Loading...
HomeMy WebLinkAboutNCC221795_Site Plan or Location Map_20220511L E PHASE IV 2 AL TRIBAL COMMUNITY DEVELOPMENT BY 0 GA ) o o/ / / eL CAE SPRIN n R0qD 34 SI TE VI CINI T Y MAP NOT TO SCALE VIA ffmwo,rME "mol,�/�1RU / / / DEVELOPER: LUMBEE TRIBE OF NORTH CAROLINA 6984 NC-711 PEMBROKE, NORTH CAROLINA 28372 LUMBEE TRIBE HOUSING DEPARTMENT CONTACTS BRADLY S. LOCKLEAR TRIBAL HOUSING DIRECTOR bslocklear@lumbeetribe.com TERRY LOCKLEAR NEW CONTRUCTION tel ockl ear@I u m b eetri b e. com MATT LOCKLEAR NEW CONTRUCTION malocklear@lumbeetribe.com ENGINEER: CHICORA, PLLC BRICE BELL, PE POST OFFICE BOX 1986 PEMBROKE, NORTH CAROLINA 28372 Ph: (910) 322-6836 SURVEYOR: POWERS SURVEYING JOHN D. POWERS JR. PLS 750 SOUTH ROBERTS AVENUE LUMBERTON, NORTH CAROLINA 28358 (910) 738-6980 LUMBEE TRIBE OF NORTH CAROLINA LOCATED IN Hoke Countv, North Carolina DEVELOPMENT LAYOUT N.T.S. N 10 ,. L 11.11111 IIIr �■fi•- . 0 mom 1j I 4� mi.' Y F 4 f µ - r r — all Mari -1, A � WIN a, _ F f j - r•r — Sl TE DEVET OPMEN T INFORMA TlON DEVELOPMENT DATA TAX PARCEL ID: JURISDICTION: TOWNSHIP: TOTAL ACREAGE: AREA IN R/W: TOTAL DEVELOPABLE ACREAGE: RIVER BASIN: WATERSHED: EXIST. ZONING: UTILITIES: IMPERVIOUS AREA CALCULATIONS: TOTAL SITE AREA BUILDING PADS: DRIVEWAY AREA: ROADS, TOTAL IMPERVIOUS 294220001296 & 294220001035 HOKE COUNTY RAEFORD +/- 13.08 ACRES +/- 1.71 ACRES +/- 11.37 ACRES LUMBER RIVER LITTLE MIDDLE SWAMP (C: Sw) RA-20 PUBLIC WATER AND SEWER 2.60/13.08 = 19.88% ZONING REQUIREMENTS 569,765 S.F. - 13.08 AC. 72,000 S.F. - 1.65 AC. 16,400 S.F. - 0.38 AC. 24,782 S.F. - 0.57 AC. MIN. LOT AREA: 20,000 S.F. - (0.46 AC.) MIN. LOT WIDTH: 80 FT. CAD R/W MIN. FRONT YARD: 30.00 FT. MIN. REAR YARD: 25.00 FT. MIN. SIDE YARD: 10 FT. OPEN SPACE: ENTIRE DEVELOPMENT AREA: 34.04 ACRES TOTAL DEVELOPMENT LOT COUNT: 50 LOTS TOTAL AREA IN R/W: 4.18 DEVELOPABLE PROJECT AREA: 29.86 REQUIRED OPEN SPACE: 10% 29.86x0.10= 2.99 AC. OPEN SPACE REQUIRED: 2.99 AC. OPEN SPACE PROVIDED: 3.11 AC > REQD.-OK* *TOTAL OPEN SPACE PROVIDED IN PRE/IOUS PHASE AND IDENTIFIED AS LOT 41 ON RECORDED PLAT DENSITY: TOTAL NUMBER OF LOTS: 20 LOTS TOTAL ACREAGE: 13.08 13.08-1.71= 11.37 AC REQUIRED DENSITY: 2.00 DU/AC 2.0 DU/AC PROVIDED DENSITY: 1.14 DU/AC 3.67 DU/AC 4 "M ■■� I I 1 I I� �I t qW f -1W -M ddoL —� 4111 REVISIONS NUMBER DESCRIP TION DA TE 1 2 3 INDEX OF SHEETS CS ............................. CO VER SHEET C1. 0.......................... SITE PLAN C2.0...........................GRADING PLAN C3.0.......................... ROAD PROFILE C4.0.......................... ROAD PROFILE C5.0.......................... U TILI TIES PLAN C6.0.......................... EROSION CONTROL — PHASE 1 C7.0.......................... EROSION CONTROL — PHASE 2 C8.0.......................... DETAIL SHEET C9.0.......................... NPDES STABILIZA TION NOTES CIO.0......................... NPDES SELF INSPECTION NOTES CI 1. 0......................... DETAIL SHEET C12.0......................... DETAIL SHEET NOTES CI3.0......................... PROJECT NOTES Know what's below. Call before you dig. CALL 1.800.632.4949 OR 811 WWW.NC811 rORG NC ONE -CALL CENTER ITS THE LAW! M z ao U O N N J? o W Z � N a e QO Z UZ0 Y O(,zw, Z W 2 U�UW W�a W o 2 �zM V X U z m W 0 a w m co m 0 z J J W m C 9, NO m C CID >- m c m 0 N L1J w U z m O W J C N Q O N Uj ` m T I w O o 0 U m W J o� w z (D w Z W o J U SHEET CS00 LOT 33 \ EXIST. LOT EX. HOUS SETBA K - EXIST_ 30_ RON - - - - I LOT 34 LOT 35 EXIST. LOT EXIST. LOT I I EX. HOUSE -- - - - - - - - I I -----_ z O CONTROL CORNER ERRS NORTH = 423,523.92' EAST = 1,923,418.64' DATUM: NAD 83/2011 w z >_ NOW OR FORMERLY 0-1 SUAZO LUNA, MARITERESITA w DB 1270, PG 462 O PID:294220001063 0- ZONING: RA-20 - J_ w eir UBLIC Rom__ -- - --- - -` � EX. HOUS EXIST. 60_ AIL EX�ST. EDP EX. CHER CIR. _ _ Its �� 1 EXIST EOP Ex ATTER'A C R/W� - - 2 -70.18 _ _ _ _ (EXIST. 60' PUBLIC R/W) o PUB EX. 72.65 LE (EXIST. 60 - -II Ex�sy EDP V LL i Exisr. EOP J � � r7 Ln CE 18 RCP _�--�---------EX. EH ------------_____ v� �� LOT 12 - & GO - - - EXIST. LOT Ir EXIST, 6 UBLIC R/W PUBLIC RAW XE IST. 60' I� � Ex. ELE �� ' Ex. ELE \ _ m- _ - I '� EXIST. 30' TELE PAD ------------- & TELE. PAD �� \\ \ \ EX HOUSE el p _ - PROP. CLUSTER m FRON SET ACK I - _ - \ \ \ _ FRONT SETBACK MAILBOX & �i m lm I \ 7- o \ 3 - EXIST. 0 EX. HOUSE PARKING Ia LOT 42 LOT 26 al W a I� o EXIST. LOT EX. HOUSE I LOT 43 (PHASE 4) EXIST. LOT LOT 25 �� i - o i 23,867 sq. ft. EXIST. LOT U CO Icn EX. ELE. IINST � • w PADLLJ `� -200.00' --------------- I ----- - - - - - I I ' r o r'a� ' o,� EXIST. PAVEMENT END OF, �\ \ i N co ________- 176_98---- o _1 I I I I 1 I ,' N o i' LOT 44 (PHASE 4) \ \ `\ \ \ LOT 14 I 00 ' II I i 1 I 1 +I - 0 , LOT 51 (PHASE 4) it 24.0' i o I i ,' , i p 23,390 sq. ft. �� \ \ I 1 I (PHASE 4) I 21,662 sq. ft. 1 1 I i ' LOT 24 I o I I o i 20,489 sq. ft. i ,�Q� .51 I , (PHASE 4) Lw L'i I I i I 1 1 END i N , 20,221 s ft. I q• � w X I L� I I I I - - - - - - - - - - - Jr ,� OF PROP. PAVEMENT i 1 I , \ I 1 6�0' I STA. 10+71.80 i i 1 EXIST, END OF I 200.02' 39. 41.02' 20100' I I-______________� PAVEMENT I 239.35'(TOTAL) I 1 , I -- - - - - - - - - - - - -- ----------- - - - - -- -------- 241.02' (TOTAL) TOTAL I eip '------------- - ----I I T I I a, m' I Ot0 I i o --------16--------L 1� i I o I LOT 50 0 � I LIJ26 0' .� I � I a i N ° I 1 I (PHASE 4) 26,411 sq. ft. a' i o 0 1 LOT 45 (PHASE 4) o I 0 I 0 m 1 w l ' I I i I 26,512 sq. ft. ' LOT 15 N u) ' a 10 I PROP. START OF PAVEMENT I N i I I I (PHASE 4) 20,158 sq. ft. I a N 1' 31.1'i t11N1�' STA. 0+00-.0-0 I 'I oN on 20,0' PROP. 10.0' SIDE iN SETBACK- Io � 23 EPtELOT ------- ---------- ---_ _ _ _ _ 240.85' TOTAL ------------------ --- - 24TOTAL - - - -� I iv (PHASE 4) I 212.29' 28 56' 212.25' o 1� 25,892 sq. ft. I,----------------------------- 28 77 - - \\\ - 9 O I w I 1U) 1� 1 0 I .'/ I Lin`®) 2 EP .0' E 1 1� II , ,-- i i----, `, \ I�-30.0'-►I I------------- - I �• ,' I I I ` I I -I 1 I \ I -- - - - - - -_ e1p RAW II LOT 49 I I , A�oo i I - - - - - - i 1 1 1 ,) (PHASE 4) 20,991 sq. ft. I ,' , I I �p I \ \• `\ \ j ` p, LOT 46 (PHASE 4) 21,153 ft. / / I I i I I PROPERTY LINE sq. LOT 16CD I �0_ (9 0 (PHASE 4) v� i N i `� 9C�� / / �3 / 22,820 sq. ft. 6, I LOT 48 `, ' I (PHASE 4) i I LOT I 47 \ /A / Co ' \ �` ��� 22,395 sq. ft. 1 I (PHASE 4) \ ` I i \ \ \ I I 22,071 sq. ft. �` / / 90.1' A' Ld FTI LOT 22v 7 ,0�� 4) 133. i >_(PHASE NOW OR FORMERLY i 47,947 sq. ft. \ ` ` �� `� 0 / .0, ' � ROBERT LOCKLEAR L� I \ �� AD S70F • �i LIJ DB 278, PG 424 O PID:294220001189 \ A ZONING: RA-20 i \\ �\ U 04 off- r1100.6' \ LOT 17 `I I ei / \ `� �- - ♦ - - - -F- iO - rn o i \ PHASE 4 v i ,' , \ \ cao to i 32,468 sq. ft. N I , , \ \ / / ♦ \ ` \ I o ' �0 , I LOT 21 , _ 51.05' 31.00 =� - LOT 18 \ ` I m i ' ' , (PHASE ( ) r' , ` N _ , , (PHASE 4) • 6� \ O 25,478 s ft. � r sq. / _ - - - - - - - _ _ - - - _ � � \ \ 27,864 sq. ft. i CD LOT 20 I I LOT 19 ` ` (PHASE 4) (PHASE 4) 23,554 sq. ft. i I 20,087 sq. ft. I I ' I , PROP. 25.0' REAR SETBACK r r ' 1 I_ '------------- PROP_ 25.0'-REAR SETBACK �\ -- - - - -� , ---------------- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 47.96' 189.86' 199.60' 0 174.14' �209.57' 46.51' ei N70` 15' 19"W 867.65' PROPERTY LINE ecm eir 4.5' FILL cCUT�,� OLDER 6.0' L PBLIC R/W 10.0' PAVEMENT C LOCAL RESIDENTIAL STREET A -A' TYPICAL ROAD X-SECTION PROPOSED ROAD DA A ROAD NAME I LENGTH I DESIGNATION CHERAW CIRCLE 1 1,072' 1 PUBLIC IOU L 6.0' NOW OR FORMERLY ROBERTLOCKLEAR DB 1047, PG 018 PID:294220001061 ZONING: RA-20 4.5' 4.9' UTILITY PROVIDERS: WATER & SEWER: HOKE COUNTY UTILITY DEPARTMENT 423 E CENTERAL AVE. RAEFORD, NC 28376 FILL CONTACT: DENNIS BAXLEY - ' 3 (910) 875-6704 ,1F CUT ELECTRICITY: LREMC 605 E. FOURTH AVE. RED SPRINGS, NC 28377 CONTACT: KAREN LLOYD ROAD PAVEMENT NOTE: (910) 843-4131 1.5" ASPHALT SURFACE COURSE TYPE S-9.5C 2.5" ASPHALT INTERMEDIATE COURSE, TYPE I-19.0C 8.0" BASE COURSE, ABC STONE SURVEY MARKER LEGEND EPK - EXISTING PK NAIL FOUND EIS - EXISTING IRON STAKE FOUND ECM - EXISTING CONCRETE MARKER FOUND ERRS - EXISTING RAILROAD SPIKE FOUND SIP - SET IRON PIPE OF - EXISTING IRON PIPE FOUND SIR - SET IRON ROD EIR - EXISTING IRON ROD FOUND PROP. E SIDEW/ PROP. CLUSTER MAILBOX MOUNTED ON PEDESTAL NOW OR FORMERLY MARY MONROE DB 677, PG 627 PID:294220001064 ZONING: RA-20 Know what's below. Call before you dig. CALL 1.800.632.4949 OR 811 WWW.NC811.ORG NC ONE -CALL CENTER IT'S THE LAW! CD Lei N ---- - - - - -- - �--- I I I REAR SE-TBACK I I I I I LOT AREA I I I 0.46 AC. I 10' 60.0' I Q I m ' � i BUILDING CO PAD o I � FRONT SETBF�''CK - �----i 80.0' I � � I I I I EDGE OF PAVEMENT TYPE LOT LAYOUT SCALE: NOT TO SCALE �I INSET SCALE: 1: 20 INSET LEGEND PROP. PAVEMENT PROP. CONCRETE CLUSTER MAILBOX SALSBURY INDUSTRIES 3400 SERIES MOUNT 4C PEDESTAL MAILBOX WITH 20 SINGLE MAILBOX DOORS/2 PACKAGE LOCKERS, 1 OUTGOING MAIL SLOT. MODEL 3416D-201 (OR EQUIVALENT EQUAL) GENERAL NOTES: 1. THIS MAP IS NOT A CERTIFIED SURVEY. BOUNDARY INFORMATION PROVIDED BY ROBESON COUNTY GIS 2. TAX PARCEL ID - 141102027 3. THIS PROPERTY IS NOT LOCATED IN A SPECIAL FLOOD HAZARD AREA AS DETERMINED BY THE FEMA FLOOD MAP COMMUNITY PANEL NUMBER 3710934300K EFFECTIVE DATE: 12/06/2019. 4. THE UTILITIES SHOWN ARE FOR THE CONTRACTOR'S CONVENIENCE ONLY. THERE MAY BE OTHER UTILITIES NOT SHOWN ON THIS PLAN; THE ENGINEER ASSUMES NO RESPONSIBILITY FOR THE LOCATIONS SHOWN. 5. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL EXIST. UTILITIES PRIOR TO COMMENCEMENT OF CONSTRUCTION. CONFLICTS BETWEEN EXIST. UTILITIES AND PROPOSED EXCAVATION SHALL BE REPORTED TO THE ENGINEER IMMEDIATELY. 6. PROVIDE MINIMUM OF 48 HOUR NOTICE TO OWNER OR REPRESENTATIVE PRIOR TO INTERRUPTION OF ANY EXIST. UTILITY, IF BEING UTILIZED. 7. THE CONTRACTOR IS RESPONSIBLE FOR REPAIR AND/OR REPLACEMENT OF ANY UTILITIES DAMAGED DURING CONSTRUCTION. 8.THE CONTRACTOR SHALL USE EXTREME CARE WHEN WORKING NEAR ALL UNDERGROUND AND OVERHEAD UTILITIES. 9. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL NECESSARY PERMITS AND APPROVALS HAVE BEEN OBTAINED PRIOR TO CONSTRUCTION. THESE PERMITS AND APPROVALS MAY INCLUDE BUT ARE NOT LIMITED TO GRADING, DEMOLITION, ZONING, BUILDING, DRIVEWAY, DETENTION, SUBDIVISION, SPECIAL USE, SEWER AND WATER. E T A mqfl,�� NIII"I' GRAPHIC SCALE 50 0 25 50 100 1 INCH = 50 FEET M Z 20 U O N N � o ^ ern M U] 00 N r�c. Z�Q0LLUZ0 Y -� 0(9 Z M Zwg V��W w:ia W o Z M Uw 0 m w m m 0 O z C J ,' O w z c4 W � Z U Q av0 � O�r, Q U Z Q0E- 0 �zo zo z w 0 a LLJ o J J LU m cc C C C 0o 00 0 m N m Z U w U Z m O w J c N W Q \ O N T m VJ o 0 w J m p � Z .I.i z W J SHEET 1,00 0 L EX LOT 34 LOT 35 � LOT 33 EXIST. LOT EXIST. LOT EXIST. LOT - - EX. HOUSE �v EX. HOUS _---- - - - - - I \ RON SETBA_K - I I \ EXIST. 30'_----- I I v 465.10 I.E.(IN) _ _ ----- --�- 60' UBLC R��-- �iST,7"-w� EXIST. W A W � _�_ EkisT. EOP y�l / � / 231.10 W H.P. 2 -70. 2�- G Ex. TLF?3 XIST. �- - / 4 -ExisT. EOP - - - 465.10 - LE 465.10 - - - - - �1. OF 8.. RCP LE- -- ,-232EH230�- 232_ ---- -232y ����- ----- -----A --- -----� ------ I IcLc�E7 V E 2/ _ SETBCw I / i in m I I\ EXIST. 30' FRONT/ \ EX. ROUSE �J\\\ I 1 I 4� G IIPj II \ L( O / \ _ 02sS I k� I III `� W + \ EX EXIST. 2�/ \ ^\\� �� LOT 25 EXIST. LOT \\ ' EX. PAD N �IE.OU 1.30 T I N \ ( )I 1 - 23 v M I LO 23 I PAD= �N IIII I I1.E. IN 9 I�'I I I� 1111'l LOT 24 w i I II L�� IIY N PAD= 235.50 234.00 �\ I WOODED I �• � \\ HP I IJ EXIST, END OF-2 2 2. -.. NIa11111 PAVEMENT - I. .(1 N \ 23 2' \ V 1111111 / �� N 23 234.00 \ I I I� IIII HP / N r7 I - V; I w) LOT 50 LOT �b -234= 23550 PAD= ��35.50 f N'_� II III / L 23 .83 WOODED 235.25 / I. (IN) 2 2.0 I \ HIP ��N 1.Er(OUT XT/O /00, \\ ss / I EXI T.-ERQSION- - ///// - - 233 LOT 23 3 _ / -. .f..f..r.. 3 01.. .. .. -► .. y ... -- C-0 ROL Bl l�d_--�;i j\ \ PAD= 235.00 3.69 - y --- ---\ If/II N 1. .( T) I I I P � I ---1�0 �I / A ---- 11�\ /- I cN,! �� II 1 \\ WOOD I LE - - - - - - ----230=---\ 231. �U, A LOT 49/ / 234.00 �T A h �' / PAD= 234.75 \ HP \ 1, LOT 46 vv i'AD= 235.25 � PROPERTY LINE �11 �� ��\/V // / -� I 1� r'0% 83 .l}0 v N 1 V I 1 \ 31�OUT v / /Z� 234.00 234P00 A v / 23 .9 V / / LE. U yj I I I \ \A \ �\ V �\ V \V A A I� V I HP / \ \\\ T, vv V � )�V 0 I � "�'S� I �`3 / �"� v vvv v vvvvv ti ti \ \ \\ \\ \\\ \\ \ \ \\ I.E.( yT) �\ // / LOT 48 PROP. TREE vV A \ \ VA / / � PAD= 234.50 r' • vv vA vv v / �� N� LOT 47 LINE (TYP) ri ,�`�svv vA vvv PROP. 50 LF 1.23p rn �c aA�=�i//i/ / �� X PAD= 234.75 00, i i -0�24RCRP{T � N I.E. UT) ''v 233 c.d /// ���_-� i/ I ILE. N V i /i /. i i / b.22�� / NOW OR FORMERLY 32 �� -.7ROBERT LOCKLEAR ` �� �� <� 3030 t, , w z } NOW OR FORMERLY SUAZO LUNA, MARITERESITA w DB 1270, PG 462 o PID:294220001063 a_ ZONING: RA-20 / v\ LOT 15 PAD= 235.50 234.00 1 HP ' N 1 LOT 16 PAD= 235.00 w � Z J 234.0 w W 7 �32.58 / -2+-0I O PROP. 5.0' X w I � CONC. i N 233I38 SIDEWALK I I ` 1 23�.63 � �02 TC:233.28 N BC: 232.78 x Ld e l T I d °N a� 233.53 / PROP. 15" RCP I TC:233. 3 I.E.(OUT): 231.94 3 232.73 /BC:2321 a PROP. 15 LF i OF 15" RCP ® Qe X w 0.53% a a i I I a a i PROP. CLUSTER I a MAILBOX WOODED MOUNTED ON PEDESTAL I I TC: 233. I I I I I 1 BC: 233. Q 232.81 PROP. 15" RCP I a l I.E.(IN): 232.04 I A 2�3.61 I 232.83 I I I D_ O c� LJ LI NOW OR FORMERLY 11 INSET MARY MONROE DB 677, PG 627 PI D: 294220001064 SCALE: 1: 10 ZONING: RA-20 WOODED DRAINAGE PATTERNS ARE TO HELP COMMUNICATE THE PROJECT'S FINE GRADING BETWEEN SPOT ELEVATIONS. THESE LINES DO NOT REPRESENT SWALES OR ANY OTHER FEATURES DB 278, PG 424 �� V A 23 LE.(oUT) / / / LOT 17 HP O PI D: 294220001189 �� ��i \ �� 5 _ A =-}_ _ _ _ _ - - - / / ZONING: RA 20 �I���\ vv �3 --�' 30. A / PAD= 234.75 �\ \\� ^� � 0 23 '23 5 • D.48\� rt -�- - -�-_ Z • / ��ii IIIIv V A v V A LE. v 23 X 111jII/ice !v � � v v�-232 2� --- � �� 230.45 v�vv�vvv 2i �2 -i.E.( szvv v -LINETYP PROP PEE ) 230.24-0�>3 WOODED >/I)LOT 21 I.E. 0.10 �I.E3. 6OU26T LE. IN i LOT 18wPAD= 234.25r 3 - - 2 _ A�v ?34 3- PAD= 234.25 232 „D ROP. 28 LF II\ PROP. 24" RCP 2 3 25 w v A \ \\ 0 8" RCP(TYP) I I \ W/HEADWALL P \ \ \ �----------- 23p / II I.E.(IN): 229.93 234.0 \v A / / 3 233.0o N LOT 20 w LOT 19 3, HP 1 1 23 9 III �v HP PAD= 1235.25 I I PAD= 235.50 vv v , 233 1 \� _---n�r� ---\ / / ^ _ \\ 1111 Ds 233 / 229- v vv 0 ^� / � III I \\\\ \\\\ \\ 1 v 1111 ��23 III P j l � PROP. 1 F W/HEADWAL V III -- I I ??g, ���I I I < \ -232- -==-- - '11 ;23 OF 24 RCP 0 II :228.50 \ \\\�--229__ - 1 232 --- - �0��� �� / 0. v _ z� / �� Know what's below. I ' I I ' \ PROP. I ' --- 3 \ ?� - 232-- _ Call before you cOg. __ __ ___ ? - 233��OPERA LINE �- - BASINS TO BE N i� ?3 �� � ?3 � - - - - - - - - - - � BASINS T01 BE ,. 4. ����� �, I I -232 ,?,32- FILLED IN v CALL 1.800.632.4949 OR &i 1 FILLED IN L r� ?3S.��=�23 233 T V I NOW OR FORMERLY _ / WOOD ��� OBERT LOCKLEAR WWW.NC811.ORG %2B 1047, PG 018 - WOODED NC ONE -CALL CENTE //35� PID 20001061 --_ / o zoNIN o IT'S THE LAW! DE -WATERING NOTES 1. THE CONTRACTOR SHALL AT ALL TIMES PROVIDE AND MAINTAIN AMPLE MEANS AND EQUIPMENT WITH WHICH TO REMOVE AND PROPERLY DISPOSE OF ANY AND ALL D WATER ENTERING THE EXCAVATION OR OTHER PARTS OF THE WORK AND KEEP ALL GRASSED SWALE NOTES: EXCAVATIONS DRY UNTIL SUCH TIME AS PIPE LAYING AND GRADING IS COMPLETED AND STRUCTURES TO BE BUILT THEREIN ARE COMPLETED. 1. EXCAVATE CHANNEL TO THE CROSS-SECTION SHOWN. C 2. APPLY LIME, FERTILIZER AND SEED TO THE CHANNEL AND ADJOINING 2. NO WATER SHALL BE ALLOWED TO RISE AROUND THE PIPE IN UNBACKFILLED TRENCHES NOR SHALL IT BE ALLOWED TO RISE OVER MASONRY UNTIL THE CONCRETE OR MORTAR - - - - - - - - - - - - - - - - - - - AREAS IN ACCORDANCE WITH THE SEEDING SCHEDULE. HAS SET (MINIMUM 24 HOURS). ALL WATER PUMPED OR DRAINED FROM THE WORK SHALL B � 1 3. START LAYING THE NET FROM THE TOP OF THE UPSTREAM END OF THE BE DISPOSED OF IN SUCH A MANNER AS TO PREVENT SILTATION AND EROSION TO ADJACENT 3'0 CHANNEL AND UNROLL IT DOWN THE GRADE. DO NO STRETCH MATTING. PROPERTY OR OTHER CONSTRUCTION. I p I 4. BURY THE UPSLOPE END AND STAPLE THE NET EVERY 12" ACROSS THE I��I NORTH AMERICAN GREEN VMAX SC350 TOP END, EVERY 3' AROUND THE EDGES AND ACROSS THE MAT SO THAT DRAINAGE NOTES: OR APPROVED EQUIVALENT THE STRAW IS HELD CLOSELY AGAINST THE SOIL. 1. THE PROPOSED CONTOURS WITHIN PAVED AREAS ARE GRAPHICAL 5. MATTING STRIPS SHOULD BE JOINED TOGETHER ALONG THE SIDES WITH REPRESENTATIONS ONLY. THE CONTRACTOR IS RESPONSIBLE FOR GRADING I A I B C D A 3" OVERLAP AND STAPLED TOGETHER. UNIFORMLY BETWEEN SPOT ELEVATIONS. I 1.0' I VARIES VARIES VARIES 6. TO JOIN ENDS OF STRIPS, INSERT THE NEW ROLL OF NET IN A TRENCH A = BOTTOM WIDTH AS WITH UPSLOPE END AND OVERLAP IT 18" WITH THE PREVIOUSLY LAID 2. CONTRACTOR TO GRADE ALL AREAS WITHIN PROJECT TO DRAIN STORM B = HIEGHT OF TEMP. LINER UPPER ROLL. TURN UNDER 6" OF THE 18" OVERLAP AND STAPLE EVERY WATER. CARE SHALL BE TAKEN TO ENSURE THAT ALL AREAS WITHIN C =DEPTH OF GRADED SWALE 12" ACROSS THE END.D PARKING LOTS, ROADS, AND LANDSCAPED ISLANDS SHALL NOT HOLD WATER = TOP WIDTH OF SWALE UPON PROJECT COMPLETION. REF. SWALE CALCULATIONS GRASS SWALE FOR DIMENSIONS N.T.S. LEGEND GENERAL NOTES: 1. THIS MAP IS NOT A CERTIFIED SURVEY. BOUNDARY INFORMATION PROVIDED BY ROBESON COUNTY GIS 2. TAX PARCEL ID - 141102027 3. THIS PROPERTY IS NOT LOCATED IN A SPECIAL FLOOD HAZARD AREA AS DETERMINED BY THE FEMA FLOOD MAP COMMUNITY PANEL NUMBER 3710934300K EFFECTIVE DATE: 12/06/2019. 4. THE UTILITIES SHOWN ARE FOR THE CONTRACTOR'S CONVENIENCE ONLY. THERE MAY BE OTHER UTILITIES NOT SHOWN ON THIS PLAN; THE ENGINEER ASSUMES NO RESPONSIBILITY FOR THE LOCATIONS SHOWN. 5. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL EXIST. UTILITIES PRIOR TO COMMENCEMENT OF CONSTRUCTION. CONFLICTS BETWEEN EXIST. UTILITIES AND PROPOSED EXCAVATION SHALL BE REPORTED TO THE ENGINEER IMMEDIATELY. 