HomeMy WebLinkAbout20220668 Ver 1_Mecklenburg Rd Permit Drawings_20220516(Version 3.00; Released August 2021)
BP7.R005.1 TIP/Proj No:17BP.7.R.137 County(ies):Guilford Page 1 of 3
TIP Number: Date:
Phone: Phone:
Email: Email:
County(ies):
CAMA County?
No
Design/Future: Year:2025 Existing:Year:
Project 17BP.7.R.137 involves the replacement of the existing 1@ 21.6' Timber Deck bridge on SR 1376 (Mecklenburg Rd) over Reddicks Creek (Registers Creek per FEMA)
near Greensboro, NC. The existing bridge will be replaced with a 12'x8' Reinforced Concrete Box Culvert (RCBC) buried 1' with 1' sills on the inlet and outlet. Erosion and
Sediment Control devices including silt fence and impervious dikes will be utilized during construction to minimize sediment from leaving the site.
General Project Narrative:
(Description of Minimization of Water
Quality Impacts)
2@ 8' lanes with 1' shoulders
1000
Golf Course, Residential
North Carolina Department of Transportation
Highway Stormwater Program
STORMWATER MANAGEMENT PLAN
FOR NCDOT PROJECTS
Project Type:
1000 Birch Ridge Drive Address:
General Project Information
17BP.7.R.137BP7.R005.1
Address:
10/26/2021
919-707-6711
Raleigh, NC 27606-5217
Contractor / Designer:
919-741-5497
940 Main Campus Dr, Suite 500
bbarham@vhb.com
GuilfordGreensboro, NC
Project Built-Upon Area (ac.)
500
2@ 9' lanes with 4' shoulders
1980
gcail@ncdot.gov
Annual Avg Daily Traffic (veh/hr/day):
Existing Site
Project Length (lin. miles or feet):
ac.ac.
City/Town:
0.1
Typical Cross Section Description:
Surrounding Land Use:
No
Wetlands within Project Limits?
0.07
200 ft
Project Description
Proposed Project
Cape FearRiver Basin(s):
Galen Cail, PE
Raleigh, NC 27610
WBS Element:
Bridge ReplacementWBS Element:
Brandon Barham, PENCDOT Contact:
(Version 3.00; Released August 2021)
BP7.R005.1 TIP/Proj No.:17BP.7.R.137 County(ies):Guilford Page 2 of 3
Aquatic T&E Species?No Comments:
No N/A
N/A
Aquatic T&E Species?Comments:
Aquatic T&E Species?Comments:
North Carolina Department of Transportation
Highway Stormwater Program
STORMWATER MANAGEMENT PLAN
FOR NCDOT PROJECTS
WBS Element:
Supplemental Classification:
Surface Water Body (2):
Deck Drains Discharge Over Water Body?(If yes, provide justification in the General Project Narrative)
NRTR Stream ID:Jordan Lake
Surface Water Body (1): Reddicks Creek (Registers Creek per FEMA)NCDWR Stream Index No.:17-8-(0.05)
General Project Information
Supplemental Classification:
Waterbody Information
NCDWR Surface Water Classification for Water Body
NRTR Stream ID: Buffer Rules in Effect:
NRTR Stream ID:
Other Stream Classification:
Impairments:
Project Includes Bridge Spanning Water Body? Deck Drains Discharge Over Buffer? Dissipator Pads Provided in Buffer?
Deck Drains Discharge Over Water Body?(If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the
General Project Narrative)(If yes, provide justification in the General Project Narrative)
Impairments:
Primary Classification: Water Supply IV (WS-IV) Class C
(If yes, describe in the General Project Narrative; if no, justify in the
General Project Narrative)(If yes, provide justification in the General Project Narrative)
Reddicks Creek Buffer Rules in Effect:
Project Includes Bridge Spanning Water Body? Deck Drains Discharge Over Buffer? Dissipator Pads Provided in Buffer?
Impairments:None
Other Stream Classification:
Supplemental Classification: NCDWR Surface Water Classification for Water Body Primary Classification:
Other Stream Classification:
Surface Water Body (3): NCDWR Stream Index No.:
Buffer Rules in Effect:
Project Includes Bridge Spanning Water Body? Deck Drains Discharge Over Buffer? Dissipator Pads Provided in Buffer?
