Loading...
HomeMy WebLinkAbout20071269 Ver 1_Triage Check List_20070801Triage Check List ~. Date: ~ ~ Project Name: ~ DWQ#: ~. County: SPY To: ARO Kevin Barnett ^ WaRO Kyle Barnes. FRO Ken Averitte ^ WiRO Noelle Lutheran/Joanne Steenhuis MRO Alan Johnson/Barry Love ^ WSRO Daryl Lamb ^ RRO Eric Kulz ` S (~~ From: w~, U Telephone : (919) ~ The file attached is being forwarded to your for your evaluation. Please call if you need. assistance. ^ Stream length impacted ^ Stream determination ^ Wetland determination and distance to blue-line surface waters on USFW topo maps ^ Minimization/avoidance issues ^ Buffer Rules (Meuse, Tar-Pamlico, Catawba, Randleman) ^ Pond fill ^ Mitigation Ratios ^ Ditching ^ Are the stream and or wetland mitigation sites available and viable? ^ Check drawings for accuracy ^ Is the application consistent with pre-application meetings? ^ Cumulative impact concern Comments: