HomeMy WebLinkAboutNCC221795_Site Plan or Location Map_20220511L
E
PHASE IV
2 AL
TRIBAL COMMUNITY DEVELOPMENT BY
0
GA
)
o
o/
/
/
eL CAE SPRIN n
R0qD
34
SI TE
VI CINI T Y MAP
NOT TO SCALE
VIA ffmwo,rME "mol,�/�1RU
/
/
/
DEVELOPER: LUMBEE TRIBE OF NORTH CAROLINA
6984 NC-711
PEMBROKE, NORTH CAROLINA 28372
LUMBEE TRIBE HOUSING DEPARTMENT CONTACTS
BRADLY S. LOCKLEAR
TRIBAL HOUSING DIRECTOR
bslocklear@lumbeetribe.com
TERRY LOCKLEAR
NEW CONTRUCTION
tel ockl ear@I u m b eetri b e. com
MATT LOCKLEAR
NEW CONTRUCTION
malocklear@lumbeetribe.com
ENGINEER: CHICORA, PLLC
BRICE BELL, PE
POST OFFICE BOX 1986
PEMBROKE, NORTH CAROLINA 28372
Ph: (910) 322-6836
SURVEYOR: POWERS SURVEYING
JOHN D. POWERS JR. PLS
750 SOUTH ROBERTS AVENUE
LUMBERTON, NORTH CAROLINA 28358
(910) 738-6980
LUMBEE TRIBE OF NORTH CAROLINA
LOCATED IN
Hoke Countv, North Carolina
DEVELOPMENT LAYOUT
N.T.S.
N
10
,.
L 11.11111 IIIr
�■fi•- . 0 mom 1j I 4� mi.' Y F 4 f
µ -
r
r
—
all
Mari
-1, A � WIN a,
_ F f
j
- r•r —
Sl TE DEVET OPMEN T INFORMA TlON
DEVELOPMENT DATA
TAX PARCEL ID:
JURISDICTION:
TOWNSHIP:
TOTAL ACREAGE:
AREA IN R/W:
TOTAL DEVELOPABLE ACREAGE:
RIVER BASIN:
WATERSHED:
EXIST. ZONING:
UTILITIES:
IMPERVIOUS AREA CALCULATIONS:
TOTAL SITE AREA
BUILDING PADS:
DRIVEWAY AREA:
ROADS,
TOTAL IMPERVIOUS
294220001296 & 294220001035
HOKE COUNTY
RAEFORD
+/- 13.08 ACRES
+/- 1.71 ACRES
+/- 11.37 ACRES
LUMBER RIVER
LITTLE MIDDLE SWAMP (C: Sw)
RA-20
PUBLIC WATER AND SEWER
2.60/13.08 = 19.88%
ZONING REQUIREMENTS
569,765 S.F. - 13.08 AC.
72,000 S.F. - 1.65 AC.
16,400 S.F. - 0.38 AC.
24,782 S.F. - 0.57 AC.
MIN.
LOT AREA:
20,000
S.F. - (0.46 AC.)
MIN.
LOT WIDTH:
80 FT.
CAD R/W
MIN.
FRONT YARD:
30.00
FT.
MIN.
REAR YARD:
25.00
FT.
MIN.
SIDE YARD:
10 FT.
OPEN SPACE:
ENTIRE DEVELOPMENT AREA: 34.04 ACRES
TOTAL DEVELOPMENT LOT COUNT: 50 LOTS
TOTAL AREA IN R/W: 4.18
DEVELOPABLE PROJECT AREA: 29.86
REQUIRED OPEN SPACE: 10%
29.86x0.10= 2.99 AC.
OPEN SPACE REQUIRED: 2.99 AC.
OPEN SPACE PROVIDED: 3.11 AC > REQD.-OK*
*TOTAL OPEN SPACE PROVIDED IN PRE/IOUS PHASE
AND IDENTIFIED AS LOT 41 ON RECORDED PLAT
DENSITY:
TOTAL NUMBER OF LOTS: 20 LOTS
TOTAL ACREAGE: 13.08
13.08-1.71= 11.37 AC
REQUIRED DENSITY: 2.00 DU/AC 2.0 DU/AC
PROVIDED DENSITY: 1.14 DU/AC 3.67 DU/AC
4
"M ■■� I I 1 I I� �I t
qW f
-1W -M
ddoL —� 4111
REVISIONS
NUMBER DESCRIP TION DA TE
1
2
3
INDEX OF SHEETS
CS .............................
CO VER SHEET
C1. 0..........................
SITE PLAN
C2.0...........................GRADING
PLAN
C3.0..........................
ROAD PROFILE
C4.0..........................
ROAD PROFILE
C5.0..........................
U TILI TIES PLAN
C6.0..........................
EROSION CONTROL — PHASE 1
C7.0..........................
EROSION CONTROL — PHASE 2
C8.0..........................
DETAIL SHEET
C9.0..........................
NPDES STABILIZA TION NOTES
CIO.0.........................
NPDES SELF INSPECTION NOTES
CI 1. 0.........................
DETAIL SHEET
C12.0.........................
DETAIL SHEET NOTES
CI3.0.........................
PROJECT NOTES
Know what's below.
Call before you dig.
CALL 1.800.632.4949 OR 811
WWW.NC811 rORG
NC ONE -CALL CENTER
ITS THE LAW!
M
z ao
U O N
N
J? o
W
Z � N
a
e QO Z UZ0
Y
O(,zw,
Z W 2
U�UW
W�a
W o
2 �zM
V X
U z m
W 0
a
w
m
co
m
0
z
J
J
W
m
C
9,
NO
m
C
CID
>-
m
c
m
0
N
L1J
w
U
z
m
O
W
J
C
N
Q
O
N
Uj
`
m
T
I
w
O
o
0
U
m
W
J
o�
w
z
(D
w
Z
W
o
J
U
SHEET
CS00
LOT 33 \
EXIST. LOT
EX. HOUS
SETBA K -
EXIST_ 30_ RON - - - -
I
LOT 34 LOT 35
EXIST. LOT EXIST. LOT I
I
EX. HOUSE
-- - - - - - - -
I
I
-----_
z
O
CONTROL CORNER ERRS
NORTH = 423,523.92'
EAST = 1,923,418.64'
DATUM: NAD 83/2011
w
z
>_ NOW OR FORMERLY
0-1 SUAZO LUNA, MARITERESITA
w DB 1270, PG 462
O PID:294220001063
0- ZONING: RA-20
- J_ w eir
UBLIC Rom__ -- - --- - -` � EX. HOUS
EXIST. 60_ AIL EX�ST. EDP EX. CHER CIR.
_ _ Its �� 1 EXIST EOP
Ex ATTER'A C R/W� - - 2 -70.18 _ _ _ _ (EXIST. 60' PUBLIC R/W) o
PUB EX. 72.65 LE
(EXIST. 60 - -II Ex�sy EDP V LL
i Exisr. EOP J � � r7
Ln
CE 18 RCP _�--�---------EX. EH ------------_____ v� �� LOT 12
- & GO - - - EXIST. LOT Ir
EXIST, 6 UBLIC R/W
PUBLIC RAW
XE IST. 60' I� �
Ex. ELE �� ' Ex. ELE \
_ m- _
-
I
'�
EXIST. 30'
TELE
PAD
-------------
& TELE. PAD
��
\\
\
\ EX HOUSE
el p
_
- PROP. CLUSTER m
FRON
SET
ACK
I
- _
-
\ \
\
_
FRONT SETBACK
MAILBOX & �i
m lm
I
\ 7-
o
\
3
- EXIST. 0
EX. HOUSE PARKING
Ia
LOT 42
LOT 26
al
W
a
I�
o EXIST. LOT
EX.
HOUSE
I
LOT 43
(PHASE 4)
EXIST. LOT
LOT 25 ��
i
-
o
i
23,867 sq. ft.
EXIST. LOT
U
CO Icn
EX. ELE. IINST �
•
w
PADLLJ
`�
-200.00'
---------------
I
----- - - - - - I
I
'
r o
r'a�
' o,�
EXIST.
PAVEMENT
END OF,
�\
\
i N
co
________- 176_98----
o
_1
I
I
I
I
1
I
,' N o
i'
LOT 44
(PHASE 4)
\ \
`\ \
\ LOT 14
I
00
'
II I i
1 I
1
+I -
0 ,
LOT 51
(PHASE 4)
it 24.0'
i o
I
i
,'
,
i p
23,390 sq. ft.
��
\ \
I
1 I (PHASE 4)
I 21,662 sq. ft.
1
1 I i
' LOT 24 I o
I
I
o i
20,489 sq. ft.
i
,�Q�
.51 I
,
(PHASE 4)
Lw
L'i I
I
i
I
1
1
END
i
N , 20,221 s ft. I
q•
�
w
X I
L�
I
I
I
I - - -
- - - - - - - - Jr
,�
OF PROP.
PAVEMENT
i
1
I
,
\
I 1
6�0'
I STA. 10+71.80
i
i
1 EXIST, END OF
I 200.02'
39.
41.02'
20100'
I
I-______________�
PAVEMENT
I
239.35'(TOTAL)
I
1
,
I -- - - - - - - - - - - - --
----------- - - - - --
--------
241.02'
(TOTAL)
TOTAL
I
eip
'------------- - ----I I
T
I
I
a,
m'
I
Ot0
I
i
o
--------16--------L
1�
i
I
o
I LOT 50 0
� I
LIJ26
0'
.�
I
�
I
a i
N
°
I
1 I
(PHASE 4)
26,411 sq. ft.
a'
i
o
0 1
LOT 45
(PHASE 4)
o
I 0
I
0
m 1
w l
' I
I
i
I
26,512 sq.
ft.
' LOT 15
N
u) '
a
10 I
PROP. START OF
PAVEMENT
I
N i
I
I
I
(PHASE 4)
20,158 sq. ft.
I a
N
1'
31.1'i
t11N1�'
STA. 0+00-.0-0
I
'I
oN
on
20,0'
PROP. 10.0' SIDE
iN
SETBACK-
Io
� 23
EPtELOT
------- ----------
---_ _ _ _ _
240.85' TOTAL
------------------
--- -
24TOTAL
- - - -�
I
iv (PHASE 4)
I
212.29'
28
56'
212.25'
o
1� 25,892 sq. ft. I,-----------------------------
28 77
- -
\\\
-
9
O
I
w I
1U)
1�
1
0
I
.'/
I Lin`®)
2
EP
.0'
E
1
1�
II
, ,--
i
i----,
`,
\
I�-30.0'-►I
I-------------
-
I
�• ,'
I
I
I
`
I
I
-I
1
I \
I -- - - - - - -_
e1p
RAW
II LOT 49
I
I
,
A�oo
i
I - - -
- - - i
1 1 1
,)
(PHASE 4)
20,991 sq. ft.
I
,' , I
I �p
I
\ \•
`\ \ j
` p,
LOT 46
(PHASE 4)
21,153 ft.
/
/ I
I
i
I
I
PROPERTY LINE
sq.
LOT 16CD
I
�0_ (9
0 (PHASE 4)
v�
i
N i
`�
9C�� /
/
�3 / 22,820 sq. ft.
6,
I
LOT 48
`,
'
I
(PHASE 4) i
I
LOT
I
47
\ /A
/
Co ' \
�` ���
22,395 sq. ft. 1
I (PHASE
4)
\
`
I
i
\ \ \
I
I 22,071
sq. ft.
�`
/
/
90.1'
A'
Ld
FTI LOT 22v
7 ,0��
4)
133.
i
>_(PHASE
NOW OR FORMERLY
i 47,947 sq. ft. \ `
` �� `�
0
/ .0,
'
�
ROBERT LOCKLEAR
L� I \
�� AD
S70F
• �i
LIJ
DB 278, PG 424
O
PID:294220001189
\
A
ZONING: RA-20
i \\
�\
U
04
off-
r1100.6'
\ LOT 17
`I
I
ei
/ \
`� �- - ♦ -
- - -F-
iO
- rn o
i
\
PHASE 4
v i ,'
, \ \
cao
to
i
32,468 sq. ft.
N I , ,
\ \
/
/
♦ \ ` \
I
o ' �0 ,
I
LOT 21 , _
51.05'
31.00 =�
-
LOT 18
\ `
I
m i ' '
,
(PHASE
( ) r'
, `
N
_
, ,
(PHASE 4)
• 6� \
O
25,478 s ft. � r
sq. /
_ - - - - - - -
_ _
- - - _
� �
\ \
27,864 sq. ft.
i
CD
LOT 20
I
I
LOT 19
` `
(PHASE 4)
(PHASE 4)
23,554 sq. ft.
i
I
20,087 sq. ft.
I
I
'
I , PROP. 25.0' REAR SETBACK
r r
'
1
I_
'-------------
PROP_ 25.0'-REAR SETBACK �\ --
- - - -�
, ----------------
_ _ _ _ _ _ _ _
_ _ _ _ _ _ _
_ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _
47.96' 189.86'
199.60' 0
174.14'
�209.57'
46.51'
ei
N70` 15' 19"W 867.65'
PROPERTY LINE
ecm
eir
4.5'
FILL
cCUT�,�
OLDER
6.0'
L
PBLIC R/W
10.0' PAVEMENT
C
LOCAL RESIDENTIAL STREET A -A'
TYPICAL ROAD X-SECTION
PROPOSED ROAD DA
A
ROAD NAME I LENGTH
I DESIGNATION
CHERAW CIRCLE 1 1,072'
1 PUBLIC
IOU L
6.0'
NOW OR FORMERLY
ROBERTLOCKLEAR
DB 1047, PG 018
PID:294220001061
ZONING: RA-20
4.5' 4.9'
UTILITY PROVIDERS:
WATER & SEWER: HOKE COUNTY UTILITY DEPARTMENT
423 E CENTERAL AVE.
RAEFORD, NC 28376
FILL
CONTACT: DENNIS BAXLEY
- ' 3
(910) 875-6704
,1F
CUT
ELECTRICITY: LREMC
605 E. FOURTH AVE.
RED SPRINGS, NC 28377
CONTACT: KAREN LLOYD
ROAD PAVEMENT NOTE: (910) 843-4131
1.5" ASPHALT SURFACE COURSE TYPE S-9.5C
2.5" ASPHALT INTERMEDIATE COURSE, TYPE I-19.0C
8.0" BASE COURSE, ABC STONE
SURVEY MARKER LEGEND
EPK - EXISTING PK NAIL FOUND
EIS - EXISTING IRON STAKE FOUND
ECM - EXISTING CONCRETE MARKER FOUND
ERRS - EXISTING RAILROAD SPIKE FOUND
SIP - SET IRON PIPE
OF - EXISTING IRON PIPE FOUND
SIR - SET IRON ROD
EIR - EXISTING IRON ROD FOUND
PROP. E
SIDEW/
PROP. CLUSTER
MAILBOX
MOUNTED ON
PEDESTAL
NOW OR FORMERLY
MARY MONROE
DB 677, PG 627
PID:294220001064
ZONING: RA-20
Know what's below.
Call before you dig.
CALL 1.800.632.4949 OR 811
WWW.NC811.ORG
NC ONE -CALL CENTER
IT'S THE LAW!
CD
Lei
N
---- - - - - --
- �---
I
I
I REAR SE-TBACK
I I
I
I I
LOT AREA I
I
I 0.46 AC. I
10' 60.0'
I
Q
I
m
'
�
i
BUILDING
CO PAD
o
I
�
FRONT SETBF�''CK
-
�----i
80.0' I
�
�
I I
I I
EDGE OF PAVEMENT
TYPE LOT LAYOUT
SCALE: NOT TO SCALE
�I
INSET
SCALE: 1: 20
INSET LEGEND
PROP. PAVEMENT
PROP. CONCRETE
CLUSTER MAILBOX
SALSBURY INDUSTRIES 3400 SERIES MOUNT 4C PEDESTAL
MAILBOX WITH 20 SINGLE MAILBOX DOORS/2 PACKAGE
LOCKERS, 1 OUTGOING MAIL SLOT.
MODEL 3416D-201 (OR EQUIVALENT EQUAL)
GENERAL NOTES:
1. THIS MAP IS NOT A CERTIFIED SURVEY. BOUNDARY INFORMATION
PROVIDED BY ROBESON COUNTY GIS
2. TAX PARCEL ID - 141102027
3. THIS PROPERTY IS NOT LOCATED IN A SPECIAL FLOOD HAZARD
AREA AS DETERMINED BY THE FEMA FLOOD MAP COMMUNITY
PANEL NUMBER 3710934300K EFFECTIVE DATE: 12/06/2019.
4. THE UTILITIES SHOWN ARE FOR THE CONTRACTOR'S CONVENIENCE
ONLY. THERE MAY BE OTHER UTILITIES NOT SHOWN ON THIS PLAN;
THE ENGINEER ASSUMES NO RESPONSIBILITY FOR THE LOCATIONS
SHOWN.
5. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL EXIST.
UTILITIES PRIOR TO COMMENCEMENT OF CONSTRUCTION. CONFLICTS
BETWEEN EXIST. UTILITIES AND PROPOSED EXCAVATION SHALL BE
REPORTED TO THE ENGINEER IMMEDIATELY.
6. PROVIDE MINIMUM OF 48 HOUR NOTICE TO OWNER OR
REPRESENTATIVE PRIOR TO INTERRUPTION OF ANY EXIST. UTILITY,
IF BEING UTILIZED.
7. THE CONTRACTOR IS RESPONSIBLE FOR REPAIR AND/OR
REPLACEMENT OF ANY UTILITIES DAMAGED DURING CONSTRUCTION.
8.THE CONTRACTOR SHALL USE EXTREME CARE WHEN WORKING
NEAR ALL UNDERGROUND AND OVERHEAD UTILITIES.
9. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL
NECESSARY PERMITS AND APPROVALS HAVE BEEN OBTAINED PRIOR
TO CONSTRUCTION. THESE PERMITS AND APPROVALS MAY INCLUDE
BUT ARE NOT LIMITED TO GRADING, DEMOLITION, ZONING, BUILDING,
DRIVEWAY, DETENTION, SUBDIVISION, SPECIAL USE, SEWER AND
WATER.
E T
A
mqfl,�� NIII"I'
GRAPHIC SCALE
50 0 25 50 100
1 INCH = 50 FEET
M
Z 20
U O N
N
� o
^ ern
M
U] 00
N
r�c.
Z�Q0LLUZ0 Y
-� 0(9 Z M
Zwg
V��W
w:ia
W o
Z M
Uw
0
m
w
m
m
0
O
z
C J ,'
O
w z c4
W � Z
U Q av0
� O�r, Q
U
Z Q0E-
0 �zo
zo z
w 0 a LLJ
o
J
J
LU
m
cc
C
C
C
0o
00
0
m
N
m
Z
U
w
U
Z
m
O
w
J
c
N
W
Q
\
O
N
T
m
VJ
o
0
w
J
m
p �
Z
.I.i
z
W
J
SHEET
1,00
0
L
EX
LOT 34 LOT 35 �
LOT 33 EXIST. LOT EXIST. LOT
EXIST. LOT - -
EX. HOUSE
�v
EX. HOUS _---- - - - - -
I \
RON SETBA_K - I I \
EXIST. 30'_----- I I v
465.10
I.E.(IN) _ _ ----- --�-
60' UBLC R��-- �iST,7"-w�
EXIST. W A W
� _�_ EkisT. EOP y�l
/ � / 231.10
W H.P.
2 -70.
2�-
G Ex. TLF?3
XIST. �- - / 4
-ExisT. EOP - - - 465.10
- LE 465.10 - - - - - �1.
OF 8.. RCP LE- -- ,-232EH230�- 232_
---- -232y ����- ----- -----A
--- -----� ------ I IcLc�E7 V E
2/
_ SETBCw I / i in m I I\
EXIST. 30' FRONT/ \ EX. ROUSE �J\\\ I 1 I 4� G IIPj II \ L(
O
/ \ _ 02sS I k� I III `� W + \ EX
EXIST. 2�/ \ ^\\� �� LOT 25
EXIST. LOT
\\ ' EX. PAD N
�IE.OU
1.30 T I N
\ ( )I 1 -
23 v M I LO
23 I PAD=
�N IIII I I1.E. IN
9
I�'I I I� 1111'l LOT 24 w
i I II L�� IIY N PAD= 235.50
234.00 �\ I
WOODED I �• � \\ HP I IJ
EXIST, END OF-2
2 2. -..
NIa11111 PAVEMENT - I. .(1 N \ 23 2'
\ V 1111111 / �� N 23
234.00
\ I I I� IIII HP / N
r7 I -
V; I w)
LOT 50 LOT �b
-234= 23550 PAD= ��35.50
f N'_� II III / L 23 .83 WOODED 235.25
/ I. (IN) 2 2.0 I \ HIP ��N
1.Er(OUT
XT/O /00,
\\ ss
/ I
EXI T.-ERQSION- - ///// - - 233 LOT 23 3
_ / -. .f..f..r.. 3
01.. .. .. -► .. y ...
-- C-0 ROL Bl l�d_--�;i j\ \ PAD= 235.00 3.69
- y
--- ---\ If/II N 1. .( T) I I I P � I
---1�0 �I
/ A
---- 11�\ /- I cN,! �� II 1 \\ WOOD I LE
- - - - - - ----230=---\
231.
�U, A LOT 49/ / 234.00 �T A h
�' / PAD= 234.75 \ HP \ 1, LOT 46
vv i'AD= 235.25 �
PROPERTY LINE �11 �� ��\/V // / -� I 1� r'0%
83 .l}0 v N 1 V I 1 \ 31�OUT v / /Z� 234.00 234P00 A v / 23 .9
V / / LE. U yj
I I I \ \A \ �\ V �\ V \V A A I� V I HP
/ \
\\\
T, vv V � )�V 0 I � "�'S� I �`3 / �"�
v vvv v vvvvv ti ti
\ \ \\ \\ \\\ \\ \ \ \\ I.E.( yT) �\ //
/ LOT 48
PROP. TREE vV A \ \ VA / / � PAD= 234.50 r'
• vv vA vv v / �� N� LOT 47
LINE (TYP) ri ,�`�svv vA vvv PROP. 50 LF 1.23p
rn �c aA�=�i//i/ / �� X PAD= 234.75 00, i
i
-0�24RCRP{T
� N I.E. UT)
''v
233
c.d /// ���_-� i/ I ILE. N V i /i /.
i i /
b.22�� /
NOW OR FORMERLY 32
�� -.7ROBERT LOCKLEAR ` �� �� <� 3030
t, ,
w
z
}
NOW OR FORMERLY
SUAZO LUNA, MARITERESITA
w
DB 1270, PG 462
o
PID:294220001063
a_
ZONING: RA-20
/
v\
LOT 15
PAD= 235.50
234.00 1
HP '
N
1
LOT 16
PAD= 235.00
w
� Z
J
234.0 w
W
7
�32.58
/ -2+-0I
O
PROP. 5.0'
X
w
I �
CONC.
i
N
233I38
SIDEWALK
I I
` 1
23�.63 �
�02
TC:233.28
N
BC: 232.78
x
Ld
e l
T I
d °N
a� 233.53
/
PROP. 15" RCP
I
TC:233.
3
I.E.(OUT): 231.94
3
232.73
/BC:2321
a
PROP. 15 LF
i
OF 15" RCP ®
Qe
X
w
0.53%
a a
i
I
I
a a
i
PROP. CLUSTER
I
a
MAILBOX
WOODED
MOUNTED ON
PEDESTAL
I
I
TC: 233.
I
I
I
I I
1 BC: 233.
Q
232.81
PROP. 15" RCP
I
a l
I.E.(IN): 232.04
I
A
2�3.61 I
232.83
I
I
I
D_
O
c�
LJ
LI
NOW OR FORMERLY
11
INSET
MARY MONROE
DB 677, PG 627
PI D: 294220001064
SCALE: 1: 10
ZONING: RA-20
WOODED
DRAINAGE PATTERNS ARE TO HELP COMMUNICATE
THE PROJECT'S FINE GRADING BETWEEN SPOT ELEVATIONS.
THESE LINES DO NOT REPRESENT SWALES OR ANY OTHER FEATURES
DB 278, PG 424 �� V A 23 LE.(oUT) / / / LOT 17 HP O
PI D: 294220001189 �� ��i \ �� 5 _ A =-}_ _ _ _ _ - - - / /
ZONING: RA 20 �I���\ vv �3 --�' 30. A / PAD= 234.75
�\
\\� ^� � 0 23 '23 5 •
D.48\� rt -�- - -�-_ Z • / ��ii
IIIIv V A v V A LE. v 23
X
111jII/ice !v � � v v�-232 2� --- � �� 230.45
v�vv�vvv 2i �2 -i.E.( szvv v -LINETYP PROP
PEE
)
230.24-0�>3
WOODED >/I)LOT 21 I.E. 0.10 �I.E3. 6OU26T
LE. IN i LOT 18wPAD= 234.25r 3
- - 2 _
A�v ?34
3- PAD= 234.25
232 „D ROP. 28 LF II\ PROP. 24" RCP 2 3 25 w v A \ \\
0 8" RCP(TYP) I I \ W/HEADWALL P \ \ \
�----------- 23p / II I.E.(IN): 229.93 234.0 \v A
/ / 3
233.0o N LOT 20 w LOT 19 3, HP
1 1 23 9 III �v HP PAD= 1235.25 I I PAD= 235.50 vv v , 233
1 \� _---n�r� ---\
/ / ^ _ \\
1111 Ds 233 / 229- v vv 0
^� / � III I \\\\ \\\\ \\
1 v 1111 ��23 III P j l
�
PROP. 1 F W/HEADWAL V III
-- I I ??g, ���I I I <
\ -232- -==-- - '11 ;23 OF 24 RCP 0 II :228.50 \ \\\�--229__ - 1
232 --- - �0��� �� / 0. v _ z�
/ �� Know what's below.
I ' I I ' \ PROP. I '
--- 3 \
?� - 232-- _ Call before you cOg.
__ __ ___ ?
- 233��OPERA LINE �- -
BASINS TO BE N i� ?3 �� � ?3 � - - - - - - - - - - � BASINS T01 BE
,. 4. ����� �, I I -232 ,?,32- FILLED IN v CALL 1.800.632.4949 OR &i 1
FILLED IN L r� ?3S.��=�23 233 T V I
NOW OR FORMERLY _
/ WOOD ��� OBERT LOCKLEAR WWW.NC811.ORG
%2B 1047, PG 018 - WOODED NC ONE -CALL CENTE
//35� PID 20001061
--_ / o zoNIN o IT'S THE LAW!
DE -WATERING NOTES
1. THE CONTRACTOR SHALL AT ALL TIMES PROVIDE AND MAINTAIN AMPLE MEANS AND
EQUIPMENT WITH WHICH TO REMOVE AND PROPERLY DISPOSE OF ANY AND ALL
D
WATER ENTERING THE EXCAVATION OR OTHER PARTS OF THE WORK AND KEEP ALL
GRASSED SWALE NOTES:
EXCAVATIONS DRY UNTIL SUCH TIME AS PIPE LAYING AND GRADING IS COMPLETED
AND STRUCTURES TO BE BUILT THEREIN ARE COMPLETED.
1.
EXCAVATE CHANNEL TO THE CROSS-SECTION SHOWN.
C
2.
APPLY LIME, FERTILIZER AND SEED TO THE CHANNEL AND
ADJOINING
2. NO WATER SHALL BE ALLOWED TO RISE AROUND THE PIPE IN UNBACKFILLED TRENCHES
NOR SHALL IT BE ALLOWED TO RISE OVER MASONRY UNTIL THE CONCRETE OR MORTAR
- - - - - - - -
-
- - - - - - - - - -
AREAS IN ACCORDANCE WITH THE SEEDING SCHEDULE.
HAS SET (MINIMUM 24 HOURS). ALL WATER PUMPED OR DRAINED FROM THE WORK SHALL
B
� 1
3.
START LAYING THE NET FROM THE TOP OF THE UPSTREAM
END OF THE
BE DISPOSED OF IN SUCH A MANNER AS TO PREVENT SILTATION AND EROSION TO ADJACENT
3'0
CHANNEL AND UNROLL IT DOWN THE GRADE. DO NO STRETCH
MATTING.
PROPERTY OR OTHER CONSTRUCTION.
I
p
I
4.
BURY THE UPSLOPE END AND STAPLE THE NET EVERY 12"
ACROSS THE
I��I
NORTH AMERICAN GREEN VMAX SC350
TOP END, EVERY 3' AROUND THE EDGES AND ACROSS THE
MAT SO THAT
DRAINAGE NOTES:
OR APPROVED EQUIVALENT
THE STRAW IS HELD CLOSELY AGAINST THE SOIL.
1. THE PROPOSED CONTOURS WITHIN PAVED AREAS ARE GRAPHICAL
5.
MATTING STRIPS SHOULD BE JOINED TOGETHER ALONG THE
SIDES WITH
REPRESENTATIONS ONLY. THE CONTRACTOR IS RESPONSIBLE FOR GRADING
I A I
B
C
D
A 3" OVERLAP AND STAPLED TOGETHER.
UNIFORMLY BETWEEN SPOT ELEVATIONS.
I 1.0' I
VARIES
VARIES
VARIES
6.
TO JOIN ENDS OF STRIPS, INSERT THE NEW ROLL OF NET IN
A TRENCH
A = BOTTOM WIDTH
AS WITH UPSLOPE END AND OVERLAP IT 18" WITH THE PREVIOUSLY LAID
2. CONTRACTOR TO GRADE ALL AREAS WITHIN PROJECT TO DRAIN STORM
B = HIEGHT OF TEMP. LINER
UPPER ROLL. TURN UNDER 6" OF THE 18" OVERLAP AND
STAPLE EVERY
WATER. CARE SHALL BE TAKEN TO ENSURE THAT ALL AREAS WITHIN
C =DEPTH OF GRADED SWALE
12" ACROSS THE END.D
PARKING LOTS, ROADS, AND LANDSCAPED ISLANDS SHALL NOT HOLD WATER
= TOP WIDTH OF SWALE
UPON PROJECT COMPLETION.
REF. SWALE CALCULATIONS
GRASS SWALE
FOR DIMENSIONS
N.T.S.
