/ .1/ k sfr sfr ', ', sfr sfr REINFORCED SILT FENCE (TYP) OVERLAP FILTER SOCKS 18" IN FRONT OF SILT FENCE (TYP) 2 - 12" STACKED FILTER SOCKS (FILTREXX ® OR APPROVED EQUIVALENT) TEMPORARY BRIDGE APPROACH BOTTOM ROW FILTER SOCK TO BE INSTALLED BENEATH BRIDGE APPROACH AND SECURED IN PLACE TYPICAL TEMPORARY BRIDGE CROSSING DETAIL (NOT TO SCALE) UPSTREAM DAM • PIPELINE NO CLEARING UNTIL • ;,CROSS THE WORKING OF THE ROW AT #HE END OF EACH DAY 1 25' NECKDOWNI (BEGINNING 20'I. (FROM THEI IOHWMf:: 50' ATWS SETBACK FROM ORDINARY HIGH WATER MARK NOTES 1. NO CLEARING UNTIL TIME OF CROSSING. ONLY WOODY VEGETATION MAY BE FLUSH CUT DURING INITIAL CLEARING. 2. 50' ATWS SETBACK FROM ORDINARY HIGH WATER MARK (OHWM) EXCEPT IN UPLAND AREAS OF CULTIVATED OR ROTATED CROPLAND OR OTHER DISTURBED LAND. 3. INDIVIDUAL COMPONENTS OF THE CROSSING SHALL BE MAINTAINED AS NECESSARY TO PREVENT EROSION AND CONTROL SEDIMENT MOVEMENT. SEDIMENT CONTROL DEVICES SECONDARY CONTAINMENT (DEVICES( ADDITIONAL TEMPORARY WORKSPACE (ATWS) WATERBODY CROSSING DAM AND PUMP METHOD (NOT TO SCALE) ```‘,,, 111 II,,,,,,/// ° °°�Es /o ° _• ti1 °°Y Q E-)409/ 2 2: ( ° G I NEB • °'>` / '''1,MkEITH PROFESSIONAL ENG/ARCH STAMP PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 REF. DWG(S) PNG-G-142-0001000 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS 0 05/09/2022 ISSUE FOR CONSTRUCTION JB TFG WKG AREA CODE 1853 ACCOUNT NUMBER 10700 DATE INITIALS REGIONAL ENGINEER PROJECT NUMBER 0232195 DRAWING BY JB DATE INITIALS MGR TECH REC & STD STATION ID CHECKER INITIALS TFG DATE 05/09/2022 INITIALS WKG PRINCIPAL ENGINEER u DUKE Piedmont IC ENERGY 4. Natural Gas COPYRIGHT 2018 LINE 142 PIPELINE E&SC DETAILS CLAYTON, NORTH CAROLINA Resource Center GOLDSBORO, NC SHEET 85 OF 119 DWG SCALE NOT TO SCALE DWG DATE 09/17/2021 SUPERSEDED DRAWING NUMBER PNG-C-142-0001091 REVISION 0 DISCIPLINE / RESOURCE CENTER / LINE NUMBER .1-1 VP I (ON LEGEND: STREAM BUFFERS r - -- 2,374 SF ZONE 1: PERM. IMPACT e • O 1,970 SF ZONE 2: PERM. IMPACT „ ; �� �--: 0, 99 2,626 SF ZONE 1: TEMP. IMPACT '' balb--/ • 2,098 SF ``' ZONE 2: TEMP. IMPACT •i( STRBFRS1 NeCP P. 2 (S1)ANGLE1053839 ±EGEND ZOE. IMPACT,�I. 2480 ZONE 2: PERM. IMPACT 0 �•� r :::// ;� ~` 0 STREAM (S1) (INTERMITTENT) u / 2,530 SF ZONE 1: TEMP. IMPACT ,- �^ tT [U8343.19 .. 0.04 OPEN CUT FOR GAS LINE, TEMPORARY STREAM CROSSING/MAT r i. 1,833 SF ZONE 2: TEMP. IMPACT ,--' p,� f' ��4 PLACEMENT, POTENTIAL BLASTING, ,'° 8 , e 0 ✓,+5 STREAM (S2) (INTERMITTENT) STREAM 3 (S3) ANGLE: 53° ^ DEWATERING STRUCTURE o e • / ; �` , .� car OPEN CUT FOR GAS LINE, O 4, :' I�' ��/ `- •'• �•� ,00 �. - •DEWATERING PLACEMENT, POTENTIAL BLASTING, STRUCTURE r� 1s' / -��� ►� 7H.ard" ii 1 , , t .1., • -� . .•�++It 0 ti �t ••.`•�`••++ • , � + • - - - - __ SO 4 . + STREAM ( TERMITTENT) RE S3) (IN OPEN CUT FOR GAS LINE, _ .. _ 0 I TEMPORARY STREAM .. '. / WETLAND (W3) OPEN CUT FOR GAS LINE, �, f r oo . �6, ; CROSSING/MAT PLACEMENT, POTENTIAL BLASTING, DEWATERING STRUCTURE SHEET PILE, ;, /POTENTIAL ~ DEWATERING STRUCTURE 11111 ' LEGEND: STREAM BUFFERS • ZONE 1: PERM. IMPACT • �' ., 3,017 SF ,% • oi. E 2,013 SF ZONE 2: PERM. IMPACT 1,811 SF ZONE 1: TEMP. IMPACT j .. t: • i) ., 1,206 SF ZONE 2: TEMP. IMPACT / / - 4- / 1 • f STREAM 2 (S2) ANGLE: 85° / 1 S1: SUBJECT STREAM S1 AND WETLAND W3 CROSSING WITH BUFFER. ALLOWABLE WITH MITIGATION. S2: SUBJECT STREAM S2 CROSSING WITH BUFFER. ALLOWABLE WITH MITIGATION. S3: SUBJECT STREAM S3 CROSSING WITH BUFFER. ALLOWABLE WITH MITIGATION (DUE TO NON -PERPENDICULAR CROSSING) -co % „ - , - _./ / .- /r ' // LEGEND: STREAM BUFFERS 0 SF ZONE 1: PERM. IMPACT 10 i LEGEND: STREAM BUFFERS po Xc''rr %" ` 3„272 SF ZONE 1: PERM. IMPACT 0 0 SF ZONE 2: PERM. IMPACT 2,695 SF ZONE 2: PERM. IMPACT 17- �: 1,856 SF ZONE 1: TEMP. IMPACT / 2,407 SF ZONE 1: TEMP. IMPACT 1,453 SF ZONE 2: TEMP. IMPACT �t / z ! 1,437 SF ZONE 2: TEMP. IMPACT STREAM 6 (S6) ANGLE: 76° leSTREAM 5 (S5) ANGLE: 105° �� Q o 0 0 0 0 o a Q co e• STREAM (S4) (INTERMITTENT) .,.._ 4�� •�• OPEN CUT FOR GAS LINE, ( 4 5O , TEMPORARY STREAM , + 0 CO Op CROSSING/MAT PLACEMENT, \ POTENTIAL BLASTING, �� � ,� DEWATERING STRUCTURE Op ,• ` �, � .