Loading...
HomeMy WebLinkAboutNCC221839_ESC Approval Submitted_20220513ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality April 29, 2022 LETTER OF APPROVAL WITH MODIFICATIONS Lum-Lot3, LLC Attn: Amit Patel, Reg. Agent/Managing Member 4131 Parklake Avenue 930 Raleigh, NC 27612 RE: Project Name: Home2-Tru Dual Brand Hotel Acres Approved: 3 Project ID: ROBES-2022-020 County: Robeson, City: Lumberton, Address: Jackson Court River Basin: Lumber Stream Classification: Other Submitted By: Anderson Engineering & Assoc., P.A. Date Received by LQS: April 1, 2022 Plan Type: New Dear Mr. Patel: This office has reviewed the subjecterosion and sedimentation control plan and hereby issues this Letter of Approval with Modifications. A list of the modifications and reservations is attached. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Should the plan not perform adequately, a revised plan will be required (G.S. 113A-54.1)(b). As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. E Q�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Fayetteville Regional Office 1225 Green Street, Suite 7141 Fayetteville, North Carolina 28301 NORTH CAROLINA - oewnmwtoiEnviro�memalaual� /`� 910.433.3300 Letter of Approval with Modifications Lum-Lot 3, LLC April 29, 2022 Page 2 of 3 Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerelv, it.Gl. CodiPace, EI Regional Engineering Associate DEMLR Enclosures: Certificate of Approval Modifications Required for Approval NPDES NCGO1 Fact Sheet cc: Dwayne Johnson, Anderson Engineering & Assoc., P.A. (electronic copy) Jody Allen, Building Inspector (electronic copy) DEMLR - Fayetteville Regional Office File Letter of Approval with Modifications Lum-Lot 3, LLC April 29, 2022 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: HOME2-TRU DUAL BRAND HOTEL Project Number: ROBES-2022-020 County: ROBESON The two proposed Curb Inlets on the west side of the project must be excavated drop inlets. Provide an excavated drop inlet detail, construction specifications and maintenance requirements. Provide two full size copies each of revised plan sheets, showing all the Modifications required for approval, prior to beginning any land -disturbing activity. Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities