Loading...
HomeMy WebLinkAboutSW3220302_Plansheet - Proposed Drainage Area_20220308-- \ -- -- FUTURE MANUFACTURING BUILDING 12,000 SF \ - 4.775 AC +- DB 2990-6 4 \ V, \ V C&9 ) \ I \ - 86 857 862------ - 56 ' j \ _ 8 a55 \\ 855 854 853 852 DA TOBMP 2.746 AC \ \ 1 19, 602 SF DRAINAGE AREA TO BMP ` IMPERVIOUS TO BMP \ 1.626 AC CROWN ATLANTIC CO. \ \\ 70,813 S F DB 1 1 13-540 �\ �- ``roos 1 UNDERGROUND POWER 11 WATERSHED LINE WS-IV CRITICAL GAS LINE CABLE LINE _ ------- LAKE NORMAN LUTHERAN CH. SEWER UMP - / DB 555-731 I � � 1 - nn, WATERSHED LINE mono ON _ - NOT IN WATERSHED WALL --= -� �������� � a , Al 856 g5 4 85 853 852 851850 849 CO 0I OD ry EX. STORM MANHOLE RIM: 846.5 INV IN: 839.5 INV OUT: 839.4 F Im�um��m��®�mmmlltm�m��ywwm mmmn ; 847 7 / EX. STORM STRUCTUI RIM: 84� INV IN & OUT: 83E EX. 15" RCP PIPE i F FY 1 G" III i a � z1 N m � �cG• R47.4' 'Z I OMMERCIAL BUILDING 1111 ONE STORY C y EX. BUILDING = Z I °' 17,030 SF � i NNG�CK1N&L \ O :n I - O /goo �NEWADDITION , d 5,203 SF O -000 ° 846 -- ° i-- 847 �L PROP. BYPASSED DRAINAGE AREA = 0.568 AC (24,760 SF) 467 \ E PROP. IMPERVIOUS BYPASSED = 0.508 AC (22,148 SF) REA �c� ® PROP. NON -IMPERVIOUS BYPASSED = 0.060 AC (2,612 SF) 15' S TBACK - ---� INLET (TO BE CONVERT TO O CURB T AFTER PH EC) C - GRATE: 843.4' INV: 841.1' CURB INLET (TO BE CONVERTED DRAINAGE AREA TO JUNCTION BOX AFTER PH1 EC) TO BYPASS BMP GRATE: 844.2' INV IN & OUT: 840.8' 60' RIGHT OF WAY PER DEED BOOK 787-339 (30' EACH SIDE OF BOUNDARY) :TAL BUILDING TO REMAIN (DA TO BMP + DA OF BYPASS) THE INVESTMENT CO. DB 2224-807 PB 15-417 IMPERVIOUS SUMMARY ITEM SQUARE FOOT ACRES PERCENTAGE OF TOTAL SITE TOTAL SITE AREA 195,759 SF 4.494 AC N/A EXISTING BUA 50,545 SF 1.16 AC 25.82 % EXISTING BUA TO BE REMOVED 16,572 SF 0.38 AC 8.47 % EXISTING BUA TO REMAIN 33,973 SF 0.78 AC 17.35 % PROPOSED BUA 70,025 SF 1.61 AC 35.77 % TOTAL NEW IMPERVIOUS 103,998 SF 2.39 AC 53.13 % IMPERVIOUS NET CHANGE 53,453 SF 1.23 AC 27.31 % TOTAL PERVIOUS 91,761 SF 2.11 AC 46.87 % -- 15" RC EX. WATER INVERT METER GAS LI C BLE LINE 1 1 1 , 1 1 1 1 -Q z I-fl n rn I 0 c �PN 1 0 c 1 � 1 11 IMPERVIOUS SUMMARY - BMP ITEM SQUARE FOOT ACRES TOTAL SITE AREA 195,759 SF 4.49 AC DRAINAGE AREA 119,602 SF 2.75 AC TOTAL BUA TO BMP 70,813 SF 1.63 AC ITEM PERCENTAGE BUA % OF SITE AREA 36.17 % BUA % OF DA 59.21 % 1. CONTRACTOR IS FULLY RESPONSIBLE FOR CONTACTING APPROPRIATE PARTIES AND ASSURING THAT EXISTING UTILITIES ARE LOCATED PRIOR TO BEGINNING CONSTRUCTION. 2. CONTRACTOR IS RESPONSIBLE FOR PLACING BARRICADES USING FLAGMEN, ETC., AS NECESSARY TO INSURE SAFETY TO THE PUBLIC. 3. ALL PAVEMENT CUTS, CONCRETE OR ASPHALT, ARE TO BE REPLACED ACCORDING TO STANDARDS OF THE DEPARTMENT OF TRANSPORTATION. 4. SHORING WILL BE ACCORDING TO OSHA TRENCHING STANDARDS PART 1926 SUBPART P, OR AS AMENDED. Know what's below. Call before you dig. E O U O CO o. O O 01 M �O CN U N0,0 _c WU wz3 C? LU JZ 0 3 W W J U > - Z< UQ J CD C � �- p QM °w 0 �_� -0 z= U (\^ P � o w Q Z W i Q W W N O C� `o Z a U r U O LO J � O Q I� Q LU 0 CV W ^ Z � 0, Z Q LU w W U_ L U > r �1 lJ 6 W J W L W Z LU � z � Q Q W m ^/ 1._L Z �� 0 W 0 � z �r�' REVISIONS: POST -DEVELOPMENT DA.DWG PROJECT NUMBER: 221011 DATE: 2/4/2022 DRAWN BY: KIW EXO1 12 SHEET OF POST -DEVELOPMENT DA.DWG - PLOT: Kennedy - THU. 2-24-2022 10:51 AM