HomeMy WebLinkAboutNCC221800_ESC Approval Submitted_20220511UENDERSON COUNTY
SOIL ER0 ION AND SEDIMENT CONTROL OFFICE
May 6, 2022
LETTER OF APPROVAL WITH CONDITIONS
Attn: Peter Radchishin
Big Hill Construction, LLC
120 Dogwood Road
Candler, NC 28715
RE: Project Name:
Acres Approved:
Project ID:
County:
City:
Address:
PIN:
River Basin:
Stream Classification:
Submitted By:
Date Received by HC:
Plan Type:
Date Received by HC:
Plan Type:
Dear Peter Radchishin,
Big Hills at Horse Shoe
17.42
SESC 2021-09-02
Henderson
N/A
Adjacent to 2777 Brannon Road (35.3455,-82.6016)
9529-59-5596; 9529-68-1993
French Broad River Basin
Brock Creek; WS-IV; 6-48
Nicholas M. Bowman, PE
October 13, 2021
New
April 20, 2022
Revisions
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be
posted at the job site. This plan shall expire three (3) years following the date of approval, if no land
disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (eNO1) form requesting a Certificate of Coverage (COC) under the NCG010000
Construction General Permit. After the form is reviewed and found to be complete, you will receive
a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will
receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted
for this project, you MUST obtain the COC prior to commencement of any land disturbing
activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about
the eNO1 form to the Stormwater Program staff in the Raleigh central office. If the owner/operator
of this project changes in the future, the new responsible party must obtain a new COC.
100 NORTH KING STREET, SUITE 118
HENDERSONVILLE, NC 28792
TELEPHONE: (828) 694-6521
LETTER OF APPROVAL
BIG HILLS AT HORSE SHOE
MAY 6, 2022
PAGE 2 OF 3
Title 15A NCAC 413 .0118(a) and the NCGOI permit rcquire that the following documentation be
kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGOI permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection
to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection
of existing natural resources and adjoining properties. If, following the commencement of this
project, it is determined that the erosion and sedimentation control plan is inadequate to meet the
requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute
I I3A-51 through 66), this office may require revisions to the plan and implementation of the revisions
to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may
also apply to this land -disturbing activity. This approval does not supersede any other permit or
approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form if
there is any change in the information included on the form. In addition, it would be helpful if you
notify this office of the proposed starting date for this project. Please notify us if you plan to have a
preconstruction conference.
Your cooperation is appreciated.
Sincerely,
Assistant Engineer Site Development
Enclosures: Certificate of Approval
NCGO1 Fact Sheet
Location Map
Final FRO Form
"Items needed for NCGO1 NOI process"
ec: Nicholas M. Bowman, PE
Stan Aiken PE, DEQ — Asheville
LETTER OF APPROVAL
BIG HILLS AT HORSE SHOE
MAY 6, 2022
PAGE 3 OF 3
CONDITIONS
• ZONING APPROVAL FROM THE JURISDICTION HAVING AUTHORITY. PROJECT
CANNOT BEGIN UNTIL THIS DOCUMENT IS RECEIVED IN THIS OFFICE.
• A DRIVEWAY PERMIT REQUIRED FRO THE JURISDICTION HAVING AUTHORITY (IF
REQUIRED). NO WORK TO BEGIN IN THIS AREA PRIOR TO OBTAINING THIS
PERMIT AND SUBMITTING TO OUR OFFICE FOR THE FILE.
• OBTAIN NOI FROM NC DEQ AS INSTRUCTED IN THIS LETTER. (see flyer attached)
• FOLLOW THE SELF -INSPECTION, RECORDKEEPING AND REPORTING
REQUIREMENTS DESCRIBED ON SHEET D15 OF THE APPROVED DRAWING "SITE
DEVELOPMENT PLAN FOR BIG HILLS AT HORSE SHOE" AND DATED APRIL 18, 2022,
WHICH IS INCORPORATED INTO THIS LETTER OF APPROVAL.
• PRE -CONSTRUCTION MEETING REQUIRED PRIOR TO LAND DISTURBANCE.
CONTACT DEB JOHNSTON AT (828) 694-6521 TO SCHEDULE.
Financial Responsible Ownership Signature: P .
Print Name and Title: ?G-recz RPcDG�A ISM
Date:
100 NORTH KING STREET, SUITE 118
HENDERSONVILLE, NC 28792
TELEPHONE: (828) 694-6521