Loading...
HomeMy WebLinkAboutSW4220502_As-Built - Certification_20220514 (2)1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 1 10 1 11 am NORTH ARROW TITLE LOCATION ELEVATION SYMBOLS N TITLE SCALE: E LEGEND SECTION SECTION ID SHEET NUMBER DETAIL DETAIL ID SHEET NUMBER ELEVATION ELEVATION ID SHEET NUMBER GOVERNING CODE INTERNATIONAL BUILDING CODE (IBC 2009/2012 NORTH CAROLINA BUILDING CODE) I. UC/1U LV/1UJ. • STRUCTURE: 2.0 PSF • GLAZING: 3.0 PSF z = 5.0 PSF 2. ROOF LIVE LOAD = 0 PSF 3. SNOW LOAD: • P = 15.0 PSF (GROUND SNOW) • P9 = 10.1 PSF (FLAT ROOF SNOW) • PS = 8.60 PSF (SLOPED ROOF SNOW) • Ce = 1.00 • Ct = 1.20 • CS = 0.91 • IS = 0.80 4. WIND LOAD: (MAIN WIND FORCE RESISTING SYSTEM) • V = 90 MPH • BUILDING CATEGORY: I • IW = 0.87 • EXPOSURE: C SEISMIC: SS = 0.208 St = 0.081 Sds = 0.222 Shc = 0.130 • OCCUPANCY CATEGORY: I • le = 1.00 • SIhE CLASS: D • SEISMIC DESIGN CATEGORY: B • SEISMIC FORCE RESISTING SYSTEM = CANTILEVERED COLUMN SYSTEM • DESIGN BASE SHEAR: V = 0.089 W CS = 0.089 R = 2.5 • EQUIVALENT LATERAL FORCE ANALYSIS PHOTOVOLTAIC MODULE GROUND MOUNT SYSTEM RBI SOLAR RACK MODEL: GM=1 FOR 0'a wl�q em 0 E N T R O P Y S O L A R I N TE G R A T O R 5 SNOW CAMP SOLAR, LLC 9200 SNOW CAMP ROAD SNOW CAMP, NC 27349 SITE PLAN OVERLAY L o X o w w ; 7 s SHEET INDEX SHEET SHEET DESCRIPTION G-001 COVER SHEET G-002 GENERAL NOTES/MODULE SPECIFICATION SHEETS S-100 SITE PLAN S-101 COMPONENT LAYOUT 1 S-102 COMPONENT LAYOUT 2 S-103 COMPONENT LAYOUT 3 S-104 COMPONENT LAYOUT 4 S-301 RACK SECTION & BAY PLAN VIEWS S-302 ALTERNATE FOUNDATION DETAILS AND SCHEDULE S-501 DETAILS SYSTEM SPECIFICATIONS NOTE: THIS SUBMITTAL/CONSTRUCTION SET WAS PRODUCED FROM DOCUMENTS DATED: 08/13/2015 RECEIVED FROM CUSTOMER ON 09/09/2015. PV MODULE MFR. JINKO SOLAR PV MODULE MODEL # JKM315P-72 # OF PV MODULES/STRING 19 # OF ACTIVE PV MODULES 26,068 # OF SPARE PV MODULES 0 TOTAL # OF PV MODULES 26,068 TOTAL PV SYSTEM WATTS 8.211 MW DC ARRAY TYPE FIXED TILT ARRAY TILT 20 DEGREES TOTAL # OF POSTS 2,380 ARRAY ROW SPACING 21'-0" INTER -ROW SPACE 8'-105/6" ARRAY AZIMUTH 180 DEGREES (NOT ADJUSTED FOR MAGNETIC DECLINATION) ,-04� I - RBI SOLAR Total Solar Service: Design " Fabrication Installation' Parts' Repair Service 5513 VINE STREET CINCINNATI, OH 45217 513.242.2051 FAX: 513.242.0816 ❑ PROFESSIONAL SEAL ENGINEER'S SEAL APPLIES TO DESIGN OF STRUCTURAL COMPONENTS ONLY ......1.... ' a SEAL 027482 ❑ RELEASE RECORD 07 04/07/16 AS -BUILT SET 6 12/15/15 100% SEALED SET 05 12/11/15 REV. CONSTRUCTION SET 04 11/03/15 CONSTRUCTION SET 03 10/20/15 PERMIT SET 02 09/15/15 PERMIT SET 01 09/10/15 PRELIMINARY LAYOUT MARK DATE DESCRIPTION ❑ PROJECT INFORMATION TITLE & ADDRESS: SNOW CAMP SOLAR, LLC 9200 SNOW CAMP ROAD SNOW CAMP, NC 27349 RBI SOLAR PROJECT No.: 153325 DRAWN BY: REVIEWED BY: AW BDS/CN SHEET TITLE: COVER SHEET SHEET No.: G=001 i 7 A 7 7 7 A r% n A r r` 7 rl n A /N A A G I J I •t N CD 0 H 0E Q 7- CD N O N V L 0 J D- W Y J 0 W W it -I 31 kI 992 40 942 m4 A Front Side Back 55 r70 Packaging Configuration ( Two boxes =One pallet ) 25pcs/ box, 50pcs/pallet, 550 pcs/40'HQ Container Current -Voltage & Power -Voltage Curves(305W) Voltage ( V ) Temperature Dependence of ISC,Voc Pmax ISO \ 160 z 140 0 a 120 c > Ise � 100 e v�Yccl N so s max 60 o Z 40 0 20 -50 -25 0 25 50 75 100 Cell Temperature('C) Cell Type Poly -crystalline 156x156mm (6 inch) No.of cells 72 (6x12) ' Dimensions 1956x992x4Omm (77.01x39.05x1.57 inch) Weight 26.5 kg (58.4 lbs.) MMEM Front Glass 4.Omm, High Transmission, Low Iron, Tempered Glass Frame Anodized Aluminium Alloy Junction Box IP67 Rated Output Cables 12 AWG, Length:1200mm Module Type JKM295P JKM300P JKM305P JKM310P JKM315P STC NOCT STC NOCT STC NOCT STC NOCT STC NOCT Maximum Power (Pmax) 295Wp 218Wp 300Wp 221Wp 305Wp 225Wp 31OWp 230Wp 315Wp 233Wp Maximum Power Voltage (Vmp) 36.2V 33.5V 36.6V 33.7V 36.8V 34.OV 37.OV 34.4V 37.2V 34.7V Maximum Power Current (Imp) 8.15A 6.50A 8.20A 6.56A 8.30A 6.62A 8.38A 6.68A 8.48A 6.71A Open -circuit Voltage (Voc) 45.1V 41.9V 45.3V 42.3V 45.6V 42AV 45.9V 42.7V 46.2V 42.8V Short-circuit Current (Isc) 8.76A 7.09A 8.84A 7.16A 8.91A 7.21A 8.96A 7.26A 9.01A 7.28A Module Efficiency STC (%) 15.20 % 15.46 % 15.72 % 15.98 % 16.23 % Operating Temperature(°C) -40°C-+85°C Maximum system voltage 1000VDC (UL) Maximum series fuse rating 15A Power tolerance 0-+3% Temperature coefficients of Pmax -0.41%/°C Temperature coefficients of Voc -0.31%/°C Temperature coefficients of Isc 0.06%i°C Nominal operating cell temperature (NOCT) 45±2°C STC: '. Irradiance 1000W/mz Cell Temperature 25°C AM=1.5 NOCT w° Irradiance 800W/mz # Ambient Temperature 20°C AM=1.5 Wind Speed 1m/s * Power measurement tolerance: ± 3 % The company reserves the final right for explanation on any of the information presented hereby. US-MKT-315P_v1.0_rev2015 www.jinkosolar.com 1& US LISTED J►n«O Building Your Trust in Solar KEY FEATURES IIIII Innovative solar cells Four bus -bar cell technology provides a more robust and powerful module ideal for utility scale applications 1y��t,+� Higher module efficiency cG"N�ER Polycrystalline 72-cell module with power output available to 315W (1 6.23% conversion efficiency) Low -light performance Improved low light performance through advancements in glass technology LOW LIGNT and surface texturing 4444 Strong and durable a 1A00Pa Tested and tried to endure up to 540OPa positive and 240OPa negative loads 54W Pa ®' Weather resistance RESISTANT Certified by TUV for high salt mist and ammonia resistance I LINEAR PERFORMANCE WARRANTY 10 Year Product Warranty • 25 Year Linear Power Warranty 100% a 97.5% `o d 90% 0 a a 80.7% 12 3 year 25 V ' J ' IV I II GENERAL NOTES GENERAL/CONSTRUCTION/SAFETY: STRUCTURAL STEEL: 1. ALL WORK SHALL CONFORM TO THE REQUIREMENTS OF THE APPLICABLE CONSTRUCTION CODE AND THE PROJECT 1. ALL STRUCTURAL STEEL SHALL BE DESIGNED, FABRICATED AND ERECTED IN ACCORDANCE WITH THE LATEST VERSION OF SPECIFICATIONS. AISC "MANUAL OF STEEL CONSTRUCTION." LIGHT GAGE COLD -FORMED SECTIONS SHALL CONFORM TO LATEST VERSION OF AISI SPECIFICATIONS FOR COLD -FORMED STEEL STRUCTURAL MEMBERS. 