LEGEND
GENERAL NOTES:
1. THIS MAP IS NOT A CERTIFIED SURVEY. BOUNDARY INFORMATION
PROVIDED BY ROBESON COUNTY GIS
2. TAX PARCEL ID - 141102027
3. THIS PROPERTY IS NOT LOCATED IN A SPECIAL FLOOD HAZARD
AREA AS DETERMINED BY THE FEMA FLOOD MAP COMMUNITY
PANEL NUMBER 3710934300K EFFECTIVE DATE: 12/06/2019.
4. THE UTILITIES SHOWN ARE FOR THE CONTRACTOR'S CONVENIENCE
ONLY. THERE MAY BE OTHER UTILITIES NOT SHOWN ON THIS PLAN;
THE ENGINEER ASSUMES NO RESPONSIBILITY FOR THE LOCATIONS
SHOWN.
5. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL EXIST.
UTILITIES PRIOR TO COMMENCEMENT OF CONSTRUCTION. CONFLICTS
BETWEEN EXIST. UTILITIES AND PROPOSED EXCAVATION SHALL BE
REPORTED TO THE ENGINEER IMMEDIATELY.
6. PROVIDE MINIMUM OF 48 HOUR NOTICE TO OWNER OR
REPRESENTATIVE PRIOR TO INTERRUPTION OF ANY EXIST. UTILITY,
IF BEING UTILIZED.
7. THE CONTRACTOR IS RESPONSIBLE FOR REPAIR AND/OR
REPLACEMENT OF ANY UTILITIES DAMAGED DURING CONSTRUCTION.
8. THE CONTRACTOR SHALL USE EXTREME CARE WHEN WORKING
NEAR ALL UNDERGROUND AND OVERHEAD UTILITIES.
9. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL
NECESSARY PERMITS AND APPROVALS HAVE BEEN OBTAINED PRIOR
TO CONSTRUCTION. THESE PERMITS AND APPROVALS MAY INCLUDE
BUT ARE NOT LIMITED TO GRADING, DEMOLITION, ZONING, BUILDING,
DRIVEWAY, DETENTION, SUBDIVISION, SPECIAL USE, SEWER AND
WATER.
-----ELEV----- EXISTING CONTOUR
EXIST.
DITCH
ELEV PROPOSED CONTOUR
i PROP.
DITCH
EXISTING STORM DRAINAGE PIPE
OHP EXIST.
OVERHEAD POWER LINE
- - - - - - PROPOSED STORM DRAINAGE PIPE
- - - - - -
EXIST.
TOP OF BANK
SPOT PROP. SPOT ELEVATION
W EXIST.
WATER LINE
100.00
PROP. GEOGRID FABRIC FOR
- - EXIST.
RIGHT OF WAY
SLOPE STABILIZATION
- PROP.
RIGHT OF WAY
`V EXIST. TREE LINE
PROP.
TREE LINE
rc1
i'a
GRAPHIC SCALE
30 0 15 30 60
1 INCH = 30 FEET
• Z
Vo�
r
J 0
J �
cn T'.
/ Zap
e Ozu
Sit 06 0Wc
O(� cn
W o
Za
Z
U wJc
= Z r
(D
C)Z a
W
w
m
m
0
O
z
V / '
-� LLJ � O
w Wiz
O�<
U
2
z QQF-
O E_zo
4e!� co Z F-
Z
�o
O Ix Y
� w 2
I -
J
J
W
m
cc
o
o
c
0o
CID
0
zQ
m
m
N
Q
w
U
z
m
C)
^J
I..L
r I�i
v
W
=
J
O
N
Z
co
Q
o
T
T
_
0
c-
m
o
w
0
�
V
m
p
W
J
m
a
Z
Lu
z
W
w
J
U
ocf)
SHEET
C200
Ld
� w
� w
w
zLL
O
Qw
J
a
U
LLJ V)
J J
Ld U
Ld
0
250
240
230
220
210
w
J
U O
� O
U +
PVI STA: 5+81
02
PVI ELEV: 230
48
Q
K: 615.75
=
LVC: 922.7
U
LOW PT. STA: 5+
0.26
J
Q
LOW PT ELEV: 2
2.16
00
+ N
Ld
(n U
EXIST. FH
m m
EXIST. GROUND
'
EXIST.
0.50%
Q
GROUND
ljt
_ _.
—0.50%
—
_
—
u Q
CA
p
-RR-QP 24=
ICE
-----
----_ —
R MAIN
DR-21 PVC WAT
W
CLASS IV
O
w �
EXIST. GV U
PROP. 1445 LF OF tD SDR-21
PVC WATER MAIN
Q
u CO
Ld
J 00
1.0
=
O
U O
BOTTOM OF
Q 4
L
COMPACTED
U
� N
U N
ROAD SUBGRADE
zxcn
Q II
w w
U
w
45` BEND WITH
45' BEND WITH
BLOCKING
-i
BLOCKING
Wn
cw
c) w
U w
PROP. 20 LF. OF
oo�J
6 DIP WL
C)o
JO
�U
oo�z
o
\o
~!�
z v
w +
U +
LOT 22 ! LOT 23
o
O
OQ
Of
w i
x
W cn
0-Cn
z!
J�
I
�I
M
M
0I
JI
I
I
N
0O
�
00 �
0 O�
0O
C) N r
O�
rrj r7
�t
r7
O
4
CN
N
CN r7
r-
N N
n
re)O
N r7
r7 r7
M
N
c
r
N N
N N
N N
N
N
N�
N
N�
N
N
N
N N
N N
N
N r
—2+70.18
—2+00
—1+00
0+00
1+00
2+00
PROP. CHERAW CIRCLE STATION (ft.)
HORIZONTAL SCALE: 40 FEET PER INCH
EXISTING GROUND AT CL----- - - - - --
CHERAW CIRCLE PROPOSED PROFILE
DE -WATERING NOTES
3+00
1. THE CONTRACTOR SHALL AT ALL TIMES PROVIDE AND MAINTAIN AMPLE MEANS AND
EQUIPMENT WITH WHICH TO REMOVE AND PROPERLY DISPOSE OF ANY AND ALL
WATER ENTERING THE EXCAVATION OR OTHER PARTS OF THE WORK AND KEEP ALL
EXCAVATIONS DRY UNTIL SUCH TIME AS PIPE LAYING AND GRADING IS COMPLETED
AND STRUCTURES TO BE BUILT THEREIN ARE COMPLETED.
4+00
2. NO WATER SHALL BE ALLOWED TO RISE AROUND THE PIPE IN UNBACKFILLED TRENCHES
NOR SHALL IT BE ALLOWED TO RISE OVER MASONRY UNTIL THE CONCRETE OR MORTAR
HAS SET (MINIMUM 24 HOURS). ALL WATER PUMPED OR DRAINED FROM THE WORK SHALL
BE DISPOSED OF IN SUCH A MANNER AS TO PREVENT SILTATION AND EROSION TO ADJACENT
PROPERTY OR OTHER CONSTRUCTION.
DRAINAGE NOTES:
1. THE PROPOSED CONTOURS WITHIN PAVED AREAS ARE GRAPHICAL
REPRESENTATIONS ONLY. THE CONTRACTOR IS RESPONSIBLE FOR GRADING
UNIFORMLY BETWEEN SPOT ELEVATIONS.
2. CONTRACTOR TO GRADE ALL AREAS WITHIN PROJECT TO DRAIN STORM WATER. CARE
SHALL BE TAKEN TO ENSURE THAT ALL AREAS WITHIN PARKING LOTS, ROADS, AND
LANDSCAPED ISLANDS SHALL NOT HOLD WATER UPON PROJECT COMPLETION.
5+00
GENERAL NOTES:
6+00
1. THIS MAP IS NOT A CERTIFIED SURVEY. BOUNDARY INFORMATION
PROVIDED BY ROBESON COUNTY GIS
2. TAX PARCEL ID - 141102027
3. THIS PROPERTY IS NOT LOCATED IN A SPECIAL FLOOD HAZARD
AREA AS DETERMINED BY THE FEMA FLOOD MAP COMMUNITY
PANEL NUMBER 3710934300K EFFECTIVE DATE: 12/06/2019.
4. THE UTILITIES SHOWN ARE FOR THE CONTRACTOR'S CONVENIENCE
ONLY. THERE MAY BE OTHER UTILITIES NOT SHOWN ON THIS PLAN;
THE ENGINEER ASSUMES NO RESPONSIBILITY FOR THE LOCATIONS
SHOWN.
5. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL EXIST.
UTILITIES PRIOR TO COMMENCEMENT OF CONSTRUCTION. CONFLICTS
BETWEEN EXIST. UTILITIES AND PROPOSED EXCAVATION SHALL BE
REPORTED TO THE ENGINEER IMMEDIATELY.
6. PROVIDE MINIMUM OF 48 HOUR NOTICE TO OWNER OR
REPRESENTATIVE PRIOR TO INTERRUPTION OF ANY EXIST. UTILITY,
IF BEING UTILIZED.
7. THE CONTRACTOR IS RESPONSIBLE FOR REPAIR AND/OR
REPLACEMENT OF ANY UTILITIES DAMAGED DURING CONSTRUCTION.
8.THE CONTRACTOR SHALL USE EXTREME CARE WHEN WORKING
NEAR ALL UNDERGROUND AND OVERHEAD UTILITIES.
9. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL
NECESSARY PERMITS AND APPROVALS HAVE BEEN OBTAINED PRIOR
TO CONSTRUCTION. THESE PERMITS AND APPROVALS MAY INCLUDE
BUT ARE NOT LIMITED TO GRADING, DEMOLITION, ZONING, BUILDING,
DRIVEWAY, DETENTION, SUBDIVISION, SPECIAL USE, SEWER AND
WATER.
0
7+C
250
E
230
220
210
�AE
,Hl�PS-
o�
GRAPHIC
SCALE
30 0 15 30 60
1 INCH = 30 FEET
M
. Z a0
Up N
N
M
J c
CD M
cn T W
Z N
d
O .. Z
UwLLi
Y
O(� zm
Z W 2
UofV
W
W o
= Z M
x
C Z m
w o
a
w
m
m
0
O
z
V) '
1--�-1 w C)
W Wiz
U aU0
� O�Q
U
2
Z QpF-
O o
z
u) z F-
Z
.� o
oxY
00 a N o
J
J
W
m
cc
C
9,
NO
m
C
co
O
W
m
c
m
N
J
�
w
z
m
o
LL
O
W
�
J
N
O
N
m
Q
�
O
T
N
T
m
Q
' I11
O
o
0
I..L
>
m
o
w
J
m
�
Q
z
w
z
W
w
J
U
ocf)
SHEET
C3,00
4--1
4-
0
Q
J
LLI
0
U
z
w
w
w
LL
w
J
a
U
J
a
U
Ld
250
cue
230
220
210
Ld
O J
4 UO
U L O
U +
W
w
J
U O
N Q
Of 00
PVI STA: 5+81
02
flf Q
z w (
U 4
M
PVI ELEV: 230
48
J
U w
Q
K: 615.75
=
J
of II
w
LVC: 922.7
00
U J
L
W PT. STA: 5+00.26
0-)
Lo
�
J w
OW PT ELEV: 2
2.16
N
�
u
Lo
+
N
O
O
W O
E
IST. GROUND
v
>
>
Ld
OQ
w
of
o_ cn
— — — — _-RR9P 24=
CP_
� _______
CLASS IV
7777
F OF 6"0 SDR-21
VC WATER MAIN
PROP. 1445 1
BOTTON
OF
COMPACTED
ROAD
UBGRADE
PROP. MEGALUG
45` BEND WITH
BLOCKING
PROP. 20 LF. OF
6" DIP WL
LOT 22 ' LOT 23
I
I
w
z
O
M
M
Il
�t
�
O
N-)
O N
N 00
N O
L
�
� O
0 I'
O
00
r
n
ND N-)
N�
M
N
N N
N N
N N
N N
N N
N N
lial
5+00
6+00
7+00
9+00
PROP. CHERAW CIRCLE STATION (ft.)_
HORIZONTAL SCALE: 40 FEET PER INCH
EXISTING GROUND AT CL
CHERAW CIRCLE PROPOSED PROFILE
DE —WATERING NOTES
10+00
1. THE CONTRACTOR SHALL AT ALL TIMES PROVIDE AND MAINTAIN AMPLE MEANS AND
EQUIPMENT WITH WHICH TO REMOVE AND PROPERLY DISPOSE OF ANY AND ALL
WATER ENTERING THE EXCAVATION OR OTHER PARTS OF THE WORK AND KEEP ALL
EXCAVATIONS DRY UNTIL SUCH TIME AS PIPE LAYING AND GRADING IS COMPLETED
AND STRUCTURES TO BE BUILT THEREIN ARE COMPLETED.
2. NO WATER SHALL BE ALLOWED TO RISE AROUND THE PIPE IN UNBACKFILLED TRENCHES
NOR SHALL IT BE ALLOWED TO RISE OVER MASONRY UNTIL THE CONCRETE OR MORTAR
HAS SET (MINIMUM 24 HOURS). ALL WATER PUMPED OR DRAINED FROM THE WORK SHALL
BE DISPOSED OF IN SUCH A MANNER AS TO PREVENT SILTATION AND EROSION TO ADJACENT
PROPERTY OR OTHER CONSTRUCTION.
DRAINAGE NOTES:
1. THE PROPOSED CONTOURS WITHIN PAVED AREAS ARE GRAPHICAL
REPRESENTATIONS ONLY. THE CONTRACTOR IS RESPONSIBLE FOR GRADING
UNIFORMLY BETWEEN SPOT ELEVATIONS.
2. CONTRACTOR TO GRADE ALL AREAS WITHIN PROJECT TO DRAIN STORM WATER. CARE
SHALL BE TAKEN TO ENSURE THAT ALL AREAS WITHIN PARKING LOTS, ROADS, AND
LANDSCAPED ISLANDS SHALL NOT HOLD WATER UPON PROJECT COMPLETION.
FONJ]
230
220
210
N
O
00
4
Po
N
10+71.51
GENERAL NOTES:
1*1101m"117
EXIST. 6"0 SDR-21 PVC
WATER MAIN
1. THIS MAP IS NOT A CERTIFIED SURVEY. BOUNDARY INFORMATION
PROVIDED BY ROBESON COUNTY GIS
2. TAX PARCEL ID — 141102027
3. THIS PROPERTY IS NOT LOCATED IN A SPECIAL FLOOD HAZARD
AREA AS DETERMINED BY THE FEMA FLOOD MAP COMMUNITY
PANEL NUMBER 3710934300K EFFECTIVE DATE: 12/06/2019.
4. THE UTILITIES SHOWN ARE FOR THE CONTRACTOR'S CONVENIENCE
ONLY. THERE MAY BE OTHER UTILITIES NOT SHOWN ON THIS PLAN;
THE ENGINEER ASSUMES NO RESPONSIBILITY FOR THE LOCATIONS
SHOWN.
5. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL EXIST.
UTILITIES PRIOR TO COMMENCEMENT OF CONSTRUCTION. CONFLICTS
BETWEEN EXIST. UTILITIES AND PROPOSED EXCAVATION SHALL BE
REPORTED TO THE ENGINEER IMMEDIATELY.
6. PROVIDE MINIMUM OF 48 HOUR NOTICE TO OWNER OR
REPRESENTATIVE PRIOR TO INTERRUPTION OF ANY EXIST. UTILITY,
IF BEING UTILIZED.
7. THE CONTRACTOR IS RESPONSIBLE FOR REPAIR AND/OR
REPLACEMENT OF ANY UTILITIES DAMAGED DURING CONSTRUCTION.
8.THE CONTRACTOR SHALL USE EXTREME CARE WHEN WORKING
NEAR ALL UNDERGROUND AND OVERHEAD UTILITIES.
9. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL
NECESSARY PERMITS AND APPROVALS HAVE BEEN OBTAINED PRIOR
TO CONSTRUCTION. THESE PERMITS AND APPROVALS MAY INCLUDE
BUT ARE NOT LIMITED TO GRADING, DEMOLITION, ZONING, BUILDING,
DRIVEWAY, DETENTION, SUBDIVISION, SPECIAL USE, SEWER AND
WATER.
0
GRAPHIC SCALE
30 0 15 30 60
1 INCH = 30 FEET
M
co
Z
co
U O N
N
M
J 0
� M
W coZ�ci
0
Q O .. Z
UZui
Y
O(� zm
Z W 2
UofV
W
W o
= Z M
x
C Z m
w o
a
w
m
m
0
O
z
V) '
-� W p
W Wiz
U � avo
� O,Q
U
2
Z QpF--
O >Zo
E- z
Cn z p F--
Z
>�o
oxY
00 a N o
J
J
W
m
cc
C
9,
NO
m
C
co
O
W
m
c
m
N
J
�
w
�
z
m
o
LL
O
W
�
J
N
O
N
m
Q
�
O
T
N
T
m
Q
' I11
O
o
0
I..L
>
m
o
W
J
m
�
Q
z
w
z
W
w
J
U
ocf)
SHEET
C4,00
0
LOT 33 \
EXIST. LOT
EX. HOUS
RON SETS
EXIST. 30'
EXIST.J—
II �
W
' PUB C R
(EXIST. 60 —II
LE
OF 18" RCP
-7- - - XE IST. 60' PUBLICC RAW
LOT 34'
EXIST. LOT
EX. HOUSE
W—
EDP
LOT 7 LOT 8 LOT 9
i EXIST. LOT
T. LO EXIST. LOT
EX. HOUSE
LEX
EXIST. ACK
I �
---------__ __ —_ EXIST._60' P BLICW EWT. 6" WL
VVEXIST. EOP
— — 2 -70.!8 _ _ _ _ (EXIST. 60 PUBLIC R/W)
EX, 72 65 LE — —
`° ExisT. EOP
--------EX. EH ----------
& cv REMOVE PLUG, GV EXIST. 60 PUBLIC R
& B.O. ASSEMBLY �W
EX. ELE._,,-"
& TELE. PAD
i
LOT 35 I ��
EXIST. LOT I
I
i
-----�.w
Ex ST. 6" wL
Ek�ST. EOP
U EXIST. 30' FRON SET ACK
J CJ
D j Im
EXIST. 30' FRONT SETBACK EX. HOUSE m Ia_ LOT 42
of to EXIST. LOT EX. HOUSE
LOT 26
EXIST. LOT LOT 25
EXIST. LOT cI IL) CO icn
x x TIE PROP. 6" W.L. TO
wl v~i EXIST. 6" W.L. AFTER SUCCESSFUL
EX. ELE i x x CHLORINATION AND TESTING,
PAD W L'i
O �
� LO51-
II I III' 1)(4
LOT 24 20,489 sq. ft.
o 1
(PHASE 4) Ljj
20,221 sq. ft. x
r w PROP. 1445 LF OF 6" SDR WL
i (MIN. 3.0' COVER)
3
i I i
I '
II i
PROP. 1 " LOT 50
WATER SERVICE I (PHASE 4)
(TYP) 7 26,411 sq. ft.
� I� u
II PROP. 10.0' SIDE SETBACK
LOT 23
(PHASE 4)
25,892 sq. ft. j PROP. 28 LF OF 18"RCP
1 0 DRIVEWAY TILE (TYP.)
' I '
I LOT 49
1 (PHASE 4)
\\ 20,991 sq. ft.
PROPERTY LINE
� 0 \
NOW OR FORMERLY
ROBERTLOCKLEAR
DB 278, PG 424
PID:294220001189
ZONING: RA-20
GENERAL NOTES:
1. THIS MAP IS NOT A CERTIFIED SURVEY. BOUNDARY INFORMATION
PROVIDED BY ROBESON COUNTY GIS
2. TAX PARCEL ID - 141102027
3. THIS PROPERTY IS NOT LOCATED IN A SPECIAL FLOOD HAZARD
AREA AS DETERMINED BY THE FEMA FLOOD MAP COMMUNITY
PANEL NUMBER 3710934300K EFFECTIVE DATE: 12/06/2019.
4. THE UTILITIES SHOWN ARE FOR THE CONTRACTOR'S CONVENIENCE
ONLY. THERE MAY BE OTHER UTILITIES NOT SHOWN ON THIS PLAN;
THE ENGINEER ASSUMES NO RESPONSIBILITY FOR THE LOCATIONS
SHOWN.
5. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL EXIST.
UTILITIES PRIOR TO COMMENCEMENT OF CONSTRUCTION. CONFLICTS
BETWEEN EXIST. UTILITIES AND PROPOSED EXCAVATION SHALL BE
REPORTED TO THE ENGINEER IMMEDIATELY.
6. PROVIDE MINIMUM OF 48 HOUR NOTICE TO OWNER OR
REPRESENTATIVE PRIOR TO INTERRUPTION OF ANY EXIST. UTILITY,
IF BEING UTILIZED.
7. THE CONTRACTOR IS RESPONSIBLE FOR REPAIR AND/OR
REPLACEMENT OF ANY UTILITIES DAMAGED DURING CONSTRUCTION.
8. THE CONTRACTOR SHALL USE EXTREME CARE WHEN WORKING
NEAR ALL UNDERGROUND AND OVERHEAD UTILITIES.
9. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL
NECESSARY PERMITS AND APPROVALS HAVE BEEN OBTAINED PRIOR
TO CONSTRUCTION. THESE PERMITS AND APPROVALS MAY INCLUDE
BUT ARE NOT LIMITED TO GRADING, DEMOLITION, ZONING, BUILDING,
DRIVEWAY, DETENTION, SUBDIVISION, SPECIAL USE, SEWER AND
WATER.
O
a
m
r
z
m
UTILITY CONSTRUCTION NOTES
LOT 43
(PHASE 4)
23,867 sq. ft.
LOT 10
EXIST. LOT
EX. HOUSE
I
PROP. 28 LF " CP
DRIVEWAY TIL (TYP.)
EX
C
EX. ELE. `
& TELE. PAD
o � \
EXIST \GV
y EX. HOUSE
TIE P. 6" TO
IST. 6' AFTER SUCCESSFUL
CHLO ATION AND TESTING,
LOT 44
(PHASE 4) \
23,390 sq. ft.
PROP. 1 " 11
WATER SERVICE I
(TYP.) c
I
LOT 45
(PHASE 4)
26,512 sq. ft.
i
PROP. 28 LF OF 18"RCP
DRIVEWAY TILE (TYP.) I
I
LOT 46
(PHASE 4)
21,153 sq. ft.
i
LOT 48
\ \ (PHASE 4) LOT 47
�`\ 22,395 sq. ft. (PHASE 4) i
� � 22,071 sq. ft. /
LOT 22 '
(PHASE 4) PROP. 50 LF 24" ATER SERVIC>F/�
47,947 sq. ft. \%` �`� CLASS IV RCP ( P.) /
1 LA TERAL SEPARA 77ON OF SEWERS AND WATER MAIN. -
WATER MAINS SHALL BE LAID AT LEAST 10 FT. LATERALLY FROM
EXISTING OR PROPOSED SEWER, UNLESS LOCAL CONDITIONS OR
BARRIERS PREVENT A 10 FT. LATERAL SEPARATION - IN WHICH
CASE.•
a. THE WATER MAIN IS LAID IN A SEPARATE TRENCH, WITH THE
ELEVATION OF THE BOTTOM OF THE WATER MAIN AT LEAST 18
INCHES ABOVE THE TOP OF THE SEWER, OR
b. THE WATER MAIN IS LAID IN THE SAME TRENCH AS THE SEWER
WITH THE WATER MAIN LOCATED AT ONE SIDE ON A BENCH OF
UNDISTURBED EARTH AND WITH THE ELEVATION OF THE
BOTTOM OF THE WATER MAIN AT LEAST 18 INCHES ABOVE THE
TOP OF THE SEWER.
2. CROSSING A WATER MAIN OVER A SEWER. WHENEVER IT IS
NECESSARY FOR A WATER MAIN TO CROSS OVER A SEWER MAIN,
THE WATER MAIN SHALL BE LAID AT SUCH AN ELEVATION THAT THE
BOTTOM OF THE WATER MAIN IS A T LEAST 18 INCHES ABOVE THE
TOP OF THE SEWER MAIN, UNLESS LOCAL CONDITIONS OR BARRIERS
PREVENT AN 18 INCH VERTICAL SEPARATION - IN WHICH CASE
BOTH THE WATER MAIN AND SEWER MAIN SHALL BE CONSTRUCTED
OF FERROUS MATERIAL AND WITH JOINTS THAT ARE EQUIVALENT TO
WATER MAIN STANDARDS FOR A DISTANCE OF 10 FT. ON EACH SIDE
OF THE POINT OF CROSSING.
� 11 -
M - - -M
PR P. 28 LF F 18'RCP
LOT 21 PROP. 1 ' DRI EWAY TIL (TYP.) LOT 18
(PHASE 4) WATER ERVI E PROP. 20 LF F D P (PHASE 4)
25,478 sq. ft. TYP.) II ON 27,864 sq. ft.
II TORM PIPE (UNDE STORM)
�� II
LOT 20 �! jj 15.00' LOT 19
(PHASE 4) II (PHASE 4)
23,554 sq. ft. II 20,087 sq. ft.
U! II U!
�i II o WL CROSSING
o II o GROUND: 232.18
TOP 24" STORM: 229.00
II BTM 24" STORM: 226.25
J. CROSSING A WATER MAIN UNDER A SEWER. WHENEVER IT IS
NECESSARY FOR A WATER MAIN TO CROSS UNDER A SEWER MAIN,
BOTH THE WATER MAIN AND THE SEWER MAIN SHALL BE
CONSTRUCTED OF DUCTILE IRON MATERIAL AND WITH JOINTS
EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE OF 10
FT. ON EACH SIDE OF THE POINT OF CROSSING. A SECTION OF
WATER MAIN PIPE SHALL BE CENTERED AT THE POINT OF CROSSING
4. CROSSING STORM DRAINAGE LINES. A MINIMUM OF 12 INCHES OF
VERTICAL CLEARANCE SHALL BE MAINTAINED BETWEEN A WATER
LINE CROSSING OVER A STORM DRAINAGE LINE UNLESS DUCTILE
IRON PIPE IS USED. IN ADDITION, THREE AND A HALF (3.5) FT. OF
COVER MUST BE MAINTAINED OVER THE WATER MAIN OR IT SHALL
BE DUCTILE IRON. IF DUCTILE IRON PIPE IS USED THEN TWO AND A
HALF (2.5) FT. OF COVER MUST BE MAINTAINED OVER THE WATER
MAIN AND A MINIMUM OF 4 INCHES OF VERTICAL CLEARANCE SHALL
BE MAINTAINED BETWEEN THE WATER MAIN AND THE STORM
DRAINAGE LINE. WHERE A WA TER MAIN CROSSES UNDER A STORM
DRAINAGE LINE THE MINIMUM OF TWELVE (12) INCHES OF VERTICAL
SEPARATION SHALL BE MAINTAINED AND THE WATER MAIN SHALL BE
DUCTILE IRON FOR A DISTANCE OF 10 FT. ON EACH SIDE OF THE
CROSSING. WHERE STORM DRAIN & SANITARY SEWER CROSSES
MAINTAIN A MIN. 24" VERTICAL SEPARATION, OTHERWISE SANITARY
SEWER MUST BE DIP.
II TOP WL. 225.25
(REF. WATER/STORM CROSSI DETAIL)
PROPERTY LINE
LOT 14
(PHASE 4)
21,662 sq. 1
I �
I i
� I
0+0
� III
II �
�� II
LOT 15
t (PHASE 4)
20,158 sq. 1
i
i
� I
PROP.
9 0 � 6" GV
IF
III PROP. FIRE
HYDRANT WITH
/ II VALVE
i
LOT 16
8�0 (PHASE 4)
22,820 sq. f .
PROP. 1
WATER SERVICE
(TYP.)
PROP. 1445 OF
6" SDR WL
(MIN. 3.0' COVE
NOW OR FORMERLY
I ROBERT LOCKLEAR
DB 1047, PG 018
PID:29422000001061
ZONING: RA-20
DE -WATERING NOTES
LOT 17
(PHASE 4)
32,468 sq. ft.
1. THE CONTRACTOR SHALL AT ALL TIMES PROVIDE AND MAINTAIN AMPLE MEANS AND
EQUIPMENT WITH WHICH TO REMOVE AND PROPERLY DISPOSE OF ANY AND ALL
WATER ENTERING THE EXCAVATION OR OTHER PARTS OF THE WORK AND KEEP ALL
EXCAVATIONS DRY UNTIL SUCH TIME AS PIPE LAYING AND GRADING IS COMPLETED
AND STRUCTURES TO BE BUILT THEREIN ARE COMPLETED.
2. NO WATER SHALL BE ALLOWED TO RISE AROUND THE PIPE IN UNBACKFILLED TRENCHES
NOR SHALL IT BE ALLOWED TO RISE OVER MASONRY UNTIL THE CONCRETE OR MORTAR
HAS SET (MINIMUM 24 HOURS). ALL WATER PUMPED OR DRAINED FROM THE WORK SHALL
BE DISPOSED OF IN SUCH A MANNER AS TO PREVENT SILTATION AND EROSION TO ADJACENT
PROPERTY OR OTHER CONSTRUCTION.
W
z
>_ NOW OR FORMERLY
SUAZO LUNA, MARITERESITA
W DB 1270, PG 462
O PID:294220001063
0- ZONING: RA-20
W
z
J
W
a-
O
of
a_
I
I
I
LEGEND
NOW OR FORMERLY
MARY MONROE
DB 677, PG 627
PID:294220001064
ZONING: RA-20
W
EXISTING WATER LINE
-
- EXISTING STORM DRAINAGE PIPE
N
EXISTING WATER VALVE
W
PROPOSED WATER LINE
- — — — — — — —
- PROPOSED STORM DRAINAGE PIPE
PROPOSED DIP
EXISTING FIRE HYDRANT
PROPOSED WATER SERVICE
GRAPHIC SCALE
30 0 15 30 60
1 INCH = 30 FEET
v�BEE
� � o
Know what's below.
Call before you dig.
CALL 1.800.632.4949 OR 811
WWW.NC811.ORG
NC ONE -CALL CENTER
IT'S THE LAW!
