Loading...
HomeMy WebLinkAbout20210829 Ver 1_Emails with ACE_20210418Strickland, Bev From: Perry, John M Sent: Monday, April 18, 2022 8:56 AM To: Jessop, Jordan E CIV USARMY CESAW (USA); Mickey Sugg Subject: FW: [External] Re: The Vineyards 20210829 Attachments: [External] Hey John Hi Jordan and Mickey, This is still an ongoing permit application issue. I attached an email from Pat Donovan -Brandenburg with Jacksonville Stormwater. We have documented concerns over an unpermitted crossing of a wetland feature that needs to be addressed. I would like to meet with your office to discuss this project in detail, the clock is running away on this project and it is a doozy. I can be available anytime next week, I have all of the materials handy for us to go over. Please advise, Thanks John Perry Environmental Specialist II Divison of Water Resources Department of Environmental Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Office: (910) 796-7341 Cell: (910) 617-9577 From: Tony Moctezuma <tmoctezuma@tidewaterenc.com> Sent: Thursday, March 17, 2022 8:37 AM To: Perry, John M <John.Perry@ncdenr.gov>; leahquinn@sydescommunities.com Cc: Jessop, Jordan E CIV USARMY CESAW (USA) <Jordan.E.Jessop@usace.army.mil>; Mickey Sugg <Mickey.t.sugg@usace.army.mil> Subject: [External] Re: The Vineyards 20210829 CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good morning, I was wondering if you have an update on this project. I'm not sure which culverts in particular you're talking about either. Would you be able to point them out on an aerial map or something? Also, I think I understand the point of not letting people just build stormwater ponds in the middle of wetland, but I wouldn't think that concept would apply to this project. It's a wetlands finger that we would want to either remove in the manner shown on the plans, or just fill in order to build parking lots for commercial frontage on the highway. Thanks, i Tony Moctezuma, El 306 New Bridge Street Jacksonville NC, 28540 910-455-2414 ext 116 TIDEWATER ASSOCIATES, INC. On 3/8/2022 9:54 AM, Perry, John M wrote: Hello Tony, I hope you are doing well. I am writing this email to inform you that I will have to place this project on hold. I am coordinating to with the Army Corps of Engineers (Jordan Jessup) to work through a few issues with this project. Until I can get answers from the Corps I will not be able to process this 401 request. One of the issues that I am trying to sort out is the stormwater basin that is located in a wetland, as I understand this is prohibited under the NW 29. I am reaching out to the Corps to clarify. We will also discuss the cumulative impacts of all of the sub -divisions within the Vineyards project. The existing culverts on the Windsor Run, Twisted Vine and Secret Garden do not, to my understanding have any previous permits associated with them and are currently failing. Will these culverts be removed and the streams restored or will they become part of a new crossing and new culverts installed? The Division of Water Resources (DWR) has additional questions regarding the proposed development and has determined that additional information will be necessary to complete the review of your permit application. The application is on hold until all of the following information has been received by our office. Please let me know if you have any questions. Thanks, John Perry Environmental Specialist II Divison of Water Resources Department of Environmental Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Office: (910) 796-7341 Cell: (910) 617-9577 2 Strickland, Bev From: Pat Donovan -Brandenburg <pdonovan-brandenburg@jacksonvillenc.gov> Sent: Thursday, April 14, 2022 3:15 PM To: Perry, John M Subject: [External] Hey John CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hope you are well. I have a question or need your advice. So Tony had Andy and I on site last week asking us to give direction on exactly what was needed to be done to clear the stream where they had crossed twice. See the attached pictures, I know there is an issue here, the water in the pocket wetland is backing up and no water is getting thru the small pipe to the wetlands on the other side. What do I direct him to do here? Put in a bigger pipe? If so, how big? Dig down to make sure the elevations are equal on both sides of the pipe? Dig out the buildup of sediment on the right or upper/higher side? Or all of these? What would you suggest? Have a happy Easter... Blessings and prayers. Thanks PAT DONOVAN-BRANDENBURG STORMWATER R MANAGER CITY" OF JACKSONVILLE PO BOX 12 $15 NEW BRIDGE ST JACK 0NVILLE, NC 28541 910-93 -6446 i Strickland, Bev From: Pat Donovan -Brandenburg <pdonovan-brandenburg@jacksonvillenc.gov> Sent: Thursday, April 14, 2022 3:04 PM To: Pat Donovan -Brandenburg Attachments: 20220412_142829_resized.jpg Sent from my Verizon, Samsung Galaxy smartphone 1 • • 17911c „ .„ S.* • • t Strickland, Bev From: Pat Donovan -Brandenburg <pdonovan-brandenburg@jacksonvillenc.gov> Sent: Thursday, April 14, 2022 3:04 PM To: Pat Donovan -Brandenburg Attachments: 20220412_142821_resizedjpg Sent from my Verizon, Samsung Galaxy smartphone 1 .,; 1-4;;Sfin. -• • ":45. Strickland, Bev From: Pat Donovan -Brandenburg <pdonovan-brandenburg@jacksonvillenc.gov> Sent: Thursday, April 14, 2022 3:04 PM To: Pat Donovan -Brandenburg Attachments: 20220412_142834_resized j pg Sent from my Verizon, Samsung Galaxy smartphone 1