2. LOCATION OF UNDERGROUND UTILITIES SHALL BE VERIFIED PRIOR TO COMMENCEMENT OF CONSTRUCTION. 2. MATERIALS: 3. DIMENSIONS SHOWN ON PLAN SHALL BE VERIFIED IN FIELD. A. ROLLED SHAPES: ASTM A992 OR A572 GRADE 50, Fy = 50 KSI MINIMUM 4. LAYOUT IS SUBJECT TO CHANGE PER REQUEST AND/OR EXISTING CONDITIONS IN THE FIELD. B. PLATES: ASTM A36 C. TUBULAR SHAPES: ASTM A500 GRADE B, Fy = 50 KSI MINIMUM 5. ENGINEER SHALL NOT BE RESPONSIBLE FOR THE MEANS, METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES OF D. FIELD BOLTS (TYP. U.N.0): SAE J429 GRADE 5 CONSTRUCTION SELECTED BY CONTRACTOR. E. SCREWS: #12 TEKS - GALVANIZED 6. CONTRACTOR SHALL FIELD MEASURE AND VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS. ANY UNEXPECTED 3. TEK SCREWS ARE TO BE INSTALLED USING A 2500 RPM MAX. NON -IMPACTING VARIABLE SPEED DRILL WITH CLUTCH OUT. CONDITIONS OR DISCREPANCIES WITH THE DESIGN DOCUMENTS SHALL BE REPORTED TO THE ENGINEER PRIOR TO INSTALLATION OR ERECTION OF MATERIALS. 4. REFER TO THE RBI SOLAR MANUAL "GROUND MOUNT SYSTEM MODEL GM -I ASSEMBLY INSTRUCTIONS", VERSION 11, FOR STRUCTURAL CONNECTION TORQUE VALUES. 7. THE CONTRACTOR WILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS OF THE JOB SITE INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY 5. ALL WELDING OF STEEL SHALL BE DONE IN ACCORDANCE WITH THE LATEST VERSION OF THE AMERICAN WELD SOCIETY'S AND NOT BE LIMITED TO NORMAL WORKING HOURS. WHEN ON SITE, THE ENGINEER IS RESPONSIBLE FOR HIS OWN SAFETY SPECIFICATIONS - AWS D1.1. ELECTRODES SHALL BE E70 SERIES UNLESS NOTED OTHERWISE. BUT HAS NO RESPONSIBILITY FOR THE SAFETY OF OTHER PERSONNEL OR SAFETY CONDITIONS AT THE SITE. 6. GALVANIZING SPECIFICATIONS - GALVANIZING SHALL BE PER CONTRACT DOCUMENTS 8. NO PERSONNEL SHALL STEP OR STAND ON PHOTOVOLTAIC (PV) MODULES (SOLAR PANELS) AT ANY TIME. RACK STRUCTURE AND PV MODULES ARE NOT DESIGNED FOR LIVE LOADS AND MAY VOID WARRANTY. A. HOT -DIPPED GALVANIZING SHALL BE PER ASTM A123. B. PRE -GALVANIZED MATERIALS SHALL COMPLY WITH ASTM A653 - G90 MINIMUM. 9. THIS RBI SOLAR CONSTRUCTION SET IS DESIGNED FROM PV MODULE DATA SHEET(S) PROVIDED BY THE CUSTOMER. C. ALL STRUCTURAL HARDWARE (NOT MODULE MOUNTING HARDWARE) SHALL BE GALVANIZED. CUSTOMER IS RESPONSIBLE FOR VERIFYING THAT THE PV MODULE(S) DELIVERED TO SITE MATCH DATA SHEET(S) PROVIDED TO RBI SOLAR RBI SOLAR IS NOT RESPONSIBLE FOR PV MODULE DIMENSIONAL DISCREPANCIES DUE TO FURNISHED PV MISCELLANEOUS FASTENER NOTES: MODULES NOT MATCHING CUSTOMER FURNISHED PV MODULE DATA SHEETS. SPECIAL FIELD INSPECTION: 1. ALL SPECIAL INSPECTORS SHALL BE RETAINED BY OWNER/CUSTOMER. THE EXTENT OF THE INSPECTION SHALL COMPLY WITH THE CONTRACT DOCUMENTS, THE BUILDING CODE REQUIREMENTS, AND LOCAL JURISDICTION. IT IS THE OWNER/CUSTOMER'S RESPONSIBILITY TO GIVE PROPER NOTIFICATION TO THE SPECIAL INSPECTOR AND PROCEED WITH THE WORK ONLY AFTER THE SPECIAL INSPECTOR'S APPROVAL. 2. FAILURE TO NOTIFY THE SPECIAL INSPECTOR MAY RESULT IN OWNER/CUSTOMER HAVING TO REMOVE WORK FOR THE PURPOSE OF INSPECTION AT THE OWNER/CUSTOMER'S EXPENSE. 3. PREMATURE NOTIFICATION FOR INSPECTION WILL RESULT IN AN ADDITIONAL INSPECTION WITH ALL EXPENSES AND FEES PAID BY THE OWNER/CUSTOMER. 4. SPECIAL INSPECTORS SHALL KEEP RECORDS OF ALL INSPECTIONS. RECORDS SHALL BE FURNISHED TO THE OWNER, ENGINEER OF RECORD, AND LOCAL JURISDICTION AS REQUIRED. ANY AND ALL DISCREPANCIES SHALL IMMEDIATELY BE BROUGHT TO THE ATTENTION OF THE CONTRACTOR. CORRECTIONS SHALL BE MADE AND A FINAL REPORT OF INSPECTIONS SHALL BE PROVIDED NOTING COMPLETION OF INSPECTIONS AND CORRECTIONS OF DISCREPANCIES. FAILURE TO CORRECT DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER OF RECORD AND THE LOCAL JURISDICTION AND MAY RESULT IN REMOVAL OF COMPLETED WORK AND ADDITIONAL WORK TO CORRECT DISCREPANCIES AT THE CONTRACTOR'S EXPENSE. 5. AS REQUIRED (BY OWNER/CUSTOMER AND/OR E.O.R.), MINIMUM INSPECTION SHALL INCLUDE: IBC TABLE 1705 STRUCTURAL STEEL/ALUMINUM FABRICATION CONTINUOUS PERIODIC MATERIAL IDENTIFICATION X HIGH STRENGTH BOLTS - MATERIAL IDENTIFICATION OF BOLTS, NUTS AND WASHERS X WELD FILLER MATERIALS - IDENTIFICATION AND CONFIRMATION OF COMPLIANCE WITH DESIGN DOCUMENTS X STRUCTURAL STEEL/ALUMINUM ERECTION MATERIAL IDENTIFICATION X INSTALLATION OF HIGH STRENGTH BOLTS X WELDED CONNECTIONS X MEMBER SIZES AND PLACEMENT X GENERAL CONFORMANCE WITH DESIGN DOCUMENTS X CONCRETE CONSTRUCTION MATERIAL IDENTIFICATION X MIX DESIGN VERIFICATION X SIZE AND PLACEMENT OF REINFORCING STEEL X PLACEMENT OF CONCRETE USING PROPER TECHNIQUES X CONCRETE SAMPLES FOR SLUMP, AIR CONTENT, TEMPERATURE, STRENGTH TESTS, ETC. IN ACCORDANCE WITH ACI 318 X PROPER MAINTENANCE OF SPECIFIED CURING TEMPERATURE AND TECHNIQUES X FOUNDATIONS SIZE AND LOCATION OF FOUNDATION EXCAVATIONS X PLACEMENT OF REINFORCING STEEL AS REQUIRED X WORK BY OTHERS: 1. SITE WORK AND DEVELOPMENT. 2. ALL ELECTRICAL WORK INCLUDING WIRING, CONDUIT, PANELS AND LIGHTS TO BE FURNISHED AND INSTALLED BY ELECTRICAL CONTRACTOR. 3. GROUNDING REQUIREMENTS. 4. ALL SHADING ANALYSIS AND/OR PRODUCTION ANALYSIS SHALL BE PERFORMED AND VERIFIED BY OTHERS. RBI SOLAR IS NOT RESPONSIBLE FOR PV SYSTEM DESIGN AS IT PERTAINS TO ELECTRICAL OR PV SYSTEM PRODUCTION. LEVEL LINE & RACK SLOPE 1. ALL BOLTS SHALL BE THE TYPE AND SIZE INDICATED ON DRAWINGS. 