0
M
z
00
U O N
N
~ o
_j
ern
41,
06
Z Z
UZ0
Oc� M
z W
2�_jW
w�a
w o
= z M
(� X
Uw
0
a
w
m
m
m
0
0
z
C J
'
W
w
V)E4
C)
UQ
FBI
^=^
I..L
ww
v)z
C)
Q
Z
OQLu
w
J
O
Y
F
10�
/
W
-1
W
C)
M
E-1
►--I
O
U
V J
1
J
J
W
m
cc
C
C
C
00
00
m
o�
0
�N
m
zw
U
U
Z
m
O
W
J
o
N
\
N
T
J
m
z
o
0
w
J
m
o �
z
z
w
o
�
SHEET
5,0
0
11
EROSION CONTROL NOTES
LOT 33
EXIST. LOT
EX. HOU
EXIST. 30'
RON SET
I I
I II
I LOT 34 II LOT 35
EXIST. LOT I EXIST. LOT I i
I II
II EX. HOUSE III
I I�
I II i I
I
LOT 7
I, EXIST. LOT
'?3s LOT I
\\
LOT 9 LOT 10
I
T. LO I
EXIST. LOT EXIST. LOT
�i I
� I
���
w
P I
EX. HOUSE
W II I
EXIST. I
EX. HOUSE �� w I Of
a_
EX. HOUSE LOT �,
Ii
AC K I
J �\
EXIST. LOT_ �� 0
EXIST. 60' P BLIC R
i � RO LIMITS EX. HODS \
E T ra \ \
�Xis:L �_ W �IST FOP W W EE1 ST EOP W W ��
�_' (EXIST. 60 _P-b�tT��/W) w DISC URBANC (TY vv
W ��� `� - -
( XIST �-�� Ex. �z E
ExisT. EOP \
_ _ _ ?34 EXIST +� _
- - F ---- --- - -
-_2 �� w-------- 234- '235-- I
LOT �2
OF 18" RCP r 232- _--_- - 2 \ 1 _ C7_7
-_-- `z� --- _���_�' � EXIIST. LOTT
-232=--- - - 0 1 / - - --- 234 --------234_7-7
�XS C 1234�
/ / E LE.�'�� & TELE. A ��
--�_�- 1 cI� / & TEL AD X. HOUSE
------------ v Ic N EXIST. 30' RON SET ACK I �� S�
� I I ' N c� 14 / I J, �
FRONT ONT SETB�OwI vvv�� I iN m Ili I\ I Q, �
EXIST. 30/ \N EX/ROUSE _4v� I N (� h II'(�t LOT 42 I
50 EXIST. LOT I /
LOT 26 �/ � \ti2�S I �I N W 9 I+ \ EX. HOUSE
EXIST. L� �� LOT 25��
III EXIST. LOT �I 1 �� I� iIEN \ ���
PROP. LIMITS OF I V / Ex. ELE ��. w`t PROP. SILT EXISTING BERM
/ PAD N
/ , \ \ W ODED
DI TURBANCE TYP. - - - - - - - �- - _ _ HIGHP NT �' I N H T FENCE / o & DITCH
(TYP.)
- - - - - - - - I� I ' s\ (TO BE REMOVED)
I
233 I �?3s, -
�
II'I I II IIIII/ I EXISTING BERMLLJ
��II' I I &DITCH , I i
WOODED I I (TO BE REMOVED)
l �4 III EXIST END OF- , \ L- j
III PAVEMENT
I I 1
v
PROP. LIMITS OF
vIIII �
DISTURBANCE (TYP.)
234/
/ N'_� IIIII
N� IIIIII PROP. 25'x60'TEMP,
CONSTRUCTION �� �r �� EXISTING \
ENTRANCE �� \
\.'VOODED s �� SWALE (TYP.)
m00% PROP. TEMP. _ �� 1
_ _ C�ISTING
EXI T. B SIN_ - - //� / - -233- - - DI�fERSIQN - - -233 �SL� (TYP.)
i �\
----- - 232/�iri / DITCH (TYY�.) 1 (
----- - - - - -/ �:/-232 - _'(�j�TD-TD
- - - - - - ----230--a�-- /
�0` %� � i ` LINO E
1
PROPERTY LINE
��AA\Q�V
Nvvv�.v v vvvvvv vv��\/v �� XI IN
�' / v v � Disturbed Area: 9.52 AC.
Iql,�/ /v�?�s��vvvv�v vvvv v v A v 1 / SWALE (T' YP.)
NIA- ���vvv vv�vvvvv v
vv
PROP. TREE ��. AVAVAA V� VA V>
LINE (TYP) V`�� �� A �� ��// / / / / P V '
/PROP. LIMITS OF
TEMP. DIM�NT TRAP: SD-1 a P
23 �^-,��TURBANCE (TYP.)
Now OR FORMERLY �^�� �PROP. SI - - 15,300 CFI REt ;RED VOLUME I �.y
ROBE Rr LOCKLEAR <� �� �W FENCE (/TYP 232 23,623-CF.-PROV16EIVOLUME
DB 278, PG 424 / i i A� l
' 5.88� Sf' FT. REQUIRED AREA i
PID:29G RA-1189' / %%i \ \ \ �532 56133F �BOVIDED AREA, / ZONING: RA-20 i/ i \ Vr'� A ' WOODED
1 _ �� \ �` EXISTING BASH BOTTOM ELEVATION = 229 TEMP. SED>�EIVT TRAR vSD-2
�%ti�� v \\ v- - - - 4 14,336 CF. PROVIDED VO13,968 Cr REQUIRED V �UIE
�'�' STOCKPILE yME
TRAvP DEPTH 3 FEET - 23
PROP. 3" SKIMMER � v� ��� 4,163 SQ. FT. REQUIRED A4EA� �
v » 6,269 SQ. FT. PROVIDED ARL�A,�
�R+F+C� RED 1.3 PROP. TEMP. x
ORIFICE DIA: 2.7" PROP. TEMP. DIVERSION bA&W BOTTOM,ELEVATION = 22S�� PROP tREE
ov v V DIVERSION D fCt� (,TYP.) TRAP 6EPTH 3 FEET )
IIII ��A DITCH (TYP.) ;� v �� -_ LINE TAP
PROP. 12' SPILLWAY --
PROP. 2.5 IMMER
WOODED � 1 IIN�I/IIIII\v� �� >>/, �)>,� � )� > ELV= 232.00 ti� � `�` I
vvv 34 I
-- ORIFICE RAD:�1 v 2
��� -- 233 - -- v T-233 ORIFICE DIA: 2.�"
VA\V-_236=���/ \
- - - TDB T TDfTDfTDfTDT TD--TT TD--T'D-
NOW OR FORMERLY
SUAZO LUNA, MARITERESITA
DB 1270. PG 462
PID: 294220001063
ZONING: RA-20
EXISTING STOCKPILES ARE COVERED
WITH SIGNIFICANT VEGETATION. ONCE
CLEARED SOIL TESTING IS
RECOMMENDED TO DETERMINE WHAT
PORTION IS STRUCTURAL SOIL
GROUND STABILIZATION
Site Area Description
Stabilization Time Frame
Stabilization Time Frame Exception
Perimeter dikes, swales, ditches
7 days
None
and slopes
High Quality Water (HQW) Zones
7 days
None
If slopes are 10' or less in length
Slopes steeper than 3:1
7 days
and are not steeper than 2:1, 14
days are allowed.
Slopes 3:1 or flatter
14 days
7-days for slopes greater than 50
feet in length.
All other areas with slopes flatter
14 days
None (except for perimeters and
than 4: 1.
HQW Zones)
* "Extensions of time may be approved by the permitting authority based on weather or other
ite-specific conditions that make compliance impracticable." (Section 11.6 (2)(b)).
NOW OR FORMERLY
MARY MONROE
DB 677, PG 627
PID: 294220001064
ZONING: RA-20
EXISTING STOCKPILE LIMITS AND VOLUME MAY BE
LARGER THAN SHOWN BY SURVEYED INFORMA11ON.
CONTRACTOR TO CONFIRM
EXCESSIVE STRUCTURAL FILL CAN BE USED TO
RAISE PAD ELEVATIONS.
ZEVIOUS TEMPORARY SEDIMENT TRAPS LOCATIONS
WILL BE UTILIZED FOR THIS FINAL PHASE
RE-ESTABLISH EXISTING DRAINAGE SWALES AND
BASINS BY CLEARING BLOCKAGES, DEBRIS,
:GETATION AND WHERE NECESSARY RE -GRADE TO
ESTABLISH POSITIVE DRAINAGE
(REF. EROSION CONTROL DETAILS)
z j 232 - _ _ _ / vv TD-� TD-� PROPS 10 SPILLWAY � , v' '�, v LEGEND
M 1 3 22 23 _ �TD-STD-STDI FL_V= 232.00 �, v
�T�� ?33-�T��� I -ETEV-- EXISTING CONTOUR
PROP. LIMITS OF N ��� �� v�� D -ELEV- PROPOSED CONTOUR
DISTURBANCE (TYP.) NI ������v_73 PROP. SILT TEMP. ROCK
EXIST. BASIN V �� �����v N TEMPORARY INLET PROTECTION
FENCE (TYP.) CHECK DAM (P.)
v ��v 2'VERT SEPARATIONI ExlsT. BASIN
\
23 ���� �v III I ■II■II■III LIMITS OF SOIL TYPES
3� vv / OR 100'Q.C. \ (( 229- - _ - 2- .�, - � � � � � � LIMITS OF DISTURBANCE
-- PROP. BERM 30 ,-� 1---------------\------------ - - - - - - - - -
\ �c--x--x- PROPOSED SILT FENCE
-- - - ---- - - -
7 -- - �0---233 0-9-
- - 232- PROPOSED TEMPORARY
OPELINE -��P-SIB - �� ?3 DIVERSION DITCH
?35 NOW OR FORME Y
RQBERT LocKLE �_ FENCE (T �� PR02P.-TOP
DB 1047, PG BERM- L33.00 I PROPOSED TEMPORARY
4 3?_-17��220 d�661' , ROCK CHECK DAM
WOO5o6 o
2 ` WOODED
2,35
PROPOSED TREE COVERAGE
1. ALL TRAPS AND BASINS SHALL BE INSPECTED DAILY
(MONDAY THROUGH FRIDAY) FOR EXCESSIVE SILT.
CONTRACTOR SHALL REMOVE EXCESSIVE SILT FROM
THE TRAPS IMMEDIATELY BEFORE CONSTRUCTION
COMMENCES ON EACH WORKING DAY.AS NECESSARY.
MAINTENANCE SHALL CONTINUE THROUGH COMPLETION
OF THE PROJECT.
2. THE DEVELOPER ENGAGED IN OR CONDUCTING THE
LAND -DISTURBING ACTIVITY SHALL BE RESPONSIBLE
FOR INSTALLING AND MAINTAINING ALL TEMPORARY
AND PERMANENT EROSION AND SEDIMENT CONTROL
MEASURES AND FACILITIES DURING THE DEVELOPMENT
OF A SITE AS REQUIRED BY THE APPROVED PLAN.
OPERATIONS AND MAINTENANCE CONDITIONS ARE
INCLUDED IN THE PLAN OUTLINING HOW THE
L,
DEVELOPER SHALL PROVIDE FOR OPERATIONS AND
MAINTENANCE DURING CONSTRUCTION.
3. WITHIN SEVEN CALENDAR DAYS FOLLOWING SOIL
DISTURBANCE OR RE -DISTURBANCE, ALL PERIMETER
SEDIMENT CONTROLS SHALL BE INSTALLED AND
TEMPORARY STABILIZATION MEASURES SHALL BE
COMPLETED ON TOPSOIL STOCKPILES.
4. AREAS AT FINAL GRADE SHALL RECEIVE PERMANENT
STABILIZATION MEASURES WITHIN SEVEN CALENDAR
DAYS OF REACHING FINAL GRADE.
5. THE RESPONSIBILITY FOR MAINTAINING ALL PERMANENT
EROSION AND SEDIMENT CONTROL MEASURES AND
FACILITIES AFTER SITE LAND DISTURBING ACTIVITY IS
COMPLETED SHALL LIE WITH THE LANDOWNER OR
PERSON IN POSSESSION OR CONTROL, EXCEPT
FACILITIES AND MEASURES INSTALLED WITHIN ROAD OR
STREET RIGHT-OF-WAYS OR EASEMENTS.
6. ADDITIONAL CONTROL DEVICES MAY BE REQUIRED
DURING CONSTRUCTION IN ORDER TO CONTROL
EROSION AND /OR OFF -SITE SEDIMENTATION.
7. APPROVED PLANS REMAIN VALID FOR FIVE YEARS
FROM THE DATE OF AN APPROVAL.
8. THE TRUCK WELL SHALL HAVE ANY/ALL SEDIMENT
AND/OR DEBRIS REMOVED PRIOR TO REMOVING THE
PLUG
CONSTRUCTION SEQUENCE
1. ANTICIPATED START DATE IS AUGUST 25, 2021
2. OBTAIN LAND DISTURBANCE PERMIT AND ALL OTHER APPLICABLE PERMITS.
3. FLAG THE LIMITS OF CONSTRUCTION.
4. HOLD PRE -CONSTRUCTION CONFERENCE AT LEAST ONE WEEK PRIOR TO
STARTING CONSTRUCTION WITH THE ENGINEER.
5. INSTALL GRAVEL CONSTRUCTION ENTRANCE
6. INSTALL SILT FENCE & ASSOCIATED MEASURES ALONG PROPERTY LINES
PER PLANS TO ESTABLISH PERIMETER PROTECTION.
7. ALL EXISTING SWALES SHALL BE CLEARED OF BLOCKAGE AND IF
NECESSARY RE -GRADED TO ENSURE THEY HAVE POSITIVE DRAINAGE
8. AFTER PERIMETER PROTECTION MEASURES HAVE BEEN ESTABLISHED.
THE CONTRACTOR SHALL CALL AND SCEDULE AN INSPECTION BY
INC DEQ
9. UPON APPROVAL BY THE DEQ INSPECTOR BEGIN INSTALL THE ASSOCIATED
MEASURES. GRADE ONLY AS NECESSARY FOR INSTALLATION OF THESE
DEVICES.
10. CLEAR AND GRADE SITE AS NEEDED FOR ROUGH GRADING OPERATIONS.
MAINTAIN EROSION CONTROL DEVICES AS NECESSARY TO PREVENT OFF
SITE SEDIMENTATION. ALL EROSION CONTROL DEVICES SHOULD BE
INSPECTED AFTER EVERY RAINFALL EVENT TO ASSURE THEY ARE
OPERATING PROPERLY.
11. ROUGH GRADE ENTIRE SITE WITH APPROVED STRUCTURAL FILL MATERIAL.
ALL STRUCTURAL FILL SHALL BE PLACED IN MAX. 8-IN LIFTS AND
COMPACTED TO 98% OF SOILS STANDARD PROCTOR MAX. DRY DENSITY.
12. AS SITE IS BROUGHT TO GRADE, BEGIN ADJUST DIVERSION DITCHES TO
EVENTUAL PHASE 2 LOCATIONS SUCH THAT AT NO TIME SEDIMENT
OVERLOADING SILT FENCES OR IN ANY OTHER WAY LEAVES THE SITE.
13. COMPLETE UTILITY INSTALLATIONS INCLUDING WATER, AND STORM
DRAINAGE UTILITIES.
14. FINAL GRADING, PAVING AND STABILIZATION OF ALL DISTURBED AREAS
INSURE SOIL STABILIZATION MEASURES AND SEEDING SCHEDULE ARE
FOLLOWED AS PER THE PLANS.
15. WHEN SITE IS STABILIZED AND PERMANENT GROUND COVER IS
APPROPRIATELY ESTABLISHED, CONTACT NCDEQ - LAND QUALITY
SECTION FOR FINAL EROSION CONTROL INSPECTION.
16. AFTER FINAL EROSION CONTROL INSPECTION APPROVAL REMOVE
TEMPORARY MEASURES
PROPOSED SWALES
EXIST. DITCH
EXIST. TOP OF BANK
EXIST. STORM DRAINAGE PIPE
EXIST. TREE COVERAGE
EXIST. POWER POLE
Z
�o�
GRAPHIC SCALE
50 0 25 50 100
1 INCH = 50 FEET
Z
Vo�
r
J
J
T'.
V Zdc
C)6
06wC
O zZWo
a
�
" �(.5u
V w=ia
w C
= Z >
U Z a
w
w
m
m
a
O
z
r)^
V'
O
w wP4a
Q Z
U a�J
Z ox°
Z QQF-
O Z0
4-4 Z
W zoo
Z
W0
0 Ix Y
m F-' 0
J
J
w
m
O
O
c
00
00
J
O
m
Cr
m
O
N
w
z
W
U
CO
O
(�
Z
Q
O
I
U
w
J
o
N
ZN
m
Q
O
T
T
Z
Om
`
Q
J
w
0-O
I..L
Ww
>-
m
°LU
J
m
Q
z
z
w
J
o
�
SHEET
C6,00
LOT 7 ,'235� LOT I LOT 9
I I EXIST. LOT LOT 10
I I � I _ T. LO I EXIST. LOT �
I LOT 34 II LOT 35 III �;� II I I 1 �- I
EXIST. LOT
LOT 33 I EXIST. LOT I EXIST. LOT i i _ �� II EX. HOUSE 1 4
EXIST. LOT II EX. HOUSE I I � I �l
EX. HOUS I I I w II I EXIST.
ACK I 1 EX. HOUSE EX. HOUSE
1 ---Pn-
RON SETBA K
EXIST_ 30"
- I I
I --- -- --- - cv EXIS UBLIC R
U.Blf MIST EOP W EWT � \ ExisT EOP W � �� RO LIMITS E
_ _ - S/ C STY
vN �_ 2 -�o.� _ _ _ _ (EXIST. 60 c W oaR� of E�ucnn DIURBAN
IC
_ i Ex. 72 65 LF234
-ExIST. =P - - X\ TAX PIN# 934316857500 �
._ . ExisT. -
-- - OF 18" RCP __EA, -
_ -
�........._ -- - 230f��---232=--_- - -��_�. � Gv \ l: I y/�//----�,_=234--234_ZXST 6 1234 gM -
7-� 6� Si�'f.��_/- _-�-1•\.� I .� I�"�I \ .II FS��!rj .w�\
' I s
-�-... - - - - - % I N I E LE, ---- ----- -232- -.ram ----/ -- - -- TEL
_ ---- II �� \ -- & TEL A6 23G &
- - ----� c� 9:
EXIST. 30' RON SET ACK
1
T. 30 T SETBCW I'.A �� i N I' m
EXIS FROM / I I EX. �J\ �i+ LOT 42�- I N / A
\N
50 EXIST. LOT
LOT 26 ^� �
EX. HOUSE
EXIST. L� L25 7: OT �4'
\ L-A. I IUUJL
I EXIST. LOT
• II '. I '�' II II: � I / �
PROP. LIMITS OF I V / Ex ��� :I :� W �- / ROP. SILL \ �'
/ ro M A / F EXIST. END OF, V A
DI TURBANCE (TYP.) - - - - -- �- - - _ _ _ _ �. I PAVEMENT
\1 23 i I 1 - i 235� /
I, I 23 0
j \
11 I
II I I� 1111Lj• � I I �l• � I: �' } v 1 �
ti, I / \\\ I ILA
� tiM I
:I J. NJII r 1 I NI:
�T I��� III EXIST END OF- 23
w;N'JI�IIII : PAVEMENT
�IIIII III: / ) I 1
234.00 23
PR P. LIMITS OF
DISTURBANCE (TYP.) I //
234- N
21.25
PROP. START OF /
j: 23 = / PAVEMENT
STA. 0+00.00
I , /
233
----- - -232 i4r ///•'/ \ /
----
N/
- - - - - - ---230---
�/ �r''A _� �� A N A,)
i A
A
\ / PROPERTY LINE
9
I
N. V I I / /"
N,v /
VT23 .0o V A A A V\ X = 2��� 234.00 \/ X 8
L� ` N
\
F,
\ i
TA A � A A A \ � \ �I �� � j I I �c,� / \
PROP. TREE �� ;��/�VA�AAAVAA �` / `N�Li, /� 2
LINE (TYP)
N
/. A��231�� X �� S° iyr ---- - - - - - -- 4 .� v�
�. -- RED
NOW OR FORMERLY , �^?.' 32 O Z
ROBERT LOCKLEAR VU' M <
DB 278, PG 424 ' \ \ 58 -AREA
PID:294220001189' A �h
ZONING: RA-20 i �'% ���� �Wv 9' N RQYZ V - - -----2��� ��TRA�
13
�P 3 -- '234o R V
\\ M� I
232 91
OP. `SK -RED: F . R ,7
s
IIIII _ �'• �StN- S ED
11j11%v�v�v�v A�� 0 IA: 2. 2
23 _R E��H-3FEE
\ 2 \ \
'ROPLx311� - - -- P. 2.5" MER
00, RIPRAP APRON ORIFICE RAD: �1
'L �\�//�'�� i�j -- __ ��'- _-- 234 = 233 234 - ORIFICE DIA: 2 �,
"/ ��\�� i��/ --------- - --- -- �
� 233
_ _ mod` III PROP. 24" RCP
.232.... _
z It �� �' / I I W/HEADWALL P
m 2 2 - / II LE.(II 229.93
PROP. LIMITS OF
DISTURBANCE (TYP.) NI
\23 OP. SILT II W 1
NCE (T`�P.) II 233�
\ 1 �"•.��Vmow.•
OP. T
23 V ���_ / I I W/HEADWALL \
` PROP. BERM ----III - - - -----------
- ------ - - -
'
-- / �►232s - 232
- - -
- - -
-- 233�OPEf LINE -
-PR-0P.-SI_LT
-,3 FORM DRAINAGE DITCH TO BE- FENCE T
T LOC FILLED IN ONCE TEMP. - - -
PROP. 8 Wx11 Lx �. 7 0,18 SEDIMENT TRAP IS
J //. RIPRAP APRON 1�0,�61< FILLED/REMOVED
35
EROSION CONTROL NOTES CONSTRUCTION SEQUENCE
1. ALL TRAPS AND BASINS SHALL BE INSPECTED DAILY (MONDAY THROUGH FRIDAY) FOR EXCESSIVE SILT. CONTRACTOR SHALL
REMOVE EXCESSIVE SILT FROM THE TRAPS IMMEDIATELY BEFORE CONSTRUCTION COMMENCES ON EACH WORKING DAY.AS
NECESSARY. MAINTENANCE SHALL CONTINUE THROUGH COMPLETION OF THE PROJECT.
2. THE DEVELOPER ENGAGED IN OR CONDUCTING THE LAND -DISTURBING ACTIVITY SHALL BE RESPONSIBLE FOR INSTALLING AND
MAINTAINING ALL TEMPORARY AND PERMANENT EROSION AND SEDIMENT CONTROL MEASURES AND FACILITIES DURING THE
DEVELOPMENT OF A SITE AS REQUIRED BY THE APPROVED PLAN. OPERATIONS AND MAINTENANCE CONDITIONS ARE INCLUDED IN
THE PLAN OUTLINING HOW THE DEVELOPER SHALL PROVIDE FOR OPERATIONS AND MAINTENANCE DURING CONSTRUCTION.
3. WITHIN SEVEN CALENDAR DAYS FOLLOWING SOIL DISTURBANCE OR RE -DISTURBANCE, ALL PERIMETER SEDIMENT CONTROLS SHALL
BE INSTALLED AND TEMPORARY STABILIZATION MEASURES SHALL BE COMPLETED ON TOPSOIL STOCKPILES.
4. AREAS AT FINAL GRADE SHALL RECEIVE PERMANENT STABILIZATION MEASURES WITHIN SEVEN CALENDAR DAYS OF REACHING
FINAL GRADE.
5. THE RESPONSIBILITY FOR MAINTAINING ALL PERMANENT EROSION AND SEDIMENT CONTROL MEASURES AND FACILITIES AFTER SITE
LAND DISTURBING ACTIVITY IS COMPLETED SHALL LIE WITH THE LANDOWNER OR PERSON IN POSSESSION OR CONTROL, EXCEPT
FACILITIES AND MEASURES INSTALLED WITHIN ROAD OR STREET RIGHT-OF-WAYS OR EASEMENTS.
6. ADDITIONAL CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION IN ORDER TO CONTROL EROSION AND /OR OFF -SITE
SEDIMENTATION.
7. APPROVED PLANS REMAIN VALID FOR FIVE YEARS FROM THE DATE OF AN APPROVAL.
8. THE TRUCK WELL SHALL HAVE ANY/ALL SEDIMENT AND/OR DEBRIS REMOVED PRIOR TO REMOVING THE PLUG
1. ANTICIPATED START DATE IS JANUARY 25, 2014.
2. OBTAIN LAND DISTURBANCE PERMIT AND ALL OTHER APPLICABLE PERMITS.
3. FLAG THE LIMITS OF CONSTRUCTION.
4. HOLD PRE -CONSTRUCTION CONFERENCE AT LEAST ONE WEEK PRIOR TO
STARTING CONSTRUCTION.
5. INSTALL GRAVEL CONSTRUCTION ENTRANCE
6. INSTALL SILT FENCE & ASSOCIATED MEASURES ALONG PROPERTY LINES PER
PLANS TO ESTABLISH PERIMETER PROTECTION.
7. AFTER PERIMETER PROTECTION MEASURES HAVE BEEN ESTABLISHED. BEGIN
INSTALL THE ASSOCIATED MEASURES. GRADE ONLY AS NECESSARY FOR
INSTALLATION OF THESE DEVICES.
9. CLEAR AND GRADE SITE AS NEEDED FOR ROUGH GRADING OPERATIONS.
MAINTAIN EROSION CONTROL DEVICES AS NECESSARY TO PREVENT OFF SITE
SEDIMENTATION. ALL EROSION CONTROL DEVICES SHOULD BE INSPECTED AFTER
EVERY RAINFALL EVENT TO ASSURE THEY ARE OPERATING PROPERLY.
10. ROUGH GRADE ENTIRE SITE WITH APPROVED STRUCTURAL FILL MATERIAL. ALL
STRUCTURAL FILL SHALL BE PLACED IN MAX. 8-IN LIFTS AND COMPACTED TO
w
_.l '
I
I -
PROP. END OF
PAVEMENT
STA. 10+71.80
1
I
I
Iz
J
NOW OR FORMERLY
w
SUAZO LUNA, MARITERESITA
DB 1270, PG 462
oPID:
294220001063
ZONING: RA-20
/I
/ I
-
c
\, I
111111'- 1
GENERAL NOTES:
1. THIS MAP IS NOT A CERTIFIED SURVEY. BOUNDARY INFORMATION PROVIDED BY ROBESON
COUNTY GIS
2. TAX PARCEL ID - 141102027
3. THIS PROPERTY IS NOT LOCATED IN A SPECIAL FLOOD HAZARD AREA AS DETERMINED
BY THE FEMA FLOOD MAP COMMUNITY PANEL NUMBER 3710934300K EFFECTIVE DATE:
12/06/2019.
4. THE UTILITIES SHOWN ARE FOR THE CONTRACTOR'S CONVENIENCE ONLY. THERE MAY BE
OTHER UTILITIES NOT SHOWN ON THIS PLAN; THE ENGINEER ASSUMES NO RESPONSIBILITY
FOR THE LOCATIONS SHOWN.
5. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL EXIST. UTILITIES PRIOR TO
COMMENCEMENT OF CONSTRUCTION. CONFLICTS BETWEEN EXIST. UTILITIES AND PROPOSED
EXCAVATION SHALL BE REPORTED TO THE ENGINEER IMMEDIATELY.
PROP. TREEPROVIDE MINIMUM OF 48 HOUR NOTICE TO OWNER OR REPRESENTATIVE PRIOR TO
LINE (TYF�TERRUPTION OF ANY EXIST. UTILITY, IF BEING UTILIZED.
7. THE CONTRACTOR IS RESPONSIBLE FOR REPAIR AND/OR REPLACEMENT OF ANY UTILITIES
DAMAGED DURING CONSTRUCTION.
8.THE CONTRACTOR SHALL USE EXTREME CARE WHEN WORKING NEAR ALL UNDERGROUND
AND OVERHEAD UTILITIES.
9. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL NECESSARY PERMITS AND
APPROVALS HAVE BEEN OBTAINED PRIOR TO CONSTRUCTION. THESE PERMITS AND
APPROVALS MAY INCLUDE BUT ARE NOT LIMITED TO GRADING, DEMOLITION, ZONING,
BUILDING, DRIVEWAY, DETENTION, SUBDIVISION, SPECIAL USE, SEWER AND WATER.
23
Y
U
>1
'Q I
N
F
I
\ w
1
I
\
,Q
I
I of
I
O
Rv N '
I
N
o_
I
D
I
GROUND STABILIZATION
Site Area Description
Stabilization Time Frame
Stabilization Time Frame Exception
Perimeter dikes, swales, ditches
7 days
None
and slopes
High Quality Water (HQW) Zones
7 days
None
If slopes are 10' or less in length
Slopes steeper than 3:1
7 days
and are not steeper than 2:1, 14
days are allowed.
Slopes 3:1 or flatter
14 days
7-days for slopes greater than 50
feet in length.
All other areas with slopes flatter
14 days
None (except for perimeters and
than 4: 1.
HQW Zones)
* "Extensions of time may be approved by the permitting authority based on weather or other
ite-specific conditions that make compliance impracticable." (Section 11.6 (2)(b)).
� I
NOW OR FORMERLY
MARY MONROE
DB 677, PG 627
23 PID: 294220001064
ZONING: RA-20
I
23 �
/ M,
S OF
yE ( )
fl
------ - - - - -
C---------- - - - - --
B �1
3.0
A NORTH AMERICAN GREEN VMAX SC350
OR APPROVED EQUIVALENT
A I B C D
1.0' I VARIES VARIES VARIES
A = BOTTOM WIDTH
B = HIEGHT OF TEMP. LINER
C = DEPTH OF GRADED SWALE
D = TOP WIDTH OF SWALE
REF. SWALE CALCULATIONS
FOR DIMENSIONS
GRASSED SWALE NOTES:
1
I
1.
EXCAVATE CHANNEL TO THE CROSS-SECTION SHOWN.
