Loading...
HomeMy WebLinkAboutSW3220301_Plansheet - Grading_Drainage Plan_20220420Dhe LIGHT POLE US H\NY, 74 1001 PUBLIC R\\N (PC. M, FILE 699) ------- ohe oh e R\\N 1802 ohe STATE PROJ. # 8.169 ohe ohe 'LIGHT ohe POLE 0 N86*25'23 159.36 L 0 b 769 IGHT ohe C3 ` EX CURB ------------- ohe R\W 0 WATER METER I/ Paz).;) g! C:) 0. -0 X % 0 ;00 4 0 0 LLJ U -a 0 c®- PIN: 09054017H L-Li co 0 PERMANENT DITCH (PD1) AVG SLOPE = 1.4% BYPASS ROUTING OF OFFITE AND ON -SITE NON -IMPERVIOUS FLOW PERMANENT DITCH (PD1 11 AVG SLOPE = 1.40%7 BYPASS ROUTING OF OFFITE AND — ON -SITE NON -IMPERVIOUS FLOW=� PIN: 09054040A CHILDREN OF TODAY CHILD #EVELOPMENT CENTER, INC. DB. 6747, PG. 31 PC. M, FILE 699 20'x 26(52OsO SAND FILTER WITH 6" PVC UNDER DRAIN SYSTEM TOP OF WASHED STONE EL - 557.80 TOP OF SAND EL-557.63 MIN. SAND AREA = 520 SF MIN. SAND DEPTH = 18" (1.5') PERMANENT DITCH (PD1) AVG SLOPE = 1.4% �PASS ROUTING OF OFFITE AND ON -SITE NON -IMPERVIOUS FLOW POLE 0 F- 0- V) < >< LAJ POWIF POLEi 7 )j 't 71 UJ s: 00 :It C14 C) C) I 0 RILLY AUTOMOTIVE STORES, 0 C-4 PERMANENT DITCH (PD2) INC. cc: !;� ff-) C/)UJ AVG SLOPE = 2.5% DB. 7303, PG. 474 BYPASS ROUTING OF OFFITE AND PC. P, FILE 326 Cn ON -SITE NON -IMPERVIOUS FLOW CL 3 C) d CO CL 4 0 0 71-11 0 0 0 OD _h 0_t,— / 5: -0 _0 a) 0 0 X -0 Ck. (0 7 LO lr� *f '0 p: J L4 a(A CA U X FWER 0 163 sf. (Deed Overlap) ANHGLE— — — 0 0 0 ► N83*36'55"E_1M.220— 777 __X EX FEN r� 1 0 uG� 4 0 2 0 U I /POLE 0 —561 _J 4% 562 0 I I /r4� 0:r Roof Pitch 7 y y y k), Prop. l0) 111lig!) �iOx5O) Bdg Z 0 PIN: 09054034A (0 LA -C CD JUNE MINCEY 0 DB. 4513, PG. 774 O 0 0 0 01 6 1 CIO -0 PIN: 09054035 FRANCES B. KNIGHT 0 DB. 3594, PG. 838 0 7' 01 'CZ 559 �0�00;00Z 7 X 01 00 RIPRAP 09 -1 MERGENCY SPILLWAY SEDIMENT CHAMBE (FOREBAY) 0 558--,,/ XWER MANHOLE PIN- 09054040 PC. FILE 699 CONCRETE OUTLET STRUCTURE (SEE DETAIL SHT 5) rz� PIN: 09054036 JACOB CLONTZ & KAYLEIGH RIVENS DB. 7701, PG. 23 3>K CIS RIPRAP APRON EWER MANHOLE PIN: 09054037 NORMA MATTHEWS WORD DB. 6143, PG. 31 BUILDING PAD / ROOF PITCH NOTES i !Proposed building slabs to be constructed on a 17. longitudinal slope in order to utilize Trachte building system. Roof pitch of exterior buildings to sloped inward toward interior of site in order to direct all impervious runoff toward the ,[proposed Skimmer Basin/SCM. NOTE: PROPERTY BOUNDARY AND ■FIELD TOPO DATA PROVIDED BY LAWRENCE ASSOCIATES, 106 W. JEFFERSON ST., MONROE, NC 28112, 70(-289-1013, www.lawrencesurveying.com us �X- JOY STATE PX_ - M41O02 699) SCM MAINTENANCE EASEMENT (SCALE 111=100') STREAM CLASSIFICATION Re eiving Stream Rays Fork •aim ST* River Ba i Yadkin Pee —Dee NOTE: NO JURISDICTIONAL FEATURES IDENTIFIED WITHIN PROPOSED PROJECT AREA AS 1ETERMINED BY FIELD STUDY PERFORMED BY LARRY THOMPSON, SOIL SCIENTIST, THOMPSON ENVIRONMENTAL CONSULTING, P.O. BOX 541, MIDLAND