6. PROVIDE MINIMUM OF 48 HOUR NOTICE TO OWNER OR REPRESENTATIVE PRIOR TO INTERRUPTION OF ANY EXIST. UTILITY, IF BEING UTILIZED. 7. THE CONTRACTOR IS RESPONSIBLE FOR REPAIR AND/OR REPLACEMENT OF ANY UTILITIES DAMAGED DURING CONSTRUCTION. 8. THE CONTRACTOR SHALL USE EXTREME CARE WHEN WORKING NEAR ALL UNDERGROUND AND OVERHEAD UTILITIES. 9. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL NECESSARY PERMITS AND APPROVALS HAVE BEEN OBTAINED PRIOR TO CONSTRUCTION. THESE PERMITS AND APPROVALS MAY INCLUDE BUT ARE NOT LIMITED TO GRADING, DEMOLITION, ZONING, BUILDING, DRIVEWAY, DETENTION, SUBDIVISION, SPECIAL USE, SEWER AND WATER. -----ELEV----- EXISTING CONTOUR EXIST. DITCH ELEV PROPOSED CONTOUR i PROP. DITCH EXISTING STORM DRAINAGE PIPE OHP EXIST. OVERHEAD POWER LINE - - - - - - PROPOSED STORM DRAINAGE PIPE - - - - - - EXIST. TOP OF BANK SPOT PROP. SPOT ELEVATION W EXIST. WATER LINE 100.00 PROP. GEOGRID FABRIC FOR - - EXIST. RIGHT OF WAY SLOPE STABILIZATION - PROP. RIGHT OF WAY `V EXIST. TREE LINE PROP. TREE LINE rc1 i'a GRAPHIC SCALE 30 0 15 30 60 1 INCH = 30 FEET • Z Vo� r J 0 J � cn T'. / Zap e Ozu Sit 06 0Wc O(� cn W o Za Z U wJc = Z r (D C)Z a W w m m 0 O z V / ' -� LLJ � O w Wiz O�< U 2 z QQF- O E_zo 4e!� co Z F- Z �o O Ix Y � w 2 I - J J W m cc o o c 0o CID 0 zQ m m N Q w U z m C) ^J I..L r I�i v W = J O N Z co Q o T T _ 0 c- m o w 0 � V m p W J m a Z Lu z W w J U ocf) SHEET C200 Ld � w � w w zLL O Qw J a U LLJ V) J J Ld U Ld 0 250 240 230 220 210 w J U O � O U + PVI STA: 5+81 02 PVI ELEV: 230 48 Q K: 615.75 = LVC: 922.7 U LOW PT. STA: 5+ 0.26 J Q LOW PT ELEV: 2 2.16 00 + N Ld (n U EXIST. FH m m EXIST. GROUND ' EXIST. 0.50% Q GROUND ljt _ _. —0.50% — _ — u Q CA p -RR-QP 24= ICE ----- ----_ — R MAIN DR-21 PVC WAT W CLASS IV O w � EXIST. GV U PROP. 1445 LF OF tD SDR-21 PVC WATER MAIN Q u CO Ld J 00 1.0 = O U O BOTTOM OF Q 4 L COMPACTED U � N U N ROAD SUBGRADE zxcn Q II w w U w 45` BEND WITH 45' BEND WITH BLOCKING -i BLOCKING Wn cw c) w U w PROP. 20 LF. OF oo�J 6 DIP WL C)o JO �U oo�z o \o ~!� z v w + U + LOT 22 ! LOT 23 o O OQ Of w i x W cn 0-Cn z! J� I �I M M 0I JI I I N 0O � 00 � 0 O� 0O C) N r O� rrj r7 �t r7 O 4 CN N CN r7 r- N N n re)O N r7 r7 r7 M N c r N N N N N N N N N� N N� N N N N N N N N N r —2+70.18 —2+00 —1+00 0+00 1+00 2+00 PROP. CHERAW CIRCLE STATION (ft.) HORIZONTAL SCALE: 40 FEET PER INCH EXISTING GROUND AT CL----- - - - - -- CHERAW CIRCLE PROPOSED PROFILE DE -WATERING NOTES 3+00 1. THE CONTRACTOR SHALL AT ALL TIMES PROVIDE AND MAINTAIN AMPLE MEANS AND EQUIPMENT WITH WHICH TO REMOVE AND PROPERLY DISPOSE OF ANY AND ALL WATER ENTERING THE EXCAVATION OR OTHER PARTS OF THE WORK AND KEEP ALL EXCAVATIONS DRY UNTIL SUCH TIME AS PIPE LAYING AND GRADING IS COMPLETED AND STRUCTURES TO BE BUILT THEREIN ARE COMPLETED. 4+00 2. NO WATER SHALL BE ALLOWED TO RISE AROUND THE PIPE IN UNBACKFILLED TRENCHES NOR SHALL IT BE ALLOWED TO RISE OVER MASONRY UNTIL THE CONCRETE OR MORTAR HAS SET (MINIMUM 24 HOURS). ALL WATER PUMPED OR DRAINED FROM THE WORK SHALL BE DISPOSED OF IN SUCH A MANNER AS TO PREVENT SILTATION AND EROSION TO ADJACENT PROPERTY OR OTHER CONSTRUCTION. DRAINAGE NOTES: 1. THE PROPOSED CONTOURS WITHIN PAVED AREAS ARE GRAPHICAL REPRESENTATIONS ONLY. THE CONTRACTOR IS RESPONSIBLE FOR GRADING UNIFORMLY BETWEEN SPOT ELEVATIONS. 2. CONTRACTOR TO GRADE ALL AREAS WITHIN PROJECT TO DRAIN STORM WATER. CARE SHALL BE TAKEN TO ENSURE THAT ALL AREAS WITHIN PARKING LOTS, ROADS, AND LANDSCAPED ISLANDS SHALL NOT HOLD WATER UPON PROJECT COMPLETION. 5+00 GENERAL NOTES: 6+00 1. THIS MAP IS NOT A CERTIFIED SURVEY. BOUNDARY INFORMATION PROVIDED BY ROBESON COUNTY GIS 2. TAX PARCEL ID - 141102027 3. THIS PROPERTY IS NOT LOCATED IN A SPECIAL FLOOD HAZARD AREA AS DETERMINED BY THE FEMA FLOOD MAP COMMUNITY PANEL NUMBER 3710934300K EFFECTIVE DATE: 12/06/2019. 4. THE UTILITIES SHOWN ARE FOR THE CONTRACTOR'S CONVENIENCE ONLY. THERE MAY BE OTHER UTILITIES NOT SHOWN ON THIS PLAN; THE ENGINEER ASSUMES NO RESPONSIBILITY FOR THE LOCATIONS SHOWN. 5. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL EXIST. UTILITIES PRIOR TO COMMENCEMENT OF CONSTRUCTION. CONFLICTS BETWEEN EXIST. UTILITIES AND PROPOSED EXCAVATION SHALL BE REPORTED TO THE ENGINEER IMMEDIATELY. 6. PROVIDE MINIMUM OF 48 HOUR NOTICE TO OWNER OR REPRESENTATIVE PRIOR TO INTERRUPTION OF ANY EXIST. UTILITY, IF BEING UTILIZED. 7. THE CONTRACTOR IS RESPONSIBLE FOR REPAIR AND/OR REPLACEMENT OF ANY UTILITIES DAMAGED DURING CONSTRUCTION. 8.THE CONTRACTOR SHALL USE EXTREME CARE WHEN WORKING NEAR ALL UNDERGROUND AND OVERHEAD UTILITIES. 9. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL NECESSARY PERMITS AND APPROVALS HAVE BEEN OBTAINED PRIOR TO CONSTRUCTION. THESE PERMITS AND APPROVALS MAY INCLUDE BUT ARE NOT LIMITED TO GRADING, DEMOLITION, ZONING, BUILDING, DRIVEWAY, DETENTION, SUBDIVISION, SPECIAL USE, SEWER AND WATER. 0 7+C 250 E 230 220 210 �AE ,Hl�PS- o� GRAPHIC SCALE 30 0 15 30 60 1 INCH = 30 FEET M . Z a0 Up N N M J c CD M cn T W Z N d O .. Z UwLLi Y O(� zm Z W 2 UofV W W o = Z M x C Z m w o a w m m 0 O z V) ' 1--�-1 w C) W Wiz U aU0 � O�Q U 2 Z QpF- O o z u) z F- Z .� o oxY 00 a N o J J W m cc C 9, NO m C co O W m c m N J � w z m o LL O W � J N O N m Q � O T N T m Q ' I11 O o 0 I..L > m o w J m � Q z w z W w J U ocf) SHEET C3,00 4--1 4- 0 Q J LLI 0 U z w w w LL w J a U J a U Ld 250 cue 230 220 210 Ld O J 4 UO U L O U + W w J U O N Q Of 00 PVI STA: 5+81 02 flf Q z w ( U 4 M PVI ELEV: 230 48 J U w Q K: 615.75 = J of II w LVC: 922.7 00 U J L W PT. STA: 5+00.26 0-) Lo � J w OW PT ELEV: 2 2.16 N � u Lo + N O O W O E IST. GROUND v > > Ld OQ w of o_ cn — — — — _-RR9P 24= CP_ � _______ CLASS IV 7777 F OF 6"0 SDR-21 VC WATER MAIN PROP. 1445 1 BOTTON OF COMPACTED ROAD UBGRADE PROP. MEGALUG 45` BEND WITH BLOCKING PROP. 20 LF. OF 6" DIP WL LOT 22 ' LOT 23 I I w z O M M Il �t � O N-) O N N 00 N O L � � O 0 I' O 00 r n ND N-) N� M N N N N N N N N N N N N N lial 5+00 6+00 7+00 9+00 PROP. CHERAW CIRCLE STATION (ft.)_ HORIZONTAL SCALE: 40 FEET PER INCH EXISTING GROUND AT CL CHERAW CIRCLE PROPOSED PROFILE DE —WATERING NOTES 10+00 1. THE CONTRACTOR SHALL AT ALL TIMES PROVIDE AND MAINTAIN AMPLE MEANS AND EQUIPMENT WITH WHICH TO REMOVE AND PROPERLY DISPOSE OF ANY AND ALL WATER ENTERING THE EXCAVATION OR OTHER PARTS OF THE WORK AND KEEP ALL EXCAVATIONS DRY UNTIL SUCH TIME AS PIPE LAYING AND GRADING IS COMPLETED AND STRUCTURES TO BE BUILT THEREIN ARE COMPLETED. 2. NO WATER SHALL BE ALLOWED TO RISE AROUND THE PIPE IN UNBACKFILLED TRENCHES NOR SHALL IT BE ALLOWED TO RISE OVER MASONRY UNTIL THE CONCRETE OR MORTAR HAS SET (MINIMUM 24 HOURS). ALL WATER PUMPED OR DRAINED FROM THE WORK SHALL BE DISPOSED OF IN SUCH A MANNER AS TO PREVENT SILTATION AND EROSION TO ADJACENT PROPERTY OR OTHER CONSTRUCTION. DRAINAGE NOTES: 1. THE PROPOSED CONTOURS WITHIN PAVED AREAS ARE GRAPHICAL REPRESENTATIONS ONLY. THE CONTRACTOR IS RESPONSIBLE FOR GRADING UNIFORMLY BETWEEN SPOT ELEVATIONS. 2. CONTRACTOR TO GRADE ALL AREAS WITHIN PROJECT TO DRAIN STORM WATER. CARE SHALL BE TAKEN TO ENSURE THAT ALL AREAS WITHIN PARKING LOTS, ROADS, AND LANDSCAPED ISLANDS SHALL NOT HOLD WATER UPON PROJECT COMPLETION. FONJ] 230 220 210 N O 00 4 Po N 10+71.51 GENERAL NOTES: 1*1101m"117 EXIST. 6"0 SDR-21 PVC WATER MAIN 1. THIS MAP IS NOT A CERTIFIED SURVEY. BOUNDARY INFORMATION PROVIDED BY ROBESON COUNTY GIS 2. TAX PARCEL ID — 141102027 3. THIS PROPERTY IS NOT LOCATED IN A SPECIAL FLOOD HAZARD AREA AS DETERMINED BY THE FEMA FLOOD MAP COMMUNITY PANEL NUMBER 3710934300K EFFECTIVE DATE: 12/06/2019. 4. THE UTILITIES SHOWN ARE FOR THE CONTRACTOR'S CONVENIENCE ONLY. THERE MAY BE OTHER UTILITIES NOT SHOWN ON THIS PLAN; THE ENGINEER ASSUMES NO RESPONSIBILITY FOR THE LOCATIONS SHOWN. 5. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL EXIST. UTILITIES PRIOR TO COMMENCEMENT OF CONSTRUCTION. CONFLICTS BETWEEN EXIST. UTILITIES AND PROPOSED EXCAVATION SHALL BE REPORTED TO THE ENGINEER IMMEDIATELY. 6. PROVIDE MINIMUM OF 48 HOUR NOTICE TO OWNER OR REPRESENTATIVE PRIOR TO INTERRUPTION OF ANY EXIST. UTILITY, IF BEING UTILIZED. 7. THE CONTRACTOR IS RESPONSIBLE FOR REPAIR AND/OR REPLACEMENT OF ANY UTILITIES DAMAGED DURING CONSTRUCTION. 8.THE CONTRACTOR SHALL USE EXTREME CARE WHEN WORKING NEAR ALL UNDERGROUND AND OVERHEAD UTILITIES. 9. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL NECESSARY PERMITS AND APPROVALS HAVE BEEN OBTAINED PRIOR TO CONSTRUCTION. THESE PERMITS AND APPROVALS MAY INCLUDE BUT ARE NOT LIMITED TO GRADING, DEMOLITION, ZONING, BUILDING, DRIVEWAY, DETENTION, SUBDIVISION, SPECIAL USE, SEWER AND WATER. 0 GRAPHIC SCALE 30 0 15 30 60 1 INCH = 30 FEET M co Z co U O N N M J 0 � M W coZ�ci 0 Q O .. Z UZui Y O(� zm Z W 2 UofV W W o = Z M x C Z m w o a w m m 0 O z V) ' -� W p W Wiz U � avo � O,Q U 2 Z QpF-- O >Zo E- z Cn z p F-- Z >�o oxY 00 a N o J J W m cc C 9, NO m C co O W m c m N J � w � z m o LL O W � J N O N m Q � O T N T m Q ' I11 O o 0 I..L > m o W J m � Q z w z W w J U ocf) SHEET C4,00 0 LOT 33 \ EXIST. LOT EX. HOUS RON SETS EXIST. 30' EXIST.J— II � W ' PUB C R (EXIST. 60 —II LE OF 18" RCP -7- - - XE IST. 60' PUBLICC RAW LOT 34' EXIST. LOT EX. HOUSE W— EDP LOT 7 LOT 8 LOT 9 i EXIST. LOT T. LO EXIST. LOT EX. HOUSE LEX EXIST. ACK I � ---------__ __ —_ EXIST._60' P BLICW EWT. 6" WL VVEXIST. EOP — — 2 -70.!8 _ _ _ _ (EXIST. 60 PUBLIC R/W) EX, 72 65 LE — — `° ExisT. EOP --------EX. EH ---------- & cv REMOVE PLUG, GV EXIST. 60 PUBLIC R & B.O. ASSEMBLY �W EX. ELE._,,-" & TELE. PAD i LOT 35 I �� EXIST. LOT I I i -----�.w Ex ST. 6" wL Ek�ST. EOP U EXIST. 30' FRON SET ACK J CJ D j Im EXIST. 30' FRONT SETBACK EX. HOUSE m Ia_ LOT 42 of to EXIST. LOT EX. HOUSE LOT 26 EXIST. LOT LOT 25 EXIST. LOT cI IL) CO icn x x TIE PROP. 6" W.L. TO wl v~i EXIST. 6" W.L. AFTER SUCCESSFUL EX. ELE i x x CHLORINATION AND TESTING, PAD W L'i O � � LO51- II I III' 1)(4 LOT 24 20,489 sq. ft. o 1 (PHASE 4) Ljj 20,221 sq. ft. x r w PROP. 1445 LF OF 6" SDR WL i (MIN. 3.0' COVER) 3 i I i I ' II i PROP. 1 " LOT 50 WATER SERVICE I (PHASE 4) (TYP) 7 26,411 sq. ft. � I� u II PROP. 10.0' SIDE SETBACK LOT 23 (PHASE 4) 25,892 sq. ft. j PROP. 28 LF OF 18"RCP 1 0 DRIVEWAY TILE (TYP.) ' I ' I LOT 49 1 (PHASE 4) \\ 20,991 sq. ft. PROPERTY LINE � 0 \ NOW OR FORMERLY ROBERTLOCKLEAR DB 278, PG 424 PID:294220001189 ZONING: RA-20 GENERAL NOTES: 1. THIS MAP IS NOT A CERTIFIED SURVEY. BOUNDARY INFORMATION PROVIDED BY ROBESON COUNTY GIS 2. TAX PARCEL ID - 141102027 3. THIS PROPERTY IS NOT LOCATED IN A SPECIAL FLOOD HAZARD AREA AS DETERMINED BY THE FEMA FLOOD MAP COMMUNITY PANEL NUMBER 3710934300K EFFECTIVE DATE: 12/06/2019. 4. THE UTILITIES SHOWN ARE FOR THE CONTRACTOR'S CONVENIENCE ONLY. THERE MAY BE OTHER UTILITIES NOT SHOWN ON THIS PLAN; THE ENGINEER ASSUMES NO RESPONSIBILITY FOR THE LOCATIONS SHOWN. 5. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL EXIST. UTILITIES PRIOR TO COMMENCEMENT OF CONSTRUCTION. CONFLICTS BETWEEN EXIST. UTILITIES AND PROPOSED EXCAVATION SHALL BE REPORTED TO THE ENGINEER IMMEDIATELY. 6. PROVIDE MINIMUM OF 48 HOUR NOTICE TO OWNER OR REPRESENTATIVE PRIOR TO INTERRUPTION OF ANY EXIST. UTILITY, IF BEING UTILIZED. 7. THE CONTRACTOR IS RESPONSIBLE FOR REPAIR AND/OR REPLACEMENT OF ANY UTILITIES DAMAGED DURING CONSTRUCTION. 8. THE CONTRACTOR SHALL USE EXTREME CARE WHEN WORKING NEAR ALL UNDERGROUND AND OVERHEAD UTILITIES. 9. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL NECESSARY PERMITS AND APPROVALS HAVE BEEN OBTAINED PRIOR TO CONSTRUCTION. THESE PERMITS AND APPROVALS MAY INCLUDE BUT ARE NOT LIMITED TO GRADING, DEMOLITION, ZONING, BUILDING, DRIVEWAY, DETENTION, SUBDIVISION, SPECIAL USE, SEWER AND WATER. O a m r z m UTILITY CONSTRUCTION NOTES LOT 43 (PHASE 4) 23,867 sq. ft. LOT 10 EXIST. LOT EX. HOUSE I PROP. 28 LF " CP DRIVEWAY TIL (TYP.) EX C EX. ELE. ` & TELE. PAD o � \ EXIST \GV y EX. HOUSE TIE P. 6" TO IST. 6' AFTER SUCCESSFUL CHLO ATION AND TESTING, LOT 44 (PHASE 4) \ 23,390 sq. ft. PROP. 1 " 11 WATER SERVICE I (TYP.) c I LOT 45 (PHASE 4) 26,512 sq. ft. i PROP. 28 LF OF 18"RCP DRIVEWAY TILE (TYP.) I I LOT 46 (PHASE 4) 21,153 sq. ft. i LOT 48 \ \ (PHASE 4) LOT 47 �`\ 22,395 sq. ft. (PHASE 4) i � � 22,071 sq. ft. / LOT 22 ' (PHASE 4) PROP. 50 LF 24" ATER SERVIC>F/� 47,947 sq. ft. \%` �`� CLASS IV RCP ( P.) / 1 LA TERAL SEPARA 77ON OF SEWERS AND WATER MAIN. - WATER MAINS SHALL BE LAID AT LEAST 10 FT. LATERALLY FROM EXISTING OR PROPOSED SEWER, UNLESS LOCAL CONDITIONS OR BARRIERS PREVENT A 10 FT. LATERAL SEPARATION - IN WHICH CASE.• a. THE WATER MAIN IS LAID IN A SEPARATE TRENCH, WITH THE ELEVATION OF THE BOTTOM OF THE WATER MAIN AT LEAST 18 INCHES ABOVE THE TOP OF THE SEWER, OR b. THE WATER MAIN IS LAID IN THE SAME TRENCH AS THE SEWER WITH THE WATER MAIN LOCATED AT ONE SIDE ON A BENCH OF UNDISTURBED EARTH AND WITH THE ELEVATION OF THE BOTTOM OF THE WATER MAIN AT LEAST 18 INCHES ABOVE THE TOP OF THE SEWER. 2. CROSSING A WATER MAIN OVER A SEWER. WHENEVER IT IS NECESSARY FOR A WATER MAIN TO CROSS OVER A SEWER MAIN, THE WATER MAIN SHALL BE LAID AT SUCH AN ELEVATION THAT THE BOTTOM OF THE WATER MAIN IS A T LEAST 18 INCHES ABOVE THE TOP OF THE SEWER MAIN, UNLESS LOCAL CONDITIONS OR BARRIERS PREVENT AN 18 INCH VERTICAL SEPARATION - IN WHICH CASE BOTH THE WATER MAIN AND SEWER MAIN SHALL BE CONSTRUCTED OF FERROUS MATERIAL AND WITH JOINTS THAT ARE EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE OF 10 FT. ON EACH SIDE OF THE POINT OF CROSSING. � 11 - M - - -M PR P. 28 LF F 18'RCP LOT 21 PROP. 1 ' DRI EWAY TIL (TYP.) LOT 18 (PHASE 4) WATER ERVI E PROP. 20 LF F D P (PHASE 4) 25,478 sq. ft. TYP.) II ON 27,864 sq. ft. II TORM PIPE (UNDE STORM) �� II LOT 20 �! jj 15.00' LOT 19 (PHASE 4) II (PHASE 4) 23,554 sq. ft. II 20,087 sq. ft. U! II U! �i II o WL CROSSING o II o GROUND: 232.18 TOP 24" STORM: 229.00 II BTM 24" STORM: 226.25 J. CROSSING A WATER MAIN UNDER A SEWER. WHENEVER IT IS NECESSARY FOR A WATER MAIN TO CROSS UNDER A SEWER MAIN, BOTH THE WATER MAIN AND THE SEWER MAIN SHALL BE CONSTRUCTED OF DUCTILE IRON MATERIAL AND WITH JOINTS EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE OF 10 FT. ON EACH SIDE OF THE POINT OF CROSSING. A SECTION OF WATER MAIN PIPE SHALL BE CENTERED AT THE POINT OF CROSSING 4. CROSSING STORM DRAINAGE LINES. A MINIMUM OF 12 INCHES OF VERTICAL CLEARANCE SHALL BE MAINTAINED BETWEEN A WATER LINE CROSSING OVER A STORM DRAINAGE LINE UNLESS DUCTILE IRON PIPE IS USED. IN ADDITION, THREE AND A HALF (3.5) FT. OF COVER MUST BE MAINTAINED OVER THE WATER MAIN OR IT SHALL BE DUCTILE IRON. IF DUCTILE IRON PIPE IS USED THEN TWO AND A HALF (2.5) FT. OF COVER MUST BE MAINTAINED OVER THE WATER MAIN AND A MINIMUM OF 4 INCHES OF VERTICAL CLEARANCE SHALL BE MAINTAINED BETWEEN THE WATER MAIN AND THE STORM DRAINAGE LINE. WHERE A WA TER MAIN CROSSES UNDER A STORM DRAINAGE LINE THE MINIMUM OF TWELVE (12) INCHES OF VERTICAL SEPARATION SHALL BE MAINTAINED AND THE WATER MAIN SHALL BE DUCTILE IRON FOR A DISTANCE OF 10 FT. ON EACH SIDE OF THE CROSSING. WHERE STORM DRAIN & SANITARY SEWER CROSSES MAINTAIN A MIN. 24" VERTICAL SEPARATION, OTHERWISE SANITARY SEWER MUST BE DIP. II TOP WL. 225.25 (REF. WATER/STORM CROSSI DETAIL) PROPERTY LINE LOT 14 (PHASE 4) 21,662 sq. 1 I � I i � I 0+0 � III II � �� II LOT 15 t (PHASE 4) 20,158 sq. 1 i i � I PROP. 9 0 � 6" GV IF III PROP. FIRE HYDRANT WITH / II VALVE i LOT 16 8�0 (PHASE 4) 22,820 sq. f . PROP. 1 WATER SERVICE (TYP.) PROP. 1445 OF 6" SDR WL (MIN. 3.0' COVE NOW OR FORMERLY I ROBERT LOCKLEAR DB 1047, PG 018 PID:29422000001061 ZONING: RA-20 DE -WATERING NOTES LOT 17 (PHASE 4) 32,468 sq. ft. 1. THE CONTRACTOR SHALL AT ALL TIMES PROVIDE AND MAINTAIN AMPLE MEANS AND EQUIPMENT WITH WHICH TO REMOVE AND PROPERLY DISPOSE OF ANY AND ALL WATER ENTERING THE EXCAVATION OR OTHER PARTS OF THE WORK AND KEEP ALL EXCAVATIONS DRY UNTIL SUCH TIME AS PIPE LAYING AND GRADING IS COMPLETED AND STRUCTURES TO BE BUILT THEREIN ARE COMPLETED. 2. NO WATER SHALL BE ALLOWED TO RISE AROUND THE PIPE IN UNBACKFILLED TRENCHES NOR SHALL IT BE ALLOWED TO RISE OVER MASONRY UNTIL THE CONCRETE OR MORTAR HAS SET (MINIMUM 24 HOURS). ALL WATER PUMPED OR DRAINED FROM THE WORK SHALL BE DISPOSED OF IN SUCH A MANNER AS TO PREVENT SILTATION AND EROSION TO ADJACENT PROPERTY OR OTHER CONSTRUCTION. W z >_ NOW OR FORMERLY SUAZO LUNA, MARITERESITA W DB 1270, PG 462 O PID:294220001063 0- ZONING: RA-20 W z J W a- O of a_ I I I LEGEND NOW OR FORMERLY MARY MONROE DB 677, PG 627 PID:294220001064 ZONING: RA-20 W EXISTING WATER LINE - - EXISTING STORM DRAINAGE PIPE N EXISTING WATER VALVE W PROPOSED WATER LINE - — — — — — — — - PROPOSED STORM DRAINAGE PIPE PROPOSED DIP EXISTING FIRE HYDRANT PROPOSED WATER SERVICE GRAPHIC SCALE 30 0 15 30 60 1 INCH = 30 FEET v�BEE � � o Know what's below. Call before you dig. CALL 1.800.632.4949 OR 811 WWW.NC811.ORG NC ONE -CALL CENTER IT'S THE LAW! 0 M z 00 U O N N ~ o _j ern 41, 06 Z Z UZ0 Oc� M z W 2�_jW w�a w o = z M (� X Uw 0 a w m m m 0 0 z C J ' W w V)E­4 C) UQ FBI ^=^ I..L ww v)z C) Q Z OQLu w J O Y F 10� / W -1 W C) M E-1 ►--I O U V J 1 J J W m cc C C C 00 00 m o� 0 �N m zw U U Z m O W J o N \ N T J m z o 0 w J m o � z z w o � SHEET 5,0 0 11 EROSION CONTROL NOTES LOT 33 EXIST. LOT EX. HOU EXIST. 30' RON SET I I I II I LOT 34 II LOT 35 EXIST. LOT I EXIST. LOT I i I II II EX. HOUSE III I I� I II i I I LOT 7 I, EXIST. LOT '?3s LOT I \\ LOT 9 LOT 10 I T. LO I EXIST. LOT EXIST. LOT �i I � I ��� w P I EX. HOUSE W II I EXIST. I EX. HOUSE �� w I Of a_ EX. HOUSE LOT �, Ii AC K I J �\ EXIST. LOT_ �� 0 EXIST. 60' P BLIC R i � RO LIMITS EX. HODS \ E T ra \ \ �Xis:L �_ W �IST FOP W W EE1 ST EOP W W �� �_' (EXIST. 