2. ALL HARDWARE USED FOR MOUNTING PV MODULES SHALL BE STAINLESS STEEL. 3. ALL PV MODULE MOUNTING HARDWARE SHALL BE INSTALLED AND TORQUED PER MODULE MANUFACTURER'S RECOMMENDATIONS. CONNECTIONS USING WEEB BONDING WASHERS SHALL BE PER RBI INSTALLATION MANUAL - MINIMUM OF 12 FT-LBS FOR 5/16" MOUNTING HARDWARE AND 6 FT-LBS FOR 1/4" MOUNTING HARDWARE. FOUNDATION/CONCRETE NOTES: 1. THE FOUNDATION DESIGN IS BASED ON FIELD TESTS PERFORMED BY RBI SOLAR DATED: 12/07/2015. 2. SOIL LAB REPORT PREPARED BY TERRACON DATED: 12/21/15. 3. CUSTOMER IS RESPONSIBLE FOR VERIFYING SOIL CONDITIONS ARE CONSISTENT WITH FINDINGS INCLUDED IN GEOTECHNICAL REPORT, IF APPLICABLE, AND/OR FIELD TESTS PERFORMED BY RBI SOLAR. VARIATIONS IN SOIL CONDITIONS SHALL BE REPORTED TO GEOTECHNICAL ENGINEER AND/OR ENGINEER OF RECORD RESPONSIBLE FOR FOUNDATION DESIGN PRIOR TO INSTALLATION OF ANY FOUNDATION MATERIALS. 4. CUSTOMER IS RESPONSIBLE FOR VERIFYING CORROSION COMPATIBILITY WITH FOUNDATIONS AND/OR DRIVEN POSTS. 5. BASED ON THE REPORT FROM TERRACON DATED: 12/21/15, THERE IS NO CORROSION MITIGATION REQUIRED FOR THE FOUNDATIONS AND/OR DRIVEN POSTS (RBI SOLAR ENGINEERS ARE NOT CORROSION ENGINEERS, THESE FINDINGS ARE IN REFERENCE TO THE STANDARD RBI SOLAR STRUCTURAL WARRANTY.) 6. INSTALLER/CONTRACTOR SHALL COORDINATE PLACEMENT OF FOUNDATIONS AND/OR ANCHOR BOLTS PER DESIGN DRAWINGS AND/OR MANUFACTURER'S SPECIFICATIONS. 7. RBI SOLAR, INC. DESIGNS DRIVEN -PILE AND ALTERNATIVE FOUNDATIONS BASED ON SOIL PROPERTIES OUTLINED IN CERTIFIED GEOTECHNICAL REPORTS AND/OR DATA FROM FIELD TESTING. ALL DESIGNS ASSUME UNDISTURBED SOIL CONDITIONS, AND DO NOT TAKE INTO ACCOUNT TRENCHING NEAR FOUNDATIONS. FOR CASES WHERE TRENCHING FOR ELECTRICAL WORK IS AT OR NEAR A FOUNDATION, RBI SOLAR RECOMMENDS A MINIMUM OF T-0" CLEAR FROM THE EDGE OF THE TRENCH TO THE EDGE OF THE FOUNDATION FOR "NORMAL GOOD SOIL CONDITIONS." IN CASES OF "POOR SOIL" CONDITIONS, RBI SOLAR RECOMMENDS A MINIMUM CLEAR DISTANCE EQUAL TO OR GREATER THAN THE DEPTH OF THE FOUNDATION. IF IN DOUBT OF SOIL CONDITIONS, RBI SOLAR RECOMMENDS CONSULTING A QUALIFIED GEOTECHNICAL ENGINEER TO ASSESS SOIL CONDITIONS AT THE SITE, NOTE: TRENCHING/EXCAVATION WITHIN T-0" OF ANY RACK SUPPORT POST REQUIRES REPLACING THE ORIGINAL SOIL AND COMPACTION TO 95% STANDARD PROCTOR DENSITY. FOR FURTHER CLARIFICATION ON COMPACTION REQUIREMENTS, RBI SOLAR RECOMMENDS CONSULTING A QUALIFIED GEOTECHNICAL ENGINEER. DRIVEN POST REFUSAL NOTES: NOTE: WHEN REFUSAL IS ENCOUNTERED WHILE INSTALLING DRIVEN -POST FOUNDATIONS, FOLLOW THIS PROCEDURE: 1. ATTEMPT TO DRIVE POST TO DEPTH SHOWN ON DESIGN DOCUMENTS - REFERENCE DETAIL Al/S-301. 2. IF REFUSAL IS ENCOUNTERED, EFFORTS TO DRIVE THE POST FURTHER SHOULD BE STOPPED. 3. DEPTH AND LOCATION OF ANY POST THAT DOES NOT MEET DESIGN EMBEDMENT SHALL BE RECORDED FOR ENGINEERING REVIEW AND RECORD DRAWINGS. 4. POSTS MAY BE FIELD TESTED FOR UPLIFT CAPACITY PROVIDED A MINIMUM EMBEDMENT OF 4 FT. IS ACHIEVED PRIOR TO REFUSAL. EMBEDMENT LESS THAN 4 FT. SHALL REQUIRE AN ALTERNATE FOUNDATION. 5. VERTICAL PULL TEST ON POSTS THAT DO NOT REACH DESIGN EMBEDMENT SHALL RESIST A MINIMUM UPLIFT FORCE OF 3550 LBS. IF POSTS DO NOT MEET THIS MINIMUM, AN ALTERNATE FOUNDATION IS REQUIRED. 6. LATERAL TEST ON POSTS THAT DO NOT REACH DESIGN EMBEDMENT SHALL RESIST A MINIMUM LATERAL FORCE OF 2200 LBS & THE POST SHALL REBOUND WITHIN 1/4" OF ORIGINAL LOCATION. IF POSTS DO NOT MEET THIS MINIMUM REQUIREMENT AN ALTERNATE FOUNDATION IS REQUIRED. 7. POSTS THAT PASS THE FIELD TESTS SHALL BE CUT DOWN TO APPROPRIATE HEIGHT AND HOLES FOR POST -TOP MOUNTING BRACKETS DRILLED IN THE TOP OF POST. 8. ALL CUT SURFACES SHALL BE PAINTED WITH BRUSH -ON GALVANIZING PAINT. RBI SOLAR DOES NOT RECOMMEND SPRAY GALVANIZING FOR REPAIR AND PAINTING OF CUT SURFACES. ETL CLASSIFIED: THIS PROJECT CONTAINS RACKING LABELED AS ETL CLASSIFIED UNDER UL SUBJECT 2703. LABELS ARE APPLIED AT THE FACTORY ON COMPONENTS THAT MAY BE ASSEMBLED AT THE FACTORY OR IN THE FIELD. SEE DETAIL SHEET IN THIS DRAWING SET FOR MORE INFORMATION. RACK SYSTEM TOPOGRAPHIC RELATIONSHIP KEY POINTS 1. TOP OF STRUCTURES LEVEL 2. COL LENGTHS MAY VARY THROUGHOUT 3. OSED PIER HEIGHTS MAY BE EQUAL THROUGHOUT OR MAY VARY FLAT PLANE LEVEL LINE KEY POINTS 1. RACK STRUCTURE IS PARALLEL TO AVERAGE SITE GRADE 2. COLUMN LENGTHS ARE EQUAL THROUGHOUT 3. TOPS OF PIERS FOLLOW AVERAGE SITE GRADE 4. EXPOSED PIER HEIGHTS MAY VARY FOLLOW GRADE RBISOLAR GM -I 0 0 L P n E NA Classified under UL Subject 2703 for Bonding and Grounding Only LEVEL LINE RAC SLOPE OPE KEY POINTS ` p 1. RACK ST URE IS PARALLEL TO AVERAGE SITE GRADE 2. COIL LENGTHS ARE EQUAL THROUGHOUT 3. S OF PIERS FOLLOW AVERAGE SITE GRADE EXPOSED PIER HEIGHTS MAY VARY FOLLOW AVERAGE GRADE '..,00 1 1 RBI SOLAR Total Solar Service: Design * Fabrication Installation * Parts * Repair Service 5513 VINE STREET CINCINNATI, OH 45217 513.242.2051 FAX: 513.242.0816 ❑ PROFESSIONAL SEAL ENGINEER'S SEAL APPLIES TO DESIGN OF STRUCTURAL COMPONENTS ONLY \\111111111/!