Loading...
HomeMy WebLinkAboutSW6220201_Design Calculations (10yr Storm)_20220510DESIGN REQUIREMENTS: A. Pass the storm event Drainage Area, (DA) = 18.38 acres Intensity, (I) = 6.22 inches/hr Composite Runoff Coefficient, (C) _> 0.30 Maximum Release Rate, (Q10) _> 34.30 cfs Drainage Area, (DA) = 18.38 acres Intensity, (I) = 7.78 inches/hr Composite Runoff Coefficient, (C) _> 0.56 Peak Release Rate, (Q10) _> 80.08 cfs Contour Contour Incr. Accum. Stage Elev. Area Storage Storage (S) (Z) 00 (sfl (cfl (cfl 00 In (S) In (Z) Z est 265.5 16,163 - - - 266.0 17,919 8,521 8,521 0.50 9.05 -0.69 0.53 266.5 18,789 9,177 17,698 1.00 9.78 0.00 lAl 267.0 19,698 9,622 27,319 1.50 € 10.22 € 0.41 1.50 267.5 20,623 10,080 37,400 2.00 € 10.53 0.69 1.98 268.0 21,564 10,547 47,946 2.50 10.78 0.92 2.47 268.5 22,521 11,021 58,968 3.00 € 10.98 € 1.10 2.98 269.0 23,494 11,504 70,471 3.50 11.16 1.25 3.49 269.5 24,483 11,994 82,466 4.00 11.32 1.39 4.02 270.0 25,485 12,492 94,958 4.50 € 11.46 € 1.50 4.56 Regression Output: b= 1.12 (X Variable Coeff) Ks- 17,433 (eY-'ri`e"pt) Stage - Storage Equation is of the form: S = (Ks)(Z)b printed: 5/10/2022 6:12 PM Page 1 of 3 Barrel Number of Barrels = Dia. of Barrel = Area of Barrel, (Ab) _ Pipe Length, (L) _ Friction Coeff, (Kp) _ Inv. of Barrel = Riser Elev. of Riser Crest Rectangular Length Weir— 96 inches Total Weir Length= Area of Riser = Orifice in Riser Dia. of Orifice = Number of Orifices = Area of Orifice, (Ab) _ Orifice Coefficient (Cd) _ Inv. of Orifice = Length of weir — Top of weir — Weir Coefficient (Cw)— Width of Spillway (Approx.) _ Weir Coefficient = Crest Elevation = Maximum Release Rate, (Q10) _ Release Rate, (Q10) _ Normal Water Surface Elev. _ 1 48 inches 12.57 sf 53 feet 0.00420 265.50 feet 269.00 feet Width Weir— 48 inches 24.00 feet 32.00 sq. ft. 2.75 inches 1 0.04 sf 0.60 265.50 feet 0.00 feet 500.00 feet 3.00 30 feet 3.3 269.20 feet 34.30 cfs 80.07 cfs 265.50 feet Water Surface Elev. @ Outlet (Qlo) = 269.69 feet printed: 5/10/2022 6:12 PM Page 2 of 3 Peak Inflow, (Qp) => Time to Peak Calculation: CN= Q*= vo1= Time to Peak, (Tp) _> (SCS TR-55) 80.08 cfs 87 P= 5.39 in. 3.94 in. (depth of runoff) 262,604 cf (vol. of runoff) 39.3 minutes S= 1.49 in. printed: 5/10/2022 6:12 PM Page 3 of 3