Loading...
HomeMy WebLinkAboutSW3220302_Plansheet - Other_20220308 (3)CROWN ATLANTIC CO. DB 1113-540 E:KIJJIIJ1N I_lJ1N1r\lJL 1. ,J1'4J1INUk-IIIJ1N 3Ch1UC1\4l_E: (rr1/-1JC Z) 1. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL PHASE 1 EROSION CONTROL DEVICES AND STRUCTURES. 2. COORDINATE WITH EROSION CONTROL INSPECTOR PRIOR TO REMOVAL OF PHASE 1 EROSION CONTROL MEASURES. 3. FOR PHASED EROSION CONTROL PLANS, CONTRACTOR SHALL MEET WITH EROSION CONTROL INSPECTOR PRIOR TO COMMENCING WITH EACH PHASE OF EROSION CONTROL MEASURES. 4. INSTALL INLET PROTECTION AND OTHER MEASURES AS SHOWN ON PLANS. 5. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES. 6. THE LAND DEVELOPMENT INSPECTOR SHOULD BE CALLED TO CONDUCT INSPECTIONS ON STORM DRAINAGE, SIDEWALKS, DRIVEWAY ON STORM DRAINAGE, SIDEWALKS, DRIVE WAY IMPROVEMENTS, AND ALL ASPECTS OF ROAD CONSTRUCTION 7. STABILIZE SITE AS AREAS ARE BROUGHT TO FINISHED GRADE. 8. COORDINATE WITH EROSION CONTROL INSPECTOR PRIOR TO REMOVAL OF ANY EROSION CONTROL MEASURES. 9. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE N. C. EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, U. S. DEPT. OF AGRICULTURE AND LINCOLN COUNTY LAND DEVELOPMENT STANDARDS 10. CALL THE WATER QUALITY INSPECTOR TO SET UP A BMP PRE -CONSTRUCTION MEETING PRIOR TO STARTING ANY WORK ON BMPS. THIS MEETING SHOULD TAKE PLACE AT LEAST 48 HOURS PRIOR TO STARTING CONSTRUCTION ON ANY BMP AND SHALL INCLUDE THE DESIGN ENGINEER TO ENSURE ENGINEER INSPECTIONS ARE PERFORMED AT KEY BMP INSTALLATION PHASES. 11. THE DESIGN ENGINEER MUST VERIFY AND CERTIFY THE DRAINAGE AREA IS PROPERLY STABILIZED; MEASURES ARE IN PLACE TO PREVENT SEDIMENTATION INTO THE BMP, THE STORM DRAINS, INLETS AND PAVEMENT HAVE BEEN PROPERLY CLEANED PRIOR TO COMMENCEMENT OF BMP CONSTRUCTION. SEE SHEET C04 FOR EROSION CONTROL NOTES UNDERGROUND POWER WATERSHED LINE WS-IV CRITICAL GAS LINE - I CABLE LINE - - --`-- LAKE NORMAN LUTHERAN CH. - I DB 555-731 �- SEWER LIMP I W7TERSHED LINE /- / d I NOT IN WATERSHED - - - 7/' � d - T - 30.8 � WALL 6 CB I Ob-8' _ .4 II RIM: 846 T `60 1 4 d I c O I a _f g5o 855 854 853 52 �1 III - - ' 8 851 850 g49 � d ° -- _ DING FFE. 847.4 ➢ ' ONE STORY COMMERCIAL BUILDING > cn 1111 I EX. BUILDING i Z j co °, 17,030 SF d < D -LOADINC�KWELLy� I a - co 70 // NEW ADDITION d O 5,203 SF hry w co / `b if - 846 1 1 847 / �V� J 72_S _ � - - 467 cv 1 c" ur�oc olr -� ASPHALT PARKING AREA EX. STORM STRUCTURE RIM: 845.9 INV IN & OUT: 836.8 SILT FENCE (TYP.) - EX. 15" RCP PIPE PROP. JB-03 RIM:843.47 INV IN:838.29 (EX JB-04) INV IN:838.50 (OCS) INV OUT:838.29 SILT SACK INLEI T PROTECTION 15' SETBACK- (TYP. ALL INLETS) _�- INLET (TO BE CONVERTEDTO O CURB INLET AFTER PH1 EC) C - GRATE:845.0 843.94 INV: 841.1' CURB INLET (TO BE CONVERTED TO JUNCTION BOX AFTER PH1 EC) GRATE: 8##.2` 845.14 INV IN & OUT: 840.8' 60' RIGHT OF WAY PER DEED BOOK 787-339 (30' EACH SIDE OF BOUNDARY) IAPPROX. LOCATION OF EX. 1-STORY METAL BUILDING I EX. 15" HDPE PIPE THE INVESTMENT CO. DB 2224-807 PB 15-417 1. CONTRACTOR IS FULLY RESPONSIBLE FOR CONTACTING APPROPRIATE PARTIES AND ASSURING THAT EXISTING UTILITIES ARE LOCATED PRIOR TO BEGINNING CONSTRUCTION. 2. CONTRACTOR IS RESPONSIBLE FOR PLACING BARRICADES USING FLAGMEN, ETC., AS NECESSARY TO INSURE SAFETY TO THE PUBLIC. 3. ALL PAVEMENT CUTS, CONCRETE OR ASPHALT, ARE TO BE REPLACED ACCORDING TO STANDARDS OF THE DEPARTMENT OF TRANSPORTATION. 4. SHORING WILL BE ACCORDING TO OSHA TRENCHING STANDARDS PART 1926 SUBPART P, OR AS AMENDED. &R� CHECK DAM INLET PROTECTION SKIMMER RIP RAP TD DIVERSION DITCH SILT FENCE DENUDED LIMITS LEGEND Know what's below. Call before you dig. E O O O O O E o. O O 01 �O U c U U � W Lu MW 62 0 3 W W J ULL. > Z< U Q ^^, W J m n, 1 ^ V / 0 S Q O O w Z= O � (\^ U w Q 7-W L Q U U a O O WN W a U r o 0 J � 00 Q N W E S NORTH ARROW 0 15 30 60 GRAPHIC SCALE 1"=30 FT. \\\\\\\\11CIA . N Z Q CL W C'7 00 O V)o Z 0, U z LU LL ­6 C' LU Z LU 1-0LU > 0 LU LU LU� V) Z > Q �m = O Z V) w 0 z U z O LU N REVISIONS: C05 - EROSION PH2.DWG PROJECT NUMBER: 221011 DATE: 2/4/2022 DRAWN BY: KIW C05 12 SHEET OF C05 - EROSION PH2.DWG - PLOT: Kennedy - WED. 2-16-2022 8:46 AM