1
2.
APPLY LIME, FERTILIZER AND SEED TO THE CHANNEL AND
ADJOINING
AREAS IN ACCORDANCE WITH THE SEEDING SCHEDULE.
PROP tREE
3.
START LAYING THE NET FROM THE TOP OF THE UPSTREAM
END OF THE
- LINE Ti
P)
CHANNEL AND UNROLL IT DOWN THE GRADE. DO NO STRETCH
MATTING.
- - 1
4.
BURY THE UPSLOPE END AND STAPLE THE NET EVERY 12"
ACROSS THE
�.��.
TOP END, EVERY 3' AROUND THE EDGES AND ACROSS THE
MAT SO THAT
234,
THE STRAW IS HELD CLOSELY AGAINST THE SOIL.
5.
MATTING STRIPS SHOULD BE JOINED TOGETHER ALONG THE
SIDES WITH
A 3" OVERLAP AND STAPLED TOGETHER.
6.
TO JOIN ENDS OF STRIPS, INSERT THE NEW ROLL OF NET IN
A TRENCH
\ -
AS WITH UPSLOPE END AND OVERLAP IT 18" WITH THE PREVIOUSLY LAID
��>• \
UPPER ROLL. TURN UNDER 6" OF THE 18" OVERLAP AND
STAPLE EVERY
- 23-
12" ACROSS THE END.
/ _ N
230
--229-
98% OF SOILS STANDARD PROCTOR MAX. DRY DENSITY.
11. AS SITE IS BROUGHT TO GRADE, AND BUILDING PAD INSTALLED BEGIN
REDUCING THE SIZE OF THE SKIMMER TRAP WITH PORTION TO THE REDUCTION
OF RUNOFF TO THE TRAP. ADJUST DIVERSION DITCHES TO EVENTUAL PHASE 2
LOCATIONS SUCH THAT AT NO TIME IS SEDIMENT OVERLOADING SILT FENCES
OR IN ANY OTHER WAY LEAVES THE SITE.
12. COMPLETE UTILITY INSTALLATIONS INCLUDING WATER, SEWER, AND STORM
DRAINAGE UTILITIES. PLACE INLET PROTECTION AT ALL STORM DRAIN
INLETS.
13. FINAL GRADING, PAVING AND STABILIZATION OF ALL DISTURBED AREAS
INSURE SOIL STABILIZATION MEASURES AND SEEDING SCHEDULE ARE FOLLOWED
AS PER THE PLANS.
14. AFTER SITE IS STABILIZED, REMOVE TEMPORARY MEASURES AND/OR COMPLETE
PERMANENT SEEDING OF REMAINING DISTURBED AREAS. RE -SEED AND
FERTILIZE AS NECESSARY TO ENSURE ADEQUATE COVERAGE OF
PERMANENT GROUNDCOVER IN ALL DISTURBED AREAS.
15. WHEN SITE IS STABILIZED AND PERMANENT GROUND COVER IS APPROPRIATELY
ESTABLISHED, CONTACT NCDENR - LAND QUALITY SECTION FOR FINAL EROSION
CONTROL INSPECTION.
TYPICAL GRASS SWALE
�233
_ 229
� 3
P`R6'P.-TOP
BERM= 233.00
LEGEND
ELEV EXISTING CONTOUR PROP. PIPE
INLET PROTECTION • •
�LEV PROPOSED CgNTpUR
O TEMPORARY INLET PROTECTION 0% EXIST. POWER POLE O
LIMITS OF DISTURBANCE
PROPOSED SILT FENCE
O O
i PROPOSED SWALES
H C P�
PROPOSED TEMPORARY SOCK
EXIST. DITCH
OHP EXIST. OVERHEAD POWER LINE GRAPHIC SCALE
EXIST. TOP OF BANK 50 0 25 50 100
EXIST. STORM DRAINAGE PIPE
1 INCH = 50 FEET
C--= EXIST. TREE COVERAGE
Z
c
c
r
J 0
� � r
Cn
/ Zd�
A OZu
°tS w c
O (�Za
Za
Sit
Zw�
U of" °
W
W c
= Z r
c5 >
C)Z a
w
w
m
m
a
C)
^ r
V) '
O
W wP4Q
Q z
U a�J
= c)
Z QQF-
O �zo
cn z F-
� z
0
O � Y
m F-' O
�w=
J
J
W
m
C
C
C
00
I
0
Z
0Z
m
Lu
m
z
N
w
m
O^
LL
W
J
O
w
J
m
c
N
C
N
Q
T_
T
"
��LL�J
VJ
%�
`
m
0
w
0
Q
O
I
U
0-
>
m
Q
w
J
m
Q
Z
Lu
z
c�
w
J
Q
�
SHEET
C700
lz
DESIGN CRITERIA
AGGREGATE SIZE -USE 2-3 INCH WASHED STONE.
DIMENSIONS OF GRAVEL PAD -
THICKNESS: 6 INCHES MINIMUM
WIDTH: 12-FEET MINIMUM OR FULL WIDTH AT ALL POINTS OF THE VEHICULAR
ENTRANCE AND EXIT AREA, WHICHEVER IS GREATER
LENGTH: 50-FEET MINIMUM
LOCATION -LOCATE CONSTRUCTION ENTRANCES AND EXITS TO LIMIT SEDIMENT FROM
LEAVING THE SITE AND TO PROVIDE FOR MAXIMUM UTILITY BY ALL CONSTRUCTION VEHICLES
(FIGURE 6.06A). AVOID STEEP GRADES, AND ENTRANCES AT CURVES IN PUBLIC ROADS.
WASHING--�F CONDITIONS AT THE SITE ARE SUCH THAT MOST OF THE MUD AND SEDIMENT
ARE NOT REMOVED BY VEHICLES TRAVELING OVER THE GRAVEL, THE TIRES SHOULD BE
WASHED. WASHING SHOULD BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE
THAT DRAINS INTO A SEDIMENT TRAP OR OTHER SUITABLE DISPOSAL AREA. A WASH
RACK MAY ALSO BE USED TO MAKE WASHING MORE CONVENIENT AND EFFECTIVE.
CONSTRUCTION SPECIFICATIONS
1. CLEAR THE ENTRANCE AND EXIT AREA OF ALL VEGETATION, ROOTS, AND OTHER
OBJECTIONABLE MATERIAL AND PROPERLY GRADE IT.
2. PLACE THE GRAVEL TO THE SPECIFIC GRADE AND DIMENSIONS SHOWN ON THE PLANS,
AND SMOOTH IT.
3. PROVIDE DRAINAGE TO CARRY WATER TO A SEDIMENT TRAP OR OTHER SUITABLE
OUTLET.
4. USE GEOTEXTILE FABRICS BECAUSE THEY IMPROVE STABILITY OF THE FOUNDATION IN
LOCATIONS SUBJECT TO SEEPAGE OR HIGH WATER TABLE.
MAINTENANCE
MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM
LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOPDRESSING WITH 2-
INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT
AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS
SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS.
TEMPORARY GRAVEL CONSTRUCTION
ENTRANCE/EXIT
(NC DEQ 6.06)
N.T.S.
TEMPORARY SEDIMENT
TRAP DESIGN CRITERIA
DRAINAGE
AREA
< 1 AC.
(ACRES)
MIN.
LENGTH TO
2: 1
WIDTH
RATIO
3600
MIN.
(CU. FT.
VOLUME
PER AC.
REQUIRED
DISTURBED)
435
SURFACE
(SQ. FT.
AREA
PER CFS
REQUIRED
Q10)
NOTES:
1. REFER TO NCESCPDM
SECTION #6.60 FOR
ADDITIONAL DESIGN
SPECIFICATIONS
REGARDING TEMPORARY
SEDIMENT TRAPS.
2. REFER TO CLDS
STANDARD #30.19 FOR
BAFFLE SPACING
PVC END CAP
PVC TEE
PERSPECTIVE VIEW
PVC ELBOW
PVC VENT
PIPE
"C" ENCLOSURE
TER ENTRY UNIT
WATER SURFACE
PVC END CAP
PVC PIPE 5
1 /2" HOLES IN7rN 1
UNDERSIDE 5�
PVC TEE
FLEXIBLE
HOSE SCHEDULE 40
6 e PVC PIPE
END VIEW FRONT VIEW
SCHEDULE 40
PVC PIPE
ORIFICE
PLATE
SCHEMATIC OF SKIMMER TAKEN FROM PENNSYLVANIA EROSION AND SEDIMENT POLLUTION CONTROL MANUAL, MARCH 2O00.
"H" REFERS TO THE HEIGHT FROM INVERT OF FLEXIBLE HOSE ON SKIMMER TO THE INVERT OF THE PRIMARY SPILLWAY.
SKIMMER
N.T.S.
FABRIC
DESIGN SETTLED TOP OVERFILL 6" FOR
21" MIN. SETTLEMENT
MAX \FILL\� \ \ L=10' MIN. _� SOP 1\\\\ \ EMERGENCY
\\ % � BY-PASS 6"
BELOW
2' TO 3.5'\\\' \\\�\\ \\\\\ `� \\\\\ SETTLED TOP
_ \\ OF DAM
�L NATURAL GROUND
FILTER FABRIC X
TEMPORARY SEDIMENT TRAP
WITH SKIMMER-
N. T. S.
INFLOW
1' FREEBOARD
6" MAX. DEPTH OF FLOW
OVER EMERGENCY SPILLWAY
Z=5' MAX.
W=5' MIN.
EMBANKMENT
T=1.5' MIN.
8' MAX. STANDARD STRENGTH FABRIC WITH WIRE FENCE
CTCCI 0("1CT I , ®-
WIRE FI
FILTER FAB[
CONSTRUCTION SPECIFICATIONS
MATERIALS
1. USE A SYNTHETIC FILTER FABRIC OF AT LEAST 95% BY WEIGHT OF POLYOLEFINS OR POLYESTER, WHICH IS CERTIFIED
BY THE MANUFACTURER OR SUPPLIER AS CONFORMING TO THE REQUIREMENTS IN ASTM D6461, WHICH IS SHOWN IN
PART IN TABLE 6.62b.
SYNTHETIC FILTER FABRIC SHOULD CONTAIN ULTRAVIOLET RAY INHIBITORS AND STABILIZERS TO PROVIDE A MINIMUM
OF 6 MONTHS OF EXPECTED USABLE CONSTRUCTION LIFE AT A TEMPERATURE RANGE OF 0 - 120` F.
2. ENSURE THAT POSTS FOR SEDIMENT FENCES ARE 1.33 LB/LINEAR FT. STEEL WITH A MINIMUM LENGTH OF 5 FEET.
MAKE SURE THAT STEEL POSTS HAVE PROJECTIONS TO FACILITATE FASTENING THE FABRIC.
3. FOR REINFORCEMENT OF STANDARD STRENGTH FILTER FABRIC, USE WIRE FENCE WITH A MINIMUM 14 GAUGE AND A
MAXIMUM MESH SPACING OF 6 INCHES.
CONSTRUCTION
1. CONSTRUCT THE SEDIMENT BARRIER OF STANDARD STRENGTH OR EXTRA STRENGTH SYNTHETIC FILTER FABRICS.
2. ENSURE THAT THE HEIGHT OF THE SEDIMENT FENCE DOES NOT EXCEED 24 INCHES ABOVE THE GROUND SURFACE.
(HIGH FENCES MAY IMPOUND VOLUMES OF WATER SUFFICIENT TO CAUSE FAILURE OF THE STRUCTURE.)
3. CONSTRUCT THE FILTER FABRIC FROM A CONTINUOUS ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID JOINTS.
WHEN JOINTS ARE NECESSARY, SECURELY FASTEN THE FILTER CLOTH ONLY AT A SUPPORT POST WITH 4 FEET
MINIMUM OVERLAP TO THE NEXT POST.
4. SUPPORT STANDARD STRENGTH FILTER FABRIC BY WIRE MESH FASTENED SECURELY TO THE UPSLOPE SIDE OF THE
POSTS. EXTEND THE WIRE MESH SUPPORT TO THE BOTTOM OF THE TRENCH. FASTEN THE WIRE REINFORCEMENT,
THEN FABRIC ON THE UPSLOPE SIDE OF THE FENCE POST. WIRE OR PLASTIC ZIP TIES SHOULD HAVE MINIMUM 50
POUND TENSILE STRENGTH.
5. WHEN A WIRE MESH SUPPORT FENCE IS USED, SPACE POSTS A MAXIMUM OF 8 FEET APART. SUPPORT POSTS
SHOULD BE DRIVEN SECURELY INTO THE GROUND A MINIMUM OF 24 INCHES.
6. EXTRA STRENGTH FILTER FABRIC WITH 6 FEET POST SPACING DOES NOT REQUIRE WIRE MESH SUPPOR TFENCE.
SECURE FASTEN THE FILTER FABRIC DIRECTLY TO POSTS. WIRE OR PLASTIC ZIP TIES SHOULD HAVE A MINIMUM 50
POUND TENSILE STRENGTH.
7. EXCAVATE A TRENCH APPROXIMATELY 4 INCHES WIDE BY 8 INCHES DEEP ALONG THE PROPOSED LINE OF POSTS AND
UPSLOPE FROM THE BARRIER (FIG. 6.62(1)
8. PLACE 12 INCHES OF THE FABRIC ALONG THE BOTTOM AND SIDE OF THE TRENCH.
9. BACKFILL THE TRENCH WITH SOIL PLACED OVER THE FILTER FABRIC AND COMPACT. THOROUGH COMPACTION OF THE
BACKFILL IS CRITICAL TO SILT FENCE PERFORMANCE.
10. DO NOT ATTACHE FILTER FABRIC TO EXISTING TREES.
INSTEAD OF EXCAVATING A TRENCH, PLACING FABRIC AND THEN BACKFILLING TRENCH, SEDIMENT FENCE MAY BE INSTALLED
USING SPECIALLY DESIGNED EQUIPMENT THAT INSERTS THE FABRIC INTO A CUT SLICED IN THE GROUND WITH A DISC (FIG.
6.62b)
2
-���-
A.L � B - CLASS B RIP RAP-'
�
m_ m-
=n1_1i==u=m=u1_ni=m=111=m= _u1-nl=ni_
L FILTER CLOTH
L= THE DISTANCE SUCH THAT POINTS
A AND B ARE AT EQUAL ELEVATIONS
PLAN
)R WIRE TIES
NATURAL GROUND
-STEEL POST
-WIRE FENCE
FILTER FABRIC
8" MIN.
4" MIN.
INSTALLATION SPECIFICATIONS
1. THE BASE OF BOTH END POSTS SHOULD BE AT LEAST ONE FOOT HIGHER THAN THE MIDDLE OF THE FENCE. CHECK
WITH A LEVEL IF NECESSARY.
2. INSTALL POSTS 4 FEET APART IN CRITICAL AREAS AND 6 FEET APART ON STANDARD APPLICATIONS.
3.INSTALL POSTS 2 FEET DEEP ON THE DOWNSTREAM SIDE OF THE SILT FENCE, AND AS CLOSE AS POSSIBLE TO THE
FABRIC, ENABLING POSTS TO SUPPORT THE FABRIC FROM UPSTREAM WATER PRESSURE.
4. INSTALL POSTS WITH THE NIPPLES FACING AWAY FROM THE SILT FABRIC.
5. ATTACH THE FABRIC TO EACH POST WITH THREE TIES, ALL SPACED WITHIN THE TOP 8 INCHES OF THE FABRIC.
ATTACH EACH TIE DIAGONALLY 45 DEGREES THROUGH THE FABRIC, WITH EACH PUNCTURE AT LEAST 1 INCH
VERTICALLY APART. ALSO, EACH TIE SHOULD BE POSITIONED TO HANG ON A POST NIPPLE WHEN TIGHTENED TO
PREVENT SAGGING.
6. WRAP APPROXIMATELY 6 INCHES OF FABRIC AROUND THE END POSTS AND SECURE WITH 3 TIES.
7. NO MORE THAN 24 INCHES OF A 36 INCH FABRIC IS ALLOWED ABOVE GROUND LEVEL.
8. THE INSTALLATION SHOULD BE CHECKED AND CORRECTED FOR ANY DEVIATIONS BEFORE COMPACTION
9. COMPACTION IS VITALLY IMPORTANT FOR EFFECTIVE RESULTS. COMPACT THE SOIL IMMEDIATELY NEXT TO THE SILT
FENCE FABRIC WITH THE FRONT WHEEL OF THE TRACTOR, SKID STEER, OR ROLLER EXERTING AT LEAST 60 POINTS
PER SQUARE INCH. COMPACT THE UPSTREAM SIDE FIRST, AND THEN EACH SIDE TWICE FOR A TOTAL OF 4 TRIPS.
MAINTENANCE
INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS
IMMEDIATELY.
SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT
PROMPTLY.
REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND
TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT.
REMOVE ALL FENCING MATERIAL AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND
STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED.
SEDIMENT FENCE
(NC DEQ 6.62)
N.T.S.
1'-6" MIN.
"OT g5 OR #57
DESIGN CRITERIA
j&WA,SHEO`STONE
2' MAX
WHEN USED IN COMBINATION WITH AN EXCAVATED SEDIMENT STORAGE AREA TO SERVE AS A TEMPORARY
AT CENTER
SEDIMENT TRAP, THE DESIGN CRITERIA FOR TEMPORARY SEDIMENT TRAPS MUST BE SATISFIED. THE MAXIMUM
DRAINAGE AREA SHOULD BE 5 ACRES, AND 3600
CUBIC FEET OF SEDIMENT STORAGE PER ACRE OF DISTURBED DRAINAGE AREA SHOULD BE PROVIDED.
<TOB
THE MINIMUM STONE HEIGHT SHOULD BE 2 FEET, WITH SIDE SLOPES NO STEEPER THAN 2:1. THE
STONE "HORSESHOE" AROUND THE PIPE INLET SHOULD BE CONSTRUCTED OF CLASS B OR CLASS I RIPRAP, WITH
CROSS SECTION
A MINIMUM CREST WIDTH OF 3 FEET. THE OUTSIDE FACE OF THE RIPRAP SHOULD BE COVED WITH A 12-INCH
THICK LAYER OF #5 OR #57 WASHED STONE.
IN PREPARING PLANS FOR ROCK PIPE INLET PROTECTION, IT IS IMPORTANT TO PROTECT THE EMBANKMENT OVER
THE PIPE FROM OVERTOPPING. THE TOP OF THE STONE SHOULD BE A
MINIMUM OF 1 FOOT BELOW THE TOP OF THE FILL OVER THE PIPE. THE STONE SHOULD TIE
INTO THE FILL ON BOTH SIDES OF THE PIPE. THE INSIDE TOE OF THE STONE SHOULD BE NO
CLOSER THAN 2 FEET FROM THE CULVERT OPENING TO ALLOW PASSAGE OF HIGH FLOWS.
THE SEDIMENT STORAGE AREA SHOULD BE EXCAVATED UPSTREAM OF THE ROCK PIPE INLET
PROTECTION, WITH A MINIMUM DEPTH OF 18 INCHES BELOW GRADE.
CONSTRUCTION SPECIFICATIONS
MAINTENANCE
1. PLACE STONE TO THE LINES AND DIMENSIONS SHOWN IN THE PLAN ON A
INSPECT CHECK DAMS AND CHANNELS AT LEAST WEEKLY AND AFTER EACH
FILTER FABRIC FOUNDATION.
SIGNIFICANT (1//2 INCH OR GREATER) RAINFALL EVENT AND REPAIR
2. KEEP THE CENTER STONE SECTION AT LEAST 9 INCHES BELOW NATURAL
IMMEDIATELY. CLEAN OUT SEDIMENT, STRAW, LIMBS, OR OTHER DEBRIS THAT
GROUND LEVEL WHERE THE DAM ABUTS THE CHANNEL BANKS.
COULD CLOG THE CHANNEL WHEN NEEDED.
NATURAL GROUND
3. EXTEND STONE AT LEAST 1.5 FEET BEYOND THE DITCH BANK (FIGURE 6.83B)
TO KEEP WATER FROM CUTTING AROUND THE ENDS OF THE CHECK DAM.
ANTICIPATE SUBMERGENCE AND DEPOSITION ABOVE THE CHECK DAM AND
4. SET SPACING BETWEEN DAMS TO ASSURE THAT THE ELEVATION AT THE TOP OF
EROSION FROM HIGH FLOW AROUND THE EDGE OF THE DAMN. CORRECT ALL
RIP RAP
THE LOWER DAM IS THE SAME AS THE TOE ELEVATION OF THE UPPER DAM.
DAMAGE IMMEDIATELY. IF SIGNIFICANT EROSION OCCURS BETWEEN DAMS,
HE DWALL
5. PROTECT THE CHANNEL AFTER THE LOWEST CHECK DAM FROM HEAVY FLOW
ADDITIONAL MEASURES CAN BE TAKEN SUCH AS, INSTALLING A PROTECTIVE
THAT COULD CAUSE EROSION.
RIPRAP LINER IN THAT PORTION OF THE CHANNEL.
RIPRAP HEADWALL, 1' MIN.-\
6. MAKE SURE THAT THE CHANNEL REACH ABOVE THE MOST UPSTREAM DAM IS
HEIGHT FROM ROAD SHOULDER
STABLE.7. ENSURE THAT OTHER AREAS OF THE CHANNEL, SUCH AS CULVERT
REMOVE SEDIMENT ACCUMULATED BEHIND THE DAMS AS NEEDED TO DRAIN
ENTRANCES BELOW THE CHECK DAMS, ARE NOT SUBJECT TO DAMAGE OR
THROUGH THE STONE CHECK DAM, AND PREVENT LARGE FLOWS FROM
CLASS B RIP AP
�i
BLOCKAGE FROM DISPLACED STONES.
CARRYING SEDIMENT OVER THE DAM. ADD STONES TO DAMS AS NEEDED TO
1' 3'�
MAINTAIN DESIGN HEIGHT AND CROSS SECTION
FLOW„
F OW
H=2' MIN. EMERGENCY
SPILLWAY NP
SKIMMER ARMS
LENGTH - SPECIFY
H x 1.5 SEEPAGE
(MIN. 5') CONTROL
MEASURES
SKIMMER INSTALLATION
N.T.S.
TEMPORARY ROCK CHECK DAM
(NC DEQ 6.83)
N.T.S.
2' MIN.
FIGURE 6.20a TEMPORARY EARTHEN DIVERSION DIKE
CONSTRUCTION SPECIFICATIONS
1. REMOVE AND PROPERLY DISPOSE OF ALL TREES, BRUSH, STUMPS, AND OTHER OBJECTIONABLE MATERIAL.
2. ENSURE THAT THE MINIMUM CONSTRUCTED CROSS SECTION MEETS ALL DESIGN REQUIREMENTS.
3. ENSURE THAT THE TOP OF THE DIKE IS NOT LOWER AT ANY POINT THAN THE DESIGN ELEVATION PLUS
THE SPECIFIED SETTLEMENT.
4. PROVIDE SUFFICIENT ROOM AROUND DIVERSIONS TO PERMIT MACHINE REGRADING AND CLEANOUT.
5. VEGETATE THE RIDGE IMMEDIATELY AFTER CONSTRUCTION, UNLESS IT WILL REMAIN IN PLACE LESS THAN
30 WORKING DAYS.
MAINTENANCE
INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE
SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS AND
MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA PROTECTED IS PERMANENTLY STABILIZED, REMOVE
THE RIDGE AND THE CHANNEL TO BLEND WITH THE NATURAL GROUND LEVEL AND APPROPRIATELY
STABILIZE IT.
ROCK
PROT
NCDOT#5 C
WASHED
1.5'
NCDOT #5 OR #57-/ CLASS B
WASHED STONE RIPRAP
ELEVATION
FIGURE 6.55A ROCK PIPE INLET PROTECTION PLAN VIEW AND CROSS-SECTION VIEW
CONSTRUCTION SPECIFICATIONS
1. CLEAR THE AREA OF ALL DEBRIS THAT MIGHT HINDER EXCAVATION AND DISPOSAL OF SPOIL.
2. INSTALL THE CLASS B OR CLASS I RIPRAP IN A SEMI -CIRCLE AROUND THE PIPE INLET. THE STONE SHOULD BE
BUILT UP HIGHER ON EACH END WHERE IT TIES INTO THE EMBANKMENT. THE MINIMUM CREST WIDTH OF THE
RIPRAP SHOULD BE 3 FEET, WITH A MINIMUM BOTTOM WIDTH OF 11 FEET. THE MINIMUM HEIGHT SHOULD BE 2
FEET, BUT ALSO 1 FOOT LOWER THAN THE SHOULDER OF THE EMBANKMENT OR DIVERSIONS.
3. A 1 FOOT THICK LAYER OF NC DOT #5 OR #57 STONE SHOULD BE PLACED ON THE OUTSIDE SLOPE OF THE
RIPRAP.
4. THE SEDIMENT STORAGE AREA SHOULD BE EXCAVATED AROUND THE OUTSIDE OF THE STONE HORSESHOE 18
INCHES BELOW NATURAL GRADE.
5. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, FILL DEPRESSION AND ESTABLISH FINAL GRADING
ELEVATIONS, COMPACT AREA PROPERLY, AND STABILIZE WITH GROUND COVER.
MAINTENANCE
INSPECT ROCK PIPE INLET PROTECTION AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/ INCH OR GREATER)
RAINFALL EVENT AND REPAIR IMMEDIATELY. REMOVE SEDIMENT AND RESTORE THE SEDIMENT STORAGE AREA
TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH OF THE
TRAP. PLACE THE SEDIMENT THAT IS REMOVED IN THE DESIGNATED DISPOSAL AREA AND REPLACE THE
CONTAMINATED PART OF THE GRAVEL FACING. CHECK THE STRUCTURE FOR DAMAGE. ANY RIPRAP DISPLACED FROM
THE STONE HORSESHOE MUST BE REPLACED IMMEDIATELY. AFTER ALL THE SEDIMENT -PRODUCING AREAS HAVE
BEEN PERMANENTLY STABILIZED, REMOVE THE STRUCTURE AND ALL THE UNSTABLE SEDIMENT. SMOOTH THE AREA
TO BLEND WITH THE ADJOINING AREAS AND PROVIDE PERMANENT GROUND COVER (SURFACE STABILIZATION).
ROCK PIPE INLET PROTECTION
(NC DEQ 6.55)
N.T.S.
Z a
U O r
r
r
J�
J
r
LL CD cp r
a
/ Z`
e aC'
O�
UOa
06
a
w
O OZo
a
Zzw�
0
J LU
Ll
C)w a
- LU
= Z r
(D }
C) w
W
m
O
z
V /
''
w
� 0
WvJ
w
Z
U
Q
��0
O�
Q
U
Z
Qp�
0
�zo
�U)
z0�
Z
1--�-1
/
�D
Z
0
0 P4
U
Lu
a p-'
0
J
J
w
m
C
C
C
m
co
�+ r
m
O
N
Lu
m
J
�
�
z
Lu
U
m
�
W
Q
LuO
J
N
m
Q
�
O
T
N
C)
m
r
WLLI
0
C
w
J
m
p
Lul
z
Z
W
W
C
J
U
m
SHEET
0 •
TEMPORARY DIVERSIONS
(NC DEQ 6.20)
N.T.S.
GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH
THE NCGO1 CONSTRUCTION GENERAL PERMIT
Implementing the details and specifications on this plan sheet will result in the construction
activity being considered compliant with the Ground Stabilization and Materials Handling
sections of the NCGO1 Construction General Permit (Sections E and F, respectively). The
permittee shall comply with the Erosion and Sediment Control plan approved by the
delegated authority having jurisdiction. All details and specifications shown on this sheet
may not apply depending on site conditions and the delegated authority having jurisdiction.
SECTION E: GROUND STABILIZATION
Required Ground Stabilization Timeframes
Stabilize within this
Site Area Description
many calendar
Timeframe variations
days after ceasing
land disturbance
(a) Perimeter dikes,
swales, ditches, and
7
None
perimeter slopes
(b) High Quality Water
7
None
(HQW) Zones
(c) Slopes steeper than
If slopes are 10' or less in length and are
3:1
7
not steeper than 2:1, 14 days are
allowed
-7 days for slopes greater than 50' in
length and with slopes steeper than 4:1
-7 days for perimeter dikes, swales,
(d) Slopes 3:1 to 4:1
14
ditches, perimeter slopes and HQW
Zones
-10 days for Falls Lake Watershed
-7 days for perimeter dikes, swales,
(e) Areas with slopes
ditches, perimeter slopes and HQW Zones
flatter than 4:1
14
-10 days for Falls Lake Watershed unless
there is zero slope
Note: After the permanent cessation of construction activities, any areas with temporary
ground stabilization shall be converted to permanent ground stabilization as soon as
practicable but in no case longer than 90 calendar days after the last land disturbing
activity. Temporary ground stabilization shall be maintained in a manner to render the
surface stable against accelerated erosion until permanent ground stabilization is achieved.
GROUND STABILIZATION SPECIFICATION
Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the
techniques in the table below:
Temporary Stabilization
Permanent Stabilization
• Temporary grass seed covered with straw or
• Permanent grass seed covered with straw or
other mulches and tackifiers
other mulches and tackifiers
• Hydroseeding
• Geotextile fabrics such as permanent soil
• Rolled erosion control products with or
reinforcement matting
without temporary grass seed
• Hydroseeding
• Appropriately applied straw or other mulch
• Shrubs or other permanent plantings covered
• Plastic sheeting
with mulch
• Uniform and evenly distributed ground cover
sufficient to restrain erosion
• Structural methods such as concrete, asphalt or
retaining walls
• Rolled erosion control products with grass seed
POLYACRYLAMIDES (PAMS) AND FLOCCULANTS
1. Select flocculants that are appropriate for the soils being exposed during
construction, selecting from the NC DWR List of Approved PAMS/Flocculants.
2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures.
3. Apply flocculants at the concentrations specified in the NC DWR List of Approved
PAMS/Flocculants and in accordance with the manufacturer's instructions.
4. Provide ponding area for containment of treated Stormwater before discharging
offsite.
5. Store flocculants in leak -proof containers that are kept under storm -resistant cover
or surrounded by secondary containment structures.
