HomeMy WebLinkAboutNCG530158_Compliance Evaluation Inspection_20220511DocuSign Envelope ID: 12957587-A14A-4F91-959F-87AB11 E5A615
ROY COOPER
Governor
ELIZABETH S. RISER
Secretary
RICHARD E. ROGERS, JR.
Director
Van Blake Ziegler
Headwaters Trout Farms
26 Trout Haven Ln
Balsam Grove, NC 28708
NORTH CAROLINA
Environmental Quality
May 11, 2022
SUBJECT: Compliance Inspection Report
Trout Have Lane farm
NPDES WW Permit No. NCG530158
Transylvania County
Dear Permittee:
The North Carolina Division of Water Resources conducted an inspection of the Trout Have Lane farm
on 5/10/2022. This inspection was conducted to verify that the facility is operating in compliance with
the conditions and limitations specified in NPDES WW Permit No. NCG530158. The findings and
comments noted during this inspection are provided in the enclosed copy of the inspection report
entitled "Compliance Inspection Report".
The following was noted during the inspection:
• The facility was not operational at the time of the inspection due to damage from Hurricane Fred.
Contact the regional office when operations resume.
If you should have any questions, please do not hesitate to contact me with the Water
Quality Regional Operations Section in the Asheville Regional Office at 828-296-4500 or via email at
tim.heim@ncdenr.gov.
ATTACHMENTS
Ec: LF
Sincerely,
(-DocuSigned by:
llwtb{%u1 fkUwt
082B1105A3CA418...
Tim Heim, P.E., Environmental Engineer
Water Quality Regional Operations Section
Asheville Regional Office
Division of Water Resources, NCDEQ
North Carolina Department of Environmental Quelfy I olvtslon of Water Resources
Asheville Regional Office 12090 O.S. Highway 70 I Swannanoa, Noah Carolina 28778
828.290 4500
DocuSign Envelope ID: 12957587-A14A-4F91-959F-87AB11 E5A615
United States Environmental Protection Agency
EPA Washington, D.C. 20460
Water Compliance Inspection Report
Form Approved.
OMB No. 2040-0057
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection
1 IN I 2 IL I 3 I NCG530158 111 121 22/05/10 117
Type
181 I
IIIIIIIIIII
Inspector Fac Type
191 S I 2011
21IIIIII IIIIIIIIIII IIIIIII I IIIIII
P6
Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved
671 I 7° I I 711 172 I N I 73I 1 74 71
I I
I I I I I I 180
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES oermit Number)
Trout Have Lane farm
26 Trout Haven Ln
Balsam Grove NC 28708
Entry Time/Date
12:OOPM 22/05/10
Permit Effective Date
21/12/01
Exit Time/Date
01:OOPM 22/05/10
Permit Expiration Date
26/11/30
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
///
Other Facility Data
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Van Blake Ziegler,26 Trout Haven Ln Balsam Grove NC
28708//828-884-6221/8288846967 No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit Operations & Maintenar Records/Reports Self -Monitoring Progran
Facility Site Review Effluent/Receiving Wate
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Timothy H Heim DWR/ARO WQ/828-296-4665/ 5/11/2022
DocuSigned by:
[—
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
D 2
s,g dby: 5/11/2022
tJt/I.UHtlFt11-1- •
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page# 1
DocuSign Envelope ID: 12957587-A14A-4F91-959F-87AB11 E5A615
sI
NPDES yr/mo/day
N C G 530158 111 121 22/0 5/ 10
I17
Inspection Type
18i i
(Cont.)
1
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Tim Heim of the Asheville Regional Office performed a Compliance Inspection of the Facility on May
10, 2022. Van Zeigler (Owner & Permitee) was present and assisted with the inspection.
The facility was not operating at the time of the inspection and had no fish. Flash flooding and
landslides associated with Hurricane Fred caused significant damage in the summer of 2021 and the
facility has not operated since that time. Mr. Zeigler is working with the USACE to construct a new
bridge across the river in order to begin repair of the facility. All of the raceways have large amounts
of debris that must be removed and the intake structure was severely damaged and must be rebuilt.
Mr. Zeigler estimated that operations would not likely resume until Fall 2022. He was advised to
contact ARO when operations resume. The new sampling requirements in the revised permit were
discussed and he was aware of them.
A return inspection with sampling will be performed once the facility is confirmed to have resumed
normal operations.
Page# 2
DocuSign Envelope ID: 12957587-A14A-4F91-959F-87AB11 E5A615
Permit: NCG530158
Inspection Date: 05/10/2022
Owner - Facility: Trout Have Lane farm
Inspection Type: Compliance Sampling
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? • ❑ ❑ ❑
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable El El El
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment:
Permit Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new El El ❑
application?
Is the facility as described in the permit? • El El El
# Are there any special conditions for the permit? ■ El El El
Is access to the plant site restricted to the general public? • ❑ ❑ ❑
Is the inspector granted access to all areas for inspection? • ❑ ❑ ❑
Comment:
Page# 3