Loading...
HomeMy WebLinkAbout20220647 Ver 1_DIFFUSED FLOW DOCUMENTATION_20220509DIFFUSED FLOW DOCUMENTATION The proposed construction will not impact the flow of water across the residential lot or from the site of construction to the tributary creek. The proposed construction will include a roof over both the Sunroom and screened porch; but the run off of rain water should not be different from run off on the hard surface of the deck that was on the site before. Run off water will pass over a grass lawn and natural vegetation around the creek bank before reaching the creek. Since very little soil will be disturbed during construction, a minimum amount of silt is expected to be created.