NCDWR Stream Index No.:
NCDWR Surface Water Classification for Water Body Primary Classification:
(If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the
General Project Narrative)(If yes, provide justification in the General Project Narrative)
Deck Drains Discharge Over Water Body?
(Version 3.00; Released August 2021)
BP7.R005.1 TIP/Proj No.:17BP.7.R.137County(ies):Guilford Page 3 of 3
Sheet No.:4 Station:12+98 L
Sq. Miles
Barrel Height (ft):
Culvert Length (ft)
%
%
Natural Stream Channel 2-yr Velocity (ft/s):3.4
Outlet Velocities
Evaluate/Describe Roadway Geometric Constraints:
Proposed Culvert 2-yr Outlet Velocity (ft/s):4.3
Natural Stream Channel 10-yr Velocity (ft/s):4.5
Proposed Culvert 10-yr Outlet Velocity (ft/s):6.6
Roadway Geometric Considerations
Stream Realignment Necessary? (provide
justification)
No
Bank Stabilization:Bank stabilization is included as part of the culvert design. Class I Rip Rap is proposed for approximately 20' upstream and downstream of the
proposed box culvert.
Stream Patterns Upstream and
Downstream of the Culvert that Could
Affect Fish Passage and Bank Stability:
There are no stream patterns upstream or downstream that could affect fish passage and bank stability.
Bed Forms Impacted by Culvert (riffles,
pools, glides, etc.):
NA
Bends at Inlet/Outlet?
(describe culvert alignment with stream)
No
Existing Streambed Material:Gravel, Silt, Sand
Low Flow Floodplain Bench Required?
(provide justification)
No A low flow bench was not recommended as we are increasing the low flow dimensions between the existing bridge and proposed
culvert.
12 ft
Proposed Sills/Baffles:1' sills will be installed at a 3' offset from the inlet and
outlet of the culvert. The sills will be installed
perpindicular to the Culvert Walls. The culvert will be
backfilled with natiev material to sill height
Existing Low Flow Velocities in the
Stream (ft/s):4.5
Proposed Low Flow Velocities Through
the Culvert (ft/s):6.6
Alternating Low Flow Sills/Baffles:1' sills will be installed at a 3' offset from the
inlet and outlet of the culvert.
Proposed Low Flow Dimensions
Through the Culvert:
Culvert/Stream Alignment
Avoidance and Minimization Efforts:
(Bridge to Culvert)
Impervious dikes with special stilling basins will be used to dewater the site during the installation of the culvert. Silt fence will be installed to
prevent erosion and sediment draining offsite. Rip Rap will be installed upstream and downstream of the wing walls to promote bank stabilization
of the newly installed culvert.
Stream Slope Fish and/or Aquatic Life Passage
Existing Average Stream Slope (%):0.20 Existing Low Flow Channel Dimensions
in the Stream:
10 ft
Proposed Culvert Slope (%):0.44
Culvert Burial
Proposed Culvert Burial Depth (ft):1
Surface Water Body:(1)Reddicks Creek (Registers Creek per FEMA)
46Culvert Type:Reinforced Concrete Box Culvert
8
Proposed Structure Summary
Sheet No. & Station
Drainage Area (ac or sq mi):1
Number of Barrels:1
Barrel Width/Diameter (ft):12
Bridge to Culvert Avoidance and Minimization
North Carolina Department of Transportation
Highway Stormwater Program
STORMWATER MANAGEMENT PLAN
FOR NCDOT PROJECTS
WBS Element:
Sedgefield
Groometown
Southern
1549
4205 4208
1581
1585
1384
4113
1384
1385
4112
4111
4114
4203
4209
4204
4110
4202
4207
4206
4205
1499
1586
1586
1582
1662
1581
1387
1580
13791380
1372
1387
1129
4213
4212
4217
4220
4121
4222
1625
4211
1549