// CARD =0.0�ESS70 '•'jam ' a SEAL 027482 In RELEASE RECORD 07 04/07/16 AS -BUILT SET 6 12/15/15 100% SEALED SET 05 12/11/15 REV. CONSTRUCTION SET 04 11/03/15 CONSTRUCTION SET 03 10/20/15 PERMIT SET 02 09/15/15 PERMIT SET 01 09/10/15 PRELIMINARY LAYOUT MARK DATE DESCRIPTION ❑ PROJECT INFORMATION TITLE & ADDRESS: SNOW CAMP SOLAR, LLC 9200 SNOW CAMP ROAD SNOW CAMP, NC 27349 RBI SOLAR PROJECT No.: 153325 DRAWN BY: REVIEWED BY: AW BDS/CN SHEET TITLE: GENERAL NOTES/ MODULE SPECIFICATION SHEETS SHEET No.: G=002 1 7 7 n H E C t] 0 A n n A r /1 % (l !1 A n A A 3I 75 00 0 N O N V w / W F 0 J a w Y J 0 W w rn E) 1 .c 1 J 1 •t 1 J 1 V 1 r 1 V POST SCHEDULE SYMBOL MARK DESCRIPTION LENGTH PIECES DETAIL A W6x9 POST 144" 585 Al/S-301 A # IB CUT AND DRILLED - 114 Al/S-302 C ALTERNATE FOUNDATION 27 Al/S-302 POST SETTING NOTES: 1. ALL POST DIMENSIONS SHOWN ARE CENTERLINE TO CENTERLINE OF POST 2. REFERENCE DETAIL Al/S-301 AND A1/3-302 FOR ADDITIONAL INFORMATION ON REQUIRED POST EMBED DEPTHS 3. POST LENGTH INCLUDES ADDITIONAL MATERIAL TO ALLOW FOR TOPOGRAPHICAL VARIANCE O228 MODULES 304 MODULES 2 — — — — MULESQq42 OD — — — — MODULES(jY42 — — — — MODULES 5 380 MOD — — — — 380 MODULES ODULES(Dm — — — — 418 MODULES 8 — — — — 456 MODULES 0456 MODULES — — — — er§-yODULES — — — — gr§-YODULES — — — — GmODULES — — — — GmODULES — — — — &156 MODULES — — — — gr§-YODULES — — — CmODULES — — — — gr§-YODULES — — — — gr§-YODULES — — — — 456 MODULES 20 8284 MODULES TOTAL BAY SCHEDULE BAYS PURLINS DETAIL TYPE QTY. POST -POST DESCRIPTION MARK LGTH. #/BAY PCS. 4P2 6 13'-3 1/4" JINKO JKM315P PORTRAIT MODULES 4 WIDE x 2 HIGH AND 20.0° Z4 159" 4 24 A8/S-301 TILT 4WP2 2 13'-3 1/4" JINKO JKM315P PORTRAIT MODULES 4 WIDE x 2 HIGH WITH 1 Z4W 198 13/16" 4 8 E8/S-301 CANTILEVER WEST SIDE AND 20.00 TILT 5E2P2 20 16'-7 1/16" JINKO JKM315P PORTRAIT MODULES 5 WIDE x 2 HIGH WITH 2 Z5E2 278 7/16" 4 80 G9/S-301 CANTILEVER EAST SIDE AND 20.00 TILT 5P2 124 16'-7 1/16" JINKO JKM315P PORTRAIT MODULES 5 WIDE x 2 HIGH AND 20.00 Z5 198 13/16" 4 496 C10/S-301 TILT JINKO JKM315P PORTRAIT MODULES 5 WIDE x 2 HIGH WITH 2 5W2P2 18 16'-7 1/16" CANTILEVER WEST SIDE AND 20.00 TILT Z5W2 278 7/16" 4 72 G7/S-301 6P2 537 19'-10 7/8" JINKO JKM315P PORTRAIT MODULES 6 WIDE x 2 HIGH AND 20.00 Z6 238 5/8" 4 2148 C8/S-301 TILT NOTES THIS BAY: 1. PURLINS ARE 2 3/4" x 7" x 2 3/4" Z 16 GA. GALVANIZED UNLESS NOTED OTHERWISE. 2. TOP CHORDS ARE 119 7/8" x 4" SQ. 14 GA. GALVANIZED UNLESS NOTED OTHERWISE. 3. LOWER KNEE BRACES ARE 71 3/4" x 2" SQ. 15 GA. GALVANIZED UNLESS NOTED OTHERWISE. w c� X-BRACE SCHEDULE SYMBOL DESCRIPTION SETS DETAIL CB 2 STRANDS OF 22'-0" LONG 3/16" GALV. 7x19 184 C7/S-501 WIRE ROPE WITH 4 GRIPPLE #4 WIRE CLAMPS 1 • . . . . . . . . . . . . . . . . . . . . . . - . 1f 111 11f 111 11 • . IIf , . , . . M. pill 1111MmillMR.111Mill RM111millIM011111R11111111111R111111.111111111111 11111MR111 . �I.E�111111.{�III'11111��11111{�11111��'�111��11111{�III� 1�11111��!'1 1f 111 1 IIf-111 - 111��IIII��IIII�F1111��IIII�FIIII�F1111��IIII�FIIII�a ����-IIII�FII11��1 I��IIII�F1111��1111��1111�FIIIf-111 . 1111.{11 . �111111.EA11111��11111��11111.E�J11111.{�111111.E�11111�1111111��!'11111.E111111�111111��1111111.E�11111.{111111��111111.E�1,11111.{�111111��111111.E1'11111.{�11111��11111��111111��11_11.E�V : I��i J �111 - If 11IIIIF11111111IIIIF1111F1111FIIIIFIIIIIIIIFIIIIFIIIIIIIIFIIIIa11111111F11 IIIIIIIIFIIIIIIIIIIIIFIIIf 11 11 . .. . • . • 1l11W 11 11111111111MR1 : 1.1111 1111111 111111111 11 1- 111��11111 111111.��11111�1111.� 1111R�!'1111.� 1111.E ! . , . • . • . • . • . • . • . • . 11111 • 1111111a1111 • •-111111111111111r-111r-111r-1Ir---111 1l1111l.111111M1111MINE IR11111 1111110111111 11111M'111E11111R111111.��11111N11111U1111R11111ml. 1.1111 U1111 P111R-m'1llMull, Nu1 . ,. •. •. •. •. •. •. •. ..11��1111��1111��1111�a1111��1111��1111��1111��1111��1111��1111��1111��1111��1111��1111��1111��111r-111r-111r-1Ir---111 - - - . . . , . .. .. . .111111.i�1'1111R�11111R�111111.i�111111��1,1111R�111111.��11111.E11111R�11111�111111.E�'11111.i�11111.E�1111�111111.i�1111.E�1111.i�1111R�11111.i11111.E�1111.i�1'111R�11111.i�11111.��11 -111r-111r-111r-111r-111f-111r-111f-llr---111 . , . • . • . • . • . • . • . • . . . 11��1111��1111��1111�a1111��1111��1111��1111��1111��1111��1111��1111��1111��1111��1111��111f INfl1111111111111IINA1111 MINE 1.�111111.��J11111. milli m11111m1111m 11111 Him Him 1.��1�'1111m1111m11111 Him NOUN 011111.��}�1111 1.��1111_I.11l IIF�IIF�111�FIIII�F1111�F1111�FIIII�F1111�F1111�FIIII�FIIII�FIIII��IIII�FIIII�FIIII�FIIII�a1111�F1111�F1111�F1111�F1111�F1111�F1111�F1111�F1111�F1111�F1111�F1111�F1111�F1111�a1111�F111F�11 ' 11 ' 11 ' 11 ' 11 ' 11 ' 1� 111 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11.E�11111.{11111.��111111.EA11111.{111111.E�11111.E�J11111�111111111111.E�111111.{�!'11111.E111111�111111.{�1111111.E�11111.{�111111.{�111111.E�1,11111.{�111111.��}11111.E1'11111.{�11111.E�11111.E�111111.{�11111.E�11111.E111111.{�11111.E�11111.{�111111.{�!'11111.E�11111��11111��!!1111R�111111.{�111111.E�11111.E�11111.��11 11 - 1-1111��IIII�F1111��1111��IIII�F1111�F1111�FIIII�FIIII��IIII�FIIII�FIIII��IIII�FIIII�a1111�F1111�F1111��1111��1111�F1111��1111��1111�F1111��1111�F1111�F1111��1111�F1111�a1111��1111�F1111�a1111��1111�F1111��111f-1Ir---111 11. 11--- - --- -1R�111111.�A11111�111111�R11111��J11111.��111111.�111111.��1111R�111111.�111111.�111111.��111111R�11111.��111111.��111111.��1,1111R�111111.��11111.�1'11111.��1111R�11111.��111111.��11111.��1111R111111.��11111.��11111.��11111��!'11111��11111��11111.��!!1111R�1111R�11111R�11111.��1111R�11 1 111��1111��1111��1111��1111��1111��1111��1111��1111��1111��1111��1111��1111��1111�a1111��1111��1111��1111��1111��1111��1111��1111��1111��1111��1111��1111��1111��1111�a1111��1111��1111�a1111��1111��1111��111F�1�-111 II��IIIII.��IIIR�IIIIII.�AIIIII�111111�R11111��J11111��lIIIII.�111111.��1111R�!'11111.�111111.�111111.��111111R�11111.��111111.��llllll.��l,IIIIR�111111.��}11111.�1'IIIII.��1111R�11111.��111111.��11111.��1111R111111.��11111.��11111.��11111R�!'11111.��11111.��11111.��!!1111R�11111.��111111.��11111.