� � ' STREAM (S5) (INTERMITTENT) L " • ,/ , %� /� �� OPEN CUT FOR GAS LINE,7 TEMPORARY STREAM V 00 ' �� •� •. -- r ' CROSSING/MAT PLACEMENT POTENTIAL BLASTING, DEWATERING STRUCTURE OOX STREAM 0o L T 0 . r i � � �� (S6) (INTERMITTENT) LEGEND: STREAM BUFFERS + �•' e,;•6 3,586 SF ZONE 1: PERM. IMPACT 3,722 SF ZONE 2: PERM. IMPACT = �� :• r , Alle o 832 SF ZONE 1: TEMP. IMPACT ''''\ 4--2,665 SF ZONE 2: TEMP. IMPACT 000 C142-WAKE-030_) ,� STREAM 4 (S4) ANGLE: 105° ■ / / // .41 AI Vd) S4: SUBJECT STREAM S4 CROSSING WITH BUFFER. ALLOWABLE WITH MITIGATION. S5: SUBJECT STREAM S5 CROSSING WITH BUFFER. ALLOWABLE WITH MITIGATION. S6: SUBJECT STREAM S6 CROSSING WITH BUFFER. EXEMPT - LESS THAN 40' OF RIPARIAN BUFFER WITH MAINTENANCE CORRIDOR LESS THAN 10' IN WIDTH. .`\\��,1 cA ' ,'', ,,\` ,0N ° ... Roy '%, o�.°°�Ess /o °. /2 :; 2•°Q�o by ••° J e % — ,°05 09/ 2 2°�; ( -. tic 1 NE ° N ' /1 �` ��I''""ii""''' PROFESSIONALENG/ARCHSTAMP *PROPRIETARY & CONFIDENTIAL *ALL RIGHTS RESERVED *DO NOT SCALE THIS DUKE ENERGY & PIEDMONT NATURAL GAS DRAWINGS ARE CONFIDENTIAL *DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE *TO ENSURE THERE IS NO WITH RECORDS & INFO MANAGEMENT (RIM) DRAWING *USE DIMENSIONS ONLY RISK OF INAPPROPRIATE DISCLOSURE, ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE REF. DWG(S) () PNG-G-142-0001000 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS SHEET(S) 112 OF 119 DWG SCALE NOT TO SCALE 0 05/09/2022 ISSUE FOR CONSTRUCTION JB TFG WKG AREA CODE 1853 DATE INITIALS REGIONAL LINE 142 PIPELINE ACCOUNT NUMBER 10700 ENGINEER DWG DATE 09117/2021 SUPERSEDED PROJECT NUMBER 0232195 DATE INITIALS MGR TECH DUKE rimI ENERGY. Natural Piedmont Natural GAS STREAM BUFFER DETAILS DRAWING NUMBER REVISION DRAWING BY JB REC & STD CLAYTON, NORTH CAROLI NA PNG 0 STATION ID DATE INITIALS PRINCIPAL -C-142-0001108 CHECKER INITIALS FG 05/09/2022 WKG ENGINEER COPYRIGHT 2018 Resource Center GOLDSBORO, NC DISCIPLINE / RESOURCE CENTER / LINE NUMBER 0 N N O N 0 O O N Z 0 0 00 0 0 U ml 0 0 0 co O O 9 0 _ .. --- —. .....,N,,,,, --I, :,f,,,,,,,,,,,,21 .,,,,,,,,, : vl. \ STREAM (S8) (PERENNIAL) _ — —_ — — I \ \ Y HDD BORE,TEMPORARY STREAM CROSSING. \ I ��� __r� \ •� / — STREAM (S9) (INTERMITTENT) • \ ..„ — — O / I / I� 1 o O // — \ , `'' HDD BORE, TEMPORARY STREAM r I I I +o u� STREAM (S7) i J \ \ [� - CROSSING. • / o �-'� o (INTERMITTENT) � o �`� — — — — — \ � _9, � � ^ ` -� A - 1 o / rr I \ 1 � � to O n. '�, HDD BORE, TEMPORARY STREAM CROSSING. ,--�, `oo' oo ` op �/ > 007 CD Opp o� � • / j � I •I \ X. \ \ p �--- co �/' o LOD 7 am00 L00 1 �� O et- O LOD i 1 O , o� COD `°p7 ^ �• ` `D `COO `` `°O, ` - •Q / \ p COp 00, `.`. o O Cop ,` °O) \ I \ �\ ` C°D°°7 \ �I •/ Ns \ \ . \4 r� / ` I I Q \ / `Op� to ` ....4 "�� °pj ° �i\ 1- o o L� 007 LEGEND: STREAM BUFFERS ,., p L �1 1,273 SF ZONE 1: PERM. IMPACT • ,_°p� Op? N -- \ I �� �. / \ �� I, LOD I too p0 \ ^� 1 i ` X LOD a 848 SF ZONE 2: PERM. IMPACT / , \ Op ' \Go, I1 °p' moo 11LOD LOD 0 SF ZONE 1: TEMP. IMPACT \ o° °o - °° oo, ^ 0 SF ; ZONE 2: TEMP. IMPACT 1 �_- °p Go, 1 STREAM 8 (S8) ANGLES: 105° �I I `°� <° D� I i i x OO COD /.. // / l I ` /!r//•` `lo°` / • i I / \ ---- /i LEGEND: STREAM BUFFERS I / ' LEGEND: STREAM BUFFERS / 1,272 SF ZONE 1: PERM. IMPACT / ��-; 1,207 SF ZONE 1: PERM. IMPACT \ I` \ ZONE 2: PERM. IMPACT \ \ `� 847 SF ZONE 2: PERM. IMPACT 804 SF i \• 0 SF ZONE 1: TEMP. IMPACT 0 SF ZONE 1: TEMP. IMPACT \ • 0 SF ZONE 2: TEMP. IMPACT \----....------ 0 SF ZONE 2: TEMP. IMPACT STREAM 7 (S7) ANGLE: 75°• \ STREAM 9 (S9) ANGLES: 82° ! I 1 S7: SUBJECT STREAM S7 CROSSING WITH BUFFER. ALLOWABLE - LESS THAN 40' OF RIPARIAN BUFFER WITH A MAINTENANCE CORRIDOR GREATER THAN 10' IN WIDTH. S8: SUBJECT STREAM S8 CROSSING WITH BUFFER. ALLOWABLE - LESS THAN 40' OF RIPARIAN BUFFER WITH A MAINTENANCE CORRIDOR GREATER THAN 10' IN WIDTH. S9: SUBJECT STREAM S9 CROSSING WITH BUFFER. ALLOWABLE - LESS THAN 40' OF RIPARIAN BUFFER WITH A MAINTENANCE CORRIDOR GREATER THAN 10' IN WIDTH. \ \ N _. . >\-- o°^ , \ / / 7 / /` �` / o° O°,\ W W W N \ \ // W W W LLB- ...... ....... ___ ______--:,..-- 7 / / ` / W W . . .,/ \ \ / W W W / \ \ / O° W W �W � / / OO XOO % /��\ OO �V 7 \ , 0 / . 4 O ° °° , /, OXO o `/- V .,(� yL O lS/ xc, 64 c_, 7 ` 1 (0,,,;., I I O / STREAM S10 HDD BORE, / i \ I� 1 LL. W LL. W LL. ,O� W \ ` \ �° W W °°/ W \ oo �,� / \ \ °77 ` ; o Q / /5� / TEMPORARY STREAM 1 Ook/ \ °� / W W / �� W°`� W 1 I `oc�• Xi9 �' O `, STREAM S12 _\ o �\ OX 7‘c' �� \ V V `� / CROSSING Ii TEMPORARY STREAM °° I / ` W W W ' V CROSSING \ ;e7 /1 / / OP- W \W °� W \ \ \ 7 7 • • \ \ \ .