60 _P-b�tT��/W) w DISC URBANC (TY vv W ��� `� - - ( XIST �-�� Ex. �z E ExisT. EOP \ _ _ _ ?34 EXIST +� _ - - F ---- --- - - -_2 �� w-------- 234- '235-- I LOT �2 OF 18" RCP r 232- _--_- - 2 \ 1 _ C7_7 -_-- `z� --- _���_�' � EXIIST. LOTT -232=--- - - 0 1 / - - --- 234 --------234_7-7 �XS C 1234� / / E LE.�'�� & TELE. A �� --�_�- 1 cI� / & TEL AD X. HOUSE ------------ v Ic N EXIST. 30' RON SET ACK I �� S� � I I ' N c� 14 / I J, � FRONT ONT SETB�OwI vvv�� I iN m Ili I\ I Q, � EXIST. 30/ \N EX/ROUSE _4v� I N (� h II'(�t LOT 42 I 50 EXIST. LOT I / LOT 26 �/ � \ti2�S I �I N W 9 I+ \ EX. HOUSE EXIST. L� �� LOT 25�� III EXIST. LOT �I 1 �� I� iIEN \ ��� PROP. LIMITS OF I V / Ex. ELE ��. w`t PROP. SILT EXISTING BERM / PAD N / , \ \ W ODED DI TURBANCE TYP. - - - - - - - �- - _ _ HIGHP NT �' I N H T FENCE / o & DITCH (TYP.) - - - - - - - - I� I ' s\ (TO BE REMOVED) I 233 I �?3s, - � II'I I II IIIII/ I EXISTING BERMLLJ ��II' I I &DITCH , I i WOODED I I (TO BE REMOVED) l �4 III EXIST END OF- , \ L- j III PAVEMENT I I 1 v PROP. LIMITS OF vIIII � DISTURBANCE (TYP.) 234/ / N'_� IIIII N� IIIIII PROP. 25'x60'TEMP, CONSTRUCTION �� �r �� EXISTING \ ENTRANCE �� \ \.'VOODED s �� SWALE (TYP.) m00% PROP. TEMP. _ �� 1 _ _ C�ISTING EXI T. B SIN_ - - //� / - -233- - - DI�fERSIQN - - -233 �SL� (TYP.) i �\ ----- - 232/�iri / DITCH (TYY�.) 1 ( ----- - - - - -/ �:/-232 - _'(�j�TD-TD - - - - - - ----230--a�-- / �0` %� � i ` LINO E 1 PROPERTY LINE ��AA\Q�V Nvvv�.v v vvvvvv vv��\/v �� XI IN �' / v v � Disturbed Area: 9.52 AC. Iql,�/ /v�?�s��vvvv�v vvvv v v A v 1 / SWALE (T' YP.) NIA- ���vvv vv�vvvvv v vv PROP. TREE ��. AVAVAA V� VA V> LINE (TYP) V`�� �� A �� ��// / / / / P V ' /PROP. LIMITS OF TEMP. DIM�NT TRAP: SD-1 a P 23 �^-,��TURBANCE (TYP.) Now OR FORMERLY �^�� �PROP. SI - - 15,300 CFI REt ;RED VOLUME I �.y ROBE Rr LOCKLEAR <� �� �W FENCE (/TYP 232 23,623-CF.-PROV16EIVOLUME DB 278, PG 424 / i i A� l ' 5.88� Sf' FT. REQUIRED AREA i PID:29G RA-1189' / %%i \ \ \ �532 56133F �BOVIDED AREA, / ZONING: RA-20 i/ i \ Vr'� A ' WOODED 1 _ �� \ �` EXISTING BASH BOTTOM ELEVATION = 229 TEMP. SED>�EIVT TRAR vSD-2 �%ti�� v \\ v- - - - 4 14,336 CF. PROVIDED VO13,968 Cr REQUIRED V �UIE �'�' STOCKPILE yME TRAvP DEPTH 3 FEET - 23 PROP. 3" SKIMMER � v� ��� 4,163 SQ. FT. REQUIRED A4EA� � v » 6,269 SQ. FT. PROVIDED ARL�A,� �R+F+C� RED 1.3 PROP. TEMP. x ORIFICE DIA: 2.7" PROP. TEMP. DIVERSION bA&W BOTTOM,ELEVATION = 22S�� PROP tREE ov v V DIVERSION D fCt� (,TYP.) TRAP 6EPTH 3 FEET ) IIII ��A DITCH (TYP.) ;� v �� -_ LINE TAP PROP. 12' SPILLWAY -- PROP. 2.5 IMMER WOODED � 1 IIN�I/IIIII\v� �� >>/, �)>,� � )� > ELV= 232.00 ti� � `�` I vvv 34 I -- ORIFICE RAD:�1 v 2 ��� -- 233 - -- v T-233 ORIFICE DIA: 2.�" VA\V-_236=���/ \ - - - TDB T TDfTDfTDfTDT TD--TT TD--T'D- NOW OR FORMERLY SUAZO LUNA, MARITERESITA DB 1270. PG 462 PID: 294220001063 ZONING: RA-20 EXISTING STOCKPILES ARE COVERED WITH SIGNIFICANT VEGETATION. ONCE CLEARED SOIL TESTING IS RECOMMENDED TO DETERMINE WHAT PORTION IS STRUCTURAL SOIL GROUND STABILIZATION Site Area Description Stabilization Time Frame Stabilization Time Frame Exception Perimeter dikes, swales, ditches 7 days None and slopes High Quality Water (HQW) Zones 7 days None If slopes are 10' or less in length Slopes steeper than 3:1 7 days and are not steeper than 2:1, 14 days are allowed. Slopes 3:1 or flatter 14 days 7-days for slopes greater than 50 feet in length. All other areas with slopes flatter 14 days None (except for perimeters and than 4: 1. HQW Zones) * "Extensions of time may be approved by the permitting authority based on weather or other ite-specific conditions that make compliance impracticable." (Section 11.6 (2)(b)). NOW OR FORMERLY MARY MONROE DB 677, PG 627 PID: 294220001064 ZONING: RA-20 EXISTING STOCKPILE LIMITS AND VOLUME MAY BE LARGER THAN SHOWN BY SURVEYED INFORMA11ON. CONTRACTOR TO CONFIRM EXCESSIVE STRUCTURAL FILL CAN BE USED TO RAISE PAD ELEVATIONS. ZEVIOUS TEMPORARY SEDIMENT TRAPS LOCATIONS WILL BE UTILIZED FOR THIS FINAL PHASE RE-ESTABLISH EXISTING DRAINAGE SWALES AND BASINS BY CLEARING BLOCKAGES, DEBRIS, :GETATION AND WHERE NECESSARY RE -GRADE TO ESTABLISH POSITIVE DRAINAGE (REF. EROSION CONTROL DETAILS) z j 232 - _ _ _ / vv TD-� TD-� PROPS 10 SPILLWAY � , v' '�, v LEGEND M 1 3 22 23 _ �TD-STD-STDI FL_V= 232.00 �, v �T�� ?33-�T��� I -ETEV-- EXISTING CONTOUR PROP. LIMITS OF N ��� �� v�� D -ELEV- PROPOSED CONTOUR DISTURBANCE (TYP.) NI ������v_73 PROP. SILT TEMP. ROCK EXIST. BASIN V �� �����v N TEMPORARY INLET PROTECTION FENCE (TYP.) CHECK DAM (P.) v ��v 2'VERT SEPARATIONI ExlsT. BASIN \ 23 ���� �v III I ■II■II■III LIMITS OF SOIL TYPES 3� vv / OR 100'Q.C. \ (( 229- - _ - 2- .�, - � � � � � � LIMITS OF DISTURBANCE -- PROP. BERM 30 ,-� 1---------------\------------ - - - - - - - - - \ �c--x--x- PROPOSED SILT FENCE -- - - ---- - - - 7 -- - �0---233 0-9- - - 232- PROPOSED TEMPORARY OPELINE -��P-SIB - �� ?3 DIVERSION DITCH ?35 NOW OR FORME Y RQBERT LocKLE �_ FENCE (T �� PR02P.-TOP DB 1047, PG BERM- L33.00 I PROPOSED TEMPORARY 4 3?_-17��220 d�661' , ROCK CHECK DAM WOO5o6 o 2 ` WOODED 2,35 PROPOSED TREE COVERAGE 1. ALL TRAPS AND BASINS SHALL BE INSPECTED DAILY (MONDAY THROUGH FRIDAY) FOR EXCESSIVE SILT. CONTRACTOR SHALL REMOVE EXCESSIVE SILT FROM THE TRAPS IMMEDIATELY BEFORE CONSTRUCTION COMMENCES ON EACH WORKING DAY.AS NECESSARY. MAINTENANCE SHALL CONTINUE THROUGH COMPLETION OF THE PROJECT. 2. THE DEVELOPER ENGAGED IN OR CONDUCTING THE LAND -DISTURBING ACTIVITY SHALL BE RESPONSIBLE FOR INSTALLING AND MAINTAINING ALL TEMPORARY AND PERMANENT EROSION AND SEDIMENT CONTROL MEASURES AND FACILITIES DURING THE DEVELOPMENT OF A SITE AS REQUIRED BY THE APPROVED PLAN. OPERATIONS AND MAINTENANCE CONDITIONS ARE INCLUDED IN THE PLAN OUTLINING HOW THE L, DEVELOPER SHALL PROVIDE FOR OPERATIONS AND MAINTENANCE DURING CONSTRUCTION. 3. WITHIN SEVEN CALENDAR DAYS FOLLOWING SOIL DISTURBANCE OR RE -DISTURBANCE, ALL PERIMETER SEDIMENT CONTROLS SHALL BE INSTALLED AND TEMPORARY STABILIZATION MEASURES SHALL BE COMPLETED ON TOPSOIL STOCKPILES. 4. AREAS AT FINAL GRADE SHALL RECEIVE PERMANENT STABILIZATION MEASURES WITHIN SEVEN CALENDAR DAYS OF REACHING FINAL GRADE. 5. THE RESPONSIBILITY FOR MAINTAINING ALL PERMANENT EROSION AND SEDIMENT CONTROL MEASURES AND FACILITIES AFTER SITE LAND DISTURBING ACTIVITY IS COMPLETED SHALL LIE WITH THE LANDOWNER OR PERSON IN POSSESSION OR CONTROL, EXCEPT FACILITIES AND MEASURES INSTALLED WITHIN ROAD OR STREET RIGHT-OF-WAYS OR EASEMENTS. 6. ADDITIONAL CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION IN ORDER TO CONTROL EROSION AND /OR OFF -SITE SEDIMENTATION. 7. APPROVED PLANS REMAIN VALID FOR FIVE YEARS FROM THE DATE OF AN APPROVAL. 8. THE TRUCK WELL SHALL HAVE ANY/ALL SEDIMENT AND/OR DEBRIS REMOVED PRIOR TO REMOVING THE PLUG CONSTRUCTION SEQUENCE 1. ANTICIPATED START DATE IS AUGUST 25, 2021 2. OBTAIN LAND DISTURBANCE PERMIT AND ALL OTHER APPLICABLE PERMITS. 3. FLAG THE LIMITS OF CONSTRUCTION. 4. HOLD PRE -CONSTRUCTION CONFERENCE AT LEAST ONE WEEK PRIOR TO STARTING CONSTRUCTION WITH THE ENGINEER. 5. INSTALL GRAVEL CONSTRUCTION ENTRANCE 6. INSTALL SILT FENCE & ASSOCIATED MEASURES ALONG PROPERTY LINES PER PLANS TO ESTABLISH PERIMETER PROTECTION. 7. ALL EXISTING SWALES SHALL BE CLEARED OF BLOCKAGE AND IF NECESSARY RE -GRADED TO ENSURE THEY HAVE POSITIVE DRAINAGE 8. AFTER PERIMETER PROTECTION MEASURES HAVE BEEN ESTABLISHED. THE CONTRACTOR SHALL CALL AND SCEDULE AN INSPECTION BY INC DEQ 9. UPON APPROVAL BY THE DEQ INSPECTOR BEGIN INSTALL THE ASSOCIATED MEASURES. GRADE ONLY AS NECESSARY FOR INSTALLATION OF THESE DEVICES. 10. CLEAR AND GRADE SITE AS NEEDED FOR ROUGH GRADING OPERATIONS. MAINTAIN EROSION CONTROL DEVICES AS NECESSARY TO PREVENT OFF SITE SEDIMENTATION. ALL EROSION CONTROL DEVICES SHOULD BE INSPECTED AFTER EVERY RAINFALL EVENT TO ASSURE THEY ARE OPERATING PROPERLY. 11. ROUGH GRADE ENTIRE SITE WITH APPROVED STRUCTURAL FILL MATERIAL. ALL STRUCTURAL FILL SHALL BE PLACED IN MAX. 8-IN LIFTS AND COMPACTED TO 98% OF SOILS STANDARD PROCTOR MAX. DRY DENSITY. 12. AS SITE IS BROUGHT TO GRADE, BEGIN ADJUST DIVERSION DITCHES TO EVENTUAL PHASE 2 LOCATIONS SUCH THAT AT NO TIME SEDIMENT OVERLOADING SILT FENCES OR IN ANY OTHER WAY LEAVES THE SITE. 13. COMPLETE UTILITY INSTALLATIONS INCLUDING WATER, AND STORM DRAINAGE UTILITIES. 14. FINAL GRADING, PAVING AND STABILIZATION OF ALL DISTURBED AREAS INSURE SOIL STABILIZATION MEASURES AND SEEDING SCHEDULE ARE FOLLOWED AS PER THE PLANS. 15. WHEN SITE IS STABILIZED AND PERMANENT GROUND COVER IS APPROPRIATELY ESTABLISHED, CONTACT NCDEQ - LAND QUALITY SECTION FOR FINAL EROSION CONTROL INSPECTION. 16. AFTER FINAL EROSION CONTROL INSPECTION APPROVAL REMOVE TEMPORARY MEASURES PROPOSED SWALES EXIST. DITCH EXIST. TOP OF BANK EXIST. STORM DRAINAGE PIPE EXIST. TREE COVERAGE EXIST. POWER POLE Z �o� GRAPHIC SCALE 50 0 25 50 100 1 INCH = 50 FEET Z Vo� r J J T'. V Zdc C)6 06wC O zZWo a � " �(.5u V w=ia w C = Z > U Z a w w m m a O z r)^ V' O w wP4a Q Z U a�J Z ox° Z QQF- O Z0 4-4 Z W zoo Z W0 0 Ix Y m F-' 0 J J w m O O c 00 00 J O m Cr m O N w z W U CO O (� Z Q O I U w J o N ZN m Q O T T Z Om ` Q J w 0-O I..L Ww >- m °LU J m Q z z w J o � SHEET C6,00 LOT 7 ,'235� LOT I LOT 9 I I EXIST. LOT LOT 10 I I � I _ T. LO I EXIST. LOT � I LOT 34 II LOT 35 III �;� II I I 1 �- I EXIST. LOT LOT 33 I EXIST. LOT I EXIST. LOT i i _ �� II EX. HOUSE 1 4 EXIST. LOT II EX. HOUSE I I � I �l EX. HOUS I I I w II I EXIST. ACK I 1 EX. HOUSE EX. HOUSE 1 ---Pn- RON SETBA K EXIST_ 30" - I I I --- -- --- - cv EXIS UBLIC R U.Blf MIST EOP W EWT � \ ExisT EOP W � �� RO LIMITS E _ _ - S/ C STY vN �_ 2 -�o.� _ _ _ _ (EXIST. 60 c W oaR� of E�ucnn DIURBAN IC _ i Ex. 72 65 LF234 -ExIST. =P - - X\ TAX PIN# 934316857500 � ._ . ExisT. - -- - OF 18" RCP __EA, - _ - �........._ -- - 230f��---232=--_- - -��_�. � Gv \ l: I y/�//----�,_=234--234_ZXST 6 1234 gM - 7-� 6� Si�'f.��_/- _-�-1•\.� I .� I�"�I \ .II FS��!rj .w�\ ' I s -�-... - - - - - % I N I E LE, ---- ----- -232- -.ram ----/ -- - -- TEL _ ---- II �� \ -- & TEL A6 23G & - - ----� c� 9: EXIST. 30' RON SET ACK 1 T. 30 T SETBCW I'.A �� i N I' m EXIS FROM / I I EX. �J\ �i+ LOT 42�- I N / A \N 50 EXIST. LOT LOT 26 ^� � EX. HOUSE EXIST. L� L25 7: OT �4' \ L-A. I IUUJL I EXIST. LOT • II '. I '�' II II: � I / � PROP. LIMITS OF I V / Ex ��� :I :� W �- / ROP. SILL \ �' / ro M A / F EXIST. END OF, V A DI TURBANCE (TYP.) - - - - -- �- - - _ _ _ _ �. I PAVEMENT \1 23 i I 1 - i 235� / I, I 23 0 j \ 11 I II I I� 1111Lj• � I I �l• � I: �' } v 1 � ti, I / \\\ I ILA � tiM I :I J. NJII r 1 I NI: �T I��� III EXIST END OF- 23 w;N'JI�IIII : PAVEMENT �IIIII III: / ) I 1 234.00 23 PR P. LIMITS OF DISTURBANCE (TYP.) I // 234- N 21.25 PROP. START OF / j: 23 = / PAVEMENT STA. 0+00.00 I , / 233 ----- - -232 i4r ///•'/ \ / ---- N/ - - - - - - ---230--- �/ �r''A _� �� A N A,) i A A \ / PROPERTY LINE 9 I N. V I I / /" N,v / VT23 .0o V A A A V\ X = 2��� 234.00 \/ X 8 L� ` N \ F, \ i TA A � A A A \ � \ �I �� � j I I �c,� / \ PROP. TREE �� ;��/�VA�AAAVAA �` / `N�Li, /� 2 LINE (TYP) N /. A��231�� X �� S° iyr ---- - - - - - -- 4 .� v� �. -- RED NOW OR FORMERLY , �^?.' 32 O Z ROBERT LOCKLEAR VU' M < DB 278, PG 424 ' \ \ 58 -AREA PID:294220001189' A �h ZONING: RA-20 i �'% ���� �Wv 9' N RQYZ V - - -----2��� ��TRA� 13 �P 3 -- '234o R V \\ M� I 232 91 OP. `SK -RED: F . R ,7 s IIIII _ �'• �StN- S ED 11j11%v�v�v�v A�� 0 IA: 2. 2 23 _R E��H-3FEE \ 2 \ \ 'ROPLx311� - - -- P. 2.5" MER 00, RIPRAP APRON ORIFICE RAD: �1 'L �\�//�'�� i�j -- __ ��'- _-- 234 = 233 234 - ORIFICE DIA: 2 �, "/ ��\�� i��/ --------- - --- -- � � 233 _ _ mod` III PROP. 24" RCP .232.... _ z It �� �' / I I W/HEADWALL P m 2 2 - / II LE.(II 229.93 PROP. LIMITS OF DISTURBANCE (TYP.) NI \23 OP. SILT II W 1 NCE (T`�P.) II 233� \ 1 �"•.��Vmow.• OP. T 23 V ���_ / I I W/HEADWALL \ ` PROP. BERM ----III - - - ----------- - ------ - - - ' -- / �►232s - 232 - - - - - - -- 233�OPEf LINE - -PR-0P.-SI_LT -,3 FORM DRAINAGE DITCH TO BE- FENCE T T LOC FILLED IN ONCE TEMP. - - - PROP. 8 Wx11 Lx �. 7 0,18 SEDIMENT TRAP IS J //. RIPRAP APRON 1�0,�61< FILLED/REMOVED 35 EROSION CONTROL NOTES CONSTRUCTION SEQUENCE 1. ALL TRAPS AND BASINS SHALL BE INSPECTED DAILY (MONDAY THROUGH FRIDAY) FOR EXCESSIVE SILT. CONTRACTOR SHALL REMOVE EXCESSIVE SILT FROM THE TRAPS IMMEDIATELY BEFORE CONSTRUCTION COMMENCES ON EACH WORKING DAY.AS NECESSARY. MAINTENANCE SHALL CONTINUE THROUGH COMPLETION OF THE PROJECT. 2. THE DEVELOPER ENGAGED IN OR CONDUCTING THE LAND -DISTURBING ACTIVITY SHALL BE RESPONSIBLE FOR INSTALLING AND MAINTAINING ALL TEMPORARY AND PERMANENT EROSION AND SEDIMENT CONTROL MEASURES AND FACILITIES DURING THE DEVELOPMENT OF A SITE AS REQUIRED BY THE APPROVED PLAN. OPERATIONS AND MAINTENANCE CONDITIONS ARE INCLUDED IN THE PLAN OUTLINING HOW THE DEVELOPER SHALL PROVIDE FOR OPERATIONS AND MAINTENANCE DURING CONSTRUCTION. 3. WITHIN SEVEN CALENDAR DAYS FOLLOWING SOIL DISTURBANCE OR RE -DISTURBANCE, ALL PERIMETER SEDIMENT CONTROLS SHALL BE INSTALLED AND TEMPORARY STABILIZATION MEASURES SHALL BE COMPLETED ON TOPSOIL STOCKPILES. 4. AREAS AT FINAL GRADE SHALL RECEIVE PERMANENT STABILIZATION MEASURES WITHIN SEVEN CALENDAR DAYS OF REACHING FINAL GRADE. 5. THE RESPONSIBILITY FOR MAINTAINING ALL PERMANENT EROSION AND SEDIMENT CONTROL MEASURES AND FACILITIES AFTER SITE LAND DISTURBING ACTIVITY IS COMPLETED SHALL LIE WITH THE LANDOWNER OR PERSON IN POSSESSION OR CONTROL, EXCEPT FACILITIES AND MEASURES INSTALLED WITHIN ROAD OR STREET RIGHT-OF-WAYS OR EASEMENTS. 6. ADDITIONAL CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION IN ORDER TO CONTROL EROSION AND /OR OFF -SITE SEDIMENTATION. 7. APPROVED PLANS REMAIN VALID FOR FIVE YEARS FROM THE DATE OF AN APPROVAL. 8. THE TRUCK WELL SHALL HAVE ANY/ALL SEDIMENT AND/OR DEBRIS REMOVED PRIOR TO REMOVING THE PLUG 1. ANTICIPATED START DATE IS JANUARY 25, 2014. 2. OBTAIN LAND DISTURBANCE PERMIT AND ALL OTHER APPLICABLE PERMITS. 3. FLAG THE LIMITS OF CONSTRUCTION. 4. HOLD PRE -CONSTRUCTION CONFERENCE AT LEAST ONE WEEK PRIOR TO STARTING CONSTRUCTION. 5. INSTALL GRAVEL CONSTRUCTION ENTRANCE 6. INSTALL SILT FENCE & ASSOCIATED MEASURES ALONG PROPERTY LINES PER PLANS TO ESTABLISH PERIMETER PROTECTION. 7. AFTER PERIMETER PROTECTION MEASURES HAVE BEEN ESTABLISHED. BEGIN INSTALL THE ASSOCIATED MEASURES. GRADE ONLY AS NECESSARY FOR INSTALLATION OF THESE DEVICES. 9. CLEAR AND GRADE SITE AS NEEDED FOR ROUGH GRADING OPERATIONS. MAINTAIN EROSION CONTROL DEVICES AS NECESSARY TO PREVENT OFF SITE SEDIMENTATION. ALL EROSION CONTROL DEVICES SHOULD BE INSPECTED AFTER EVERY RAINFALL EVENT TO ASSURE THEY ARE OPERATING PROPERLY. 10. ROUGH GRADE ENTIRE SITE WITH APPROVED STRUCTURAL FILL MATERIAL. ALL STRUCTURAL FILL SHALL BE PLACED IN MAX. 8-IN LIFTS AND COMPACTED TO w _.l ' I I - PROP. END OF PAVEMENT STA. 10+71.80 1 I I Iz J NOW OR FORMERLY w SUAZO LUNA, MARITERESITA DB 1270, PG 462 oPID: 294220001063 ZONING: RA-20 /I / I - c \, I 111111'- 1 GENERAL NOTES: 1. THIS MAP IS NOT A CERTIFIED SURVEY. BOUNDARY INFORMATION PROVIDED BY ROBESON COUNTY GIS 2. TAX PARCEL ID - 141102027 3. THIS PROPERTY IS NOT LOCATED IN A SPECIAL FLOOD HAZARD AREA AS DETERMINED BY THE FEMA FLOOD MAP COMMUNITY PANEL NUMBER 3710934300K EFFECTIVE DATE: 12/06/2019. 4. THE UTILITIES SHOWN ARE FOR THE CONTRACTOR'S CONVENIENCE ONLY. THERE MAY BE OTHER UTILITIES NOT SHOWN ON THIS PLAN; THE ENGINEER ASSUMES NO RESPONSIBILITY FOR THE LOCATIONS SHOWN. 5. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL EXIST. UTILITIES PRIOR TO COMMENCEMENT OF CONSTRUCTION. CONFLICTS BETWEEN EXIST. UTILITIES AND PROPOSED EXCAVATION SHALL BE REPORTED TO THE ENGINEER IMMEDIATELY. PROP. TREEPROVIDE MINIMUM OF 48 HOUR NOTICE TO OWNER OR REPRESENTATIVE PRIOR TO LINE (TYF�TERRUPTION OF ANY EXIST. UTILITY, IF BEING UTILIZED. 7. THE CONTRACTOR IS RESPONSIBLE FOR REPAIR AND/OR REPLACEMENT OF ANY UTILITIES DAMAGED DURING CONSTRUCTION. 8.THE CONTRACTOR SHALL USE EXTREME CARE WHEN WORKING NEAR ALL UNDERGROUND AND OVERHEAD UTILITIES. 9. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL NECESSARY PERMITS AND APPROVALS HAVE BEEN OBTAINED PRIOR TO CONSTRUCTION. THESE PERMITS AND APPROVALS MAY INCLUDE BUT ARE NOT LIMITED TO GRADING, DEMOLITION, ZONING, BUILDING, DRIVEWAY, DETENTION, SUBDIVISION, SPECIAL USE, SEWER AND WATER. 23 Y U >1 'Q I N F I \ w 1 I \ ,Q I I of I O Rv N ' I N o_ I D I GROUND STABILIZATION Site Area Description Stabilization Time Frame Stabilization Time Frame Exception Perimeter dikes, swales, ditches 7 days None and slopes High Quality Water (HQW) Zones 7 days None If slopes are 10' or less in length Slopes steeper than 3:1 7 days and are not steeper than 2:1, 14 days are allowed. Slopes 3:1 or flatter 14 days 7-days for slopes greater than 50 feet in length. All other areas with slopes flatter 14 days None (except for perimeters and than 4: 1. HQW Zones) * "Extensions of time may be approved by the permitting authority based on weather or other ite-specific conditions that make compliance impracticable." (Section 11.6 (2)(b)). � I NOW OR FORMERLY MARY MONROE DB 677, PG 627 23 PID: 294220001064 ZONING: RA-20 I 23 � / M, S OF yE ( ) fl ------ - - - - - C---------- - - - - -- B �1 3.0 A NORTH AMERICAN GREEN VMAX SC350 OR APPROVED EQUIVALENT A I B C D 1.0' I VARIES VARIES VARIES A = BOTTOM WIDTH B = HIEGHT OF TEMP. LINER C = DEPTH OF GRADED SWALE D = TOP WIDTH OF SWALE REF. SWALE CALCULATIONS FOR DIMENSIONS GRASSED SWALE NOTES: 1 I 1. EXCAVATE CHANNEL TO THE CROSS-SECTION SHOWN. 1 2. APPLY LIME, FERTILIZER AND SEED TO THE CHANNEL AND ADJOINING AREAS IN ACCORDANCE WITH THE SEEDING SCHEDULE. PROP tREE 3. START LAYING THE NET FROM THE TOP OF THE UPSTREAM END OF THE - LINE Ti P) CHANNEL AND UNROLL IT DOWN THE GRADE. DO NO STRETCH MATTING. - - 1 4. BURY THE UPSLOPE END AND STAPLE THE NET EVERY 12" ACROSS THE �.