1482
4121
1457
1447
1449
4228
4155
4161
1459
1458
1456
1473
1473 1222
1127
1383
4233
4206
41241498
1495
1482
14831381
1380
1477
1371
1379
1423
1479
1378
1370 1372
1377
1373
1376
1485
1484
1369
1368
1367
1366
1366
1493
1494
1491
1489
1492
1373
1450 1624
1372
1375
1430
1390
1404
1391
1129
1549
1487
1374
1472
1438 1439
1406
4221
1116
1490
14904215
4214
4219
1383
1383
4121
1382
1479
1365
1483
1372
4211
4223
4224
4227
13814154
4153
4150
4150
4152
4151
1478
4216
4157
4158
4160
4166
4165
1429
1367
1376
4121
4217
1476
4228
1383
1431
1475
1388
1403
1442
1382
4238
4237
4225
4236
1546
4221
1383
1373
1379
1372
4218
1482
4224
4226
4182
4206
1387
4243
1584
1129
1129
1129
1546
1389
1403
73
73
85
421
1472
1472
1474
1489
-L- POC Sta. 12+00.00
BEGIN PROJECT 17BP.7.R.137 -L- POC Sta. 14+00.00
END PROJECT 17BP.7.R.137
LIMITS
PROJECT
17BP.7.R.137
NAD 83/ NA 2011
-L- Sta. 12+91.07
BEGIN CULVERT
-L- Sta. 13+04.93
END CULVERTREDDICKS CREEK-L-
(MECKLENBURG ROAD)
SR 1376
JAMESTOWNTO
GREENSBOROTO
WETLAND AND SURFACE WATERS IMPACTS PERMIT
SITE 1
SHEET 1 OF 5
PERMIT DRAWING
65% PLANS
25 50 10050
25 50 10050
5 10 20 10
=ADT
FUNC CLASS =
0
0
0
PROFILE (HORIZONTAL)
PROJECT LENGTH
LETTING DATE:
STATE STATE PROJECT REFERENCE NO.
STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION
NO.
TOTAL
SHEETS
N.C.
SHEET
1
DESIGN DATA
SIGNATURE:
SIGNATURE:
P.E.
P.E.
GRAPHIC SCALES
PLANS
PROFILE (VERTICAL)
HYDRAULICS ENGINEER
LOCATION:
TYPE OF WORK:09/08/99DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
0
00
5:09:36 PMR:\Hydraulics\PERMITS_Environmental\Drawings\400402_Hyd_prm_WET_tsh.dgnbbarhamNORTH CAROLINA DEPARTMENT OF TRANSPORTATION
PROJECT ENGINEER
HYDRAULIC ENGINEERHYDRAULIC ENGINEER
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
PLANS PREPARED BY:
VICINITY MAP
(NOT TO SCALE)
V =
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
ROADWAY DESIGN ENGINEER
17BP.7.R.137
17BP.7.R.137REID B. ROBOL, PE
(1980)
=ADT (2025)
TOTAL LENGTH TIP PROJECT = 0.038 MILES
LENGTH STRUCTURE TIP PROJECT = 0.003 MILES
LENGTH ROADWAY TIP PROJECT = 0.035 MILES 2018 STANDARD SPECIFICATIONS
DAVID SIMPSON, PE
NCDOT CONTACT:
PROGRAM MANAGER
DIVISION BRIDGE
Prepared in the Office of Simpson Engineers & Associates for
RIGHT OF WAY DATE:
1,000
OFF-SITE DETOUR
CONTRACT:GUILFORD COUNTY
ON SR 1376 (MECKLENBURG ROAD)
DIVISION 7
TIM POWERS, PE
500
25 MPH
BRIDGE NO. 402 OVER REDDICKS CREEK
LOCAL
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
GRADING, PAVING, DRAINAGE AND CULVERT
MINIMUM DESIGN CRITERIATIP PROJECT:BP7.R005.1
BP7.R005.2
BP7.R005.3
PE
ROW
CONSTRUCTION
IMPSON
NGINEERS
&SSOCIATESAES
www.simpsonengr.com
(919) 852-0598 (Fax)
(919) 852-0468
Cary, NC 27518
Suite 200
5640 Dillard Drive
LICENSE NO. C-2521
CONCC A R T PA TH 9' B ST
CART PATH 9' BST
36" WD
36" WD
CART PATH 9' BST42" RCPTO JAMESTOWN
TO GREENSBORO
10" PVC
45.00'45.00'EXISTING R/W
EXISTING R/W
EXISTING R/W
EXISTING R/W
INVERT 768.20
10" PVC IN HW INVERT 774.70
TOP 777.02
INVERT S 775.25
INVERT W 774.73
TOP 777.41
INVERT 776.12
36" WD
2SFD
ELEV: 777.88
FINISHED FLOOR
769.19
INVERT REDDICKS CRREDDICKS CR
BK WD RAIL
WD RAIL
vvSEDGEFIELD SANITARY DISTRICT15' SEWER EASEMENT PERSEDGEFIELD SANITARY DISTRICT15' SEWER EASEMENT PERWD8" VCP
10" VCP10" VCP
12" VCPGPS-1
BL-3
MH
MH
EIP
CB
CB
GPS-2
MARKER
BOUNDARY
GOLF
MARKER
BOUNDARY
GOLF
WOODS
SEDGEFIELD SANITARY DISTRICT
15' SEWER EASEMENT PER
SEDGEFIELD COUNTRY
CLUB ACQUISITION LLC
SEDGEFIELD INC.
