Loading...
HomeMy WebLinkAboutNCC201415_NOT Closeout Documents_20220506HOLLY � Town of Holly Springs SPRINGS Utilities and Infrastructure Department i�lf{G NFF itP[SOYFC[. Certificate of Completion For Erosion and Sedimentation Control May 5, 2022 PROJECT Lowe's Roadway Improvements PHASE n/a ENVIRONMENTAL DEVELOPMENT PERMIT NO. 15-2020 FINANCIALLY RESPONSIBLE PARTY Lowe's Home Centers, LLC This is to certify that on the above referenced project the grading has been completed, all utilities and streets have been installed, and permanent stabilization has been successfully achieved in or along all roads and utilities in accordance with the approved erosion control plan. With this certificate, the Town of Holly Springs Engineering Department certifies that the above referenced project is in final compliance with the Town's Soil Erosion and Sedimentation Control Ordinance and therefore closes the active erosion control file for the above referenced project. Jeff Peters, Engineering Technician Note: This document does notpreclude the Town from taking action on future land disturbance or other erosion or sedimentation issues at this site.