Carpenter,Kristi
From:Deyton, Joshua B
Sent:Friday, April 29, 2022 8:32 AM
To:Mitchell, Robert K
Cc:Amschler, Crystal C CIV USARMY CESAW (US); Jamison, John; Donnie Brew
(Donnie.Brew@dot.gov); White, Ryan (Ryan.White@stantec.com); Honeycutt, Nikki T.;
Mcdowell, Kenneth J; allyson.conner@usda.gov
Subject:RE: R-2822B (NC 143 Graham)
Kevin,
I have copied Ryan White, with Stantec, so that he can provide you the documentation for CP 2A and meeting minutes
for CP3 and 4A. I have also asked Mr. White to have a meeting with USFS prior to the CP 4B so that new staff members
can be caught up on the project. Mr. White can also send you an invite to this meeting as well so you can see the
progress on the project up to this point.
I do not have any additional information regarding acidic rock other than what is in your PDF. However, this
documentation states that no acidic rock was found along the existing alignment, which was the chosen
alternative. Since the new alignment alternative will not be constructed, no additional studies for that corridor will be
conducted.
Joshua B. Deyton, PE
Division 14 Project Team Lead
North Carolina Department of Transportation
828 586 2141 office
jbdeyton@ncdot.gov
Highway Division 14
253 Webster Rd.
Sylva, NC 28779
From: Mitchell, Robert K <kevin.mitchell@ncdenr.gov>
Sent: Friday, April 29, 2022 7:34 AM
To: Deyton, Joshua B <jbdeyton@ncdot.gov>
Cc: Amschler, Crystal C CIV USARMY CESAW (US) <Crystal.C.Amschler@usace.army.mil>; Jamison, John
<johnjamison@ncdot.gov>; Donnie Brew (Donnie.Brew@dot.gov) <Donnie.Brew@dot.gov>
Subject: R-2822B (NC 143 Graham)
Josh,
1
Are you guys planning on sending more information on CP 2A? I am trying to get up to speed on this project since this is
the first time being introduced. Can you send me the meeting minutes/information from CP 3 and CP 4A? Also, any
updated information on the presence of acid rock? The information I have is from 2013 (see attached). I really
appreciate your help.
Kevin Mitchell
Environmental Specialist II
Division of Water Resources
401 & Buffer Transportation Permitting
NC Department of Environmental Quality
828-296-4650 Office
828-231-1580 Mobile
Email Kevin.mitchell@ncdenr.gov
NC DEQ Asheville Regional Office
2090 U.S. Hwy. 70
Swannanoa, N.C. 28778
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
2