HomeMy WebLinkAbout20220603 Ver 1_More Info Received_20220513Strickland, Bev
From: Cheryl Piazza <ncpizza27@gmail.com>
Sent: Friday, May 13, 2022 11:46 AM
To: Perez, Douglas J
Subject: Re: [External] 5210 Woodland Bay Drive, Belmont, NC - ID 20220603
Attachments: Catawba Riparian Buffer form.pdf
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Hey Doug!
Thanks for getting back to me!
Attached please find the signed Catawba Riparian Buffer form you requested. Second, as it relates to the rip rap, yes I
agree that we only need it 2' above full pond. If my diagram inaccurately depicted this, I apologize but yes, we are
planning on only using rip rap to 2' above full pond. As it relates to removing trees, we are trying to keep as many trees
as possible. The ones I marked for removal were because either the root systems were undermined with erosion or they
posed a danger of falling onto the existing dock (two of those trees are severely leaning into the lake right above the
dock). Our goal is to have the shoreline look very natural with as many trees as we can save.
I hope this answers your questions. If you should need any further information or have any additional questions, please
do not hesitate to contact me. Thank you for your time!
Sincerely,
Cheryl Piazza
On Fri, May 13, 2022 at 10:06 AM Perez, Douglas J <doug.perez@ncdenr.gov> wrote:
Hi Cheryl,
So I need a signed version of the attached Catawba Riparian Buffer form. I've attached it in two formats. Just use
whichever one works best for you. Similarly, we typically only approve 2'-3' above full pond. I don't see the need for an
additional 2' above full pond. Keep in mind, any tree that is 3" or greater in diameter at breast height that is not along
the immediate shoreline and/or severely undermined needs to stay in the buffer.
If you could get back to me on these things, I can keep working on the application.
Thanks,
Doug
Original Message
From: ncpizza27@gmail.com [mailto:ncpizza27@gmail.com]
Sent: Tuesday, May 10, 2022 10:11 AM
To: Perez, Douglas J <doug.perez@ncdenr.gov>
Subject: [External] 5210 Woodland Bay Drive, Belmont, NC - ID 20220603
1
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an
attachment to Report Spam.<mailto:report.spam@nc.gov>
Hey Doug!
Just trying to get a status on our permit requests for shoreline stabilization and dock rehab, under ID number
20020603.
Thank you!
Cheryl Piazza
Sent from my iPhone
2
CATAWBA RIPARIAN BUFFER NOTIFICATION FORM
Project Name/address:
Owner:
Contractor/agent:
County:
Print Signature
The approval is for the purpose and design described in your application. Impacts not indicated in the
application is a violation of the Buffer Rule. Site specific work should be provided in the application. 115A NCAC
02H .0506 and 15A NCAC 02B .0243(8)]
Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless
approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed.
Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B .0243(6)]
Benching and grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243
(6)]
Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved
by the Division. There are limitation on size for decks. [15A NCAC 02B .0243(4) and (6)]
Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The
work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction
material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 028 .0243 (4), (6), (8)]
Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater
discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or
sheet flow at non -erosive velocities to the lake. [15A NCAC 02B .0243(5), (6)]
Acknowledgement of Notification
, __.__. � 9,a I r/Q1,�-- --_----,hereby state that I have been informed of the Catawba
Riparian Buff"ule. Any work conducted in the buffer, not specifically stated in the application and approved
by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be
taken such that the construction will be built within substantial compliance and intent of the 401 Water
Quality Certification and Buffer Rules, the approved plan(s) and specification(s), and other supporting
materials.
Signature (owner): Date: i