• .• \ • • / 0 .-..,._. ‘.0(...‘ ________j - C., \ V '-' . • • \ . .• \ 4. \ 4. \ \ \ W W SOW W \ • ' ')Fit 'I \ \ , Q°� / Wow / \ \ oW �a " 1 i / \/ 0, t lip''', / C70x Vd) / \ K---.----- 00x • ' \ • • . • * \ ''' N o(4 //.•,`,••• / \ `l \ 7,007 W W :o;: i'/ i I k I k0 •� O / / OOX /•/ O•roa •• • • 5� \ i �oo� • / oo ' I LEGEND: STREAM BUFFERS `, STREAM (S11) LEGEND: STREAM BUFFERS oc, -,�•�- • ler7 W W W W C4 \ ••• iW� W W Voo� \ 1439 SF ZONE 1: PERM. IMPACT �, (INTERMITTENT) 1,331 SF ZONE 1: PERM. IMPACT •Q� LEGEND: STREAM BUFFERS i W W / I1 '� •$3,692 i- / HDD BORE, •`•°�.�•�• \;V'/ ZONE 1: PERM. IMPACT W W W I \ 803 SF ZONE 2: PERM. IMPACT \ TEMPORARYSTREAM 901 SF• ZONE 2: PERM. IMPACT ' 9 SF :1- \ + • �\`\ CROSSING. %,� ZONE 2: PERM. IMPACT°° 1 END HDD BORE 208+86 2,649 SF W I 0 SF ZONE 1: TEMP. IMPACT 0 SF ZONE 1: TEMP. IMPACT • • •.�04� / \ / •• , .•`� W W 1 >,/ ZONE 1: TEMP. IMPACT / \ \ 0 SF ZONE 2: TEMP. IMPACT 0 SF ZONE 2: TEMP. IMPACT . 2,952 SF N \ STREAM S10 (S10) ANGLE: 94° �'�r STREAM 11 (SiS11) ANGLE: 64° • 7 ... . 1,566 SF ZONE 2: TEMP. IMPACT ` \ . N 1036 46 ,' STREAM S12 (S12) ANGLE: 36° S10: SUBJECT STREAM S10 CROSSING WITH BUFFER. ALLOWABLE WITH MITIGATION (DUE TO NON -PERPENDICULAR CROSSING) S11: SUBJECT STREAM S11 CROSSING WITH BUFFER. ALLOWABLE WITH MITIGATION (DUE TO NON -PERPENDICULAR CROSSING) S12: SUBJECT STREAM S12 CROSSING WITH ALLOWABLE WITH MITIGATION BUFFER. (DUE TO NON -PERPENDICULAR CROSSING) `` ,0 cARi,,,,,,,, ,`\`Q'N•Ess /.�< '-� o °• of o °° "4, =' - ••°Q. •• 7 '= 1 • g - ' �•O5 09/ Z �°�;ENGINEER ��, .'VGIN•°,N`; ��,/�kEITH�,.�� PROFESSIONALENG/ARCHSTAMP *PROPRIETARY & CONFIDENTIAL *ALL RIGHTS RESERVED *DO NOT SCALE DUKE ENERGY & PIEDMONT NATURAL GAS DRAWINGS ARE CONFIDENTIAL *DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE *TO ENSURE THERE IS WITH RECORDS & INFO MANAGEMENT (RIM) THIS DRAWING *USE DIMENSIONS ONLY NO RISK OF INAPPROPRIATE DISCLOSURE, ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE REF. DWG(S) PNG-G-142-0001000 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS SHEET(S) 113 OF 119 DWG SCALE NOT TO SCALE 0 05/09/2022 ISSUE FOR CONSTRUCTION JB TFG WKG AREA CODE 1853 DATE INITIALS REGIONALR LINE 142 PIPELINE ACCOUNT NUMBER 10700 DWG DATE 09/17/2021 SUPERSEDED PROJECT NUMBER 0232195 DATE NITIALSMGR TECH 4/11N DUKE Piedmont Natural Gas�,,11,,,,`DRAWING STREAM BUFFER DETAILS•9 DRAWING NUMBER REVISION BY JB REC&STD ENERGY-,:CLAYTON NORTH CAROLINA PNG 0 STATION ID DATE INITIALS PRINCIPAL -C-142-0001109 CHECKER INITIALS FG 05/09/2022 WKG ENGINEER COPYRIGHT 2018 Resource Center GOLDSBORO, NC DISCIPLINE / RESOURCE CENTER / LINE NUMBER 2 N N 0 0 0 O 0 0 Z d 0 -o 0 O 0 ml 0 0 O N co 0 0 0 �I 0 CV -, tip o n CV 0 CO N qb ►:• r $ N :. 0 STREAM (S15) (INTERMITTENT) OPEN CUT FOR GAS LINE, TEMPORARY STREAM CROSSING/MAT•��. 400PP 40PPP ;' '. STREAM (S13)' (INTERMITTENT) ( ° M a. `� PLACEMENT, POTENTIAL BLASTING, DEWATERING STRUCTURE f ` �� •' ••.�II . �� PERMANENT STREAM CROSSING ON do;oo' �•, -. ' a.M `►• o 0 i. "� , ' gl . • f • / ,' /'w ,i a: , J Pr N �) 00 `� ' S ���� •� •' : �• 4,/, STREAMCUT S16FOR INTGAS ERMITTEN OPEN LINE TEMPORARY STREAM CROSSING/MAT PLACEMENT, , ' ► ► LEGEND: STREAM BUFFERS 001 4 POTENTIAL BLASTING, 3,313 SF / DEWATERING STRUCTURE o :::::::: IL r / ,•4011P' 411 elt • i'V A .1, STREAM (S14) Lip2,100 " 1 SF ZONE 1: TEMP. IMPACT '253 r 011k �' ► . (INTERMITTENT) $ •� /� PERMANENT 1,385 SF ZONE 2: TEMP. IMPACT . -,_^- � o �` STREAM CROSSING �, STREAM 16 (S16) ANGLE: 85° � _ to �O N . 4" R1 t LEGEND: STREAM BUFFERS f LEGEND: STREAM BUFFERS ►' 0 SF ZONE 1: PERM. IMPACT 3,318 SF ZONE 1: PERM. IMPACT 7 0 SF ZONE 2: PERM. IMPACT .` ZONE 2: PERM. IMPACT c\f 2,212 SF :` 5,432 SF ZONE 1: TEMP. IMPACT 2,321 SF ZONE 1: TEMP. IMPACT 1,309 SF ZONE 2: TEMP. IMPACT r : 1 0 ` 704 SF ZONE 2: TEMP. IMPACT �,� • R STREAM 13/14 (S13/14) ANGLE: XX° STREAM 15 (S15) ANGLE: 63°/ x_ c-, Li'1 S13/14: SUBJECT STREAM 13/14 CROSSING WITH BUFFER. ALLOWABLE WITH MITIGATION (DUE TO NON -PERPENDICULAR CROSSING) S15: SUBJECT STREAM 15 CROSSING WITH BUFFER. ALLOWABLE WITH MITIGATION (DUE TO NON -PERPENDICULAR CROSSING) S16: SUBJECT STREAM S16 CROSSING WITH BUFFER. ALLOWABLE WITH MITIGATION. 