Loading...
HomeMy WebLinkAboutSite Inspection 5.9.22 Cedar Creek ImprovementsWetland Inspection Report Inspection Type: Reason for Inspection: Inspection Date: Site Owner Name: Latitude: County: Project Name: Project Num: Location: SW Plan Location: 20210723 NCDOT - SR 2793 Cedar Creek Road Improvements Buncombe NCDOT - SR 2793 Cedar Creek Road Improvements NC DOT Division 13 5/9/2022 Routine Site Inspection (DOT) Version: 1 Status:Issued Project Type:Road maintenance/repair/improveme ntsRegion:Asheville Longitude:-82° 12' 01''+35° 32' 19'' Inspection Contact Person:Title:Phone: On-Site Representative(s): Secondary Inspector(s): Primary Inspector:Phone:Robert K Mitchell Facility Compliance Status:Compliant Not Compliant Question Areas: Program Areas:401 (includes isolated/non-404) Permit (401 WQC) Site inspection was conducted by Kevin Mitchell with the Asheville Regional Office on May 9, 2022. No one was present during the inspeciton. The following are recommendations: - Station - 11+25 RT - Add groundcover to silt deposition adjacent to silt fence. - Station - 12+00 - 15+00 LT - Add groundcover/mulch to slope. - Station - 23+00 LT - Need check in ditch above JS (proposed 18"HDPE). - Station - ~ 22+00 & 25+50 RT. Silt fence needs maintenance. Inspection Summary: page:1 Inspection Date: Site Number: Inspection Type: Owner: Reason for Visit: 20210723 5/9/2022 Bryan, Roger D Site Inspection (DOT)Routine Permit (401 WQC)Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment: page:2