EQUIPMENT AND VEHICLE MAINTENANCE
1. Maintain vehicles and equipment to prevent discharge of fluids.
2. Provide drip pans under any stored equipment.
3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the
project.
4. Collect all spent fluids, store in separate containers and properly dispose as
hazardous waste (recycle when possible).
5. Remove leaking vehicles and construction equipment from service until the problem
has been corrected.
6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products
to a recycling or disposal center that handles these materials.
LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE
1. Never bury or burn waste. Place litter and debris in approved waste containers.
2. Provide a sufficient number and size of waste containers (e.g dumpster, trash
receptacle) on site to contain construction and domestic wastes.
3. Locate waste containers at least 50 feet away from storm drain inlets and surface
waters unless no other alternatives are reasonably available.
4. Locate waste containers on areas that do not receive substantial amounts of runoff
from upland areas and does not drain directly to a storm drain, stream or wetland.
5. Cover waste containers at the end of each workday and before storm events or
provide secondary containment. Repair or replace damaged waste containers.
6. Anchor all lightweight items in waste containers during times of high winds.
7. Empty waste containers as needed to prevent overflow. Clean up immediately if
containers overflow.
8. Dispose waste off -site at an approved disposal facility.
9. On business days, clean up and dispose of waste in designated waste containers.
PAINT AND OTHER LIQUID WASTE
1. Do not dump paint and other liquid waste into storm drains, streams or wetlands.
2. Locate paint washouts at least 50 feet away from storm drain inlets and surface
waters unless no other alternatives are reasonably available.
3. Contain liquid wastes in a controlled area.
4. Containment must be labeled, sized and placed appropriately for the needs of site.
5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from
construction sites.
PORTABLE TOILETS
1. Install portable toilets on level ground, at least 50 feet away from storm drains,
streams or wetlands unless there is no alternative reasonably available. If 50 foot
offset is not attainable, provide relocation of portable toilet behind silt fence or place
on a gravel pad and surround with sand bags.
2. Provide staking or anchoring of portable toilets during periods of high winds or in high
foot traffic areas.
3. Monitor portable toilets for leaking and properly dispose of any leaked material.
Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace
with properly operating unit.
EARTHEN STOCKPILE MANAGEMENT
1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least
50 feet away from storm drain inlets, sediment basins, perimeter sediment controls
and surface waters unless it can be shown no other alternatives are reasonably
available.
2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of
five feet from the toe of stockpile.
3. Provide stable stone access point when feasible.
4. Stabilize stockpile within the tmeframes provided on this sheet and in accordance
with the approved plan and any additional requirements. Soil stabilization is defined
as vegetative, physical or chemical coverage techniques that will restrain accelerated
erosion on disturbed soils for temporary or permanent control needs.
ONSITE CONCRETE WASHOUT
STRUCTURE WITH LINER
A
HIGH
COHESIVE &
0 CD CD
CD
0
LOW FILTRATION
SANDBAGS (TYP.)
SOIL BERM
0
0
OR STAPLES
0 CD10
MIL
1:1 PLASTIC
0
0
SILT FENCE SIDE SLOP LINING�SANDBAGS (TYP.)
STAPLES
0
(TYPOR
0
0
00
0_
o
00
't
00
A
CLEARLY MARKED SIGNAGE SECTION A -A
CONCRETE NOTING DEVICE (18"X24" MIN.) NOTES:
WASHOUT 1. ACTUAL LOCATION DETERMINED IN FIELD
2. THE CONCRETE WASHOUT STRUCTURES SHALL
BE MAINTAINED WHEN THE LIQUID AND/OR SOLID
REACHES 75% OF THE STRUCTURES CAPACITY.
PLAN 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE
CLEARY MARKED WITH SIGNAGE NOTING DEVICE.
BELOW GRADE WASHOUT STRUCTURE
NOT TO SCALE
SANDBAGS (TYP.)
NOTES:
OR STAPLES
1. ACTUAL LOCATION DETERMINED IN
FI ELD
CLEARLY MARKED SIGNAGE
CONCRETE
NOTING DEVICE (18"X24" MIN.)
2. THE CONCRETE WASHOUT
WASHOUT
STRUCTURES SHALL BE MAINTAINED
WHEN THE LIQUID AND/OR SOLID
REACHES 75% OF THE STRUCTURES
CAPACITY TO PROVIDE ADEQUATE
HOLDING CAPACITY WITH A MINIMUM 12
PLAN
INCHES OF FREEBOARD.
3.CONCRETE WASHOUT STRUCTURE
NEEDS TO BE CLEARY MARKED WITH
SIGNAGE NOTING DEVICE.
ABOVE GRADE WASHOUT
STRUCTURE
NOT TO SCALE
CONCRETE WASHOUTS
1. Do not discharge concrete or cement slurry from the site.
2. Dispose of, or recycle settled, hardened concrete residue in accordance with local
and state solid waste regulations and at an approved facility.
3. Manage washout from mortar mixers in accordance with the above item and in
addition place the mixer and associated materials on impervious barrier and within
lot perimeter silt fence.
4. Install temporary concrete washouts per local requirements, where applicable. If an
alternate method or product is to be used, contact your approval authority for
review and approval. If local standard details are not available, use one of the two
types of temporary concrete washouts provided on this detail.
5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk
sections. Stormwater accumulated within the washout may not be pumped into or
discharged to the storm drain system or receiving surface waters. Liquid waste must
be pumped out and removed from project.
6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it
can be shown that no other alternatives are reasonably available. At a minimum,
install protection of storm drain inlet(s) closest to the washout which could receive
spills or overflow.
7. Locate washouts in an easily accessible area, on level ground and install a stone
entrance pad in front of the washout. Additional controls may be required by the
approving authority.
8. Install at least one sign directing concrete trucks to the washout within the project
limits. Post signage on the washout itself to identify this location.
9. Remove leavings from the washout when at approximately 75% capacity to limit
overflow events. Replace the tarp, sand bags or other temporary structural
components when no longer functional. When utilizing alternative or proprietary
products, follow manufacturer's instructions.
10. At the completion of the concrete work, remove remaining leavings and dispose of
in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance
caused by removal of washout.
HERBICIDES, PESTICIDES AND RODENTICIDES
1. Store and apply herbicides, pesticides and rodenticides in accordance with label
restrictions.
2. Store herbicides, pesticides and rodenticides in their original containers with the
label, which lists directions for use, ingredients and first aid steps in case of
accidental poisoning.
3. Do not store herbicides, pesticides and rodenticides in areas where flooding is
possible or where they may spill or leak into wells, Stormwater drains, ground water
or surface water. If a spill occurs, clean area immediately.
4. Do not stockpile these materials onsite.
HAZARDOUS AND TOXIC WASTE
1. Create designated hazardous waste collection areas on -site.
2. Place hazardous waste containers under cover or in secondary containment.
3. Do not store hazardous chemicals, drums or bagged materials directly on the ground.
NCGO1 GROUND STABILIZATION AND MATERIALS HANDLING
EFFECTIVE: 04/01/19
M
00
Z �
O N
N
M
J
J
�n
M
N
® Q0.z
U0w
(DWo
(DZM
zm
Zw2
(.5E9w
w_J0-
-LU
= Z 't
X
Uw
0
a
w
C0
Q0
0
0
z
C)
-� W � O
W w�Q
Q �
U a�J
= ox°
>�
1 Qp01
O �Z0
�4-4z
U) zoo
� z
.�> 0
0 P4 LU
m ENO
J
J
LU
m
C
9,
o
m
o
CO
U)
m
m
0
N
J
�
z
Q
w
U
m
_-S
W
0
W
=
J
o
N
�
m
Q
o
T
N
U
�
m
r
Ww
�
O
o
0
m
LU
J
o�
z
w
Z
Cl)
o
J
U
SHEET
C9,00
0
PART III
SELF -INSPECTION, RECORDKEEPING AND REPORTING
SECTION A: SELF -INSPECTION
Self -inspections are required during normal business hours in accordance with the table
below. When adverse weather or site conditions would cause the safety of the inspection
personnel to be in jeopardy, the inspection may be delayed until the next business day on
which it is safe to perform the inspection. In addition, when a storm event of equal to or
greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be
performed upon the commencement of the next business day. Any time when inspections
were delayed shall be noted in the Inspection Record.
Frequency
Inspect
(during normal
Inspection records must include:
business hours)
(1) Rain gauge
Daily
Daily rainfall amounts.
maintained in
If no daily rain gauge observations are made during weekend or
good working
holiday periods, and no individual -day rainfall information is
order
available, record the cumulative rain measurement for those un-
attended days (and this will determine if a site inspection is
needed). Days on which no rainfall occurred shall be recorded as
"zero." The permittee may use another rain -monitoring device
approved by the Division.
(2) E&SC
At least once per
1. Identification of the measures inspected,
Measures
7 calendar days
2. Date and time of the inspection,
and within 24
3. Name of the person performing the inspection,
hours of a rain
4. Indication of whether the measures were operating
event > 1.0 inch in
properly,
24 hours
5. Description of maintenance needs for the measure,
6. Description, evidence, and date of corrective actions taken.
(3) Stormwater
At least once per
1. Identification of the discharge outfalls inspected,
discharge
7 calendar days
2. Date and time of the inspection,
outfalls (SDOs)
and within 24
3. Name of the person performing the inspection,
hours of a rain
4. Evidence of indicators of stormwater pollution such as oil
event > 1.0 inch in
sheen, floating or suspended solids or discoloration,
24 hours
5. Indication of visible sediment leaving the site,
6. Description, evidence, and date of corrective actions taken.
(4) Perimeter of
At least once per
If visible sedimentation is found outside site limits, then a record
site
7 calendar days
of the following shall be made:
and within 24
1. Actions taken to clean up or stabilize the sediment that has left
hours of a rain
the site limits,
event > 1.0 inch in
2. Description, evidence, and date of corrective actions taken, and
24 hours
3. An explanation as to the actions taken to control future
releases.
(5) Streams or
At least once per
If the stream or wetland has increased visible sedimentation or a
wetlands onsite
7 calendar days
stream has visible increased turbidity from the construction
or offsite
and within 24
activity, then a record of the following shall be made:
(where
hours of a rain
1. Description, evidence and date of corrective actions taken, and
accessible)
event > 1.0 inch in
2. Records of the required reports to the appropriate Division
24 hours
Regional Office per Part III, Section C, Item (2)(a) of this permit.
(6) Ground
After each phase
1. The phase of grading (installation of perimeter E&SC
stabilization
of grading
measures, clearing and grubbing, installation of storm
measures
drainage facilities, completion of all land -disturbing
activity, construction or redevelopment, permanent
ground cover).
2. Documentation that the required ground stabilization
measures have been provided within the required
timeframe or an assurance that they will be provided as
soon as possible.
NOTE: The rain inspection resets the required 7 calendar day inspection requirement.
PART III
SELF -INSPECTION, RECORDKEEPING AND REPORTING
SECTION B: RECORDKEEPING
1. E&SC Plan Documentation
The approved E&SC plan as well as any approved deviation shall be kept on the site. The
approved E&SC plan must be kept up-to-date throughout the coverage under this permit.
The following items pertaining to the E&SC plan shall be kept on site and available for
inspection at all times during normal business hours.
Item to Document
Documentation Requirements
(a) Each E&SC measure has been installed
Initial and date each E&SC measure on a copy
and does not significantly deviate from the
of the approved E&SC plan or complete, date
locations, dimensions and relative elevations
and sign an inspection report that lists each
shown on the approved E&SC plan.
E&SC measure shown on the approved E&SC
plan. This documentation is required upon the
initial installation of the E&SC measures or if
the E&SC measures are modified after initial
installation.
(b) A phase of grading has been completed.
Initial and date a copy of the approved E&SC
plan or complete, date and sign an inspection
report to indicate completion of the
construction phase.
(c) Ground cover is located and installed
Initial and date a copy of the approved E&SC
in accordance with the approved E&SC
plan or complete, date and sign an inspection
plan.
report to indicate compliance with approved
ground cover specifications.
(d) The maintenance and repair
Complete, date and sign an inspection report.
requirements for all E&SC measures
have been performed.
(e) Corrective actions have been taken
Initial and date a copy of the approved E&SC
to E&SC measures.
plan or complete, date and sign an inspection
report to indicate the completion of the
corrective action.
2. Additional Documentation to be Kept on Site
In addition to the E&SC plan documents above, the following items shall be kept on the
site and available for inspectors at all times during normal business hours, unless the
Division provides a site -specific exemption based on unique site conditions that make
this requirement not practical:
(a) This General Permit as well as the Certificate of Coverage, after it is received.
(b) Records of inspections made during the previous twelve months. The permittee shall
record the required observations on the Inspection Record Form provided by the
Division or a similar inspection form that includes all the required elements. Use of
electronically -available records in lieu of the required paper copies will be allowed if
shown to provide equal access and utility as the hard -copy records.
3. Documentation to be Retained for Three Years
All data used to complete the e-NOI and all inspection records shall be maintained for a period
of three years after project completion and made available upon request. [40 CFR 122.41]
PART II, SECTION G, ITEM (4)
DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT
Sediment basins and traps that receive runoff from drainage areas of one acre or more shall use outlet structures that withdraw water from the surface when these devices need to be drawn down
for maintenance or close out unless this is infeasible. The circumstances in which it is not feasible to withdraw water from the surface shall be rare (for example, times with extended cold weather).
Non -surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met:
(a) The E&SC plan authority has been provided with documentation of the non -surface withdrawal and the specific time periods or conditions in which it will occur. The non -surface withdrawal
shall not commence until the E&SC plan authority has approved these items,
(b) The non -surface withdrawal has been reported as an anticipated bypass in accordance with Part III, Section C, Item (2)(c) and (d) of this permit,
(c) Dewatering discharges are treated with controls to minimize discharges of pollutants from Stormwater that is removed from the sediment basin. Examples of appropriate controls include
properly sited, designed and maintained dewatering tanks, weir tanks, and filtration systems,
(d) Vegetated, upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in Item (c) above,
(e) Velocity dissipation devices such as check dams, sediment traps, and riprap are provided at the discharge points of all dewatering devices, and
(f) Sediment removed from the dewatering treatment devices described in Item (c) above is disposed of in a manner that does not cause deposition of sediment into waters of the United States.
PART III
SELF -INSPECTION, RECORDKEEPING AND REPORTING
SECTION C: REPORTING
1. Occurrences that Must be Reported
Permittees shall report the following occurrences:
(a) Visible sediment deposition in a stream or wetland.
(b) Oil spills if:
• They are 25 gallons or more,
• They are less than 25 gallons but cannot be cleaned up within 24 hours,
• They cause sheen on surface waters (regardless of volume), or
• They are within 100 feet of surface waters (regardless of volume).
(c) Releases of hazardous substances in excess of reportable quantities under Section 311
of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA
(Ref: 40 CFR 302.4) or G.S. 143-215.85.
(d) Anticipated bypasses and unanticipated bypasses.
(e) Noncompliance with the conditions of this permit that may endanger health or the
environment.
2. Reporting Timeframes and Other Requirements
After a permittee becomes aware of an occurrence that must be reported, he shall contact
the appropriate Division regional office within the tmeframes and in accordance with the
other requirements listed below. Occurrences outside normal business hours may also be
reported to the Department's Environmental Emergency Center personnel at (800)
858-0368.
Occurrence
Reporting Timeframes (After Discovery) and Other Requirements
(a) Visible sediment
•
Within 24 hours, an oral or electronic notification.
deposition in a
•
Within 7 calendar days, a report that contains a description of the
stream or wetland
sediment and actions taken to address the cause of the deposition.
Division staff may waive the requirement for a written report on a
case -by -case basis.
•
If the stream is named on the NC 303(d) list as impaired for sediment -
related causes, the permittee may be required to perform additional
monitoring, inspections or apply more stringent practices if staff
determine that additional requirements are needed to assure compliance
with the federal or state impaired -waters conditions.
(b) Oil spills and
•
Within 24 hours, an oral or electronic notification. The notification
release of
shall include information about the date, time, nature, volume and
hazardous
location of the spill or release.
substances per Item
1(b)-(c) above
(c) Anticipated
•
A report at least ten days before the date of the bypass, if possible.
bypasses [40 CFR
The report shall include an evaluation of the anticipated quality and
122.41(m)(3)]
effect of the bypass.
(d) Unanticipated
•
Within 24 hours, an oral or electronic notification.
bypasses [40 CFR
.
Within 7 calendar days, a report that includes an evaluation of the
122.41(m)(3)]
quality and effect of the bypass.
(e) Noncompliance
•
Within 24 hours, an oral or electronic notification.
with the conditions
.
Within 7 calendar days, a report that contains a description of the
of this permit that
noncompliance, and its causes; the period of noncompliance,
may endanger
including exact dates and times, and if the noncompliance has not
health or the
been corrected, the anticipated time noncompliance is expected to
environment[40
continue; and steps taken or planned to reduce, eliminate, and
CFR 122.41(I)(7)]
prevent reoccurrence of the noncompliance. [40 CFR 122.41(I)(6).
•
Division staff may waive the requirement for a written report on a
case -by -case basis.
NCGO I SELF -INSPECTION, RECORDKEEPING AND REPORTING
EFFECTIVE: 04/01/19
w
co
co
0
0
z
-� LLJ O
W wP4Q
Q z
U a�J
= ox°
>�
2
Z QOF-
0 z0
z
U' z O z
-�
W C)
O t� Y
m ENO
J
J
W
m
C
C
N
o
m
co
U)
m
m
0
N
J
z
Qw
U
m
_S
UJ
0
W
=
J
o
N
m
Q
�
O
T
N
U
�
m
r
LIJ
w
�
0
o
0
m
LU
J
Hi
z
w
Z
W
J
U
C 10,00
72„
0
PEDESTAL
N.T.S
PEDESTAL BASE
BOLT PATTERN
N.T.S
MODEL #3416D-20
4C PEDESTAL MAILBOX
AVAILABLE COLORS: c
191,
MODEL #3416D-20
(20) 'MB1' DOORS
(1) 'OM2' OUTGOING MAIL COMPARTMENT
(2) PL4.5 PARCEL LOCKERS (15 Ys" H)
CHAMFER
EDGES
CBU OUTLINE -
I II
I
I
I I
I I
L---J
EXPANSION
JOINT (TYP.)
5.0'
SIDEWALK
BROOM FINISH
15"
FIELD VERIFY
U-D
PLAN VIEW
N.T.S
z
0
3»
Z/ /
�% % .�
\-��..+:-�-a 00 te ...
BUTYL RUBBER PAD
(WITH METAL PEDESTAL ONLY)
MATCH EXISTING GRADE IN PAVED AREAS
SLOPE SURFACE 0.25 IN PER FOOT
ON ALL SIDES FOR DRAINAGE
4 RODS ON CENTERS MAX. EACH WAY
COMPACT GRAVEL
OR CRUSHED STONE
FIRM UNDISTURBED
SOIL OR WE
Concrete Pad COMPAACTEDLSOIL
N.T.S.
USPS SDL ISSUED 10/1/2016
NOTES
CONCRETE SHALL HAVE COMPRESSIVE STRENGTH OF 3,000 PSI ® 28 DAYS
CONTAIN MIN. - 6% MAX AIR ENTRANMENT AND BE PLACED WITH A 3.5 -
4.5 SLUMP IN ACCORDANCE WITH ACI 301.
REINFORCING STEEL RODS SHALL CONFORM TO ASTM A515, GRADE 60.
BRONZE,
BLACK OR GRAY CLUSTER MAILBOX D E TA I L
BLACK O
INSPECTION AND COMMENCEMENT OF MAIL DELIVERY SERVICES
APPROPRIATE MAIL RECEPTACLES MUST BE PROVIDED FOR THE RECEIPT OF MAIL. THE
TYPE OF MAIL RECEPTACLE DEPENDS ON THE MODE OF DELIVERY IN PLACE. PURCHASE,
INSTALLATION, MAINTENANCE, REPAIR, AND REPLACEMENT OF MAIL RECEPTACLES ARE THE
RESPONSIBILITY OF THE CUSTOMER. VERIFY WITH THE LOCAL POSTMASTER OR GROWTH
MANAGER, THE APPROPRIATE LOCATIONS FOR INSTALLATION. THE FOLLOWING APPLY:
IN LOCATIONS WHERE THE POSTAL SERVICE HAS DETERMINED THAT CENTRALIZED DELIVERY
IS APPROPRIATE, CUSTOMERS MUST INSTALL MAIL RECEPTACLES THAT COMPLY WITH THE
LISPS STD- 4C MOUNTED MAIL RECEPTACLES OR USPSB1118, POSTAL SERVICE
SPECIFICATION, CBUS, TO INCLUDE SECURED PARCEL LOCKERS.
PAVEMENT
'GONG. CURB &aGUTTEF
1" FULL PORT ANGLE BALL VALVE -
WITH ONE OR TWO STEP STYLE
z COMPRESSION FOR IPS PE INLET
g AND FEMALE METER THREAD
1" CC SINGLE SWIVEL NUT WITH LOCK. ALL
ih STAINLESS STEEL INSERTS SHALL BE STAINLESS
STRAP SADDLE STEEL
BALL CORPORATION STOP
WITH AWWA INLETS, ONE
OR TWO STEP STYLE
COMPRESSION FOR IPS PE,
WITH STAINLESS STEEL
INSERTS.
1" IPS POLYETHYLENE PIPE
P.E. 3406 160 PSI/P.E. 3408
200 PSI ASTM D1248-TYPE III
ASTM D 3350-355434 C
r(WATER o
MAIN
\\ // TRACER
(DO NOT CONNECT TO
CORPORATION OR BANDS)
2" SOLID BRICK METER
D BOX BASE
BACK FILL IIIII
11- D BOTTOM
METER BOX -III
1 -
BRICK j OF BOX
777
SECTION "A -A"
BRICK METER BOX BASE
INSET "A"
PROPOSED 1" WATER SERVICE LATERAL
SHEET NO.
1 OF 1
VARIES
z
00
METER BOX WITH NOTES: 1. ALL MATERIALS TO BE APPROVED BY
RECESSED AMR READING P.W.C.
LID SET 1/4" ABOVE GRADE 2. SERVICE LATERAL SIZE 1" IPS
18 POLYETHYLENE UNLESS OTHERVISE
} SPECIFIED
_ 3. SERVICE LATERAL INSTALLATION SHALL
EQ III O a BE APPROVED BY P.W.C.
z 4. WATER SERVICE LOCK VALVE TO BE
a _j LOCATED 18" FROM SANITARY SEWER
�- - INCH.
D TSTACK WHEN INSTALLED
I- 5. WHEN INSTALLED IN A PAVED AREA,
METER BOX TO BE SET 1/4" ABOVE
FINISHED PAVEMENT GRADES AND
PAVEMENT FEATHERED TO TOP OF BOX
- _ TO PROVIDE DRAIN AWAY FROM BOX
III -III- 6. C.I. METER BOXES SHALL BE USED
IN TRAFFIC AREAS SEE WAB.
12" METER COUPLING 7 PERIMETER SOLID CONCRETE BRICK
BASE WITH NO GAPS, DO NOT LAY
WTH 3/4" FEMALE BRICK ON PIPE. SEE INSET "A"
THREAD METER SWIVEL
NUT X 3/a" MIPT. 8. WHERE ASPHALT CURB OR STRIP
PAVEMENT EXIST, THE LOCATION OF
1" x 7-1/2" SPACER FOR BOX SHALL BE AS DIRECTED BY PWC
DOMESTIC SERVICE, REPRESENTATIVE
1" x 10-1" SPACER FOR 9. DISTANCE FROM TOP OF LOCK VALVE
IRRIGATION SERVICE, OPERATING STEM TO TOP OF BOX
SPACER SHALL BE SHALL BE 8" MIN. TO 10" MAX.
FURNISHED BY PWC.
10. RESIDENTIAL METER BOX SHALL BE SET
BRICK METER BOX BASE 18" FROM R/W TO CENTERLINE OF
SEE INSET "A" METER BOX PERPENDICULAR TO THE R/W.
12 GA SINGLE STRAND
COATED COPPER WIRE
EXTENDED INTO METER
BOX 6" AND WRAPPED
AROUND LOCK VALVE
EQ EQ
O
w
w
a�
SPACER SHALL BE
CENTERED
PLAN IN METER BOX
11. COMMERCIAL METER BOX
LOCATION SHALL BE AS APPROVED
(PREFER NO METER BE INSTALLED
LESS THAN 5FROM BLDG. TO EDGE
OF BOX).
12. LATERAL SHALL BE CENTERED
ON LOT UNLESS OTHERWISE NOTED.
13. LATERAL SHALL NOT BE
BACK FILLED UNTIL INSPECTED BY
PWC PROJECT COORDINATOR.
14. WATER MAIN AND LATERAL SHALL PASS
HYDROSTATIC, LEAKAGE AND
STERILIZATION TESTS (200 PSI).
15. BARB -TYPE FITTINGS ARE NOT
ACCEPTABLE
16. SHOULD IT BE NECESSARY TO CRIMP THE
WATER SERVICE LATERAL, A FULL CIRCLE
REPAIR CLAMP SHALL BE PLACED ON THE
#10 SOLID
COPPER WIRE
j SPIRAL WRAPPED
O AROUND PVC PIPE
NOT REQUIRED
z FOR DIP
z N
ww
mZ
O
N
PIPE
3" WIDE DETECTOR
TAPE - 18" BURY
J
J
LL
Y
U
a
m
J
a
z
LL
J
J_
LL
Y
U
a
m
J
a
z
U
PIPE Z
0
UNDISTURBED SOIL""WIDTH o
AS REQUIRED m
BELL O.D.+12" MIN.
BELL O.D.+24" MAX.
WATER MAIN TRENCH DETAILS
N.T.S.
NOTES:
1. LAYING CONDITIONS AS PER AWWA C600 AND C605 STANDARDS.
2. BEDDING MATERIAL SHALL BE 4" MINIMUM THICKNESS, LOOSE SOIL (DEFINED
IAS NATIVE SOIL EXCAVATED FROM THE TRENCH), FREE FROM ROCKS AND SHALL
PROVIDE UNIFORM SUPPORT FOR THE FULL LENGTH OF PIPE. COMPACT TO 95%
MAXIMUM DENSITY.
3. INITIAL BACKFILL SHALL BE LIGHTLY CONSOLIDATED IN MAXIMUM 6" LOOSE
LIFTS, COMPACTED TO 95% OF MAXIMUM DENSITY.
4. UNDER AREAS TO BE SEEDED OR SODDED, COMPACT SUCCEEDING LAYERS OF
FINAL BACKFILL IN 12" LOOSE LIFTS TO 85% MAXIMUM DENSITY.
5. UNDER STRUCTURES, PAVEMENTS AND ROAD SHOULDERS, COMPACT SUCCEEDING
LAYERS OF FINAL BACKFILL IN 6" LOOSE LIFTS TO 95% MAXIMUM DENSITY
EXCEPT COMPACT TOP 12" OF SUBGRADE TO 98 % MAXIMUM DENSITY.
6. PROVIDE #10 SOLID COPPER WIRE IN SUFFICIENT LENGTH TO BE SPIRAL
WRAPPED AROUND EACH SEPARATE RUN OF ALL BURIED PVC PIPING. AT VALVE
BOXES, BRING WIRE TO WITHIN 6 IN. OF TOP OF BOX AND INSERT INTO BOX
THROUGH DRILLED HOLE. NOT REQUIRED FOR DUCTILE IRON PIPE.
7 INSTALL 3" WIDE DETECTOR TAPE AT 18" DEPTH. TAPE SHALL HAVE MIDDLE
FOIL LAYER.
HOKE COUNTY REGIONAL
WATER SYSTEM DETAILS
HOKE COUNTY, NORTH CAROLINA
DOUBLE
CHECK VALVE
METER BOX
(CONC., C/I,
OR PLASTIC
COPPER SETTER
TO BE FORD
(VHH 172-7W-SN)
OR APPROVED
EQUAL
METER BY
OTHERS
WATER MAIN TRENCH DETAILS
R/W
ANGLE
VALVE
POLY. WATER SERVICE LINE
COMPRESSION
FITTING
BRASS ADAPTER
METER FOR
YOKE COMPRESSION
CONECTION YL
TYPICAL HOUSE SERVICE DETAIL (SHORT)
N.T.S.
NOTES:
1. INLETS WILL HAVE A BRASS ADAPTER
AS REQUIRED FOR A COMPRESSION
FITTING TO "IPS" WATER SERVICE PIPE.
2. YOKE WILL HAVE CHECK VALVE THAT
SHALL HAVE SPRING ASSISTED SEATING,
AND THE SEAT SHALL BE OF BUNA-N-
RUBBER.
3. OUTLET SHALL BE FORD DOUBLE
PURPOSE COUPLING OR APPROVED
EQUAL.
4. METER YOKES SHALL BE SUPPORTED AS
CALLED FOR IN SPECIAL PROVISIONS.
CORPORATI
STOP
HOKE COUNTY REGIONAL WATER SYSTEM DETAILS TYPICAL HOUSE SERVICE DETAIL
(SHORT)
HOKE COUNTY, NORTH CAROLINA
HOKE COUNTY REGIONAL
WATER SYSTEM DETAILS
HOKE COUNTY, NORTH CAROLINA
SOLID COVEF
5.75" 5.75"
17.25"
OD
20.125"
.2 5»
I
LO
N
LO
SECTION A -A SECTION B-B
WATER METER BOX DETAIL
N.T.S.
MIN. AVG. WGT.
12 GA SINGLE STRAND
COATED COPPER WIRE
EXTENDED INTO METER
BOX 6" AND WRAPPED
AROUND LOCK VALVE
EQ EQ
O
w
w
a�
SPACER SHALL BE
CENTERED
PLAN IN METER BOX
11. COMMERCIAL METER BOX
LOCATION SHALL BE AS APPROVED
(PREFER NO METER BE INSTALLED
LESS THAN 5FROM BLDG. TO EDGE
OF BOX).
12. LATERAL SHALL BE CENTERED
ON LOT UNLESS OTHERWISE NOTED.
13. LATERAL SHALL NOT BE
BACK FILLED UNTIL INSPECTED BY
PWC PROJECT COORDINATOR.