4 0, Ocs' ;'• / STREAM (S20) (INTERMITTENT) OPEN CUT FOR GAS LINE, TEMPORARY STREAM CROSSING/MAT PLACEMENT, POTENTIAL BLASTING, 4;4 0 �x,6 STREAM (S17) (INTERMITTENT) e�'� V DEWATERING STRUCTURE OPEN CUT FOR GAS LINE, �� ' 00 �^ "s> p� - ; " ,‘ •. ,• .4 / t* STREAM (S18) (INTERMITTENT) % • \ / o 1 00% `o o _ . o o Aft CP HDD BORE, TEMPORARY STREAM CROSSING. 0 j • �� V •A o co i. 't 40 • N r_. • Ln N ` 00 0 p �1 0 V�L Cb7 /.___,-- W / , ... � _ A/1K -41111r4er ••••••,...a �*p 1,„ '' 4. 1 / 0 p STREAM (S19) (INTERMITTENT) OPEN CUT FOR GAS LINE, TEMPORARY STREAM CROSSING/MAT PLACEMENT, POTENTIAL BLASTING, DEWATERING STRUCTURE v `•r ir 4. ; iiippP' i , Ox� �+ O\ LEGEND: STREAM BUFFERS `h / 2,405 SF ZONE 1: PERM. IMPACT LEGEND: STREAM BUFFERS .1 LEGEND: STREAM BUFFERS5,145 3,456 SF ZONE 1: PERM. IMPACT 1,301 SF ZONE 2: PERM. IMPACT .� .. SF ZONE 1: PERM. IMPACT ��j/ O0x0 3,149 SF ZONE 2: PERM. IMPACT44 ►: 0 SF ZONE 1: TEMP. IMPACT 06_, 2,078 SF ZONE 2: PERM. IMPACT 1,860 SF ZONE 1: TEMP. IMPACT I 0 SF ZONE 2: TEMP. IMPACT .° 2,725 SF ZONE 1: TEMP. IMPACT 1,516 SF ZONE 2: TEMP. IMPACT - STREAM 18 (S18) ANGLE: 159° 1,341 SF ZONE 2: TEMP. IMPACT STREAM 17 (S17) ANGLE: 102° 1STREAM 19/20 (S19/20) ANGLES: 62° & 83° S17: SUBJECT STREAM S17 CROSSING WITH BUFFER. ALLOWABLE WITH MITIGATION. S18: SUBJECT STREAM S18 CROSSING WITH BUFFER. ALLOWABLE WITH MITIGATION (DUE TO NON -PERPENDICULAR CROSSING). S19/20: SUBJECT STREAMS 19 AND 20 CROSSINGS WITH BUFFER. ALLOWABLE WITH MITIGATION. .`\\\\�1 CA/ „''�� 'ot.•°°° ss/0 �/,'= ;oe° o••'L'; 2•°Q�o by •° J e % - ,05 09/ 2 2°�; ( -. /1/G I NE ° N ' /1�` �''%M kE I TH °``'• ��I''""iiiiil '\\ PROFESSIONALENG/ARCHSTAMP *PROPRIETARY & CONFIDENTIAL *ALL RIGHTS RESERVED *DO NOT SCALE DUKE ENERGY & PIEDMONT NATURAL GAS DRAWINGS ARE CONFIDENTIAL *DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE *TO ENSURE THERE IS WITH RECORDS & INFO MANAGEMENT (RIM) THIS DRAWING *USE DIMENSIONS ONLY NO RISK OF INAPPROPRIATE DISCLOSURE, ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE REF. DWG(S) PNG-G-142-0001000 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS SHEET(S) 114 OF 119 DWG SCALE NOT TO SCALE 0 05/09/2022 ISSUE FOR CONSTRUCTION JB TFG WKG AREA CODE 1853 DATE INITIALS REGIONAL LINE 142 PIPELINE ACCOUNT NUMBER 10700 ENGINEER DWG DATE 09/17/2021 SUPERSEDED PROJECT NUMBER 0232195 DATE INITIALS MGR TECH DUKE EER'7'Y. ran �IedmOc,t C�,I�tLli'�� GAS STREAM BUFFER DETAILS DRAWING NUMBER REVISION DRAWING BY JB REC &STD4 CLAYTON NORTH CAROLI NA PNG 0 STATION ID DATE INITIALS PRINCIPAL -C-142-0001110 CHECKER INITIALS FG 05/09/2022 WKG ENGINEER COPYRIGHT 2018 Resource Center GOLDSBORO, NC DISCIPLINE / RESOURCE CENTER / LINE NUMBER 2 T2 N N 0 0 0) Z d 17. 0 0 U ml 0 0 0 0 co 0 0 9 0 V STREAM (S21) (PERENNIAL) OPEN CUT FOR GAS LINE, TEMPORARY STREAM CROSSING/MAT PLACEMENT, POTENTIAL BLASTING, DEWATERING STRUCTURE, o BANK STABILIZATION. ', STREAM (S22) (INTERMITTENT) a o 4,t14... ,:: } a c- o T. OPEN CUT FOR GAS LINE, a c o 000) `° .+ 6 o ., .: �, ; -er c p TEMPORARY STREAM it `" L� CO o� o co "� � �,� CROSSING/MAT PLACEMENT, POTENTIAL BLASTING, LC c o L� + Ali �i DEWATERING STRUCTURE, BANK STABILIZATION. LOp � � '"' °" :: di ��..„ -• Mr., co_ y 147 • n' 411, 0 APPAIIIIii I. y '2ev. r ,... ir ,,,,Z 7 ,e, 4- / , • (..,,,, .,, .,„ . IPPPAde:"Prr), , 1,„ c, ,,, . I C A \ f •• : r• r• ! f r II 4,44/e: 64 N/ afO C O k0 ° f /VN e a �''+ STREAM (S23) (INTERMITTENT) LEGEND: STREAM BUFFERS OPEN CUT FOR GAS LINE, CP LEGEND: STREAM BUFFERS LEGEND: STREAM BUFFERS No / . 3,397 SF ZONE 1: PERM. IMPACT 3,005 SF ZONE 1: PERM. IMPACT * 3,928 SF ZONE 1: PERM. IMPACT TEMPORARY STREAM CROSSING/MAT �. PLACEMENT, POTENTIAL BLASTING, ZONE 2: PERM. IMPACT DEWATERING STRUCTURE 3,318 SF ZONE 2: PERM. IMPACT 2,003 SF ZONE 2: PERM. IMPACT .'' 00 2,194 SF x pf' 1,855 SF ZONE 1: TEMP. IMPACT 1,800 SF ZONE 1: TEMP. IMPACT ,� �(� 2,556 SF ZONE 1: TEMP. IMPACT '6E1 1,162 SF ZONE 2: TEMP. IMPACT 1,600 SF ZONE 2: TEMP. IMPACT4. 1,669 SF ZONE 2: TEMP. IMPACT ,.