��llllR�ll 11 -11r-1111��1111��1111��1111��1111��1111��1111��1111��1111��1111��1111��1111��1111��1111�a1111��1111��1111��1111��1111��1111��1111��1111��1111��1111��1111��1111��1111��1111�a1111��1111��1111�a1111��1111��1111��111r-1Ir---111 11�f1111R11111.111111i111111.i111111.E111111.E�111111.i111111111111.E�111111.i�!'11111.E111111.i111111.i�1'11111.E�111111.i�111111.i�111111.E�1,11111.i�111111.��11111.E1'11111.i�11111111111�'1111R�11111.E�11111.E111111.i�11111.E�11111.i111111.i!'11111.E111111.i111111.��!!11111.E�111111.i111111.E�11111.E�11111.�11 11 1 111��1111��1111��1111��1111��1111��1111��1111��1111��1111��1111��1111��1111��1111�a1111��1111��1111��1111��1111��1111��1111��1111��1111��1111��1111��1111��1111��1111�a1111��1111��1111�a1111��1111��1111��111r-1Ir---111 II.Ei1111.i�1111.��lIIIII.EAIIIII�111111��11111��J11111�1IIIII�111111.E�11111.i�!'IIIII.E111111.i1llllli�l'11111.E111111.i�111111.i�111111.E�l,llllli�111111.��}11111.E1'IIIII.i�11111.E1lIIII.E�111111.i�11111.E�11111.E111111.i�lIIII.E�11111.i�111111.i�!'IIIII.E�11111.i�11111.��!!11111.E�11111.i�111111.E�11111.E�11111.��11 11 1 111��1111��1111��1111��1111��1111��1111��IIII��IIII��IIII��IIII��IIII��IIII��IIII�a1111��1111��1111��1111��1111��1111��1111��1111��1111��1111��1111��1111��1111��1111�a1111��1111��1111�a1111��1111��1111��111r-11r---111 INfl111 Mill Mm1111 MINE Milli MR.1111 MINE milli Milli R 1111MI.R11111.111111.�1'11111.��11111�111111��111111��11111��11111�111111��11111��11111��111111��!'11111.��11111.��11111.��!!11111��111111��111111��11111��11111��11 11 - 1 - 111�F1111��1111�F1111�F1111��1111�F1111�FIIII�FIIII��IIII�FIIII�FIIII��IIII�FIIII�a1111��1111�F1111��1111��1111�F1111��1111��1111�F1111��1111�F1111�F1111��1111�F1111�a1111��1111�F1111�a1111��1111�F1111��111f-1Ir---111 11.��11111.�11111.��111111.�A11111.111111.�111111.��J11111.��111111.111111.��111111��111111�111111�111111��1111111�11111R�111111��11111R 1111R 11111M11111M'1111R11111R11111M111111M11111R01111R11111U-1111M111111 HIM1 11 - 1 - 111�FIIII�F1111��1111��IIII�F1111��1111��IIII�FIIII��IIII�FIIII�FIIII��IIII�FIIII�a1111��1111�F1111��1111��1111�F1111��1111��1111�F1111��1111�F1111�F1111��1111�F1111�a1111��1111�F1111�a1111��1111�F1111��111f-1Ir---111 MIN Nil Mil R11111R111llMR.1111Milli Milli RMill Iill - 11�111111�1!1111R11111R111111�111111�111111�111111��111111��!'11111�111111�111111��1111111��111111��111111��11111��11111��11111��11 1- - - - - - II�F1111��1111�a1111�F1111�F1111�F111 • • • • • • • • • • • • • III�a1111��1111�F1111��1111��1111�F1111��1111��1111�F1111��1111�F1111�F1111��1111�F111f-111f-1Ir---111 ,. ,. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . • . I Al SCALE: COMPONENT LAYOUT 1 ') 1 2 I ^ F R 7 Q Q 1 n J w I RBI SOLAR Total Solar Service: Design ' Fabrication Installation' Parts' Repair Service 5513 VINE STREET CINCINNATI, OH 45217 513.242.2051 FAX: 513.242.0816 ❑ PROFESSIONAL SEAL ENGINEER'S SEAL APPLIES TO DESIGN OF STRUCTURAL COMPONENTS ONLY `�unlun',q \ACAR0 'a SEAL = 027482 N S E ❑ RELEASE RECORD 07 04/07/16 AS -BUILT SET 6 12/15/15 100% SEALED SET 05 12/11/15 REV. CONSTRUCTION SET 04 11/03/15 CONSTRUCTION SET 03 10/20/15 PERMIT SET 02 09/15/15 PERMIT SET 01 09/10/15 PRELIMINARY LAYOUT MARK DATE DESCRIPTION ❑ PROJECT INFORMATION TITLE & ADDRESS: SNOW CAMP SOLAR, LLC 9200 SNOW CAMP ROAD SNOW CAMP, NC 27349 RBI SOLAR PROJECT No.: 153325 DRAWN BY: REVIEWED BY: AW BDS/CN SHEET TITLE: COMPONENT LAYOUT 1 SHEET No.: smi 0 1 H E C t] 0 A II ■ A u ■ ■ A f% A A i, ■ POST SCHEDULE SYMBOL MARK DESCRIPTION LENGTH PIECES DETAIL A W6x9 POST 144" 214 Al/S-301 A # IB CUT AND DRILLED 15 Al/S-302 POST SETTING NOTES: 1. ALL POST DIMENSIONS SHOWN ARE CENTERLINE TO CENTERLINE OF POST 2. REFERENCE DETAIL Al/S-301 AND A1/3-302 FOR ADDITIONAL INFORMATION ON REQUIRED POST EMBED DEPTHS 3. POST LENGTH INCLUDES ADDITIONAL MATERIAL TO ALLOW FOR TOPOGRAPHICAL VARIANCE Al SCALE: 1 /32" COMPONENT LAYOUT 3 =1'-0' 1 76 MODULES — 2 152 MODULES — 3 152 MODULES — 4 152 MODULES — 5 152 MODULES — Qj��DULES — 152 MODULES 7 — — 76 MODULES 114 MODULES 114 MODULES 10 — -- 11 152 MODULES — Qj��DULES — — 152 MODULES 13 — -- 14 152 MODULES — &152 MODULES — — 152 MODULES 16 — -- EY2356MOC�ULIfS152 MODULES _ TOTAL BAY SCHEDULE BAYS PURLINS DETAIL TYPE QTY. POST -POST DESCRIPTION MARK LGTH. #/BAY PCS. 4P2 17 13' 3 1/4" JINKO JKM315P PORTRAIT MODULES 4 WIDE x 2 HIGH AND 20.0° Z4 159" 4 68 ASIS 301 TILT 4WP2 11 13'-3 1/4" JINKO JKM315P PORTRAIT MODULES 4 WIDE x 2 HIGH WITH 1 Z4W 198 13/16" 4 44 E8/S-301 CANTILEVER WEST SIDE AND 20.00 TILT 5E2P2 17 16-7 1/16" JINKO JKM315P PORTRAIT MODULES 5 WIDE x 2 HIGH WITH 2 Z5E2 278 7/16" 4 68 G9/S-301 CANTILEVER EAST SIDE AND 20.00 TILT 5P2 72 16-7 1/16" JINKO JKM315P PORTRAIT MODULES 5 WIDE x 2 HIGH AND 20.00 Z5 198 13/16" 4 288 C10/S-301 TILT JINKO JKM315P PORTRAIT MODULES 5 WIDE x 2 HIGH WITH 2 5W2P2 6 16-7 1/16" CANTILEVER WEST SIDE AND 20.00 TILT Z5W2 278 7/16" 4 24 G7/S-301 6P2 89 19'-10 7/8" JINKO JKM315P PORTRAIT MODULES 6 WIDE x 2 HIGH AND 20.00 Z6 238 5/8" 4 356 C8/S-301 1 TILT NOTES THIS BAY: 1. PURLINS ARE 2 3/4" x 7" x 2 3/4" ZEE 16 GA. GALVANIZED UNLESS NOTED OTHERWISE. 2. TOP CHORDS ARE 119 7/8" x 4" SQ. 14 GA. GALVANIZED UNLESS NOTED OTHERWISE. 3. KNEE BRACES ARE 71 3/4" x 2" SQ. 15 GA. GALVANIZED UNLESS NOTED OTHERWISE. CB CB Al A2 A3 A4�A AF A7 AS 5W2P2 5P2 5P2 5P2 5P2 4P2 5E2P2 126'-1%6" CB CB CB [REF.] CB Al A2 1.3 A4 A5 AF A7 AR AQ A11) 61'1 612 613 A14 Al!; Al6 5W2P2 5P25P2 5P2 5P2 5P2 5P2 5P2 5P2 5P2 5P2 4P2 4P2 4P2 5E2P2 CB CB CB CB Al f A3 A4 A5 A6 A7 A8A9610 611 612 613A14 A15 5W2P25P2 6P2 6P2 5P2 5P2 5P2 5P2 5P2 5P2 5P2 5P2 5P2 5E2P2 CB CB CB CB Al A2 A3 A4 A A6 A7 BR 6P2 A9 A111 B1'1 61'? A1'3 A14 4WP2 6P2 6P 2 6P2 6P2 6P2 6P6P2 5P2 5P2 5E2P2 CB CB CB CB Al A2 t f-6P2 A5A6 A7 AR A9 A111 B1'1 61'? 