NC. STORMWATER NARRATIVE Mini —Storage USA is a proposed mini —warehouse project located off Hwy 74 in Wingate NC (Union County). The site is in the Yadkin Pee —Dee River Basin and drains to Rays Fork Creek. Th e site is in the To of Wingate Zoning District. Stormwater is regulated by NCDEQ. A an Filter SCM is proposed to provide the required water quality treatment and water quantity runoff controls as required by NCDEQ & Town of Wingate. It is anticipated that the mini —warehouse units will be constructed in 3 phases. The development is proposed as "high density". The SCM is designed to treat and control a built upon ar1.305) acres at ultimate built out. CONTROLLED AREA RUNOFF ANALYSIS Controlled Post Developed' Design Pre—Devel. _Tot'ai1__7T_'_ Peak I Discharge Runoff Peak Flow 11 Elevation 0.02 cf 4.53 cf:) 559.76 cfs 112.22 cfs 12.09 s I Ref, HydroCad Analysis SKIMMER BASIN CONVERSION & SCM CONSTRUCTION SEQUENCE 1 . Upon completion of Phase 3 site grading, construction, and stabilization of upstream disturbance notify NCDEQ Land Quality for review and approval prior to beginning conversion of the skimmer basin to Sand Filter SCM. 2Upon approval, floating skimmer to be modified to allow skimmer basin to fully drah Skimmer to be removed and outlet structure orifice to be protected with temporary slit fence prior to sediment removal. 3. Sediment to be removed from basin and properly disposed, 4, Subgrade of SCM to be constructed to grades, specifications, and details shown on I approved plans, 5. Sand chamber to be constructed in accordance with SAND FILTER AND UNDERDRAIN CONSTRUCTION (Sheet 5). 6. Upon completion of sand chamber construction, disturbed sediment chamber area to be stabilized with SOD per plan specifications. External embankment and other areas not draining to sediment chamber to be stabilized in accordance with seeding specifications, 7Temporary silt fence around sand filter chamber can be removed and r1prap berm installed once SOD has begun to root, 8, Follow Erosion Control Construction Sequence (Sht 6) for maintenance and removal of remaining site construction erosion control measures. ism LEGEND R/W = Right—of—way Utility Pole RCP ® Reinforced Concrete Pipe A ®° = Riprap Outlet Apron _816— = Existing Grade Contour _818— = Proposed Finished Contour PD* Permanent Diversion NUTINAMArmfil I M1, X4 THET ky, EAW MOL Storage USA, Inc. i4724 Old Monroe— Marsh ville Road 'Marshville, NC 28103 iContact: Danny Jordan ;'704-361-3619, Danny.DTPH@gmaii.com GRAPHIC SCALE 0 3069 IN FEET 1 inch = 3o f t. W61114) MORO 11211111112-11201111111 Z 101 VA0,11 a, VC9=01101 MB 11: Ma. eMb V111 1:11,111111111M AT &I, S1 ON\\\ NO fill 4 16101 Silver Road Oakbom, NC28129 980-621-0935 kovin@,koWnhol#ngqqgineefing.coii�, DATE- 12/15/2021 HORIZ. SCALE 1" 30-1 VERT. SCALE NIA DRArr WN BY. keh