+ •' •• STREAM 21 (S16) ANGLE: 94° STREAM 22 (S17) ANGLE: 93° STREAM 23 (S23) ANGLE: 86° S21: SUBJECT STREAM S21 CROSSING WITH BUFFER. ALLOWABLE WITH MITIGATION. S22: SUBJECT STREAM S22 CROSSING WITH BUFFER. ALLOWABLE WITH MITIGATION. S23: SUBJECT STREAM S23 CROSSING WITH ALLOWABLE WITH MITIGATION. BUFFER. LEGEND: STREAM BUFFERS WETLAND W7A 3,025 SF ZONE 1: PERM. IMPACT 'v..: • FORESTED • TEMPORARY WETLAND CROSSING / 2,656 SF ZONE 2: PERM. IMPACT '' c " if I'LEGEND: STREAM BUFFERS MAT PLACEMENT, TEMPORARY IMPACT DUE TO TRANSITION OF 1,919 SF ZONE 1: TEMP. IMPACT `' = 3,798 SF ZONE 1: PERM. IMPACT FORESTED TO NON -FORESTED �• WETLANDS. SF ZONE 2: TEMP. IMPACT Di, ', 2,356 SF ZONE 2: PERM. IMPACT . • • • . .• .• .• r•1,876 CO da 6) • °, ,`, •` ` ,`, r ••••`•••` •`••,' STREAM 25 (S25) ANGLE: 86° • OD �� 3,570 SF ZONE 1: TEMP. IMPACT •.. r•.•••• .• .*.*.•.••• , • •••r ..... •.•.•••• • L� •• • ....../...........3,496 0 SF ZONE 2: TEMP. IMPACT L00 0 ., •. . STREAM 26 (S26) ANGLE: 105° • ••••rr•••r•r..•r••••.•.• . . •r ...r •••rrr..•rrr.rrr...r•r••rr••rr.•rr• r• ••• r..r• r••-~~ X9�Cr' / f %•; u • / CZ) :: r••••••. ...r•••••• ••••r•• r••r•• •••••rr ••rr •rr• • • ••• •• • ••••••• ••• ••• ••• ••••••• • • •••••••••• ••• '• f 5 ' I ' -7 STREAM S26 INTERMITTENT OPEN CUT FOR GAS LINE, STREAM S24 ( ) . . • • • . • • . • . • . r . . . . • a . . • c� . • a . r • . .rrr•.••r.r•..r•.• •ra•r••r•r...• r • • • • • rrr • • . . . • • • a . r r • • • • • a , ♦ �iT '• •. •'%^ TEMPORARY STREAM (INTERMITTENT) OPEN CUT FOR GAS LINE, TEMPORARY STREAM • r r • • r • • • • • r • r • r • . r . r a • • • • • r r r ra • • • • • y a • • • • • • • • • • • r • • r r r • • • • • r • '``'• �`y�, r r • a • r• • • , , r • • o , , . , . .� MMr • , ` \, -•r. / • �r • .� �i' / o , , ® d- * , t •�� CROSSING/MAT PLACEMENT, POTENTIAL BLASTING, DEWATERING STRUCTURE CROSSING/MAT PLACEMENT, POTENTIAL BLASTING, DEWATERING STRUCTURE �. a lam. • . � r • • • • •- • • • oCO r• 051 '•••••••• • • • •• r • • - • - • • • • - -•- -•-•- ;; STREAM (S25) (INTERMITTENT) OPEN CUT FOR GAS LINE,v, TEMPORARY STREAM � o _r 4*o' N '::,•• • . . . . . a _ . • `• h CROSSING/MAT PLACEMENT, •- _ •• .' '. `�, ' � _••• •� � �' POTENTIAL BLASTING, DEWATERING STRUCTURE "Illir / o -� ' x � �� � CO C � • .... e . I P I 9:10PAI I Pr' Q • CO .10. 'i / zApp. ilird 411P Apr 41, in WETLAND W7B 7 ' #, IPA, FORESTED LEGEND: STREAM BUFFERS a; /, ♦ �• OPEN CUT FOR GAS LINE, 6,332 SF ZONE 1: PERM. IMPACT p —' TEMPORARY WETLAND CROSSING /,' rEW • i e,�� ,,, ' MAT PLACEMENT, POTENTIAL 2,487 SF ZONE 2: PERM. IMPACT /' ;' i • BLASTING, POTENTIAL SHEET PILE, DEWATERING STRUCTURE. 2,881 SF ZONE 1: TEMP. IMPACT = J PERMANENT IMPACT DUE TO / t° TRANSITION OF FORESTED TO 1,515 SF ZONE 2: TEMP. IMPACT • NON WETLAND. -FORESTED STREAM 24 (S24) ANGLE: 140° S24: SUBJECT STREAM S24 AND WETLAND W7 CROSSING WITH BUFFER. ALLOWABLE WITH MITIGATION (DUE TO NON -PERPENDICULAR CROSSING) S25: SUBJECT STREAM S25 CROSSING WITH BUFFER. ALLOWABLE WITH MITIGATION. S26: SUBJECT STREAM S26CROSSING WITH ALLOWABLE WITH MITIGATION. BUFFER. .`\\\��1 CA/ „''�� 'ot.•°°° ss/0 �/,'= ;oe° o'•'L'; 2•°Q4o by •° J e % - ,e05 09/ 2 2°; << •e`�tic i NE° � ' /T'` �''%M kE I TH ° ``'• ��I''""ii""''' PROFESSIONAL ENG/ARCH STAMP *PROPRIETARY & CONFIDENTIAL *ALL RIGHTS RESERVED *DO NOT SCALE DUKE ENERGY & PIEDMONT NATURAL GAS DRAWINGS ARE CONFIDENTIAL *DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE *TO ENSURE THERE IS WITH RECORDS & INFO MANAGEMENT (RIM) THIS DRAWING *USE DIMENSIONS ONLY NO RISK OF INAPPROPRIATE DISCLOSURE, ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE REF. DWG(S) PNG-G-142-0001000 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS SHEET(S) 115 OF 119 DWG SCALE NOT TO SCALE 0 05/09/2022 ISSUE FOR CONSTRUCTION JB TFG WKG AREA CODE 1853 DATE INITIALS REGIONAL LINE 142 PIPELINE ACCOUNT NUMBER 10700 ENGINEER DWG DATE 09/17/2021 SUPERSEDED PROJECT NUMBER 0232195 DATE INITIALS MGR TECH DUKE ENERGY. ra I natural t Natural GAS STREAM BUFFER DETAILS DRAWING NUMBER REVISION DRAWING BY JB REC & STD CLAYTON, NORTH CAROLINA PNG 0 STATION ID DATE INITIALS PRINCIPAL -C-142-0001111 CHECKER INITIALS FG 05/09/2022 WKG ENGINEER COPYRIGHT 2018 Resource Center GOLDSBORO, NC DISCIPLINE / RESOURCE CENTER / LINE NUMBER WETLAND W9-A FORESTED OPEN CUT FOR GAS LINE, TEMPORARY WETLAND CROSSING / MAT PLACEMENT, POTENTIAL BLASTING, POTENTIAL SHEET PILE, DEWATERING STRUCTURE. PERMANENT IMPACT DUE TO TRANSITION OF FORESTED