From: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil>
Sent: Thursday, May 12, 2022 2:03 PM
To: Jennifer Robertson; Holden Sabato
Cc: Doug Keesee; Homewood, Sue
Subject: [External] RE: Reedy Fork Industrial - Summit Avenue, Greensboro, Guilford County;
SAW-2019-02059
Attachments: 2019-02059 NWP 39 Tearsheet.pdf; 2021NWP39.pdf
Follow Up Flag: Follow up
Flag Status: Flagged
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Hi Jennifer, and thank you for your email. Based on this information and our discussion on Tuesday, the Corps is
amenable to extending the deadline for completion of all aspects of the Stream CH 100 relocation. As such, Special
Condition 2 of the attached Nationwide Permit (NWP) 39 verification, dated 1/21/2022, has been revised to state the
following:
2. Stream CH 100 must be relocated using natural channel design techniques. The approved stream relocation is shown
on Permit Figures 7 and 8 of the enclosed plans. This stream must be relocated according to the plans and descriptions
shown on Permit Figures 8 through 20 of the enclosed plans. These activities shall be completed no later than August 31,
2022, with the exception of live stake planting wherever referenced, which shall be completed no later than March 31,
2023. Once the stream relocation work is complete, you must submit an initial report within 30 days detailing the work
completed, including a photograph record sufficient to document the entirety of the stream relocation reach.
All other Special Conditions and terms and conditions of the above referenced NWP 39 verification remain valid and
unchanged.
Please let me know if you have any questions.
-Dave Bailey
David E. Bailey, PWS
Regulatory Project Manager
US Army Corps of Engineers
CE-SAW-RG-R
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Mobile: (919) 817-2436
Office: (919) 554-4884, Ext. 30.
Fax: (919) 562-0421
Email: David.E.Bailey2@usace.army.mil
We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is
located at: https://regulatory.ops.usace.army.mil/customer-service-survey/
Thank you for taking the time to visit this site and complete the survey.
1
From: Jennifer Robertson <jrobertson@atlasenvi.com>
Sent: Tuesday, May 10, 2022 4:08 PM
To: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil>; sue.homewood@ncdenr.gov
Cc: Holden Sabato <holdensabato@silvermangroup.net>; Doug Keesee <dougkeesee@silvermangroup.net>
Subject: [URL Verdict: Neutral][Non-DoD Source] Reedy Fork Industrial - Summit Avenue, Greensboro, Guilford County;
SAW-2019-02059
David,
Per your request as a follow up to our phone conversation please let this email serve as the request to extend
the deadline for permit special condition #2. We need a three-month extension until August 31, 2022 in order
to complete the stream CH 100 relocation. We will need to seed the area in August then plant live stakes
before spring 2023. The stream relocation project has been delayed due to the on -going construction of the
City of Greensboro's water and sewer line installation as well as Duke Energy's power pole relocation
project. The best approach for the stream relocation project is to start construction once these other projects in
this area are completed and stabilized. Atlas Environmental and Silverman Group continue to be committed to
completing the project as required and feel confident that the three month extension will give us enough time.
Thank you,
Jennifer L Robertson, President
ATLAS Environmental, Inc.
338 S. Sharon Amity Road #411
Charlotte, NC 28211
(704) 512-1206 office
(828) 712-9205 mobile
www.atlasenvi.com
Offices in Asheville and Charlotte
2