14. WATER MAIN AND LATERAL SHALL PASS
HYDROSTATIC, LEAKAGE AND
STERILIZATION TESTS (200 PSI).
15. BARB -TYPE FITTINGS ARE NOT
ACCEPTABLE
16. SHOULD IT BE NECESSARY TO CRIMP THE
WATER SERVICE LATERAL, A FULL CIRCLE
REPAIR CLAMP SHALL BE PLACED ON THE
#10 SOLID
COPPER WIRE
j SPIRAL WRAPPED
O AROUND PVC PIPE
NOT REQUIRED
z FOR DIP
z N
ww
mZ
O
N
PIPE
3" WIDE DETECTOR
TAPE - 18" BURY
J
J
LL
Y
U
a
m
J
a
z
LL
J
J_
LL
Y
U
a
m
J
a
z
U
PIPE Z
0
UNDISTURBED SOIL""WIDTH o
AS REQUIRED m
BELL O.D.+12" MIN.
BELL O.D.+24" MAX.
WATER MAIN TRENCH DETAILS
N.T.S.
NOTES:
1. LAYING CONDITIONS AS PER AWWA C600 AND C605 STANDARDS.
2. BEDDING MATERIAL SHALL BE 4" MINIMUM THICKNESS, LOOSE SOIL (DEFINED
IAS NATIVE SOIL EXCAVATED FROM THE TRENCH), FREE FROM ROCKS AND SHALL
PROVIDE UNIFORM SUPPORT FOR THE FULL LENGTH OF PIPE. COMPACT TO 95%
MAXIMUM DENSITY.
3. INITIAL BACKFILL SHALL BE LIGHTLY CONSOLIDATED IN MAXIMUM 6" LOOSE
LIFTS, COMPACTED TO 95% OF MAXIMUM DENSITY.
4. UNDER AREAS TO BE SEEDED OR SODDED, COMPACT SUCCEEDING LAYERS OF
FINAL BACKFILL IN 12" LOOSE LIFTS TO 85% MAXIMUM DENSITY.
5. UNDER STRUCTURES, PAVEMENTS AND ROAD SHOULDERS, COMPACT SUCCEEDING
LAYERS OF FINAL BACKFILL IN 6" LOOSE LIFTS TO 95% MAXIMUM DENSITY
EXCEPT COMPACT TOP 12" OF SUBGRADE TO 98 % MAXIMUM DENSITY.
6. PROVIDE #10 SOLID COPPER WIRE IN SUFFICIENT LENGTH TO BE SPIRAL
WRAPPED AROUND EACH SEPARATE RUN OF ALL BURIED PVC PIPING. AT VALVE
BOXES, BRING WIRE TO WITHIN 6 IN. OF TOP OF BOX AND INSERT INTO BOX
THROUGH DRILLED HOLE. NOT REQUIRED FOR DUCTILE IRON PIPE.
7 INSTALL 3" WIDE DETECTOR TAPE AT 18" DEPTH. TAPE SHALL HAVE MIDDLE
FOIL LAYER.
HOKE COUNTY REGIONAL
WATER SYSTEM DETAILS
HOKE COUNTY, NORTH CAROLINA
DOUBLE
CHECK VALVE
METER BOX
(CONC., C/I,
OR PLASTIC
COPPER SETTER
TO BE FORD
(VHH 172-7W-SN)
OR APPROVED
EQUAL
METER BY
OTHERS
WATER MAIN TRENCH DETAILS
R/W
ANGLE
VALVE
POLY. WATER SERVICE LINE
COMPRESSION
FITTING
BRASS ADAPTER
METER FOR
YOKE COMPRESSION
CONECTION YL
TYPICAL HOUSE SERVICE DETAIL (SHORT)
N.T.S.
NOTES:
1. INLETS WILL HAVE A BRASS ADAPTER
AS REQUIRED FOR A COMPRESSION
FITTING TO "IPS" WATER SERVICE PIPE.
2. YOKE WILL HAVE CHECK VALVE THAT
SHALL HAVE SPRING ASSISTED SEATING,
AND THE SEAT SHALL BE OF BUNA-N-
RUBBER.
3. OUTLET SHALL BE FORD DOUBLE
PURPOSE COUPLING OR APPROVED
EQUAL.
4. METER YOKES SHALL BE SUPPORTED AS
CALLED FOR IN SPECIAL PROVISIONS.
CORPORATI
STOP
HOKE COUNTY REGIONAL WATER SYSTEM DETAILS TYPICAL HOUSE SERVICE DETAIL
(SHORT)
HOKE COUNTY, NORTH CAROLINA
HOKE COUNTY REGIONAL
WATER SYSTEM DETAILS
HOKE COUNTY, NORTH CAROLINA
SOLID COVEF
5.75" 5.75"
17.25"
OD
20.125"
.2 5»
I
LO
N
LO
SECTION A -A SECTION B-B
WATER METER BOX DETAIL
N.T.S.
MIN. AVG. WGT.
O
w
w
a�
SPACER SHALL BE
CENTERED
PLAN IN METER BOX
11. COMMERCIAL METER BOX
LOCATION SHALL BE AS APPROVED
(PREFER NO METER BE INSTALLED
LESS THAN 5FROM BLDG. TO EDGE
OF BOX).
12. LATERAL SHALL BE CENTERED
ON LOT UNLESS OTHERWISE NOTED.
13. LATERAL SHALL NOT BE
BACK FILLED UNTIL INSPECTED BY
PWC PROJECT COORDINATOR.
14. WATER MAIN AND LATERAL SHALL PASS
HYDROSTATIC, LEAKAGE AND
STERILIZATION TESTS (200 PSI).
15. BARB -TYPE FITTINGS ARE NOT
ACCEPTABLE
16. SHOULD IT BE NECESSARY TO CRIMP THE
WATER SERVICE LATERAL, A FULL CIRCLE
REPAIR CLAMP SHALL BE PLACED ON THE
#10 SOLID
COPPER WIRE
j SPIRAL WRAPPED
O AROUND PVC PIPE
NOT REQUIRED
z FOR DIP
z N
ww
mZ
O
N
PIPE
3" WIDE DETECTOR
TAPE - 18" BURY
J
J
LL
Y
U
a
m
J
a
z
LL
J
J_
LL
Y
U
a
m
J
a
z
U
PIPE Z
0
UNDISTURBED SOIL""WIDTH o
AS REQUIRED m
BELL O.D.+12" MIN.
BELL O.D.+24" MAX.
WATER MAIN TRENCH DETAILS
N.T.S.
NOTES:
1. LAYING CONDITIONS AS PER AWWA C600 AND C605 STANDARDS.
2. BEDDING MATERIAL SHALL BE 4" MINIMUM THICKNESS, LOOSE SOIL (DEFINED
IAS NATIVE SOIL EXCAVATED FROM THE TRENCH), FREE FROM ROCKS AND SHALL
PROVIDE UNIFORM SUPPORT FOR THE FULL LENGTH OF PIPE. COMPACT TO 95%
MAXIMUM DENSITY.
3. INITIAL BACKFILL SHALL BE LIGHTLY CONSOLIDATED IN MAXIMUM 6" LOOSE
LIFTS, COMPACTED TO 95% OF MAXIMUM DENSITY.
4. UNDER AREAS TO BE SEEDED OR SODDED, COMPACT SUCCEEDING LAYERS OF
FINAL BACKFILL IN 12" LOOSE LIFTS TO 85% MAXIMUM DENSITY.
5. UNDER STRUCTURES, PAVEMENTS AND ROAD SHOULDERS, COMPACT SUCCEEDING
LAYERS OF FINAL BACKFILL IN 6" LOOSE LIFTS TO 95% MAXIMUM DENSITY
EXCEPT COMPACT TOP 12" OF SUBGRADE TO 98 % MAXIMUM DENSITY.
6. PROVIDE #10 SOLID COPPER WIRE IN SUFFICIENT LENGTH TO BE SPIRAL
WRAPPED AROUND EACH SEPARATE RUN OF ALL BURIED PVC PIPING. AT VALVE
BOXES, BRING WIRE TO WITHIN 6 IN. OF TOP OF BOX AND INSERT INTO BOX
THROUGH DRILLED HOLE. NOT REQUIRED FOR DUCTILE IRON PIPE.
7 INSTALL 3" WIDE DETECTOR TAPE AT 18" DEPTH. TAPE SHALL HAVE MIDDLE
FOIL LAYER.
HOKE COUNTY REGIONAL
WATER SYSTEM DETAILS
HOKE COUNTY, NORTH CAROLINA
DOUBLE
CHECK VALVE
METER BOX
(CONC., C/I,
OR PLASTIC
COPPER SETTER
TO BE FORD
(VHH 172-7W-SN)
OR APPROVED
EQUAL
METER BY
OTHERS
WATER MAIN TRENCH DETAILS
R/W
ANGLE
VALVE
POLY. WATER SERVICE LINE
COMPRESSION
FITTING
BRASS ADAPTER
METER FOR
YOKE COMPRESSION
CONECTION YL
TYPICAL HOUSE SERVICE DETAIL (SHORT)
N.T.S.
NOTES:
1. INLETS WILL HAVE A BRASS ADAPTER
AS REQUIRED FOR A COMPRESSION
FITTING TO "IPS" WATER SERVICE PIPE.
2. YOKE WILL HAVE CHECK VALVE THAT
SHALL HAVE SPRING ASSISTED SEATING,
AND THE SEAT SHALL BE OF BUNA-N-
RUBBER.
3. OUTLET SHALL BE FORD DOUBLE
PURPOSE COUPLING OR APPROVED
EQUAL.
4. METER YOKES SHALL BE SUPPORTED AS
CALLED FOR IN SPECIAL PROVISIONS.
CORPORATI
STOP
HOKE COUNTY REGIONAL WATER SYSTEM DETAILS TYPICAL HOUSE SERVICE DETAIL
(SHORT)
HOKE COUNTY, NORTH CAROLINA
HOKE COUNTY REGIONAL
WATER SYSTEM DETAILS
HOKE COUNTY, NORTH CAROLINA
SOLID COVEF
5.75" 5.75"
17.25"
OD
20.125"
.2 5»
I
LO
N
LO
SECTION A -A SECTION B-B
WATER METER BOX DETAIL
N.T.S.
MIN. AVG. WGT.
ww
mZ
O
N
PIPE
3" WIDE DETECTOR
TAPE - 18" BURY
J
J
LL
Y
U
a
m
J
a
z
LL
J
J_
LL
Y
U
a
m
J
a
z
U
PIPE Z
0
UNDISTURBED SOIL""WIDTH o
AS REQUIRED m
BELL O.D.+12" MIN.
BELL O.D.+24" MAX.
WATER MAIN TRENCH DETAILS
N.T.S.
NOTES:
1. LAYING CONDITIONS AS PER AWWA C600 AND C605 STANDARDS.
2. BEDDING MATERIAL SHALL BE 4" MINIMUM THICKNESS, LOOSE SOIL (DEFINED
IAS NATIVE SOIL EXCAVATED FROM THE TRENCH), FREE FROM ROCKS AND SHALL
PROVIDE UNIFORM SUPPORT FOR THE FULL LENGTH OF PIPE. COMPACT TO 95%
MAXIMUM DENSITY.
3. INITIAL BACKFILL SHALL BE LIGHTLY CONSOLIDATED IN MAXIMUM 6" LOOSE
LIFTS, COMPACTED TO 95% OF MAXIMUM DENSITY.
4. UNDER AREAS TO BE SEEDED OR SODDED, COMPACT SUCCEEDING LAYERS OF
FINAL BACKFILL IN 12" LOOSE LIFTS TO 85% MAXIMUM DENSITY.
5. UNDER STRUCTURES, PAVEMENTS AND ROAD SHOULDERS, COMPACT SUCCEEDING
LAYERS OF FINAL BACKFILL IN 6" LOOSE LIFTS TO 95% MAXIMUM DENSITY
EXCEPT COMPACT TOP 12" OF SUBGRADE TO 98 % MAXIMUM DENSITY.
6. PROVIDE #10 SOLID COPPER WIRE IN SUFFICIENT LENGTH TO BE SPIRAL
WRAPPED AROUND EACH SEPARATE RUN OF ALL BURIED PVC PIPING. AT VALVE
BOXES, BRING WIRE TO WITHIN 6 IN. OF TOP OF BOX AND INSERT INTO BOX
THROUGH DRILLED HOLE. NOT REQUIRED FOR DUCTILE IRON PIPE.
7 INSTALL 3" WIDE DETECTOR TAPE AT 18" DEPTH. TAPE SHALL HAVE MIDDLE
FOIL LAYER.
HOKE COUNTY REGIONAL
WATER SYSTEM DETAILS
HOKE COUNTY, NORTH CAROLINA
DOUBLE
CHECK VALVE
METER BOX
(CONC., C/I,
OR PLASTIC
COPPER SETTER
TO BE FORD
(VHH 172-7W-SN)
OR APPROVED
EQUAL
METER BY
OTHERS
WATER MAIN TRENCH DETAILS
R/W
ANGLE
VALVE
POLY. WATER SERVICE LINE
COMPRESSION
FITTING
BRASS ADAPTER
METER FOR
YOKE COMPRESSION
CONECTION YL
TYPICAL HOUSE SERVICE DETAIL (SHORT)
N.T.S.
NOTES:
1. INLETS WILL HAVE A BRASS ADAPTER
AS REQUIRED FOR A COMPRESSION
FITTING TO "IPS" WATER SERVICE PIPE.
2. YOKE WILL HAVE CHECK VALVE THAT
SHALL HAVE SPRING ASSISTED SEATING,
AND THE SEAT SHALL BE OF BUNA-N-
RUBBER.
3. OUTLET SHALL BE FORD DOUBLE
PURPOSE COUPLING OR APPROVED
EQUAL.
4. METER YOKES SHALL BE SUPPORTED AS
CALLED FOR IN SPECIAL PROVISIONS.
CORPORATI
STOP
HOKE COUNTY REGIONAL WATER SYSTEM DETAILS TYPICAL HOUSE SERVICE DETAIL
(SHORT)
HOKE COUNTY, NORTH CAROLINA
HOKE COUNTY REGIONAL
WATER SYSTEM DETAILS
HOKE COUNTY, NORTH CAROLINA
SOLID COVEF
5.75" 5.75"
17.25"
OD
20.125"
.2 5»
I
LO
N
LO
SECTION A -A SECTION B-B
WATER METER BOX DETAIL
N.T.S.
MIN. AVG. WGT.
FRAME
50 LBS.
COVER
20 LBS.
HOKE COUNTY REGIONAL
WATER SYSTEM DETAILS
HOKE COUNTY, NORTH CAROLINA
5' MIN. EXIST. ROAD 20' AVG
POLY. WATER
SERVICE LINE
WATER METER BOX DETAIL
DOUBLE CHECK
VALVE
BRASS ADAPTER COMPRESSION
FOR FITTING
COMPRESSION
CONECTION PVC CASING
CORPORATION (CLASS 200)
STOP
SADDLE
TYPICAL HOUSE SERVICE DETAIL (LONG)
A BRASS ADAPTER
A COMPRESSION
WATER SERVICE PIPE.
CHECK VALVE THAT
NG ASSISTED SEATING,
HALL BE OF BUNA-N-
FORD DOUBLE
NG OR APPROVED
ALL BE SUPPORTED
PECIAL PROVISIONSI.
TYPICAL HOUSE SERVICE DETAIL
(LONG)
R
N.T.S.
NOTES:
1. INLETS WILL HAVE
AS REQUIRED FO
FITTING TO "IPS"
2. YOKE WILL HAVE
SHALL HAVE SPRI
AND THE SEAT S
RUBBER.
3. OUTLET SHALL BE
PURPOSE COUPLI
EQUAL.
4. METER YOKES SH
AS
CALLED FOR IN S
ANGLE
METER BOX ON P
VALVE
METER BOX
(GONG., C/I, O
PLASTIC
R
COPPER SETTER TO BE
aurLEr FORD (VHH172-7W-SN)
OR APPROVED EQUAL
METER
YOKE
M
. Z 28
N
U O N
_j o
ern
^
co
N
Za
' J
O
01'
6 w
uwi �
O(D
Z 2
U w
who
W o
= z M
x
(D
U Z m
w 0
a
W
m
m
m
FW-
0
O
z
-� LLJ � O
W W�Q
U Z
U P. 00
o�Q
U
>�
z C)
O >-�Zo
E_ z
cn z o z
� Z
>_ �0
w p p4 Lu
m allo
J
J
W
m
cc
C
C
N
C
m
co
r %�Cr
"' '
Com
m
O
J
U
Z)
z
W
U
m
�
W
0
Luo
J
N
m
Q
�
O
T
N
U
�
m
r
WW
O
o
0
>-
m
W
J
m
Q
pLu
z
W
Z
oC/)
J
HEET
C 1 1,00
a
CL
POUNDS
ASTM
SIZE
T
L
PER
SPEC. &
OD
A
B
C
E
F
G
J
K
M
N
PLANT
D
FOOT
CLASS
15
B2 1
8'
134
ASTM C76
19 1
2
16 15
1
17 4
2
3
17 T
17
3
21 8
4 1
7
1 1
SR
4
III IV V
2
16
2
16
4
VN-KN
18
B2
8
173
ASTM C76
23
2
20
3
20 4
2
1
21 4
1
20 2
1
23 2
1
6 2
3
1
1
SR
2
III IV V
4
4
VN-KN
24
B3
8'
268
ASTM C76
30
2 1
26 3
26 7
2 13
27 3
27
31 1
4 1
1
1 1
VN -KN
III IV V
2
16
8
16
4
32
4
2
2
SR
30
B31
8'
396
ASTM C76
37
2 15
32 1
33 1
3
34 1
33 1
38 1
5 1
3
1 1
SR-K
2
III IV V
16
16
8
32
32
2
2
4
2
36
g4
8'
543
ASTM C76
44
3 3
39 1
39 29
3 13
40 19
40 5
46 1
6
1
1
2 1 1
SR-K
III IV V
4
4
32
16
32
16
2
4
16
L E
1
M 1 F <--
PAVFMFNT Sl1RFACF
A MINIMUM OF 6" OF #57 WASHED STONE IS
REQUIRED FOR ALL PIPE INSTALLATION. SEE CITY
CITY OF FAYETTEVILLE STANDARD DETAIL DR-1.
MODIFIED TONGUE
AND GROOVE
8 FOOT LENGTH
MORTAR OF FLEXIBLE
PLASTIC TYPE JOINT
SPECIFICATIONS:
ASTM C 76-LATEST
NCDOT
REINFORCED IN ACCORDANCE
WITH APPLICABLE SPECIFICATIONS
LIFT HOLES STANDARD ON 36"
AS ALLOWED PER ASTM
SPECIFICATIONS
MINIMUM FILL UNDER ROADWAYS
PIPE CLASS
MINIMUM FILL
CLASS III
2'
CLASS IV
1'
CLASS V
V
FILL HEIGHT IS MEASURED FROM THE
TOP OF THE PIPE TO THE BOTTOM
OF THE PAVEMENT STRUCTURE.
BASE COURSE
100% COMPACTION
1'-0"
9 a
2'-0$'
a
° o
#57 WASHED STONE
SEE NOTE
TYPICAL STORM DRAIN
COMPACTION
tNOTES:
1. STONE BEDDING FOR PIPE IS REQUIRED
UNLESS OTHERWISE APPROVED BY
THE ENGINEER
r- W1 (FT.)
H2
H1
).C.(TYP.)
:R TO CHART
FOR BAR SIZE
ELEVATION
W2 (FT.)
DI AN
D 6"
1 -0"
O I -
Al
ifl
6" 8" O.C.(TYP.)
REFER TO CHART
FOR BAR SIZE
SIDE
NOTES:
• THIS PRECAST ENDWALL MAY BE USED FOR THE FOLLOWING
STANDARDS: 838.01, 838.11, 838.21, 838.27, 838.333
838.39, 838.51, 838.57, 838.63 AND 838.69.
• INSTALL PRECAST ENDWALLS WITH WINGS AND PAY
FOR IN ACCORDANCE WITH SPECIFICATION SECTION 838.
• USE 4000 PSI CONCRETE.
• PROVIDE ALL REINFORCING STEEL WHICH MEETS ASTM A615
FOR GRADE 60 AND WELDED WIRE FABRIC CONFORMING
TO ASTM A185 WITH 2" MIN. CLEARANCE.
• PLACE LIFT HOLES OR PINS IN ACCORDANCE WITH
OSHA STANDARD 1926.704.
• PIPE TO BE GROUTED INTO HEADWALL AT JOB SITE BY
CONTRACTOR
• ALL ELEMENTS PRECAST TO MEET ASTM C913.
• WELDED WIRE FABRIC MAY BE SUBSTITUTED FOR REBAR
AS LONG AS THE SAME AREA OF STEEL IS PROVIDED.
• CHAMFER ALL CORNERS 1" OR HAVE A RADIUS OF 1".
NOTE: THE MINIMUM BAR SIZE SHALL BE #5 BARS
AT 8" CTS.THE CONTRACTOR WILL HAVE THE OPTION
TO INCREASE THIS BAR SIZE AS NEEDED.
ENDWALL DIMENSIONS
FT.
MINIMUM
MIN./MAX.
MIN./MAX.
MIN./MAX.
MIN./MAX.
MIN./MAX.
PIPE DIA.
BAR SIZE
H1(FT.)
H2(FT.)
D (FT.)
W1
W2
1.0
#5 @ 8"
1.25/2.00
2.00/3.75
1.25/1.75
3.00/3.75
5.50/6.00
1.25
1 #5 @ 8"
1.25/2.00
3.00/3.75
1.25/2.00
3.50/3.75
6.50/6.75
1.50
#5 @ 8"
1.25/2.00
3.00/4.25
1.50/2.50
3.50/3.75
6.50/6.75
2.0
#5 @ 8"
1.50/2.50
4.00/4.75
1.75/2.50
4.00/4.25
7.50/8.25
2.5
#5 @ 8"
2.50/3.50
4.00/6.00
2.00/3.00
4.50/5.50
10.00/11.50
3.0
#5 @ 8"
3.00/3.50
5.00/6.00
2.75/3.50
5.25/5.75
11.50/11.75
3.5
#5 @ 8"
3.25/4.50
6.00/6.75
3.25/3.50
6.00/6.75
12.00/13.25
4.0
#5 @ 8"
3.50/4.50
6.50/7.00
3.25/3.50
6.50/6.75
13.00/13.25
4.5
#5 @ 8"
4.00/5.00
6.50/8.50
3.25/4.00
7.00/9.25
13.50/15.75
5.0
#5 @ 8"
4.50/5.00
7.00/8.50
3.25/4.00
7.25/9.25
13.75/15.75
5.5
#5 @ 8"
4.50/5.00
7.50/8.50
3.25/4.00
7.25/9.25
14.00/15.75
6.0
#5 @ 8"
4.50/5.00
7.50/8.50
3.25/4.00
7.75/9.25
14.75/16.75
NOTES:
1. CLASS OR MEDIAN SIZE OF RIPRAP AND LENGTH, WIDTH AND DEPTH OF APRON
TO BE DESIGNED BY THE ENGINEER.
2. REFER TO THE CHARLOTTE MECKLENBURG STORM WATER DESIGN MANUAL FOR
RIPRAP APRON DESIGN STANDARDS.
3. RIPRAP SHOULD EXTEND UP BOTH SIDES OF THE APRON AND AROUND THE END
OF THE PIPE OR CULVERT AT THE DISCHARGE OUTLET AT A MAXIMUM SLOPE OF
2:1 AND A HEIGHT NOT LESS THAN TWO THIRDS THE PIPE DIAMETER OR
CULVERT HEIGHT.
4. THERE SHALL BE NO OVERFLOW FROM THE END OF THE APRON TO THE
SURFACE OF THE RECEIVING CHANNEL. THE AREA TO BE PAVED OR RIPRAPPED
SHALL BE UNDERCUT SO THAT THE INVERT OF THE APRON SHALL BE AT THE
SAME GRADE (FLUSH) WITH THE SURFACE OF THE RECEIVING CHANNEL. THE
APRON SHALL HAVE A CUTOFF OR TOE WALL AT THE DOWNSTREAM END.
5. THE WIDTH OF THE END OF THE APRON SHALL BE EQUAL TO THE BOTTOM
WIDTH OF THE RECEIVING CHANNEL. MAXIMUM TAPER TO RECEIVING CHANNEL 5:1
6. ALL SUBGRADE FOR STRUCTURE TO BE COMPACTED TO 95% OR GREATER.
7. THE PLACING OF FILL, EITHER LOOSE OR COMPACTED IN THE RECEIVING
CHANNEL SHALL NOT BE ALLOWED.
8. NO BENDS OR CURVES IN THE HORIZONTAL ALIGNMENT OF THE APRON
WILL BE PERMITTED.
9. FILTER FABRIC SHALL BE INSTALLED ON COMPACTED SUBGRADE PRIOR TO
PLACEMENT OF RIP RAP.
10. ANY DISTURBED AREA FROM END OF APRON TO RECIEVING CHANNEL
MUST BE STABILIZED.
USE USDA NOMOGRAPH FROM NC SEDIMENT AND EROSION CONTROL MANUAL OR
CHARLOTTE MECKLENBURG STORM WATER DESIGN MANUAL FOR DESIGN DATA.
OUTLET La W1 W2 *T H
* d50 (see fig 8.06 a&b "NC SEDIMENT AND EROSION CONTROL MANUAL"
dmax = 1.5 x d50
T = 1.5 X dmax.
T(min.)=10"
NATURAL
W2
END OF FLARED SECTION
PLAN
ELEVATION
MINIMUM H=2/3 PIPE DIAMETER
SECTION B-B
RIPRAP APRON AT PIPE OUTHALLS
OTHER THAN AT SWIM
(IF NEEDED)
THICKNESS)=10" MIN.
d IN.
Z
O �
Q Q
IZ-I00()
ILL J0-HZ
0 0 cl)cc 2-7
_
LU<<LL2
Q�o�
F-=~ZW
CnHLLOJ
OOCnM
Z H
H
1Lu
w
J Y
OJ U)
IL 0
30)
H Z
Q W CL
o W
o W N
O V cr
zQ Z
O
~ V=
N
r
aC5
z
O W "
13. Cc:
O
ILL
(M
00
z (D
U O N
N
M
J c
M
CD z
00
�� z�N
0_
® 06 W
off$ `1
oW
O(DU)x
zzm
_ Lu
U �VLU
0-
W J
LU o
=z M
(� X
Uw
O
a
w
m
m
O
z
V) ''
i--r-1 w � 0
w Wiz
U Q avo
o�Q
U
P4 _
Z Qp�
LD �Zo
F Z
U) zOZ
O
U
w �P4 Lu
a F-' O
J
J
W
m
cc
O
C
CVO
m
O
00
m
p
O
N
m
J
z
LU
U
m
�
1
W
Q
w
J
O
O
N
m
Q
�
O
T
N
U
D
m
r
Wz
�
o
0
O
w
J
m
p �
ud
z
Z
w
W
p
J
U
m
HEET
C1200
CL
0
n
0
i
0
N
U
0
1
rl
0
c
(n
a
.,�,
.c
CL
11
0
z
i
n
U
6
a
oi
m
U
Q
0
m
U
w
Q
k
IT
a
CL
J
0
0
U
6
w
a
w
k
0
0
I-
0
I.
MISCELLANEOUS
CURRENT EDITIONS OF THE NORTH CAROLINA DOT ROADWAY STANDARD DRAWINGS AND
V.
PAVING AND GRADING
ALL DELETERIOUS SUBSURFACE MATERIAL (I.E. MUCK, PEAT, BURIED DEBRIS) IS TO BE
NPDES NOTE:
A.
A.
SPECIFICATIONS MANUAL SHALL BE CONSIDERED PART OF THESE PLANS.
EXCAVATED IN ACCORDANCE WITH THESE PLANS OR AS DIRECTED BY THE OWNER, THE
REGULATIONS ADOPTED BY THE US ENVIRONMENTAL PROTECTION AGENCY (US EPA) AND BY
B.
THE CONTRACTOR SHALL BECOME FAMILIAR WITH THE PERMIT AND INSPECTION
OWNER'S ENGINEER, OR OWNER'S SOIL TESTING COMPANY. DELETERIOUS MATERIAL IS TO
THE NORTH CAROLINA DIVISION OF WATER QUALITY REQUIRE THAT A NATURAL POLLUTANT
REQUIREMENTS SPECIFIED BY THE VARIOUS GOVERNMENTAL AGENCIES THE ENGINEER,
BE STOCKPILED OR REMOVED FROM THE SITE AS DIRECTED BY THE OWNER OR THE
DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT BE OBTAINED FOR STORM WATER
AND THE ARCHITECT. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS PRIOR
OWNER'S ENGINEER. EXCAVATED AREAS TO BE BACKFILLED WITH APPROVED MATERIALS
DISCHARGES FROM CONSTRUCTION ACTIVITIES WITH LAND DISTURBANCE OF 1 ACRE OR MORE.
TO CONSTRUCTION, AND SHALL SCHEDULE ANY NECESSARY INSPECTIONS ACCORDING TO
AND COMPACTED AS SHOWN ON THESE PLANS. CONTRACTOR IS RESPONSIBLE FOR
AGENCY INSTRUCTIONS.
ACQUIRING ANY PERMITS THAT ARE NECESSARY FOR REMOVING DELETERIOUS MATERIAL
CONTRACTOR SHALL CHECK EROSION CONTROL MEASURES WEEKLY AND/OR AFTER A 1/2"
C.
ALL SPECIFICATIONS AND DOCUMENTS REFERRED TO IN THESE PLANS SHALL BE OF THE
FROM THE SITE.
OR MORE RAIN. CONTRACTOR SHALL KEEP RECORDS OF EVERY INSPECTION.
LATEST REVISION.
B.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING EXCAVATIONS AGAINST
D.
ALL WORK PERFORMED SHALL COMPLY WITH THE REGULATIONS AND ORDINANCES OF THE
COLLAPSE AND WILL PROVIDE BRACING, SHEETING OR SHORING AS NECESSARY.
EROSION CONTROL NOTES:
VARIOUS GOVERNMENTAL AGENCIES HAVING JURISDICTION OVER THE WORK.