61'3 A14 4WP2 6P2 6P2 6P2 6P2 6P2 6P2 6P2 6P2 5P2 5P2 5E2P2 _ 7'-3Y" U CB CB CB ' CB �� U. N. O. a- q Al Al- A3 A4 A5 AF A7 AR AQ A111 A11 A161,3 611 A1,� A16 4WP2 4P2 4P2 4P2 4P2 4P2 4P2 6P2 6P2 6P2 6P2 6P2 5P2 5P2 5E2P2 p `� CB CB CB CB o ED Lu Al A2 A3 A4 A5 AF A7 AR AQ g111 A1'1 Al') A13 A11 A1!i A16 z 4WP2 4P2 4P2 4P2 4P2 4P2 4P2 6P2 6P2 6P2 6P2 6P2 5P2 5P2 5E2P2 CB CB � Al A2 A3 t A5AFA7AS5W2P2 4P2 5P25P2 5P2 5P2 5E2P2 111��1111��1111��111��'11�� ■■�i'�'1111�i'�,'11�1�i�♦1� 1 11 CB CB CB CB Al A2 A3 f A5A6A7ARAQ A1. A1. A1:_ Al:. A1�.4WP2 5P2 5P25P2 5P2 5P2 5P2 5P2 6P2 6P2 6P2 6P2 5P2 5E2P2 CB CB CB Al A2 A3 ArCB S A6 A7 AR A9 A1. A1. A1A1:. A1. 4WP2 5P2 5P2 5P2 5P2 5P2 5P2 5P2 6P2 6P2 6P2 6P2 5P2 5E2P2 CB CB CB CB Al A2 A3 A4 AF AF A7 AR AQ A111 A1'1 Arm_A1'3 A1q� 4WP2 5P2 6P2 6P2 6P2 6P2 6P2 6P2 6P2 6P2 6P2 5E2P2 u CB CB CB CB _— — Al A2 A3 �rA4 A5 t f f AQ A11) A1'1 A1'�r�13 A14 4WP2 5P2 6P2 6P2 6P2 6P2 6P2 6P2 6P2 6P2 6P2 5P2 5E2P2 J CB CB CB CB Al A2 A3 �rA4 �A5 AF A7 AR AQ A11) A1'1 A1'�rrA13 A14 4WP2 5P2 6P2 6P 6P2 6P 6P 6P2 6P2 6P 6P 5P2 5E2P2 J CB CB CB CB Al A2 A3 A4 t AF A7 AlR AlQ A1D 1111 A1'? A11.11 A14 4WP2 5P2 6P2 6P2 6P2 6P2 6P2 6P2 6P2 6P2 6P2 5P2 5E2P2 J CB CB CB CB Al A2 A3 A4 A5 AF f AR 6P2 A111 I 1'1 I 1'? A13 A14 4WP2 5P2 6P2 6P2 6P2 6P2 6P2 6P2 6P2 6P2 6P2 5P2 5E2P2 339'-2Y2" [APPROXIMATE] 00 co X-BRACE SCHEDULE SYMBOL DESCRIPTION SETS DETAIL CB 2 STRANDS OF 22'-0" LONG 3/16" GALV. 7x19 WIRE ROPE WITH 4 GRIPPLE #4 WIRE CLAMPS 62 C7/S-501 w N E RBI SOLAR Total Solar Service: Design ' Fabrication Installation' Parts' Repair Service 5513 VINE STREET CINCINNATI, OH 45217 513.242.2051 FAX: 513.242.0816 ❑ PROFESSIONAL SEAL ENGINEER'S SEAL APPLIES TO DESIGN OF STRUCTURAL COMPONENTS ONLY 0\A CArR0 ",,,� °0'FESS7� - ? a SEAL 027482 ❑ RELEASE RECORD 07 04/07/16 AS -BUILT SET 6 12/15/15 100% SEALED SET 05 12/11/15 REV. CONSTRUCTION SET 04 11/03/15 CONSTRUCTION SET 03 10/20/15 PERMIT SET 02 09/15/15 PERMIT SET 01 09/10/15 PRELIMINARY LAYOUT MARK DATE DESCRIPTION ❑ PROJECT INFORMATION TITLE & ADDRESS: SNOW CAMP SOLAR, LLC 9200 SNOW CAMP ROAD SNOW CAMP, NC 27349 RBI SOLAR PROJECT No.: 153325 DRAWN BY: REVIEWED BY: AW BDS/CN SHEET TITLE: COMPONENT LAYOUT 3 SHEET No.: S=1 03 ■ i7 ■ F ■ M ■ m ■ •7 ■ n 7 A II ■ A r r+ u ■ I ■ I A f% A A 1 v 0 0E J 11111111 41 ME POST SCHEDULE SYMBOL MARK DESCRIPTION LENGTH PIECES DETAIL A W6x9 POST 144" 300 Al/S-301 A # IB CUT AND DRILLED - 44 Al/S-302 C I ALTERNATE FOUNDATION 11 Al/S-302 POST SETTING NOTES: 1. ALL POST DIMENSIONS SHOWN ARE CENTERLINE TO CENTERLINE OF POST 2. REFERENCE DETAIL Al/S-301 AND Al/S-302 FOR ADDITIONAL INFORMATION ON REQUIRED POST EMBED DEPTHS 3. POST LENGTH INCLUDES ADDITIONAL MATERIAL TO ALLOW FOR TOPOGRAPHICAL VARIANCE Al SCALE: 1 /32"= l'-0' COMPONENT LAYOUT 4 BAY SCHEDULE BAYS PURLINS DETAIL TYPE QTY. POST -POST DESCRIPTION MARK LGTH. #/BAY PCS. 3P2 3 9'-11 7/16" JINKO JKM315P PORTRAIT MODULES 3 WIDE x 2 HIGH AND 20.0° Z3 119 3/16" 4 12 A10/S-301 TILT 4EP2 2 13'-3 1/4" JINKO JKM315P PORTRAIT MODULES 4 WIDE x 2 HIGH WITH 1 Z4E 198 13/16" 4 8 E10/S-301 CANTILEVER EAST SIDE AND 20.00 TILT 4P2 72 13'-3 1/4" JINKO JKM315P PORTRAIT MODULES 4 WIDE x 2 HIGH AND 20.00 Z4 159" 4 288 A8/S-301 TILT 4WP2 16 13'-3 1/4" JINKO JKM315P PORTRAIT MODULES 4 WIDE x 2 HIGH WITH 1 Z4W 198 13/16" 4 64 E8/S-301 CANTILEVER WEST SIDE AND 20.00 TILT JINKO JKM315P PORTRAIT MODULES 5 WIDE x 2 HIGH WITH 2 5E2P2 16 16-7 1/16" CANTILEVER EAST SIDE AND 20.00 TILT Z5E2 278 7/16" 4 64 G9/S-301 5P2 45 16-7 1/16" JINKO JKM315P PORTRAIT MODULES 5 WIDE x 2 HIGH AND 20.00 Z5 198 13/16" 4 180 C10/S-301 TILT 5W2P2 2 16-7 1/16" JINKO JKM315P PORTRAIT MODULES 5 WIDE x 2 HIGH WITH 2 Z5W2 278 7/16" 4 8 G7/S-301 CANTILEVER WEST SIDE AND 20.00 TILT 6P2 181 19'-10 7/8" JINKO JKM315P PORTRAIT MODULES 6 WIDE x 2 HIGH AND 20.00 Z6 238 5/8" 4 724 C8/S-301 TILT NOTES THIS BAY: 1. PURLINS ARE 2 3/4" x 7" x 2 3/4" Z 16 GA. GALVANIZED UNLESS NOTED OTHERWISE. 2. TOP CHORDS ARE 119 7/8" x 4" SQ. 14 GA. GALVANIZED UNLESS NOTED OTHERWISE. 3. LOWER KNEE BRACES ARE 71 3/4" x 2" SQ. 15 GA. GALVANIZED UNLESS NOTED OTHERWISE. 50 V-7" CO CD 0 ow3:Cb N 0' 0 CB CB CB CB CB Q aiEn LILES Al A2 A3 A4 A5 A6 A7 A8 A9 1IJI1IlI11 14 All A116 All A18 A19 4WP2 4P2 4P2 4P2 4P2 4P2 6P2 6P2 2 2 5P2 5P2 5P2 5E2P2 CB CB CB CB CIB it I ' P. U,N TYP. U.N.O. 190MODULES Al A2 A3 A4 A5 A6 17 A8 AQ A1() 1 1'1 IJAA18 A19 1 9 4WP2 4P2 4P2 4P2 4P2 4P2 6P2 6P2 6P2 6P2 2 5P2 5P2 5P2 5E2P2 CB CB CB CB 152 MODULES A l A 2 A 3 A 4 A 5 JA F A Q A A 11) All A l'? 20 4WP2 5P2 6P2 6P2 6P2 6P2 6P2 6P2 5P2 A 1/5E2P214 w CB CB CB CB U 152 MODULES w Al A2 A3 f A5 t A7 �� f TT� qa A11) Al'I Al'? A .3 A14 a_ Q L 4WP2 5P2 6P2 6P2 6P2 6P2 6P2 6P2 6P2 6P2 6P2 5P2 5E2P2 = 3: w OX CB CB �r CB CB 1 � N O MODULES Al A2 A3 A4 A5 AF A7 AR AQ A111 All Al.? Bl3 A14 bowQjL2 4WP2 5P2 6P2 6P2 6P2 6P2 6P2 6P2 6P2 6P2 6P2 5P2 5E2P2 z } CB CB CB CB CB w ~ 23 228 MODULES — — TTTT a T1Tr rTTT,f�r _ ~ Al A2 A3 A . A5 AF A7 f g111 Al'1 Al'� A13 Al<I Al5 B11 Al'' A1,3 Al') A�1) A21 4WP2 5P2 5P2 5P2 6P2 6P2 6P2 6P2 6P2 6P2 6P2 6P2 6P2 6P2 6P2 6P2 5P2 5P2 5P2 5E2P2 CB CB CB CB CB -r--� ,-,--r r T 24 228 MODULES — — A l A 2 A 3 A 4 A 5 A F A 7 f f All) A 1'1 A l'? All f < 111; c 14i A T' A 1,3 B l() 42 1) B 21 4WP2 5P2 5P2 5P2 6P2 6P2 6P2 6P2 6P2 6P2 6P2 6P2 6P2 6P2 6P2 6P2 5P2 5P2 5P25E2P2 CB CB CB CB CB A l A 2 A 3 A 4 Tr A 5 A F C 7 B R g a g 111 A l'1 B 19 B l'3 B l<< B l5 B 113 B 1'r B 1,3 B 1,. B �1) � B 21 O�MODULES4WP2 4P2 4P2 6P 6P2 6P2 6P2 6P2 6P2 6P2 6P2 6P2 6P2 6P2 6P 6P 6P 5P2 5P2 5E2P2 CB CB CB CB CB 228 MODULES A l A 2 A 4 A 5 A F A 7 B R C Q B 11) B l'1 B l'? A l'3 Bid C 11; C 14i B l'' B lA B lq B �1) B 21 2 6 4WP2 4P2 6P2� 6P2 6P2 6P2 6P2� 6P2 6P2 6P2 6P2 6P2 6P2 6P2 6P2 6P2 5P2 5P2 5E2P2 CB CB CB CB 152MODULE0 Al A2 A3 A4 B.5 BF C. CR CQ Bl1) C1.1 Bl2 - - - Bl3 614 5W2P2 5P2 6P2 6P2 6P 6P2 6P2 6P2 6P2 5P2 5P2 5P2 5E2P2 CB CB CB CB 190MODULES Al A2 A3 A4 A5 AF A7 AR Ba g111 A1'1 A1'? A1'3 A14 A11; A1f3 B17 2 8 5W2P2 5P2 6P2 6P2 6P2 6P2 6P2 6P2 6P2 6P2 6P2 6P2 6P2 5P2 5P2 5E2P2 CB CB CB CB CB 228 MODULES A l A 2 A 3 A 4 A 5 WI IW1 I I 1141111 141111146111 1WI I I IIAI I 1 1611 11 1111I 1111WAIIII61 I Ilfil A A 1() C 2() B 21 29 4WP2 4P2 4P2 U25P2 5P2 5E2P2 CB CB CB CB CB &28 MODULES — — — — A 1 A 2ILI1W11WI1UIIIAI16IIJAII 11. 