MICHAEL C. GULLEDGE
COURSE
GOLF
PUE PER
DB 6653 PG 213
COURSE
GOLF
EIP
BK
COURSE
GOLF
A/G GAS
ENCASED
MH
MH
SEDGEFIELD COUNTRY
CLUB ACQUISITION LLC
COURSE
GOLF
MH
SEDGEFIELD SANITARY DISTRICT15' SEWER EASEMENT PER
MECKLENBURG RD
SR 1376 17' BST
-L- POT Sta. 10+00.00
-L- PC Sta. 10+25.00
-L- PT Sta. 12+26.41
-L- PC Sta. 13+26.32
-L- POT Sta. 14+75.00
-L- PT Sta. 14+51.78
-L- Sta. 12+91.07
BEGIN CULVERT
-L- Sta. 13+04.93
END CULVERT
-L- POC Sta. 12+00.00
BEGIN PROJECT 17BP.7.R.137
-L- POC Sta. 14+00.00
END PROJECT 17BP.7.R.137
-L-
1
1
2
SHEET NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
bbarhamR:\Hydraulics\PERMITS_Environmental\Drawings\400402_Hyd_prm_WET_PSH04.dgn5:09:47 PM10/26/2021PROJECT REFERENCE
Office of:
Prepared in the
0 10'025'25'50'5'5'
VERTICAL SCALE HORIZONTAL SCALE
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
LICENSE NO. F-0669
MOTT MACDONALD I & E, LLC
17BP.7.R.137 - GUILFORD 402
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
LICENSE NO. C-3705
VHB ENGINEERING
7621 Purfoy Road, Suite 115
Fuquay-Varina, NC 27526
www.mottmac.com/americas
PI = 13+00.00
EL = 776.95'
VC = 200'
BEGIN GRADE
STA. 12+00.00
EL = 776.46'
END GRADE
STA. 14+00.00
EL = 779.41'
1 @ 12' x 8' RCBC
10 11 12 13 14
750
760
770
780
790 K = 102
BEGIN PROJECT END PROJECT
750
760
770
780
790
-L-
(+)0.4900%
(+)2.4600%
03/12/2019
DATE OF SURVEY
NWSEL = 769.3'
ABUTMENTS
EXISTING
CULVERT HYDRAULIC DATA
DESIGN FREQUENCY
DESIGN DISCHARGE
DESIGN HW ELEVATION
BASE DISCHARGE
BASE FREQUENCY
BASE HW ELEVATION
OVERTOPPING DISCHARGE
OVERTOPPING FREQUENCY
OVERTOPPING ELEVATION
DATE OF SURVEY
W.S. ELEVATION
AT DATE OF SURVEY FT
CFS
FT
CFS
YRS
FT
CFS
YRS
FT
YR
= 637
= 25
= 777.6
= 100
= 777.6
= 880
= 625
= +/-25
= 776.5
= 3/12/2019
= 769.3
(SEE DETAIL)
INLET & OUTLET
1.0' SILL
4
SHEET 2 OF 5
PERMIT DRAWING
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
S S SURFACE WATER
DENOTES IMPACTS IN
050'50'100'SITE 1
INSET SCALE SITE 1
WATER IMPACTS
SURFACE
TEMPORARY
WATER IMPACTS
SURFACE
TEMPORARY
NTS
OUTLET DETAIL
THICKNESS = 2'
W/ GEOTEXTILE (TYP)
CLASS II RIP RAP
2:1
1 @ 12' x 8' RCBC
EST 14 CY
EXCAVATION
THICKNESS = 2'
W/ GEOTEXTILE (TYP)
CLASS II RIP RAP
2:12:12:1
1 @ 12' x 8' RCBC
INLET DETAIL
NTS
EST 12 CY
EXCAVATION
NG
NG
1.0' SILL
1.0' SILL
1@12'X8' RCBC
EST. 60 SY GEOTEXTILE
EST. 24 TONS
CLASS II RIP RAP
EST. 60 SY GEOTEXTILE
EST. 18 TONS
CLASS II RIP RAP
CART PATH 9' BST
36" WD
BK WD RAIL