TO NON -FORESTED WETLAND. S27: SUBJECT STREAM S27AND WETLAND W9 CROSSING WITH BUFFER. ALLOWABLE WITH MITIGATION. STREAM (S27) (INTERMITTENT) OPEN CUT FOR GAS LINE, TEMPORARY STREAM CROSSING/MAT PLACEMENT, POTENTIAL BLASTING, DEWATERING STRUCTURE WETLAND W9-B FORESTED TEMPORARY WETLAND CROSSING / MAT PLACEMENT, TEMPORARY IMPACT DUE TO TRANSITION OF FORESTED TO NON -FORESTED WETLANDS. STREAM S31 OPEN CUT FOR GAS LINE, PERMANENT STREAM CROSSING, POTENTIAL BLASTING, DEWATERING STRUCTURE. S31: SUBJECT STREAM S31 CROSSING WITH BUFFER. ALLOWABLE WITH MITIGATION (DUE TO NON -PERPENDICULAR CROSSING). PROFESSIONAL ENG/ARCH STAMP LEGEND: STREAM BUFFERS 3,161 SF ZONE 1: PERM. IMPACT 2,107 SF ZONE 2: PERM. IMPACT 1,904 SF ZONE 1: TEMP. IMPACT 1,268 SF ZONE 2: TEMP. IMPACT STREAM 27 (S27) ANGLE: 105° LEGEND: STREAM BUFFERS 3,368 SF ZONE 1: PERM. IMPACT 2,261 SF ZONE 2: PERM. IMPACT 2,090 SF ZONE 1: TEMP. IMPACT 1,361 SF ZONE 2: TEMP. IMPACT STREAM 31 (S31) ANGLE: 118° LEGEND: STREAM BUFFERS 3000 SF ZONE 1: PERM. IMPACT 2000 SF ZONE 2: PERM. IMPACT 1800 SF ZONE 1: TEMP. IMPACT 1200 SF ZONE 2: TEMP. IMPACT STREAM S-28 ANGLE: 89° S-28: SUBJECT STREAM S-28 WITH BUFFER. ALLOWABLE WITH MITIGATION. S-32: SUBJECT STREAM S-32 WITH BUFFER. ALLOWABLE WITH MITIGATION. STREAM S-32 LEGEND: STREAM BUFFERS 1670 SF ZONE 1: PERM. IMPACT 985 SF ZONE 2: PERM. IMPACT 2500 SF ZONE 1: TEMP. IMPACT 1300 SF ZONE 2: TEMP. IMPACT STREAM S-32 ANGLE: 50° LEGEND: STREAM BUFFERS 3000 SF ZONE 1: PERM. IMPACT 2000 SF ZONE 2: PERM. IMPACT 1800 SF ZONE 1: TEMP. IMPACT 1200 SF ZONE 2: TEMP. IMPACT STREAM S-29/30 ANGLE: XX° S-29/30: SUBJECT STREAM S-29/30 WITH BUFFER. ALLOWABLE WITH MITIGATION. STREAM S-29 STREAM S-30 STREAM (S33/34) (INTERMITTENT) OPEN CUT FOR GAS LINE, PERMANENT STREAM CROSSING, POTENTIAL BLASTING, DEWATERING STRUCTURE LEGEND: STREAM BUFFERS 3,260 SF ZONE 1: PERM. IMPACT 2,160 SF ZONE 2: PERM. IMPACT 1,799 SF ZONE 1: TEMP. IMPACT 1,307 SF ZONE 2: TEMP. IMPACT STREAM 33/34 (S33/34) ANGLE: 100° S33/34: SUBJECT STREAM S33/34 CROSSING WITH BUFFER. ALLOWABLE WITH MITIGATION. *PROPRIETARY & CONFIDENTIAL *ALL RIGHTS RESERVED *DO NOT SCALE THIS DRAWING *USE DIMENSIONS ONLY DUKE ENERGY & PIEDMONT NATURAL GAS DRAWINGS ARE CONFIDENTIAL *DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE *TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE, ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE 05/09/2022 REVISION(S) DESCRIPTION ISSUE FOR CONSTRUCTION BY CHK APPD DESCRIPTION AREA CODE ACCOUNT NUMBER PROJECT NUMBER DRAWING BY STATION ID 10700 0232195 CHECKER INITIALS 1FG 05/09/2022 INITIALS INITIALS INITIALS APPROVALS REGIONAL ENGINEER MGR TECH REC & STD PRINCIPAL ENGINEER COPYRIGHT 2018 LINE 142 PIPELINE STREAM BUFFER DETAILS CLAYTON, NORTH CAROLINA Resource Center GOLDSBORO, NC REF. DWG(S) PNG-G-142-0001000 SHEET(S) 116 OF 1191 DWG SCALE NOT TO SCALE DWG DATE 09/17/2021 SUPERSEDED DRAWING NUMBER PNG-C-142-0001112 DISCIPLINE / RESOURCE CENTER / LINE NUMBER REVISION STREAM (S35) (PERENNIAL) OPEN CUT FOR GAS LINE, TEMPORARY STREAM CROSSING/MAT \ PLACEMENT POTENTIAL BLASTING, DEWATERING STRUCTURE. BANK STABILIZATION. hg • ♦ • \ \ \ --- \`�^\\� \ 11 1 \ I,\\. \ 104, VI TO' \ /\ LEGEND: STREAM BUFFERS 3,015 SF ZONE 1: PERM. IMPACT 2,995 SF�J ZONE 2: PERM. IMPACT 3,665 SF • ZONE 1: TEMP. IMPACT 1,480 SF • • • ZONE 2: TEMP. IMPACT STREAM (S35) ANGLE: 62° S35: SUBJECT STREAM S35 CROSSING WITH BUFFER. ALLOWABLE WITH MITIGATION (DUE TO NON -PERPENDICULAR CROSSING) NRCS NJ-1 WETLAND W1A FORESTED, TEMPORARY WETLAND CROSSING/MAT PLACEMENT, NO PERMANENT IMPACT. 0 / / / A QOs l: 00 MtAlLf ciliZti WAX MY ia`airi -iWYigt• 4Vii�,nCSaVivat VJt' 2VATArrigal SW IGIVAMMEtriffe VAVANKO rA AI NY ANciFIVW. DO 0 0 0 0 co 8 o" Li, I 007 CO / o ° O7 LEGEND: STREAM BUFFERS 0 SF ZONE 1: PERM. IMPACT 0 SF ZONE 2: PERM. IMPACT 3000 SF ZONE 1: TEMP. IMPACT 2000 SF • a • ZONE 2: TEMP. IMPACT NRCS NJ-1 ANGLE: NA NRCS NJ-1: SUBJECT NRCS NJ-1 AND WETLAND W1A WITH BUFFER. ALLOWABLE WITH MITIGATION. LEGEND: STREAM BUFFERS 3,079 SF ZONE 1: PERM. IMPACT 2,066 SF ZONE 2: PERM. IMPACT 2,032 SF , ZONE 1: TEMP. IMPACT 1,372 SF ZONE 2: TEMP. IMPACT STREAM 37 (S36) ANGLE: 94° STREAM (S36) (INTERMITTENT) OPEN CUT FOR GAS LINE, TEMPORARY STREAM CROSSING/MAT PLACEMENT, POTENTIAL BLASTING, DEWATERING STRUCTURE S36: SUBJECT STREAM S36 CROSSING WITH BUFFER. ALLOWABLE WITH MITIGATION. 