��. TOP END, EVERY 3' AROUND THE EDGES AND ACROSS THE MAT SO THAT 234, THE STRAW IS HELD CLOSELY AGAINST THE SOIL. 5. MATTING STRIPS SHOULD BE JOINED TOGETHER ALONG THE SIDES WITH A 3" OVERLAP AND STAPLED TOGETHER. 6. TO JOIN ENDS OF STRIPS, INSERT THE NEW ROLL OF NET IN A TRENCH \ - AS WITH UPSLOPE END AND OVERLAP IT 18" WITH THE PREVIOUSLY LAID ��>• \ UPPER ROLL. TURN UNDER 6" OF THE 18" OVERLAP AND STAPLE EVERY - 23- 12" ACROSS THE END. / _ N 230 --229- 98% OF SOILS STANDARD PROCTOR MAX. DRY DENSITY. 11. AS SITE IS BROUGHT TO GRADE, AND BUILDING PAD INSTALLED BEGIN REDUCING THE SIZE OF THE SKIMMER TRAP WITH PORTION TO THE REDUCTION OF RUNOFF TO THE TRAP. ADJUST DIVERSION DITCHES TO EVENTUAL PHASE 2 LOCATIONS SUCH THAT AT NO TIME IS SEDIMENT OVERLOADING SILT FENCES OR IN ANY OTHER WAY LEAVES THE SITE. 12. COMPLETE UTILITY INSTALLATIONS INCLUDING WATER, SEWER, AND STORM DRAINAGE UTILITIES. PLACE INLET PROTECTION AT ALL STORM DRAIN INLETS. 13. FINAL GRADING, PAVING AND STABILIZATION OF ALL DISTURBED AREAS INSURE SOIL STABILIZATION MEASURES AND SEEDING SCHEDULE ARE FOLLOWED AS PER THE PLANS. 14. AFTER SITE IS STABILIZED, REMOVE TEMPORARY MEASURES AND/OR COMPLETE PERMANENT SEEDING OF REMAINING DISTURBED AREAS. RE -SEED AND FERTILIZE AS NECESSARY TO ENSURE ADEQUATE COVERAGE OF PERMANENT GROUNDCOVER IN ALL DISTURBED AREAS. 15. WHEN SITE IS STABILIZED AND PERMANENT GROUND COVER IS APPROPRIATELY ESTABLISHED, CONTACT NCDENR - LAND QUALITY SECTION FOR FINAL EROSION CONTROL INSPECTION. TYPICAL GRASS SWALE �233 _ 229 � 3 P`R6'P.-TOP BERM= 233.00 LEGEND ELEV EXISTING CONTOUR PROP. PIPE INLET PROTECTION • • �LEV PROPOSED CgNTpUR O TEMPORARY INLET PROTECTION 0% EXIST. POWER POLE O LIMITS OF DISTURBANCE PROPOSED SILT FENCE O O i PROPOSED SWALES H C P� PROPOSED TEMPORARY SOCK EXIST. DITCH OHP EXIST. OVERHEAD POWER LINE GRAPHIC SCALE EXIST. TOP OF BANK 50 0 25 50 100 EXIST. STORM DRAINAGE PIPE 1 INCH = 50 FEET C--= EXIST. TREE COVERAGE Z c c r J 0 � � r Cn / Zd� A OZu °tS w c O (�Za Za Sit Zw� U of" ° W W c = Z r c5 > C)Z a w w m m a C) ^ r V) ' O W wP4Q Q z U a�J = c) Z QQF- O �zo cn z F- � z 0 O � Y m F-' O �w= J J W m C C C 00 I 0 Z 0Z m Lu m z N w m O^ LL W J O w J m c N C N Q T_ T " ��LL�J VJ %� ` m 0 w 0 Q O I U 0- > m Q w J m Q Z Lu z c� w J Q � SHEET C700 lz DESIGN CRITERIA AGGREGATE SIZE -USE 2-3 INCH WASHED STONE. DIMENSIONS OF GRAVEL PAD - THICKNESS: 6 INCHES MINIMUM WIDTH: 12-FEET MINIMUM OR FULL WIDTH AT ALL POINTS OF THE VEHICULAR ENTRANCE AND EXIT AREA, WHICHEVER IS GREATER LENGTH: 50-FEET MINIMUM LOCATION -LOCATE CONSTRUCTION ENTRANCES AND EXITS TO LIMIT SEDIMENT FROM LEAVING THE SITE AND TO PROVIDE FOR MAXIMUM UTILITY BY ALL CONSTRUCTION VEHICLES (FIGURE 6.06A). AVOID STEEP GRADES, AND ENTRANCES AT CURVES IN PUBLIC ROADS. WASHING--�F CONDITIONS AT THE SITE ARE SUCH THAT MOST OF THE MUD AND SEDIMENT ARE NOT REMOVED BY VEHICLES TRAVELING OVER THE GRAVEL, THE TIRES SHOULD BE WASHED. WASHING SHOULD BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE THAT DRAINS INTO A SEDIMENT TRAP OR OTHER SUITABLE DISPOSAL AREA. A WASH RACK MAY ALSO BE USED TO MAKE WASHING MORE CONVENIENT AND EFFECTIVE. CONSTRUCTION SPECIFICATIONS 1. CLEAR THE ENTRANCE AND EXIT AREA OF ALL VEGETATION, ROOTS, AND OTHER OBJECTIONABLE MATERIAL AND PROPERLY GRADE IT. 2. PLACE THE GRAVEL TO THE SPECIFIC GRADE AND DIMENSIONS SHOWN ON THE PLANS, AND SMOOTH IT. 3. PROVIDE DRAINAGE TO CARRY WATER TO A SEDIMENT TRAP OR OTHER SUITABLE OUTLET. 4. USE GEOTEXTILE FABRICS BECAUSE THEY IMPROVE STABILITY OF THE FOUNDATION IN LOCATIONS SUBJECT TO SEEPAGE OR HIGH WATER TABLE. MAINTENANCE MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOPDRESSING WITH 2- INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT (NC DEQ 6.06) N.T.S. TEMPORARY SEDIMENT TRAP DESIGN CRITERIA DRAINAGE AREA < 1 AC. (ACRES) MIN. LENGTH TO 2: 1 WIDTH RATIO 3600 MIN. (CU. FT. VOLUME PER AC. REQUIRED DISTURBED) 435 SURFACE (SQ. FT. AREA PER CFS REQUIRED Q10) NOTES: 1. REFER TO NCESCPDM SECTION #6.60 FOR ADDITIONAL DESIGN SPECIFICATIONS REGARDING TEMPORARY SEDIMENT TRAPS. 2. REFER TO CLDS STANDARD #30.19 FOR BAFFLE SPACING PVC END CAP PVC TEE PERSPECTIVE VIEW PVC ELBOW PVC VENT PIPE "C" ENCLOSURE TER ENTRY UNIT WATER SURFACE PVC END CAP PVC PIPE 5 1 /2" HOLES IN7rN 1 UNDERSIDE 5� PVC TEE FLEXIBLE HOSE SCHEDULE 40 6 e PVC PIPE END VIEW FRONT VIEW SCHEDULE 40 PVC PIPE ORIFICE PLATE SCHEMATIC OF SKIMMER TAKEN FROM PENNSYLVANIA EROSION AND SEDIMENT POLLUTION CONTROL MANUAL, MARCH 2O00. "H" REFERS TO THE HEIGHT FROM INVERT OF FLEXIBLE HOSE ON SKIMMER TO THE INVERT OF THE PRIMARY SPILLWAY. SKIMMER N.T.S. FABRIC DESIGN SETTLED TOP OVERFILL 6" FOR 21" MIN. SETTLEMENT MAX \FILL\� \ \ L=10' MIN. _� SOP 1\\\\ \ EMERGENCY \\ % � BY-PASS 6" BELOW 2' TO 3.5'\\\' \\\�\\ \\\\\ `� \\\\\ SETTLED TOP _ \\ OF DAM �L NATURAL GROUND FILTER FABRIC X TEMPORARY SEDIMENT TRAP WITH SKIMMER- N. T. S. INFLOW 1' FREEBOARD 6" MAX. DEPTH OF FLOW OVER EMERGENCY SPILLWAY Z=5' MAX. W=5' MIN. EMBANKMENT T=1.5' MIN. 8' MAX. STANDARD STRENGTH FABRIC WITH WIRE FENCE CTCCI 0("1CT I , ®- WIRE FI FILTER FAB[ CONSTRUCTION SPECIFICATIONS MATERIALS 1. USE A SYNTHETIC FILTER FABRIC OF AT LEAST 95% BY WEIGHT OF POLYOLEFINS OR POLYESTER, WHICH IS CERTIFIED BY THE MANUFACTURER OR SUPPLIER AS CONFORMING TO THE REQUIREMENTS IN ASTM D6461, WHICH IS SHOWN IN PART IN TABLE 6.62b. SYNTHETIC FILTER FABRIC SHOULD CONTAIN ULTRAVIOLET RAY INHIBITORS AND STABILIZERS TO PROVIDE A MINIMUM OF 6 MONTHS OF EXPECTED USABLE CONSTRUCTION LIFE AT A TEMPERATURE RANGE OF 0 - 120` F. 2. ENSURE THAT POSTS FOR SEDIMENT FENCES ARE 1.33 LB/LINEAR FT. STEEL WITH A MINIMUM LENGTH OF 5 FEET. MAKE SURE THAT STEEL POSTS HAVE PROJECTIONS TO FACILITATE FASTENING THE FABRIC. 3. FOR REINFORCEMENT OF STANDARD STRENGTH FILTER FABRIC, USE WIRE FENCE WITH A MINIMUM 14 GAUGE AND A MAXIMUM MESH SPACING OF 6 INCHES. CONSTRUCTION 1. CONSTRUCT THE SEDIMENT BARRIER OF STANDARD STRENGTH OR EXTRA STRENGTH SYNTHETIC FILTER FABRICS. 2. ENSURE THAT THE HEIGHT OF THE SEDIMENT FENCE DOES NOT EXCEED 24 INCHES ABOVE THE GROUND SURFACE. (HIGH FENCES MAY IMPOUND VOLUMES OF WATER SUFFICIENT TO CAUSE FAILURE OF THE STRUCTURE.) 3. CONSTRUCT THE FILTER FABRIC FROM A CONTINUOUS ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID JOINTS. WHEN JOINTS ARE NECESSARY, SECURELY FASTEN THE FILTER CLOTH ONLY AT A SUPPORT POST WITH 4 FEET MINIMUM OVERLAP TO THE NEXT POST. 4. SUPPORT STANDARD STRENGTH FILTER FABRIC BY WIRE MESH FASTENED SECURELY TO THE UPSLOPE SIDE OF THE POSTS. EXTEND THE WIRE MESH SUPPORT TO THE BOTTOM OF THE TRENCH. FASTEN THE WIRE REINFORCEMENT, THEN FABRIC ON THE UPSLOPE SIDE OF THE FENCE POST. WIRE OR PLASTIC ZIP TIES SHOULD HAVE MINIMUM 50 POUND TENSILE STRENGTH. 5. WHEN A WIRE MESH SUPPORT FENCE IS USED, SPACE POSTS A MAXIMUM OF 8 FEET APART. SUPPORT POSTS SHOULD BE DRIVEN SECURELY INTO THE GROUND A MINIMUM OF 24 INCHES. 6. EXTRA STRENGTH FILTER FABRIC WITH 6 FEET POST SPACING DOES NOT REQUIRE WIRE MESH SUPPOR TFENCE. SECURE FASTEN THE FILTER FABRIC DIRECTLY TO POSTS. WIRE OR PLASTIC ZIP TIES SHOULD HAVE A MINIMUM 50 POUND TENSILE STRENGTH. 7. EXCAVATE A TRENCH APPROXIMATELY 4 INCHES WIDE BY 8 INCHES DEEP ALONG THE PROPOSED LINE OF POSTS AND UPSLOPE FROM THE BARRIER (FIG. 6.62(1) 8. PLACE 12 INCHES OF THE FABRIC ALONG THE BOTTOM AND SIDE OF THE TRENCH. 9. BACKFILL THE TRENCH WITH SOIL PLACED OVER THE FILTER FABRIC AND COMPACT. THOROUGH COMPACTION OF THE BACKFILL IS CRITICAL TO SILT FENCE PERFORMANCE. 10. DO NOT ATTACHE FILTER FABRIC TO EXISTING TREES. INSTEAD OF EXCAVATING A TRENCH, PLACING FABRIC AND THEN BACKFILLING TRENCH, SEDIMENT FENCE MAY BE INSTALLED USING SPECIALLY DESIGNED EQUIPMENT THAT INSERTS THE FABRIC INTO A CUT SLICED IN THE GROUND WITH A DISC (FIG. 6.62b) 2 -���- A.L � B - CLASS B RIP RAP-' � m_ m- =n1_1i==u=m=u1_ni=m=111=m= _u1-nl=ni_ L FILTER CLOTH L= THE DISTANCE SUCH THAT POINTS A AND B ARE AT EQUAL ELEVATIONS PLAN )R WIRE TIES NATURAL GROUND -STEEL POST -WIRE FENCE FILTER FABRIC 8" MIN. 4" MIN. INSTALLATION SPECIFICATIONS 1. THE BASE OF BOTH END POSTS SHOULD BE AT LEAST ONE FOOT HIGHER THAN THE MIDDLE OF THE FENCE. CHECK WITH A LEVEL IF NECESSARY. 2. INSTALL POSTS 4 FEET APART IN CRITICAL AREAS AND 6 FEET APART ON STANDARD APPLICATIONS. 3.INSTALL POSTS 2 FEET DEEP ON THE DOWNSTREAM SIDE OF THE SILT FENCE, AND AS CLOSE AS POSSIBLE TO THE FABRIC, ENABLING POSTS TO SUPPORT THE FABRIC FROM UPSTREAM WATER PRESSURE. 4. INSTALL POSTS WITH THE NIPPLES FACING AWAY FROM THE SILT FABRIC. 5. ATTACH THE FABRIC TO EACH POST WITH THREE TIES, ALL SPACED WITHIN THE TOP 8 INCHES OF THE FABRIC. ATTACH EACH TIE DIAGONALLY 45 DEGREES THROUGH THE FABRIC, WITH EACH PUNCTURE AT LEAST 1 INCH VERTICALLY APART. ALSO, EACH TIE SHOULD BE POSITIONED TO HANG ON A POST NIPPLE WHEN TIGHTENED TO PREVENT SAGGING. 6. WRAP APPROXIMATELY 6 INCHES OF FABRIC AROUND THE END POSTS AND SECURE WITH 3 TIES. 7. NO MORE THAN 24 INCHES OF A 36 INCH FABRIC IS ALLOWED ABOVE GROUND LEVEL. 8. THE INSTALLATION SHOULD BE CHECKED AND CORRECTED FOR ANY DEVIATIONS BEFORE COMPACTION 9. COMPACTION IS VITALLY IMPORTANT FOR EFFECTIVE RESULTS. COMPACT THE SOIL IMMEDIATELY NEXT TO THE SILT FENCE FABRIC WITH THE FRONT WHEEL OF THE TRACTOR, SKID STEER, OR ROLLER EXERTING AT LEAST 60 POINTS PER SQUARE INCH. COMPACT THE UPSTREAM SIDE FIRST, AND THEN EACH SIDE TWICE FOR A TOTAL OF 4 TRIPS. MAINTENANCE INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. REMOVE ALL FENCING MATERIAL AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. SEDIMENT FENCE (NC DEQ 6.62) N.T.S. 1'-6" MIN. "OT g5 OR #57 DESIGN CRITERIA j&WA,SHEO`STONE 2' MAX WHEN USED IN COMBINATION WITH AN EXCAVATED SEDIMENT STORAGE AREA TO SERVE AS A TEMPORARY AT CENTER SEDIMENT TRAP, THE DESIGN CRITERIA FOR TEMPORARY SEDIMENT TRAPS MUST BE SATISFIED. THE MAXIMUM DRAINAGE AREA SHOULD BE 5 ACRES, AND 3600 CUBIC FEET OF SEDIMENT STORAGE PER ACRE OF DISTURBED DRAINAGE AREA SHOULD BE PROVIDED. <TOB THE MINIMUM STONE HEIGHT SHOULD BE 2 FEET, WITH SIDE SLOPES NO STEEPER THAN 2:1. THE STONE "HORSESHOE" AROUND THE PIPE INLET SHOULD BE CONSTRUCTED OF CLASS B OR CLASS I RIPRAP, WITH CROSS SECTION A MINIMUM CREST WIDTH OF 3 FEET. THE OUTSIDE FACE OF THE RIPRAP SHOULD BE COVED WITH A 12-INCH THICK LAYER OF #5 OR #57 WASHED STONE. IN PREPARING PLANS FOR ROCK PIPE INLET PROTECTION, IT IS IMPORTANT TO PROTECT THE EMBANKMENT OVER THE PIPE FROM OVERTOPPING. THE TOP OF THE STONE SHOULD BE A MINIMUM OF 1 FOOT BELOW THE TOP OF THE FILL OVER THE PIPE. THE STONE SHOULD TIE INTO THE FILL ON BOTH SIDES OF THE PIPE. THE INSIDE TOE OF THE STONE SHOULD BE NO CLOSER THAN 2 FEET FROM THE CULVERT OPENING TO ALLOW PASSAGE OF HIGH FLOWS. THE SEDIMENT STORAGE AREA SHOULD BE EXCAVATED UPSTREAM OF THE ROCK PIPE INLET PROTECTION, WITH A MINIMUM DEPTH OF 18 INCHES BELOW GRADE. CONSTRUCTION SPECIFICATIONS MAINTENANCE 1. PLACE STONE TO THE LINES AND DIMENSIONS SHOWN IN THE PLAN ON A INSPECT CHECK DAMS AND CHANNELS AT LEAST WEEKLY AND AFTER EACH FILTER FABRIC FOUNDATION. SIGNIFICANT (1//2 INCH OR GREATER) RAINFALL EVENT AND REPAIR 2. KEEP THE CENTER STONE SECTION AT LEAST 9 INCHES BELOW NATURAL IMMEDIATELY. CLEAN OUT SEDIMENT, STRAW, LIMBS, OR OTHER DEBRIS THAT GROUND LEVEL WHERE THE DAM ABUTS THE CHANNEL BANKS. COULD CLOG THE CHANNEL WHEN NEEDED. NATURAL GROUND 3. EXTEND STONE AT LEAST 1.5 FEET BEYOND THE DITCH BANK (FIGURE 6.83B) TO KEEP WATER FROM CUTTING AROUND THE ENDS OF THE CHECK DAM. ANTICIPATE SUBMERGENCE AND DEPOSITION ABOVE THE CHECK DAM AND 4. SET SPACING BETWEEN DAMS TO ASSURE THAT THE ELEVATION AT THE TOP OF EROSION FROM HIGH FLOW AROUND THE EDGE OF THE DAMN. CORRECT ALL RIP RAP THE LOWER DAM IS THE SAME AS THE TOE ELEVATION OF THE UPPER DAM. DAMAGE IMMEDIATELY. IF SIGNIFICANT EROSION OCCURS BETWEEN DAMS, HE DWALL 5. PROTECT THE CHANNEL AFTER THE LOWEST CHECK DAM FROM HEAVY FLOW ADDITIONAL MEASURES CAN BE TAKEN SUCH AS, INSTALLING A PROTECTIVE THAT COULD CAUSE EROSION. RIPRAP LINER IN THAT PORTION OF THE CHANNEL. RIPRAP HEADWALL, 1' MIN.-\ 6. MAKE SURE THAT THE CHANNEL REACH ABOVE THE MOST UPSTREAM DAM IS HEIGHT FROM ROAD SHOULDER STABLE.7. ENSURE THAT OTHER AREAS OF THE CHANNEL, SUCH AS CULVERT REMOVE SEDIMENT ACCUMULATED BEHIND THE DAMS AS NEEDED TO DRAIN ENTRANCES BELOW THE CHECK DAMS, ARE NOT SUBJECT TO DAMAGE OR THROUGH THE STONE CHECK DAM, AND PREVENT LARGE FLOWS FROM CLASS B RIP AP �i BLOCKAGE FROM DISPLACED STONES. CARRYING SEDIMENT OVER THE DAM. ADD STONES TO DAMS AS NEEDED TO 1' 3'� MAINTAIN DESIGN HEIGHT AND CROSS SECTION FLOW„ F OW H=2' MIN. EMERGENCY SPILLWAY NP SKIMMER ARMS LENGTH - SPECIFY H x 1.5 SEEPAGE (MIN. 5') CONTROL MEASURES SKIMMER INSTALLATION N.T.S. TEMPORARY ROCK CHECK DAM (NC DEQ 6.83) N.T.S. 2' MIN. FIGURE 6.20a TEMPORARY EARTHEN DIVERSION DIKE CONSTRUCTION SPECIFICATIONS 1. REMOVE AND PROPERLY DISPOSE OF ALL TREES, BRUSH, STUMPS, AND OTHER OBJECTIONABLE MATERIAL. 2. ENSURE THAT THE MINIMUM CONSTRUCTED CROSS SECTION MEETS ALL DESIGN REQUIREMENTS. 3. ENSURE THAT THE TOP OF THE DIKE IS NOT LOWER AT ANY POINT THAN THE DESIGN ELEVATION PLUS THE SPECIFIED SETTLEMENT. 4. PROVIDE SUFFICIENT ROOM AROUND DIVERSIONS TO PERMIT MACHINE REGRADING AND CLEANOUT. 5. VEGETATE THE RIDGE IMMEDIATELY AFTER CONSTRUCTION, UNLESS IT WILL REMAIN IN PLACE LESS THAN 30 WORKING DAYS. MAINTENANCE INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA PROTECTED IS PERMANENTLY STABILIZED, REMOVE THE RIDGE AND THE CHANNEL TO BLEND WITH THE NATURAL GROUND LEVEL AND APPROPRIATELY STABILIZE IT. ROCK PROT NCDOT#5 C WASHED 1.5' NCDOT #5 OR #57-/ CLASS B WASHED STONE RIPRAP ELEVATION FIGURE 6.55A ROCK PIPE INLET PROTECTION PLAN VIEW AND CROSS-SECTION VIEW CONSTRUCTION SPECIFICATIONS 1. CLEAR THE AREA OF ALL DEBRIS THAT MIGHT HINDER EXCAVATION AND DISPOSAL OF SPOIL. 2. INSTALL THE CLASS B OR CLASS I RIPRAP IN A SEMI -CIRCLE AROUND THE PIPE INLET. THE STONE SHOULD BE BUILT UP HIGHER ON EACH END WHERE IT TIES INTO THE EMBANKMENT. THE MINIMUM CREST WIDTH OF THE RIPRAP SHOULD BE 3 FEET, WITH A MINIMUM BOTTOM WIDTH OF 11 FEET. THE MINIMUM HEIGHT SHOULD BE 2 FEET, BUT ALSO 1 FOOT LOWER THAN THE SHOULDER OF THE EMBANKMENT OR DIVERSIONS. 3. A 1 FOOT THICK LAYER OF NC DOT #5 OR #57 STONE SHOULD BE PLACED ON THE OUTSIDE SLOPE OF THE RIPRAP. 4. THE SEDIMENT STORAGE AREA SHOULD BE EXCAVATED AROUND THE OUTSIDE OF THE STONE HORSESHOE 18 INCHES BELOW NATURAL GRADE. 5. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, FILL DEPRESSION AND ESTABLISH FINAL GRADING ELEVATIONS, COMPACT AREA PROPERLY, AND STABILIZE WITH GROUND COVER. MAINTENANCE INSPECT ROCK PIPE INLET PROTECTION AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/ INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. REMOVE SEDIMENT AND RESTORE THE SEDIMENT STORAGE AREA TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH OF THE TRAP. PLACE THE SEDIMENT THAT IS REMOVED IN THE DESIGNATED DISPOSAL AREA AND REPLACE THE CONTAMINATED PART OF THE GRAVEL FACING. CHECK THE STRUCTURE FOR DAMAGE. ANY RIPRAP DISPLACED FROM THE STONE HORSESHOE MUST BE REPLACED IMMEDIATELY. AFTER ALL THE SEDIMENT -PRODUCING AREAS HAVE BEEN PERMANENTLY STABILIZED, REMOVE THE STRUCTURE AND ALL THE UNSTABLE SEDIMENT. SMOOTH THE AREA TO BLEND WITH THE ADJOINING AREAS AND PROVIDE PERMANENT GROUND COVER (SURFACE STABILIZATION). ROCK PIPE INLET PROTECTION (NC DEQ 6.55) N.T.S. Z a U O r r r J� J r LL CD cp r a / Z` e aC' O� UOa 06 a w O OZo a Zzw� 0 J LU Ll C)w a - LU = Z r (D } C) w W m O z V / '' w � 0 WvJ w Z U Q ��0 O� Q U Z Qp� 0 �zo �U) z0� Z 1--�-1 / �D Z 0 0 P4 U Lu a p-' 0 J J w m C C C m co �+ r m O N Lu m J � � z Lu U m � W Q LuO J N m Q � O T N C) m r WLLI 0 C w J m p Lul z Z W W C J U m SHEET 0 • TEMPORARY DIVERSIONS (NC DEQ 6.20) N.T.S. GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCGO1 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCGO1 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and 7 None perimeter slopes (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, (d) Slopes 3:1 to 4:1 14 ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes, swales, (e) Areas with slopes ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: Temporary Stabilization Permanent Stabilization • Temporary grass seed covered with straw or • Permanent grass seed covered with straw or other mulches and tackifiers other mulches and tackifiers • Hydroseeding • Geotextile fabrics such as permanent soil • Rolled erosion control products with or reinforcement matting without temporary grass seed • Hydroseeding • Appropriately applied straw or other mulch • Shrubs or other permanent plantings covered • Plastic sheeting with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the tmeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER A HIGH COHESIVE & 0 CD CD CD 0 LOW FILTRATION SANDBAGS (TYP.) SOIL BERM 0 0 OR STAPLES 0 CD10 MIL 1:1 PLASTIC 0 0 SILT FENCE SIDE SLOP LINING�SANDBAGS (TYP.) STAPLES 0 (TYPOR 0 0 00 0_ o 00 't 00 A CLEARLY MARKED SIGNAGE SECTION A -A CONCRETE NOTING DEVICE (18"X24" MIN.) NOTES: WASHOUT 1. ACTUAL LOCATION DETERMINED IN FIELD 2. THE CONCRETE WASHOUT STRUCTURES SHALL BE MAINTAINED WHEN THE LIQUID AND/OR SOLID REACHES 75% OF THE STRUCTURES CAPACITY. PLAN 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE. BELOW GRADE WASHOUT STRUCTURE NOT TO SCALE SANDBAGS (TYP.) NOTES: OR STAPLES 1. ACTUAL LOCATION DETERMINED IN FI ELD CLEARLY MARKED SIGNAGE CONCRETE NOTING DEVICE (18"X24" MIN.) 2. THE CONCRETE WASHOUT WASHOUT STRUCTURES SHALL BE MAINTAINED WHEN THE LIQUID AND/OR SOLID REACHES 75% OF THE STRUCTURES CAPACITY TO PROVIDE ADEQUATE HOLDING CAPACITY WITH A MINIMUM 12 PLAN INCHES OF FREEBOARD. 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE. ABOVE GRADE WASHOUT STRUCTURE NOT TO SCALE CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, Stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. NCGO1 GROUND STABILIZATION AND MATERIALS HANDLING EFFECTIVE: 04/01/19 M 00 Z � O N N M J J �n M N ® Q0.z U0w (DWo (DZM zm Zw2 (.5E9w w_J0- -LU = Z 't X Uw 0 a w C0 Q0 0 0 z C) -� W � O W w�Q Q � U a�J = ox° >� 1 Qp01 O �Z0 �4-4z U) zoo � z .�> 0 0 P4 LU m ENO J J LU m C 9, o m o CO U) m m 0 N J � z Q w U m _-S W 0 W = J o N � m Q o T N U � m r Ww � O o 0 m LU J o� z w Z Cl) o J U SHEET C9,00 0 PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION Self -inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. Frequency Inspect (during normal Inspection records must include: business hours) (1) Rain gauge Daily Daily rainfall amounts. maintained in If no daily rain gauge observations are made during weekend or good working holiday periods, and no individual -day rainfall information is order available, record the cumulative rain measurement for those un- attended days (and this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain -monitoring device approved by the Division. (2) E&SC At least once per 1. Identification of the measures inspected, Measures 7 calendar days 2. Date and time of the inspection, and within 24 3. Name of the person performing the inspection, hours of a rain 4. Indication of whether the measures were operating event > 1.0 inch in properly, 24 hours 5. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken. (3) Stormwater At least once per 1. Identification of the discharge outfalls inspected, discharge 7 calendar days 2. Date and time of the inspection, outfalls (SDOs) and within 24 3. Name of the person performing the inspection, hours of a rain 4. Evidence of indicators of stormwater pollution such as oil event > 1.0 inch in sheen, floating or suspended solids or discoloration, 24 hours 5. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. (4) Perimeter of At least once per If visible sedimentation is found outside site limits, then a record site 7 calendar days of the following shall be made: and within 24 1. Actions taken to clean up or stabilize the sediment that has left hours of a rain the site limits, event > 1.0 inch in 2. Description, evidence, and date of corrective actions taken, and 24 hours 3. An explanation as to the actions taken to control future releases. (5) Streams or At least once per If the stream or wetland has increased visible sedimentation or a wetlands onsite 7 calendar days stream has visible increased turbidity from the construction or offsite and within 24 activity, then a record of the following shall be made: (where hours of a rain 1. Description, evidence and date of corrective actions taken, and accessible) event > 1.0 inch in 2. Records of the required reports to the appropriate Division 24 hours Regional Office per Part III, Section C, Item (2)(a) of this permit. (6) Ground After each phase 1. The phase of grading (installation of perimeter E&SC stabilization of grading measures, clearing and grubbing, installation of storm measures drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be kept on site and available for inspection at all times during normal business hours. Item to Document Documentation Requirements (a) Each E&SC measure has been installed Initial and date each E&SC measure on a copy and does not significantly deviate from the of the approved E&SC plan or complete, date locations, dimensions and relative elevations and sign an inspection report that lists each shown on the approved E&SC plan. E&SC measure shown on the approved E&SC plan. This documentation is required upon the initial installation of the E&SC measures or if the E&SC measures are modified after initial installation. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed Initial and date a copy of the approved E&SC in accordance with the approved E&SC plan or complete, date and sign an inspection plan. report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair Complete, date and sign an inspection report. requirements for all E&SC measures have been performed. (e) Corrective actions have been taken Initial and date a copy of the approved E&SC to E&SC measures. plan or complete, date and sign an inspection report to indicate the completion of the corrective action. 2. Additional Documentation to be Kept on Site In addition to the E&SC plan documents above, the following items shall be kept on the site and available for inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This General Permit as well as the Certificate of Coverage, after it is received. (b) Records of inspections made during the previous twelve months. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. 3. Documentation to be Retained for Three Years All data used to complete the e-NOI and all inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] PART II, SECTION G, ITEM (4) DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT Sediment basins and traps that receive runoff from drainage areas of one acre or more shall use outlet structures that withdraw water from the surface when these devices need to be drawn down for maintenance or close out unless this is infeasible. The circumstances in which it is not feasible to withdraw water from the surface shall be rare (for example, times with extended cold weather). Non -surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met: (a) The E&SC plan authority has been provided with documentation of the non -surface withdrawal and the specific time periods or conditions in which it will occur. The non -surface withdrawal shall not commence until the E&SC plan authority has approved these items, (b) The non -surface withdrawal has been reported as an anticipated bypass in accordance with Part III, Section C, Item (2)(c) and (d) of this permit, (c) Dewatering discharges are treated with controls to minimize discharges of pollutants from Stormwater that is removed from the sediment basin. Examples of appropriate controls include properly sited, designed and maintained dewatering tanks, weir tanks, and filtration systems, (d) Vegetated, upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in Item (c) above, (e) Velocity dissipation devices such as check dams, sediment traps, and riprap are provided at the discharge points of all dewatering devices, and (f) Sediment removed from the dewatering treatment devices described in Item (c) above is disposed of in a manner that does not cause deposition of sediment into waters of the United States. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that Must be Reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (c) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (d) Anticipated bypasses and unanticipated bypasses. (e) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the tmeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Department's Environmental Emergency Center personnel at (800) 858-0368. Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) Visible sediment • Within 24 hours, an oral or electronic notification. deposition in a • Within 7 calendar days, a report that contains a description of the stream or wetland sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. • If the stream is named on the NC 303(d) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. (b) Oil spills and • Within 24 hours, an oral or electronic notification. The notification release of shall include information about the date, time, nature, volume and hazardous location of the spill or release. substances per Item 1(b)-(c) above (c) Anticipated • A report at least ten days before the date of the bypass, if possible. bypasses [40 CFR The report shall include an evaluation of the anticipated quality and 122.41(m)(3)] effect of the bypass. (d) Unanticipated • Within 24 hours, an oral or electronic notification. bypasses [40 CFR . Within 7 calendar days, a report that includes an evaluation of the 122.41(m)(3)] quality and effect of the bypass. (e) Noncompliance • Within 24 hours, an oral or electronic notification. with the conditions . Within 7 calendar days, a report that contains a description of the of this permit that noncompliance, and its causes; the period of noncompliance, may endanger including exact dates and times, and if the noncompliance has not health or the been corrected, the anticipated time noncompliance is expected to environment[40 continue; and steps taken or planned to reduce, eliminate, and CFR 122.41(I)(7)] prevent reoccurrence of the noncompliance. [40 CFR 122.41(I)(6). • Division staff may waive the requirement for a written report on a case -by -case basis. NCGO I SELF -INSPECTION, RECORDKEEPING AND REPORTING EFFECTIVE: 04/01/19 w co co 0 0 z -� LLJ O W wP4Q Q z U a�J = ox° >� 2 Z QOF- 0 z0 z U' z O z -� W C) O t� Y m ENO J J W m C C N o m co U) m m 0 N J z Qw U m _S UJ 0 W = J o N m Q � O T N U � m r LIJ w � 0 o 0 m LU J Hi z w Z W J U C 10,00 72„ 0 PEDESTAL N.T.S PEDESTAL BASE BOLT PATTERN N.T.S MODEL #3416D-20 4C PEDESTAL MAILBOX AVAILABLE COLORS: c 191, MODEL #3416D-20 (20) 'MB1' DOORS (1) 'OM2' OUTGOING MAIL COMPARTMENT (2) PL4.5 PARCEL LOCKERS (15 Ys" H) CHAMFER EDGES CBU OUTLINE - I II I I I I I I L---J EXPANSION JOINT (TYP.) 5.0' SIDEWALK BROOM FINISH 15" FIELD VERIFY U-D PLAN VIEW N.T.S z 0 3» Z/ / �% % .� \-��..+:-�-a 00 te ... BUTYL RUBBER PAD (WITH METAL PEDESTAL ONLY) MATCH EXISTING GRADE IN PAVED AREAS SLOPE SURFACE 0.25 IN PER FOOT ON ALL SIDES FOR DRAINAGE 4 RODS ON CENTERS MAX. EACH WAY COMPACT GRAVEL OR CRUSHED STONE FIRM UNDISTURBED SOIL OR WE Concrete Pad COMPAACTEDLSOIL N.T.S. USPS SDL ISSUED 10/1/2016 NOTES CONCRETE SHALL HAVE COMPRESSIVE STRENGTH OF 3,000 PSI ® 28 DAYS CONTAIN MIN. - 6% MAX AIR ENTRANMENT AND BE PLACED WITH A 3.5 - 4.5 SLUMP IN ACCORDANCE WITH ACI 301. REINFORCING STEEL RODS SHALL CONFORM TO ASTM A515, GRADE 60. BRONZE, BLACK OR GRAY CLUSTER MAILBOX D E TA I L BLACK O INSPECTION AND COMMENCEMENT OF MAIL DELIVERY SERVICES APPROPRIATE MAIL RECEPTACLES MUST BE PROVIDED FOR THE RECEIPT OF MAIL. THE TYPE OF MAIL RECEPTACLE DEPENDS ON THE MODE OF DELIVERY IN PLACE. PURCHASE, INSTALLATION, MAINTENANCE, REPAIR, AND REPLACEMENT OF MAIL RECEPTACLES ARE THE RESPONSIBILITY OF THE CUSTOMER. VERIFY WITH THE LOCAL POSTMASTER OR GROWTH MANAGER, THE APPROPRIATE LOCATIONS FOR INSTALLATION. THE FOLLOWING APPLY: IN LOCATIONS WHERE THE POSTAL SERVICE HAS DETERMINED THAT CENTRALIZED DELIVERY IS APPROPRIATE, CUSTOMERS MUST INSTALL MAIL RECEPTACLES THAT COMPLY WITH THE LISPS STD- 4C MOUNTED MAIL RECEPTACLES OR USPSB1118, POSTAL SERVICE SPECIFICATION, CBUS, TO INCLUDE SECURED PARCEL LOCKERS. PAVEMENT 'GONG. CURB &aGUTTEF 1" FULL PORT ANGLE BALL VALVE - WITH ONE OR TWO STEP STYLE z COMPRESSION FOR IPS PE INLET g AND FEMALE METER THREAD 1" CC SINGLE SWIVEL NUT WITH LOCK. ALL ih STAINLESS STEEL INSERTS SHALL BE STAINLESS STRAP SADDLE STEEL BALL CORPORATION STOP WITH AWWA INLETS, ONE OR TWO STEP STYLE COMPRESSION FOR IPS PE, WITH STAINLESS STEEL INSERTS. 1" IPS POLYETHYLENE PIPE P.E. 3406 160 PSI/P.E. 3408 200 PSI ASTM D1248-TYPE III ASTM D 3350-355434 C r(WATER o MAIN \\ // TRACER (DO NOT CONNECT TO CORPORATION OR BANDS) 2" SOLID BRICK METER D BOX BASE BACK FILL IIIII 11- D BOTTOM METER BOX -III 1 - BRICK j OF BOX 777 SECTION "A -A" BRICK METER BOX BASE INSET "A" PROPOSED 1" WATER SERVICE LATERAL SHEET NO. 1 OF 1 VARIES z 00 METER BOX WITH NOTES: 1. ALL MATERIALS TO BE APPROVED BY RECESSED AMR READING P.W.C. LID SET 1/4" ABOVE GRADE 2. SERVICE LATERAL SIZE 1" IPS 18 POLYETHYLENE UNLESS OTHERVISE } SPECIFIED _ 3. SERVICE LATERAL INSTALLATION SHALL EQ III O a BE APPROVED BY P.W.C. z 4. WATER SERVICE LOCK VALVE TO BE a _j LOCATED 18" FROM SANITARY SEWER �- - INCH. D TSTACK WHEN INSTALLED I- 5. WHEN INSTALLED IN A PAVED AREA, METER BOX TO BE SET 1/4" ABOVE FINISHED PAVEMENT GRADES AND PAVEMENT FEATHERED TO TOP OF BOX - _ TO PROVIDE DRAIN AWAY FROM BOX III -III- 6. C.I. METER BOXES SHALL BE USED IN TRAFFIC AREAS SEE WAB. 12" METER COUPLING 7 PERIMETER SOLID CONCRETE BRICK BASE WITH NO GAPS, DO NOT LAY WTH 3/4" FEMALE BRICK ON PIPE. SEE INSET "A" THREAD METER SWIVEL NUT X 3/a" MIPT. 8. WHERE ASPHALT CURB OR STRIP PAVEMENT EXIST, THE LOCATION OF 1" x 7-1/2" SPACER FOR BOX SHALL BE AS DIRECTED BY PWC DOMESTIC SERVICE, REPRESENTATIVE 1" x 10-1" SPACER FOR 9. DISTANCE FROM TOP OF LOCK VALVE IRRIGATION SERVICE, OPERATING STEM TO TOP OF BOX SPACER SHALL BE SHALL BE 8" MIN. TO 10" MAX. FURNISHED BY PWC. 10. RESIDENTIAL METER BOX SHALL BE SET BRICK METER BOX BASE 18" FROM R/W TO CENTERLINE OF SEE INSET "A" METER BOX PERPENDICULAR TO THE R/W. 12 GA SINGLE STRAND COATED COPPER WIRE EXTENDED INTO METER BOX 6" AND WRAPPED AROUND LOCK VALVE EQ EQ O w w a� SPACER SHALL BE CENTERED PLAN IN METER BOX 11. COMMERCIAL METER BOX LOCATION SHALL BE AS APPROVED (PREFER NO METER BE INSTALLED LESS THAN 5FROM BLDG. TO EDGE OF BOX). 12. LATERAL SHALL BE CENTERED ON LOT UNLESS OTHERWISE NOTED. 13. LATERAL SHALL NOT BE BACK FILLED UNTIL INSPECTED BY PWC PROJECT COORDINATOR. 14. WATER MAIN AND LATERAL SHALL PASS HYDROSTATIC, LEAKAGE AND STERILIZATION TESTS (200 PSI). 15. BARB -TYPE FITTINGS ARE NOT ACCEPTABLE 16. SHOULD IT BE NECESSARY TO CRIMP THE WATER SERVICE LATERAL, A FULL CIRCLE REPAIR CLAMP SHALL BE PLACED ON THE #10 SOLID COPPER WIRE j SPIRAL WRAPPED O AROUND PVC PIPE NOT REQUIRED z FOR DIP z N ww mZ O N PIPE 3" WIDE DETECTOR TAPE - 18" BURY J J LL Y U a m J a z LL J J_ LL Y U a m J a z U PIPE Z 0 UNDISTURBED SOIL""WIDTH o AS REQUIRED m BELL O.D.+12" MIN. BELL O.D.+24" MAX. WATER MAIN TRENCH DETAILS N.T.S. NOTES: 1. LAYING CONDITIONS AS PER AWWA C600 AND C605 STANDARDS. 2. BEDDING MATERIAL SHALL BE 4" MINIMUM THICKNESS, LOOSE SOIL (DEFINED IAS NATIVE SOIL EXCAVATED FROM THE TRENCH), FREE FROM ROCKS AND SHALL PROVIDE UNIFORM SUPPORT FOR THE FULL LENGTH OF PIPE. COMPACT TO 95% MAXIMUM DENSITY. 3. INITIAL BACKFILL SHALL BE LIGHTLY CONSOLIDATED IN MAXIMUM 6" LOOSE LIFTS, COMPACTED TO 95% OF MAXIMUM DENSITY. 4. UNDER AREAS TO BE SEEDED OR SODDED, COMPACT SUCCEEDING LAYERS OF FINAL BACKFILL IN 12" LOOSE LIFTS TO 85% MAXIMUM DENSITY. 5. UNDER STRUCTURES, PAVEMENTS AND ROAD SHOULDERS, COMPACT SUCCEEDING LAYERS OF FINAL BACKFILL IN 6" LOOSE LIFTS TO 95% MAXIMUM DENSITY EXCEPT COMPACT TOP 12" OF SUBGRADE TO 98 % MAXIMUM DENSITY. 6. PROVIDE #10 SOLID COPPER WIRE IN SUFFICIENT LENGTH TO BE SPIRAL WRAPPED AROUND EACH SEPARATE RUN OF ALL BURIED PVC PIPING. AT VALVE BOXES, BRING WIRE TO WITHIN 6 IN. OF TOP OF BOX AND INSERT INTO BOX THROUGH DRILLED HOLE. NOT REQUIRED FOR DUCTILE IRON PIPE. 7 INSTALL 3" WIDE DETECTOR TAPE AT 18" DEPTH. TAPE SHALL HAVE MIDDLE FOIL LAYER. HOKE COUNTY REGIONAL WATER SYSTEM DETAILS HOKE COUNTY, NORTH CAROLINA DOUBLE CHECK VALVE METER BOX (CONC., C/I, OR PLASTIC COPPER SETTER TO BE FORD (VHH 172-7W-SN) OR APPROVED EQUAL METER BY OTHERS WATER MAIN TRENCH DETAILS R/W ANGLE VALVE POLY. WATER SERVICE LINE COMPRESSION FITTING BRASS ADAPTER METER FOR YOKE COMPRESSION CONECTION YL TYPICAL HOUSE SERVICE DETAIL (SHORT) N.T.S. NOTES: 1. INLETS WILL HAVE A BRASS ADAPTER AS REQUIRED FOR A COMPRESSION FITTING TO "IPS" WATER SERVICE PIPE. 2. YOKE WILL HAVE CHECK VALVE THAT SHALL HAVE SPRING ASSISTED SEATING, AND THE SEAT SHALL BE OF BUNA-N- RUBBER. 3. OUTLET SHALL BE FORD DOUBLE PURPOSE COUPLING OR APPROVED EQUAL. 4. METER YOKES SHALL BE SUPPORTED AS CALLED FOR IN SPECIAL PROVISIONS. CORPORATI STOP HOKE COUNTY REGIONAL WATER SYSTEM DETAILS TYPICAL HOUSE SERVICE DETAIL (SHORT) HOKE COUNTY, NORTH CAROLINA HOKE COUNTY REGIONAL WATER SYSTEM DETAILS HOKE COUNTY, NORTH CAROLINA SOLID COVEF 5.75" 5.75" 17.25" OD 20.125" .2 5» I LO N LO SECTION A -A SECTION B-B WATER METER BOX DETAIL N.T.S. MIN. AVG. WGT. 12 GA SINGLE STRAND COATED COPPER WIRE EXTENDED INTO METER BOX 6" AND WRAPPED AROUND LOCK VALVE EQ EQ O w w a� SPACER SHALL BE CENTERED PLAN IN METER BOX 11. COMMERCIAL METER BOX LOCATION SHALL BE AS APPROVED (PREFER NO METER BE INSTALLED LESS THAN 5FROM BLDG. TO EDGE OF BOX). 12. LATERAL SHALL BE CENTERED ON LOT UNLESS OTHERWISE NOTED. 13. LATERAL SHALL NOT BE BACK FILLED UNTIL INSPECTED BY PWC PROJECT COORDINATOR. 14. WATER MAIN AND LATERAL SHALL PASS HYDROSTATIC, LEAKAGE AND STERILIZATION TESTS (200 PSI). 15. BARB -TYPE FITTINGS ARE NOT ACCEPTABLE 16. SHOULD IT BE NECESSARY TO CRIMP THE WATER SERVICE LATERAL, A FULL CIRCLE REPAIR CLAMP SHALL BE PLACED ON THE #10 SOLID COPPER WIRE j SPIRAL WRAPPED O AROUND PVC PIPE NOT REQUIRED z FOR DIP z N ww mZ O N PIPE 3" WIDE DETECTOR TAPE - 18" BURY J J LL Y U a m J a z LL J J_ LL Y U a m J a z U PIPE Z 0 UNDISTURBED SOIL""WIDTH o AS REQUIRED m BELL O.D.+12" MIN. BELL O.D.+24" MAX. WATER MAIN TRENCH DETAILS N.T.S. NOTES: 1. LAYING CONDITIONS AS PER AWWA C600 AND C605 STANDARDS. 2. BEDDING MATERIAL SHALL BE 4" MINIMUM THICKNESS, LOOSE SOIL (DEFINED IAS NATIVE SOIL EXCAVATED FROM THE TRENCH), FREE FROM ROCKS AND SHALL PROVIDE UNIFORM SUPPORT FOR THE FULL LENGTH OF PIPE. COMPACT TO 95% MAXIMUM DENSITY. 3. INITIAL BACKFILL SHALL BE LIGHTLY CONSOLIDATED IN MAXIMUM 6" LOOSE LIFTS, COMPACTED TO 95% OF MAXIMUM DENSITY. 4. UNDER AREAS TO BE SEEDED OR SODDED, COMPACT SUCCEEDING LAYERS OF FINAL BACKFILL IN 12" LOOSE LIFTS TO 85% MAXIMUM DENSITY. 5. UNDER STRUCTURES, PAVEMENTS AND ROAD SHOULDERS, COMPACT SUCCEEDING LAYERS OF FINAL BACKFILL IN 6" LOOSE LIFTS TO 95% MAXIMUM DENSITY EXCEPT COMPACT TOP 12" OF SUBGRADE TO 98 % MAXIMUM DENSITY. 