WD RAIL
10" VCP
EIP
BK
A/G GAS
ENCASED
MH
FF
F
F
F F
F
F
FF
F
F
F F
F
F
CONCC A R T PA TH 9' B ST
CART PATH 9' BST
36" WD
36" WD
CART PATH 9' BST42" RCPTO JAMESTOWN
TO GREENSBORO
10" PVC
45.00'45.00'EXISTING R/W
EXISTING R/W
EXISTING R/W
EXISTING R/W
INVERT 768.20
10" PVC IN HW INVERT 774.70
TOP 777.02
INVERT S 775.25
INVERT W 774.73
TOP 777.41
INVERT 776.12
36" WD
2SFD
ELEV: 777.88
FINISHED FLOOR
769.19
INVERT REDDICKS CRREDDICKS CR
BK WD RAIL
WD RAIL
vvSEDGEFIELD SANITARY DISTRICT15' SEWER EASEMENT PERSEDGEFIELD SANITARY DISTRICT15' SEWER EASEMENT PERWD8" VCP
10" VCP10" VCP
12" VCPGPS-1
BL-3
MH
MH
EIP
CB
CB
GPS-2
MARKER
BOUNDARY
GOLF
MARKER
BOUNDARY
GOLF
WOODS
SEDGEFIELD SANITARY DISTRICT
15' SEWER EASEMENT PER
SEDGEFIELD COUNTRY
CLUB ACQUISITION LLC
SEDGEFIELD INC.
MICHAEL C. GULLEDGE
COURSE
GOLF
PUE PER
DB 6653 PG 213
COURSE
GOLF
EIP
BK
COURSE
GOLF
A/G GAS
ENCASED
MH
MH
SEDGEFIELD COUNTRY
CLUB ACQUISITION LLC
COURSE
GOLF
MH
SEDGEFIELD SANITARY DISTRICT15' SEWER EASEMENT PER
MECKLENBURG RD
SR 1376 17' BST
-L- POT Sta. 10+00.00
-L- PC Sta. 10+25.00
-L- PT Sta. 12+26.41
-L- PC Sta. 13+26.32
-L- POT Sta. 14+75.00
-L- PT Sta. 14+51.78
-L- Sta. 12+91.07
BEGIN CULVERT
-L- Sta. 13+04.93
END CULVERT
-L- POC Sta. 12+00.00
BEGIN PROJECT 17BP.7.R.137
-L- POC Sta. 14+00.00
END PROJECT 17BP.7.R.137
-L-
1
1
2
SHEET NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
bbarhamR:\Hydraulics\PERMITS_Environmental\Drawings\400402_Hyd_prm_WET_con_PSH04.dgn5:09:55 PM10/26/2021PROJECT REFERENCE
Office of:
Prepared in the
0 10'025'25'50'5'5'
VERTICAL SCALE HORIZONTAL SCALE
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
LICENSE NO. F-0669
MOTT MACDONALD I & E, LLC
17BP.7.R.137 - GUILFORD 402
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
LICENSE NO. C-3705
VHB ENGINEERING
7621 Purfoy Road, Suite 115
Fuquay-Varina, NC 27526
www.mottmac.com/americas
PI = 13+00.00
EL = 776.95'
VC = 200'
BEGIN GRADE
STA. 12+00.00
EL = 776.46'
END GRADE
STA. 14+00.00
EL = 779.41'
1 @ 12' x 8' RCBC
10 11 12 13 14
750
760
770
780
790 K = 102
BEGIN PROJECT END PROJECT
750
760
770
780
790
-L-
(+)0.4900%
(+)2.4600%
03/12/2019
DATE OF SURVEY
NWSEL = 769.3'
ABUTMENTS
EXISTING
CULVERT HYDRAULIC DATA
DESIGN FREQUENCY
DESIGN DISCHARGE
DESIGN HW ELEVATION
BASE DISCHARGE
BASE FREQUENCY
BASE HW ELEVATION
OVERTOPPING DISCHARGE
OVERTOPPING FREQUENCY
OVERTOPPING ELEVATION
DATE OF SURVEY
W.S. ELEVATION