5kpp 6+00 STREAM (S37/38) (PERENNIAL) OPEN CUT FOR GAS LINE, PERMANENT STREAM CROSSING, POTENTIAL BLASTING, DEWATERING STRUCTURE LEGEND: STREAM BUFFERS 842 SF ZONE 1: PERM. IMPACT 743 SF ZONE 2: PERM. IMPACT 4,055 SF ZONE 1: TEMP. IMPACT 3,983 SF ^ Q e a e a l,e ZONE 2: TEMP. IMPACT STREAM 37/38 (S37/38) ANGLE: 130° • S37/38: SUBJECT STREAM S37/38 CROSSING WITH BUFFER. ALLOWABLE WITH MITIGATION (DUE TO NON -PERPENDICULAR CROSSING). (BEGIN HDD BORE 7+50 WETLAND W1 B FORESTED, OPEN CUT FOR GAS LINE, TEMPORARY WETLAND CROSSING / MAT PLACEMENT, POTENTIAL SHEET PILE, DEWATERING STRUCTURE, PERMANENT IMPACT DUE TO TRANSITION OF FORESTED TO NON -FORESTED WETLANDS. °°XZL o NRCS NJ-2: SUBJECT NRCS NJ-2 AND WETLAND W1 B WITH BUFFER. ALLOWABLE WITH MITIGATION. LIx / LEGEND: STREAM BUFFERS 3751 SF ZONE 1: PERM. IMPACT 2508 SF ZONE 2: PERM. IMPACT 695 SF ZONE 1: TEMP. IMPACT 468 SF ZONE 2: TEMP. IMPACT • • • • NRCS NJ-2 ANGLE: 80° • LOD — SSF ▪ 0O1 LOD a co — LOD .SSF col 0 o / Lo0 NRCS NJ-3 Lo0 LOp SF <DD SF \ SF� SOD SF NRCS NJ-3: SUBJECT NRCS NJ-3 AND WETLAND W2 WITH BUFFER. ALLOWABLE WITH MITIGATION. / 00 / / / / OD F WETLAND W2 FORESTED HDD BORE TEMPORARY WETLAND CROSSING/MAT PLACEMENT. NO GRUBBING ALLOWED. PERMANENT IMPACT DUE TO TRANSITION OF FORESTED TO NON -FORESTED WETLANDS. LEGEND: STREAM BUFFERS 1201 SF ZONE 1: PERM. IMPACT 801 SF ZONE 2: PERM. IMPACT 0 SF ZONE 1: TEMP. IMPACT 0 SF > a • a'. a _ ZONE 2: TEMP. IMPACT NRCS NJ-3 ANGLE: 59° `,.�,N CA RO =�Ess i •.. = ' E)4 09/ 2 2°` �j. tiGINEti \/ kEITH"\\` PROFESSIONAL ENG/ARCH STAMP *PROPRIETARY & CONFIDENTIAL *ALL RIGHTS RESERVED *DO NOT SCALE THIS DRAWING *USE DIMENSIONS ONLY DUKE ENERGY & PIEDMONT NATURAL GAS DRAWINGS ARE CONFIDENTIAL *DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE *TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE, ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO MANAGEMENT (RIM) REF. DWG(S) PNG-G-142-0001000 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS 0 05/09/2022 ISSUE FOR CONSTRUCTION JB TFG WKG AREA CODE 1853 ACCOUNT NUMBER 10700 DATE INITIALS REGIONAL ENGINEER PROJECT NUMBER 0232195 DRAWING BY JKS DATE INITIALS MGR TECH REC & STD STATION ID DATE INITIALS PRINCIPAL ENGINEER eirmi DUKE r6,.. Piedmont ENERGY.. Natural Gas LINE 142 PIPELINE STREAM BUFFER DETAILS CLAYTON, NORTH CAROLINA SHEET(S)117 OF 119 DWG SCALE NOT TO SCALE DWG DATE 09/17/2021 SUPERSEDED DRAWING NUMBER PNG—C-142-0001116 REVISION 0 CHECKER INITIALS FG 05/09/2022 WKG COPYRIGHT 2018 Resource Center GOLDSBORO, NC DISCIPLINE / RESOURCE CENTER / LINE NUMBER (142-WAKE-030_000) (END HDD BORE 163+81 SF - — SF — - SF — — SF LOD LOD LOD LOD LOD LOD O O O rn N a 0 0 0 a c) LOD LOD Goa_ se ^, a0� G01 001 ace SF - — SF — SF SF SF SF — LOD LOD LOD LOD LOD LOD LOD LOD LOD LEGEND: STREAM BUFFERS 3360 SF ZONE 1: PERM. IMPACT 2241 SF ZONE 2: PERM. IMPACT a 3382 SF ZONE 1: TEMP. IMPACT 2241 SF ZONE 2: TEMP. IMPACT a NRCS NJ-4 ANGLE: 118° NRCS NJ-4: SUBJECT NRCS NJ-4 WITH BUFFER. ALLOWABLE WITH MITIGATION. ao�_ + aol gaol oci a0� aol aol aol ao °0°0°O t 00:300°0 of °f30� I SF LOD � SF amen LOD fteamai LOD SF amai LOD S' O°O°O•O- LOD F 0°O°0.0`=0°0°0 _ LOD LOD sp.-�� 13f:jge�0_ LOD LODP�jQOQ LEGEND: STREAM BUFFERS 3007 SF ZONE 1: PERM. IMPACT 2005 SF ZONE 2: PERM. IMPACT 3305 SF ZONE 1: TEMP. IMPACT 2207 SF = ZONE 2: TEMP. IMPACT NRCS NJ-7 ANGLE: 86° emenemft aol aol _ 001 ommenemft a°l a°, LOD Sr- _ LOD SF. SF _ LOD LOD � LOD LOD _ LOD LOD SF _ LOD 1 NRCS NJ-7: SUBJECT NRCS NJ-7 WITH BUFFER. ALLOWABLE WITH MITIGATION. GD, O 7r a ", 7 - - SF LOD LOD CI)tg°':c.;° o - SF g LOD - LOD N ) - U) 0 jL_ LOD (0 0 r0 NRCS NJ-5 STREAM (S6) (INTERMITTENT) TEMPORARY STREAM CROSSING/MAT PLACEMENT --SF _� S LOD LOD L DF SF oftsmanft LOD LOD SF smaft LOD _ LOD mal LEGEND: STREAM BUFFERS 3013 SF ZONE 1: PERM. IMPACT 2009 SF a.ZONE 2: PERM. IMPACT 2596 SF _ ZONE 1: TEMP. IMPACT 2470 SF > ZONE 2: TEMP. IMPACT NRCS NJ-5 ANGLE: 88° NRCS NJ-5: SUBJECT NRCS NJ-5 AND STREAM S6 WITH BUFFER. ALLOWABLE WITH MITIGATION. 