6. PROVIDE #10 SOLID COPPER WIRE IN SUFFICIENT LENGTH TO BE SPIRAL WRAPPED AROUND EACH SEPARATE RUN OF ALL BURIED PVC PIPING. AT VALVE BOXES, BRING WIRE TO WITHIN 6 IN. OF TOP OF BOX AND INSERT INTO BOX THROUGH DRILLED HOLE. NOT REQUIRED FOR DUCTILE IRON PIPE. 7 INSTALL 3" WIDE DETECTOR TAPE AT 18" DEPTH. TAPE SHALL HAVE MIDDLE FOIL LAYER. HOKE COUNTY REGIONAL WATER SYSTEM DETAILS HOKE COUNTY, NORTH CAROLINA DOUBLE CHECK VALVE METER BOX (CONC., C/I, OR PLASTIC COPPER SETTER TO BE FORD (VHH 172-7W-SN) OR APPROVED EQUAL METER BY OTHERS WATER MAIN TRENCH DETAILS R/W ANGLE VALVE POLY. WATER SERVICE LINE COMPRESSION FITTING BRASS ADAPTER METER FOR YOKE COMPRESSION CONECTION YL TYPICAL HOUSE SERVICE DETAIL (SHORT) N.T.S. NOTES: 1. INLETS WILL HAVE A BRASS ADAPTER AS REQUIRED FOR A COMPRESSION FITTING TO "IPS" WATER SERVICE PIPE. 2. YOKE WILL HAVE CHECK VALVE THAT SHALL HAVE SPRING ASSISTED SEATING, AND THE SEAT SHALL BE OF BUNA-N- RUBBER. 3. OUTLET SHALL BE FORD DOUBLE PURPOSE COUPLING OR APPROVED EQUAL. 4. METER YOKES SHALL BE SUPPORTED AS CALLED FOR IN SPECIAL PROVISIONS. CORPORATI STOP HOKE COUNTY REGIONAL WATER SYSTEM DETAILS TYPICAL HOUSE SERVICE DETAIL (SHORT) HOKE COUNTY, NORTH CAROLINA HOKE COUNTY REGIONAL WATER SYSTEM DETAILS HOKE COUNTY, NORTH CAROLINA SOLID COVEF 5.75" 5.75" 17.25" OD 20.125" .2 5» I LO N LO SECTION A -A SECTION B-B WATER METER BOX DETAIL N.T.S. MIN. AVG. WGT. O w w a� SPACER SHALL BE CENTERED PLAN IN METER BOX 11. COMMERCIAL METER BOX LOCATION SHALL BE AS APPROVED (PREFER NO METER BE INSTALLED LESS THAN 5FROM BLDG. TO EDGE OF BOX). 12. LATERAL SHALL BE CENTERED ON LOT UNLESS OTHERWISE NOTED. 13. LATERAL SHALL NOT BE BACK FILLED UNTIL INSPECTED BY PWC PROJECT COORDINATOR. 14. WATER MAIN AND LATERAL SHALL PASS HYDROSTATIC, LEAKAGE AND STERILIZATION TESTS (200 PSI). 15. BARB -TYPE FITTINGS ARE NOT ACCEPTABLE 16. SHOULD IT BE NECESSARY TO CRIMP THE WATER SERVICE LATERAL, A FULL CIRCLE REPAIR CLAMP SHALL BE PLACED ON THE #10 SOLID COPPER WIRE j SPIRAL WRAPPED O AROUND PVC PIPE NOT REQUIRED z FOR DIP z N ww mZ O N PIPE 3" WIDE DETECTOR TAPE - 18" BURY J J LL Y U a m J a z LL J J_ LL Y U a m J a z U PIPE Z 0 UNDISTURBED SOIL""WIDTH o AS REQUIRED m BELL O.D.+12" MIN. BELL O.D.+24" MAX. WATER MAIN TRENCH DETAILS N.T.S. NOTES: 1. LAYING CONDITIONS AS PER AWWA C600 AND C605 STANDARDS. 2. BEDDING MATERIAL SHALL BE 4" MINIMUM THICKNESS, LOOSE SOIL (DEFINED IAS NATIVE SOIL EXCAVATED FROM THE TRENCH), FREE FROM ROCKS AND SHALL PROVIDE UNIFORM SUPPORT FOR THE FULL LENGTH OF PIPE. COMPACT TO 95% MAXIMUM DENSITY. 3. INITIAL BACKFILL SHALL BE LIGHTLY CONSOLIDATED IN MAXIMUM 6" LOOSE LIFTS, COMPACTED TO 95% OF MAXIMUM DENSITY. 4. UNDER AREAS TO BE SEEDED OR SODDED, COMPACT SUCCEEDING LAYERS OF FINAL BACKFILL IN 12" LOOSE LIFTS TO 85% MAXIMUM DENSITY. 5. UNDER STRUCTURES, PAVEMENTS AND ROAD SHOULDERS, COMPACT SUCCEEDING LAYERS OF FINAL BACKFILL IN 6" LOOSE LIFTS TO 95% MAXIMUM DENSITY EXCEPT COMPACT TOP 12" OF SUBGRADE TO 98 % MAXIMUM DENSITY. 6. PROVIDE #10 SOLID COPPER WIRE IN SUFFICIENT LENGTH TO BE SPIRAL WRAPPED AROUND EACH SEPARATE RUN OF ALL BURIED PVC PIPING. AT VALVE BOXES, BRING WIRE TO WITHIN 6 IN. OF TOP OF BOX AND INSERT INTO BOX THROUGH DRILLED HOLE. NOT REQUIRED FOR DUCTILE IRON PIPE. 7 INSTALL 3" WIDE DETECTOR TAPE AT 18" DEPTH. TAPE SHALL HAVE MIDDLE FOIL LAYER. HOKE COUNTY REGIONAL WATER SYSTEM DETAILS HOKE COUNTY, NORTH CAROLINA DOUBLE CHECK VALVE METER BOX (CONC., C/I, OR PLASTIC COPPER SETTER TO BE FORD (VHH 172-7W-SN) OR APPROVED EQUAL METER BY OTHERS WATER MAIN TRENCH DETAILS R/W ANGLE VALVE POLY. WATER SERVICE LINE COMPRESSION FITTING BRASS ADAPTER METER FOR YOKE COMPRESSION CONECTION YL TYPICAL HOUSE SERVICE DETAIL (SHORT) N.T.S. NOTES: 1. INLETS WILL HAVE A BRASS ADAPTER AS REQUIRED FOR A COMPRESSION FITTING TO "IPS" WATER SERVICE PIPE. 2. YOKE WILL HAVE CHECK VALVE THAT SHALL HAVE SPRING ASSISTED SEATING, AND THE SEAT SHALL BE OF BUNA-N- RUBBER. 3. OUTLET SHALL BE FORD DOUBLE PURPOSE COUPLING OR APPROVED EQUAL. 4. METER YOKES SHALL BE SUPPORTED AS CALLED FOR IN SPECIAL PROVISIONS. CORPORATI STOP HOKE COUNTY REGIONAL WATER SYSTEM DETAILS TYPICAL HOUSE SERVICE DETAIL (SHORT) HOKE COUNTY, NORTH CAROLINA HOKE COUNTY REGIONAL WATER SYSTEM DETAILS HOKE COUNTY, NORTH CAROLINA SOLID COVEF 5.75" 5.75" 17.25" OD 20.125" .2 5» I LO N LO SECTION A -A SECTION B-B WATER METER BOX DETAIL N.T.S. MIN. AVG. WGT. ww mZ O N PIPE 3" WIDE DETECTOR TAPE - 18" BURY J J LL Y U a m J a z LL J J_ LL Y U a m J a z U PIPE Z 0 UNDISTURBED SOIL""WIDTH o AS REQUIRED m BELL O.D.+12" MIN. BELL O.D.+24" MAX. WATER MAIN TRENCH DETAILS N.T.S. NOTES: 1. LAYING CONDITIONS AS PER AWWA C600 AND C605 STANDARDS. 2. BEDDING MATERIAL SHALL BE 4" MINIMUM THICKNESS, LOOSE SOIL (DEFINED IAS NATIVE SOIL EXCAVATED FROM THE TRENCH), FREE FROM ROCKS AND SHALL PROVIDE UNIFORM SUPPORT FOR THE FULL LENGTH OF PIPE. COMPACT TO 95% MAXIMUM DENSITY. 3. INITIAL BACKFILL SHALL BE LIGHTLY CONSOLIDATED IN MAXIMUM 6" LOOSE LIFTS, COMPACTED TO 95% OF MAXIMUM DENSITY. 4. UNDER AREAS TO BE SEEDED OR SODDED, COMPACT SUCCEEDING LAYERS OF FINAL BACKFILL IN 12" LOOSE LIFTS TO 85% MAXIMUM DENSITY. 5. UNDER STRUCTURES, PAVEMENTS AND ROAD SHOULDERS, COMPACT SUCCEEDING LAYERS OF FINAL BACKFILL IN 6" LOOSE LIFTS TO 95% MAXIMUM DENSITY EXCEPT COMPACT TOP 12" OF SUBGRADE TO 98 % MAXIMUM DENSITY. 6. PROVIDE #10 SOLID COPPER WIRE IN SUFFICIENT LENGTH TO BE SPIRAL WRAPPED AROUND EACH SEPARATE RUN OF ALL BURIED PVC PIPING. AT VALVE BOXES, BRING WIRE TO WITHIN 6 IN. OF TOP OF BOX AND INSERT INTO BOX THROUGH DRILLED HOLE. NOT REQUIRED FOR DUCTILE IRON PIPE. 7 INSTALL 3" WIDE DETECTOR TAPE AT 18" DEPTH. TAPE SHALL HAVE MIDDLE FOIL LAYER. HOKE COUNTY REGIONAL WATER SYSTEM DETAILS HOKE COUNTY, NORTH CAROLINA DOUBLE CHECK VALVE METER BOX (CONC., C/I, OR PLASTIC COPPER SETTER TO BE FORD (VHH 172-7W-SN) OR APPROVED EQUAL METER BY OTHERS WATER MAIN TRENCH DETAILS R/W ANGLE VALVE POLY. WATER SERVICE LINE COMPRESSION FITTING BRASS ADAPTER METER FOR YOKE COMPRESSION CONECTION YL TYPICAL HOUSE SERVICE DETAIL (SHORT) N.T.S. NOTES: 1. INLETS WILL HAVE A BRASS ADAPTER AS REQUIRED FOR A COMPRESSION FITTING TO "IPS" WATER SERVICE PIPE. 2. YOKE WILL HAVE CHECK VALVE THAT SHALL HAVE SPRING ASSISTED SEATING, AND THE SEAT SHALL BE OF BUNA-N- RUBBER. 3. OUTLET SHALL BE FORD DOUBLE PURPOSE COUPLING OR APPROVED EQUAL. 4. METER YOKES SHALL BE SUPPORTED AS CALLED FOR IN SPECIAL PROVISIONS. CORPORATI STOP HOKE COUNTY REGIONAL WATER SYSTEM DETAILS TYPICAL HOUSE SERVICE DETAIL (SHORT) HOKE COUNTY, NORTH CAROLINA HOKE COUNTY REGIONAL WATER SYSTEM DETAILS HOKE COUNTY, NORTH CAROLINA SOLID COVEF 5.75" 5.75" 17.25" OD 20.125" .2 5» I LO N LO SECTION A -A SECTION B-B WATER METER BOX DETAIL N.T.S. MIN. AVG. WGT. FRAME 50 LBS. COVER 20 LBS. HOKE COUNTY REGIONAL WATER SYSTEM DETAILS HOKE COUNTY, NORTH CAROLINA 5' MIN. EXIST. ROAD 20' AVG POLY. WATER SERVICE LINE WATER METER BOX DETAIL DOUBLE CHECK VALVE BRASS ADAPTER COMPRESSION FOR FITTING COMPRESSION CONECTION PVC CASING CORPORATION (CLASS 200) STOP SADDLE TYPICAL HOUSE SERVICE DETAIL (LONG) A BRASS ADAPTER A COMPRESSION WATER SERVICE PIPE. CHECK VALVE THAT NG ASSISTED SEATING, HALL BE OF BUNA-N- FORD DOUBLE NG OR APPROVED ALL BE SUPPORTED PECIAL PROVISIONSI. TYPICAL HOUSE SERVICE DETAIL (LONG) R N.T.S. NOTES: 1. INLETS WILL HAVE AS REQUIRED FO FITTING TO "IPS" 2. YOKE WILL HAVE SHALL HAVE SPRI AND THE SEAT S RUBBER. 3. OUTLET SHALL BE PURPOSE COUPLI EQUAL. 4. METER YOKES SH AS CALLED FOR IN S ANGLE METER BOX ON P VALVE METER BOX (GONG., C/I, O PLASTIC R COPPER SETTER TO BE aurLEr FORD (VHH172-7W-SN) OR APPROVED EQUAL METER YOKE M . Z 28 N U O N _j o ern ^ co N Za ' J O 01' 6 w uwi � O(D Z 2 U w who W o = z M x (D U Z m w 0 a W m m m FW- 0 O z -� LLJ � O W W�Q U Z U P. 00 o�Q U >� z C) O >-�Zo E_ z cn z o z � Z >_ �0 w p p4 Lu m allo J J W m cc C C N C m co r %�Cr "' ' Com m O J U Z) z W U m � W 0 Luo J N m Q � O T N U � m r WW O o 0 >- m W J m Q pLu z W Z oC/) J HEET C 1 1,00 a CL POUNDS ASTM SIZE T L PER SPEC. & OD A B C E F G J K M N PLANT D FOOT CLASS 15 B2 1 8' 134 ASTM C76 19 1 2 16 15 1 17 4 2 3 17 T 17 3 21 8 4 1 7 1 1 SR 4 III IV V 2 16 2 16 4 VN-KN 18 B2 8 173 ASTM C76 23 2 20 3 20 4 2 1 21 4 1 20 2 1 23 2 1 6 2 3 1 1 SR 2 III IV V 4 4 VN-KN 24 B3 8' 268 ASTM C76 30 2 1 26 3 26 7 2 13 27 3 27 31 1 4 1 1 1 1 VN -KN III IV V 2 16 8 16 4 32 4 2 2 SR 30 B31 8' 396 ASTM C76 37 2 15 32 1 33 1 3 34 1 33 1 38 1 5 1 3 1 1 SR-K 2 III IV V 16 16 8 32 32 2 2 4 2 36 g4 8' 543 ASTM C76 44 3 3 39 1 39 29 3 13 40 19 40 5 46 1 6 1 1 2 1 1 SR-K III IV V 4 4 32 16 32 16 2 4 16 L E 1 M 1 F <-- PAVFMFNT Sl1RFACF A MINIMUM OF 6" OF #57 WASHED STONE IS REQUIRED FOR ALL PIPE INSTALLATION. SEE CITY CITY OF FAYETTEVILLE STANDARD DETAIL DR-1. MODIFIED TONGUE AND GROOVE 8 FOOT LENGTH MORTAR OF FLEXIBLE PLASTIC TYPE JOINT SPECIFICATIONS: ASTM C 76-LATEST NCDOT REINFORCED IN ACCORDANCE WITH APPLICABLE SPECIFICATIONS LIFT HOLES STANDARD ON 36" AS ALLOWED PER ASTM SPECIFICATIONS MINIMUM FILL UNDER ROADWAYS PIPE CLASS MINIMUM FILL CLASS III 2' CLASS IV 1' CLASS V V FILL HEIGHT IS MEASURED FROM THE TOP OF THE PIPE TO THE BOTTOM OF THE PAVEMENT STRUCTURE. BASE COURSE 100% COMPACTION 1'-0" 9 a 2'-0$' a ° o #57 WASHED STONE SEE NOTE TYPICAL STORM DRAIN COMPACTION tNOTES: 1. STONE BEDDING FOR PIPE IS REQUIRED UNLESS OTHERWISE APPROVED BY THE ENGINEER r- W1 (FT.) H2 H1 ).C.(TYP.) :R TO CHART FOR BAR SIZE ELEVATION W2 (FT.) DI AN D 6" 1 -0" O I - Al ifl 6" 8" O.C.(TYP.) REFER TO CHART FOR BAR SIZE SIDE NOTES: • THIS PRECAST ENDWALL MAY BE USED FOR THE FOLLOWING STANDARDS: 838.01, 838.11, 838.21, 838.27, 838.333 838.39, 838.51, 838.57, 838.63 AND 838.69. • INSTALL PRECAST ENDWALLS WITH WINGS AND PAY FOR IN ACCORDANCE WITH SPECIFICATION SECTION 838. • USE 4000 PSI CONCRETE. • PROVIDE ALL REINFORCING STEEL WHICH MEETS ASTM A615 FOR GRADE 60 AND WELDED WIRE FABRIC CONFORMING TO ASTM A185 WITH 2" MIN. CLEARANCE. • PLACE LIFT HOLES OR PINS IN ACCORDANCE WITH OSHA STANDARD 1926.704. • PIPE TO BE GROUTED INTO HEADWALL AT JOB SITE BY CONTRACTOR • ALL ELEMENTS PRECAST TO MEET ASTM C913. • WELDED WIRE FABRIC MAY BE SUBSTITUTED FOR REBAR AS LONG AS THE SAME AREA OF STEEL IS PROVIDED. • CHAMFER ALL CORNERS 1" OR HAVE A RADIUS OF 1". NOTE: THE MINIMUM BAR SIZE SHALL BE #5 BARS AT 8" CTS.THE CONTRACTOR WILL HAVE THE OPTION TO INCREASE THIS BAR SIZE AS NEEDED. ENDWALL DIMENSIONS FT. MINIMUM MIN./MAX. MIN./MAX. MIN./MAX. MIN./MAX. MIN./MAX. PIPE DIA. BAR SIZE H1(FT.) H2(FT.) D (FT.) W1 W2 1.0 #5 @ 8" 1.25/2.00 2.00/3.75 1.25/1.75 3.00/3.75 5.50/6.00 1.25 1 #5 @ 8" 1.25/2.00 3.00/3.75 1.25/2.00 3.50/3.75 6.50/6.75 1.50 #5 @ 8" 1.25/2.00 3.00/4.25 1.50/2.50 3.50/3.75 6.50/6.75 2.0 #5 @ 8" 1.50/2.50 4.00/4.75 1.75/2.50 4.00/4.25 7.50/8.25 2.5 #5 @ 8" 2.50/3.50 4.00/6.00 2.00/3.00 4.50/5.50 10.00/11.50 3.0 #5 @ 8" 3.00/3.50 5.00/6.00 2.75/3.50 5.25/5.75 11.50/11.75 3.5 #5 @ 8" 3.25/4.50 6.00/6.75 3.25/3.50 6.00/6.75 12.00/13.25 4.0 #5 @ 8" 3.50/4.50 6.50/7.00 3.25/3.50 6.50/6.75 13.00/13.25 4.5 #5 @ 8" 4.00/5.00 6.50/8.50 3.25/4.00 7.00/9.25 13.50/15.75 5.0 #5 @ 8" 4.50/5.00 7.00/8.50 3.25/4.00 7.25/9.25 13.75/15.75 5.5 #5 @ 8" 4.50/5.00 7.50/8.50 3.25/4.00 7.25/9.25 14.00/15.75 6.0 #5 @ 8" 4.50/5.00 7.50/8.50 3.25/4.00 7.75/9.25 14.75/16.75 NOTES: 1. CLASS OR MEDIAN SIZE OF RIPRAP AND LENGTH, WIDTH AND DEPTH OF APRON TO BE DESIGNED BY THE ENGINEER. 2. REFER TO THE CHARLOTTE MECKLENBURG STORM WATER DESIGN MANUAL FOR RIPRAP APRON DESIGN STANDARDS. 3. RIPRAP SHOULD EXTEND UP BOTH SIDES OF THE APRON AND AROUND THE END OF THE PIPE OR CULVERT AT THE DISCHARGE OUTLET AT A MAXIMUM SLOPE OF 2:1 AND A HEIGHT NOT LESS THAN TWO THIRDS THE PIPE DIAMETER OR CULVERT HEIGHT. 4. THERE SHALL BE NO OVERFLOW FROM THE END OF THE APRON TO THE SURFACE OF THE RECEIVING CHANNEL. THE AREA TO BE PAVED OR RIPRAPPED SHALL BE UNDERCUT SO THAT THE INVERT OF THE APRON SHALL BE AT THE SAME GRADE (FLUSH) WITH THE SURFACE OF THE RECEIVING CHANNEL. THE APRON SHALL HAVE A CUTOFF OR TOE WALL AT THE DOWNSTREAM END. 5. THE WIDTH OF THE END OF THE APRON SHALL BE EQUAL TO THE BOTTOM WIDTH OF THE RECEIVING CHANNEL. MAXIMUM TAPER TO RECEIVING CHANNEL 5:1 6. ALL SUBGRADE FOR STRUCTURE TO BE COMPACTED TO 95% OR GREATER. 7. THE PLACING OF FILL, EITHER LOOSE OR COMPACTED IN THE RECEIVING CHANNEL SHALL NOT BE ALLOWED. 8. NO BENDS OR CURVES IN THE HORIZONTAL ALIGNMENT OF THE APRON WILL BE PERMITTED. 9. FILTER FABRIC SHALL BE INSTALLED ON COMPACTED SUBGRADE PRIOR TO PLACEMENT OF RIP RAP. 10. ANY DISTURBED AREA FROM END OF APRON TO RECIEVING CHANNEL MUST BE STABILIZED. USE USDA NOMOGRAPH FROM NC SEDIMENT AND EROSION CONTROL MANUAL OR CHARLOTTE MECKLENBURG STORM WATER DESIGN MANUAL FOR DESIGN DATA. OUTLET La W1 W2 *T H * d50 (see fig 8.06 a&b "NC SEDIMENT AND EROSION CONTROL MANUAL" dmax = 1.5 x d50 T = 1.5 X dmax. T(min.)=10" NATURAL W2 END OF FLARED SECTION PLAN ELEVATION MINIMUM H=2/3 PIPE DIAMETER SECTION B-B RIPRAP APRON AT PIPE OUTHALLS OTHER THAN AT SWIM (IF NEEDED) THICKNESS)=10" MIN. d IN. Z O � Q Q IZ-I00() ILL J0-HZ 0 0 cl)cc 2-7 _ LU<<LL2 Q�o� F-=~ZW CnHLLOJ OOCnM Z H H 1Lu w J Y OJ U) IL 0 30) H Z Q W CL o W o W N O V cr zQ Z O ~ V= N r aC5 z O W " 13. Cc: O ILL (M 00 z (D U O N N M J c M CD z 00 �� z�N 0_ ® 06 W off$ `1 oW O(DU)x zzm _ Lu U �VLU 0- W J LU o =z M (� X Uw O a w m m O z V) '' i--r-1 w � 0 w Wiz U Q avo o�Q U P4 _ Z Qp� LD �Zo F Z U) zOZ O U w �P4 Lu a F-' O J J W m cc O C CVO m O 00 m p O N m J z LU U m � 1 W Q w J O O N m Q � O T N U D m r Wz � o 0 O w J m p � ud z Z w W p J U m HEET C1200 CL 0 n 0 i 0 N U 0 1 rl 0 c (n a .,�, .c CL 11 0 z i n U 6 a oi m U Q 0 m U w Q k IT a CL J 0 0 U 6 w a w k 0 0 I- 0 I. MISCELLANEOUS CURRENT EDITIONS OF THE NORTH CAROLINA DOT ROADWAY STANDARD DRAWINGS AND V. PAVING AND GRADING ALL DELETERIOUS SUBSURFACE MATERIAL (I.E. MUCK, PEAT, BURIED DEBRIS) IS TO BE NPDES NOTE: A. A. SPECIFICATIONS MANUAL SHALL BE CONSIDERED PART OF THESE PLANS. EXCAVATED IN ACCORDANCE WITH THESE PLANS OR AS DIRECTED BY THE OWNER, THE REGULATIONS ADOPTED BY THE US ENVIRONMENTAL PROTECTION AGENCY (US EPA) AND BY B. THE CONTRACTOR SHALL BECOME FAMILIAR WITH THE PERMIT AND INSPECTION OWNER'S ENGINEER, OR OWNER'S SOIL TESTING COMPANY. DELETERIOUS MATERIAL IS TO THE NORTH CAROLINA DIVISION OF WATER QUALITY REQUIRE THAT A NATURAL POLLUTANT REQUIREMENTS SPECIFIED BY THE VARIOUS GOVERNMENTAL AGENCIES THE ENGINEER, BE STOCKPILED OR REMOVED FROM THE SITE AS DIRECTED BY THE OWNER OR THE DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT BE OBTAINED FOR STORM WATER AND THE ARCHITECT. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS PRIOR OWNER'S ENGINEER. EXCAVATED AREAS TO BE BACKFILLED WITH APPROVED MATERIALS DISCHARGES FROM CONSTRUCTION ACTIVITIES WITH LAND DISTURBANCE OF 1 ACRE OR MORE. TO CONSTRUCTION, AND SHALL SCHEDULE ANY NECESSARY INSPECTIONS ACCORDING TO AND COMPACTED AS SHOWN ON THESE PLANS. CONTRACTOR IS RESPONSIBLE FOR AGENCY INSTRUCTIONS. ACQUIRING ANY PERMITS THAT ARE NECESSARY FOR REMOVING DELETERIOUS MATERIAL CONTRACTOR SHALL CHECK EROSION CONTROL MEASURES WEEKLY AND/OR AFTER A 1/2" C. ALL SPECIFICATIONS AND DOCUMENTS REFERRED TO IN THESE PLANS SHALL BE OF THE FROM THE SITE. OR MORE RAIN. CONTRACTOR SHALL KEEP RECORDS OF EVERY INSPECTION. LATEST REVISION. B. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING EXCAVATIONS AGAINST D. ALL WORK PERFORMED SHALL COMPLY WITH THE REGULATIONS AND ORDINANCES OF THE COLLAPSE AND WILL PROVIDE BRACING, SHEETING OR SHORING AS NECESSARY. EROSION CONTROL NOTES: VARIOUS GOVERNMENTAL AGENCIES HAVING JURISDICTION OVER THE WORK. DEWATERING METHODS SHALL BE USED AS REQUIRED TO KEEP TRENCHES DRY WHILE 1. CONTRACTOR SHALL STABILIZE EXPOSED GROUND AS SOON AS INDIVIDUAL AREAS ARE E. WORK PERFORMED UNDER THIS CONTRACT SHALL INTERFACE SMOOTHLY WITH OTHER PIPE AND APPURTENANCES ARE BEING PLACED. COMPLETED. WORK BEING PERFORMED ON SITE BY OTHER CONTRACTORS AND UTILITY COMPANIES. THE C. ALL NECESSARY FILL AND EMBANKMENT THAT IS PLACED DURING CONSTRUCTION SHALL CONTRACTOR SHALL COORDINATE AND SCHEDULE HIS ACTIVITIES, WHERE NECESSARY, CONSIST OF MATERIAL SPECIFIED BY THE OWNER'S SOIL TESTING COMPANY OR ENGINEER 2. CONTRACTOR SHALL NOT REMOVE ANY BASIN UNTIL ALL SEDIMENT -PRODUCING AREAS WITH OTHER CONTRACTORS AND UTILITY COMPANIES. AND BE PLACED AND COMPACTED ACCORDING TO THESE PLANS OR THE REFERENCED UPSTREAM HAVE BEEN PERMANENTLY STABILIZED AND REMOVAL IS APPROVED BY F. THE WATER AND SANITARY SEWER FACILITIES ARE SUBJECT TO REVIEW BY THE TOWN OF SOILS REPORT. EROSION CONTROL COORDINATOR. HOKE PUBLIC WORKS AND APPROVAL. STORM DRAINAGE FACILITIES ARE SUBJECT TO THE D. PROPOSED SPOT ELEVATIONS REPRESENT FINISHED PAVEMENT OR GROUND SURFACE REVIEW AND APPROVAL OF THE TOWN OF HOKE AND IT SHALL BE THE RESPONSIBILITY GRADE UNLESS OTHERWISE NOTED ON DRAWINGS. 3. STABILIZATION IS THE BEST FORM OF EROSION CONTROL. TEMPORARY SEEDING IS OF THE CONTRACTOR TO OBTAIN THE REQUIRED PERMITS TO PERFORM WORK IN THE E. CONTRACTOR SHALL PROVIDE EROSION CONTROL AND SEDIMENTATION BARRIER (SILT NECESSARY TO ACHIEVE EROSION CONTROL ON LARGE DENUDED AREAS AND ESPECIALLY PUBLIC RIGHT-OF-WAY. WHEN SPECIFICALLY REQUIRED AS PART OF THE CONSTRUCTION SEQUENCE SHOWN ON G. GRADING OFF SITE WILL REQUIRE A LETTER OF PERMISSION FROM THE OWNER PRIOR TO FENCE OR OTHER MEASURES TO PREVENT SILTATION OF ADJACENT PROPERTY, STREETS, THE PLAN. ALL GRADED SLOPES MUST BE SEEDED AND MULCHED WITHIN 7 TO 14 ANY LAND DISTURBING ACTIVITIES. STORM SEWERS AND WATERWAYS. CALENDAR DAYS (7 CALENDAR DAYS FOR SLOPES STEEPER THAN 3:1). H. ALL CONSTRUCTION SHALL COMPLY WITH THE LATEST EDITION OF THE TOWN OF HOKE F F. IF WIND EROSION BECOMES SIGNIFICANT DURING CONSTRUCTION, THE CONTRACTOR SHALL UDO STANDARDS. STABILIZE THE AFFECTED AREA USING SPRINKLING, IRRIGATION OR OTHER ACCEPTABLE 4. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY I. THE TOWN OF HOKE RESERVES THE RIGHT TO INSPECT ALL CONSTRUCTION WITHIN THE METHODS. LOCAL AUTHORITY. PUBLIC RIGHT-OF-WAY, PUBLIC STORM DRAIN EASEMENTS, DETENTION AND WATER G. A A THE CONTRACTOR WILL STABILIZE BY SEED AND MULCH, SOD OR OTHER APPROVED QUALITY BMP'S. THE TOWN HAS THE ABILITY TO APPROVE OR REJECT ANY WORK MATERIALS AS REQUIRED ANY DISTURBED AREAS WITHIN ONE WEEK FOLLOWING 5. NO SLOPES SHALL EXCEED 2:1. FILL SLOPES GREATER THAN 10' REQUIRE ADEQUATE COMPLETED OR ONGOING BY THE CONTRACTOR AT THE DEVELOPER'S EXPENSE. CONSTRUCTION OF THE UTILITY SYSTEMS AND PAVEMENT AREAS. CONTRACTOR SHALL TERRACING. MAINTAIN SUCH AREAS UNTIL FINAL ACCEPTANCE BY OWNER. H. ENGINEERED FILL MATERIAL SHALL NOT CONTAIN ROCKS OR HARD LUMPS GREATER THAN II, SAFETY 3 INCHES IN MAXIMUM DIMENSIONS AND SHALL BE FREE OF VEGETATION, ORGANIC 6. GROUNDCOVER ON EXPOSED SLOPES SHOULD BE COMPLETED WITHIN 14 CALENDAR DAYS. A. DURING THE CONSTRUCTION AND MAINTENANCE OF THIS PROJECT, ALL SAFETY MATTER, DEBRIS, RUBBLE, AND OTHER UNSUITABLE MATERIALS. SHALL BE 7. ALL SILT FENCE SHALL HAVE WIRE AND WASHED STONE. NON -EXPANSIVE MATERIALS REGULATIONS SHALL BE ENFORCED. THE CONTRACTOR OR HIS REPRESENTATIVE I. IMPORTED SOILS FOR USE AS ENGINEERED FILL AND SHALL NOT CONTAIN ROCKS OR SHALL BE RESPONSIBLE FOR THE CONTROL AND SAFETY OF THE TRAVELING PUBLIC HARD LUMPS GREATER THAN 3 INCHES IN MAXIMUM DIMENSIONS AND SHALL BE FREE OF 8. A OUTLET PROTECTION SHALL BE PLACED TEMPORALLY AT THE END OF ALL FES UNTIL AND THE SAFETY OF HIS PERSONNEL. VEGETATION, ORGANIC MATTER, DEBRIS, RUBBLE, AND OTHER UNSUITABLE MATERIALS. RIP RAP APRONS ARE INSTALLED. B. THE CONTRACTOR'S MAINTENANCE OF TRAFFIC PLAN MUST BE SUBMITTED AND J. AGGREGATE BASE MATERIAL SHALL MEET THE FOLLOWING GRADATION REQUIREMENTS. APPROVED BY THE TOWN OF HOKE AND CHICORA PLLC ENGINEERING PRIOR TO 9 ANY GRADING BEYOND THE DENUDED LIMITS SHOWN ON THE PLAN IS A VIOLATION OF BEGINNING ANY CONSTRUCTION ACTIVITIES. SEIVE SIZE (PER ASTM D422) % PASSING BY WEIGHT THE CITY/COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. C. LABOR SAFETY REGULATIONS SHALL CONFORM TO THE PROVISIONS SET FORTH BY 1 INCH 100 10. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A OSHA IN THE FEDERAL REGISTER OF THE DEPARTMENT OF TRANSPORTATION. 1" 90 - 100 VIOLATION OF NC LAW AND IS SUBJECT TO A FINE. D. CONTRACTOR SHALL PROVIDE AND MAINTAIN HIS OWN SAFETY EQUIPMENT IN NO. 8 ACCORDANCE WITH HIS HEALTH & SAFETY PROGRAM AND ALL OTHER APPLICABLE NO. 200 0 - 8 11. A GRADING PLAN MUST BE SUBMITTED FOR ANY LOT GRADING THAT WAS NOT LEGAL AND HEALTH AND SAFETY REQUIREMENTS. THE CONTRACTOR IS ALSO PREVIOUSLY APPROVED. K. ALL AREAS TO RECEIVE FILL, AND AREAS OF STRUCTURES AND PAVEMENTS, SHALL BE RESPONSIBLE FOR PROVIDING ITS EMPLOYEES AND SUB CONTRACTORS WITH STRIPPED OF VEGETATION, ORGANIC MATTER, DEBRIS, RUBBLE, AND OTHER UNSUITABLE ADEQUATE INFORMATION AND TRAINING TO ENSURE THAT ALL EMPLOYEES AND SUB MATERIALS. STRIPPED SOILS SHALL NOT BE USED IN ENGINEERED FILL, BUT MAY BE 12. APPROVAL OF THIS PLAN IS NOT AN AUTHORIZATION TO GRADE ADJACENT PROPERTIES. CONTRACTORS AND SUB CONTRACTOR'S EMPLOYEES COMPLY WITH ALL APPLICABLE USED IN LANDSCAPE AREAS. ENGINEERED FILL MATERIAL SHALL BE COMPACTED TO AT WHEN FIELD CONDITIONS WARRANT OFF -SITE GRADING, PERMISSION MUST BE OBTAINED FROM AFFECTED PROPERTY OWNERS. REQUIREMENTS. CONTRACTOR SHALL REMAIN IN COMPLIANCE WITH ALL OCCUPATION LEAST THE FOLLOWING SAFETY AND HEALTH REGULATIONS AS WELL AS THE ENVIRONMENTAL PROTECTION 13. ALL STD. NUMBERS REFER TO THE NCDENR STANDARDS MANUAL UNLESS OTHERWISE LAWS. THE FOLLOWING IS NOT TO BE PERCEIVED AS THE ENTIRE SAFETY PROGRAM * PERCENTAGES OF MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT, PER ASTM NOTED. BUT JUST BASIC REQUIREMENTS. D-698 (STANDARD PROCTOR): E. ALL EXCAVATIONS BY THE CONTRACTOR SHALL CONFORM TO THE REQUIREMENTS 14. STEEL POST WITH WIRE FENCE BACKING SHOULD BE USED INSTEAD OF WOODEN POST, OF THE DEPARTMENT OF LABOR'S OCCUPATIONAL SAFETY AND HEALTH ENGINEERED FILL MINIMUM % MOISTURE CONTENT BURIED OR DRIVEN TO A DEPTH OF 18" IN THE GROUND. PREFABRICATED SILT FENCE IS ADMINISTRATION RULES AND REGULATIONS PARTICULAR ATTENTION MUST BE PAID MATERIAL COMPACTION RANGE NOT ACCEPTABLE ON THIS PROJECT. NATIVE SOIL 92% OPTIMUM TO OPTIMUM PLUS 3% TO THE CONSTRUCTION STANDARDS FOR EXCAVATIONS, 29 CFR PART 1926, SUBPART P. ENGINEERED FILL UNDER STRUCTURES 98% OPTIMUM TO OPTIMUM PLUS 3% 15. SEDIMENT TRAP AND BASINS SLOPES SHALL SEEDED IMMEDIATE AFTER CONSTRUCTION F. THE MINIMUM STANDARDS AS SET FORTH IN THE CURRENT EDITION OF "MANUAL ON AND BEHIND RETAINING WALLS O TO PROMOTE STABLE SLOPES AS SOON AS POSSIBLE. UNIFORM TRAFFIC CONTROL DEVICES" (U.S. DOT) SHALL BE FOLLOWED IN THE 16. WHERE TEMPORARY DIVERSIONS ENTER SEDIMENT TRAPS AND BASINS, TEMPORARY SLOPE DESIGN APPLICATION, INSTALLATION, MAINTENANCE AND REMOVAL OF ALL TRAFFIC ENGINEERED FILL UNDER 95% OPTIMUM PLUS OR MINUS 2% DRAINS MAY BE NECESSARY BASED ON FIELD CONDITIONS. CONTROL DEVICES, WARNING DEVICES AND BARRIERS NECESSARY TO PROTECT THE PAVEMENT AREAS PUBLIC AND WORKMEN FROM HAZARDS WITHIN THE PROJECT LIMITS. FILL IN LANDSCAPE AREAS 92% 2 TO 5% ABOVE OPTIMUM G. ALL TRAFFIC CONTROL MARKINGS AND DEVICES SHALL CONFORM TO THE PROVISIONS SET FORTH IN THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES AGGREGATE BASE MATERIAL OR IMPORTED GRANULAR SOIL IN BUILDING AND PAVED AREAS PREPARED BY THE U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY SHALL BE COMPACTED TO AT LEAST THE FOLLOWING PERCENTAGES OF MAXIMUM DRY MAINTENANCE PLAN: ADMINISTRATION. DENSITY AND OPTIMUM MOISTURE CONTENT, PER ASTM D-698 MODIFIED OR AASHTO 1. FOR THE TEMPORARY CONSTRUCTION ENTRANCE; MAINTAIN THE GRAVEL PAD IN A H. IT SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO COMPLY AND EQUIVALENT. CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE SITE. THIS MAY REQUIRE ENFORCE ALL APPLICABLE SAFETY REGULATIONS. THE ABOVE INFORMATION HAS PERIODIC TOPDRESSING WITH 2-INCH STONE. AFTER EACH RAINFALL, INSPECT ANY BEEN PROVIDED FOR THE CONTRACTOR'S INFORMATION ONLY AND DOES NOT IMPLY MATERIAL COMPACTION RANGE STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY AGGREGATE BASE MATERIAL OR 98% OPTIMUM PLUS OR MINUS 2% REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED OR TRACKED ONTO PUBLIC THAT THE OWNER OR ENGINEER WILL INSPECT AND/OR ENFORCE SAFETY IMPORTED GRANULAR SOIL IN BUILDING ROADWAYS. REGULATIONS. AND PAVEMENT AREAS 2. INSPECT SKIMMER SEDIMENT BASINS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT I. THE CONTRACTOR SHALL EXERCISE EXTREME CAUTION IN AREAS OF BURIED (1/2 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. REMOVE SEDIMENT UTILITIES AND SHALL PROVIDE AT LEAST 48 HOURS NOTICE TO THE UTILITY AND RESTORE THE BASIN TO ITS ORIGINAL DIMENSIONS WHEN IT ACCUMULATES TO COMPANIES PRIOR TO CONSTRUCTION TO OBTAIN FIELD LOCATIONS OF EXISTING L. IF SUB GRADE SOILS EXHIBIT PUMPING DURING COMPACTION, THE AREA SHALL BE ONE-HALF THE HEIGHT OF THE FIRST BAFFLE. PULL THE SKIMMER TO ONE SIDE SO THAT UNDERGROUND UTILITIES. ALLOWED TO DRY UNTIL THE SOILS BECOME WORKABLE WITHOUT PUMPING. THE THE SEDIMENT UNDERNEATH CAN BE EXCAVATED. EXCAVATE THE SEDIMENT FROM THE J. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE TO EXISTING MOISTURE CONTENT OF THE SOILS SHALL BE ADJUSTED TO PREVENT PUMPING. ENTIRE BASIN, NOT JUST AROUND THE SKIMMER OR THE FIRST CELL. MAKE SURE FACILITIES, ABOVE OR BELOW GROUND, THAT MAY OCCUR AS A RESULT OF THE M. EXPOSURE TO THE ENVIRONMENT MAY REDUCE THE STRENGTH OF SOILS IN FOOTING, VEGETATION GROWING IN THE BOTTOM OF THE BASIN DOES NOT HOLD DOW THE SKIMMER. FLOOR SLAB, AND PAVED AREAS. IF THIS OCCURS, THE SOFTENED SOILS SHALL BE PLACE REMOVED SEDIMENT IN AN AREA WITH SEDIMENT CONTROLS. WORK PERFORMED BY THE CONTRACTOR CALLED FOR IN THIS CONTRACT. REMOVED AND REWORKED IMMEDIATELY PRIOR TO CONCRETE PLACEMENT. IF RAINFALL IS 3. REPAIR BAFFLES IF THEY ARE DAMAGED. RE -ANCHOR THE BAFFLES IF WATER IS FLOWING K. ALL UNDERGROUND UTILITIES MUST BE IN PLACE AND TESTED OR INSPECTED PRIOR EXPECTED AT A TIME WHEN BEARING SOILS IN FOOTING AREAS ARE EXPOSED, A 2 TO 4 UNDERNEATH OR AROUND THEM. TO BASE AND PAVEMENT CONSTRUCTION. INCH THICK LAYER OF LEAN CONCRETE MAY BE PLACED IN SUCH AREAS. THE SITE 4. IF THE SKIMMER IS CLOGGED WITH TRASH AND THERE IS WATER IN THE BASIN, USUALLY SHALL BE GRADED TO TRANSPORT SURFACE RUNOFF AWAY FROM THE STRUCTURES AND JERKING ON THE ROPE WILL MAKE THE SKIMMER BOB UP AND DOWN AND DISLODGE THE III, SITE PLAN AND COORDINATE GEOMETRY PAVED AREAS. WATER SHALL NOT BE ALLOWED TO ACCUMULATE (POND) AROUND DEBRIS AND RESTORE FLOW. IF THIS DOES NOT WORK, PULL THE SKIMMER OVER TO THE A. PRELIMINARY ARCHITECTURAL BUILDING AND PLUMBING PLANS BEEN HAVE NOT BUILDING PERIMETERS OR ON PAVED AREAS. SIDE OF THE BASIN AND REMOVE THE DEBRIS. ALSO CHECK THE ORIFICE INSIDE THE RECEIVED BY CHICORA, PLLC N. GENERAL ROCK EXCAVATION: ROCK SHALL BE DEFINED AS ANY MATERIAL WHICH SKIMMER TO SEE IF IT IS CLOGGED; IF SO REMOVE THE DEBRIS. B. SITE PLAN PREPARED BY CHICORA PLLC. CANNOT BE EXCAVATED WITH A SINGLE TOOTH RIPPER DRAWN BY A CRAWLER 5. IF THE SKIMMER ARM OR BARREL PIPE IS CLOGGED, THE ORIFICE CAN BE REMOVED AND C. STRUCTURAL PLANS HAVE NOT BEEN RECEIVED BY CHICORA PLLCI. TRACTOR HAVING A MINIMUM DRAW BAR PULL RATED AT NOT LESS THAN 56,000 THE OBSTRUCTION CLEARED WITH A PLUMBER'S SNAKE OR BY FLUSHING WITH WATER. BE D. ELECTRICAL, MECHANICAL, AND FIRE SAFETY PLANS HAVE NOT BEEN RECEIVED BY POUNDS (CATERPILLAR D8K OR EQUIVALENT). THE VOLUME OF ROCK EXCAVATION SHALL SURE AND REPLACE THE ORIFICE BEFORE REPOSITIONING THE SKIMMER. CHICORA PLLC. BE DETERMINED BY A LICENSED SURVEYOR BY THE AVERAGE END AREA METHOD. THE 6. CHECK THE FABRIC SPILLWAY FOR DAMAGE AND MAKE ANY REQUIRED REPAIRS WITH CONTRACTOR SHALL SUBMIT TO THE ENGINEER A SCALED PLAN WITH SUFFICIENT FABRIC THAT SPANS THE FULL WIDTH OF THE SPILLWAY. CHECK THE EMBANKMENT, E. BOUNDARY SURVEY & TOPOGRAPHIC SURVEY PREPARED BY ELEVATION POINTS TO ACCURATELY DEFINE THE VOLUME OF ROCK EXCAVATED. THE SPILLWAYS AND OUTLET FOR EROSION DAMAGE AND INSPECT THE EMBANKMENT FOR F. ALL POINTS AND MONUMENTS SHALL BE SURVEYED UPON MOBILIZATION TO VERIFY DEPTH OF ROCK SHALL BE DEFINED AS FROM TOP OF ROCK TO THE CONTRACT PIPING SETTLEMENT. MAKE ALL NECESSARY REPAIRS IMMEDIATELY. REMOVE ALL TRASH THEIR ACCURACY. ANY DISCREPANCIES DISCOVERED MUST BE BROUGHT TO THE SPECIFIED ELEVATION FOR EXCAVATION. CONTRACTOR SHALL BE COMPENSATED FOR ROCK AND OTHER DEBRIS FROM THE RISER AND POOL AREA. ATTENTION OF THE ENGINEER IN WRITING. EXCAVATION AS DEFINED HEREIN IN ACCORDANCE WITH CONTRACT UNIT PRICES. 7. FREEZING WEATHER CAN RESULT IN ICE FORMING IN THE BASIN . SOME SPECIAL G. MONUMENTS AND OTHER SURVEY CONTROL POINTS SHALL BE PROTECTED FROM PRECAUTIONS SHOULD BE TAKEN IN THE WINTER TO PREVENT THE SKIMMER FROM DAMAGE AND DISTURBANCE. IF ANY CONTROL POINTS ARE DAMAGED OR VI. DRAINAGE: PLUGGING WITH ICE. DISTURBED, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE A. ALL STORM SEWER PIPE SHALL BE REINFORCED CONCRETE PIPE UNLESS OTHERWISE 8. FOR RIPRAP CHANNELS; INSPECT CHANNELS AT REGULAR INTERVALS AS WELL AS AFTER ENGINEER AND REPLACE THE CONTROL POINTS TO THEIR ORIGINAL CONDITION AT NOTED ON PLANS. ALL DRAINAGE STRUCTURES SHALL BE IN ACCORDANCE WITH NCDOT MAJOR RAINS AND REPAIRS PROMPTLY. GIVE SPECIAL ATTENTION TO THE OUTLET AND HIS OWN EXPENSE. STANDARDS UNLESS OTHERWISE NOTED. INLET SECTIONS AND OTHER POINTS WHERE CONCENTRATED FLOW ENTERS. CAREFULLY CHECK STABILITY AT ROAD CROSSINGS AND LOOK FOR INDICATIONS OF PIPING, SCOUR H. ALL ELEVATIONS REFER TO THE NATIONAL GEODETIC VERTICAL DATUM. B, PIPE LENGTHS SHOWN ARE APPROXIMATE AND TO CENTER OF DRAINAGE STRUCTURE OR HOLES OR BANK FAILURES. MAINTAIN ALL VEGETATION ADJACENT TO THE CHANNEL IN A L LOCATIONS, ELEVATIONS, AND DIMENSIONS OF EXISTING UTILITIES, STRUCTURES AND TO THE END OF THE PIPE. CONTRACTOR SHALL VERIFY ALL QUANTITIES PRIOR TO HEALTHY VIGOROUS CONDITION TO PROTECT THE AREA FROM EROSION AND SCOUR OTHER FEATURES ARE SHOWN ACCORDING TO THE BEST INFORMATION AVAILABLE SUBMITTAL OF BID. DURING OUT -OF -BANK FLOW. AT THE TIME OF PREPARATION OF THESE PLANS. THE CONTRACTOR SHALL VERIFY 9. INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE THE LOCATIONS, ELEVATIONS AND DIMENSIONS OF ALL EXISTING UTILITIES, C. ALL DRAINAGE STRUCTURE GRATES AND COVERS SHALL BE AS PER NCDOT STANDARDS ANY REQUIRED REPAIRS IMMEDIATELY. STRUCTURES AND OTHER FEATURES AFFECTING THIS WORK PRIOR TO UNLESS OTHERWISE NOTED. 10. SHOULD THE FABRIC OF THE SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME CONSTRUCTION. INEFFECTIVE, REPLACE IT PROMPTLY. J. UPON COMPLETION OF CONSTRUCTION, THE CONTRACTOR SHALL FURNISH OWNER'S D. ALL STORM DRAINAGE PIPING SHALL BE SUBJECT TO A VISUAL INSPECTION BY THE 11. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME ENGINEER WITH COMPLETE "AS -BUILT" INFORMATION CERTIFIED BY A REGISTERED OWNER'S ENGINEER PRIOR TO THE PLACEMENT OF BACKFILL. CONTRACTOR TO NOTIFY THE FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID ENGINEER 48 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS. UNDERMINING THE FENCE DURING CLEANOUT. LAND SURVEYOR. THIS "AS -BUILT INFORMATION SHALL BE PRODUCED ON AUTOCAD 12. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE VERSION 12, OR LATER, AND UPON COMPLETION, THE CONTRACTOR SHALL E. THE CONTRACTOR SHALL MAINTAIN AND PROTECT FROM MUD, DIRT, DEBRIS, ETC. THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN FURNISH CHICORA PLLC ENGINEERING WITH DISKS OF ALL DRAWINGS, ONE SET OF STORM DRAINAGE SYSTEM UNTIL FINAL ACCEPTANCE OF THE PROJECT. THE CONTRACTOR PROPERLY STABILIZED. REPRODUCIBLE MYLARS, AND FIVE SETS OF BLUEPRINTS. THE "AS -BUILT" MAY BE REQUIRED TO RECLEAN PIPES AND INLETS FOR THESE PURPOSES. 13. INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL. INFORMATION SHALL CLEARLY AND ACCURATELY REPRESENT ALL CONSTRUCTED IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE ITEMS INCLUDING, BUT NOT LIMITED T0: AREA PROTECTED IS PERMANENTL STABILIZED, REMOVE THE RIDGE AND CHANNEL TO 1. ELEVATIONS OF ALL STORM SEWER AND SANITARY SEWER STRUCTURE BOTTOMS, VII. EROSION/TURBIDITY CONTROL BLEND WITH NATURAL GROUND LEVEL AND APPROPRIATELY STABILIZE IT. TOPS, AND INVERTS. A. THE INSTALLATION OF TEMPORARY EROSION CONTROL BARRIERS SHALL BE COORDINATED 14. INSPECT CHECK DAMS AND CHANNELS AT LEAST WEEKLY AND AFTER EVERY SIGNIFICANT 2. FIELD MEASURED LENGTHS OF PIPES FOR ALL INSTALLED UTILITIES, CONDUITS, WITH THE CONSTRUCTION OF THE PERMANENT EROSION CONTROL FEATURES TO THE (1/2-INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. CLEAN OUT SLEEVES, ETC. EXTENT NECESSARY TO ASSURE ECONOMICAL, EFFECTIVE AND CONTINUOUS CONTROL OF SEDIMENT, STRAW, LIMBS OR OTHER DEBRIS THAT COULD CLOG THE CHANNEL WHEN 3. LOCATIONS OF ALL STRUCTURES, PIPES, CONDUITS, SLEEVES, ETC. EROSION AND WATER POLLUTION THROUGHOUT THE LIFE OF THE CONSTRUCTION PHASE. NEEDED. 