4I f 3 A 1_) B 2() A 21 4WP2 4P2 2 2 5P2 5P2 5E2P2 CB CB CB CB CB 228 MODULES A l A 2 A l%3 ll() f 1) A 21 2M 6P2 5P2 5P25E2P2 CB CB CB CB CB 228 MODULES A l A 2 A 3 A 6�B 1'' A lA A 1�a A 211 A 21 32 L 4WP2 4P2 4P 2 P2 , , 5P2 , 5E2P2 CB CB CB CB CB CB 33 228 MODULES — — — — — A l A 2 A 3 A 4 A 5 A F4IILI14�11III1jjI1hjIIJ1I1jjIIIJIILJI A l!) A 21) A 2'1 A 22 4WP2 4P2 4P2 4P2 4P2 4P2 2 6P2 5P2 5P2 5E2P2 CB CB CB CB CB CB CB 228 MODULES A l A 2 A 3 A 4 A 5 f A 7 A R IIIA Q A 11) A l'1 A l'� A l A l A 1,A l_ A l q 1,3 g lsa A �I) A �'1 A �'� A 23 A �4 A �'i A �B B T A �,3 A 29 4WP2 4P2 4P2 4P2 4P24P2 4P2 14P2 4P2 4P2 4P2 4P2 4P2 4P2 4P2 4P2 4P2 4P2 4P2 4P2 4P2 4P2 4P2 4P2 4P2 4P2 4P2 4EP2 CB CB CB CB CB CB 35 1" MODULES _ — — — — — — — — A l A 2 A 3 A 4 A 5 A F A 7 A R A Q All) All '1 A l'� A l3 A l4 All 'i A 113 All � A l,3 A l2 A ?i) A 21 A 2'� A 23 A 24 Al' 3648 M ODULES TOTAL 4WP2 4P2 4P2 4P2 4P2 4P2 4P2 4P2 4P2 4P2 4P2 4P2 4P2 4P2 4P2 4P2 4P2 4P2 4P2 4P2 3P2 3P2 3P2 4EP2 X-BRACE SCHEDULE SYMBOL DESCRIPTION SETS DETAIL CB 2 STRANDS OF 22'-0" LONG 3/16" GALV. 7x19 WIRE ROPE WITH 4 GRIPPLE #4 WIRE CLAMPS 89 C7/S-501 N S E RBI SOLAR Total Solar Service: Design ' Fabrication Installation' Parts' Repair Service 5513 VINE STREET CINCINNATI, OH 45217 513.242.2051 FAX: 513.242.0816 ❑ PROFESSIONAL SEAL ENGINEER'S SEAL APPLIES TO DESIGN OF STRUCTURAL COMPONENTS ONLY `01%11 IIIlift,,�' N CAR O,.'FESS7p'.�7, �. QO a SEAL 027482 _= GINE� ❑ RELEASE RECORD 07 04/07/16 AS -BUILT SET 6 12/15/15 100% SEALED SET 05 12/11/15 REV. CONSTRUCTION SET 04 11/03/15 CONSTRUCTION SET 03 10/20/15 PERMIT SET 02 09/15/15 PERMIT SET 01 09/10/15 PRELIMINARY LAYOUT MARK DATE DESCRIPTION ❑ PROJECT INFORMATION TITLE & ADDRESS: SNOW CAMP SOLAR, LLC 9200 SNOW CAMP ROAD SNOW CAMP, NC 27349 RBI SOLAR PROJECT No.: 153325 DRAWN BY: REVIEWED BY: AW BDS/CN SHEET TITLE: COMPONENT LAYOUT 4 SHEET No.: S=1 04 ■ i7 ■ E ■ n 7 II I I i % fl !1 A f% A A c 0 M U) 0E Q J m� Al SCALE: RACK SECTION I 12'-11 Y,;" 20' LO G7 5W2 P2 SCALE: PLAN VIEW 16'-7Y6" LENGTH DETERMINED BY PV MODULE DIMENSIONS IN PORTRAIT ORIENTATION POST J I V I I 16-7&" LENGTH DETERMINED BY PV MODULE DIMENSIONS IN PORTRAIT ORIENTATION POST POST Z5E2 (4) Z5E2 (3) Z5E2 (2) Z5E2 (1) G9 5E2P2 SCALE: PLAN VIEW 13'-3Y4" LENGTH DETERMINED BY PV MODULE DIMENSIONS IN PORTRAIT ORIENTATION POST POST Z4W (3) Z4W (2) Z4W (1) Z4W (4) Es 4WP2 SCALE: PLAN VIEW 19'-107 LENGTH DETERMINED BY PV MODULE DIMENSIONS IN PORTRAIT ORIENTATION POST POST Z6 (4) 13'-3%" LENGTH DETERMINED BY PV MODULE DIMENSIONS IN PORTRAIT ORIENTATION POST POST Z4E (4) Z4E (3) Z4E (2) Z4E (1) E10 4EP2 SCALE: PLAN VIEW 16'-7%6" LENGTH DETERMINED BY PV MODULE DIMENSIONS IN PORTRAIT ORIENTATION POST Z5 (4) Z5 (3) Z5 (2) Z5 (1) C8 6P2 c10 5P2 SCALE: PLAN VIEW SCALE: PLAN VIEW 13'-3Y4" 9'-11 7/ 6" LENGTH DETERMINED BY LENGTH DETERMINED BY PV MODULE DIMENSIONS PV MODULE DIMENSIONS IN PORTRAIT ORIENTATION IN PORTRAIT ORIENTATION POST Z4 (4) Z4 (3) Z4 (2) Z4 (1) L POST POST Z3 (4) Z3 (3) Z3 (2) Z3 (1) L POST As 4P2 A10 3P2 SCALE: PLAN VIEW SCALE: PLAN VIEW 7 2 A F 7 1 Q 1 0 1 1 (1 1 11 L POST RBI SOLAR Total Solar Service: Design " Fabrication Installation' Parts' Repair Service 5513 VINE STREET CINCINNATI, OH 45217 513.242.2051 FAX: 513.242.0816 ❑ PROFESSIONAL SEAL ENGINEER'S SEAL APPLIES TO DESIGN OF STRUCTURAL COMPONENTS ONLY "0\A CA,f , 'a SEAL 027482 ❑ RELEASE RECORD 07 04/07/16 AS -BUILT SET 6 12/15/15 100% SEALED SET 05 12/11/15 REV. CONSTRUCTION SET 04 11/03/15 CONSTRUCTION SET 03 10/20/15 PERMIT SET 02 09/15/15 PERMIT SET 01 09/10/15 PRELIMINARY LAYOUT MARK DATE DESCRIPTION ❑ PROJECT INFORMATION TITLE & ADDRESS: SNOW CAMP SOLAR, LLC 9200 SNOW CAMP ROAD SNOW CAMP, NC 27349 RBI SOLAR PROJECT No.: 153325 DRAWN BY: REVIEWED BY: AW BDS/CN SHEET TITLE: RACK SECTION & BAY PLAN VIEWS SHEET No.: S=301 1 1 2 1 3 4 1 5 1 6 1 7 1 8 1 9 1 10 1 11 N O M 0E Q J 7- 0 N O N V L / w 0 J a- w Y J 0 w w am 11 m Jm Al CONCRETE PIER SCALE: FOUNDATION SECTION 1" = 1'-0' 1 F I QJ 1 '-0" 1 C� FOOTING SCHEDULE TYPE LENGTH x WIDTH DEPTH REINFORCING PARALLEL TO POST WEB AND POST CUT-OFF REINFORCING PERPENDICULAR TO POST WEB AND POST CUT-OFF NORTH ZONES 5-6" x 5-6" V-6" (4) #4 BARS T&B OR (4) #5 BARS T&B (6) #4 BARS T&B OR (4) #5 BARS T&B ALL OTHER ZONES 5-3" x 5-3" V-6" (4) #4 BARS T&B OR (4) #5 BARS T&B (6) #4 BARS T&B OR (4) #5 BARS T&B NOTE: ALL REINFORCING TO HAVE 3" MINIMUM COVER A8 S-302 POST PER POST SCHEDULE ON SHEETS (S-101)-(S-104) FOR ODD # OF BARS, OFFSET TOP CENTER BAR AS SHOWN FOR ODD # OF BARS, BOTTOM CENTER BAR STAYS CENTERED AS SHOWN PARTIAL LENGTH OF EXCESS POST CUT AND BOLTED TO BOTTOM OF REMAINING POST W/ 2"x2"xC LONG 10 GA. CLIP ANGLE AND (4) 01/2" BOLTS OR APPROVED EQUIVALENT C8 S-302 LENGTH REINFORCING PARALLEL TO POST WEB SEE FOOTING SCHEDULE CONCRETE FOOTING NOTE: REINFORCING SHOWN MAY NOT REPRESENT THE ACTUAL REINFORCING REQUIRED. SEE FOOTING SCHEDULE FOR REQUIRED REINFORCING. PROVIDE MINIMUM 3" COVER FOR ALL