7 7 7 sI 7 7 4 0- 0 Qa„, °O°o 000°,0000000 � O°0°:3 <0Q000 ??0 Coo c / / / / o ° / 4/ / // 4 o / ° 0_0 LEGEND: STREAM BUFFERS 678 SF ZONE 1: PERM. IMPACT 610 SF ZONE 2: PERM. IMPACT 4180 SF = rt R rt R rt R ZONE 1: TEMP. IMPACT 2628 SF ZONE 2: TEMP. IMPACT >° > ° •NRCS NJ-8 ANGLE: NA NRCS NJ-8: SUBJECT NRCS NJ-8 WITH BUFFER. ALLOWABLE WITH MITIGATION. aol o L.L. o co l I lol aol a0j L.L. CD OD _ LOD LOD I co LOD Cr LOD . -- �� _ LOD _ LOD SF �— ••00000 OQC ame,LOD SF LOD LOD L♦yi0-p O-0 �pc c) CO c-p aol WETLAND W5B-B FORESTED OPEN CUT FOR GAS LINE, TEMPORARY WETLAND CROSSING / MAT PLACEMENT, POTENTIAL SHEET PILE, DEWATERING STRUCTURE. TEMPORARY IMPACT DUE TO TRANSITION OF FORESTED TO NON -FORESTED WETLANDS. WETLAND W5B-A FORESTED OPEN CUT FOR GAS LINE, TEMPORARY WETLAND CROSSING / MAT PLACEMENT, POTENTIAL SHEET PILE, DEWATERING STRUCTURE. PERMANENT IMPACT DUE TO TRANSITION OF FORESTED TO NON -FORESTED WETLANDS a0l aol is 007 a°l 001 O aol 001 SF LODSF _ LOD _ LOD c —�_ �F .� LOD _ LOD Sr LOD L( LEGEND: STREAM BUFFERS 3912 SF ZONE 1: PERM. IMPACT 2614 SF ZONE 2: PERM. IMPACT 5937 SF ZONE 1: TEMP. IMPACT 3519 SF a ZONE 2: TEMP. IMPACT NRCS NJ-6 ANGLE: 50° NRCS NJ-6: SUBJECT NRCS NJ-6 AND WETLAND W5B-A/B WITH BUFFER. ALLOWABLE WITH MITIGATION. / O O M coo 0 SI M sF �- cc / i / / / / a0 00.0pO, sF pO, p0, jrl p0, // p0, 00.0 p0, / 00 00, 0 I M,e� j sF o i`° j s te, a0� / / O O co O `oo'*****' / //00.0 p01 SF pO, // / p0, co ao, LEGEND: STREAM BUFFERS 3090 SF ZONE 1: PERM. IMPACT 2060 SF ZONE 2: PERM. IMPACT 1854 SF rt rt rt ZONE 1: TEMP. IMPACT 1236 SF ZONE 2: TEMP. IMPACT as ° a ° NRCS NJ-9 ANGLE: 104° NRCS NJ-9: SUBJECT NRCS NJ-9 WITH BUFFER. ALLOWABLE WITH MITIGATION. PROFESSIONAL ENG/ARCH STAMP *PROPRIETARY & CONFIDENTIAL *ALL RIGHTS RESERVED *DO NOT SCALE THIS DRAWING *USE DIMENSIONS ONLY DUKE ENERGY & PIEDMONT NATURAL GAS DRAWINGS ARE CONFIDENTIAL *DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE *TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE, ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO MANAGEMENT (RIM) REF. DWG(S) PNG-G-142-0001 000 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS 05/09/2022 ISSUE FOR CONSTRUCTION JB TFG WKG AREA CODE 1853 ACCOUNT NUMBER 10700 DATE INITIALS REGIONAL ENGINEER PROJECT NUMBER 0232195 DRAWING BY JKS DATE INITIALS MGR TECH STATION ID CHECKER INITIALS FG DATE 05/09/2022 INITIALS WKG PRINCIPAL ENGINEER ebb) DUKE 111 Piedmont le ENERGY Natural Gas COPYRIGHT 2018 LINE 142 PIPELINE STREAM BUFFER DETAILS CLAYTON, NORTH CAROLINA Resource Center GOLDSBORO, NC SHEET(S)118 OF 119 DWG SCALE NOT TO SCALE DWG DATE 09/17/2021 SUPERSEDED DRAWING NUMBER REVISION DISCIPLINE / RESOURCE CENTER / LINE NUMBER oD \ MO po7 ` 07 pO Sr Cl `0O' F `� p0> s0 O 0 1. t<0& M LEGEND: STREAM BUFFERS 3178 SF ZONE 1: PERM. IMPACT 2119 SF ZONE 2: PERM. IMPACT 1908 SF rt ZONE 1: TEMP. IMPACT 1271 SF a ZONE 2: TEMP. IMPACT NRCS NJ-10 ANGLE: 109° D cos., o CO M <o� 007 007 °p> SF o0 NRCS NJ-10: SUBJECT NRCS NJ-10 WITH BUFFER. ALLOWABLE WITH MITIGATION. VD` °O> S,p oo`� O' Is oo NRCS NJ-11: SUBJECT NRCS NJ-11 WITH BUFFER. ALLOWABLE WITH MITIGATION. LEGEND: STREAM BUFFERS 3000 SF ZONE 1: PERM. IMPACT 2000 SF '1 ZONE 2: PERM. IMPACT 1800 SF ZONE 1: TEMP. IMPACT 1200 SF ° ° ° ° ZONE 2: TEMP. IMPACT NRCS NJ-11 ANGLE: 76° .0\`N° ° CAROB OQ °ESS /0. !1': " Q�0 — .� 04 09/ 2Q22.° N. <<j° �GIEti• �N: //''qM kE I TH ° \\\\' PROFESSIONAL ENG/ARCHSTAMP *PROPRIETARY & CONFIDENTIAL *ALL RIGHTS RESERVED *DO NOT SCALE THIS DRAWING *USE DIMENSIONS ONLY DUKE ENERGY & PIEDMONT NATURAL GAS DRAWINGS ARE CONFIDENTIAL *DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE *TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE, ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO MANAGEMENT (RIM) REF. DWG(S) PNG-G-142-0001 000 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS 0 05/09/2022 ISSUE FOR CONSTRUCTION JB TFG WKG AREA CODE 1853 ACCOUNT NUMBER 10700 DATE INITIALS REGIONAL ENGINEER PROJECT NUMBER 0232195 DRAWING BY JKS DATE INITIALS MGR TECH REC & STD STATION ID CHECKER INITIALS FG DATE 05/09/2022 INITIALS WKG PRINCIPAL ENGINEER DUKE 1111 Piedmont 'C ENERGY Rill Natural Gas COPYRIGHT 2018 LINE 142 PIPELINE STREAM BUFFER DETAILS CLAYTON, NORTH CAROLINA Resource Center GOLDSBORO, NC SHEET(S)119 OF 119 DWG SCALE NOT TO SCALE DWG DATE 09/17/2021 SUPERSEDED DRAWING NUMBER PNG-C-142-0001118 REVISION 0 DISCIPLINE / RESOURCE CENTER / LINE NUMBER