Loading...
HomeMy WebLinkAboutSW3220302_Plansheet - Existing Conditions_Survey_20220308LAKE NORMAN LUTHERAN CH. DB 555-731 WATERSHED LINE _ NOT IN WATERSHED _ — N 83°20'00" 7/30.8' 974.53' �1025.j WALL / EX. SIDEWALK 30 SETBACK (TO REMAIN)(TYP.) EX. SIDEWALK i (TO BE REMOVED) EX. EOP �. EX. YARD INLET (TYP.) (TO BE REMOVED) RIM: 861 INV OUT: 842.8 � (TO BE REMOVED w ,"A/C❑ o�i 17 AFTFP PWI F(-1 4.775 AC +- / 1 DB 2990-634 �� PF / EX. ASPHALT (21) EX. PARKING SPACES \ / / (TO BE REMOVED)(TYP.) (TO BE REMOVED) / �7 EX. PARKING SPACES / (TO BE REMOVED) \ \ / EX. STORM MANHOLE 17 \ / RIM:846.5 \ \ \ INV / O T: 83 INV OUT: 839.4 \ / (T BE (TO BE REMOVEC 2 / / 1>110 A / s io RCP PIPE CROWN ATLANTIC CO. EX. 15 � � \ DB 1 1 13-540 \\ / W S� ` 15' ET AC -- -7 , y �R S 87 29' 8"W 13.17' \_ I \ \ EX. STORM STRUCTURE RIM: 845.9 INV IN & OUT: 836.8 UNDERGROUND POWER WATERSHED LINE WS-IV CRITICAL GAS LINE CABLE LINE APPROX. LOCATION OF EXISTING BUILDING ROOF LEADER. CONTRACTOR TO FIELD VERIFY. (TO BE RE-ROUTED AFTER PH EC) 7z COMMERCIAL BUILDING FFE: 8474' ONE STORY SEWER UMP i EX. ADA SPACES 68.4' � (TO REMAIN) ° 1 III o II I° Ln� I ➢1° v> 1 = Z EX. ASPHALT —xll (TO BE REMOVED AS REQUIRED EX. SIDEWALK \ ' FOR NEW BUILDING ADDITION) (TO BE REMOVED) � Z (TYP.) G� SIDE ALK\ O 1 4 a ° — EX. SIDEWALK EX. CURB &GUTTER 12 EX. PARKING SPACES (TO REMAIN)(TYP.)' (TO BE REMOVED) 5 ( ) -- (TO BE REMOVED) 467 5" FifSPE PIPE ASPHALT PARKING AREA — _ — EX. DRIVEWAY J 15' SETBACK � _ � � � /— EX. CURB & GUTTER - -_ (TO REMAIN)(TYP.)------------- _-- --- / --- --- �475. ' — 'A 525.26' � — EX. POWER POLE _C INLET (TO BE CONVERTED TO CURB INLET AFTER P (TO REMAIN) GRATE: 843.4' INV: 841.1' CURB INLET (TO BE CONVERTED TO JUNCTION BOX AFTER PH1 EC) GRATE: 844.2' INV IN & OUT: 840.8' 60' RIGHT OF WAY PER DEED BOOK 787-339 (30' EACH SIDE OF BOUNDARY) IAPPROX. LOCATION OF EX. 1-STORY METAL BUILDING I I I EX. 15" HDPE PIPE THE INVESTMENT CO. DB 2224-807 PB 15-417 1. CONTRACTOR IS FULLY RESPONSIBLE FOR CONTACTING APPROPRIATE PARTIES AND ASSURING THAT EXISTING UTILITIES ARE LOCATED PRIOR TO BEGINNING CONSTRUCTION. 2. CONTRACTOR IS RESPONSIBLE FOR PLACING BARRICADES USING FLAGMEN, ETC., AS NECESSARY TO INSURE SAFETY TO THE PUBLIC. 3. ALL PAVEMENT CUTS, CONCRETE OR ASPHALT, ARE TO BE REPLACED ACCORDING TO STANDARDS OF THE DEPARTMENT OF TRANSPORTATION. 4. SHORING WILL BE ACCORDING TO OSHA TRENCHING STANDARDS PART 1926 SUBPART P, OR AS AMENDED. --A- 15' RCP EX. WATER INVERT: 843.7' METER GAS LINE 1 1 i C BLE LINE 1 1N C, No � N � m i -10z I 0 � ' 1 I � � � O � �JGN 0 I 15" RCP INVERT: 42.8' Know what's below. Call before you dig. 0 U O CC) o. CDO M �O CC) U U � U W w Z 3 MW Uz 0 3 W W J ULL > U< U V / < D 0 O=o U (D mw ' ^ ?_ (\v^) U � 0o w a Z W i Q 7C) O O WN W `o Z a U r U O LO J r" Lu 0 Q N W E S NORTH ARROW 0 15 30 60 GRAPHIC SCALE 1"=30 FT. \\\�\\\I►CIA 1//// *~N 0 . N Z Q I..L 0 w 00 w �oU o Z � z '0� 06 LU � w LUo z w Z �� 0 � U LU z F_ �m LU z U 0 Q � z U Iq (w Z 'F_ �/ ) X LU REVISIONS: CO2 - SURVEY.DWG PROJECT NUMBER: 221011 DATE: 2/4/2022 DRAWN BY: KIW CO2 SHEET 12 OF =j CO2 - SURVEY.DWG - PLOT: Kennedy - WED. 2-16-2022 8:46 AM