DEWATERING METHODS SHALL BE USED AS REQUIRED TO KEEP TRENCHES DRY WHILE
1. CONTRACTOR SHALL STABILIZE EXPOSED GROUND AS SOON AS INDIVIDUAL AREAS ARE
E.
WORK PERFORMED UNDER THIS CONTRACT SHALL INTERFACE SMOOTHLY WITH OTHER
PIPE AND APPURTENANCES ARE BEING PLACED.
COMPLETED.
WORK BEING PERFORMED ON SITE BY OTHER CONTRACTORS AND UTILITY COMPANIES. THE
C.
ALL NECESSARY FILL AND EMBANKMENT THAT IS PLACED DURING CONSTRUCTION SHALL
CONTRACTOR SHALL COORDINATE AND SCHEDULE HIS ACTIVITIES, WHERE NECESSARY,
CONSIST OF MATERIAL SPECIFIED BY THE OWNER'S SOIL TESTING COMPANY OR ENGINEER
2. CONTRACTOR SHALL NOT REMOVE ANY BASIN UNTIL ALL SEDIMENT -PRODUCING AREAS
WITH OTHER CONTRACTORS AND UTILITY COMPANIES.
AND BE PLACED AND COMPACTED ACCORDING TO THESE PLANS OR THE REFERENCED
UPSTREAM HAVE BEEN PERMANENTLY STABILIZED AND REMOVAL IS APPROVED BY
F.
THE WATER AND SANITARY SEWER FACILITIES ARE SUBJECT TO REVIEW BY THE TOWN OF
SOILS REPORT.
EROSION CONTROL COORDINATOR.
HOKE PUBLIC WORKS AND APPROVAL. STORM DRAINAGE FACILITIES ARE SUBJECT TO THE
D.
PROPOSED SPOT ELEVATIONS REPRESENT FINISHED PAVEMENT OR GROUND SURFACE
REVIEW AND APPROVAL OF THE TOWN OF HOKE AND IT SHALL BE THE RESPONSIBILITY
GRADE UNLESS OTHERWISE NOTED ON DRAWINGS.
3. STABILIZATION IS THE BEST FORM OF EROSION CONTROL. TEMPORARY SEEDING IS
OF THE CONTRACTOR TO OBTAIN THE REQUIRED PERMITS TO PERFORM WORK IN THE
E.
CONTRACTOR SHALL PROVIDE EROSION CONTROL AND SEDIMENTATION BARRIER (SILT
NECESSARY TO ACHIEVE EROSION CONTROL ON LARGE DENUDED AREAS AND ESPECIALLY
PUBLIC RIGHT-OF-WAY.
WHEN SPECIFICALLY REQUIRED AS PART OF THE CONSTRUCTION SEQUENCE SHOWN ON
G.
GRADING OFF SITE WILL REQUIRE A LETTER OF PERMISSION FROM THE OWNER PRIOR TO
FENCE OR OTHER MEASURES TO PREVENT SILTATION OF ADJACENT PROPERTY, STREETS,
THE PLAN. ALL GRADED SLOPES MUST BE SEEDED AND MULCHED WITHIN 7 TO 14
ANY LAND DISTURBING ACTIVITIES.
STORM SEWERS AND WATERWAYS.
CALENDAR DAYS (7 CALENDAR DAYS FOR SLOPES STEEPER THAN 3:1).
H.
ALL CONSTRUCTION SHALL COMPLY WITH THE LATEST EDITION OF THE TOWN OF HOKE
F
F.
IF WIND EROSION BECOMES SIGNIFICANT DURING CONSTRUCTION, THE CONTRACTOR SHALL
UDO STANDARDS.
STABILIZE THE AFFECTED AREA USING SPRINKLING, IRRIGATION OR OTHER ACCEPTABLE
4. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY
I.
THE TOWN OF HOKE RESERVES THE RIGHT TO INSPECT ALL CONSTRUCTION WITHIN THE
METHODS.
LOCAL AUTHORITY.
PUBLIC RIGHT-OF-WAY, PUBLIC STORM DRAIN EASEMENTS, DETENTION AND WATER
G.
A
A
THE CONTRACTOR WILL STABILIZE BY SEED AND MULCH, SOD OR OTHER APPROVED
QUALITY BMP'S. THE TOWN HAS THE ABILITY TO APPROVE OR REJECT ANY WORK
MATERIALS AS REQUIRED ANY DISTURBED AREAS WITHIN ONE WEEK FOLLOWING
5. NO SLOPES SHALL EXCEED 2:1. FILL SLOPES GREATER THAN 10' REQUIRE ADEQUATE
COMPLETED OR ONGOING BY THE CONTRACTOR AT THE DEVELOPER'S EXPENSE.
CONSTRUCTION OF THE UTILITY SYSTEMS AND PAVEMENT AREAS. CONTRACTOR SHALL
TERRACING.
MAINTAIN SUCH AREAS UNTIL FINAL ACCEPTANCE BY OWNER.
H.
ENGINEERED FILL MATERIAL SHALL NOT CONTAIN ROCKS OR HARD LUMPS GREATER THAN
II,
SAFETY
3 INCHES IN MAXIMUM DIMENSIONS AND SHALL BE FREE OF VEGETATION, ORGANIC
6. GROUNDCOVER ON EXPOSED SLOPES SHOULD BE COMPLETED WITHIN 14 CALENDAR DAYS.
A.
DURING THE CONSTRUCTION AND MAINTENANCE OF THIS PROJECT, ALL SAFETY
MATTER, DEBRIS, RUBBLE, AND OTHER UNSUITABLE MATERIALS. SHALL BE
7. ALL SILT FENCE SHALL HAVE WIRE AND WASHED STONE.
NON -EXPANSIVE MATERIALS
REGULATIONS SHALL BE ENFORCED. THE CONTRACTOR OR HIS REPRESENTATIVE
I.
IMPORTED SOILS FOR USE AS ENGINEERED FILL AND SHALL NOT CONTAIN ROCKS OR
SHALL BE RESPONSIBLE FOR THE CONTROL AND SAFETY OF THE TRAVELING PUBLIC
HARD LUMPS GREATER THAN 3 INCHES IN MAXIMUM DIMENSIONS AND SHALL BE FREE OF
8. A OUTLET PROTECTION SHALL BE PLACED TEMPORALLY AT THE END OF ALL FES UNTIL
AND THE SAFETY OF HIS PERSONNEL.
VEGETATION, ORGANIC MATTER, DEBRIS, RUBBLE, AND OTHER UNSUITABLE MATERIALS.
RIP RAP APRONS ARE INSTALLED.
B.
THE CONTRACTOR'S MAINTENANCE OF TRAFFIC PLAN MUST BE SUBMITTED AND
J.
AGGREGATE BASE MATERIAL SHALL MEET THE FOLLOWING GRADATION REQUIREMENTS.
APPROVED BY THE TOWN OF HOKE AND CHICORA PLLC ENGINEERING PRIOR TO
9 ANY GRADING BEYOND THE DENUDED LIMITS SHOWN ON THE PLAN IS A VIOLATION OF
BEGINNING ANY CONSTRUCTION ACTIVITIES.
SEIVE SIZE (PER ASTM D422) % PASSING BY WEIGHT
THE CITY/COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE.
C.
LABOR SAFETY REGULATIONS SHALL CONFORM TO THE PROVISIONS SET FORTH BY
1 INCH 100
10. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A
OSHA IN THE FEDERAL REGISTER OF THE DEPARTMENT OF TRANSPORTATION.
1" 90 - 100
VIOLATION OF NC LAW AND IS SUBJECT TO A FINE.
D.
CONTRACTOR SHALL PROVIDE AND MAINTAIN HIS OWN SAFETY EQUIPMENT IN
NO. 8
ACCORDANCE WITH HIS HEALTH & SAFETY PROGRAM AND ALL OTHER APPLICABLE
NO. 200 0 - 8
11. A GRADING PLAN MUST BE SUBMITTED FOR ANY LOT GRADING THAT WAS NOT
LEGAL AND HEALTH AND SAFETY REQUIREMENTS. THE CONTRACTOR IS ALSO
PREVIOUSLY APPROVED.
K.
ALL AREAS TO RECEIVE FILL, AND AREAS OF STRUCTURES AND PAVEMENTS, SHALL BE
RESPONSIBLE FOR PROVIDING ITS EMPLOYEES AND SUB CONTRACTORS WITH
STRIPPED OF VEGETATION, ORGANIC MATTER, DEBRIS, RUBBLE, AND OTHER UNSUITABLE
ADEQUATE INFORMATION AND TRAINING TO ENSURE THAT ALL EMPLOYEES AND SUB
MATERIALS. STRIPPED SOILS SHALL NOT BE USED IN ENGINEERED FILL, BUT MAY BE
12. APPROVAL OF THIS PLAN IS NOT AN AUTHORIZATION TO GRADE ADJACENT PROPERTIES.
CONTRACTORS AND SUB CONTRACTOR'S EMPLOYEES COMPLY WITH ALL APPLICABLE
USED IN LANDSCAPE AREAS. ENGINEERED FILL MATERIAL SHALL BE COMPACTED TO AT
WHEN FIELD CONDITIONS WARRANT OFF -SITE GRADING, PERMISSION MUST BE OBTAINED
FROM AFFECTED PROPERTY OWNERS.
REQUIREMENTS. CONTRACTOR SHALL REMAIN IN COMPLIANCE WITH ALL OCCUPATION
LEAST THE FOLLOWING
SAFETY AND HEALTH REGULATIONS AS WELL AS THE ENVIRONMENTAL PROTECTION
13. ALL STD. NUMBERS REFER TO THE NCDENR STANDARDS MANUAL UNLESS OTHERWISE
LAWS. THE FOLLOWING IS NOT TO BE PERCEIVED AS THE ENTIRE SAFETY PROGRAM
* PERCENTAGES OF MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT, PER ASTM
NOTED.
BUT JUST BASIC REQUIREMENTS.
D-698 (STANDARD PROCTOR):
E.
ALL EXCAVATIONS BY THE CONTRACTOR SHALL CONFORM TO THE REQUIREMENTS
14. STEEL POST WITH WIRE FENCE BACKING SHOULD BE USED INSTEAD OF WOODEN POST,
OF THE DEPARTMENT OF LABOR'S OCCUPATIONAL SAFETY AND HEALTH
ENGINEERED
FILL MINIMUM % MOISTURE CONTENT
BURIED OR DRIVEN TO A DEPTH OF 18" IN THE GROUND. PREFABRICATED SILT FENCE IS
ADMINISTRATION RULES AND REGULATIONS PARTICULAR ATTENTION MUST BE PAID
MATERIAL COMPACTION RANGE
NOT ACCEPTABLE ON THIS PROJECT.
NATIVE SOIL
92%
OPTIMUM TO OPTIMUM PLUS 3%
TO THE CONSTRUCTION STANDARDS FOR EXCAVATIONS, 29 CFR PART 1926,
SUBPART P.
ENGINEERED FILL UNDER STRUCTURES
98%
OPTIMUM TO OPTIMUM PLUS 3%
15. SEDIMENT TRAP AND BASINS SLOPES SHALL SEEDED IMMEDIATE AFTER CONSTRUCTION
F. THE MINIMUM STANDARDS AS SET FORTH IN THE CURRENT EDITION OF "MANUAL ON
AND BEHIND RETAINING WALLS
O
TO PROMOTE STABLE SLOPES AS SOON AS POSSIBLE.
UNIFORM TRAFFIC CONTROL DEVICES" (U.S. DOT) SHALL BE FOLLOWED IN THE
16. WHERE TEMPORARY DIVERSIONS ENTER SEDIMENT TRAPS AND BASINS, TEMPORARY SLOPE
DESIGN APPLICATION, INSTALLATION, MAINTENANCE AND REMOVAL OF ALL TRAFFIC
ENGINEERED FILL UNDER
95%
OPTIMUM PLUS OR MINUS 2%
DRAINS MAY BE NECESSARY BASED ON FIELD CONDITIONS.
CONTROL DEVICES, WARNING DEVICES AND BARRIERS NECESSARY TO PROTECT THE
PAVEMENT AREAS
PUBLIC AND WORKMEN FROM HAZARDS WITHIN THE PROJECT LIMITS.
FILL IN LANDSCAPE AREAS
92%
2 TO 5% ABOVE OPTIMUM
G. ALL TRAFFIC CONTROL MARKINGS AND DEVICES SHALL CONFORM TO THE
PROVISIONS SET FORTH IN THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES
AGGREGATE BASE MATERIAL OR IMPORTED
GRANULAR
SOIL IN BUILDING AND PAVED AREAS
PREPARED BY THE U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY
SHALL BE COMPACTED TO AT LEAST THE FOLLOWING PERCENTAGES OF MAXIMUM DRY
MAINTENANCE
PLAN:
ADMINISTRATION.
DENSITY AND OPTIMUM MOISTURE CONTENT, PER ASTM D-698 MODIFIED OR AASHTO
1.
FOR THE TEMPORARY CONSTRUCTION ENTRANCE; MAINTAIN THE GRAVEL PAD IN A
H.
IT SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO COMPLY AND
EQUIVALENT.
CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE SITE. THIS MAY REQUIRE
ENFORCE ALL APPLICABLE SAFETY REGULATIONS. THE ABOVE INFORMATION HAS
PERIODIC TOPDRESSING WITH 2-INCH STONE. AFTER EACH RAINFALL, INSPECT ANY
BEEN PROVIDED FOR THE CONTRACTOR'S INFORMATION ONLY AND DOES NOT IMPLY
MATERIAL COMPACTION RANGE
STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY
AGGREGATE BASE MATERIAL OR 98% OPTIMUM PLUS OR MINUS 2%
REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED OR TRACKED ONTO PUBLIC
THAT THE OWNER OR ENGINEER WILL INSPECT AND/OR ENFORCE SAFETY
IMPORTED GRANULAR SOIL IN BUILDING
ROADWAYS.
REGULATIONS.
AND PAVEMENT AREAS
2.
INSPECT SKIMMER SEDIMENT BASINS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT
I.
THE CONTRACTOR SHALL EXERCISE EXTREME CAUTION IN AREAS OF BURIED
(1/2 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. REMOVE SEDIMENT
UTILITIES AND SHALL PROVIDE AT LEAST 48 HOURS NOTICE TO THE UTILITY
AND RESTORE THE BASIN TO ITS ORIGINAL DIMENSIONS WHEN IT ACCUMULATES TO
COMPANIES PRIOR TO CONSTRUCTION TO OBTAIN FIELD LOCATIONS OF EXISTING
L. IF SUB GRADE SOILS EXHIBIT PUMPING DURING COMPACTION, THE AREA SHALL BE
ONE-HALF THE HEIGHT OF THE FIRST BAFFLE. PULL THE SKIMMER TO ONE SIDE SO THAT
UNDERGROUND UTILITIES.
ALLOWED TO DRY UNTIL THE SOILS BECOME WORKABLE WITHOUT PUMPING. THE
THE SEDIMENT UNDERNEATH CAN BE EXCAVATED. EXCAVATE THE SEDIMENT FROM THE
J.
THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE TO EXISTING
MOISTURE CONTENT OF THE SOILS SHALL BE ADJUSTED TO PREVENT PUMPING.
ENTIRE BASIN, NOT JUST AROUND THE SKIMMER OR THE FIRST CELL. MAKE SURE
FACILITIES, ABOVE OR BELOW GROUND, THAT MAY OCCUR AS A RESULT OF THE
M. EXPOSURE TO THE ENVIRONMENT MAY REDUCE THE STRENGTH OF SOILS IN FOOTING,
VEGETATION GROWING IN THE BOTTOM OF THE BASIN DOES NOT HOLD DOW THE SKIMMER.
FLOOR SLAB, AND PAVED AREAS. IF THIS OCCURS, THE SOFTENED SOILS SHALL BE
PLACE REMOVED SEDIMENT IN AN AREA WITH SEDIMENT CONTROLS.
WORK PERFORMED BY THE CONTRACTOR CALLED FOR IN THIS CONTRACT.
REMOVED AND REWORKED IMMEDIATELY PRIOR TO CONCRETE PLACEMENT. IF RAINFALL IS
3.
REPAIR BAFFLES IF THEY ARE DAMAGED. RE -ANCHOR THE BAFFLES IF WATER IS FLOWING
K.
ALL UNDERGROUND UTILITIES MUST BE IN PLACE AND TESTED OR INSPECTED PRIOR
EXPECTED AT A TIME WHEN BEARING SOILS IN FOOTING AREAS ARE EXPOSED, A 2 TO 4
UNDERNEATH OR AROUND THEM.
TO BASE AND PAVEMENT CONSTRUCTION.
INCH THICK LAYER OF LEAN CONCRETE MAY BE PLACED IN SUCH AREAS. THE SITE
4.
IF THE SKIMMER IS CLOGGED WITH TRASH AND THERE IS WATER IN THE BASIN, USUALLY
SHALL BE GRADED TO TRANSPORT SURFACE RUNOFF AWAY FROM THE STRUCTURES AND
JERKING ON THE ROPE WILL MAKE THE SKIMMER BOB UP AND DOWN AND DISLODGE THE
III,
SITE PLAN AND COORDINATE GEOMETRY
PAVED AREAS. WATER SHALL NOT BE ALLOWED TO ACCUMULATE (POND) AROUND
DEBRIS AND RESTORE FLOW. IF THIS DOES NOT WORK, PULL THE SKIMMER OVER TO THE
A.
PRELIMINARY ARCHITECTURAL BUILDING AND PLUMBING PLANS BEEN
HAVE NOT
BUILDING PERIMETERS OR ON PAVED AREAS.
SIDE OF THE BASIN AND REMOVE THE DEBRIS. ALSO CHECK THE ORIFICE INSIDE THE
RECEIVED BY CHICORA, PLLC
N. GENERAL ROCK EXCAVATION: ROCK SHALL BE DEFINED AS ANY MATERIAL WHICH
SKIMMER TO SEE IF IT IS CLOGGED; IF SO REMOVE THE DEBRIS.
B.
SITE PLAN PREPARED BY CHICORA PLLC.
CANNOT BE EXCAVATED WITH A SINGLE TOOTH RIPPER DRAWN BY A CRAWLER
5.
IF THE SKIMMER ARM OR BARREL PIPE IS CLOGGED, THE ORIFICE CAN BE REMOVED AND
C.
STRUCTURAL PLANS HAVE NOT BEEN RECEIVED BY CHICORA PLLCI.
TRACTOR HAVING A MINIMUM DRAW BAR PULL RATED AT NOT LESS THAN 56,000
THE OBSTRUCTION CLEARED WITH A PLUMBER'S SNAKE OR BY FLUSHING WITH WATER. BE
D.
ELECTRICAL, MECHANICAL, AND FIRE SAFETY PLANS HAVE NOT BEEN RECEIVED BY
POUNDS (CATERPILLAR D8K OR EQUIVALENT). THE VOLUME OF ROCK EXCAVATION SHALL
SURE AND REPLACE THE ORIFICE BEFORE REPOSITIONING THE SKIMMER.
CHICORA PLLC.
BE DETERMINED BY A LICENSED SURVEYOR BY THE AVERAGE END AREA METHOD. THE
6.
CHECK THE FABRIC SPILLWAY FOR DAMAGE AND MAKE ANY REQUIRED REPAIRS WITH
CONTRACTOR SHALL SUBMIT TO THE ENGINEER A SCALED PLAN WITH SUFFICIENT
FABRIC THAT SPANS THE FULL WIDTH OF THE SPILLWAY. CHECK THE EMBANKMENT,
E.
BOUNDARY SURVEY & TOPOGRAPHIC SURVEY PREPARED BY
ELEVATION POINTS TO ACCURATELY DEFINE THE VOLUME OF ROCK EXCAVATED. THE
SPILLWAYS AND OUTLET FOR EROSION DAMAGE AND INSPECT THE EMBANKMENT FOR
F.
ALL POINTS AND MONUMENTS SHALL BE SURVEYED UPON MOBILIZATION TO VERIFY
DEPTH OF ROCK SHALL BE DEFINED AS FROM TOP OF ROCK TO THE CONTRACT
PIPING SETTLEMENT. MAKE ALL NECESSARY REPAIRS IMMEDIATELY. REMOVE ALL TRASH
THEIR ACCURACY. ANY DISCREPANCIES DISCOVERED MUST BE BROUGHT TO THE
SPECIFIED ELEVATION FOR EXCAVATION. CONTRACTOR SHALL BE COMPENSATED FOR ROCK
AND OTHER DEBRIS FROM THE RISER AND POOL AREA.
ATTENTION OF THE ENGINEER IN WRITING.
EXCAVATION AS DEFINED HEREIN IN ACCORDANCE WITH CONTRACT UNIT PRICES.
7.
FREEZING WEATHER CAN RESULT IN ICE FORMING IN THE BASIN . SOME SPECIAL
G.
MONUMENTS AND OTHER SURVEY CONTROL POINTS SHALL BE PROTECTED FROM
PRECAUTIONS SHOULD BE TAKEN IN THE WINTER TO PREVENT THE SKIMMER FROM
DAMAGE AND DISTURBANCE. IF ANY CONTROL POINTS ARE DAMAGED OR
VI. DRAINAGE:
PLUGGING WITH ICE.
DISTURBED, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE
A. ALL STORM SEWER PIPE SHALL BE REINFORCED CONCRETE PIPE UNLESS OTHERWISE
8.
FOR RIPRAP CHANNELS; INSPECT CHANNELS AT REGULAR INTERVALS AS WELL AS AFTER
ENGINEER AND REPLACE THE CONTROL POINTS TO THEIR ORIGINAL CONDITION AT
NOTED ON PLANS. ALL DRAINAGE STRUCTURES SHALL BE IN ACCORDANCE WITH NCDOT
MAJOR RAINS AND REPAIRS PROMPTLY. GIVE SPECIAL ATTENTION TO THE OUTLET AND
HIS OWN EXPENSE.
STANDARDS UNLESS OTHERWISE NOTED.
INLET SECTIONS AND OTHER POINTS WHERE CONCENTRATED FLOW ENTERS. CAREFULLY
CHECK STABILITY AT ROAD CROSSINGS AND LOOK FOR INDICATIONS OF PIPING, SCOUR
H.
ALL ELEVATIONS REFER TO THE NATIONAL GEODETIC VERTICAL DATUM.
B, PIPE LENGTHS SHOWN ARE APPROXIMATE AND TO CENTER OF DRAINAGE STRUCTURE OR
HOLES OR BANK FAILURES. MAINTAIN ALL VEGETATION ADJACENT TO THE CHANNEL IN A
L
LOCATIONS, ELEVATIONS, AND DIMENSIONS OF EXISTING UTILITIES, STRUCTURES AND
TO THE END OF THE PIPE. CONTRACTOR SHALL VERIFY ALL QUANTITIES PRIOR TO
HEALTHY VIGOROUS CONDITION TO PROTECT THE AREA FROM EROSION AND SCOUR
OTHER FEATURES ARE SHOWN ACCORDING TO THE BEST INFORMATION AVAILABLE
SUBMITTAL OF BID.
DURING OUT -OF -BANK FLOW.
AT THE TIME OF PREPARATION OF THESE PLANS. THE CONTRACTOR SHALL VERIFY
9.
INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE
THE LOCATIONS, ELEVATIONS AND DIMENSIONS OF ALL EXISTING UTILITIES,
C. ALL DRAINAGE STRUCTURE GRATES AND COVERS SHALL BE AS PER NCDOT STANDARDS
ANY REQUIRED REPAIRS IMMEDIATELY.
STRUCTURES AND OTHER FEATURES AFFECTING THIS WORK PRIOR TO
UNLESS OTHERWISE NOTED.
10.
SHOULD THE FABRIC OF THE SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME
CONSTRUCTION.
INEFFECTIVE, REPLACE IT PROMPTLY.
J.
UPON COMPLETION OF CONSTRUCTION, THE CONTRACTOR SHALL FURNISH OWNER'S
D. ALL STORM DRAINAGE PIPING SHALL BE SUBJECT TO A VISUAL INSPECTION BY THE
11.
REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME
ENGINEER WITH COMPLETE "AS -BUILT" INFORMATION CERTIFIED BY A REGISTERED
OWNER'S ENGINEER PRIOR TO THE PLACEMENT OF BACKFILL. CONTRACTOR TO NOTIFY THE
FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID
ENGINEER 48 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS.
UNDERMINING THE FENCE DURING CLEANOUT.
LAND SURVEYOR. THIS "AS -BUILT INFORMATION SHALL BE PRODUCED ON AUTOCAD
12.
REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE
VERSION 12, OR LATER, AND UPON COMPLETION, THE CONTRACTOR SHALL
E. THE CONTRACTOR SHALL MAINTAIN AND PROTECT FROM MUD, DIRT, DEBRIS, ETC. THE
AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN
FURNISH CHICORA PLLC ENGINEERING WITH DISKS OF ALL DRAWINGS, ONE SET OF
STORM DRAINAGE SYSTEM UNTIL FINAL ACCEPTANCE OF THE PROJECT. THE CONTRACTOR
PROPERLY STABILIZED.
REPRODUCIBLE MYLARS, AND FIVE SETS OF BLUEPRINTS. THE "AS -BUILT"
MAY BE REQUIRED TO RECLEAN PIPES AND INLETS FOR THESE PURPOSES.
13.
INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL.
INFORMATION SHALL CLEARLY AND ACCURATELY REPRESENT ALL CONSTRUCTED
IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION
RIDGE. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE
ITEMS INCLUDING, BUT NOT LIMITED T0:
AREA PROTECTED IS PERMANENTL STABILIZED, REMOVE THE RIDGE AND CHANNEL TO
1. ELEVATIONS OF ALL STORM SEWER AND SANITARY SEWER STRUCTURE BOTTOMS,
VII. EROSION/TURBIDITY CONTROL
BLEND WITH NATURAL GROUND LEVEL AND APPROPRIATELY STABILIZE IT.
TOPS, AND INVERTS.
A. THE INSTALLATION OF TEMPORARY EROSION CONTROL BARRIERS SHALL BE COORDINATED
14.
INSPECT CHECK DAMS AND CHANNELS AT LEAST WEEKLY AND AFTER EVERY SIGNIFICANT
2. FIELD MEASURED LENGTHS OF PIPES FOR ALL INSTALLED UTILITIES, CONDUITS,
WITH THE CONSTRUCTION OF THE PERMANENT EROSION CONTROL FEATURES TO THE
(1/2-INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. CLEAN OUT
SLEEVES, ETC.
EXTENT NECESSARY TO ASSURE ECONOMICAL, EFFECTIVE AND CONTINUOUS CONTROL OF
SEDIMENT, STRAW, LIMBS OR OTHER DEBRIS THAT COULD CLOG THE CHANNEL WHEN
3. LOCATIONS OF ALL STRUCTURES, PIPES, CONDUITS, SLEEVES, ETC.
EROSION AND WATER POLLUTION THROUGHOUT THE LIFE OF THE CONSTRUCTION PHASE.
NEEDED.
4. CALCULATED SLOPE OF ALL SANITARY SEWER AND STORM SEWER LINES.
B. THE TYPE OF EROSION CONTROL BARRIERS USED SHALL BE GOVERNED BY THE NATURE
15.
ANTICIPATE SUBMERGENCE AND DEPOSITION ABOVE THE CHECK DAM AND EROSION FROM
5. HORIZONTAL AND VERTICAL CONTROL OF ALL WATER MAIN FITTINGS AND
OF THE CONSTRUCTION OPERATION AND SOIL TYPE THAT WILL BE EXPOSED. SILTY
HIGH FLOWS AROUND THE EDGES OF THE DAM. CORRECT ALL DAMAGES IMMEDIATELY. IF
APPURTENANCES, AND HORIZONTAL AND VERTICAL CONTROL ON THE TOP OF
AND CLAYEY MATERIAL USUALLY REQUIRE SOLID SEDIMENT BARRIERS TO PREVENT
SIGNIFICANT EROSION OCCURS BETWEEN THE DAMS ADDITIONAL MEASURES CAN BE TAKEN
TURBID WATER DISCHARGE, WHILE SANDY MATERIAL MAY NEED ONLY SILT SILT FENCE TO
SUCH AS INSTALLING A PROTECTIVE RIP RAP LINER IN THAT PORTION OF THE CHANNEL.
WATER MAINS AT ALL CROSSINGS, AND A MINIMUM OF EVERY 200 LINEAR FEET
PREVENT EROSION. FLOATING TURBIDITY CURTAINS SHALL BE USED IN OPEN WATER
16.
REMOVE SEDIMENT ACCUMULATED BEHIND THE DAMS AS NEEDED TO PREVENT DAMAGE
OF PIPE.
SITUATIONS. DIVERSION DITCHES OR SWALES MAY BE REQUIRED TO PREVENT TURBID
TO CHANNEL VEGETATION, ALLOW THE CHANNEL TO DRAIN THROUGH THE STONE CHECK
6. HORIZONTAL AND VERTICAL CONTROL OF ALL TOP OF BANKS, TOE OF SLOPES,
STORM WATER RUNOFF FROM BEING DISCHARGED TO WETLANDS OR OTHER WATER
DAM, AND PREVENT LARGE FLOWS FROM CARRYING SEDIMENT OVER THE DAM. ADD
ALL GRADE BREAKS, BUILDINGS, PONDS, ETC.
BODIES. IT MAY BE NECESSARY TO EMPLOY A COMBINATION OF BARRIERS, DITCHES AND
STONES TO DAM AS NEEDED TO MAINTAIN DESIGN HEIGHT AND CROSS SECTION.
K.
ALL DIMENSIONS SHOWN ON PLAN ARE TO FACE OF BUILDING, EDGE OF PAVEMENT,
OTHER EROSION/TURBIDITY CONTROL MEASURES IF CONDITIONS WARRANT.
CENTERLINE OF STRUCTURE, OR END OF PIPE UNLESS NOTED OTHERWISE.
C. CONSTRUCTION OPERATIONS IN OR ADJACENT TO WETLANDS SHALL BE RESTRICTED TO
THOSE AREAS IDENTIFIED IN THE PLANS AND IN THE SPECIFICATIONS.