REINFORCEMENT. E$ SPREAD FOOTER 1 CALEO: FOUNDATION PLAN POST PER POST SCHEDULE ON SHEETS (S-101) - (S-104) CONCRETE FOOTING GRADE REINFORCING PER '-Tj FOOTING SCHEDULE HOLD TIGHT TO TOP & BOTTOM OF HORIZONTAL POST CUT-OFF C8 SPREAD FOOTER SCALE: FOUNDATION SECTION 1"=1'0' POST PER POST SCHEDULE ON SHEETS (S-101)-(S-104) CONCRETE FOOTING GRADE REINFORCING PER FOOTING SCHEDULE =11 HOLD TIGHT TO TOP & BOTTOM OF HORIZONTAL POST CUT-OFF A8 SPREAD FOOTER SCALE: FOUNDATION SECTION F 7 Q d ° . a a. ° v ° ° Zi LENGTH PER FOOTING SCHEDULE EXCESS POST CUT-OFF a TI-i I I=11I — a I I � �I I I I=11 EXCESS POST CUT-OFF II II TI'IT'Ilil a a 1 a IIIII- a a a a a a a 3" REINFORCING & CUT-OFF POST LENGTH = 3" (OVERALL WIDTH - 6") WIDTH PER FOOTING SCHEDULE Lu 0 ULu J RBI SOLAR Total Solar Service: Design ' Fabrication Installation ` Parts ` Repair Service 5513 VINE STREET CINCINNATI, OH 45217 513.242.2051 FAX: 513.242.0816 ❑ PROFESSIONAL SEAL ENGINEER'S SEAL APPLIES TO DESIGN OF STRUCTURAL COMPONENTS ONLY \�\\1111111111//�� \A .CA RO a SEAL 027482 '' SINE •� 7 II ❑ RELEASE RECORD 07 04/07/16 AS -BUILT SET 6 12/15/15 100% SEALED SET 05 12/11/15 REV. CONSTRUCTION SET 04 11/03/15 CONSTRUCTION SET 03 10/20/15 PERMIT SET 02 09/15/15 PERMIT SET 01 09/10/15 PRELIMINARY LAYOUT MARK DATE DESCRIPTION ❑ PROJECT INFORMATION TITLE & ADDRESS: SNOW CAMP SOLAR, LLC 9200 SNOW CAMP ROAD SNOW CAMP, NC 27349 RBI SOLAR PROJECT No.: 153325 DRAWN BY: REVIEWED BY: AW BDS/CN SHEET TITLE: ALTERNATE FOUNDATION DETAILS AND SCHEDULE SHEET No.: S=302 0 1 in A n n A r n 7 (l !1 A /1 A A c I G J i i I / 1/2" x 5" HH / GALVANIZED / BOLT & NUT / [2GB50X500HH] / / I TOP CHORD PER BAY SCHEDULE 12 GA. GALVANIZED STEEL KNEE BRACE U-CLIP `SO491501 mm A2 KNEE BRACE TO TOP SCALE: CHORD CONNECTION DETAIL 1/2" x 3" HH GALVANIZED BOLT & NUT [2GB50X300HH] KNEE BRACE PER BAY SCHEDULE] WEEB-11. INSTALL WEEB WITH LABEL O O FACING UP AND ORIENTED IN SLOT AS SHOWN LINE OF 3/8" x 3/4" RECTANGULAR PUNCHED j:= PEDETLLISTED HOLE (SLOT) IN PURLIN BELOW THE 4 WEEB 'LEGS' SHOULD CONTACT EDGE OF SLOT NOTE: WEEB SHOULD FIT SNUGLY IN SLOT FOR USE WITH 5/16" HARDWARE (1 PER PV MODULE) WEEB-UIR INSTALL WEEB WITH LABEL FACING UP AS SHOWN LINE OF 3/8" x 3/4" WILEY 80 RECTANGULAR PUNCHED 7Z:7 HOLE (SLOT) IN PURLIN BELOW WEEB 'TEETH' SHOULD BE ORIENTED UP TO EMBED IN ETL LISTED PV MODULE FRAME NOTE: WEEB MAY ROTATE DURING FASTENER TIGHTENING FOR USE WITH 1/4" HARDWARE (1 PER PV MODULE) F5 WEEB PV MODULE BONDING WASHER DETAIL SCALE: NONE (2) 1/2" x 5" HH GALV. THRU BOLT & NUT (TYP.) [2GB50X500HH] (6) 1/2" x 1 1/4" HH GALV. BOLT & NUT [2GB50X125HH] (12) 1/2" GALV. WASHERS (TYP.) [2W50PLTD] (2) 10 GA. GALV. POST MOUNTING BRACKET TOP CHORD PER ® BAY SCHEDULE (1) 12 GA. GALV. TOP CHORD MOUNTING -� BRACKET [S702120] POST PER POST - - ///F SCHEDULE 0 D5 TOP CHORD TO POST SCALE: CONNECTION DETAIL (2) #12 x 1 1/4" HEX HD TEK SCREW [2GT12X125HH45] INSTALL ONLY AFTER POST TOP ASSEMBLY IS SQUARE KNEE BRACE PER BAY SCHEDULE 1/2" x 3" HH GALVANIZED BOLT & NUT [2GB50X300HH] 12 GA. GALVANIZED KNEE BRACE CLIP EACH SIDE [S7041] (2) 1/2" x 1 1/4" HH GALVANIZED BOLT & NUT PER CLIP [2GB50X125HH] POST PER POST SCHEDULE 1 5/16" X 3/4" HH S.S. BOLT [2SSB31X075HHAS] 5/16" S.S. WASHER [2W31 SS] PV MODULE FRAME WEEB-11.5 [l EL-WEEB11-5] SEE DETAIL F5/S-501 Z - PURLIN PER BAY SCHEDULE 7/16" S.S. WASHER [2W43SS] 5/16" S.S FLANGE NUT [2NUT31 SS -FL] Q� �O 5 QO E7 PV MODULE TO E9 TRANSVERSE PURLIN NONE' PURLIN CONNECTION DETAIL 6SCALE6: CONNECTION DETAIL RACK STRUCTURE _ N POST PER POST SCHEDULE - X-BRACING PER X-BRACING SCHEDULE A7 S-501 LINE OF GRADE OR TOP OF BASE PLATE N NOTE: X-BRACING IS LOCATED ON THE DOWN SLOPE SIDE OF THE POSTS. C7 I X-BRACING SCALE: 112" = ELEVATION 1'-0' POST PER POST SCHEDULE X-BRACING PER X-BRACING SCHEDULE INSTALLED IN FIELD DRILLED MIN. 01/4" HOLE WITH 3/4" MIN. EDGE DISTANCE Ji a 0 J U Z GRIPPLE #4 Q o WIRE CLAMP 6" MAX. NOTE: X-BRACING IS LOCATED ON THE DOWN SLOPE SIDE OF THE POSTS A5 KNEE BRACE TO POST A7 X-BRACE TO POST SCALE: CONNECTION DETAIL 6SCALE6: CONNECTION DETAIL a 1 a 7 1 Q E7 TYP. S-501 /„ A9 LONGITUDINAL PURLIN SCALE: CONNECTION DETAIL 0 1 1n PV MODULE Z-PURLIN PER BAY SCHEDULE 1/2" x 1 1/4" HH GALVANIZED BOLT & NUT (TYP.) [2GB50X125HH] ORIENT AS SHOWN TO ALLOW MODULE HARDWARE INSTALLATION (2) ETL CLASSIFIED LABELED PURLIN BRACKETS PER ROW. INSTALLED AT EYE LEVEL AT BOTH ENDS OF EVERY ROW BOLT ORIENTATION SHOWN TO ALLOW PURLIN TO BE USED FOR WIRE MANAGEMENT PURLIN MOUNTING BRACKET [S7045] 1/2" x 5" HH GALVANIZED THRU BOLT & NUT (TYP.) [2GB50X500HH] TOP CHORD PER BAY SCHEDULE USE 1/4" THICK SPACING PLATE AS DIRECTED IN INSTALLATION MANUAL TO MAINTAIN 1/4" PURLIN GAP DURING INSTALLATION PV MODULE (TYP.) 1/2" x 1 1/4" HH GALVANIZED BOLT & NUT (TYP.) [2GB50X125HH] PURLIN PER BAY SCHEDULE PURLIN MOUNTING BRACKET [S7045] BEHIND 1/2" x 5" HH GALVANIZED THRU BOLT & NUT (TYP.) [2GB50X500HH] TOP CHORD PER BAY SCHEDULE RBI SOLAR Total Solar Service: Design ' Fabrication Installation ` Parts ` Repair Service 5513 VINE STREET CINCINNATI, OH 45217 513.242.2051 FAX: 513.242.0816 ❑ PROFESSIONAL SEAL ENGINEER'S SEAL APPLIES TO DESIGN OF STRUCTURAL COMPONENTS ONLY `x�����i11llirrrrr,i (F OO� S S a SEAL 027482 ❑ RELEASE RECORD 07 04/07/16 AS -BUILT SET 6 12/15/15 100% SEALED SET 05 12/11/15 REV. CONSTRUCTION SET 04 11/03/15 CONSTRUCTION SET 03 10/20/15 PERMIT SET 02 09/15/15 PERMIT SET 01 09/10/15 PRELIMINARY LAYOUT MARK DATE DESCRIPTION ❑ PROJECT INFORMATION TITLE & ADDRESS: SNOW CAMP SOLAR, LLC 9200 SNOW CAMP ROAD SNOW CAMP, NC 27349 RBI SOLAR PROJECT No.: 153325 DRAWN BY: REVIEWED BY: AW BDS/CN SHEET TITLE: DETAILS SHEET No.: S=501