Loading...
HomeMy WebLinkAboutNCC204871_NOT Closeout Documents_20220509North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481 County: Lenoir Project: Smithfield Way West Gravity Sewer River basin: Neuse Person financially responsible: City of Kinston - Tony Sears, City Manager Project #: LENOI-2020-006 Address: PO Drawer 339, Kinston, NC 28501 1. Project Location: Smithfield Way, Kinston Pictures: No 2. Weather and soil conditions: sunny, warm, dry 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes 5. Violations: 6. Is the site in compliance with the NPDES Permit? Yes Describe: Initial inspection: No If no, check violations below: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No one on site Title: Inspection report: Sent Report Date given/sent: April 28, 2022 9. Corrective action needed: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NP®FS General Stormwater Permit for Construction 10. Comments: Activities (N0001) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https:Hedocs.deg.nc.goy/Forms/NCG01-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process Reported by: Bradley West Others present: Date of inspection: April 26, 2022 Time arriving on site: 10:45 AM Time leaving site: 11:00 AM cc: