Loading...
HomeMy WebLinkAboutSW3220301_Plansheet - SCM Detail_20220420Entire P Adjacent pavement (if , applicable) ariater of sand filter The erirn to r oaf the d p and P e �'` P The inlet Swale The embankment ' Forebay or pretreatment area Filter bed and undardrain collection system Outlet device Receiving crater Trash/debris is present. Sediment Is present on the pavement surface. Areas of bare soil andtor erosive gullies have formed. Vegetation is too short or too long, Areas of bare soil and/or erosive gullies have formed. Erosion is occurring in the Swale, , Shrubs have started to grows on the embankment, Evidence of muskrat or beaver activity is present. A tree has started to grown on the embankment. An annual inspection her an appropriate professional shows that the embankment needs repair'. Sediment has accumulated to a depth of greater than six inches. Erosion has occurred. Weeds are present, Water Is pending on the surface for more than 24 hours after a sto Clogging has occurred, The outlet device Is damaged Erosion or other Signs of damage have occurred at the outlet. Remove# +` i as soon as possibW Reg *,. soil If necessary to remove- gully,, then time and a one-time fertilizer application. Mai 6tain vegetation appropriate -. remove the gully, ,, then lime r a one-time application. to smooth it over # provide to avoid future problems erosion. Remove . -, Mpt consultand professional remove•' to remove Make all needed # . Search for . of sedimentsediment and remedy the problem if possible. Remove the rl StabiliZeor it will not impacts•, streams # r the BMP. Provide addi • i r protection• d to prevent erosion problems. • •If •• r- -• spraylng� Check to see If the collector cloggedsystem is and flush if • • r• 11111611 • , _ water still ponds, then consult expert,an Clean out the outlet Repairor replace the outlet device. Contact- NC Division , Water Resources, FILTERSAND MAINTENANCE hours1. During the first 3 months after construction inspections should be made after every storm event. Thereafter, the sand filter should be inspected at least once a quarter (every 3 months) and within 24 - Frequency2. The sand chamber should be raked periodically to remove surface sediment, trash, and delaris. not to exceedone year. 3. First 2 or 3 inches of sand should be removed and replaced with new sand when water is ponding on the surface for more 4. Clean out -•iment chamber whenever sedimentaccumulated to s. depth greater Remove sediment and stablize. Remedy source of sediment If possible, 5. Heplace the sand filter media whenever It fails to function properly 6. All contaminated -.. • and sediment removed to be disposed of in accordance with local,, federal regulations. 7. Maintain operation and maintenance records In a known set location. Operation and maintenance records shall be made available upon 1 D FILTER t"iCIVI NTS 20'x26'(52OsD SAND CHAMBER TOP OF , M :# TOP OF y r EL = 557.63 RIP a P BERM SEPARATING y it a y 1 i + it lox,M PVC CLEANOUT INVERT = 555.60 10'-6 PERF SCH-40 PVC SLOPED @ 0.5% PVC CLEANOUT INVERT = 555.54 7'-6" SOLID SCH-40 PVC SLOPED 0.5% OUTLET STRUCTURE INVERT = 555.5 SEE OUTLET STRUCTURE J DETAIL THIS SHEET f , % ; " 40 -15 P p / LOPED @ 0.75% WITH F S i ro TOP OF DAM 10.0' MINIMUM WIDTH s - FILTERL, SAND *.LAYOUT 0.17' (2"+/-) THICK LAYER FILTER FABRIC � `� 3"-#57 WASHED STONE (Bottom Layer) \_ SCARIFIED SUBGRADE 6" SCHEDULE 40 PERFORATED PVC (NOT COMPACTED) 3"-#57 WASHED STONE 4-HOLE, 3/6" PERFORATIONS, 6" ON CENTER ALONG TOP & SIDES HOLE ROTATION AT SHOWN 1. ReferenceSKIMMER BASINr. :,:SCIVI CONSTRUCTION SEQUENCE (Sheet• x to .. completed prior to underdrain and sand filter construction 2. Temporary silt fence to be installed around perimeter of proposed sand chamber. 3. Subgrade of sand filter to be scarified (not compacted). 4. Bottom of proposed filter to be lined with Mirafi 140n, or equal, filter fabric. 5. 6" Sch-40 perforated PVC pipes to be placed on top of filter fabric. 6. Perforations shall be 3/8" and spaced 6" on center along four longitudinal rows spaced 900 apart. 7. Perforated PVC pipe to be placed at a minimum slope of 0.5% and rotated such that holes are not placed on bottom. Spacing of parallel PVC underdrain lines to not exceed 10'. ♦ r chamber and sides and top of i . #57 washed stone to be placed along bottom of VC to a thickness of 3". r: of • r washed stone. . #57 stone to be covered with 10. An 18" thick layer of clean, washed, course masonry sand (ASTM C33 or =• particles less average diameter is to be placed in the sand chamber. 11. Refer to note # 6 of SKIMMER BASIN CONVERSION & SCM CONSTRUCTION SEQUENCE (Sheet 4). PUM r : Y 1.' # 7 WASHED STONE 6" I zNo MEMO - • `' r ! . • r rd rj . * rz .�* �, .: . *, a ,, r► _ -* .' i # � • - • ♦ • `� . a � � ',*♦ . . .. :.. • ..r :: I~ r i r `r r 4• � � `� • • ! , Ili # l i #, i- #' - � # " u5l5i 1116111IM1. ''.•. ,r Ili IIIII``I`iIII�I ';9I �'"'"• 555 „ rir i .+ a - r ' -- o* a+, *r • r: r NOTES:GENERAL CONCRETEi BE USED THROUGHOUT. 2. PIPE ouTLEr STRUCTURETO BE STRUCK INSIDEri r AND BRUSHED SMOOTH. 3. FORMS TO BE USED FOR CONSTRUCTION OF BOTTOM CONCRETE4. COVER: 1. AREA UNDER EMBANKMENTx xr.:r GRUBBED, AND STRIPPED OF ANY VEGETATION AND ROOT MAT. THE POOL AREA y SHALL BE CLEARED. 2. SUBGRADE FOR DAM TO BE PRO r _PRIOR TO EARTH r PLACEMENT. ANY • PUMPING AREAS ARE BE UNDERCUT , r , w WITH COMPACTED " EARTH CORE TRENCH TO BE TED TO GOOD CLAY SOIL MATERIAL. TRENCH EARTH +rCOMPACTED TO MINIMUM OF . OF r PROCTOR MAXIMUM DRY r MATERIAL . THE FILL r i ROOTS OR EMBANKMENT k WOODYOTHER VEGETATION AS AS OVERSIZED ORGANIC OBJECTIONABLEMATERIAL OR OTHER MATERIAL. EMBANKMENT MAXIMUMBE COMPACTED BY TRAVERSING WITH EQUIPMENT WHILE BEING CONSTRUCTED. 15. COMPACTED EARTH FILL TO HAVE DRY UNIT WEIGHT OF AT LEAST 90 PCF. ALL EARTH FILL TO BE COMPACTED TO MINIMUM OF 95% OF STD. PROCTOR DRY DENSITY. 6. EXCAVATED SIDE SLOPES TO BE STABILIZED WITH SOD IN ACCORDANCE WITH SPECIFICATIONS. 7. FINAL DAM INTERNAL EMBANKMENT SLOPES TO BE TRACKED AND STABILIZED WITH SOD IN ACCORDANCE WITH SPECIFICATIONS, 1° RIP RAP SPILLWAY EL. 560.3 TOP OF DAM EL. 561.5 CROSS SECTION a• REM 4"CONCH EMERGENCY SPILLWAY N TS COVER ROVER 3 5$0.3 19"wx3-h 131W x 8°h " .. PENING (3 Sides) ENING (3 $Idea) n 13" ° 559.3 0" 559.30 ;0 p CH WIDTH 1 III II (FOrErndad DrBfn} ;> a& 3'Tbmaded Capped PVC TRENCH v (PPE� 11- -F WDTH P. �. T } �tr 55 8 a Sand =TTI GRADE11T- r` 3c s° _ Ii v 1I- I �k ti. • `k l = 1 15"NQPE a � o- ' .�1- A I Ia I1(- PIPE 555.5 60 16" PVC Underdratn a _ � a II ITH a'< ��. SECTION X-XI- Ia I II SECTION Y-Y - ., aan- II=i uu E a" �1TI • I �� a (GAMECONCRETE OUTLET s STRUCTUREI IT= ..•a w� ITT =1 ` g r - I :. , •: i:; "• :IT � p . --Ill-1 E PLR M ANTI-SEEPLL N T3 r r , a ii DDING ar PVC CLEANOUTen 3 Side561.5 T ENDS _. Si __ _ _____ c�10 E1=560.45 _ _ _ _ _.Is � Q50 EI=560.3 _. --- - - - - .,_._ -. _ _ _ 1 Class T_______________________m 10 EI=560.05 - - - - __ __ _ _ _ �_.�___ 6prap L.iri r° spillway--'- IP A -------------,.______- -i, Q2 EI=5 .76 - 1 1=559,5 _ - SAND CHAMBER QV=559,43 _ MIN. 520 SF SURFACE AREA 1 OV(Ad])=5,09 1 • ' TOP OF ASHD STONE - 557 i30 it TOP OF SAND = 557.63 _ Storm = 26 ..�� 1) 4'x4' 0.5' Concrete1 4I Natural Ground layer of Antiseep Collar r-57± ached stone. . _ --------_---- -� -�- tura o o a a o a o o a o o a a a a o ------- 55. ottaIII I UUhtTKtNUM Clean, washed, course masonry son IN -SITU SOIL of SandFilter DETAIL THIS (AST C or equal) with particles , less than m average diameter r 2 sry6" Sch-40 Perforated V 4 -1 "HDPE o-ub II al' c t - -Holed /S Perforations, on center aints s II v t i ht seals Hole Rotation at 4-6- .'clack n �l r 4' MIN DEPTH CORE TREINICH DETAIL NTS 0