20210305
NCDOT - Replace Bridge 155 on SR 1410
Burke
NCDOT - Replace Bridge 155 on SR 1410
NC DOT Division 13
5/13/2022
Routine
Site Inspection (DOT)
Version: 1 Status:Issued
Project Type:Replace bridge with bridge
Region:Asheville
Longitude:-81° 45' 46''+35° 48' 13''
Inspection Contact Person:Title:Phone:
On-Site Representative(s):
Secondary Inspector(s):
Primary Inspector:Phone:Robert K Mitchell
Facility Compliance Status:Compliant Not Compliant
Question Areas:
Program Areas:401 (includes isolated/non-404)
Permit (401 WQC)
Site inspection was conducted by Kevin Mitchell with the Asheville Regional Office on May 13, 2022. No one was
present during the inspection. The following are items that need attention:
- Add silt fence above inlet to diversion pipe. It appears to have been damaged from stock piling material on the
impervious dike.
- Silt bag needs to be sealed better where hose enters.
- Add ground cover per NPDES stabilization timeframes.
NPDES records were up to date.
Inspection Summary:
page:1
Inspection Date:
Site Number:
Inspection Type:
Owner:
Reason for Visit:
20210305
5/13/2022
Bryan, Roger D
Site Inspection (DOT)Routine
Permit (401 WQC)Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and/or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Culvert is under construction.Comment: