Loading...
HomeMy WebLinkAboutSite Inspection 05.09.22 Br 79 on NC9Wetland Inspection Report Inspection Type: Reason for Inspection: Inspection Date: Site Owner Name: Latitude: County: Project Name: Project Num: Location: SW Plan Location: 20191425 NCDOT - Replace Bridge 79 on NC9 (BR-0009) Buncombe NCDOT - Replace Bridge 79 on NC9 (BR-0009) NC DOT Division 13 5/9/2022 Routine Site Inspection (DOT) Version: 1 Status:Issued Project Type:Replace bridge with bridge Region:Asheville Longitude:-82° 15' 03''+35° 31' 32'' Inspection Contact Person:Title:Phone: On-Site Representative(s): Secondary Inspector(s): Primary Inspector:Phone:Robert K Mitchell Facility Compliance Status:Compliant Not Compliant Question Areas: Program Areas:401 (includes isolated/non-404) Permit (401 WQC) Site inspection was conducted on May 9, 2022 by Kevin Mitchell with the Asheville Regional Office. Work is complete. Site is compliant with the 401 Water Quality Certification with additional conditions. Inspection Summary: page:1 Inspection Date: Site Number: Inspection Type: Owner: Reason for Visit: 20191425 5/9/2022 Bryan, Roger D Site Inspection (DOT)Routine Permit (401 WQC)Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment: page:2