D. EXCEPT AS NECESSARY FOR CONSTRUCTION, EXCAVATED MATERIAL SHALL NOT BE
DEPOSITED IN WETLANDS OR IN A POSITION CLOSE ENOUGH THERETO TO BE WASHED G.S. 113A-57(2), THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO
IV, CLEARING,MEMOLITION AWAY BY HIGH WATER OR RUNOFF. GREATER THAN THE ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR
A. THE CONTRACTOR SHALL CLEAR AND GRUB ONLY THOSE PORTIONS OF THE SITE E. THE CONTRACTOR SHALL SCHEDULE HIS OPERATIONS SUCH THAT THE AREA OF OTHER ADEQUATE EROSION -CONTROL DEVISES OR STRUCTURES. IN ANY EVENT,
NECESSARY FOR CONSTRUCTION. DISTURBED AREAS WILL BE SEEDED, MULCHED, UNPROTECTED ERODIBLE EARTH EXPOSED AT ANY ONE TIME IS NOT LARGER THAN THE SLOPES LEFT EXPOSED SHALL, WITHIN 7 TO 14 CALENDAR DAYS OF COMPLETION OF
SODDED OR PLANTED WITH OTHER APPROVED LANDSCAPE MATERIAL IMMEDIATELY MINIMUM AREA NECESSARY FOR EFFICIENT CONSTRUCTION OPERATIONS, AND THE ANY PHASE OF GRADING, BE PLANTED OR OTHERWISE BE PROVIDED WITH
FOLLOWING CONSTRUCTION. DURATION OF EXPOSED, UNCOMPLETED CONSTRUCTION TO THE ELEMENTS SHALL BE AS TEMPORARY OR PERMANENT GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT
B. THE TOP 6" OF GROUND REMOVED DURING CLEARING AND GRUBBING SHALL BE SHORT AS PRACTICABLE. CLEARING AND GRUBBING SHALL BE SO SCHEDULED AND TO RESTRAIN EROSION.
PERFORMED THAT GRADING OPERATIONS CAN FOLLOW IMMEDIATELY THEREAFTER, AND
STOCKPILED AT A SITE DESIGNATED BY THE OWNER OR THE OWNER'S ENGINEER TO GRADING OPERATIONS SHALL BE SCHEDULED AND PERFORMED THAT PERMANENT G.S. 113A-57(3), PROVISIONS FOR A PERMANENT GROUND COVER SUFFICIENT TO
BE USED FOR LANDSCAPING PURPOSES, UNLESS OTHERWISE DIRECTED BY THE EROSION CONTROL FEATURES CAN FOLLOW IMMEDIATELY THEREAFTER IF CONDITIONS ON RESTRAIN EROSION MUST BE ACCOMPLISHED WITHIN 15 WORKING DAYS OR 90
OWNER OR THE OWNER'S ENGINEER. REMAINING EARTHWORK THAT RESULTS FROM THE PROJECT PERMIT. CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT,
CLEARING AND GRUBBING OR SITE EXCAVATION IS TO BE UTILIZED ON -SITE IF F. THE CONTRACTOR SHALL PROVIDE ROUTINE MAINTENANCE OF PERMANENT AND WHICHEVER PERIOD IS SHORTER.
REQUIRED, PROVIDED THAT THE MATERIAL IS DEEMED SUITABLE FOR CONSTRUCTION TEMPORARY EROSION CONTROL FEATURES UNTIL THE PROJECT IS COMPLETE AND ALL
BY THE OWNER'S SOILS TESTING COMPANY. EXCESS MATERIAL IS TO BE EITHER DISTURBED SOILS ARE STABILIZED.
STOCKPILED ON THE SITE AS DIRECTED BY THE OWNER OR OWNER'S ENGINEER, OR
REMOVED FROM THE SITE. THE CONTRACTOR IS RESPONSIBLE FOR ACQUIRING ANY
PERMITS THAT ARE NECESSARY FOR REMOVING EXCESS EARTHWORK FROM THE
SITE.
C. ALL CONSTRUCTION DEBRIS AND OTHER WASTE MATERIALS SHALL BE DISPOSED OF
OFF -SITE IN ACCORDANCE WITH APPLICABLE REGULATORY AGENCY REQUIREMENTS
OR AS DIRECTED BY THE OWNER OR THE OWNER'S ENGINEER.
TEMPORARY SEEDING REQUIREMENTS PER NCDENR EROSION AND
TABLE 6.10A
TEMPORARY SEEDING RECOMMENDATIONS FOR LATE WINTER AND EARLY SPRING
SEEDING MIXTURE
SPECIES RATE (LB/ACRE)
RYE (GRAIN) 120
ANNUAL LESPEDEZA (KOBE IN
PIEDMONT AND COASTAL PLAIN,
KOREAN IN MOUNTAINS) 50
OMIT ANNUAL LESPEDEZA WHEN DURATION OF TEMPORARY COVER IS NOT TO EXTEND
BEYOND JUNE.
SEEDING DATES
MOUNTAINS ABOVE 2500 FEET: FEB. 15 - MAY 15
BELOW 2500 FEET: FEB. 1- MAY 1
PIEDMONT JAN. 1 - MAY 1
COASTAL PLAIN DEC. 1 - APR. 15
SOIL AMENDMENTS
FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND
AGRICULTURAL LIMESTONE AND 750 LB/ACRE 10-10-10 FERTILIZER.
MULCH
APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING,
OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE
USED AS A MULCH ANCHORING TOOL.
MAINTENANCE
REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE AND MULCH
IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE.
TABLE 6.10B
TEMPORARY SEEDING RECOMMENDATIONS FOR SUMMER
SEEDING MIXTURE
SPECIES RATE (LB/ACRE
GERMAN MILLET 40
IN THE PIEDMONT AND MOUNTAINS, A SMALL -STEMMED SUDANGRASS MAY BE
SUBSTITUTED AT A RATE OF 50 LB/ACRE.
SEEDING DATES
MOUNTAINS MAY 15 - AUG. 15
PIEDMONT MAY 1 - AUG. 15
COASTAL PLAIN APR. 15 - AUG. 15
SOIL AMENDMENTS
FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND
AGRICULTURAL LIMESTONE AND 750 LB/ACRE 10-10-10 FERTILIZER.
MULCH
APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING,
OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE
USED AS A MULCH ANCHORING TOOL.
MAINTENANCE
REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE AND MULCH
IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE.
TABLE 6.10C
TEMPORARY SEEDING RECOMMENDATIONS FOR FALL
SEEDING MIXTURE
SPECIES
RATE (LB/ACRE
RYE (GRAIN)
120
SEEDING DATES
MOUNTAINS
AUG. 15 - DEC. 15
COASTAL PLAIN
AND PIEDMONT
AUG. 15 - DEC. 30
SOIL AMENDMENTS
FOLLOW SOIL TESTS OR APPLY 2,000 LB ACRE GROUND AGRICULTURAL LIMESTONE
AND 1,000 LB/ACRE 10-10-10 FERTILIZER.
MULCH
APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING,
OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE
USED AS A MULCH ANCHORING TOOL.
MAINTENANCE
REPAIR AND REFERTILIZE DAMAGED AREAS IMMEDIATELY. TOPDRESS WITH 50 LB/ACRE
OF NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTENT TEMPORARY COVER BEYOND
JUNE 15, OVERSEED WITH 50 LB/ACRE KOBE (PIEDMONT AND COASTAL PLAIN) OR
KOREAN MOUNTAINS LESPEDEZA IN LATE FEBRUARY OR EARLY MARCH.
PERMANENT SEEDING REQUIREMENTS PER NCDENR EROSION AND
TABLE 6.1 1 K
PERMANENT SEEDING FOR STEEP SLOPES OR POOR SOILS; LOW MAINTENANCE
SEEDING MIXTURE
SPECIES RATE (LB/ACRE)
TALL FESCUE 100
SERICEA LESPEDEZA 30
KOBE LESPEDEZA 10
SEEDING NOTES
1. IN EASTERN PIEDMONT ADD 25 LB/ACRE PENSACOLA BAHIAGRASS OR 10 LB/ACRE
COMMON BERMUDAGRASS. USE COMMON BERMUDAGRASS ONLY WHERE IT IS UN-
LIKELY TO BECOME A PEST
2. AFTER AUG. 15 USE UNSCARIFIED SERICEA SEED
3. WHERE A NEAT APPEARANCE IS DESIRED, OMIT SERICEA AND SUBSTITUTE 40
LB/ACRE BAHIAGRASS OR 15 LB/ACRE BERMUDAGRASS.
4. TO EXTEND SPRING SEEDING DATES INTO JUNE, ADD 15 LB/ACRE HULLED BER-
MUDAGRASS. HOWEVER, IT IS PREFERABLE TO SEED TEMPORARY COVER AND SEED
FESCUE IN SEPT.
NURSE PLANTS
BETWEEN MAY 1 AND AUG. 15, ADD 10 LB/ACRE GERMAN MILLET OR 15 LB/ACRE
SUDANGRASS. PRIOR TO MAY 1 OR AFTER AUG. 15 AND 40 LB/ACRE RYE (GRAIN)
SEEDING DATES
BEST POSSIBLE
FALL: AUG. 25 - SEPT. 15 AUG. 20 - OCT. 25
LATE WINTER: FEB. 15 - MAR. 21 FEB. 1 - APR. 15
FALL IS BEST FOR TALL FESCUE AND LATE WINTER LESPEDEZAS. OVERSEEDING OF
KOBE LESPEDEZA OVER FALL -SEEDED TALL FESCUE IS VERY EFFECTIVE. USE
UNHULLED BERMUDAGRASS SEED IN FALL.
SOIL AMENDMENTS
APPLY LIME AND FERTILIZER ACCORDING TO SOIL TESTS, OR APPLY 4,000 LB/ACRE
GROUND AGRICULTURAL LIMESTONE AND 1,000 LB/ACRE 10-10-10 FERTILIZER.
MULCH
APPLY 4,000-5000 LB/ACRE GRAIN STRAW, OR EQUIVALENT COVER OF ANOTHER
SUITABLE MULCHING MATERIAL. ANCHOR MULCH BY TACKING WITH ASPHALT, ROVING,
OR NETTING. NETTING IS THE PREFERRED ANCHORING METHOD ON STEEP SLOPES.
MAINTENANCE
REFERTILIZE IN THE SECOND YEAR UNLESS GROWTH IS FULLY ADEQUATE. MAY BE
MOWED ONCE OR TWICE A YEAR, BUT MOWING IS NOT NECESSARY. RESEED, FERTILIZE
AND MULCH DAMAGED AREAS IMMEDIATELY.
DE -WATERING:
THE CONTRACTOR SHALL AT ALL TIMES
PROVIDE AND MAINTAIN
AMPLE MEANS
AND EQUIPMENT WITH WHICH TO REMOVE
AND
PROPERLY DISPOSE OF
ANY AND ALL
WATER ENTERING THE EXCAVATION OR OTHER
PARTS OF THE WORK
AND KEEP ALL
EXCAVATIONS DRY UNTIL SUCH TIME AS
PIPE
LAYING AND GRADING
IS COMPLETED
AND STRUCTURES TO BE BUILT THEREIN
ARE
COMPLETED.
NO WATER SHALL BE ALLOWED TO RISE AROUND THE PIPE IN UNBACKFILLED
TRENCHES NOR SHALL IT BE ALLOWED TO RISE OVER MASONRY UNTIL THE
CONCRETE OR MORTAR HAS SET (MINIMUM 24 HOURS). ALL WATER PUMPED OR
DRAINED FROM THE WORK SHALL BE DISPOSED OF IN SUCH A MANNER AS TO
PREVENT SILTATION AND EROSION TO ADJACENT PROPERTY OR OTHER
CONSTRUCTION.
VII. PROTECTION OF EXISTING UTILITIES
THE CONTRACTOR SHALL CONTACT THE APPROPRIATE AGENCY FOR THE EXACT FIELD LOCATIONS OF ALL WATER,
SEWER, ELECTRIC, TELEPHONE, TELEVISION AND ANY OTHER UNDERGROUND AND OVERHEAD UTILITY BEFORE
STARTING CONSTRUCTION. THE OMISSION FROM OR THE INCLUSION OF UTILITY LOCATION ON THE CONTRACT
DRAWINGS IS NOT TO BE CONSIDERED AS THE NON-EXISTANCE OF OR A DEFINITE LOCATION OF EXISTING UTILITIES.
IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE LOCATION AND DEPTH OF ALL
UNDERGROUND UTILITIES ALONG THE ROUTE OF WORK.
THE FOLLOWING LISTING OF UTILITY COMPANIES (WHICH MAY OR MAY NOT BE COMPLETE) MAY HAVE EXISTING
UNDERGROUND OR OVERHEAD UTILITIES IN THE CONTRACT VICINITY.
IX, SANITARY SEWER AND WATER DISTRIBUTION
A. SANITARY SEWERS AND STORM SEWERS SHOULD ALWAYS CROSS UNDER WATER MAINS. SANITARY SEWERS AND
STORM SEWERS CROSSING WATER MAINS SHALL BE LAID TO PROVIDE A MINIMUM VERTICAL DISTANCE OF 18 INCHES
BETWEEN THE INVERT OF THE UPPER PIPE AND THE CROWN OF THE LOWER PIPE.
B. WHERE SANITARY SEWERS AND STORM SEWERS MUST CROSS A WATER MAIN WITH LESS THAN 18 INCHES VERTICAL
DISTANCE, BOTH THE SEWER AND THE WATER MAIN SHALL BE CONSTRUCTED OF DUCTILE IRON PIPE (DIP) AT THE
CROSSING. (DIP IS NOT REQUIRED FOR STORM SEWERS IF IT IS NOT AVAILABLE IN THE SIZE PROPOSED). SUFFICIENT
LENGTHS OF DIP MUST BE USED TO PROVIDE A MINIMUM SEPARATION OF 10 FEET BETWEEN ANY TWO JOINTS. ALL
JOINTS ON THE WATER MAIN WITHIN 20 FEET OF THE CROSSING MUST BE LEAK FREE AND MECHANICALLY RESTRAINED.
A MINIMUM VERTICAL CLEARANCE OF 6 INCHES MUST BE MAINTAINED AT THE CROSSING.
C. ALL CROSSINGS SHALL BE ARRANGED SO THAT THE SEWER PIPE JOINTS AND THE WATER MAIN PIPE JOINTS ARE
EQUIDISTANT FROM THE POINT OF CROSSING (PIPES CENTERED ON THE CROSSING).
D. WHERE A NEW PIPE CONFLICTS WITH AN EXISTING PIPE, THE NEW PIPE SHALL BE CONSTRUCTED OF DIP AND THE
CROSSING SHALL BE ARRANGED TO MEET THE REQUIREMENTS ABOVE.
E. A MINIMUM 10-FOOT HORIZONTAL SEPARATION SHALL BE MAINTAINED BETWEEN ANY TYPE OF SEWER AND WATER
MAIN IN PARALLEL INSTALLATIONS.
F. IN CASES WHERE IT IS NOT POSSIBLE TO MAINTAIN A 10-FOOT HORIZONTAL SEPARATION, THE WATER MAIN MUST
BE LAID IN A SEPARATE TRENCH OR ON AN UNDISTURBED EARTH SHELF LOCATED ON ONE SIDE OF THE SEWER OR
FORCE MAIN AT SUCH AN ELEVATION THAT THE BOTTOM OF THE WATER MAIN IS AT LEAST 18 INCHES ABOVE THE TOP
OF THE SEWER.
G. WHERE IT IS NOT POSSIBLE TO MAINTAIN A VERTICAL DISTANCE OF 18 INCHES IN PARALLEL INSTALLATIONS, THE
WATER MAIN SHALL BE CONSTRUCTED OF DIP AND THE SEWER OR THE FORCE MAIN SHALL BE CONSTRUCTED OF DIP
(IF AVAILABLE IN THE SIZE PROPOSED) WITH A MINIMUM VERTICAL SEPARATION OF 6 INCHES. THE WATER MAIN SHOULD
ALWAYS BE ABOVE THE SEWER. JOINTS ON THE WATER MAIN SHALL BE LOCATED AS FAR APART AS POSSIBLE FROM
THE JOINTS ON THE SEWER OR FORCE MAIN(STAGGERED JOINTS).
H. ALL SANITARY SEWER MAINS, LATERALS AND FORCE MAINS SHALL HAVE A MINIMUM OF 36 INCHES OF COVER.
I. ALL ON SITE P.V.C. GRAVITY SANITARY SEWER PIPE SHALL BE MADE OF MATERIAL HAVING A CELL CLASSIFICATION
OF 12454 B, 12454 C OR 13354 B AS DEFINED IN ASTM D-1784 AND CONFORM TO THE REQUIREMENTS OF SDR 26.
ELASTOMERIC GASKET JOINTS SHALL BE UTILIZED.
J. ALL ON SITE DUCTILE IRON PIPE SHALL BE CLASS 52 AND SHALL RECEIVE INTERIOR AND EXTERIOR BITUMINOUS
COATING IN ACCORDANCE WITH ANSI A 21.6, A 21.8, OR A 21.51.
K. SANITARY SERVICE CONNECTION LOCATIONS SHOWN ON THESE PLANS ARE APPROXIMATE.
L. ALL SANITARY SEWER WORK SHALL CONFORM TO TOWN OF HOKE STANDARDS AND SPECIFICATIONS, HOKE & TO
HOKE COUNTY WATER & SEWER EXTENSION ORDINANCE.
M. PRIOR TO COMMENCING WORK WHICH REQUIRES CONNECTING NEW SANITARY SEWER LINES TO EXISTING LINES OR
APPURTENANCES, THE CONTRACTOR SHALL VERIFY LOCATION AND ELEVATION OF ALL EXISTING UTILITIES NEAR THE
POINT OF CONNECTION AND NOTIFY OWNER'S ENGINEER OF ANY CONFLICTS OR DISCREPANCIES WITH DESIGN
INFORMATION SHOWN IN THESE PLANS. CONTRACTOR SHALL NOTIFY ENGINEER AND TOWN OF HOKE INSPECTOR AT
LEAST 48 HOURS IN ADVANCE OF SCHEDULED WORK.
N. ALL GRAVITY SEWER PIPING SHALL BE SUBJECT TO A VISUAL INSPECTION BY THE OWNER'S ENGINEER AND TOWN
OF HOKE PRIOR TO PLACEMENT OF AND PAVING AND AGAIN PRIOR TO OBTAINING CERTIFICATE OF OCCUPANCY.
CONTRACTOR TO NOTIFY THE ENGINEER AND TOWN OF HOKE 48 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS.
0. THE CONTRACTOR SHALL PERFORM ALL NECESSARY TESTING IN ACCORDANCE WITH TOWN OF HOKE STANDARDS.
SAID TESTS ARE TO BE CERTIFIED BY THE ENGINEER OF RECORD AND SUBMITTED TO THE REGULATORY AGENCY FOR
APPROVAL. COORDINATION OF TESTING AND NOTIFICATION OF ALL PARTIES IS THE CONTRACTOR'S RESPONSIBILITY.
P. ALL WATER MAINS SHALL HAVE A MINIMUM OF 36 INCHES OF COVER.
Q. ALL WATER SYSTEM WORK SHALL CONFORM TO TOWN OF HOKE STANDARDS AND SPECIFICATIONS, EXTENSION
ORDINANCE.
R. ALL ON SITE PVC WATER MAINS 4 INCHES THROUGH 12 INCHES SHALL BE IN ACCORDANCE WITH AWWA C-900 AND
SHALL BE CLASS 150 DR 18. ALL ON -SITE PVC WATER MAINS 2" TO 3" SHALL BE CLASS 1120 AND MEET
REQUIREMENTS OF SDR 21 IN ACCORDANCE WITH ASTM D-2241. WATER MAINS SMALLER THAN 1 1/2" SHALL BE CLASS
1120 OR 1220 SCHEDULE 80 AND MEET REQUIREMENTS OF ASTM D-1785.
. aria loplagraJ:i•119411 • ► _ ► _ .�srzz• ��►I•r•>nnr-aakM**I.1sOIi , SPION4.0
T. ALL DUCTILE IRON PIPE SHALL CONFORM TO THE REQUIREMENTS OF ANSI STANDARD A21.51, MINIMUM CLASS 50.
JOINTS FOR DUCTILE IRON PIPE SHALL BE MECHANICAL OR PUSH -ON JOINTS. PIPE SHALL HAVE AN EXTERIOR
BITUMINOUS COATING IN ACCORDANCE WITH ANSI A21.51. PIPE INTERIOR SHALL HAVE A CEMENT MORTAR LINING WITH
AN ASPHALTIC SEAL COAT CONFORMING TO AWWA/ANSI C104/A21.4. THE WEIGHT AND CLASS DESIGNATION SHALL BE
PAINTED IN WHITE ON THE EXTERIOR SURFACE OF ALL PIPES AND FITTINGS. MANUFACTURER'S CODE OR SERIAL NUMBER
SHALL BE PROVIDED ON THE BELL OF EACH PIPE JOINT.
U. ALL DUCTILE FITTINGS SHALL BE MECHANICAL JOINT WITH A MINIMUM PRESSURE RATING OF 250 PSI AND SHALL
CONFORM TO THE REQUIREMENTS OF ANSI/AWWA STANDARD A21.10/C110. ALL FITTINGS SHALL BE COATED AND LINED
AS SPECIFIED ABOVE FOR DUCTILE IRON PIPE.
V. CONTRACTOR SHALL INSTALL TEMPORARY BLOWOFFS AT THE END OF WATER SERVICE LATERALS TO BUILDINGS TO
ASSURE ADEQUATE FLUSHING AND DISINFECTION.
W. THRUST BLOCKING SHALL BE PROVIDED AT ALL FITTINGS AND HYDRANTS IN ACCORDANCE WITH TOWN OF HOKE
PUBLIC WORKS.
X. POINTS OF CONNECTION OF THE EXTERNAL WATER LINES ARE TO COINCIDE WITH THE BUILDING PLUMBING AS
SHOWN ON THE BUILDING PLUMBING PLANS. CONNECTION LOCATIONS SHOWN ON THESE PLANS ARE APPROXIMATE.
Y. FIRE LINES TO BUILDINGS SHALL BE INSTALLED BY A CONTRACTOR DULY LICENSED BY THE STATE FIRE MARSHALL'S
OFFICE. CONTRACTOR TO VERIFY REQUIREMENTS PRIOR TO CONSTRUCTION.
Z. ALL COMPONENTS OF THE WATER SYSTEM, INCLUDING FITTINGS, HYDRANTS, CONNECTIONS, AND VALVES SHALL
REMAIN UNCOVERED UNTIL PROPERLY INSPECTED AND ACCEPTED BY THE OWNER'S ENGINEER AND THE TOWN OF HOKE
PUBLIC WORKS. PRESSURE TESTS SHALL BE IN ACCORDANCE WITH TOWN OF HOKE PUBLIC WORKS SPECIFICATIONS.
CONTRACTOR TO NOTIFY OWNER'S ENGINEER AND TOWN OF HOKE PUBLIC WORKS INSPECTORS 48 HOURS IN ADVANCE
OF PERFORMING TESTS.
AA. DISINFECTION: SHALL CONFORM TO AWWA C651. ALL NEW WATER MAINS SHALL BE DISINFECTED AFTER THEY HAVE
BEEN PRESSURE TESTED. THE MAIN SHALL BE THOROUGHLY FLUSHED AT A RATE OF 2 FEET PER SECOND WITH CLEAN
WATER AFTER WHICH A CHLORINE SOLUTION OF 50 PARTS PER MILLION SHALL BE INDUCED. THE CHLORINE SOLUTION
SHALL REMAIN IN THE LINES FOR A MINIMUM OF 24 HOURS. THE LINES SHALL AGAIN BE FLUSHED AT A RATE OF 2
FEET PER SECOND WITH CLEAN WATER UNTIL THE CHLORINE RESIDUAL IS REDUCED TO THAT OF THE SUPPORTING
SYSTEM. SAMPLES SHALL BE THEN COLLECTED AND TESTED FOR COLIFORM BACTERIA. ANALYSIS SHALL BE BY A STATE
CERTIFIED LABORATORY USING THE MULTIPLE TUBE FEREMENTATION METHOD. ONE SAMPLE SHALL BE COLLECTED FROM
EACH DEAD END SEGMENT OF THE PIPELINES INSTALLED. IF BACTERIA OF ANY TIME IS FOUND, THE TEST SHALL BE
REPEATED UNTIL THE LINES ARE CLEAN.
BB. WATER MAIN SHALL HAVE 14 GA. BLUE COATED TRACER WIRE ON ALL SERVICES AND MAINS BURIED OVER THE
WATER MAIN.
CC. FIRE HYDRANTS SHALL BE PLACED A MINIMUM DISTANCE OF 6' FROM EOP AND HAVE A CLEAR SPACE OF 3'
FROM ANY PERMANENT STRUCTURES.
DD. WATER VALVES SHALL COMPLY WITH APPROPRIATE AWWA STANDARDS.
1. GATE VALVES 2-INCHES: SHALL CONFORM TO ANSI/AWWA A21.11/C111 FOR CAST IRON BODIED, BRONZE MOUNTED,
PARALLEL DOUBLE DISC, NON RISING STEM VALVES. VALVES SHALL BE RATED AT 200 PSIG WORKING PRESSURE
AND 400 PSIG TEST PRESSURE. END CONNECTIONS SHALL BE STANDARD FEMALE IRON PIPE THREADS OR
ANSI/AWWA A21.11 /C111 MECHANICAL JOINTS FOR BURIED LOCATIONS ADN ANSI B16.1 FLANGES FOR EXPOSED
LOCATIONS. VALVE OPERATOR SHALL BE A 2 INCH SQUARE NUT FOR BURIED LOCATIONS AND STANDARD
HANDWHEEL FOR EXPOSED LOCATIONS. ALL VALVES SHALL BE OPEN LEFT.
2. GATE VALVES 6-INCHES THROUGH 16-INCHES: SHALL CONFORM TO AWWA C509 FOR BRONZE MOUNTED, RESILIENT
SEATED, CAST IRON BODIED GATE VALVES. VALVE BODY SHALL BE RATED FOR 200 PSIG WORKING PRESSURE AND
400 PSIG TEST PRESSURE. PROVIDE VALVE WITH SOLID WEDGE, NON RISING STEM CONSTRUCTION. VALVES SHALL
EBE SEALED RUBBER "O" RING SEALS BOTH ABOVE AND BELOW THE THRUST RING. VALVES STEMS SHALL BE OF
BRONZE. INTERIOR OF THE VALVES SHALL BE COATED IN ACCORDANCE WITH AWWA C550. END CONNECTIONS SHALL
CONFORM TO ANSI/AWWA AS2.22/C111 MECHANICAL JOINTS FOR BURIED LOCATIONS AND ANSI B16.1 FLANGES FOR
EXPOSED LOCATIONS. VALVE OPERATORS SHALL BE 2 INCH SQUARE NUTS FOR BURIED LOCATIONS OR STANDARD
HANDWHEEL FOR EXPOSED LOCATIONS. ALL VALVES SHALL BE OPEN LEFT. IN LINE VALVES TO BE INSTALLED EVERY
2000 FEET OR EVERY OTHER HYDRANT.
EE. WATER MAINS SHALL BE SUBJECT TO BOTH A PRESSURE TEST AND A LEAKAGE TEST. THE CONTRACTOR MAY BE
BILLED FOR THE AMOUNT OF WATER USED.
1. PRESSURE TEST: SHALL CONFORM TO AWWA STANDARD C605 FOR PVC PIPE AND AWWA C600 FOR DUCTILE IRON.
THE TEST PRESSURE SHALL BE 200 PSIG AND THE DURATION OF THE TEST SHALL BE NOT LESS THAN 2 HOURS
OR MORE THAN 24 HOURS. THE DURATION OF THE TEST WILL BE DETERMINED BY THE COUNTY ENGINEER AS THE
TEST PROGRESSES. PRESSURE SHALL NOT BE ALLOWED TO VARY MORE THAN 5 PSIG DURING THE TEST.
2. LEAKAGE TEST: SHALL BE CONDUCTED ALONG WITH THE PRESSURE TEST. LEAKAGE WILL BE DEFINED AS THE
AMOUNT OF WATER THAT MUST BE SUPPLIED TO THE NEWLY LAID LINES TO MAINTAIN THE TEST PRESSURE WITHIN
A 5 PSIG RANGE OVER A SPECIFIED PERIOD OF TIME. ALLOWABLE LEAKAGE WILL BE COMPUTED BY THE FOLLOWING
FORMULA:
L = (S) (D) (SORT P) / 148,000
WHERE:
L = ALLOWABLE LEAKAGE IN GALLONS PER HOUR
S = LENGTH OF PIPE TESTED, IN FEET
D = NOMINAL DIAMETER OF PIPE IN INCHES
P = TEST PRESSURE IN PSIG
BUT NOT MORE THAN: 12.1 GALLONS PER INCH OF DIAMETER PER MILE OF PIPE PER 24 HOURS BASED ON
200 PSI TEST PRESSURE.
Z `°
U O M
co
N
J U
JD o
0�a);)
�- rn
12 N
r
ZEL
M
ro
Q.: N
U
O U
Z
0 0� ,c) Z
°6 w ui
(D z Y
Z O
O Zw=
U wJIt
W M
= z x
0
(D m
Z o
U
W m
w
U)
m
m
0
O
lz
= ,_�
-4 ui &. O
W U zx
W � Z
U Q avo
= O x IY
W Q
0- W
p4 2
z QO0,
g �-Zo
E_ Z
�_ z F-
O
Z
P4
two
PQ U
f4 0 o w
m a E� o
2
w
U U) G" W
0404 4
r E.
J
J
w
cc
0
0,
c
m
m
0
00
�/
V)
m
1):EW
0
N
m
u
w
z
m
U
O'
0
Z
W
N
M
J
m
0
N
o
U
T
NQ
T
W
\
m
z
0
C)0
uj
0/
0-
w
M
J
>-- m
m
C) 3
w
Q
Z
Z
CO
w
_l
U
L
o
.
U)
..
SHEET
I Cl
3.0]
LL