AT DATE OF SURVEY FT
CFS
FT
CFS
YRS
FT
CFS
YRS
FT
YR
= 637
= 25
= 777.6
= 100
= 777.6
= 880
= 625
= +/-25
= 776.5
= 3/12/2019
= 769.3
(SEE DETAIL)
INLET & OUTLET
1.0' SILL
4
SHEET 3 OF 5
PERMIT DRAWING
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
S S SURFACE WATER
DENOTES IMPACTS IN
050'50'100'SITE 1
INSET SCALE
WATER IMPACTS
SURFACE
TEMPORARY
WATER IMPACTS
SURFACE
TEMPORARY
SITE 1
NTS
OUTLET DETAIL
THICKNESS = 2'
W/ GEOTEXTILE (TYP)
CLASS II RIP RAP
2:1
1 @ 12' x 8' RCBC
EST 14 CY
EXCAVATION
THICKNESS = 2'
W/ GEOTEXTILE (TYP)
CLASS II RIP RAP
2:12:12:1
1 @ 12' x 8' RCBC
INLET DETAIL
NTS
EST 12 CY
EXCAVATION
NG
NG
1.0' SILL
1.0' SILL
1@12'X8' RCBC
EST. 60 SY GEOTEXTILE
EST. 24 TONS
CLASS II RIP RAP
EST. 60 SY GEOTEXTILE
EST. 18 TONS
CLASS II RIP RAP770 770
770770770770770770
7
7
0
770 775775775775775
7 7 5 7757757
75775775
775
775
780780
780785790CART PATH 9' BST
36" WD
BK WD RAIL
WD RAIL
10" VCP
EIP
BK
A/G GAS
ENCASED
MH
770770775775775 775FF
F
F
F F
F
F
FF
F
F
F F
F
F
4
SHEET 4 OF 5
PERMIT DRAWING
0 50'50'100'100'150'150'
760
770
780
790
03/12/2019
DATE OF SURVEY
NWSEL = 769.3'
SLOPE = 0.44%
CL ELEV = 766.80'
TOP OF BANK RT
TOP OF BANK LT
EX BEDBRIDGE
GOLF CART
SKEW = 120°
GP = 777.41'
1.0' SILLS INLET/OUTLET
W/6" BEVELED HW
1@12'x8' RCBC
CL STA 12+98.00 -L-
1.0' SILL1.0' SILL
SHEET NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
bbarhamR:\Hydraulics\PERMITS_Environmental\Drawings\400402_wet_psh_Culvert.dgn5:10:02 PM10/26/2021PROJECT REFERENCE
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
Office of:
Prepared in the
0 10'025'25'50'5'5'
VERTICAL SCALE HORIZONTAL SCALE
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
LICENSE NO. F-0669
MOTT MACDONALD I & E, LLC
17BP.7.R.137 - GUILFORD 402
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
LICENSE NO. C-3705
VHB ENGINEERING
7621 Purfoy Road, Suite 115
Fuquay-Varina, NC 27526
www.mottmac.com/americas
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream
No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design
(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)
1 -L- 12+83 TO 13+13 1@ 12'x8' RCBC 0.07 < 0.01 47 56
TOTALS*: 0.07 < 0.01 47 56 0
*Rounded totals are sum of actual impacts
NOTES:
Revised 2018 Feb SHEET 5 OF 5
WETLAND AND SURACE WATER IMPACTS SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
GUILFORD
17BP.7.R.137
NC DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
10/26/2021