4. CALCULATED SLOPE OF ALL SANITARY SEWER AND STORM SEWER LINES. B. THE TYPE OF EROSION CONTROL BARRIERS USED SHALL BE GOVERNED BY THE NATURE 15. ANTICIPATE SUBMERGENCE AND DEPOSITION ABOVE THE CHECK DAM AND EROSION FROM 5. HORIZONTAL AND VERTICAL CONTROL OF ALL WATER MAIN FITTINGS AND OF THE CONSTRUCTION OPERATION AND SOIL TYPE THAT WILL BE EXPOSED. SILTY HIGH FLOWS AROUND THE EDGES OF THE DAM. CORRECT ALL DAMAGES IMMEDIATELY. IF APPURTENANCES, AND HORIZONTAL AND VERTICAL CONTROL ON THE TOP OF AND CLAYEY MATERIAL USUALLY REQUIRE SOLID SEDIMENT BARRIERS TO PREVENT SIGNIFICANT EROSION OCCURS BETWEEN THE DAMS ADDITIONAL MEASURES CAN BE TAKEN TURBID WATER DISCHARGE, WHILE SANDY MATERIAL MAY NEED ONLY SILT SILT FENCE TO SUCH AS INSTALLING A PROTECTIVE RIP RAP LINER IN THAT PORTION OF THE CHANNEL. WATER MAINS AT ALL CROSSINGS, AND A MINIMUM OF EVERY 200 LINEAR FEET PREVENT EROSION. FLOATING TURBIDITY CURTAINS SHALL BE USED IN OPEN WATER 16. REMOVE SEDIMENT ACCUMULATED BEHIND THE DAMS AS NEEDED TO PREVENT DAMAGE OF PIPE. SITUATIONS. DIVERSION DITCHES OR SWALES MAY BE REQUIRED TO PREVENT TURBID TO CHANNEL VEGETATION, ALLOW THE CHANNEL TO DRAIN THROUGH THE STONE CHECK 6. HORIZONTAL AND VERTICAL CONTROL OF ALL TOP OF BANKS, TOE OF SLOPES, STORM WATER RUNOFF FROM BEING DISCHARGED TO WETLANDS OR OTHER WATER DAM, AND PREVENT LARGE FLOWS FROM CARRYING SEDIMENT OVER THE DAM. ADD ALL GRADE BREAKS, BUILDINGS, PONDS, ETC. BODIES. IT MAY BE NECESSARY TO EMPLOY A COMBINATION OF BARRIERS, DITCHES AND STONES TO DAM AS NEEDED TO MAINTAIN DESIGN HEIGHT AND CROSS SECTION. K. ALL DIMENSIONS SHOWN ON PLAN ARE TO FACE OF BUILDING, EDGE OF PAVEMENT, OTHER EROSION/TURBIDITY CONTROL MEASURES IF CONDITIONS WARRANT. CENTERLINE OF STRUCTURE, OR END OF PIPE UNLESS NOTED OTHERWISE. C. CONSTRUCTION OPERATIONS IN OR ADJACENT TO WETLANDS SHALL BE RESTRICTED TO THOSE AREAS IDENTIFIED IN THE PLANS AND IN THE SPECIFICATIONS. D. EXCEPT AS NECESSARY FOR CONSTRUCTION, EXCAVATED MATERIAL SHALL NOT BE DEPOSITED IN WETLANDS OR IN A POSITION CLOSE ENOUGH THERETO TO BE WASHED G.S. 113A-57(2), THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO IV, CLEARING,MEMOLITION AWAY BY HIGH WATER OR RUNOFF. GREATER THAN THE ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR A. THE CONTRACTOR SHALL CLEAR AND GRUB ONLY THOSE PORTIONS OF THE SITE E. THE CONTRACTOR SHALL SCHEDULE HIS OPERATIONS SUCH THAT THE AREA OF OTHER ADEQUATE EROSION -CONTROL DEVISES OR STRUCTURES. IN ANY EVENT, NECESSARY FOR CONSTRUCTION. DISTURBED AREAS WILL BE SEEDED, MULCHED, UNPROTECTED ERODIBLE EARTH EXPOSED AT ANY ONE TIME IS NOT LARGER THAN THE SLOPES LEFT EXPOSED SHALL, WITHIN 7 TO 14 CALENDAR DAYS OF COMPLETION OF SODDED OR PLANTED WITH OTHER APPROVED LANDSCAPE MATERIAL IMMEDIATELY MINIMUM AREA NECESSARY FOR EFFICIENT CONSTRUCTION OPERATIONS, AND THE ANY PHASE OF GRADING, BE PLANTED OR OTHERWISE BE PROVIDED WITH FOLLOWING CONSTRUCTION. DURATION OF EXPOSED, UNCOMPLETED CONSTRUCTION TO THE ELEMENTS SHALL BE AS TEMPORARY OR PERMANENT GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT B. THE TOP 6" OF GROUND REMOVED DURING CLEARING AND GRUBBING SHALL BE SHORT AS PRACTICABLE. CLEARING AND GRUBBING SHALL BE SO SCHEDULED AND TO RESTRAIN EROSION. PERFORMED THAT GRADING OPERATIONS CAN FOLLOW IMMEDIATELY THEREAFTER, AND STOCKPILED AT A SITE DESIGNATED BY THE OWNER OR THE OWNER'S ENGINEER TO GRADING OPERATIONS SHALL BE SCHEDULED AND PERFORMED THAT PERMANENT G.S. 113A-57(3), PROVISIONS FOR A PERMANENT GROUND COVER SUFFICIENT TO BE USED FOR LANDSCAPING PURPOSES, UNLESS OTHERWISE DIRECTED BY THE EROSION CONTROL FEATURES CAN FOLLOW IMMEDIATELY THEREAFTER IF CONDITIONS ON RESTRAIN EROSION MUST BE ACCOMPLISHED WITHIN 15 WORKING DAYS OR 90 OWNER OR THE OWNER'S ENGINEER. REMAINING EARTHWORK THAT RESULTS FROM THE PROJECT PERMIT. CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT, CLEARING AND GRUBBING OR SITE EXCAVATION IS TO BE UTILIZED ON -SITE IF F. THE CONTRACTOR SHALL PROVIDE ROUTINE MAINTENANCE OF PERMANENT AND WHICHEVER PERIOD IS SHORTER. REQUIRED, PROVIDED THAT THE MATERIAL IS DEEMED SUITABLE FOR CONSTRUCTION TEMPORARY EROSION CONTROL FEATURES UNTIL THE PROJECT IS COMPLETE AND ALL BY THE OWNER'S SOILS TESTING COMPANY. EXCESS MATERIAL IS TO BE EITHER DISTURBED SOILS ARE STABILIZED. STOCKPILED ON THE SITE AS DIRECTED BY THE OWNER OR OWNER'S ENGINEER, OR REMOVED FROM THE SITE. THE CONTRACTOR IS RESPONSIBLE FOR ACQUIRING ANY PERMITS THAT ARE NECESSARY FOR REMOVING EXCESS EARTHWORK FROM THE SITE. C. ALL CONSTRUCTION DEBRIS AND OTHER WASTE MATERIALS SHALL BE DISPOSED OF OFF -SITE IN ACCORDANCE WITH APPLICABLE REGULATORY AGENCY REQUIREMENTS OR AS DIRECTED BY THE OWNER OR THE OWNER'S ENGINEER. TEMPORARY SEEDING REQUIREMENTS PER NCDENR EROSION AND TABLE 6.10A TEMPORARY SEEDING RECOMMENDATIONS FOR LATE WINTER AND EARLY SPRING SEEDING MIXTURE SPECIES RATE (LB/ACRE) RYE (GRAIN) 120 ANNUAL LESPEDEZA (KOBE IN PIEDMONT AND COASTAL PLAIN, KOREAN IN MOUNTAINS) 50 OMIT ANNUAL LESPEDEZA WHEN DURATION OF TEMPORARY COVER IS NOT TO EXTEND BEYOND JUNE. SEEDING DATES MOUNTAINS ABOVE 2500 FEET: FEB. 15 - MAY 15 BELOW 2500 FEET: FEB. 1- MAY 1 PIEDMONT JAN. 1 - MAY 1 COASTAL PLAIN DEC. 1 - APR. 15 SOIL AMENDMENTS FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB/ACRE 10-10-10 FERTILIZER. MULCH APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. TABLE 6.10B TEMPORARY SEEDING RECOMMENDATIONS FOR SUMMER SEEDING MIXTURE SPECIES RATE (LB/ACRE GERMAN MILLET 40 IN THE PIEDMONT AND MOUNTAINS, A SMALL -STEMMED SUDANGRASS MAY BE SUBSTITUTED AT A RATE OF 50 LB/ACRE. SEEDING DATES MOUNTAINS MAY 15 - AUG. 15 PIEDMONT MAY 1 - AUG. 15 COASTAL PLAIN APR. 15 - AUG. 15 SOIL AMENDMENTS FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB/ACRE 10-10-10 FERTILIZER. MULCH APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. TABLE 6.10C TEMPORARY SEEDING RECOMMENDATIONS FOR FALL SEEDING MIXTURE SPECIES RATE (LB/ACRE RYE (GRAIN) 120 SEEDING DATES MOUNTAINS AUG. 15 - DEC. 15 COASTAL PLAIN AND PIEDMONT AUG. 15 - DEC. 30 SOIL AMENDMENTS FOLLOW SOIL TESTS OR APPLY 2,000 LB ACRE GROUND AGRICULTURAL LIMESTONE AND 1,000 LB/ACRE 10-10-10 FERTILIZER. MULCH APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE REPAIR AND REFERTILIZE DAMAGED AREAS IMMEDIATELY. TOPDRESS WITH 50 LB/ACRE OF NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTENT TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 LB/ACRE KOBE (PIEDMONT AND COASTAL PLAIN) OR KOREAN MOUNTAINS LESPEDEZA IN LATE FEBRUARY OR EARLY MARCH. PERMANENT SEEDING REQUIREMENTS PER NCDENR EROSION AND TABLE 6.1 1 K PERMANENT SEEDING FOR STEEP SLOPES OR POOR SOILS; LOW MAINTENANCE SEEDING MIXTURE SPECIES RATE (LB/ACRE) TALL FESCUE 100 SERICEA LESPEDEZA 30 KOBE LESPEDEZA 10 SEEDING NOTES 1. IN EASTERN PIEDMONT ADD 25 LB/ACRE PENSACOLA BAHIAGRASS OR 10 LB/ACRE COMMON BERMUDAGRASS. USE COMMON BERMUDAGRASS ONLY WHERE IT IS UN- LIKELY TO BECOME A PEST 2. AFTER AUG. 15 USE UNSCARIFIED SERICEA SEED 3. WHERE A NEAT APPEARANCE IS DESIRED, OMIT SERICEA AND SUBSTITUTE 40 LB/ACRE BAHIAGRASS OR 15 LB/ACRE BERMUDAGRASS. 4. TO EXTEND SPRING SEEDING DATES INTO JUNE, ADD 15 LB/ACRE HULLED BER- MUDAGRASS. HOWEVER, IT IS PREFERABLE TO SEED TEMPORARY COVER AND SEED FESCUE IN SEPT. NURSE PLANTS BETWEEN MAY 1 AND AUG. 15, ADD 10 LB/ACRE GERMAN MILLET OR 15 LB/ACRE SUDANGRASS. PRIOR TO MAY 1 OR AFTER AUG. 15 AND 40 LB/ACRE RYE (GRAIN) SEEDING DATES BEST POSSIBLE FALL: AUG. 25 - SEPT. 15 AUG. 20 - OCT. 25 LATE WINTER: FEB. 15 - MAR. 21 FEB. 1 - APR. 15 FALL IS BEST FOR TALL FESCUE AND LATE WINTER LESPEDEZAS. OVERSEEDING OF KOBE LESPEDEZA OVER FALL -SEEDED TALL FESCUE IS VERY EFFECTIVE. USE UNHULLED BERMUDAGRASS SEED IN FALL. SOIL AMENDMENTS APPLY LIME AND FERTILIZER ACCORDING TO SOIL TESTS, OR APPLY 4,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 1,000 LB/ACRE 10-10-10 FERTILIZER. MULCH APPLY 4,000-5000 LB/ACRE GRAIN STRAW, OR EQUIVALENT COVER OF ANOTHER SUITABLE MULCHING MATERIAL. ANCHOR MULCH BY TACKING WITH ASPHALT, ROVING, OR NETTING. NETTING IS THE PREFERRED ANCHORING METHOD ON STEEP SLOPES. MAINTENANCE REFERTILIZE IN THE SECOND YEAR UNLESS GROWTH IS FULLY ADEQUATE. MAY BE MOWED ONCE OR TWICE A YEAR, BUT MOWING IS NOT NECESSARY. RESEED, FERTILIZE AND MULCH DAMAGED AREAS IMMEDIATELY. DE -WATERING: THE CONTRACTOR SHALL AT ALL TIMES PROVIDE AND MAINTAIN AMPLE MEANS AND EQUIPMENT WITH WHICH TO REMOVE AND PROPERLY DISPOSE OF ANY AND ALL WATER ENTERING THE EXCAVATION OR OTHER PARTS OF THE WORK AND KEEP ALL EXCAVATIONS DRY UNTIL SUCH TIME AS PIPE LAYING AND GRADING IS COMPLETED AND STRUCTURES TO BE BUILT THEREIN ARE COMPLETED. NO WATER SHALL BE ALLOWED TO RISE AROUND THE PIPE IN UNBACKFILLED TRENCHES NOR SHALL IT BE ALLOWED TO RISE OVER MASONRY UNTIL THE CONCRETE OR MORTAR HAS SET (MINIMUM 24 HOURS). ALL WATER PUMPED OR DRAINED FROM THE WORK SHALL BE DISPOSED OF IN SUCH A MANNER AS TO PREVENT SILTATION AND EROSION TO ADJACENT PROPERTY OR OTHER CONSTRUCTION. VII. PROTECTION OF EXISTING UTILITIES THE CONTRACTOR SHALL CONTACT THE APPROPRIATE AGENCY FOR THE EXACT FIELD LOCATIONS OF ALL WATER, SEWER, ELECTRIC, TELEPHONE, TELEVISION AND ANY OTHER UNDERGROUND AND OVERHEAD UTILITY BEFORE STARTING CONSTRUCTION. THE OMISSION FROM OR THE INCLUSION OF UTILITY LOCATION ON THE CONTRACT DRAWINGS IS NOT TO BE CONSIDERED AS THE NON-EXISTANCE OF OR A DEFINITE LOCATION OF EXISTING UTILITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE LOCATION AND DEPTH OF ALL UNDERGROUND UTILITIES ALONG THE ROUTE OF WORK. THE FOLLOWING LISTING OF UTILITY COMPANIES (WHICH MAY OR MAY NOT BE COMPLETE) MAY HAVE EXISTING UNDERGROUND OR OVERHEAD UTILITIES IN THE CONTRACT VICINITY. IX, SANITARY SEWER AND WATER DISTRIBUTION A. SANITARY SEWERS AND STORM SEWERS SHOULD ALWAYS CROSS UNDER WATER MAINS. SANITARY SEWERS AND STORM SEWERS CROSSING WATER MAINS SHALL BE LAID TO PROVIDE A MINIMUM VERTICAL DISTANCE OF 18 INCHES BETWEEN THE INVERT OF THE UPPER PIPE AND THE CROWN OF THE LOWER PIPE. B. WHERE SANITARY SEWERS AND STORM SEWERS MUST CROSS A WATER MAIN WITH LESS THAN 18 INCHES VERTICAL DISTANCE, BOTH THE SEWER AND THE WATER MAIN SHALL BE CONSTRUCTED OF DUCTILE IRON PIPE (DIP) AT THE CROSSING. (DIP IS NOT REQUIRED FOR STORM SEWERS IF IT IS NOT AVAILABLE IN THE SIZE PROPOSED). SUFFICIENT LENGTHS OF DIP MUST BE USED TO PROVIDE A MINIMUM SEPARATION OF 10 FEET BETWEEN ANY TWO JOINTS. ALL JOINTS ON THE WATER MAIN WITHIN 20 FEET OF THE CROSSING MUST BE LEAK FREE AND MECHANICALLY RESTRAINED. A MINIMUM VERTICAL CLEARANCE OF 6 INCHES MUST BE MAINTAINED AT THE CROSSING. C. ALL CROSSINGS SHALL BE ARRANGED SO THAT THE SEWER PIPE JOINTS AND THE WATER MAIN PIPE JOINTS ARE EQUIDISTANT FROM THE POINT OF CROSSING (PIPES CENTERED ON THE CROSSING). D. WHERE A NEW PIPE CONFLICTS WITH AN EXISTING PIPE, THE NEW PIPE SHALL BE CONSTRUCTED OF DIP AND THE CROSSING SHALL BE ARRANGED TO MEET THE REQUIREMENTS ABOVE. E. A MINIMUM 10-FOOT HORIZONTAL SEPARATION SHALL BE MAINTAINED BETWEEN ANY TYPE OF SEWER AND WATER MAIN IN PARALLEL INSTALLATIONS. F. IN CASES WHERE IT IS NOT POSSIBLE TO MAINTAIN A 10-FOOT HORIZONTAL SEPARATION, THE WATER MAIN MUST BE LAID IN A SEPARATE TRENCH OR ON AN UNDISTURBED EARTH SHELF LOCATED ON ONE SIDE OF THE SEWER OR FORCE MAIN AT SUCH AN ELEVATION THAT THE BOTTOM OF THE WATER MAIN IS AT LEAST 18 INCHES ABOVE THE TOP OF THE SEWER. G. WHERE IT IS NOT POSSIBLE TO MAINTAIN A VERTICAL DISTANCE OF 18 INCHES IN PARALLEL INSTALLATIONS, THE WATER MAIN SHALL BE CONSTRUCTED OF DIP AND THE SEWER OR THE FORCE MAIN SHALL BE CONSTRUCTED OF DIP (IF AVAILABLE IN THE SIZE PROPOSED) WITH A MINIMUM VERTICAL SEPARATION OF 6 INCHES. THE WATER MAIN SHOULD ALWAYS BE ABOVE THE SEWER. JOINTS ON THE WATER MAIN SHALL BE LOCATED AS FAR APART AS POSSIBLE FROM THE JOINTS ON THE SEWER OR FORCE MAIN(STAGGERED JOINTS). H. ALL SANITARY SEWER MAINS, LATERALS AND FORCE MAINS SHALL HAVE A MINIMUM OF 36 INCHES OF COVER. I. ALL ON SITE P.V.C. GRAVITY SANITARY SEWER PIPE SHALL BE MADE OF MATERIAL HAVING A CELL CLASSIFICATION OF 12454 B, 12454 C OR 13354 B AS DEFINED IN ASTM D-1784 AND CONFORM TO THE REQUIREMENTS OF SDR 26. ELASTOMERIC GASKET JOINTS SHALL BE UTILIZED. J. ALL ON SITE DUCTILE IRON PIPE SHALL BE CLASS 52 AND SHALL RECEIVE INTERIOR AND EXTERIOR BITUMINOUS COATING IN ACCORDANCE WITH ANSI A 21.6, A 21.8, OR A 21.51. K. SANITARY SERVICE CONNECTION LOCATIONS SHOWN ON THESE PLANS ARE APPROXIMATE. L. ALL SANITARY SEWER WORK SHALL CONFORM TO TOWN OF HOKE STANDARDS AND SPECIFICATIONS, HOKE & TO HOKE COUNTY WATER & SEWER EXTENSION ORDINANCE. M. PRIOR TO COMMENCING WORK WHICH REQUIRES CONNECTING NEW SANITARY SEWER LINES TO EXISTING LINES OR APPURTENANCES, THE CONTRACTOR SHALL VERIFY LOCATION AND ELEVATION OF ALL EXISTING UTILITIES NEAR THE POINT OF CONNECTION AND NOTIFY OWNER'S ENGINEER OF ANY CONFLICTS OR DISCREPANCIES WITH DESIGN INFORMATION SHOWN IN THESE PLANS. CONTRACTOR SHALL NOTIFY ENGINEER AND TOWN OF HOKE INSPECTOR AT LEAST 48 HOURS IN ADVANCE OF SCHEDULED WORK. N. ALL GRAVITY SEWER PIPING SHALL BE SUBJECT TO A VISUAL INSPECTION BY THE OWNER'S ENGINEER AND TOWN OF HOKE PRIOR TO PLACEMENT OF AND PAVING AND AGAIN PRIOR TO OBTAINING CERTIFICATE OF OCCUPANCY. CONTRACTOR TO NOTIFY THE ENGINEER AND TOWN OF HOKE 48 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS. 0. THE CONTRACTOR SHALL PERFORM ALL NECESSARY TESTING IN ACCORDANCE WITH TOWN OF HOKE STANDARDS. SAID TESTS ARE TO BE CERTIFIED BY THE ENGINEER OF RECORD AND SUBMITTED TO THE REGULATORY AGENCY FOR APPROVAL. COORDINATION OF TESTING AND NOTIFICATION OF ALL PARTIES IS THE CONTRACTOR'S RESPONSIBILITY. P. ALL WATER MAINS SHALL HAVE A MINIMUM OF 36 INCHES OF COVER. Q. ALL WATER SYSTEM WORK SHALL CONFORM TO TOWN OF HOKE STANDARDS AND SPECIFICATIONS, EXTENSION ORDINANCE. R. ALL ON SITE PVC WATER MAINS 4 INCHES THROUGH 12 INCHES SHALL BE IN ACCORDANCE WITH AWWA C-900 AND SHALL BE CLASS 150 DR 18. ALL ON -SITE PVC WATER MAINS 2" TO 3" SHALL BE CLASS 1120 AND MEET REQUIREMENTS OF SDR 21 IN ACCORDANCE WITH ASTM D-2241. WATER MAINS SMALLER THAN 1 1/2" SHALL BE CLASS 1120 OR 1220 SCHEDULE 80 AND MEET REQUIREMENTS OF ASTM D-1785. . aria loplagraJ:i•119411 • ► _ ► _ .�srzz• ��►I•r•>nnr-aakM**I.1sOIi , SPION4.0 T. ALL DUCTILE IRON PIPE SHALL CONFORM TO THE REQUIREMENTS OF ANSI STANDARD A21.51, MINIMUM CLASS 50. JOINTS FOR DUCTILE IRON PIPE SHALL BE MECHANICAL OR PUSH -ON JOINTS. PIPE SHALL HAVE AN EXTERIOR BITUMINOUS COATING IN ACCORDANCE WITH ANSI A21.51. PIPE INTERIOR SHALL HAVE A CEMENT MORTAR LINING WITH AN ASPHALTIC SEAL COAT CONFORMING TO AWWA/ANSI C104/A21.4. THE WEIGHT AND CLASS DESIGNATION SHALL BE PAINTED IN WHITE ON THE EXTERIOR SURFACE OF ALL PIPES AND FITTINGS. MANUFACTURER'S CODE OR SERIAL NUMBER SHALL BE PROVIDED ON THE BELL OF EACH PIPE JOINT. U. ALL DUCTILE FITTINGS SHALL BE MECHANICAL JOINT WITH A MINIMUM PRESSURE RATING OF 250 PSI AND SHALL CONFORM TO THE REQUIREMENTS OF ANSI/AWWA STANDARD A21.10/C110. ALL FITTINGS SHALL BE COATED AND LINED AS SPECIFIED ABOVE FOR DUCTILE IRON PIPE. V. CONTRACTOR SHALL INSTALL TEMPORARY BLOWOFFS AT THE END OF WATER SERVICE LATERALS TO BUILDINGS TO ASSURE ADEQUATE FLUSHING AND DISINFECTION. W. THRUST BLOCKING SHALL BE PROVIDED AT ALL FITTINGS AND HYDRANTS IN ACCORDANCE WITH TOWN OF HOKE PUBLIC WORKS. X. POINTS OF CONNECTION OF THE EXTERNAL WATER LINES ARE TO COINCIDE WITH THE BUILDING PLUMBING AS SHOWN ON THE BUILDING PLUMBING PLANS. CONNECTION LOCATIONS SHOWN ON THESE PLANS ARE APPROXIMATE. Y. FIRE LINES TO BUILDINGS SHALL BE INSTALLED BY A CONTRACTOR DULY LICENSED BY THE STATE FIRE MARSHALL'S OFFICE. CONTRACTOR TO VERIFY REQUIREMENTS PRIOR TO CONSTRUCTION. Z. ALL COMPONENTS OF THE WATER SYSTEM, INCLUDING FITTINGS, HYDRANTS, CONNECTIONS, AND VALVES SHALL REMAIN UNCOVERED UNTIL PROPERLY INSPECTED AND ACCEPTED BY THE OWNER'S ENGINEER AND THE TOWN OF HOKE PUBLIC WORKS. PRESSURE TESTS SHALL BE IN ACCORDANCE WITH TOWN OF HOKE PUBLIC WORKS SPECIFICATIONS. CONTRACTOR TO NOTIFY OWNER'S ENGINEER AND TOWN OF HOKE PUBLIC WORKS INSPECTORS 48 HOURS IN ADVANCE OF PERFORMING TESTS. AA. DISINFECTION: SHALL CONFORM TO AWWA C651. ALL NEW WATER MAINS SHALL BE DISINFECTED AFTER THEY HAVE BEEN PRESSURE TESTED. THE MAIN SHALL BE THOROUGHLY FLUSHED AT A RATE OF 2 FEET PER SECOND WITH CLEAN WATER AFTER WHICH A CHLORINE SOLUTION OF 50 PARTS PER MILLION SHALL BE INDUCED. THE CHLORINE SOLUTION SHALL REMAIN IN THE LINES FOR A MINIMUM OF 24 HOURS. THE LINES SHALL AGAIN BE FLUSHED AT A RATE OF 2 FEET PER SECOND WITH CLEAN WATER UNTIL THE CHLORINE RESIDUAL IS REDUCED TO THAT OF THE SUPPORTING SYSTEM. SAMPLES SHALL BE THEN COLLECTED AND TESTED FOR COLIFORM BACTERIA. ANALYSIS SHALL BE BY A STATE CERTIFIED LABORATORY USING THE MULTIPLE TUBE FEREMENTATION METHOD. ONE SAMPLE SHALL BE COLLECTED FROM EACH DEAD END SEGMENT OF THE PIPELINES INSTALLED. IF BACTERIA OF ANY TIME IS FOUND, THE TEST SHALL BE REPEATED UNTIL THE LINES ARE CLEAN. BB. WATER MAIN SHALL HAVE 14 GA. BLUE COATED TRACER WIRE ON ALL SERVICES AND MAINS BURIED OVER THE WATER MAIN. CC. FIRE HYDRANTS SHALL BE PLACED A MINIMUM DISTANCE OF 6' FROM EOP AND HAVE A CLEAR SPACE OF 3' FROM ANY PERMANENT STRUCTURES. DD. WATER VALVES SHALL COMPLY WITH APPROPRIATE AWWA STANDARDS. 1. GATE VALVES 2-INCHES: SHALL CONFORM TO ANSI/AWWA A21.11/C111 FOR CAST IRON BODIED, BRONZE MOUNTED, PARALLEL DOUBLE DISC, NON RISING STEM VALVES. VALVES SHALL BE RATED AT 200 PSIG WORKING PRESSURE AND 400 PSIG TEST PRESSURE. END CONNECTIONS SHALL BE STANDARD FEMALE IRON PIPE THREADS OR ANSI/AWWA A21.11 /C111 MECHANICAL JOINTS FOR BURIED LOCATIONS ADN ANSI B16.1 FLANGES FOR EXPOSED LOCATIONS. VALVE OPERATOR SHALL BE A 2 INCH SQUARE NUT FOR BURIED LOCATIONS AND STANDARD HANDWHEEL FOR EXPOSED LOCATIONS. ALL VALVES SHALL BE OPEN LEFT. 2. GATE VALVES 6-INCHES THROUGH 16-INCHES: SHALL CONFORM TO AWWA C509 FOR BRONZE MOUNTED, RESILIENT SEATED, CAST IRON BODIED GATE VALVES. VALVE BODY SHALL BE RATED FOR 200 PSIG WORKING PRESSURE AND 400 PSIG TEST PRESSURE. PROVIDE VALVE WITH SOLID WEDGE, NON RISING STEM CONSTRUCTION. VALVES SHALL EBE SEALED RUBBER "O" RING SEALS BOTH ABOVE AND BELOW THE THRUST RING. VALVES STEMS SHALL BE OF BRONZE. INTERIOR OF THE VALVES SHALL BE COATED IN ACCORDANCE WITH AWWA C550. END CONNECTIONS SHALL CONFORM TO ANSI/AWWA AS2.22/C111 MECHANICAL JOINTS FOR BURIED LOCATIONS AND ANSI B16.1 FLANGES FOR EXPOSED LOCATIONS. VALVE OPERATORS SHALL BE 2 INCH SQUARE NUTS FOR BURIED LOCATIONS OR STANDARD HANDWHEEL FOR EXPOSED LOCATIONS. ALL VALVES SHALL BE OPEN LEFT. IN LINE VALVES TO BE INSTALLED EVERY 2000 FEET OR EVERY OTHER HYDRANT. EE. WATER MAINS SHALL BE SUBJECT TO BOTH A PRESSURE TEST AND A LEAKAGE TEST. THE CONTRACTOR MAY BE BILLED FOR THE AMOUNT OF WATER USED. 1. PRESSURE TEST: SHALL CONFORM TO AWWA STANDARD C605 FOR PVC PIPE AND AWWA C600 FOR DUCTILE IRON. THE TEST PRESSURE SHALL BE 200 PSIG AND THE DURATION OF THE TEST SHALL BE NOT LESS THAN 2 HOURS OR MORE THAN 24 HOURS. THE DURATION OF THE TEST WILL BE DETERMINED BY THE COUNTY ENGINEER AS THE TEST PROGRESSES. PRESSURE SHALL NOT BE ALLOWED TO VARY MORE THAN 5 PSIG DURING THE TEST. 2. LEAKAGE TEST: SHALL BE CONDUCTED ALONG WITH THE PRESSURE TEST. LEAKAGE WILL BE DEFINED AS THE AMOUNT OF WATER THAT MUST BE SUPPLIED TO THE NEWLY LAID LINES TO MAINTAIN THE TEST PRESSURE WITHIN A 5 PSIG RANGE OVER A SPECIFIED PERIOD OF TIME. ALLOWABLE LEAKAGE WILL BE COMPUTED BY THE FOLLOWING FORMULA: L = (S) (D) (SORT P) / 148,000 WHERE: L = ALLOWABLE LEAKAGE IN GALLONS PER HOUR S = LENGTH OF PIPE TESTED, IN FEET D = NOMINAL DIAMETER OF PIPE IN INCHES P = TEST PRESSURE IN PSIG BUT NOT MORE THAN: 12.1 GALLONS PER INCH OF DIAMETER PER MILE OF PIPE PER 24 HOURS BASED ON 200 PSI TEST PRESSURE. Z `° U O M co N J U JD o 0�a);) �- rn 12 N r ZEL M ro Q.: N U O U Z 0 0� ,c) Z °6 w ui (D z Y Z O O Zw= U wJIt W M = z x 0 (D m Z o U W m w U) m m 0 O lz = ,_� -4 ui &. O W U zx W � Z U Q avo = O x IY W Q 0- W p4 2 z QO0, g �-Zo E_ Z �_ z F- O Z P4 two PQ U f4 0 o w m a E� o 2 w U U) G" W 0404 4 r E. J J w cc 0 0, c m m 0 00 �/ V) m 1):EW 0 N m u w z m U O' 0 Z W N M J m 0 N o U T NQ T W \ m z 0 C)0 uj 0/ 0- w M J >-- m m C) ­3 w Q Z Z CO w _l U L o . U) .. SHEET I Cl 3.0] LL