HomeMy WebLinkAbout20071269 Ver 1_Triage Check List_20070801Triage Check List
~.
Date: ~ ~ Project Name: ~
DWQ#: ~.
County:
SPY
To: ARO Kevin Barnett ^ WaRO Kyle Barnes.
FRO Ken Averitte ^ WiRO Noelle Lutheran/Joanne Steenhuis
MRO Alan Johnson/Barry Love ^ WSRO Daryl Lamb
^ RRO Eric Kulz
` S (~~
From: w~, U Telephone : (919) ~
The file attached is being forwarded to your for your evaluation.
Please call if you need. assistance.
^ Stream length impacted
^ Stream determination
^ Wetland determination and distance to blue-line surface waters on USFW topo maps
^ Minimization/avoidance issues
^ Buffer Rules (Meuse, Tar-Pamlico, Catawba, Randleman)
^ Pond fill
^ Mitigation Ratios
^ Ditching
^ Are the stream and or wetland mitigation sites available and viable?
^ Check drawings for accuracy
^ Is the application consistent with pre-application meetings?
^ Cumulative impact concern
Comments: